# 83 Ill. Adm. Code 466.60: Section 466.60 General Requirements

> Illinois · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_60

## Section

- **Citation:** 83 Ill. Adm. Code 466.60
- **Heading:** Section 466.60 General Requirements
- **Jurisdiction:** Illinois
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Illinois Administrative Code / Title 83 PUBLIC UTILITIES / CHAPTER I: ILLINOIS COMMERCE COMMISSION / Part 466 ELECTRIC INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES FACILITIES / Section 466.60 General Requirements

## Text

Section 466.60  General Requirements
a)         When
an interconnection request for a DER facility includes multiple energy
production devices at a site for which the applicant seeks a single point of
interconnection, the interconnection request shall be evaluated based on the
aggregate nameplate capacity of the multiple devices.  Where the export
capacity is limited through acceptable means as defined in Section 466.75, the
EDC shall evaluate only the aggregate export capacity for certain impacts as
specified in the screening and study provisions.
b)         When
an interconnection request is for an increase in capacity for an existing DER
facility, the interconnection request shall be evaluated based on the incremental
impact of the new total nameplate capacity of the DER facility.  Where the
export capacity is limited through acceptable means as defined in Section 466.75,
the EDC shall evaluate only the aggregate export capacity for certain impacts
as specified in the screening and study provisions.
c)         EDCs
shall publish on their websites a dedicated email address and phone number as a
point of contact.  The point of contact shall be able to direct applicant
questions concerning interconnection request submissions and the
interconnection request process to knowledgeable individuals within the EDC.
d)         The
information that the EDC makes available to potential applicants can include
previously existing EDC studies that help applicants understand whether it is
feasible to interconnect a DER facility at a particular point on the EDC's
electric distribution system.  The EDC may require a confidentiality agreement
prior to release of this information.  However, the EDC can refuse to provide
the information to the extent that providing it violates security requirements
or confidentiality agreements, or it is contrary to law or State or federal
regulations.
e)         The
EDC shall deem an interconnection request complete when the applicant submits
completed forms
may require a confidentiality agreement
prior to release of this information.  However, the EDC can refuse to provide
the information to the extent that providing it violates security requirements
or confidentiality agreements, or it is contrary to law or State or federal
regulations.
e)         The
EDC shall deem an interconnection request complete when the applicant submits
completed forms.
f)         When
an applicant is not currently a customer of the EDC at the proposed site, the
applicant shall provide, at the time of the interconnection request, proof of the
applicant's legal right to control the site, evidenced by the applicant's name
on a property tax bill, deed, lease agreement, option agreement, or other
legally binding contract.
g)         An
interconnection request shall be processed in accordance with Sections
466.90(b)(2), 466.100(b)(2), 466.110(a)(2), and 466.120(b) of this Part.
h)         To
minimize the cost to interconnect multiple DER facilities, the EDC or the
applicant may propose a single point of interconnection for multiple DER
facilities located at an interconnection customer site that is on contiguous
property.  If the applicant rejects the EDC's proposal for a single point of
interconnection, the applicant shall pay any additional cost to provide a
separate point of interconnection for each DER facility.  If the EDC, without
written and detailed technical explanation, rejects the customer's proposal for
a single point of interconnection, the EDC shall pay any additional cost to
provide separate points of interconnection for each DER facility.
Any disagreement over who bears the cost for providing
separate points of interconnection shall be resolved in accordance with Section
466.130.
i)          To
protect the safety of the EDC's employees or the reliability of the
distribution system, EDCs may require that DER facilities have the capability
to be isolated from the electric distribution system
nterconnection for each DER facility.
Any disagreement over who bears the cost for providing
separate points of interconnection shall be resolved in accordance with Section
466.130.
i)          To
protect the safety of the EDC's employees or the reliability of the
distribution system, EDCs may require that DER facilities have the capability
to be isolated from the electric distribution system.  For DER facilities
interconnecting to a primary line, the isolation shall be by means of a
lockable, visible-break isolation device accessible by the EDC.  For DER
facilities interconnecting to a secondary line, the isolation shall be by means
of a lockable isolation device whose status is indicated and is accessible by
the EDC.  For DER facilities interconnecting to a secondary line through a
self-contained meter, the EDC's removal of the self-contained electric meter
may satisfy this capability.  The isolation device shall be installed, owned
and maintained by the owner of the DER facility and located electrically
between the DER facility and the point of interconnection.  A draw-out type of circuit
breaker accessible to the EDC with a provision for padlocking at the drawn-out
position satisfies the requirement for an isolation device.
j)          The
interconnection customer shall allow the EDC to isolate the DER facility.  An
interconnection customer may elect to provide the EDC with access to an
isolation device that is contained in a building or area that may be unoccupied
and locked or not otherwise accessible to the EDC by installing a lockbox
provided by the EDC that allows ready access to the isolation device.  The
lockbox shall be in a location determined by the EDC to be accessible by the
EDC.  The interconnection customer shall permit the EDC to affix a placard in a
location of its choosing that provides instructions to EDC operating personnel
for accessing the isolation device
ise accessible to the EDC by installing a lockbox
provided by the EDC that allows ready access to the isolation device.  The
lockbox shall be in a location determined by the EDC to be accessible by the
EDC.  The interconnection customer shall permit the EDC to affix a placard in a
location of its choosing that provides instructions to EDC operating personnel
for accessing the isolation device.  If the EDC needs to isolate the distribution
generation facility, the EDC shall not be held liable for any damages resulting
from the actions necessary to isolate the generation facility.
k)         Any
metering required for a DER interconnection shall be installed, operated, and
maintained in accordance with applicable EDC tariffs and agreements.  Any such
metering requirements shall be identified in the standard DER interconnection
agreement executed between the interconnection customer and the EDC.
l)          EDC
monitoring and control of DER facilities are permitted only when the nameplate capacity
is greater than 2 MVA or for a DER facility with a nameplate capacity equal to
or less than 2 MVA when the EDC determines, and the applicant agrees, that such
monitoring and control could be used to mitigate impacts from the project that
may otherwise require an upgrade or would otherwise be useful or beneficial.  Monitoring
and control requirements shall be consistent with the EDC's published
requirements and shall be clearly identified in the interconnection agreement
between the interconnection customer and the EDC.  Transfer trip shall not be
considered EDC monitoring and control when required and installed to protect
the electric distribution system or an affected system against adverse system
impacts.  However, transfer trip, if required, shall be clearly identified in
the interconnection agreement between the interconnection customer and the EDC.
m)        The
EDC may require a witness test after the DER facility is constructed
considered EDC monitoring and control when required and installed to protect
the electric distribution system or an affected system against adverse system
impacts.  However, transfer trip, if required, shall be clearly identified in
the interconnection agreement between the interconnection customer and the EDC.
m)        The
EDC may require a witness test after the DER facility is constructed.  The
applicant shall provide the EDC with at least 15 business days' notice of the
planned commissioning test for the DER facility
, unless
otherwise agreed by the EDC and applicant
.  The applicant and EDC shall
schedule the witness test at a mutually agreeable time.  If the witness test results
are not acceptable to the EDC, the applicant shall be granted 30 business days
to address and resolve any deficiencies.  The time period for addressing and
resolving any deficiencies may be extended upon the mutual agreement of the EDC
and the applicant prior to the end of the 30 business days.  The EDC shall not
deny an initial request for extension.  Subsequent requests may be denied
only if there are applicants later in the queue that would
be impacted by additional delays
.  If the applicant fails to address and
resolve the deficiencies to the EDC's satisfaction, the EDC may deem the
interconnection request withdrawn.  Even if the EDC or an entity approved by
the EDC does not witness a commissioning test, the applicant remains obligated
to satisfy the interconnection test specifications and requirements set forth
in IEEE Standard 1547 Clause 11.  The applicant shall, if requested by the EDC,
provide a copy of all documentation in its possession regarding testing
conducted pursuant to IEEE Standard 1547.1.
n)         Each
EDC shall allow interconnection requests to be submitted through the EDC's
website or via another website if a link is provided on the EDC's website.
o)         Each
EDC shall dedicate a page on its website to interconnection procedures
, if requested by the EDC,
provide a copy of all documentation in its possession regarding testing
conducted pursuant to IEEE Standard 1547.1.
n)         Each
EDC shall allow interconnection requests to be submitted through the EDC's
website or via another website if a link is provided on the EDC's website.
o)         Each
EDC shall dedicate a page on its website to interconnection procedures.  The
relevant website page shall include the following information updated as it
changes or with the frequency specifically identified in this subsection:
1)         the
EDC's interconnection procedures and attachments in an electronically
searchable format;
2)         the
EDC's interconnection request forms in a format that allows for electronic
entry of data;
3)         the
EDC's interconnection agreements;
4)         the
EDC's point of contact for questions about interconnection and submission of
interconnection requests, including a dedicated e-mail address and phone number;
5)         the EDC's interconnection queue;
6)         the
EDC's hosting capacity map;
7)         for
EDCs serving more than 500,000 customers, the EDC's hosting capacity analysis
results, including, at a minimum, mapping and GIS capability; and
8)         an electronic
form to request the technical standards required by Section 466.140(d).
p)         Each
EDC shall allow electronic signatures to be used for interconnection requests
and agreements.
q)         Each EDC shall accept electronic payments for
interconnection fees and study costs.
r)          Nothing
in this Part shall be interpreted to limit the ability of EDCs and interconnection
customers to enter into an agreement to allow the EDC to actively communicate
with and control the interconnection customer's smart inverter in order to
reduce the facilities and costs associated with interconnection upgrade or as
would otherwise be useful or beneficial.

## Nearby sections

- [83 Ill. Adm. Code 466.10 Section 466.10  Scope](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_10.md)
- [83 Ill. Adm. Code 466.15 Section 466.15  Compliance](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_15.md)
- [83 Ill. Adm. Code 466.20 Section 466.20  Definitions](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_20.md)
- [83 Ill. Adm. Code 466.30 Section 466.30  Waiver](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_30.md)
- [83 Ill. Adm. Code 466.35 Section 466.35  Waiver (Renumbered)](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_35.md)
- [83 Ill. Adm. Code 466.40 Section 466.40  Technical Standards](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_40.md)
- [83 Ill. Adm. Code 466.45 Section 466.45  Pre-Application Report](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_45.md)
- [83 Ill. Adm. Code 466.50 Section 466.50  Interconnection Requests](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_50.md)
- [83 Ill. Adm. Code 466.60 Section 466.60  General Requirements](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_60.md)
- [83 Ill. Adm. Code 466.70 Section 466.70  Lab-Certified Equipment](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_70.md)
- [83 Ill. Adm. Code 466.75 Section 466.75  Limited-Export and Non-Exporting Distribution Energy Resources Facilities](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_75.md)
- [83 Ill. Adm. Code 466.80 Section 466.80  Determining the Review Level](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_80.md)
- [83 Ill. Adm. Code 466.90 Section 466.90  Level 1 Expedited Review](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_90.md)
- [83 Ill. Adm. Code 466.100 Section 466.100  Level 2 Expedited Review](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_100.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T83_P466_S466_60. Check the current official text before relying on it. Not legal advice.