# 401 KAR 45:080: 401 KAR 45:080. Financial requirements and bonds for special waste facilities

> Kentucky · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R080

## Section

- **Citation:** 401 KAR 45:080
- **Heading:** 401 KAR 45:080. Financial requirements and bonds for special waste facilities
- **Jurisdiction:** Kentucky
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Kentucky Administrative Regulations / Title 401 (Energy and Environment Cabinet - Department for Environmental Protection) / Chapter 045 / 401 KAR 45:080

## Text

Section 1. Applicability. The financial assurance criteria and bond requirements shall apply to the owner or operator of special waste landfills; Type A landfarming and composting sites or facilities; research, development, and demonstration sites or facilities; and other sites or facilities if required by the cabinet as part of a remedy or requirement included in a resolution of permit violations. Section 2. Closure Cost Estimate. The owner or operator shall have a detailed, current written estimate, in dollars, of the cost of hiring a third party to close the special waste disposal site or facility in accordance with the closure plan developed to satisfy the closure requirements in 401 KAR 45:100, Section 4, and 401 KAR 45:110, Section 5. (1) The estimate shall equal the cost of closing the special waste disposal site or facility at the point in the active life when the extent and manner of its operation would make closure the most expensive. The cabinet may adjust the figure for inflation and other factors. The owner or operator shall base the cost estimate on the following elements that are applicable depending on the type of site or facility: (a) Design; (b) Site grading and drainage; (c) Hauling and placing of each element of the approved cap; (d) Final grading and drainage of the cap; (e) Revegetation of the cap; and (f) Quality control and construction certification. (2) The owner or operator shall increase the closure cost estimate and the amount of financial assurance established under Section 5 of this administrative regulation if changes to the closure plan or special waste disposal site or facility conditions increase the maximum cost of closure at any time during the active life
getation of the cap; and (f) Quality control and construction certification. (2) The owner or operator shall increase the closure cost estimate and the amount of financial assurance established under Section 5 of this administrative regulation if changes to the closure plan or special waste disposal site or facility conditions increase the maximum cost of closure at any time during the active life. (3) The owner or operator may request a reduction in the closure cost estimate and the amount of financial assurance established under Section 5 of this administrative regulation if the owner or operator can demonstrate that the cost estimate exceeds the maximum cost of closure at any time over the life of the special waste disposal site or facility. (4) The owner or operator shall keep a copy of the latest closure cost estimate at the special waste disposal site or facility until the owner or operator has been notified by the cabinet that the owner or operator has been released from closure financial assurance requirements under Section 5 of this administrative regulation. Section 3. Postclosure Cost Estimate. (1) Â (a) The owner or operator shall have a current, detailed written estimate, in dollars, of the cost of hiring a third party to conduct each phase of postclosure monitoring and maintenance of the special waste site or facility in accordance with the postclosure plan developed to satisfy the postclosure requirements of 401 KAR 45:100, Section4, and 401 KAR 45:110, Section 5. (b) The postclosure cost estimate for each phase of postclosure used to demonstrate financial assurance in Section 6 of this administrative regulation shall be calculated by multiplying the annual cost estimate for each phase of postclosure by the number of years of postclosure care required. (2) The cost estimate for each phase of postclosure shall be based on the most expensive costs of postclosure during that phase
ost estimate for each phase of postclosure used to demonstrate financial assurance in Section 6 of this administrative regulation shall be calculated by multiplying the annual cost estimate for each phase of postclosure by the number of years of postclosure care required. (2) The cost estimate for each phase of postclosure shall be based on the most expensive costs of postclosure during that phase. (3) The owner or operator shall increase the amount of the postclosure cost estimate and the amount of financial assurance established under Section 6 of this administrative regulation if changes in the postclosure plan or facility conditions increase the maximum costs of postclosure. (4) The owner or operator may request a reduction in the postclosure cost estimate and the amount of financial assurance established under Section 6 of this administrative regulation if the owner or operator can demonstrate to the satisfaction of the cabinet that the cost estimate exceeds the maximum costs of postclosure remaining over the postclosure period. (5) The owner or operator shall keep a copy of the latest postclosure cost estimate at the site or facility until notified by the cabinet that the owner or operator has been released from postclosure financial assurance requirements for the entire facility under Section 6 of this administrative regulation. Section 4. Financial Mechanisms. The owner or operator shall use one (1) of the financial mechanisms established in Section 7 or 10 of this administrative regulation, which satisfies the criteria in subsections (1) through (3) of this section. The financial assurance mechanism shall: (1) Ensure that the amount of funds shall be sufficient to cover the costs of closure and postclosure care; (2) Ensure that funds shall be available in a timely fashion; and (3) Guarantee the availability of the required amount of coverage prior to the initial receipt of special waste. Section 5. Closure Financial Assurance
(1) through (3) of this section. The financial assurance mechanism shall: (1) Ensure that the amount of funds shall be sufficient to cover the costs of closure and postclosure care; (2) Ensure that funds shall be available in a timely fashion; and (3) Guarantee the availability of the required amount of coverage prior to the initial receipt of special waste. Section 5. Closure Financial Assurance. The owner or operator of a special waste site or facility governed by this administrative regulation shall establish, in accordance with Section 4 of this administrative regulation, financial assurance for closure of the facility, in an amount equal to the most recent closure cost estimate prepared in accordance with Section 2 of this administrative regulation. The owner or operator shall provide continuous coverage for closure until released from financial assurance requirements pursuant to 401 KAR 45:100, Section 4, or 401 KAR 45:110, Section 5. Section 6. Postclosure Financial Assurance. The owner or operator of a special waste site or facility governed by this administrative regulation shall establish, in accordance with Section 4 of this administrative regulation, financial assurance for postclosure care of the facility, in an amount equal to the most recent postclosure cost estimate prepared in accordance with Section 3 of this administrative regulation. The owner or operator shall provide continuous coverage for postclosure until released from the financial assurance requirement pursuant to 401 KAR 45:100, Section 4, or 401 KAR 45:110, Section 5. Section 7. Performance Agreement. (1) Before the cabinet shall issue a construction and operation permit, the owner or operator of a special waste site or facility that is required to post financial assurance pursuant to this administrative regulation shall complete a performance agreement form on Performance Agreement, DWM 4650
pursuant to 401 KAR 45:100, Section 4, or 401 KAR 45:110, Section 5. Section 7. Performance Agreement. (1) Before the cabinet shall issue a construction and operation permit, the owner or operator of a special waste site or facility that is required to post financial assurance pursuant to this administrative regulation shall complete a performance agreement form on Performance Agreement, DWM 4650. (2) To satisfy the financial requirement, the owner or operator shall submit a performance bond and one (1) of the following: (a) A surety bond which is executed by filling in the required information on the performance bond form submitted in accordance with subsection (1) of this section and by submitting a copy of the surety bond agreement to the cabinet; (b) A letter of credit submitted on form Irrevocable Letter of Credit, DWM 4670; or (c) An escrow agreement submitted on form Escrow Agreement, DWM 4665. Section 8. Release of Financial Assurance. (1) Financial assurance posted to assure proper closure of a special waste landfarming or composting facility shall be released in accordance with 401 KAR 45:100, Section 4. (2) Financial assurance posted to assure proper closure of a special waste landfill shall be released in accordance with 401 KAR 45:110, Section 5. Section 9. Financial Assurance for Publicly Owned Facilities. The owner or operator of a publicly owned facility shall provide a budget for the permitting, construction, operation, closure, and postclosure care of the facility. The budget shall be revised and submitted annually. If elements of the facility's permitting, construction, operation, closure, or postclosure care are to be accomplished by contract or agreement, a copy of the contract or agreement shall be submitted to the cabinet. Section 10. Financial Assurance for Captive Facilities
ting, construction, operation, closure, and postclosure care of the facility. The budget shall be revised and submitted annually. If elements of the facility's permitting, construction, operation, closure, or postclosure care are to be accomplished by contract or agreement, a copy of the contract or agreement shall be submitted to the cabinet. Section 10. Financial Assurance for Captive Facilities. The cabinet may accept other satisfactory financial assurance as adequate financial responsibility for a special waste site or facility exclusively owned and operated by a special waste generator on property owned by the special waste generator for the purpose of accepting special waste exclusively from the special waste generator. Section 11. Incorporation by Reference. (1) The following material is incorporated by reference: (a) "Performance Agreement", form DWM 4650, February 2019; (b) "Irrevocable Letter of Credit" form DWM 4670, [; February 2019; and (c) "Escrow Agreement", form DWM 4665, February 2019. (2) This material may be inspected, copied, or obtained, subject to applicable copyright law, at the Division of Waste Management, 300 Sower Boulevard, 2nd Floor, Frankfort, Kentucky 40601, Monday through Friday, 8:00 a.m. to 4:30 p.m. (3) This material may also be obtained on the division's Web site at eec.ky.gov/environmental-protection/waste.

## Nearby sections

- [401 KAR 45:010 401 KAR 45:010. Definitions for 401 KAR Chapter 45](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R010.md)
- [401 KAR 45:020 401 KAR 45:020. Types of special waste permits](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R020.md)
- [401 KAR 45:025 401 KAR 45:025. Permit review and determination timetables](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R025.md)
- [401 KAR 45:030 401 KAR 45:030. Obtaining a special waste site or facility permit](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R030.md)
- [401 KAR 45:040 401 KAR 45:040. Modification, transfer or revocation of special waste permits](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R040.md)
- [401 KAR 45:050 401 KAR 45:050. Public information procedures for special waste site or facility permits](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R050.md)
- [401 KAR 45:060 401 KAR 45:060. Special waste permit-by-rule](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R060.md)
- [401 KAR 45:070 401 KAR 45:070. Special waste registered permit-by-rule](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R070.md)
- [401 KAR 45:080 401 KAR 45:080. Financial requirements and bonds for special waste facilities](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R080.md)
- [401 KAR 45:090 401 KAR 45:090. Special waste operator certification](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R090.md)
- [401 KAR 45:100 401 KAR 45:100. Landfarming and composting of special waste](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R100.md)
- [401 KAR 45:105 401 KAR 45:105. Land application of biosolids](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R105.md)
- [401 KAR 45:110 401 KAR 45:110. Technical and operating requirements for special waste landfills](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R110.md)
- [401 KAR 45:130 401 KAR 45:130. Siting requirements for special waste landfills](https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R130.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_KY_KAR_T401_C045_R080. Check the current official text before relying on it. Not legal advice.
