# RCW 19.405.080: RCW 19.405.080: Report to legislature

> Washington · Statutes · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S080

## Section

- **Citation:** RCW 19.405.080
- **Heading:** RCW 19.405.080: Report to legislature
- **Jurisdiction:** Washington
- **Kind:** Statutes
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Washington Code / Title 19 / Chapter 405 / Section 080

## Text

By January 1, 2024, and at least every four years thereafter and in compliance with RCW 43.01.036 , the department must submit a report to the legislature. The report must include the following: (1) A review of the standards described in RCW 19.405.030 through 19.405.050 focused on technologies, forecasts, and existing transmission, and an evaluation of safety, environmental and public safety protection, affordability, and system reliability. (2)(a) An evaluation, produced in consultation with the commission, electric utilities, transmission operators in Washington, the reliability coordinator for electric utilities, any regional planning organization serving electric utilities, public interest and environmental organizations, and the regional entity for the western interconnection identifying the potential benefits, impacts, and risks on system reliability associated with achieving the standards described in RCW 19.405.040 and 19.405.050 . The evaluation must assess whether electric utilities have sufficient electric generation resources to meet forecasted retail electric load in addition to adequate transmission capability to implement RCW 19.405.030 through 19.405.050 without: (i) Violating mandatory and enforceable reliability standards of the North American electric reliability corporation; (ii) violating prudent utility practice for assuring resource adequacy; or (iii) compromising the power quality or integrity of the electricity system. Subject to funding appropriated for this purpose, the department must consult with a national laboratory with expertise in grid reliability, security, and resilience. (b) The evaluation should assess the anticipated financial costs and benefits of investments necessary to correct those deficiencies at the lowest reasonable costs as identified by electric utilities, transmission operators in Washington, the regional entity for the western interconnection, or any regional planning organization serving electric utilities. The assessment of these investments in the report is not deemed to be approval of such investments for rate recovery by any authorizing entity. (3) An evaluation identifying the nature of any anticipated financial costs and benefits to electric utilities, including customer rate impacts and benefits including, but not limited to: (a) Greenhouse gas emissions of electric utilities; (b) The allocation of risk between customers and electric utilities; (c) The allocation of financial costs among electric utilities in the state and whether retail electric customers are equitably bearing the financial costs of implementing RCW 19.405.030 through 19.405.050 ; (d) The timing of cost recovery for electricity generated by nonemitting electric generation or renewable resources; (e) The resource procurement process of electric utilities; and (f) The barriers to, and benefits of, implementing RCW 19.405.040 and 19.405.050 . (4) An evaluation of new or emerging technologies that could be considered to be a renewable resource. (5) An assessment of the impacts of RCW 19.405.030 through 19.405.050 on middle-income families, small businesses, and manufacturers in Washington.

## Nearby sections

- [RCW 19.405.010 RCW 19.405.010: Findings—Intent—2019 c 288.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S010.md)
- [RCW 19.405.020 RCW 19.405.020: Definitions.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S020.md)
- [RCW 19.405.030 RCW 19.405.030: Coal-fired resources—Depreciation schedule—Penalties.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S030.md)
- [RCW 19.405.040 RCW 19.405.040: Greenhouse gas neutrality—Responsibilities for electric utilities—Energy transformation project criteria—Penalties.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S040.md)
- [RCW 19.405.050 RCW 19.405.050: Clean energy implementation—Hydroelectric facilities—Special contracts.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S050.md)
- [RCW 19.405.060 RCW 19.405.060: Clean energy implementation plan—Compliance criteria—Incremental cost of compliance.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S060.md)
- [RCW 19.405.080 RCW 19.405.080: Report to legislature.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S080.md)
- [RCW 19.405.090 RCW 19.405.090: Compliance, enforcement, and penalties—Alternatives.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S090.md)
- [RCW 19.405.100 RCW 19.405.100: Rule making.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S100.md)
- [RCW 19.405.110 RCW 19.405.110: Relationship to the energy independence act.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S110.md)
- [RCW 19.405.120 RCW 19.405.120: Energy assistance for low-income households.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S120.md)
- [RCW 19.405.130 RCW 19.405.130: Stakeholder work group.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S130.md)
- [RCW 19.405.140 RCW 19.405.140: Department of health—Cumulative impact analysis.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S140.md)
- [RCW 19.405.160 RCW 19.405.160: Declaratory order.](https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S160.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_WA_T19_C405_S080. Check the current official text before relying on it. Not legal advice.