# KRS § 278.017: 278.017 Establishing boundaries of certified areas

> Kentucky · Statutes · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.017

## Section

- **Citation:** KRS § 278.017
- **Heading:** 278.017 Establishing boundaries of certified areas
- **Jurisdiction:** Kentucky
- **Kind:** Statutes
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** KY Code / Title XXIV / Chapter 278 / Section 278.017

## Text

278.017 Establishing boundaries of certified areas.

(1) Except as otherwise provided in this section, the boundaries of the certified territory

of each retail electric supplier are hereby set as a line or lines substantially

equidistant between its existing distribution lines and the nearest existing

distribution lines of any other retail electric supplier in every direction, with the

result that there is hereby certified to each retail electric supplier such area which in

its entirety is located substantially in closer proximity to one of its existing

distribution lines than to the nearest existing distribution line of any other retail

electric supplier.

(2) On or before one hundred twenty (120) days after June 16, 1972, or, when requested

in writing by a retail electric supplier and for good cause shown, such further time

as the commission may fix by order, each retail electric supplier shall file with the

commission a map or maps showing all of its existing distribution lines. The

commission shall prepare or cause to be prepared within one hundred twenty (120)

days thereafter a map or maps of uniform scale to show, accurately and clearly, the

boundaries of the certified territory of each retail electric supplier as established

under subsection (1) of this section, and shall issue such map or maps of certified

territory to each retail electric supplier. Any retail electric supplier who feels itself

aggrieved by reason of a certification of territory pursuant to this section may

protest the certification of territory within a one hundred twenty day period after

issuance of the map of certified territory by the commission; and the commission

shall have the power, after hearing, to revise or vacate such certified territories or

portions thereof.

(3) In such hearing, the commission shall be guided by the following conditions as they

existed on June 16, 1972:

(a) The proximity of existing distribution lines to such certified territory.

(b) Which supplier was first furnishing retail electric service, and the age of

existing facilities in the area.

(c) The adequacy and dependability of existing distribution lines to provide

dependable, high quality retail electric service at reasonable costs.

(d) The elimination and prevention of duplication of electric lines and facilities

supplying such territory. In its determination of such protest, the commission

hearing shall be de novo; and neither supplier shall bear the burden of proof.

(4) In each area, where the commission shall determine that the existing distribution

lines of two or more retail electric suppliers are so intertwined or located that

subsection (1) of this section cannot reasonably be applied, the commission shall,

after hearing, certify the service territory or territories for the retail electric suppliers

under the provisions of subsection (3) of this section.

## Nearby sections

- [KRS § 278.010 278.010 Definitions for KRS 278.010 to 278.450, 278.541 to 278.544, 278.546 to 278.5462, and 278.990](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.010.md)
- [KRS § 278.012 278.012 Water association subject to Public Service Commission -- Exceptions](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.012.md)
- [KRS § 278.015 278.015 Water district; combined water, gas, or sewer district; or water commission a public utility subject to Public Service Commission -- Exceptions](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.015.md)
- [KRS § 278.016 278.016 Commonwealth to be divided into geographical service areas](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.016.md)
- [KRS § 278.017 278.017 Establishing boundaries of certified areas](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.017.md)
- [KRS § 278.018 278.018 Right to serve certified territory](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.018.md)
- [KRS § 278.019 278.019 Deadlines for commission to issue final orders -- Failure to meet deadline deemed approval](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.019.md)
- [KRS § 278.020 278.020 Certificate of convenience and necessity required for construction provision of utility service or of utility -- Exceptions -- Approval required for acquisition or transfer of ownership -- Public hearing on proposed transmission line -- Limitations upon approval of application to transfer control of utility or to abandon or cease provision of services -- Hearing -- Severability of provisions](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.020.md)
- [KRS § 278.021 278.021 Receivership for abandoned utility -- Criteria for finding of abandonment -- Consolidation of actions -- Powers and duties of receiver -- Temporary receivership -- Commission's discretion to approve or decline to approve applications](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.021.md)
- [KRS § 278.022 278.022 Utility to notify commission upon receipt of notice of discontinuance or termination from supplier](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.022.md)
- [KRS § 278.023 278.023 Approval of federally-funded construction projects -- Commission review of agreement and supporting documents -- Surcharge](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.023.md)
- [KRS § 278.027 278.027 Application for certificate -- Publishing notice of hearing](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.027.md)
- [KRS § 278.030 278.030 Rates, classifications and service of utilities to be just and reasonable -- Service to be adequate -- Utilities prohibited from energizing power to electrical service where seal is not present](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.030.md)
- [KRS § 278.035 278.035 Prohibition against preferential retail rates for utility services for certain publicly-funded entities -- Exception](https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.035.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_KY_TXXIV_C278_S278.017. Check the current official text before relying on it. Not legal advice.
