# 805 KAR 1:020: 805 KAR 1:020. Protection of fresh water zones

> Kentucky · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R020

## Section

- **Citation:** 805 KAR 1:020
- **Heading:** 805 KAR 1:020. Protection of fresh water zones
- **Jurisdiction:** Kentucky
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Kentucky Administrative Regulations / Title 805 (Energy and Environment Cabinet) / Chapter 001 / 805 KAR 1:020

## Text

Section 1. Protection of Fresh Water Zones for Drilling and Plugging Operations. (1) During drilling operations, one (1) of the methods established in paragraphs (a) through (c) of this subsection shall be used to protect fresh water zones. (a) Method A. Casing shall be set on a casing shoulder and the casing shall have a shoe installed on the bottom of the bottom joint. Upon the completion of the drilling program, all the recoverable casing shall be removed or cemented to the surface. (b) Method B. Casing shall be set on a shoulder and cemented sufficiently to cover at least 100 feet including the shoe. Upon completion of the drilling, all of the recoverable casing shall be removed or cemented to the surface. (c) Method C. Method C shall be a top to bottom drilling mud system with a filtrate water loss of less than ten (10) cubic centimeters, as established in Recommended Practice for Field Testing Water-based Drilling Fluids API RP 13B-1 Fourth Edition, March, 2009. Certification of filtrate water loss shall be made by the operator. (2) In the event a well is to be plugged, then it shall be plugged as established in 805 KAR 1:060. Section 2. Protection of Fresh Water Zones. Any well drilled in the Commonwealth of Kentucky subject to the jurisdiction of the Division of Oil and Gas shall be equipped with fresh water protection as established in this section prior to production or injection. (1) A protective string of casing, be it surface, intermediate, or long string, shall extend at least thirty (30) feet below the deepest known fresh water zone. (a) The protective string shall have cement circulated in the annular space outside said casing of a sufficient volume of cement, to assure the return of the cement to the surface. (b) If the cement does not return to the surface, every reasonable attempt shall be made to fill the annular spaces by introducing cement from the surface
least thirty (30) feet below the deepest known fresh water zone. (a) The protective string shall have cement circulated in the annular space outside said casing of a sufficient volume of cement, to assure the return of the cement to the surface. (b) If the cement does not return to the surface, every reasonable attempt shall be made to fill the annular spaces by introducing cement from the surface. (c) If the intermediate casing or long casing string is cemented to the surface or cemented thirty (30) feet into the next larger string of cemented casing, the string or combination of strings shall be considered as the fresh water protection. (2) In areas where abnormal pressures are expected or encountered: (a) The surface and intermediate casing string shall be anchored in sufficient cement and at a sufficient depth to contain the pressures; and (b) Blowout prevention valves and related equipment shall be installed. (3) If a well is drilled through a void: (a) 1. The hole shall be drilled at least thirty (30) feet below the void; and 2. The annular space shall be cemented from the base of the casing up to the void and to the surface from the top of the void, or it shall be cemented at least fifty (50) feet into the next higher string or strings of casing that are cemented to the surface and be verified by a cement top log. (b) If an operator is unable to perform the casing and cementing requirement established in paragraph (a) of this subsection, the department may approve alternative casing procedures proposed by the operator. Section 3. Material Incorporated by Reference. (1) "Recommended Practice for Field Testing Water-based Drilling Fluids" API RP 13B-1 Fourth Edition, March, 2009, is incorporated by reference. (2) This material may be inspected, copied, or obtained, subject to applicable copyright law, at the Kentucky Department for Natural Resources, Division of Oil and Gas, 300 Sower Boulevard, Frankfort, Kentucky 40601, Monday through Friday, 8 a.m. to 4:30 p.m., Eastern Prevailing Time.

## Nearby sections

- [805 KAR 1:001 805 KAR 1:001. Definitions for 805 KAR Chapter 1](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R001.md)
- [805 KAR 1:010 805 KAR 1:010. General information associated with oil and gas permits](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R010.md)
- [805 KAR 1:020 805 KAR 1:020. Protection of fresh water zones](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R020.md)
- [805 KAR 1:030 805 KAR 1:030. Well location and as-drilled location plat, preparation, form and contents](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R030.md)
- [805 KAR 1:040 805 KAR 1:040. Vacuums; use of](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R040.md)
- [805 KAR 1:050 805 KAR 1:050. Bonds; requirements, cancellation](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R050.md)
- [805 KAR 1:060 805 KAR 1:060. Plugging wells](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R060.md)
- [805 KAR 1:080 805 KAR 1:080. Gas storage reservoirs; drilling, plugging in vicinity](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R080.md)
- [805 KAR 1:100 805 KAR 1:100. Commission's rules of procedure, spacing of deep well drilling, wildcat wells, and pooling of interests](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R100.md)
- [805 KAR 1:110 805 KAR 1:110. Underground injection control](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R110.md)
- [805 KAR 1:120 805 KAR 1:120. Operating or deepening existing wells and drilling deeper than the permitted depth](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R120.md)
- [805 KAR 1:130 805 KAR 1:130. Casing, cementing, plugging, gas detection, and blow-out prevention in oil and gas wells](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R130.md)
- [805 KAR 1:140 805 KAR 1:140. Directional and horizontal wells](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R140.md)
- [805 KAR 1:160 805 KAR 1:160. Posting of an identification sign and a danger sign on a crude oil tank battery site](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R160.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T805_C001_R020. Check the current official text before relying on it. Not legal advice.