## Section

- **Citation:** 16 Tex. Admin. Code § 8.208
- **Heading:** 16 TAC § 8.208. Mandatory Removal and Replacement Program
- **Jurisdiction:** Texas
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Texas Administrative Code / Title 16 ECONOMIC REGULATION / Part 1 RAILROAD COMMISSION OF TEXAS / Chapter 8 PIPELINE SAFETY REGULATIONS / 16 TAC § 8.208

## Text

(a) Effective September 1, 2008, this section applies to each operator of a gas distribution system that is subject to the requirements of
49 CFR Part 192
.
(b) For leaks identified on any underground compression coupling used to mechanically join steel pipe, each operator shall either replace the leaking compression coupling or repair it using a sleeve welded over the compression coupling.
(c) Each operator shall repair or replace any compression coupling used to mechanically join steel pipe that is exposed during operation and maintenance activities unless the operator can determine the coupling was installed after 1980.
(d) For leaks identified on any underground compression coupling used to mechanically join plastic pipe, each operator shall remove and/or replace the leaking compression coupling.
(e) For any other compression coupling used to join plastic pipe that is exposed during operation and maintenance activities, each operator shall:
(1) For plastic pipe two inches or less in diameter, replace or remove such coupling unless the operator can determine that the coupling is designated as an ASTM (American Society for Testing and Materials) D2513 Category 1 type fitting.
(2) For plastic pipe greater than two inches in diameter, replace or remove such coupling unless the operator can determine that the coupling is designated as an ASTM D2513 Category 1 or Category 3 type fitting.
(f) Each operator shall remove and replace all compression couplings at currently known service riser installations, identifiable by a meter number or a street address, if they are not manufactured and installed in accordance with ASTM D2513 for Category 1 fittings.
(g) Each operator shall complete the removal and replacement of such compression couplings by November 30, 2009.
(h) Any coupling installed on plastic pipe after September 1, 2008, shall be designed to meet the requirements of ASTM D2513 Category 1.
(i) Any coupling installed on steel pipe after September 1, 2008, shall be designed to meet the requirements of
49 CFR Part 192
, §192.273.
(j) Beginning January 15, 2025, and annually thereafter until all compression couplings on the operator's system subject to subsection (f) of this section have been removed and replaced, each operator shall maintain a progress report showing the number of service riser installations checked, the condition of the coupling, and the total number of compression couplings replaced for the prior calendar year. Each operator shall retain this progress report and shall provide a copy of the report to the Commission upon request.

## Nearby sections

- [16 Tex. Admin. Code § 8.201 16 TAC § 8.201. Pipeline Safety and Regulatory Program Fees](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_201.md)
- [16 Tex. Admin. Code § 8.203 16 TAC § 8.203. Supplemental Regulations](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_203.md)
- [16 Tex. Admin. Code § 8.205 16 TAC § 8.205. Written Procedure for Handling Gas Leak Complaints](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_205.md)
- [16 Tex. Admin. Code § 8.206 16 TAC § 8.206. Risk-Based Leak Survey Program](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_206.md)
- [16 Tex. Admin. Code § 8.207 16 TAC § 8.207. Leak Grading and Repair](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_207.md)
- [16 Tex. Admin. Code § 8.208 16 TAC § 8.208. Mandatory Removal and Replacement Program](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_208.md)
- [16 Tex. Admin. Code § 8.209 16 TAC § 8.209. Distribution Facilities Replacements](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_209.md)
- [16 Tex. Admin. Code § 8.210 16 TAC § 8.210. Reports](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_210.md)
- [16 Tex. Admin. Code § 8.215 16 TAC § 8.215. Odorization of Gas](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_215.md)
- [16 Tex. Admin. Code § 8.220 16 TAC § 8.220. Master Metered Systems](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_220.md)
- [16 Tex. Admin. Code § 8.225 16 TAC § 8.225. Plastic Pipe Requirements](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_225.md)
- [16 Tex. Admin. Code § 8.230 16 TAC § 8.230. School Piping Testing](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_230.md)
- [16 Tex. Admin. Code § 8.235 16 TAC § 8.235. Natural Gas Pipelines Public Education and Liaison](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_235.md)
- [16 Tex. Admin. Code § 8.240 16 TAC § 8.240. Discontinuance of Service](https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_240.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_TX_TAC_T16_P1_C8_S8_208. Check the current official text before relying on it. Not legal advice.