# 17 Ill. Adm. Code 3702.40: Section 3702.40 Requirements for Approval of Permits for Construction of New Dams and Major Modifications of Existing Dams

> Illinois · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_40

## Section

- **Citation:** 17 Ill. Adm. Code 3702.40
- **Heading:** Section 3702.40 Requirements for Approval of Permits for Construction of New Dams and Major Modifications of Existing Dams
- **Jurisdiction:** Illinois
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Illinois Administrative Code / Title 17 CONSERVATION / CHAPTER I: DEPARTMENT OF NATURAL RESOURCES / Part 3702 CONSTRUCTION AND MAINTENANCE OF DAMS / Section 3702.40 Requirements for Approval of Permits for Construction of New Dams and Major Modifications of Existing Dams

## Text

Section 3702
Section 3702.40  Requirements
for Approval of Permits for Construction of New Dams and Major Modifications of
Existing Dams
a)         The following are OWR requirements which must be met in order
to obtain a permit for construction of a new dam or major modification of an
existing dam.  Applicants are encouraged to submit to OWR a preliminary report
for approval of concept prior to completion of the permit application form. The
preliminary and all subsequent plans and reports shall be prepared under the
direction of an engineer or other qualified personnel.  The engineer or
qualified personnel may be assisted by other professional personnel applying
the disciplines of hydrologic engineering, hydraulic engineering, soil
mechanics, structural engineering, or engineering geology.
b)         OWR staff will be available for consultation prior to
initiation of design studies, and at any time during the development of the
permit application if questions should arise.
1)         Structural and Geotechnical Design Requirements
The basis for OWR review and approval of the structural and
geotechnical design requirements of Class I, II and III dams is the Corps
Guidelines subject to modification as indicated in this Part.  The criteria for
structural and geotechnical design contained in the Corps Guidelines are
minimum criteria.  Variations from the criteria may be required or allowed by
OWR for special physical conditions at the proposed site as necessary or
appropriate to meet the interest of the overall structural and geotechnical
requirements of this Part.  Technical publications, other than the Corps
Guidelines, may be used by OWR to assure the use of current and applicable data
for the structural and geotechnical review of the dam design.
2)         Hydrologic and Hydraulic Design Requirements
The basis for OWR review and approval of the hydrologic and
hydraulic design requirements for Class I, II and III dams is the Corps
Guidelines, subject to modifications as indicted herein
the Corps
Guidelines, may be used by OWR to assure the use of current and applicable data
for the structural and geotechnical review of the dam design.
2)         Hydrologic and Hydraulic Design Requirements
The basis for OWR review and approval of the hydrologic and
hydraulic design requirements for Class I, II and III dams is the Corps
Guidelines, subject to modifications as indicted herein.  Technical
publications other than the Corps Guidelines may be used to assure the use of
current and applicable data for the hydrologic and hydraulic review of dam
design.
A)        Proposed Dams
The following minimum spillway design floods shall be used
for proposed structures:
i)          Principal Spillway Design Flood
CLASSIFICATION
SIZE
PRINCIPAL
SPILLWAY
DESIGN FLOOD
Class I
All
100-yr.
Class II
All
50-yr.
Class III
All
25-yr.
ii)         Total Spillway Design Flood
CLASSIFICATION
SIZE
PRINCIPAL
SPILLWAY
DESIGN FLOOD
Class I
Small
0.5
PMF
Intermediate
1.0
PMF
Large
1.0
PMF
Class II
Small
100-yr.
Intermediate
0.5
PMF
Large
1.0
PMF
Class III
Small
100-yr.*
Intermediate
100-yr.
Large
0.5
PMF
*For proposed
Class III dams where the dam height multiplied by the impounding capacity is
less than or equal to 300, no specific total spillway capacity is required.
iii)        For all proposed Class II or III dams, a determination of
alternatives for increasing the total spillway capacity to accommodate the PMF
shall also be submitted to OWR.  The initial dam design shall provide for the
capability of increasing the spillway capacity.  Future downstream land use,
land use controls, and growth projections will be considered in the review of
the spillway capacity design.
B)        Existing Dams
The minimum
spillway design flood for modifications to existing dams built after September
2, 1980 shall be the same as the criteria for proposed dams
al dam design shall provide for the
capability of increasing the spillway capacity.  Future downstream land use,
land use controls, and growth projections will be considered in the review of
the spillway capacity design.
B)        Existing Dams
The minimum
spillway design flood for modifications to existing dams built after September
2, 1980 shall be the same as the criteria for proposed dams.  The minimum
spillway design flood for modifications to existing dams that were constructed
and in service on or before September 2, 1980, are as follows:
i)          Principal Spillway Design Flood
CLASSIFICATION
SIZE
TOTAL
SPILLWAY
DESIGN FLOOD
Class I
All
100-yr.
Class II
All
50-yr.
Class III
All
No
specific requirement.
ii)         Total Spillway Design Flood
CLASSIFICATION
SIZE
TOTAL
SPILLWAY
DESIGN FLOOD
Class I
Small
0.3
PMF
Intermediate
0.6
PMF
Large
0.6
PMF
Class II
Small
100-yr.
Intermediate
0.3
PMF
Large
0.6
PMF
Class III
Small
100-yr.*
Intermediate
100-yr.
Large
0.3
PMF
*For
modifications to existing Class III dams where the height multiplied by
impounding capacity is less than or equal to 300, no specific total spillway
capacity is required.
iii)        The Department may approve total spillway design capacities
for existing dams other than the spillway design floods listed above.  A total
spillway design capacity less than the 100-yr. flood will only be allowed for
small size, Class III structures with dam height multiplied by impounding
capacity less than or equal to 300
to 300, no specific total spillway
capacity is required.
iii)        The Department may approve total spillway design capacities
for existing dams other than the spillway design floods listed above.  A total
spillway design capacity less than the 100-yr. flood will only be allowed for
small size, Class III structures with dam height multiplied by impounding
capacity less than or equal to 300.  Any submittal for variation from the
above-listed spillway design flood must include a detailed hydraulic risk
assessment that shows that additional spillway capacity will not provide a
decrease in potential loss of life or property damage or a detailed economic
risk assessment that shows that the chosen spillway design alternative provides
the minimum rehabilitation costs plus damage losses; a detailed early warning
and emergency evacuation plan coordinated with the local ESDA; and a list (with
mailing addresses) of all persons living within the dam breach wave inundation
area.
iv)        All hearings regarding variation from the above-listed
spillway design criteria shall be in accordance with Section 3702.170 of this
Part.
C)        For Class I and II dams, a dam breach wave analysis for
downstream impacts from failure during the total spillway design flood and
impoundment initially at normal pool shall be required for:
i)          a nearly instantaneous total failure and
ii)         should the applicant so desire, a failure to the degree and
timing believed reasonable by the applicant.
D)        Dewatering Capabilities
i)          All new Class I and II dams, all new Class III dams unless
exempted by OWR for functional reasons, and existing Class I and II dams
requiring major modifications shall have a capability for dewatering the
reservoir within a reasonable period of time
ld the applicant so desire, a failure to the degree and
timing believed reasonable by the applicant.
D)        Dewatering Capabilities
i)          All new Class I and II dams, all new Class III dams unless
exempted by OWR for functional reasons, and existing Class I and II dams
requiring major modifications shall have a capability for dewatering the
reservoir within a reasonable period of time.  In determining a reasonable time
period, OWR shall consider the damage potential posed by possible failure, risk
and nature of potential failure, purpose of the dam and reservoir, capability
and stability of available drainage courses to convey the waters released in
the event of an emergency dewatering, and influence of rapid drawdown on
stability of the dam.  Although each permit must be considered based on its
individual circumstances, in general, a reasonable time to dewater 50% of the
normal pool storage volume is 7 days for Class I dams, 14 days for Class II
dams and 30 days for Class III dams.
ii)         No dewatering capability shall be required for any existing
Class III dam or for any existing Class I or II dam which OWR determines to
require no major modifications thereto under this Part.
E)        Specific requirements for minimum freeboard allowances are not
appropriate because of the many factors involved in such determinations.  The
applicant must assess the factors affecting the individual project and develop
the appropriate minimum freeboard allowance.  Many projects are reasonably safe
without freeboard allowance because they are designed for overtopping, or because
other factors minimize possible overtopping.  Conversely, freeboard allowances
of several feet may be necessary to provide a safe condition for some dams
applicant must assess the factors affecting the individual project and develop
the appropriate minimum freeboard allowance.  Many projects are reasonably safe
without freeboard allowance because they are designed for overtopping, or because
other factors minimize possible overtopping.  Conversely, freeboard allowances
of several feet may be necessary to provide a safe condition for some dams.
Factors that should be considered include the duration of high water levels in
the reservoir during the design flood; the effective wind fetch and reservoir
depth available to support wave generation; the probability of high wind speed
occurring from a critical direction; the potential wave runup on the dam based
on roughness and slope; and the ability of the dam to resist erosion from
overtopping waves.
F)         The applicant must provide stilling basins or other
appropriate structures or devices capable of dissipating the energy created at
the outlet of the principal spillway and at dewatering outlets for all flows.
3)         Erosion Protection Requirements
A)        As a minimum the applicant shall adequately protect by
structural or nonstructural means the upstream face of earth embankment dams
from an elevation below normal pool of two feet or 0.50 times the anticipated
wave height (if greater than 2.0 feet) up to the minimum freeboard elevation.
In addition, if normal pool water surface varies, the upstream face shall be
protected within the range of variation.
B)        The applicant shall vegetate or otherwise protect from erosion
the downstream face and top of earth embankment dams.  The applicant should
design earth embankment dams to provide a dam section which can be easily
maintained
eet) up to the minimum freeboard elevation.
In addition, if normal pool water surface varies, the upstream face shall be
protected within the range of variation.
B)        The applicant shall vegetate or otherwise protect from erosion
the downstream face and top of earth embankment dams.  The applicant should
design earth embankment dams to provide a dam section which can be easily
maintained.
C)        The applicant shall provide riprap or other appropriate
protection as necessary at dam abutments, dam slope toes (the line of the dam
embankment slopes where it intersects the natural ground at the upstream or
downstream edge), spillways, stilling basins, and at other locations which, if
left unprotected, could lead to damage to, or failure of the dam.
D)        If the spillway design of the dam requires that an earth
emergency spillway pass any portion of the 100-year flood, the applicant shall
protect the earth emergency spillway against erosion consistent with the dam
classification and physical characteristics of the dam site.  The applicant
must construct all earth emergency spillways on in situ material or on well
compacted cohesive materials that will be stable during design flows.
E)        The applicant shall submit plans for control of erosion and
water pollution during the anticipated construction or major modifications,
including plans for adequate measures to limit the erosion of the soil from
exposed slopes after completion of construction.  Such plans shall indicate
that adequate control measures will be taken during construction to protect the
quality of stream flow below the project site, and during the estimated time
for filling.
4)         Operating Requirements
An applicant
for a Class I or II dam shall submit an operational plan specifying the method
and schedule for the operation of the dam and the routine operating procedures
to keep the dam in good working order, including an emergency warning plan
nstruction to protect the
quality of stream flow below the project site, and during the estimated time
for filling.
4)         Operating Requirements
An applicant
for a Class I or II dam shall submit an operational plan specifying the method
and schedule for the operation of the dam and the routine operating procedures
to keep the dam in good working order, including an emergency warning plan.
The emergency warning plan must outline the procedures to be followed during
major storm events or other emergency situations. Under this plan, a person
designated by the dam owner would monitor dam conditions, and would warn
appropriate state and local officials if major problems require immediate
repairs and would indicate how the owner plans to accomplish the needed
repairs, and indicate if evacuation of persons in areas downstream of the dam
may be necessary.
5)         Maintenance Requirements
As a condition
of each permit, dam owners shall submit a maintenance plan detailing the
procedures and schedules to be followed to maintain the dam and its
appurtenances in a reasonable state of repair.  The maintenance plan shall
include but not be limited to the following:
A)        Class I and II Dams
The dam owner
shall retain an engineer or other qualified personnel to make an initial
inspection and report and subsequent inspections and reports as required by
this Part.  The owner of a Class I dam shall submit the report annually on
forms furnished by OWR.  The owner of a Class II dam shall submit the report
every three years on forms furnished by OWR
owing:
A)        Class I and II Dams
The dam owner
shall retain an engineer or other qualified personnel to make an initial
inspection and report and subsequent inspections and reports as required by
this Part.  The owner of a Class I dam shall submit the report annually on
forms furnished by OWR.  The owner of a Class II dam shall submit the report
every three years on forms furnished by OWR.  In the intervals between the
engineer or other qualified personnel reports on Class II dams, the owner shall
file with OWR an annual statement on forms furnished by OWR stating that he is
maintaining the dam in accordance with the maintenance plan prepared by his
engineer or other qualified personnel and indicating any change in land use
which may have occurred in the 100-year flood plain within the previously
accepted limits downstream of the dam.  The reports shall outline modifications
made to the dam, any deficiencies found, detail the remedial measures
necessary, and the method and time the owner will use to correct the
deficiencies found.  The dam owner may be required to provide additional
inspections and reports by an engineer or other qualified personnel, following
unusual storms or seismic events; provided such inspection procedures are
required as a part of the maintenance plan approved by OWR in issuing a
permit.  A sketch showing land use in the flood plain downstream of the dam
shall be included in the reports.  The extent of downstream land use to be
reported is dependent upon factors such as slope and width of the 100-year
flood plain and the density and intensity of downstream development.  The
extent downstream will not exceed 2 miles unless otherwise indicated by OWR.
The owner may provide information for review by OWR indicating that an extent
downstream which is shorter than 2 miles may be appropriate
t of downstream land use to be
reported is dependent upon factors such as slope and width of the 100-year
flood plain and the density and intensity of downstream development.  The
extent downstream will not exceed 2 miles unless otherwise indicated by OWR.
The owner may provide information for review by OWR indicating that an extent
downstream which is shorter than 2 miles may be appropriate.
B)        Class III Dams
The owner of a
new Class III dam or owner of an existing Class III dam qualifying under the
provisions of Section 3702.30 (relating to the major modification of existing
Class III dams), shall retain an engineer or other qualified personnel to make
an initial inspection and report and subsequent inspections and reports on a
5-year interval, in accordance with this Part.  The dam owner shall submit to
OWR on forms furnished by OWR the engineer's initial report and subsequent
fifth year reports.  The reports shall include a description of flood plain
land use downstream of the dam.  In the intervals between the engineer's
reports, the owner shall file with OWR an annual statement on forms furnished
by OWR stating that he is maintaining the dam in accordance with the
maintenance plan prepared by his engineer or other qualified personnel and
indicating any change in land use downstream of the dam.  The extent of
downstream land use to be reported is dependent upon factors such as slope and
width of the 100-year flood plain and the density and intensity of downstream
development.  The extent downstream will not exceed 2 miles unless otherwise
indicated by OWR.
6)         Financial Responsibility of Owner
A)        For Class I and II dams, the owner shall document that he has
the financial capability to adequately maintain or breach his dam in a safe
condition
s such as slope and
width of the 100-year flood plain and the density and intensity of downstream
development.  The extent downstream will not exceed 2 miles unless otherwise
indicated by OWR.
6)         Financial Responsibility of Owner
A)        For Class I and II dams, the owner shall document that he has
the financial capability to adequately maintain or breach his dam in a safe
condition.  This may be established by showing that the applicant has the
resources and the authority to obtain funds in the amount required to safely
breach the dam within 10 days of receipt of notice of the need to breach or
repair.  For public bodies, this may be done by showing taxing power or other
revenue generating ability and passage of an appropriate ordinance or
resolution indicating the authority to take such action if necessary.  If the
owner cannot adequately demonstrate this financial capability, OWR may require
the applicant to post a performance bond.  The amount of the bond will be that
estimated by OWR as reasonably necessary to safely breach the dam in an
environmentally sound manner if the condition of the dam becomes a threat to
life or property.  The owners shall notify OWR when each performance bond has
been renewed or extended in time.
B)        Except in emergencies, should the cost of repair to place the
dam in a safe condition be less than the cost of breaching, the performance
bond may be used to pay for repair, rather than breach of the dam.
7)         Other Requirements
A)        The owner shall grant the State the right of access to inspect
the dam site and immediate vicinity before, during and after construction and
for the life of the dam and appurtenances.  Except under emergency conditions,
such as when the dam is in imminent danger of failure or is in the process of
failing, the State shall notify the owner at least 10 days in advance of any
inspection
A)        The owner shall grant the State the right of access to inspect
the dam site and immediate vicinity before, during and after construction and
for the life of the dam and appurtenances.  Except under emergency conditions,
such as when the dam is in imminent danger of failure or is in the process of
failing, the State shall notify the owner at least 10 days in advance of any
inspection.
B)        For Class I and II dams, the owner shall notify OWR prior to
initiating foundation preparations, including cut-off trench excavation.
C)        For Class I and II dams, OWR will require the owner to have
continuous inspection during construction.  The construction shall be under the
direction of an engineer, or other qualified personnel.  For Class III dams,
OWR may require the owner to have continuous inspection during construction if
foundation conditions have not been completely determined or if the dam has
been designed with minimal factors of safety.
D)        For Class I and II dams – prior to commencing filling
operations, or refilling operations after a drawdown, the applicant shall
request OWR inspection of the dam, and must receive authority from OWR before
commencing filling. When drawdowns are performed on a frequent basis as a part
of the approved operation plan, the authority is not necessary.
E)        If OWR has not acted to grant or deny the authorization to fill
within 30 days after receipt of request, the owner may proceed with filling or
refilling operations.
F)         For all new dams, or for major modifications to existing dams,
the dam owner shall
i)          own or have permanent flood easements for all land that will
be inundated in the reservoir up to the proposed 100-year frequency flood pool
elevation, or
ii)         submit hydraulic computations showing that, for floods up to
the 100-year frequency flood, the pool elevation will not be increased above
existing conditions.

## Nearby sections

- [17 Ill. Adm. Code 3702.10 Section 3702.10  Purpose](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_10.md)
- [17 Ill. Adm. Code 3702.20 Section 3702.20  Definitions](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_20.md)
- [17 Ill. Adm. Code 3702.30 Section 3702.30  Applicability](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_30.md)
- [17 Ill. Adm. Code 3702.35 Section 3702.35  Permit Application Fee](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_35.md)
- [17 Ill. Adm. Code 3702.40 Section 3702.40  Requirements for Approval of Permits for Construction of New Dams and Major Modifications of Existing Dams](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_40.md)
- [17 Ill. Adm. Code 3702.50 Section 3702.50  Requirements for Approval of Permits for Removal of Dams](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_50.md)
- [17 Ill. Adm. Code 3702.60 Section 3702.60  Application for Permit to Construct New Dams or Make Major Modifications to Existing Dams – Contents](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_60.md)
- [17 Ill. Adm. Code 3702.70 Section 3702.70  Application for Permit to Remove Dams – Contents](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_70.md)
- [17 Ill. Adm. Code 3702.80 Section 3702.80  Dam Breach Wave Advisories](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_80.md)
- [17 Ill. Adm. Code 3702.90 Section 3702.90  Datum For Dam Elevations](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_90.md)
- [17 Ill. Adm. Code 3702.100 Section 3702.100  Permits Not Transferable](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_100.md)
- [17 Ill. Adm. Code 3702.110 Section 3702.110  Acceptance Of Other Agency Permits](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_110.md)
- [17 Ill. Adm. Code 3702.120 Section 3702.120  Use Of Joint Permit Forms](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_120.md)
- [17 Ill. Adm. Code 3702.130 Section 3702.130  Permit Application](https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_130.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_IL_IAC_T17_P3702_S3702_40. Check the current official text before relying on it. Not legal advice.