# IDAPA 37.03.05.010: Section 010. Definitions (Rule 10)

> Idaho · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_010

## Section

- **Citation:** IDAPA 37.03.05.010
- **Heading:** Section 010. Definitions (Rule 10)
- **Jurisdiction:** Idaho
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Idaho Administrative Code / IDAPA 37 (Water Resources, Department of) / Chapter 37.03.05 / Section 010

## Text

Unless the context otherwise requires, the following definitions govern these rules. (3-30-23) 01. Board. The Idaho Water Resource Board. (3-30-23) 02. Director. The Director of the Idaho Department of Water Resources. (3-30-23) 03. Department. The Idaho Department of Water Resources. (3-30-23) 04. Mine Tailings Impoundment Structure. Any artificial embankment which is or will be more tha n thirty (30) feet in height measured from the lowest elevation of the toe to the maximum crest elevation constructed fo r the purpose of storing mine tailings slurry. (3-30-23) 05. Mine Tailings Slurry. All slurry wastes from a mineral processing or mining operation. (3-30-23) 06. Mine Tailings Storage Capacity. The total storage volume of the impoundment when filled wit h tailings to the maximum approved design storage elevation. (3-30-23) 07. Borrowed Fill Embankment. Any embankment constructed of borrowed earth materials an d which is designed for construction by conventional earth moving equipment. (3-30-23) 08. Reservoir. Any basin which contains or will contain the material impounded by the mine tailing s impoundment structure. (3-30-23) 09. Owner. Includes any of the following who own, control, operate, maintain, manage, or propose t o construct a mine tailings impoundment structure or reservoir. (3-30-23) a. The state of Idaho and any of its departments, agencies, institutions and political subdivisions; (3-30-23) b. The United States of America and any of its departments, bureaus, agencies and institutions ; provided that the United States of America shall not be required to pay any of the fees required by Section 42-1713 , Idaho Code, and shall submit plans, drawings and specifications as required by Section 42-1721, Idaho Code, fo r information purposes only; (3-30-23) c. Every municipal or quasi-municipal corporation; (3-30-23) d. Every public utility; (3-30-23) e. Every person, firm, association, organization, partnership, business, trust, corporation or company; (3-30-23) f
the fees required by Section 42-1713 , Idaho Code, and shall submit plans, drawings and specifications as required by Section 42-1721, Idaho Code, fo r information purposes only; (3-30-23) c. Every municipal or quasi-municipal corporation; (3-30-23) d. Every public utility; (3-30-23) e. Every person, firm, association, organization, partnership, business, trust, corporation or company; (3-30-23) f. The duly authorized agents, lessees, or trustees of any of the foregoing; (3-30-23) g. Receivers or trustees appointed by any court for any of the foregoing. (3-30-23) 10. Alterations, Repairs or Either of Them. Only such alterations or repairs as may directly affec t the safety of the mine tailings impoundment structure or reservoir, as determined by the Director. (3-30-23) 11. Enlargement. Any change in or addition to an existing mine tailings impoundment structure o r reservoir, which raises or may raise the storage capacity of the structure, as defined in Rule Subsection 010.06. (3-30-23) 12. Days Used in Establishing Deadlines. Calendar days including Sundays and holidays. (3-30-23) 13. Certificate of Approval. A certificate issued by the Director for the mine tailings impoundmen t structure listing restrictions imposed by the Director, and without which no new mine tailings impoundmen t structures shall be allowed to impound mine tailings slurry or water and no existing impoundment shall be allowed t o impound water or continue deposition of mine tailings slurry. The structure will be recertified following the sit e inspection scheduled according to the Hazard Classification assigned by the Department, unless the Directo r determines that the structure is unsafe. (3-30-23) 14. Engineer. A registered professional engineer, licensed as such by the state of Idaho. (3-30-23) 011. -- 024. (RESERVED)

## Nearby sections

- [IDAPA 37.03.05.000 Section 000. Legal Authority (Rule 0)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_000.md)
- [IDAPA 37.03.05.001 Section 001. Scope (Rule 1)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_001.md)
- [IDAPA 37.03.05.010 Section 010. Definitions (Rule 10)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_010.md)
- [IDAPA 37.03.05.025 Section 025. Authority Of Representative (Rule 25)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_025.md)
- [IDAPA 37.03.05.030 Section 030. Forms (Rule 30)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_030.md)
- [IDAPA 37.03.05.035 Section 035. Plans, Drawings, And Specifications (Rule 35)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_035.md)
- [IDAPA 37.03.05.040 Section 040. Bonding (Rule 40)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_040.md)
- [IDAPA 37.03.05.045 Section 045. Mine Tailings Impoundment Structures Design Criteria (Rule 45)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_045.md)
- [IDAPA 37.03.05.050 Section 050. Dams Storing Tailing And Water (Rule 50)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_050.md)
- [IDAPA 37.03.05.055 Section 055. Provisions Of Chapter 17, Title 42, Idaho Code (Rule 55)](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_055.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_37_03_05_010. Check the current official text before relying on it. Not legal advice.