# Idaho Code § 39-4109A: 39-4109A MASS TIMBER CONSTRUCTION

> Idaho · Statutes · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4109A

## Section

- **Citation:** Idaho Code § 39-4109A
- **Heading:** 39-4109A MASS TIMBER CONSTRUCTION
- **Jurisdiction:** Idaho
- **Kind:** Statutes
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Idaho Code / Title 39 / Chapter 41 / Section 39-4109A

## Text

39-4109A. mass timber construction. By January 1, 2022, the Idaho building code board shall amend the current Idaho building code to include the provisions of the 2021 International Building Code relating to mass timber construction. This must include permitting the three (3) new mass timber construction types IV-A, IV-B, and IV-C, along with the corresponding maximum heights and fire safety features.

History:

[39-4109A, added 2021, ch. 244, sec. 1, p. 761.]

## Nearby sections

- [Idaho Code § 39-4101 39-4101 LEGISLATIVE FINDING AND INTENT.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4101.md)
- [Idaho Code § 39-4102 39-4102 SHORT TITLE.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4102.md)
- [Idaho Code § 39-4103 39-4103 SCOPE — EXEMPTIONS.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4103.md)
- [Idaho Code § 39-4104 39-4104 ENFORCEMENT OF LAW.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4104.md)
- [Idaho Code § 39-4105 39-4105 DEFINITIONS.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4105.md)
- [Idaho Code § 39-4106 39-4106 IDAHO BUILDING CODE BOARD CREATED — MEMBERSHIP — APPOINTMENT — TERMS — QUORUM — COMPENSATION — MEETINGS.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4106.md)
- [Idaho Code § 39-4107 39-4107 POWERS AND DUTIES.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4107.md)
- [Idaho Code § 39-4108 39-4108 CERTIFICATION.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4108.md)
- [Idaho Code § 39-4109 39-4109 APPLICATION OF CODES.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4109.md)
- [Idaho Code § 39-4109A 39-4109A MASS TIMBER CONSTRUCTION.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4109A.md)
- [Idaho Code § 39-4109B 39-4109B ELECTRIC VEHICLE BUILDING PLAN REQUIREMENTS — PREEMPTION.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4109B.md)
- [Idaho Code § 39-4109C 39-4109C SINGLE STAIRWAY BUILDING EXCEPTIONS.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4109C.md)
- [Idaho Code § 39-4111 39-4111 PERMITS REQUIRED.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4111.md)
- [Idaho Code § 39-4112 39-4112 MAXIMUM PERMIT FEES TO BE ASSESSED BY THE DIVISION.](https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4112.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_ID_T39_C41_S39-4109A. Check the current official text before relying on it. Not legal advice.
