# IDAPA 24.39.31.500: Section 500. Permits, Plan Reviews, And Inspections

> Idaho · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_500

## Section

- **Citation:** IDAPA 24.39.31.500
- **Heading:** Section 500. Permits, Plan Reviews, And Inspections
- **Jurisdiction:** Idaho
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Idaho Administrative Code / IDAPA 24 (Occupational and Professional Licenses, Division of) / Chapter 24.39.31 / Section 500

## Text

01. Modular Building Permit Fees. Permits must be obtained from the Division prior to th e construction of structures governed by 39-4303, Idaho Code. Other than as specified in this section, the permit fe e schedule for Modular Buildings is as provided in Table 1-A plus ninety dollars ($90) and two and one-half percen t (2.5%) of the plumbing, electrical, and HVAC installation costs. The determination of value or valuation is based o n the total value of all construction work for which a permit is issued. TABLE 1-A – MODULAR BUILDING PERMIT FEES TOTAL VALUATION FEE $1 to $500 = $18.80 $18.80 for the first $500 plus $2.44 for each additional $501 to $2,000 = $100, or fraction thereof, to and including $2,000 TABLE 1-A – MODULAR BUILDING PERMIT FEES TOTAL VALUATION FEE $55.40 for the first $2,000 plus $11.20 for each additional $2,001 to $25,000 = $1,000, or fraction thereof, to and including $25,000 $313.40 for the first $25,000 plus $8.09 for each additional $25,001 to $50,000 = $1,000, or fraction thereof, to and including $50,000 $515 for the first $50,000 plus $5.60 for each additional $50,001 to $100,000 = $1,000, or fraction thereof, to and including $100,000 $795 for the first $100,000 plus $4.48 for each additional $100,001 to $500,000 = $1,000, or fraction thereof, to and including $500,000 $2,587 for the first $500,000 plus $3.80 for each additional $500,001 to $1,000,000 = $1,000, or fraction thereof, to and including $1,000,000 $4,487 for the first $1,000,000 plus $2.92 for $1,000,001and up = each additional $1,000, or fraction thereof (1-1-25)T 02. Modular Plan Review. The Modular Building fee includes an additional amount equal to sixty- five percent (65%) of the permit fee calculated in accordance with Table 1-A. A fee of sixty-five dollars ($65) pe r hour applies to additional plan review required by changes, additions, or revisions to plans. (7-1-24) 03. Manufactured/Mobile Home Installation Permit Fees
or fraction thereof (1-1-25)T 02. Modular Plan Review. The Modular Building fee includes an additional amount equal to sixty- five percent (65%) of the permit fee calculated in accordance with Table 1-A. A fee of sixty-five dollars ($65) pe r hour applies to additional plan review required by changes, additions, or revisions to plans. (7-1-24) 03. Manufactured/Mobile Home Installation Permit Fees. Permits must be obtained from th e Division prior to the site installation governed by 44-2202, and 39-4004, Idaho Code in accordance with th e following schedule: (7-1-24) a. Single Section Unit. The permit fee is one hundred twenty dollars ($120). (1-1-25)T b. Double Section Unit. The permit fee is one hundred sixty dollars ($160). (1-1-25)T c. More Than Two Sections. The permit fee for a home consisting of more than two (2) sections is tw o hundred dollars ($200). (1-1-25)T 04. In-Plant Inspection Agency Fees. In-plant inspection fees for manufactured homes produced b y Idaho Manufactures as per 39-4003A and 39-4004 of Idaho Code is set at forty-five dollars ($45) per floor. (7-1-24) 05. Inspections at Manufacturing Plants. The Division conducts inspections at the manufacturin g plant to determine compliance with codes adopted by Title 39, Chapters 40 and 41, Idaho Code, and Title 54 , Chapters 10, 26, and 50, Idaho Code. (7-1-24) 06. Manufactured Home Site Installation Inspections. Installation permits must be obtained fro m the Division for installations in areas where there is no approved local program, or from a city or county that has b y ordinance adopted building codes pursuant to Section 39-4116, Idaho Code, and whose installation program has bee n approved by the Division. All installations must be inspected and approved by the authority having jurisdictio n before the manufactured home is occupied. (7-1-24) a. Installation inspections shall be conducted in accordance with the Idaho Manufactured Hom e Installation Standard or the Design Approval Primary Inspection Agency of the manufactured home
ode, and whose installation program has bee n approved by the Division. All installations must be inspected and approved by the authority having jurisdictio n before the manufactured home is occupied. (7-1-24) a. Installation inspections shall be conducted in accordance with the Idaho Manufactured Hom e Installation Standard or the Design Approval Primary Inspection Agency of the manufactured home. (7-1-24) 07. Modular Site Installation Inspection. In order to complete the installation of an Idaho approve d Modular Building, approval and inspection of the installation by the enforcement agency having jurisdiction over th e site location is required. (7-1-24) 08. Qualifications of Inspectors. All inspectors must be properly certified for the type of inspectio n being conducted. The Factory Built Structures Board recognizes certifications granted through the Nationa l Certification Program Construction Code Inspector program (NCPCCI), the National Inspection Testing Certification program (NITC), the International Association of Electrical Inspectors (IAEI), and the International Code Council (ICC). (7-1-24) 09. Minimum Training Requirements for Inspectors. All manufactured home installation inspector s must complete eight (8) hours of training or instruction germane to the profession. (7-1-24) 10. Rights and Limitations of Local Enforcement Agencies for Modular Buildings. (7-1-24) a. A local enforcement agency has the right to require a complete set of plans and specifications approved by the Division for each Modular Building to be installed within its jurisdiction, to require that all permits be obtained before delivery of any unit. (7-1-24) b
ction germane to the profession. (7-1-24) 10. Rights and Limitations of Local Enforcement Agencies for Modular Buildings. (7-1-24) a. A local enforcement agency has the right to require a complete set of plans and specifications approved by the Division for each Modular Building to be installed within its jurisdiction, to require that all permits be obtained before delivery of any unit. (7-1-24) b. A local enforcement agency does not have the right to: open for inspection any Modular Buildin g or component bearing an Insignia to determine compliance with any codes or ordinances; require by ordinance or otherwise that Modular Buildings meet any requirements not equally applicable to on-site construction; or to charg e permit or plan review fees for any portion of the structure prefabricated or assembled at a place other than th e Building Site. (7-1-24) 11. Division Approval. A city or county that has by ordinance adopted a building code pursuant t o Section 39-4116, Idaho Code, is eligible to participate in the inspection of manufactured and mobile homes. Suc h local installation inspection program must be approved by the Division to provide inspection services if the followin g minimum criteria is met: (7-1-24) a. Inspections are conducted by the city or county employing inspectors holding a valid certificatio n as residential building inspector from the International Code Council; (7-1-24) b. Inspectors attended training sessions provided or approved by the Division and receive a certificat e evidencing successful completion thereof. (7-1-24) c. Voluntary Withdrawal. A city or county may voluntarily withdraw from participation in th e program to inspect manufactured homes upon providing to the Administrator of the Division thirty (30) days written notice of its intention to do so. (7-1-24) d. Quality Assurance. Any inspected installation is subject to quality assurance reviews by Division of Occupational and Professional Licenses
1-24) c. Voluntary Withdrawal. A city or county may voluntarily withdraw from participation in th e program to inspect manufactured homes upon providing to the Administrator of the Division thirty (30) days written notice of its intention to do so. (7-1-24) d. Quality Assurance. Any inspected installation is subject to quality assurance reviews by Division of Occupational and Professional Licenses. Findings made by the Division pursuant to such reviews will be forwarde d to the inspection authority having jurisdiction. (7-1-24) i. All inspectors and approved programs are subject to review. (7-1-24) 12. Modular Insignia and Serial Number. (7-1-24) a. Assigned Insignia are not transferable and are void when not affixed as assigned. (7-1-24) b. Each Modular Building must bear a legible identifying serial number. Each section of a multipl e Modular Building must have the same identifying serial number followed by a numerical sequence identifier or a letter suffix, or both. (7-1-24) 501. -- 999. (RESERVED)

## Nearby sections

- [IDAPA 24.39.31.000 Section 000. Legal Authority](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_000.md)
- [IDAPA 24.39.31.001 Section 001. Scope](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_001.md)
- [IDAPA 24.39.31.002 Section 002. Incorporation By Reference](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_002.md)
- [IDAPA 24.39.31.003 Section 003. Definitions](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_003.md)
- [IDAPA 24.39.31.100 Section 100. Licensure](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_100.md)
- [IDAPA 24.39.31.400 Section 400. Manufactured/Mobile Home License Fees](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_400.md)
- [IDAPA 24.39.31.500 Section 500. Permits, Plan Reviews, And Inspections](https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_500.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_ID_IDAPA_24_39_31_500. Check the current official text before relying on it. Not legal advice.