# 49 CFR § 193.2019: Mobile and temporary LNG facilities

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2019

## Section

- **Citation:** 49 CFR § 193.2019
- **Heading:** Mobile and temporary LNG facilities
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** September 22, 2026
- **Source:** Publisher's official text
- **Location:** Title 49—Transportation > Subtitle B—Other Regulations Relating to Transportation > CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION > SUBCHAPTER D—PIPELINE SAFETY > PART 193—LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS > Subpart A—General

## Text

(a) Mobile and temporary LNG facilities for peakshaving application, for service maintenance during gas pipeline systems repair/alteration, or for other short term applications need not meet the requirements of this part if the facilities are in compliance with applicable sections of NFPA-59A-2001 (incorporated by reference, see § 193.2013).
(b) The State agency having jurisdiction over pipeline safety in the State in which the portable LNG equipment is to be located must be provided with a location description for the installation at least 2 weeks in advance, including to the extent practical, the details of siting, leakage containment or control, fire fighting equipment, and methods employed to restrict public access, except that in the case of emergency where such notice is not possible, as much advance notice as possible must be provided.
[Amdt. 193-14, 62 FR 41311, Aug. 1, 1997, as amended by Amdt. 193-18, 69 FR 11336, Mar. 10, 2004; Amdt. 193-25, 80 FR 182, Jan. 5, 2015]

## Nearby sections

- [49 CFR § 193.2001 § 193.2001 Scope of part.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2001.md)
- [49 CFR § 193.2005 § 193.2005 Applicability.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2005.md)
- [49 CFR § 193.2007 § 193.2007 Definitions.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2007.md)
- [49 CFR § 193.2009 § 193.2009 Rules of regulatory construction.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2009.md)
- [49 CFR § 193.2011 § 193.2011 Reporting.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2011.md)
- [49 CFR § 193.2013 § 193.2013 What documents are incorporated by reference partly or wholly in this part?](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2013.md)
- [49 CFR § 193.2017 § 193.2017 Plans and procedures.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2017.md)
- [49 CFR § 193.2019 § 193.2019 Mobile and temporary LNG facilities.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2019.md)
- [49 CFR § 193.2051 § 193.2051 Scope.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2051.md)
- [49 CFR § 193.2057 § 193.2057 Thermal radiation protection.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2057.md)
- [49 CFR § 193.2059 § 193.2059 Flammable vapor-gas dispersion protection.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2059.md)
- [49 CFR § 193.2067 § 193.2067 Wind forces.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2067.md)
- [49 CFR § 193.2101 § 193.2101 Scope.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2101.md)
- [49 CFR § 193.2301 § 193.2301 Scope.](https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2301.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/ecfr-49-193.2019. Check the current official text before relying on it. Not legal advice.
