noting that removal 10 rights are broader under Section 1442(a)(1) than under Section 1441 and courts are “to interpret 11 section 1442 broadly in favor of removal”
How later courts described this case
- noting that removal 10 rights are broader under Section 1442(a)(1) than under Section 1441 and courts are “to interpret 11 section 1442 broadly in favor of removal”
- holding that “the government contractor defense applies not only to 1 equipment is produced. Accordingly, a contractor who agrees to operate a production facility 2 pursuant to government specifications may qualify for the defense”
- finding the defense applicable to an action 4 involving the design and manufacture, as well as “testing and installation,” of a ladder on a 5 military submarine
- concluding removal of a failure-to-warn case to federal court was 26 proper under the government contractor defense
Written by the judges who cited it.
The opinion
1
2
3
4 UNITED STATES DISTRICT COURT
5 NORTHERN DISTRICT OF CALIFORNIA
6
7 WAYNE BUTTERFIELD, et al., Case No. 23-cv-01620-AMO
8 Plaintiffs,
ORDER DENYING MOTION TO
9 v. REMAND
10 GENERAL ELECTRIC COMPANY, et al., Re: Dkt. No. 52
Defendants.
11
12
13 Before the Court is Plaintiff’s motion to remand. The matter is fully briefed and suitable
14 for decision without oral argument. See Civil L.R. 7-6. Having read the parties’ papers and
15 carefully considered their arguments and the relevant legal authority, and good cause appearing,
16 the Court hereby DENIES the motion to remand for the following reasons.
17 I. BACKGROUND
18 This case concerns the wrongful death of Charlotte Butterfield (“Decedent”). On February
19 15, 2023, Plaintiffs Wayne Butterfield, Sr., Wayne Butterfield, Jr., and Charlotte Duncan
20 (Decedent’s husband and children, together “Plaintiffs”) filed a complaint against various
21 corporations seeking to hold them accountable for Decedent’s death on March 26, 2022, from
22 cancer caused by asbestos exposure brought home on her husband’s clothing. ECF 52-1
23 (“Compl.”) at 5-6.1 Defendant National Steel and Shipbuilding Company (“NASSCO”) filed its
24 Notice of Removal on April 4, 2023. ECF 1 (“NOR”). On May 3, 2023, Plaintiffs filed a motion
25 to remand the case to California Superior Court for lack of federal subject matter jurisdiction.
26 ECF 52 (“Motion”).
27
1 Plaintiffs allege only one cause of action against NASSCO, negligence for “take home”
2 exposure. Compl. ¶¶ 164-174.2 Mr. Butterfield was an employee of NASSCO from 1963 to 1998,
3 and during that time he worked with and around materials containing asbestos. Id. ¶¶ 167-68.
4 Toxic asbestos dust accumulated on his person and work clothing, which he brought home with
5 him, and which exposed his wife to asbestos. Id. Plaintiffs argue that NASSCO was negligent in
6 failing to prevent Mr. Butterfield from bringing home asbestos dust, which exposed members of
7 his household to these toxins. Id. ¶¶ 170-71.
8 Defendant NASSCO removed the case under the federal officer removal statute, Title 28
9 U.S.C. § 1442(a). NOR ¶ 5. NASSCO’s basis for removal is that it can state a colorable
10 “government contractor” defense against Plaintiffs’ claims. Id. NASSCO asserts that there are
11 additional grounds for removal, including derivative sovereign immunity under Yearsley, federal
12 question removal under the federal enclave doctrine in 28 U.S.C. § 1331, and the combatant
13 activities exception. Id. ¶¶ 29-31. Because the Court finds that the federal officer removal statute
14 applies to Plaintiffs’ claims, the Court does not reach the Defendant’s remaining arguments.
15 II. LEGAL STANDARD
16 In general, “any civil action brought in a State court of which the district courts of the
17 United States have original jurisdiction, may be removed by the defendant or the defendants, to
18 the district court . . . where such action is pending.” 28 U.S.C. § 1441(a). Under Title 28 U.S.C. §
19 1442(a)(1), the federal officer removal statute, a civil action filed in state court may be removed to
20 a federal district court if the action was filed against or directed to the “United States or any
21 agency thereof or any officer (or any person acting under that officer) of the United States or of
22 any agency thereof, in an official or individual capacity, for or relating to any act under color of
23 such office . . .” 28 U.S.C. § 1442(a)(1). Federal contractors may remove cases based on actions
24 performed under color of a federal office if they assert a colorable federal defense. Durham v.
25 Lockheed Martin Corp., 445 F.3d 1247, 1251 (9th Cir. 2006). To invoke the federal officer
26
27
2 As Plaintiffs facially attack subject matter jurisdiction, the Court “accept[s] the [defendant’s
1 removal statute, a defendant must show that the following elements are met: (1) “it is a ‘person’
2 within the meaning of the statute, (2) a causal nexus exists between [the] plaintiffs’ claims and the
3 actions [the defendant] took pursuant to a federal officer’s direction, and (3) it has a ‘colorable’
4 federal defense to [the] plaintiffs’ claims.” Leite v. Crane Co., 749 F.3d 1117, 1120 (9th Cir.
5 2014) (citing Durham, 445 F.3d at 1251).
6 Although typically the removal statute is construed against removal, the opposite is true
7 where defendants seek removal under the federal officer removal statute. See Leite, 749 F.3d at
8 1122 (“defendants enjoy much broader removal rights under the federal officer removal statute
9 than they do under the general removal statute”); Durham, 445 F.3d at 1252 (noting that removal
10 rights are broader under Section 1442(a)(1) than under Section 1441 and courts are “to interpret
11 section 1442 broadly in favor of removal”). Section 1442(a)(1) also authorizes removal without
12 the consent of any other party. Ely Valley Mines, Inc. v. Hartford Accident & Indem. Co., 644
13 F.2d 1310, 1315 (9th Cir. 1981) (“Since the federal officer is the only one entitled to remove
14 under [Section] 1442, he alone can remove without other defendants joining in the petition, and
15 the entire case is removed to the federal court.”).
16 “As under Rule 12(b)(1), a plaintiff’s motion to remand may raise either a facial attack or a
17 factual attack.” Leite, 749 F.3d at 1122. A “facial” attack accepts the truth of the defendant’s
18 allegations in the notice of removal but “asserts that [the allegations] are insufficient on their face
19 to invoke federal jurisdiction.” Id. at 1121 (citing Safe Air for Everyone v. Meyer, 373 F.3d 1035,
20 1039 (9th Cir. 2004)). A “factual” attack “contests the truth of the [defendant’s] factual
21 allegations, usually by introducing evidence outside the pleadings,” and requiring the defendant to
22 come forward with “competent proof” to support its allegations. Id. “The district court resolves a
23 facial attack as it would a motion to dismiss under Rule 12(b)(6): Accepting the [defendant’s
24 jurisdictional] allegations as true and drawing all reasonable inferences in the [removing
25 defendant’s] favor . . .” Id.; see Wilgenbusch v. Fryer-Knowles, Inc., No. 19-CV-05620-JST, 2019
26 WL 13201904, at *2 (N.D. Cal. Nov. 19, 2019).
27 III. DISCUSSION
1 to which Plaintiffs advance a facial challenge. To invoke the federal officer removal statute,
2 NASSCO must show it is a “person” within the meaning of Section 1442(a)(1), it has a colorable
3 federal defense to plaintiff’s claims, and there is a causal nexus between plaintiff’s claims and
4 defendant’s actions. Leite, 749 F.3d at 1120. The parties do not dispute that NASSCO qualifies
5 as a “person” within the meaning of Section 1442(a)(1). ECF 61 (“Response”) at 14; see
6 generally Motion at 13-14, 16-17. Indeed, “courts of appeals have uniformly held that
7 corporations are ‘person[s]’ under § 1442(a)(1).” Goncalves v. Rady Children’s Hosp. San Diego,
8 865 F.3d 1237, 1244 (9th Cir. 2017) (collecting cases). However, Plaintiffs contend that
9 NASSCO has not shown the other two elements of the federal officer removal statute, namely that
10 (A) NASSCO has a colorable federal defense and (B) there exists a causal nexus between actions
11 taken pursuant to a federal officer’s directions and Plaintiff’s claims. The Court examines these
12 contentions in turn.
13 A. Colorable Federal Defense
14 NASSCO asserts that it has a colorable “government contractor” defense under Boyle v.
15 United Technologies Corp., 487 U.S. 500, 504 (1988) and under Yearsley v. W.A. Ross Constr.
16 Co., 309 U.S. 18 (1940). ECF 1 ¶¶ 5, 9, 29-31. Plaintiffs argue that NASSCO cannot sufficiently
17 allege that it has a “colorable” defense. Plaintiffs contend that 1) NASSCO cannot invoke the
18 government contractor defense; 2) NASSCO’s declarations are inadmissible and do not address
19 the facts of this case; and 3) even if they are admissible, the declarations do not support a
20 colorable defense as to the “failure to decontaminate” negligence cause of action pled against
21 NASSCO. Motion at 11. The Court begins by addressing the availability of the government
22 contractor defense in this case before considering the admissibility and effect of the evidence.
23 1. Government Contractor Defense Under Boyle and Yearsley
24 a. Legal Sufficiency of Government Contractor Defense
25 Plaintiffs argue that NASSCO was negligent in failing to decontaminate the person or
26 clothing of its employee (Decedent’s husband), allowing him to return home to his family covered
27 in toxic asbestos dust. Motion at 9; Compl. ¶¶ 170-71. They argue that the government contractor
1 based failure to warn claim.” Motion at 11. A brief accounting of the caselaw is necessary to
2 understand the government contractor defense.
3 In 1940, the Supreme Court in Yearsley held that in certain circumstances where private
4 contractors’ actions are controlled by the Federal government, the contractors are protected by
5 derivative sovereign immunity. Specifically, a private contractor enjoys derivative sovereign
6 immunity when it performs acts pursuant to a valid authorization of Congress and does not exceed
7 the scope of that authority. Yearsley, 309 U.S. at 20-21.
8 Decades later in Boyle, the Supreme Court recognized the government contractor defense
9 and announced a three-factor test which precludes state law liability against a government
10 contractor when: (1) the United States approved “reasonably precise specifications” for the
11 defendant to follow; (2) the defendant “conformed to those specifications;” and (3) the defendant
12 warned the United States about the dangers that were known to the defendant but not to the United
13 States. Boyle, 487 U.S. at 512. The defense protects “government contractors from tort liability
14 that arises as a result of the contractor’s compliance with the specifications of a federal
15 government contract.” Cabalce v. Thomas E. Blanchard & Assocs., Inc., 797 F.3d 720, 731 (9th
16 Cir. 2015) (quoting Getz v. Boeing Co., 654 F.3d 852, 860 (9th Cir. 2011)). Boyle relied on
17 Yearsley to conclude that the federal interest in preventing liability “exists as much in procurement
18 as in performance contracts,” noting “no basis for a distinction” between the two types of
19 contracts. Boyle, 487 U.S. at 506. The Supreme Court later held that Yearsley is not limited to
20 claims “arising out of property damage caused by public works projects,” but rather “the
21 contractor’s performance in compliance with all federal directions.” Campbell-Ewald Co. v.
22 Gomez, 577 U.S. 153, 167 n.7 (2016).
23 Based on this authority and contrary to the Plaintiffs’ arguments here, courts have
24 repeatedly held that the government contractor defense is not limited to product liability cases.
25 See Leite, 749 F.3d at 1123-24 (concluding removal of a failure-to-warn case to federal court was
26 proper under the government contractor defense); In re Hanford Nuclear Rsrv. Litig., 534 F.3d
27 986, 1000 (9th Cir. 2008) (holding that “the government contractor defense applies not only to
1 equipment is produced. Accordingly, a contractor who agrees to operate a production facility
2 pursuant to government specifications may qualify for the defense”); Butler v. Ingalls
3 Shipbuilding, Inc., 89 F.3d 582, 585 (9th Cir. 1996) (finding the defense applicable to an action
4 involving the design and manufacture, as well as “testing and installation,” of a ladder on a
5 military submarine). In Laukat v. ABB, Inc., No. CV 19-09436-CJC(EX), 2019 WL 9088036, at
6 *4 (C.D. Cal. Dec. 13, 2019), National Steel invoked the government contractor defense where the
7 only claims against them were negligence claims for “negligently creating asbestos dust and
8 failing to protect from asbestos dust,” as plaintiffs had waived all product liability claims against
9 the defendant. The court found that “it would defy the principle of the [government contractor]
10 defense if a defendant-contractor was protected when it produced military equipment subject to
11 reasonably precise federal specifications, but not when the same contractor made repairs to the
12 same equipment subject to the same degree of federal oversight and specifications.” Id. at *5.
13 The court reasoned that plaintiffs failed to provide Ninth Circuit precedent providing for such a
14 “line-drawing exercise,” as the Ninth Circuit “found the government contractor defense applicable
15 to a contract for the design, manufacture, and installation of an accommodation ladder on a
16 military submarine.” Id. at *5 (emphasis in original) (citing Butler, 89 F.3d at 585); see also
17 Ollerton v. Nat’l Steel & Shipbuilding Co., No. CV-231267-MWFRAOX, 2023 WL 2947544, at
18 *1 (C.D. Cal. Apr. 14, 2023) (concluding that the defendant could raise the federal contractor
19 defense arising from defendant’s alleged negligence in performance of a service contract for
20 “fail[ing] to protect” plaintiff from asbestos dust or warning plaintiff of its dangers).
21 The Plaintiffs’ allegations regarding the transfer and harm of asbestos dust resemble the
22 allegations in the cases mentioned above. See Compl. ¶¶ 167-171. And similar to the various
23 theories of negligence described above, the negligent “take home” exposure to asbestos arose as a
24 result of Mr. Butterfield’s work for a government contractor. Plaintiffs here, as in Laukat, fail to
25 provide any authority in support of the “line drawing exercise” they seek to impose. Accordingly,
26 the Court rejects Plaintiffs’ position that the government contractor defense only applies to
27 products-based or failure to warn causes of action. If NASSCO meets the elements, it may avail
1 b. Admissibility of the Evidence in Support of Boyle Defense
2 In support of its NOR and opposition to the motion to remand, NASSCO filed four
3 substantive declarations as well as supportive exhibits to establish that it has a colorable federal
4 defense. It provides testimony from a former Lieutenant of the U.S. Naval Reserve and current
5 CEO of a firm specializing in research and analysis of U.S. Navy maintenance, repair, and
6 construction (Christopher P. Herfel), a former Program Manager at NASSCO (who formerly
7 served a Lieutenant Junior of the U.S. Navy) (Stephen B. Severs), and two former Rear Admirals
8 of the U.S. Navy (Admirals John B. Padgett III and Roger B. Horne, Jr.). ECF 61-1 (“Herfel
9 Dec.”); ECF 61-2 (“Severs Dec.”); ECF 61-4 (“Padgett Dec.”); ECF 1-1 (“Horne Declaration”) at
10 117; ECF 61-3 (“Bessette Dec.”). In addition, NASSCO submitted a 2004 affidavit from a now-
11 deceased former Rear Admiral of the U.S. Navy (Admiral Ben J. Lehmnan). ECF 1-1 (“Lehman
12 Dec.”) at 131.
13 Plaintiffs challenge the Horne declaration and the Lehman affidavit as inadmissible
14 because they “contain hearsay, speculation, lack foundation, and neither were signed in this case
15 and/or address the facts of this case.” Motion at 10-11. Plaintiffs fail to include any legal support
16 or analysis for any of these arguments. As Plaintiffs do not explain the basis for the hearsay,
17 speculation, or lack of foundation objections, the Court is “largely reduced to guessing at the
18 arguments underlying them.” Sandoval v. Cnty. of San Diego, 985 F.3d 657, 666 (9th Cir. 2021),
19 cert. denied sub nom. San Diego Cnty. v. Sandoval, 142 S. Ct. 711 (2021). The Court abstains
20 from such guesswork and OVERRULES the objections.
21 Moreover, Plaintiffs’ arguments about the utility of the evidence fail to address the nature
22 of the declarations. The declarations are offered as expert testimony, and though Horne and
23 Lehman do not purport to know the facts of the case, the declarations establish their qualifications
24 to opine on Navy specifications for Naval ships and the type of work at issue here. See ECF 1-1 at
25 117-129, 131-32. As NASSCO explains, the testimony from Horne, Padgett, Herfel, and Severs
26 collectively demonstrates that the Navy provided NASSCO with “precise and detailed
27 specifications governing every aspect of the planning and repair of naval vessels.” Response at
1 whom indicate that they are aware of the facts of this case and provide relevant information
2 regarding the ships and shipyards where Plaintiff Wayne Butterfield, Sr. worked. Herfel Decl. ¶¶
3 15-17; Severs Decl. ¶¶ 8-10; Padgett Decl. ¶¶ 6-9. The declarations submitted in support of the
4 government contractor defense are admissible.
5 c. Sufficiency of the Evidence in Support of Boyle Defense
6 To avail itself of the Boyle defense, NASSCO must show (1) the United States approved
7 “reasonably precise specifications” for NASSCO to follow; (2) NASSCO “conformed to those
8 specifications;” and (3) NASSCO warned the United States about the dangers regarding use of
9 equipment that were known to it but not to the United States. Boyle, 487 U.S. at 512. As detailed
10 below, the evidence NASSCO submits establishes that it has a colorable federal defense.
11 i. The United States Provided Reasonably Precise
12 Specifications
13 Under the first prong, NASSCO must show “a continuous exchange and back and forth
14 dialogue between the contractor and the government,” that amounts to “more than a cursory
15 rubber stamp.” Cabalce, 797 F.3d at 731 (citing Getz, 654 F.3d at 861). NASSCO has satisfied
16 this element.
17 Severs explains that private shipyards were “not given independent authority to deviate”
18 from U.S. Navy regulations and had “no authority to impose standards and regulations on the
19 performance of work other than expressly authorized by the Navy.” Severs Dec. ¶ 19. He
20 describes Navy ship repair operations at NASSCO as a “hand-in-glove relationship” between
21 NASSCO and the Navy and testifies that “[a]t all times, the ships were under the command and
22 control of the Navy.” Id. ¶ 22. Padgett similarly explains that the work performed on the U.S.
23 Navy vessels where Mr. Butterfield worked was done under the Navy’s “full control” and
24 “decision-making authority.” Padgett Dec. ¶¶ 17-19. Herfel adds that NASSCO employees and
25 subcontractors were required to remove insulation materials containing asbestos in accordance
26 with U.S. Navy rules, regulations, and standards. Herfel Dec. ¶¶ 75-76.
27 The evidence suggests that the Navy provided “reasonably precise specifications” to
1 handling protocols during the relevant times. For example, NASSCO was subject to NAVSHIPS
2 Notice 9390 (detailing safety and control procedures for installing and ripping out asbestos);
3 Chapter 9390 of the Naval Ship Systems Command Technical Manual (providing safety
4 precautions for handling asbestos containing thermal insulation); and Military Standard 769
5 (requiring restoration with asbestos free materials). Herfel Dec. ¶¶ 71-76.
6 Severs also details the strict standards promulgated by the U.S. Navy for removing and
7 disposing of asbestos materials. He points to NAVSEA Standard Item 009-10 and SUPSHIP
8 regulations, which “spelled-out [sic] exactly how contractors are to safely deal with asbestos-
9 containing materials . . . [and] are designed to protect all persons who might be exposed to toxins
10 aboard ships . . .” Severs Dec. ¶ 18. Severs explains that “NASSCO did not have any discretion
11 relative to the creation or implementation of the [asbestos] standards and the shipyard could not
12 deviate from the standards, even if they proved inadequate.” Id. ¶ 18. The regulations governing
13 the handling of asbestos also included “Naval Ships Technical Manual, Chapter 9390; Naval Ships
14 Technical Manual, Chapter 635; NAVSHIPS Instruction 5100.26; NAVMAT 5100.19;
15 NAVSHIPINST 6260; [amd] BUMED 6260.” Id. ¶ 22. As Severs testifies, “[t]he Navy specified
16 in precise detail the repair tasks that were to be performed and issued safety protocols for the
17 performance of shipboard activities, including the handling of toxic substances, such as asbestos.”
18 Id. He adds, “[t]here was no margin for unauthorized deviation from government specifications
19 and directives . . . for the handling of toxic substances aboard naval vessels . . .” Id.
20 Additionally, Padgett testifies that “[a]ll Navy vessel construction, assembly, overhaul,
21 repair, modernization, and maintenance work performed at NASSCO [and by NASSCO] was
22 conducted in accordance with Navy Military Specifications [] and under the direct supervision of
23 United States Navy Personnel.” Padgett Dec. ¶¶ 11-12. He explains that the Navy “directed all
24 aspects” of work associated with Navy vessels, that the Navy was “in full control of, and dictated
25 the type of work to be done and the equipment or materials to be removed,” and that the Navy
26 “retain[ed] ultimate decision-making authority.” Id. ¶¶ 16-17. Any deviation from Navy Military
27 Specifications “requires specific and express written approval from the Navy.” Id. ¶ 19.
1 the evidence shows that the Government prevented NASSCO from decontaminating employees or
2 directed them not to decontaminate. ECF 69 (“Reply”) at 2, 4. However, as the Ninth Circuit
3 explained in Leite, “[i]t’s enough under Getz that the Navy exercised its discretion by prescribing
4 certain [actions] and prohibiting others without its express approval.” 749 F.3d at 1123. And
5 contrary to Plaintiffs’ argument, NASSCO “need not prove that the Navy would have forbidden
6 it” to decontaminate employees. Id. Under Boyle, “government discretion, rather than dictation
7 [of whether a company can warn or the precise contents of a warning] is the standard.” Getz, 654
8 F.3d at 867 (holding that the Government’s exercise of discretion “necessarily ‘conflicts’ with the
9 Contractor’s ‘duty to warn under state law’” where the Army “considered, reviewed, and
10 determined which warnings to provide”). The evidence presented here shows that the Navy
11 “considered, reviewed, and determined” the protocols for employees operating with asbestos
12 materials on its ships. See id.
13 Thus, considering the uncontroverted evidence provided by NASSCO, the first element of
14 Boyle is satisfied. See, e.g., Leite, 749 F.3d at 1123 (finding the first Boyle prong met by evidence
15 showing the Navy was “directly involved in preparing” safety manuals for the handling of
16 asbestos and that contractors could not include warnings beyond those approved and required by
17 the Navy); Getz, 654 F.3d at 866 (the government contractor defense is not limited to “instances
18 where the government forbids additional warning or dictates the precise contents of a warning”).
19 ii. NASSCO’s Conformity with Specifications
20 Plaintiffs do not appear to challenge the second and third elements of Boyle, but regardless,
21 Defendant has met its burden. The second element requires conformity with the Government’s
22 specifications. That is, NASSCO must show that a federal officer had “direct and detailed
23 control” over it. Wilgenbusch, 2019 WL 13201904, at *3 (citing Fung v. Abex Corp., 816 F.
24 Supp. 569, 572 (N.D. Cal. 1992)). Such control may exist where “the government consistently
25 monitors a contractor’s performance; requires it to comply with specifications; [and] performs
26 tests to ensure compliance.” Id. (citation omitted). Continued acceptance of a military
27 contractor’s service is valid evidence that the contractor’s services conformed to the military
1 F.3d 852 (9th Cir. 2011).
2 As detailed by Padgett and Severs, the Navy guidelines controlled NASSCO’s handling of
3 asbestos. Padgett explains that all work was done “in conformance with military specifications,
4 and under Navy supervision, requirements, and oversight.” Padgett Dec. ¶ 59. Herfel testifies that
5 ships being repaired by NASSCO were “in strict compliance with the ship repair specifications.
6 Changes in the specifications could not be made without the specific approval of the U.S. Navy.”
7 Herfel Dec. ¶ 66. Severs also explains that NASSCO was “required to fully comply with all
8 contracts, plans and specifications the U.S. Navy set forth.” Severs Dec. ¶ 21. The U.S. Navy had
9 “detailed specifications . . . dictating asbestos handling protocols, which mandated compliance
10 with Navy guidelines for the handling of asbestos-containing materials encountered during repair
11 operations.” Id. ¶ 16(a). Severs further testifies that “a failure to comply with naval regulations
12 could result in the rejection of work performed” and that “[a]ny and all warnings related to the
13 performance of shipboard work were specified by the Navy and complied with by NASSCO.” Id.
14 ¶ 22. Any “discrepancies in the handling of hazardous waste by military contractors aboard
15 military vessels [would] be the subject of notification and corrective action measure.” Id. ¶ 21.
16 “Strict compliance with all work specifications, including those standards and regulations related
17 to the display of hazard information, was mandatory” and “[n]on-conforming work was not
18 accepted by the Navy.” Id. ¶ 22.
19 Compliance was further enforced by the “presence of U.S. Navy personnel,” including
20 representatives of SUPSHIP, a Navy Port Engineer, and ship officers, supervisors, and crew, who
21 would direct and supervise NASSCO’s repairs. Id. ¶ 16(b). The Navy “mandated compliance
22 with Navy guidelines for the handling of asbestos-containing materials.” Id. ¶ 16(a). Severs
23 explains that Navy engineers were “continuously engaged” and helped “ensure full satisfaction”
24 with the repair and modernization processes. Id. ¶ 16(c).
25 Plaintiffs appear to conflate the “causal nexus” requirement of the officer removal statute
26 with the elements of the Boyle defense. Plaintiffs argue that NASSCO failed to comply with
27 NAVSHIPS Instruction 5100.26, which directs NASSCO to take certain steps to decontaminate
1 B at 29). Although Plaintiffs frame their argument as going to the causal nexus element of the
2 officer removal statute, the Court understands Plaintiffs to challenge the second Boyle factor
3 because Defendants failed to conform to the U.S. Navy’s specifications. However, the Ninth
4 Circuit makes clear that “[a]t this stage, [NASSCO] doesn’t have to prove that its government
5 contractor defense is in fact meritorious.” Leite, 749 F.3d at 1124. That is, NASSCO “need not
6 win [its] case before [it] can have it removed.” Id. (citing Willingham v. Morgan, 395 U.S. 402,
7 407 (1969)). Moreover, testimony that NASSCO’s work would not have been accepted without
8 compliance with Navy specifications, that any deviations from Navy specifications would have
9 required written approval, and that the Navy oversaw operations on the ships satisfy the second
10 element at this stage. See id.
11 iii. Element 3 – NASSCO warned of any dangers known to it
12 but not U.S.
13 Finally, as to the third Boyle element, the declarations of Herfel and Horne indicate that the
14 Navy was aware of a connection between asbestos and cancer. Response at 25-26; Horne Dec. ¶
15 16; Herfel Dec. ¶¶ 78-80; Severs Dec. ¶ 4. There is no indication at this point that NASSCO knew
16 more than the federal government about the risks of using asbestos. See Leite, 749 F.3d at 1124
17 (finding that evidence that “the Navy at all times knew at least as much about asbestos hazards as
18 the equipment manufacturers” was sufficient to satisfy the third Boyle element). Therefore, there
19 is no indication that NASSCO knew of any dangers not known to the United States, and the third
20 element of the Boyle defense is satisfied.
21 Overall, NASSCO presents sufficient evidence to show a colorable government contractor
22 defense at this stage. The Court turns next to whether a causal nexus exists between actions
23 pursuant to a federal officer’s directions and Plaintiffs’ claims.
24 B. Causal Nexus
25 “To show that it was acting under the direction of a federal officer, Defendant [ ] must
26 show that a federal officer had ‘direct and detailed control’ over it.” Ballenger v. Agco Corp.,
27 2007 WL 1813821, at *3 (N.D. Cal. June 22, 2007) (citations omitted). The same evidence
1 claim that there is a causal connection. See Leite, 749 F.3d at 1124 (“Based on the same evidence,
2 [defendant] has also proved by a preponderance of the evidence that a causal nexus exists between
3 || plaintiffs’ claims and the actions [defendant] took at the direction of a federal officer”). As in
4 || Leite, the “very act that forms the basis of plaintiffs’ claims,” NASSCO’s failure to decontaminate
5 its employees from asbestos hazards, “is an act that [NASSCO] contends it performed under the
6 || direction of the Navy.” Id. NASSCO contends that it “did not have any discretion” regarding
7 asbestos standards, and the shipyard “could not deviate from [Navy] standards, even if they proved
8 || inadequate.” Severs Dec. J 18.
9 Ultimately, NASSCO may fail in its attempt to utilize the government contractor defense —
10 || indeed, the Navy may not have had anything to do with NASSCO’s failure to decontaminate its
11 employees. But whether NASSCO’s actions were “outside the scope” of its official duties is a
12 question for federal courts to determine. See Leite, 749 F.3d at 1124.
g 13 || IV. CONCLUSION
14 For the foregoing reasons, Defendant has satisfied its burden of establishing subject matter
15 || jurisdiction under the federal officer removal statute. Accordingly, the Court DENIES Plaintiffs’
16 || motion to remand this case.
Z 18 IT IS SO ORDERED.
19 Dated: December 15, 2023