# 30 CFR § 250.301: Inspection of facilities

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/ecfr-30-250.301

## Section

- **Citation:** 30 CFR § 250.301
- **Heading:** Inspection of facilities
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** September 22, 2026
- **Source:** Publisher's official text
- **Location:** Title 30—Mineral Resources > CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR > SUBCHAPTER B—OFFSHORE > PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF > Subpart C—Pollution Prevention and Control

## Text

Drilling and production facilities shall be inspected daily or at intervals approved or prescribed by the District Manager to determine if pollution is occurring. Necessary maintenance or repairs shall be made immediately. Records of such inspections and repairs shall be maintained at the facility or at a nearby manned facility for 2 years.

## Nearby sections

- [30 CFR § 250.300 § 250.300 Pollution prevention.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.300.md)
- [30 CFR § 250.301 § 250.301 Inspection of facilities.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.301.md)
- [30 CFR § 250.500 § 250.500 General requirements.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.500.md)
- [30 CFR § 250.501 § 250.501 Definition.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.501.md)
- [30 CFR § 250.503 § 250.503 Emergency shutdown system.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.503.md)
- [30 CFR § 250.504 § 250.504 Hydrogen sulfide.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.504.md)
- [30 CFR § 250.505 § 250.505 Subsea completions.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.505.md)
- [30 CFR § 250.509 § 250.509 Well-completion structures on fixed platforms.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.509.md)
- [30 CFR § 250.510 § 250.510 Diesel engine air intakes.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.510.md)
- [30 CFR § 250.511 § 250.511 Traveling-block safety device.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.511.md)
- [30 CFR § 250.512 § 250.512 Field well-completion rules.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.512.md)
- [30 CFR § 250.513 § 250.513 Approval and reporting of well-completion operations.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.513.md)
- [30 CFR § 250.514 § 250.514 Well-control fluids, equipment, and operations.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.514.md)
- [30 CFR § 250.518 § 250.518 Tubing and wellhead equipment.](https://www.frixlaw.com/law-library/statutes/ecfr-30-250.518.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/ecfr-30-250.301. Check the current official text before relying on it. Not legal advice.
