# 17 Ill. Adm. Code 3708.70: Section 3708.70 Permitting Appropriate Uses of the Regulatory Floodway

> Illinois · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_70

## Section

- **Citation:** 17 Ill. Adm. Code 3708.70
- **Heading:** Section 3708.70 Permitting Appropriate Uses of the Regulatory Floodway
- **Jurisdiction:** Illinois
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Illinois Administrative Code / Title 17 CONSERVATION / CHAPTER I: DEPARTMENT OF NATURAL RESOURCES / Part 3708 FLOODWAY CONSTRUCTION IN NORTHEASTERN ILLINOIS / Section 3708.70 Permitting Appropriate Uses of the Regulatory Floodway

## Text

Section 3708
Section 3708.70  Permitting
Appropriate Uses of the Regulatory Floodway
a)         The Department will issue permits for appropriate uses of the
regulatory floodway of which
periodic inundation will not pose a danger to
the general health and welfare of the user or require the expenditure of public
funds or the provisions of public resources or disaster relief services
(Section 18g of the Act) or result in increased flood stages due to the
singular or cumulative loss of regulatory floodway storage or regulatory
floodway conveyance or increase in flood velocities.
b)         To receive a permit for work in the regulatory floodway, the
proposed construction shall meet two criteria:
1)         The proposed construction shall be an appropriate use of the
regulatory floodway as defined in subsection (c); and
2)         The proposed construction shall not reduce the regulatory
floodway storage or conveyance and shall not increase regulatory floodway
velocities.
c)         Appropriate uses of the regulatory floodway that will be
considered for permit issuance consist of construction, modification, repair,
or replacement of:
1)
Flood control structures, dikes, dams and other public
works or private improvements relating to the control of drainage, flooding or
erosion
(Section 18g of the Act) or water quality or habitat for fish and
wildlife (e.g. Section 3708.80(a)(3) and(4));
2)
Structures or facilities relating to the use of, or
requiring access to, the water or shoreline, such as pumping and treatment
facilities, and facilities and improvements related to recreational boating,
commercial shipping and other functionally dependent uses
(Section 18g of
the Act);
3)         Storm and sanitary sewer outfalls;
4)         Underground and overhead utilities;
5)         Recreational facilities such as playing fields and trail
systems including any related fencing built parallel to the direction of flood
flows;
6)         Detached
Garages, storage sheds, or other
non-habitable
accessory structu
g and other functionally dependent uses
(Section 18g of
the Act);
3)         Storm and sanitary sewer outfalls;
4)         Underground and overhead utilities;
5)         Recreational facilities such as playing fields and trail
systems including any related fencing built parallel to the direction of flood
flows;
6)         Detached
Garages, storage sheds, or other
non-habitable
accessory structures to existing buildings that will not block flood flows.
This does not include the construction
or placement
of any other new
structures
, (Section 18g of the Act) fill, building additions, buildings on
stilts, fencing (including landscaping or plantings designed to act as a fence)
and the storage of materials;
7)         Bridges, culverts, roadways, sidewalks, railways, runways and
taxiways and any modification thereto;
8)         Parking lots built at or below existing grade where either:
A)        the depth of flooding at the 100-year frequency flood event
will not exceed 1.0 foot; or
B)        the parking lot is for short-term outdoor recreational use
facilities where the applicant agrees to restrict access during overbank
flooding events and agrees to accept liability for all damage caused by
vehicular access during all overbank flooding events;
9)         Aircraft parking aprons built at or below ground elevation
where the depth of flooding at the 100-year frequency flood event will not
exceed 1.0 foot;
10)       Regulatory floodway regrading, without fill, to create a
positive slope toward a watercourse;
11)       Flood proofing activities to protect existing structures such
as, but not limited to, constructing water tight window wells, and elevating;
12)       The replacement, reconstruction or repair of a damaged
building, provided that the outside dimensions of the building are not
increased, and provided that, if the building is damaged to 50% or more of the
building's market value before it was damaged, the building will be protected
from flooding to or above the 100-year frequency flood e
cting water tight window wells, and elevating;
12)       The replacement, reconstruction or repair of a damaged
building, provided that the outside dimensions of the building are not
increased, and provided that, if the building is damaged to 50% or more of the
building's market value before it was damaged, the building will be protected
from flooding to or above the 100-year frequency flood elevation; and
13)       Modifications to an existing building that would not increase
the enclosed floor area of the building below the 100-year frequency flood
elevation, and which will not block flood flows including but not limited to,
fireplaces, bay windows, decks, patios and second story additions.
d)         The construction of an appropriate use below the 100-year
frequency flood elevation will be considered permissible provided the proposed
project meets the following criteria and is so stated in writing with supporting
plans, calculations and data by a registered professional engineer or in the
case of a federal project, by the federal agency:
1)         In the case of the construction of a new bridge or culvert
crossing and roadway approach, the proposed structure shall not result in an
increase of upstream flood stages greater than 0.1 foot  when compared to the
existing conditions for all flood events up to and including the 100-year
frequency event; or the upstream flood stage increases will be contained within
the channel banks (or within existing vertical extensions of the channel banks)
such as within the design protection grade of existing levees or flood walls or
within recorded flood easements; or a flood control project is built to
mitigate the increased backwater due to the structure
to and including the 100-year
frequency event; or the upstream flood stage increases will be contained within
the channel banks (or within existing vertical extensions of the channel banks)
such as within the design protection grade of existing levees or flood walls or
within recorded flood easements; or a flood control project is built to
mitigate the increased backwater due to the structure.
2)         In the case of bridge and culvert reconstruction or
modification, the bridge or culvert and roadway approach reconstruction or
modification shall be constructed with no more than 0.1 foot increase in
backwater over the existing flood profile for all flood frequencies up to and
including the 100-year event, if the existing structure is not a source of
flood damage. The proposed construction shall meet the following criteria:
A)        The proposed structure, including approach roads, does not
result in an increase in upstream stages for normal and flood flows when
compared to the existing structure.
B)        On publicly navigated waterways, the proposed structure is not
an obstruction to navigation.
C)        The determination as to whether the existing structure is a
source of flood damage shall be made according to the following method:
i)          Determine the increase in upstream flood profile due to the
existing bridge or culvert by calculation or from the flood study used to
delineate the regulatory floodway for all reported flood profiles up to and
including the 100-year flood.
ii)         Determine if there are any buildings or structures located in
the 100-year flood plain upstream of the existing bridge or culvert that may be
subjected to flooding.  The upstream flood plain shall be checked for the
length of stream required for the backwater impacts due to the existing bridge
or culvert to be reduced to 0.1 foot or less.
iii)        Collect the low opening elevations or lowest damageable
elevations of the upstream buildings and structures as identified in subsection
am of the existing bridge or culvert that may be
subjected to flooding.  The upstream flood plain shall be checked for the
length of stream required for the backwater impacts due to the existing bridge
or culvert to be reduced to 0.1 foot or less.
iii)        Collect the low opening elevations or lowest damageable
elevations of the upstream buildings and structures as identified in subsection
(d)(2)(c) (ii), above.  Determine if any buildings or structures are subject to
inundation by the 100-year frequency flood event.
3)         In the case of bridge or culvert reconstruction and
modification, if the existing bridge or culvert and roadway approach is a
source of flood damage to buildings or structures in the upstream flood plain,
based on the above review, the applicant's engineer must evaluate the
feasibility of redesigning the structure to reduce the existing backwater,
taking into consideration the effects on flood stages on upstream and
downstream properties.
A)        The applicant's engineer must submit to the Department his or
her evaluation to justify why the proposed structure should be designed to
allow an increase in the upstream flood stage of more than 0.1 foot when
compared to a flood stage without the existing bridge or culvert or roadway
approach in place for all flood events up to and including the 100-year
frequency event.
B)        The evaluation shall also consider the feasibility of
containing the upstream flood stage increases within the channel banks (or
within existing vertical extensions of the channel banks such as within the
design protection grade of existing levees or flood walls), or within recorded
flood easements; or constructing a flood control project to mitigate the
increased backwater due to the structure.
4)         In the case of any other on-stream structure built for the
purpose of backing up water in the stream during normal or flood flows, but not
permitted as a dam according to 17 Ill. Adm
hin the
design protection grade of existing levees or flood walls), or within recorded
flood easements; or constructing a flood control project to mitigate the
increased backwater due to the structure.
4)         In the case of any other on-stream structure built for the
purpose of backing up water in the stream during normal or flood flows, but not
permitted as a dam according to 17 Ill. Adm. Code 3702 (Construction and
Maintenance of Dams), the proposed structure shall not result in an increase of
upstream flood stages greater than 0.0 foot when compared to the existing
conditions, for all flood events up to and including the 100-year frequency
event; or the upstream flood stage increases will be contained within the
channel banks (or within existing vertical extensions of the channel banks)
such as within the design protection grade of existing levees or flood walls or
within recorded flood easements; or a flood control project is built to
mitigate the increased backwater due to the structure.
5)         In the case of the construction of appropriate uses other than
bridge or culvert crossings, on-stream structures or dams, all effective
regulatory floodway conveyance lost due to the project will be replaced for all
flood events up to and including the 100-year frequency flood.  In calculating
effective regulatory floodway conveyance, the following factors must be taken
into consideration:
A)
Regulatory flood way
conveyance,
K
=
1.486 AR (⅔)
n
where "n" is Manning's roughness factor, "A" is the
effective area of the cross-section, and "R" is the ratio of the area
to the wetted perimeter. (See Open Channel Hydraulics, Ven Te Chow, 1959
Edition, McGraw-Hill Book Company, New York, New York.  This incorporation contains
no later editions or amendments)
e taken
into consideration:
A)
Regulatory flood way
conveyance,
K
=
1.486 AR (⅔)
n
where "n" is Manning's roughness factor, "A" is the
effective area of the cross-section, and "R" is the ratio of the area
to the wetted perimeter. (See Open Channel Hydraulics, Ven Te Chow, 1959
Edition, McGraw-Hill Book Company, New York, New York.  This incorporation contains
no later editions or amendments).
B)        The same Manning's "n" value shall be used for both
existing and proposed conditions unless a recorded maintenance agreement with a
federal, state or local unit of government can assure the proposed conditions will
be maintained or the land cover is changing from a vegetative to a
non-vegetative land cover.
C)        Transition sections must be provided and used in calculations
of effective regulatory floodway conveyance.  The following expansion and
contraction ratios shall be used unless an applicant's engineer can prove to
the Department through engineering calculations and model tests that more
abrupt transitions may be used with the same efficiency:
i)          When water is flowing from a narrow section to a wider
section, the water should be assumed to expand no faster than at a rate of one
foot horizontal for every four feet of the flooded stream's length.
ii)         When water is flowing from a wide section to a narrow
section, the water should be assumed to contract no faster than at a rate of
one foot horizontal for every one foot of the flooded stream's length.
iii)        When expanding or contracting flows in a vertical direction,
a minimum of one foot vertical transition for every ten feet of stream length
shall be used.
iv)        Transition sections shall be provided between cross-sections
with rapid expansions and contractions and when meeting the regulatory floodway
delineation on adjacent properties.
v)         All cross-sections used in the calculations must be located
perpendicular to flood flows
cal direction,
a minimum of one foot vertical transition for every ten feet of stream length
shall be used.
iv)        Transition sections shall be provided between cross-sections
with rapid expansions and contractions and when meeting the regulatory floodway
delineation on adjacent properties.
v)         All cross-sections used in the calculations must be located
perpendicular to flood flows.
6)         For all appropriate uses, compensatory storage shall be
provided for any regulatory floodway storage lost due to the proposed work from
the volume of fill or structures placed and the impact of any related flood
control projects.  Artificially created storage lost due to a reduction in head
loss behind a bridge shall not be required to be replaced.  The compensatory
regulatory floodway storage must be placed between the proposed normal water
elevation and the proposed 100-year flood elevation.  All regulatory floodway
storage lost below the existing 10-year flood elevation must be replaced below
the proposed 10-year flood elevation.  All regulatory floodway storage lost
above the existing 10-year flood elevation must be replaced above the proposed
10-year flood elevation.  If the compensatory storage will not be placed at the
location of the proposed construction, the applicant's engineer must
demonstrate to the Department through a determination of flood discharges and
water surface elevations that the compensatory storage is hydraulically
equivalent.
7)         For all appropriate uses, except bridges or culverts or
on-stream structures, the proposed work will not result in an increase in the
average channel or regulatory floodway velocities.  However in the case of
bridges or culverts or on-stream structures built for the purpose of backing up
water in the stream during normal or flood flows, velocities may be increased
at the structure site if scour, erosion and sedimentation will be avoided by
the use of rip-rap or other design measures
ork will not result in an increase in the
average channel or regulatory floodway velocities.  However in the case of
bridges or culverts or on-stream structures built for the purpose of backing up
water in the stream during normal or flood flows, velocities may be increased
at the structure site if scour, erosion and sedimentation will be avoided by
the use of rip-rap or other design measures.
8)         When excavation is proposed in the design of the bridge and
culvert openings, including the modifications to and replacement of existing
bridge and culvert structures, or to compensate for lost conveyance for other
appropriate uses, transition sections must be provided for the excavation. The
following expansion and contraction ratios shall be used unless an applicant's
engineer can prove to the Department through engineering calculations and model
tests that more abrupt transitions may be used with the same efficiency:
A)        When water is flowing from a narrow section to a wider section,
the water should be assumed to expand no faster than at a rate of one foot
horizontal for every four feet of the flooded stream's length;
B)        When water is flowing from a wide section to a narrow section,
the water should be assumed to contract no faster than at a rate of one foot
horizontal for every one foot of the flooded stream's length; and
C)        When expanding or contracting flows in a vertical direction, a
minimum of one foot vertical transition for every ten feet of stream length
shall be used.
9)         If the 100-year regulatory floodway elevation at the site of
the proposed construction is affected by backwater from a downstream receiving stream
with a larger drainage area, the proposed construction shall be shown to meet
the requirements of this section for the 100-year frequency flood elevations of
the regulatory floodway conditions and conditions with the receiving stream at
normal water elevations
ear regulatory floodway elevation at the site of
the proposed construction is affected by backwater from a downstream receiving stream
with a larger drainage area, the proposed construction shall be shown to meet
the requirements of this section for the 100-year frequency flood elevations of
the regulatory floodway conditions and conditions with the receiving stream at
normal water elevations.  However, for bridge and culvert construction or
reconstruction, a smaller bridge or culvert may be built if it can be
demonstrated to the Department that the proposed structure would meet the
requirements of this section for the 100-year frequency flood elevation of the
regulatory floodway flood study profile and would not be a source of flood
damage as determined according to the method described in subsections
(d)(2)(C)(i)-(iii), to any existing upstream building or structure when
analyzed as follows:
The proposed bridge or culvert shall be analyzed for a
100-year flood frequency flow on the tributary stream and for all tailwater
elevations on the receiving stream between and including the normal water
elevation and the 10-year flood frequency elevation.
10)       If an applicant learns from the Department, local government or
a private owner that a downstream restrictive bridge or culvert is scheduled to
be removed, reconstructed, modified, or a public flood control project is
scheduled to be built within the next five years, the proposed construction
shall be analyzed and shown to meet the requirements of this Section for both
the existing conditions and the expected flood profile conditions when the
bridge, culvert or flood control project is built.
11)       In the case of flood proofing activities, if construction is
required beyond the outside dimensions of an existing building, the flood
proofing construction shall be placed as close as possible to the existing
building and be the minimum width necessary to protect the building
itions and the expected flood profile conditions when the
bridge, culvert or flood control project is built.
11)       In the case of flood proofing activities, if construction is
required beyond the outside dimensions of an existing building, the flood
proofing construction shall be placed as close as possible to the existing
building and be the minimum width necessary to protect the building.
Compensation of lost storage and conveyance will not be required for flood
proofing activities.
12)       For public flood control projects (as defined in Section
3708.20), the permitting requirements of this Section will be considered met if
the applicant can demonstrate to the Department through hydraulic and
hydrologic calculations that the proposed project will not singularly or
cumulatively result in increased flood heights outside the project
right-of-way or easements for all flood events up to and including the 100-year
frequency event.
13)       If the appropriate use would result in a change in the
regulatory floodway location or the 100-year frequency flood elevation, the
applicant shall submit to the Department and to FEMA all the information,
calculations and documents necessary to be issued a conditional regulatory
floodway map revision and receive from the Department a conditional approval of
the regulatory floodway change before a permit is issued.  However, the final
regulatory floodway map will not be changed by the Department until as-built
plans are submitted and accepted by FEMA and the Department.  In the case of
non-government projects, the municipality in incorporated areas and the county
in unincorporated areas must concur with the proposed conditional regulatory
floodway map revision before Department approval can be given.
14)       All engineering analyses shall be performed by or under the
supervision of a registered professional engineer, except in the case of a
federal project.
15)       All dams, as defined by 17 Ill. Adm
unicipality in incorporated areas and the county
in unincorporated areas must concur with the proposed conditional regulatory
floodway map revision before Department approval can be given.
14)       All engineering analyses shall be performed by or under the
supervision of a registered professional engineer, except in the case of a
federal project.
15)       All dams, as defined by 17 Ill. Adm. Code 3702, shall meet the
permitting requirements of Part 3702 (Construction and Maintenance of Dams).

## Nearby sections

- [17 Ill. Adm. Code 3708.10 Section 3708.10  Purpose](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_10.md)
- [17 Ill. Adm. Code 3708.30 Section 3708.30  Jurisdiction](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_30.md)
- [17 Ill. Adm. Code 3708.40 Section 3708.40  General Provisions](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_40.md)
- [17 Ill. Adm. Code 3708.50 Section 3708.50  Regulatory Floodway Maps](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_50.md)
- [17 Ill. Adm. Code 3708.60 Section 3708.60  Delineation of the Regulatory Floodway](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_60.md)
- [17 Ill. Adm. Code 3708.70 Section 3708.70  Permitting Appropriate Uses of the Regulatory Floodway](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_70.md)
- [17 Ill. Adm. Code 3708.80 Section 3708.80  Changes to the Regulatory Floodway](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_80.md)
- [17 Ill. Adm. Code 3708.90 Section 3708.90  Delegation to Municipalities and Counties](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_90.md)
- [17 Ill. Adm. Code 3708.100 Section 3708.100  Violations](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_100.md)
- [17 Ill. Adm. Code 3708.110 Section 3708.110  Permit Application](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_110.md)
- [17 Ill. Adm. Code 3708.115 Section 3708.115  Permit Application Fee](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_115.md)
- [17 Ill. Adm. Code 3708.120 Section 3708.120  Public Notice](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_120.md)
- [17 Ill. Adm. Code 3708.130 Section 3708.130  Public Hearings](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_130.md)
- [17 Ill. Adm. Code 3708.140 Section 3708.140  Time to Permit Issuance; Emergency Authorizations; Duration; Revisions](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_140.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3708_S3708_70. Check the current official text before relying on it. Not legal advice.