# 8 CCR 1302-14: NON-RESIDENTIAL AND RESIDENTIAL FACTORY-BUILT STRUCTURES AND TINY HOMES; SELLERS OF MANUFACTURED HOMES AND TINY HOMES; MANUFACTURED HOME, TINY HOME, AND MULTI-FAMILY STRUCTURE INSTALLATIONS

> Colorado · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_14

## Section

- **Citation:** 8 CCR 1302-14
- **Heading:** NON-RESIDENTIAL AND RESIDENTIAL FACTORY-BUILT STRUCTURES AND TINY HOMES; SELLERS OF MANUFACTURED HOMES AND TINY HOMES; MANUFACTURED HOME, TINY HOME, AND MULTI-FAMILY STRUCTURE INSTALLATIONS
- **Jurisdiction:** Colorado
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Code of Colorado Regulations / 1300 Department of Local Affairs / 1302 Division of Housing / 8 CCR 1302-14

## Text

1
DEPARTMENT OF LOCAL AFFAIRS
Division of Housing
NON-RESIDENTIAL AND RESIDENTIAL FACTORY-BUILT STRUCTURES AND
TINY HOMES; SELLERS OF MANUFACTURED HOMES AND TINY HOMES;
MANUFACTURED HOME, TINY HOME, AND MULTI-FAMILY STRUCTURE
INSTALLATIONS; FOUNDATION SYSTEMS FOR MANUFACTURED HOMES, TINY
HOMES, AND FACTORY-BUILT STRUCTURES WHERE NO STANDARDS EXIST;
AND HOTELS, MOTELS, AND MULTI-FAMILY STRUCTURES IN THOSE AREAS OF
THE STATE WHERE NO STANDARDS EXIST
8 CCR 1302-14
[Editor’s Notes follow the text of the rules at the end of this CCR Document.]
Rule 1.
Definitions.
In addition to the definitions provided in section 24-32-3302, C.R.S., the following
definitions apply to these rules:
1.1
“Authorized quality assurance representative” as defined in section 24-32-
3302(1), C.R.S., means a “third party agency” (defined in Rule 1.35 below)
approved by the Division of Housing.
1.2
“Alternative Construction” or “AC” has been replaced with “On-site Construction
(OC)” in Rule 1.21. This definition has been left in since there are number of
forms and documents circulating with this legacy term.
1.3
“Authority Having Jurisdiction” or “AHJ” means the local government’s building
department with oversight over where the structure is to be located.
1.4
“Built-for-Purpose Trailer” means a vehicle trailer that is built to serve as a
construction platform for a tiny home and has: a Vehicle Identification Number
(VIN), a Gross Vehicle Weight Rating (GVWR), and is capable of sustaining and
moving a tiny home.
1.5
“Certificate of Occupancy” means a certificate issued by the Division of Housing
stating at the time of issuance the structure was built in compliance with all
applicable codes and construction standards adopted by the State Housing
Board. It only applies to motels, hotels, and multi-family structures in those areas
of the state where no such standards exist.
Code of Colorado Regulations
Secretary of State
State of Colorado

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
the time of issuance the structure was built in compliance with all
applicable codes and construction standards adopted by the State Housing
Board. It only applies to motels, hotels, and multi-family structures in those areas
of the state where no such standards exist.
Code of Colorado Regulations
Secretary of State
State of Colorado

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

2
1.6
“Certified” is the status given by the Division of Housing to an installer,
independent contractor, manufacturer, or Third Party Agency after submission of
an application and required documentation set in rule, has shown compliance
with the minimum performance standards for quality control of their respective
registration requirements and approved by the Division. A business entity may
become certified only when all registered installers within that entity have been
certified. A certified individual installer registered under the business entity is
authorized to only certify an installation that they supervised completion of in
compliance with Rule 1.10.
1.7
“Certified Inspector” means one of the following individuals authorized by the
Division of Housing:
1.7.1 An “independent contractor” as defined pursuant to section 24-32-
3302(15), C.R.S., that is authorized by the Division of Housing to perform
or enforce installation inspections,
1.7.2 An employee of a “state” or “firm” as used in the definition of a “quality
assurance representative” pursuant to section 24-32-3302(30), C.R.S.,
and further defined in Rule 1.35.2 of these rules, or
1.7.3 A Colorado licensed engineer that is authorized by the Division of Housing
to perform an On-site Construction inspection and oversight manufacturer
inspection.
1.8
“Closed Panel System” means a building component or assembly built off-site
that may include electrical, plumbing, mechanical, or insulation with finishes
applied to both sides and then transported to be erected on-site to complete a
residential or nonresidential building
authorized by the Division of Housing
to perform an On-site Construction inspection and oversight manufacturer
inspection.
1.8
“Closed Panel System” means a building component or assembly built off-site
that may include electrical, plumbing, mechanical, or insulation with finishes
applied to both sides and then transported to be erected on-site to complete a
residential or nonresidential building.
1.9
“Conflict of Interest” means when there is personal or private interest(s) sufficient
to influence or appear to influence the proper exercise of duties or
responsibilities.
1.10 “Direct On-site Supervision” as used in section 24-32-3315(1)(b)(I), C.R.S.,
means the registered or certified installer must be present at the installation “site”
as defined by section 24-32-3302(33), C.R.S., and readily available to properly
supervise installation work as defined by section 24-32-3302(16), C.R.S., that is
performed by an employee not registered or certified as an installer.
1.11 “Down payment(s)” as used in section 24-32-3325(2)(b), C.R.S, and Rules 5.3,
5.4, 5.10, and 5.11, means all money given by a purchaser to a seller for the
purchase of a manufactured home or tiny home before the manufactured home
or tiny home is delivered.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

3
1.12 “Factory-built” means the construction of nonresidential structures or residential
structures (modular homes, tiny homes, or multi-family structures) that occurs at
an offsite location (e.g. manufacturing plant, small business space or school
workshop, or private barn), separate from the site where the structure is to be
installed.
1.13 “Firm” as used in the definition of an “independent contractor” pursuant to section
24-32-3302(15), C.R.S., and in the definition of a “quality assurance
representative” pursuant to section 24-32-3302(30), C.R.S., means a “third party
agency” (defined in Rule 1.35 below)
, small business space or school
workshop, or private barn), separate from the site where the structure is to be
installed.
1.13 “Firm” as used in the definition of an “independent contractor” pursuant to section
24-32-3302(15), C.R.S., and in the definition of a “quality assurance
representative” pursuant to section 24-32-3302(30), C.R.S., means a “third party
agency” (defined in Rule 1.35 below).
1.14 “HUD-code Home” means a manufactured home constructed in compliance with
the “National Manufactured Housing Construction and Safety Standards Act of
1974”, 42 U.S.C. sec. 5401 et seq., and any standard promulgated by the
Secretary of the U.S. Department of Housing and Urban Development (HUD)
pursuant to that federal act.
1.15 “Individual” as used in the definition of an “independent contractor” pursuant to
section 24-32-3302(15), C.R.S., means a Colorado licensed professional
engineer (PE) or architect authorized by the Division of Housing to perform or
enforce installation inspections.
1.16 “Insignia” means a seal, label, or tag issued by the Division of Housing that when
permanently affixed to a structure confirms compliance as one of the following:
1.16.1 An “insignia of approval” pursuant to sections 24-32-3303(1)(c), 24-32-
3310, 24-32-3311(a), 24-32-3311(1)(a.5), 24-32-3311(1)(b), 24-32-
3311(4), 24-32-3311(5), C.R.S., issued by the Division of Housing or an
“authorized quality assurance representative” pursuant to sections 24-32-
3302(1), 24-32-3303(1)(c), 24-32-3304(1)(e), 24-32-3311(1)(a), 24-32-
3311(1)(b), 24-32-3311(4), and 24-32-3311(5), C.R.S., verifies that a
factory built structure is deemed to be designed and constructed in
compliance with the requirements of all codes and standards enacted or
adopted by the state and accounts for any local government installation
requirements
ntative” pursuant to sections 24-32-
3302(1), 24-32-3303(1)(c), 24-32-3304(1)(e), 24-32-3311(1)(a), 24-32-
3311(1)(b), 24-32-3311(4), and 24-32-3311(5), C.R.S., verifies that a
factory built structure is deemed to be designed and constructed in
compliance with the requirements of all codes and standards enacted or
adopted by the state and accounts for any local government installation
requirements.
1.16.2 A “certificate of installation” as defined pursuant to section 24-32-3302(3),
C.R.S., and issued by the Division of Housing or a party authorized by the
Division of Housing, verifies compliance with the installation standards
established by the State Housing Board in Rule 2.12 through 2.14 of these
rules.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

4
1.17 “Installation Authorization” pursuant to sections 24-32-3317(1), 24-32-3317(2),
and 24-32-3317(4), C.R.S., means a Division of Housing approved form posted
on the site of an installation, located beyond the authority of a “participating
jurisdiction” as defined in Rule 1.23, verifying that the home owner or registered
installer has made application with the Division of Housing to install a
manufactured home or a tiny home and has received authorization to install it, or
that the home will be installed by a certified installer who has automatic
authorization to do so under their certified status.
1.18 “Multi-family structure(s)” means a commercial use structure containing at least
three independent dwelling units within an International Building Code (IBC)
Group R-2, R-3, or R-4 building; or a residential use structure built to the
International Residential Code (IRC) Townhouse building provisions. Such
commercial uses are limited to apartments, condominiums, live work units,
vacation time shares, and other similar uses with independent dwelling units
where the building is used, intended, or designed to be built, used, rented,
leased, let, or hired out to be occupied or that are occupied for living purposes
ture built to the
International Residential Code (IRC) Townhouse building provisions. Such
commercial uses are limited to apartments, condominiums, live work units,
vacation time shares, and other similar uses with independent dwelling units
where the building is used, intended, or designed to be built, used, rented,
leased, let, or hired out to be occupied or that are occupied for living purposes.
1.19 “No cover” means no materials, appliances, or equipment should be concealing
any component specifically requested to be exposed for inspection by the
Division or its approved Third Party Agency or required for rough inspection per
the adopted codes in these Administrative Rules.
1.20 “Occupancy” or “Occupied” means a factory-built structure, manufactured home,
or tiny home designed, built, modified, or used with the intent for individuals to
enter.
1.21 “On-site Construction” or “OC” means on-site construction or modification of the
factory-built structure that directly relates to the durability, quality, and safety; that
is completed at the installation “site” as defined by section 24-32-3302(33),
C.R.S.; using components not installed at the manufacturer’s location; and to
complete the compliance of that structure as reflected in the Division of Housing
approved plans. These items do not include the component(s) required for
setting and securing the structure for its installation.
1.22 “Open Construction” means any building component, assembly, or system
manufactured in such a manner that all concealed parts or processes of
manufacture can be readily inspected at the building site without disassembly,
damage, or destruction, i.e., panelized construction assembled on site, or units
that arrive onsite for a no cover inspection by local jurisdiction. Note: Assembled
rooms or spaces, panels with finishes applied to both sides and electrical wiring
in conduit are not open construction, but rather a “closed panel system” as
defined pursuant to Rule 1.8.
ected at the building site without disassembly,
damage, or destruction, i.e., panelized construction assembled on site, or units
that arrive onsite for a no cover inspection by local jurisdiction. Note: Assembled
rooms or spaces, panels with finishes applied to both sides and electrical wiring
in conduit are not open construction, but rather a “closed panel system” as
defined pursuant to Rule 1.8.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

5
1.23 “Participating Jurisdiction” means a “local government” as defined pursuant to
section 24-32-3302(18), C.R.S., which has agreed to administer and inspect
manufactured housing installations within the legal boundaries of the jurisdiction
and in compliance with the manufactured home, multi-family, and tiny home
installation standards established by the State Housing Board in rules 2.12
through 2.14 of these rules.
1.24 “Permanent Foundation” as defined in section 24-32-3302(26.5) C.R.S, is further
defined to account for point loads of the structure to the ground, prevent lateral
movement and overturning of the structure, and provide frost protection. Local
government building departments are responsible for design review and approval
of permanent foundations. For areas of the state without a local government
building department, the Division of Housing will review and approve permanent
foundations designed by a Colorado licensed design professional.
1.25 “Plan” means a specific design for the construction of a structure submitted by
the manufacturer to the Division of Housing for review and approval that typically
includes a floor plan, elevation drawings, structural pages, electrical circuit
layouts, recommended foundation drawings, mechanical drawings, plumbing
isometrics, cross section drawings, an energy code compliance report, heat load
calculations, and the engineering calculations
nstruction of a structure submitted by
the manufacturer to the Division of Housing for review and approval that typically
includes a floor plan, elevation drawings, structural pages, electrical circuit
layouts, recommended foundation drawings, mechanical drawings, plumbing
isometrics, cross section drawings, an energy code compliance report, heat load
calculations, and the engineering calculations.
1.26 “Quality Control Procedures” means procedures prepared by a manufacturer for
each of its manufacturing facilities and approved by the Division of Housing or
“third party agency” (defined in Rule 1.35. below) describing the method that the
manufacturer uses to assure structures produced by that manufacturer are in
conformance with the applicable standards, codes, and approved plans.
1.27 “Red Tag Notice” means a physical identification posted visibly on a particular
structure indicating that it is in violation of applicable state statutes, federal law,
or these rules. A structure posted with this notice cannot be sold, offered for sale,
nor have occupancy in Colorado.
1.28 “Registered” is the status that is given by the Division of Housing that signifies
that an installer, independent contractor, seller, or manufacturer has met the
minimum requirements for registration, and approved by the Division, through
submission of an application and required documents set in rule.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
have occupancy in Colorado.
1.28 “Registered” is the status that is given by the Division of Housing that signifies
that an installer, independent contractor, seller, or manufacturer has met the
minimum requirements for registration, and approved by the Division, through
submission of an application and required documents set in rule.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

6
1.29 “Remote Inspection” means a production inspection performed where the
inspector is in a location other than the location where the structure is being
manufactured using a computer having an internet or cellular connection to
communicate with a manufacturer’s representative responsible for quality control.
The manufacturer’s representative responsible for quality control shall utilize a
smart device (cell phone, tablet, etc.). The inspection must be performed in “real
time” with continuous live stream video from the manufacturing location, and two-
way audio. Each inspection must be securely stored on the internet and
retrievable by VIN, serial number, insignia number or other approved identifier.
Remote inspections may only be conducted by an approved Third Party Agency”.
1.30 “State Administrative Agency” or “SAA” means the Building Codes & Standards
Section of the Department of Local Affairs’ Division of Housing which has been
approved or conditionally approved by the federal government to carry out its
state plan for enforcement of its standards pursuant to Rule 2.8 of these rules.
1.31 “Temperature Sensitive Equipment” means equipment or instrumentation whose
performance or lifespan can change due to changes in the ambient temperature
surrounding that equipment or instrumentation.
1.32 “Temporary Foundation” As defined in section 24-32-3302(34) C.R.S., is further
defined to clarify that local government building departments are responsible for
design review and approval of temporary foundations
sitive Equipment” means equipment or instrumentation whose
performance or lifespan can change due to changes in the ambient temperature
surrounding that equipment or instrumentation.
1.32 “Temporary Foundation” As defined in section 24-32-3302(34) C.R.S., is further
defined to clarify that local government building departments are responsible for
design review and approval of temporary foundations. For areas of the state
without a local government building department, the Division of Housing will
review and approve temporary foundation designed by a Colorado licensed
design professional.
1.33 “Temporary Structure” means a structure that is intended to be installed at a
location for no longer than 180 days.
1.34 “Temporary Use” means a structure that is only intended to be occupied for short
periods of time. This use may be for temporary or permanent structures.
1.35 “Third Party Agency” means one of the following entities authorized by the
Division of Housing:
1.35.1 “Firm” as used in the definition of an “independent contractor” pursuant to
section 24-32-3302(15), C.R.S., to perform or enforce installation
inspections, or
1.35.2 “State” or “firm” as used in the definition of a “quality assurance
representative” pursuant to section 24-32-3302(30), C.R.S., to:

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

7
(A)
Inspect a manufacturer’s registered or certified facility by
conducting a “production review” pursuant to section 24-32-
3302(28), C.R.S., in order to determine its ability to follow a building
“plan” approved by the Division of Housing and the construction
standards and codes adopted by the State Housing Board,
evaluating a manufacturer’s “quality control procedures”, and
performing design evaluations;
(B)
Inspect a factory-built structure or tiny home at seller lots or on site
as part of an oversight inspection of a registered factory, random
audit inspection of a certified factory, or an on-site construction
(OC) inspection to ensure compliance with construction standards
and codes ado
e Housing Board,
evaluating a manufacturer’s “quality control procedures”, and
performing design evaluations;
(B)
Inspect a factory-built structure or tiny home at seller lots or on site
as part of an oversight inspection of a registered factory, random
audit inspection of a certified factory, or an on-site construction
(OC) inspection to ensure compliance with construction standards
and codes adopted by the State Housing Board; and
(C)
Certify a manufacturer’s factory-built structure or tiny home by
affixing an insignia of approval issued by the Division of Housing
deeming it to be designed and constructed in compliance with the
requirements of all codes and standards enacted or adopted by the
State and accounting for any local government installation
requirements adopted in compliance with sections 24-32-3310 and
24-32-3318.
1.36 “Tiny House” is distinct from a “tiny home” as defined pursuant to section 24-32-
3302(35), C.R.S. in that a “tiny house” as defined in Appendix AQ of the 2021
International Residential Code shall be installed on a permanent foundation.
1.37 “Vehicle Chassis” means the base frame of a single-family dwelling, designed
and constructed for long-term occupancy that supports the home’s construction
and transportation, and includes axles, wheels, GVWR and a VIN.
1.38 “Wildfire Risk” means local building codes applied to meet the intent of the
International Wildland-Urban Interface Code per Chapter 5 – Special Building
Construction Regulations.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
designed
and constructed for long-term occupancy that supports the home’s construction
and transportation, and includes axles, wheels, GVWR and a VIN.
1.38 “Wildfire Risk” means local building codes applied to meet the intent of the
International Wildland-Urban Interface Code per Chapter 5 – Special Building
Construction Regulations.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

8
Rule 2.
Codes and Standards
Pursuant to sections 24-32-3303(1), 24-32-3304(1)(a) and (b), and section 24-32-
3305(2), C.R.S., the State Housing Board hereby adopts and incorporates by reference
the following nationally recognized codes, standards, guidelines, procedures, or rules in
their entirety, except for the revisions, additions, deletions, or exceptions/exemptions
specified below. The incorporated codes, standards, guidelines, procedures, or rules do
not include later revisions. They are readily available for public inspection in written
format during the regular business hours at the Division of Housing, Building Codes and
Standards Section, 1313 Sherman Street, Suite 320, Denver, CO 80203. Paper copies
are available for a reasonable fee paid to the Division of Housing. Electronic copies are
available from the agencies originally issuing them as noted below. In the case of a
conflict between an adopted code, standard, procedure, or rules, the program will
review and provide written guidance.
Building Codes for Factory-Built Residential Structures and Tiny Homes; Factory-
Built Nonresidential Structures; and Site-Built Hotels, Motels, and Multi-Family
Structures in those areas of the State where no Standards Exist
Manufacturers are permitted to use the construction codes in effect prior to the adoption
of any new code for a maximum of 180 days after the amendment in rule takes effect
.
Building Codes for Factory-Built Residential Structures and Tiny Homes; Factory-
Built Nonresidential Structures; and Site-Built Hotels, Motels, and Multi-Family
Structures in those areas of the State where no Standards Exist
Manufacturers are permitted to use the construction codes in effect prior to the adoption
of any new code for a maximum of 180 days after the amendment in rule takes effect.
The Program Manager for the Building Codes & Standards Section, the Director of the
Office of Regulatory Oversight, the Deputy Division Director, or the Division Director is
authorized to grant, in writing, one extension, for a period not more than 180 days.
2.1
The International Building Code (IBC), 2021 Edition, published by the
International Code Council, Inc. (ICC). This is a safety code and is available
through the ICC at: https://www.iccsafe.org.
2.1.1 Section 105.2 Work exempt from permit
Revise #1 within “Building” to:
2.1.1.1
Any structures that are one story in height and utilized for the
storage of equipment or materials that:
- Do not exceed 120 sq. ft.
- Are not connected to a permanent utility (power, sewer,
fuel-gas)
- Are not classified as an electrical hazardous area per
Article 500 of the NEC (is a nonhazardous area), and
- Are not installed on a permanent foundation.
2.1.1.2
Listed Structures

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

9
A building that in its entirety operates as a listed product is
automatically exempt as long as the manufacturer is able to
demonstrate it is labeled as such.
2.1.1.3
Open Panel Construction:
A building component, assembly, or system constructed in
the factory as open construction (see definitions).
The above exemptions from approval through the State
factory-built program do not grant any exemption from local
jurisdiction requirements or state electrical or plumbing
requirements. The above exemptions do not grant
authorization for any work to be done in a manner that is in
violation of the provisions of the adopted codes
stem constructed in
the factory as open construction (see definitions).
The above exemptions from approval through the State
factory-built program do not grant any exemption from local
jurisdiction requirements or state electrical or plumbing
requirements. The above exemptions do not grant
authorization for any work to be done in a manner that is in
violation of the provisions of the adopted codes.
2.1.2 Section 901.2 Fire Protection systems
Add the following new section:
2.1.2.1
Section 901.2.1 Certified inspector required
An automatic fire sprinkler system shall be installed in
buildings as required by the local jurisdiction where the
structure will be set. Final tests required by this Section shall
be approved by a certified inspector
2.1.3 Section 907.2.10.2 (1) Smoke Alarms – Location
Revise “immediate vicinity” to read “within 15 feet”.
2.1.4 Section 907.2.10.6 Smoke Alarms – Power Source
Add to the end of the paragraph the following:
Smoke and/or carbon monoxide alarms shall not be installed on a circuit
dedicated only for smoke and/or carbon monoxide alarms.
2.1.5 Section 915.2.1 Carbon monoxide alarms – Locations
Revise “immediate vicinity” to read “within 15 feet”.
2.1.6 Section 915.4.1 Carbon monoxide alarms – Power Source
Add to the end of the paragraph the following:
Smoke and/or carbon monoxide alarms shall not be installed on a circuit
dedicated only for smoke and/or carbon monoxide alarms.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
tion 915.2.1 Carbon monoxide alarms – Locations
Revise “immediate vicinity” to read “within 15 feet”.
2.1.6 Section 915.4.1 Carbon monoxide alarms – Power Source
Add to the end of the paragraph the following:
Smoke and/or carbon monoxide alarms shall not be installed on a circuit
dedicated only for smoke and/or carbon monoxide alarms.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

10
2.1.7 Section 1006.1 Numbers of Exit Access Doorways
Add 1006.1 Single exit in certain multifamily residential structures – For
multifamily residential structures that meet the requirements of Colorado
Revised Statutes 30-28-213 or 31-15-604, a single exit may serve a
building no more than five stories for Group R-2 Occupancy.
2.1.8 Chapter 13
Delete in its entirety.
2.1.9 Section 1507.1.1 Ice barriers
Add the following sentence at the beginning:
Due to a history of ice forming along the eaves in Colorado, an ice barrier
is required.
And add the following language at the end of the first sentence:
...or not fewer than two layers of underlayment cemented together and to
the roof.
2.1.10 Section 1608.2 Ground snow loads
Revise to read as follows:
Roof Snow Load (Pf) shall be in accordance with the local jurisdiction
requirements and shall not be less than a minimum roof snow load of 30
PSF. The allowable increase of snow duration shall not be used when the
snow load is above 65 PSF.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
ed together and to
the roof.
2.1.10 Section 1608.2 Ground snow loads
Revise to read as follows:
Roof Snow Load (Pf) shall be in accordance with the local jurisdiction
requirements and shall not be less than a minimum roof snow load of 30
PSF. The allowable increase of snow duration shall not be used when the
snow load is above 65 PSF.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

11
2.1.11 Section 1609.3.1 Wind speed conversion
Add this new section with the following language:
The 3 second gust basic wind speed shall be in accordance with the local
jurisdiction requirements. For jurisdictions that have adopted a building
code edition prior to the 2012, the basic wind speed of that jurisdiction
shall be multiplied by 1.20 for Risk category I structures, 1.29 for Risk
category II structures, and 1.38 for Risk category III and IV structures to
obtain Vult. The design wind speed Vult shall not be less than the
minimum basic wind speeds as follows (Risk category as determined by
Table 1604.5):
Risk category I structures – 105 MPH
Risk category II structures – 115 MPH
Risk category III and IV structures – 120 MPH
The Exposure category shall be C, unless otherwise justified.
2.1.12 Section 2111.1 and 2111.14.1 Fireplaces
Add this new section with the following language:
Every new fireplace must comply with one of the following:
1.
Listed and labeled fireplace and chimney systems composed of
factory-made components, and assembled in the field in
accordance with the manufacturer’s instructions and the conditions
of the listing, and
2.
Approved gas logs.
2.2
The International Residential Code (IRC), 2021 Edition, published by the
International Code Council, Inc. (ICC). This is a safety code and is available
through the ICC at: https://www.iccsafe.org.
2.2.1 Section 105.2 Work exempt from permit
Revise #1 within “Building to:
-
Any structures that are one story in height and utilized
for the storage of equipment or materials that:
-
Do not exceed 200 sq. ft.,
ernational Residential Code (IRC), 2021 Edition, published by the
International Code Council, Inc. (ICC). This is a safety code and is available
through the ICC at: https://www.iccsafe.org.
2.2.1 Section 105.2 Work exempt from permit
Revise #1 within “Building to:
-
Any structures that are one story in height and utilized
for the storage of equipment or materials that:
-
Do not exceed 200 sq. ft.,

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

12
-
Are not connected to a permanent utility (power,
sewer, fuel-gas)
-
Are not classified as an electrical hazardous area per
Article 500 of the NEC (is a nonhazardous area), and
-
Are not installed on a permanent foundation.
Listed Structures
A building that in its entirety operates as a listed product is
automatically exempt as long as the manufacturer is able to
demonstrate it is labeled as such.
Open Panel Construction
A building component, assembly, or system constructed in
the factory as open construction (see definitions).
The above exemptions from approval through the State
factory-built program do not grant any exemption from local
jurisdiction requirements or state electrical or plumbing
requirements. The above exemptions do not grant
authorization for any work to be done in a manner that is in
violation of the provisions of the adopted codes.
2.2.2 Table R301.2 (1) -
Revise as follows:
Climatic or Geographic
Design Criteria
for IRC Dwellings
(Risk Category II Structures)
Division of Housing Minimum
Roof Snow load(1)
30 psf, non-reducible
Basic Wind Speed(1)
115 mph (Vult), Exposure C
Wind Topographic Effects
Per Local
Seismic Design Category(1)
Minimum B
Weathering
Severe
Frost Line Depth(4)
Per Local

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
se as follows:
Climatic or Geographic
Design Criteria
for IRC Dwellings
(Risk Category II Structures)
Division of Housing Minimum
Roof Snow load(1)
30 psf, non-reducible
Basic Wind Speed(1)
115 mph (Vult), Exposure C
Wind Topographic Effects
Per Local
Seismic Design Category(1)
Minimum B
Weathering
Severe
Frost Line Depth(4)
Per Local

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

13
Climatic or Geographic
Design Criteria
for IRC Dwellings
(Risk Category II Structures)
Division of Housing Minimum
Termite Damage
Slight
Winter Design
Temperature(2)
Per Local
Ice Barrier Underlayment
Requirement
Yes
Flood Hazards
Per Local
Air Freezing Index(3)
Per Local
Mean Annual Temperature(3)
Per Local
Wildfire Risk
Per Local
Radon Mitigation
Per Local
ADU Fire Separation
Per Local
(1)The roof snow load, wind design, and seismic zone shall be in accordance with
the local jurisdiction requirements and shall not be less than the minimums
stated. The allowable increase for snow duration shall not be used when the
snow load is above 65 PSF.
(2)See Appendix B and verify with local jurisdiction.
(3)See the National Climatic Data Center data table “Air Freezing Index-USA
Method (Base 32o Fahrenheit)” at www.ncdc.noaa.gov.
(4) In areas of the state without a local jurisdiction, the Division of Housing will
approve all temporary or permanent foundation systems as defined in Rule 2.
2.2.3 Table R301.5 – Live Loads
Add footnote (j) to Decks, Porches, Exterior balconies, Fire escapes to
read as follows:
e National Climatic Data Center data table “Air Freezing Index-USA
Method (Base 32o Fahrenheit)” at www.ncdc.noaa.gov.
(4) In areas of the state without a local jurisdiction, the Division of Housing will
approve all temporary or permanent foundation systems as defined in Rule 2.
2.2.3 Table R301.5 – Live Loads
Add footnote (j) to Decks, Porches, Exterior balconies, Fire escapes to
read as follows:
(j)When the snow load is above 65 psf, the minimum uniformly distributed
live loads for exterior balconies, decks and fire escapes shall be as
required for roof snow loads.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

14
2.2.4 Table R302.1 (1) – Exterior Walls
Delete footnote (b).
2.2.5 Table R302.1 (2) – Exterior Walls—Dwellings with Fire Sprinklers
Delete footnote (c).
2.2.6 Section R308.4.6 Glazing adjacent to stairs and ramps
Revise to include the following sentence as an exception:
1.
Where the glazing is protected by a guard complying with Section
R312 and the plane of the glass is more than 18 inches (457 mm)
from the guard.
2.2.7 Section R308.4.7 Glazing adjacent to the bottom of the stair landing
Revise to increase to less than 60 inches (1524 mm) above the landing.
2.2.8 Section R310.1 Emergency escape and rescue opening required
Add a second sentence that reads as follows:
Cape Cod style attics that qualify as a story shall require one operable
emergency and escape opening.
2.2.9 Section 311.7.12 Ships ladders
Add the following sentence to the end of the Exception:
The device must remain fixed in position when used in these areas.
2.2.10 Section R313 Automatic Fire Sprinkler Systems
Delete this section and replace it with the following:
An automatic fire sprinkler system shall be installed in one and two family
dwellings and townhouses as required by the local jurisdiction where the
home will be set. In-plant and final tests required by this Section shall be
approved by a certified inspector
sition when used in these areas.
2.2.10 Section R313 Automatic Fire Sprinkler Systems
Delete this section and replace it with the following:
An automatic fire sprinkler system shall be installed in one and two family
dwellings and townhouses as required by the local jurisdiction where the
home will be set. In-plant and final tests required by this Section shall be
approved by a certified inspector.
2.2.11 Section 314.3 (2) Smoke Alarms – Location
Revise “immediate vicinity” to read “within 15 feet”.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

15
2.2.12 Section 314.4 Revise “Physical interconnection of smoke alarms shall not
be required where listed wireless alarms are installed and…” to “Physical
interconnection of smoke alarms shall not be required where listed
wireless alarms are installed in existing construction when approved by
the Division of Housing and…”
2.2.13 Section 314.6 Smoke Alarms – Power Source
Add to the end of the paragraph the following:
Smoke and/or carbon monoxide alarms shall not be installed on a circuit
dedicated only for smoke and/or carbon monoxide alarms.
2.2.14 Section 315.3 Carbon monoxide alarms – Locations
Revise “immediate vicinity” to read “within 15 feet”.
2.2.15 Section 315.6 Carbon monoxide alarms – Power Source
Add to the end of the paragraph the following:
Smoke and/or carbon monoxide alarms shall not be installed on a circuit
dedicated only for smoke and/or carbon monoxide alarms.
2.2.16 Section R802.10 Wood trusses
Add the following new section:
Section R802.10.5 Marking
Each truss shall be legibly branded, marked, or shall have other
permanent labeling of the truss drawing’s designated identification number
on the large face of the top chord and within two (2) feet of the peak of the
truss.
2.2.17 Section R905.1.2 Ice barriers
Revise to read as follows:
Due to a history of ice forming along eaves in Colorado, an ice barrier is
required
:
Section R802.10.5 Marking
Each truss shall be legibly branded, marked, or shall have other
permanent labeling of the truss drawing’s designated identification number
on the large face of the top chord and within two (2) feet of the peak of the
truss.
2.2.17 Section R905.1.2 Ice barriers
Revise to read as follows:
Due to a history of ice forming along eaves in Colorado, an ice barrier is
required. The ice barrier shall consist of a self-adhering polymer-modified
bitumen sheet and shall extend from the eave’s edge to a point at least
24” inside the exterior wall line of the building or of not fewer than two
layers of underlayment cemented together and to the roof.
2.2.18 Section R1004.4, G2406.2 exceptions 3 and 4, G2425.8 #7, G2445
Delete all and replace with the following:

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

16
Unvented fuel fired room heaters and unvented fuel fired fireplaces are
prohibited.
2.2.19 Add the following new sections:
Section R1001.1and R1004.1 – Fireplaces
Every new fireplace must comply with one of the following:
1.
Listed and labeled fireplace and chimney systems composed of
factory-made components, and assembled in the field in
accordance with manufacturer’s instructions and the conditions of
the listing, and
2.
Approved gas logs.
2.2.20 Section P2503.5.1 Rough plumbing
Delete the words “other than plastic” in the sentence for water and air
testing.
2.2.21 Chapter 11 ENERGY EFFICIENCY
Delete in its entirety.
2.2.22 Section M2001.1 Installation and G2452.2 Installation
Add the following sentence:
All rooms or spaces containing boilers shall be provided with a floor drain
and trap primer.
2.2.23 Section G2417.4.1 Test pressure
Revise to read as follows:
The test pressure to be used shall not be less than 1 ½ times the
proposed maximum working pressure, but not less than 10 psig (69 kPa
gauge) for a period of not less than 15 minutes
ation and G2452.2 Installation
Add the following sentence:
All rooms or spaces containing boilers shall be provided with a floor drain
and trap primer.
2.2.23 Section G2417.4.1 Test pressure
Revise to read as follows:
The test pressure to be used shall not be less than 1 ½ times the
proposed maximum working pressure, but not less than 10 psig (69 kPa
gauge) for a period of not less than 15 minutes. Where the test pressure
exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a
value that produces a hoop stress in the piping greater than 50 percent of
the specified minimum yield strength of the pipe. The test pressure for
valves and connections to appliances shall not exceed 0.5 psig (3kPa).
2.2.24 Electrical Sections
Delete Chapters 34 through 43.
2.2.25 Appendix A – Sizing and Capacities of Gas Piping

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

17
Adopted.
2.2.26 Appendix P – Sizing of Water Piping System
Adopted.
2.2.27 Appendix AQ – Tiny Houses and Tiny Homes

1.
Amend Appendix AQ Tiny Houses as follows:
a.
AQ101.1 Scope: Change to read: This appendix shall be
applicable to tiny houses, and “tiny homes” as defined by
section 24-32-3302(35), C.R.S., used as single dwelling
units. Tiny houses, and “tiny homes” as defined by section
24-32-3302(35), C.R.S., shall comply with this code except
as otherwise stated in this appendix. Insert “…and tiny
homes” after each reference to “tiny houses” in all sections
of this appendix.
b.
Add: AQ106.2.7 Tiny homes may use R30 in ceiling
insulation to meet the intent of R402.1.2
c.
Add: AQ107: Bathroom Lavatory, For Tiny Homes, if a
bathroom lavatory cannot be added due to size constraints,
then the kitchen sink can be substituted to meet the lavatory
requirement.
d.
Add: AQ108: Construction on a Built-for-Purpose Trailer.
The tiny home will be built on a built-for-purpose trailer
.
Add: AQ106.2.7 Tiny homes may use R30 in ceiling
insulation to meet the intent of R402.1.2
c.
Add: AQ107: Bathroom Lavatory, For Tiny Homes, if a
bathroom lavatory cannot be added due to size constraints,
then the kitchen sink can be substituted to meet the lavatory
requirement.
d.
Add: AQ108: Construction on a Built-for-Purpose Trailer.
The tiny home will be built on a built-for-purpose trailer.
Trailers that have structure modifications prior to the start of
the tiny home build must provide engineered stamped
drawings and the documentation to be roadworthy on
Colorado roads. (Structural modifications may change the
trailer classification to a kit trailer or homemade trailer and a
new VIN/GVWR and physical inspection by CDOT or
Colorado State Highway Patrol, or other approved agencies
may be required.)
e.
Add: AQ109: Tiny Home on a Temporary Foundation. A tiny
home on wheels which is installed on a temporary
foundation may utilize connections to an electrical pedestal
or plumbing connections that allow for movement from one
location to another.
2.3
The International Mechanical Code (IMC), 2021 Edition, published by the
International Code Council, Inc. (ICC). This is a safety code and is available
through the ICC at: https://www.iccsafe.org.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

18
2.3.1 Section 303.3.1 LPG appliance
Add the following new section:
LPG appliances shall not be installed in a pit, basement, or crawl space
where unburned fuel may accumulate unless an approved sensing device
is installed in conjunction with an automatic shutoff valve located where
the gas enters the structure only for retro-fitting of existing structures or as
required by the local jurisdiction
8
2.3.1 Section 303.3.1 LPG appliance
Add the following new section:
LPG appliances shall not be installed in a pit, basement, or crawl space
where unburned fuel may accumulate unless an approved sensing device
is installed in conjunction with an automatic shutoff valve located where
the gas enters the structure only for retro-fitting of existing structures or as
required by the local jurisdiction.
2.3.2 Section 903.1 General
Add the following additional sentence:
Every new installation of a solid fuel-burning, vented decorative appliance
or room heater shall meet the most stringent emission standards for wood
stoves established under State statute and/or regulations promulgated by
the State Air Quality Control Commission as of the time of installation of
the appliance or room heater. (Effective January 1, 1991 – CC90-617).
2.3.3 Section 903.3 Unvented gas log heaters
Delete this section in its entirety.
2.4
The International Plumbing Code (IPC), 2021 Edition, published by the
International Code Council, Inc. (ICC). This is a safety code and the edition as
adopted by the Colorado State Plumbing Board will be the state adopted edition.
This code is available through the ICC at: https://www.iccsafe.org.
A transition period of 180 days after the effective date applies. The Program
Manager for the Building Codes and Standards Section is authorized to grant, in
writing, one extension, for a period not more than 180 days.
Any conflicts that may arise between these amendments and a future State
adopted edition of the IPC shall be resolved by applying the specific amended
provisions of the 2021 edition. The following amendments are made to the NEC
for use with all factory-built units:
2.4.1 Appendix Chapter E – Sizing of water piping systems
2.4.1.1
Section 312.3
Delete the words “Plastic Piping shall not be tested by using air”.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
ted edition of the IPC shall be resolved by applying the specific amended
provisions of the 2021 edition. The following amendments are made to the NEC
for use with all factory-built units:
2.4.1 Appendix Chapter E – Sizing of water piping systems
2.4.1.1
Section 312.3
Delete the words “Plastic Piping shall not be tested by using air”.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

19
2.5
The National Electric Code (NEC), published by the National Fire Protection
Association, Inc. (NFPA), and the Edition as adopted by the Colorado State
Electrical Board at the time of plan submittal. This is a safety code and is
available through the NFPA at: https://www.nfpa.org.
A transition period of 180 days after the effective date applies. The Program
Manager for the Building Codes and Standards Section is authorized to grant, in
writing, one extension, for a period not more than 180 days.
Any conflicts that may arise between these amendments and a future State
adopted edition of the NEC shall be resolved by applying the specific amended
provisions of the 2020 edition. The following amendments are made to the NEC
for use with all factory-built units:
2.5.1 Article 210.52(A)(2) Wall Space.
Add the following exception to the end: Space directly below the island
and peninsular countertop and work surfaces are not considered wall
space.
2.5.2 Article 210.52(C)(2) Island and Peninsular Countertops and Work
Surfaces.
Add the following sentence to the end: “Receptacle outlets, other than
those installed per 210.52(C)(3) shall not be installed in the space directly
below the island or peninsular countertop or work surface.
2.5.3 Article 545 Manufactured Buildings
Add the following new section:
2.5.3.1
Section 545.14 Testing
(A)
Continuity and Operational Tests and Polarity Checks. Each
manufactured building shall be subjected to:
(1)
An electrical continuity test to ensure that all exposed
electrically conductive parts are properly bonded;
the space directly
below the island or peninsular countertop or work surface.
2.5.3 Article 545 Manufactured Buildings
Add the following new section:
2.5.3.1
Section 545.14 Testing
(A)
Continuity and Operational Tests and Polarity Checks. Each
manufactured building shall be subjected to:
(1)
An electrical continuity test to ensure that all exposed
electrically conductive parts are properly bonded;
(2)
An electrical operational test to demonstrate that all
equipment, except water heaters and electric
furnaces, is connected and in working order; and

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

20
(3)
Electrical polarity checks of permanently wired
equipment and receptacle outlets to determine that
connections have been properly made.
These tests shall be performed after branch circuits are
complete and after wiring devices are installed and wiring
properly terminated.
2.5.4 Article 334.23 Cables Run Across the Top of Floor Joists/Rafters
Add the following new sentence at the end:
Substantial guard strips or other protection shall be provided to protect
wiring within three (3) feet of the marriage line where the attic is exposed
and the roof is completed on-site, such as a hinged roof.
2.5.5 Article 210.8(F) Outdoor Outlets
Add the following to the existing exception:
…than those covered in 210.8(C), and outlets designated for outdoor
mechanical cooling equipment.
This exception is limited to outdoor mechanical cooling equipment shipped
loose by the manufacturer with the factory-built structure to be completed
on-site. This exemption does not apply if the outdoor mechanical cooling
equipment is provided by any other party. If it is provided by a party that is
not the manufacturer of the factory-built structure, then the State Electrical
Board’s requirement applies.
2.6
The International Fuel Gas Code (IFGC), 2021 Edition, published by the
International Code Council, Inc. (ICC). This is a safety code and is available
through the ICC at: https://www.iccsafe.org
hanical cooling
equipment is provided by any other party. If it is provided by a party that is
not the manufacturer of the factory-built structure, then the State Electrical
Board’s requirement applies.
2.6
The International Fuel Gas Code (IFGC), 2021 Edition, published by the
International Code Council, Inc. (ICC). This is a safety code and is available
through the ICC at: https://www.iccsafe.org.
2.6.1 Section 303.3 Prohibited locations
Add the following:
LPG appliances shall not be installed in a pit, basement, or crawl space
where unburned fuel may accumulate unless an approved sensing device
is installed in conjunction with an automatic shutoff valve located where
the gas enters the structure only for retro-fitting of existing structures or as
required by the local jurisdiction.
2.6.2 Section 303.3, 501.8 #8, Section 621
Delete all and replace with the following:

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

21
Unvented fuel fired room heaters and unvented fuel fired fireplaces are
prohibited.
2.6.3 Section 406.4.1 Test pressure
Revise to read as follows:
The test pressure to be used shall not be less than 1 ½ times the
proposed maximum working pressure, but not less than 10 psig (69 kPa
gauge), irrespective of design pressure. Where the test pressure exceeds
125 psig (862 kPa gauge), the test pressure shall not exceed a value that
produces a hoop stress in the piping greater than 50 percent of the
specified minimum yield strength of the pipe. The test pressure for valves
and connections to appliances shall not exceed 0.5 psig (3kPa).
2.7
The International Energy Conservation Code (IECC), 2021 Edition, published by
the International Code Council, Inc. (ICC). This code is available through the ICC
at: https://www.iccsafe.org.
2.7.1 Section R402.4.1.2
Add the following requirement:
All air barrier elements shall be installed as detailed in Table 402.4.1.1
for valves
and connections to appliances shall not exceed 0.5 psig (3kPa).
2.7
The International Energy Conservation Code (IECC), 2021 Edition, published by
the International Code Council, Inc. (ICC). This code is available through the ICC
at: https://www.iccsafe.org.
2.7.1 Section R402.4.1.2
Add the following requirement:
All air barrier elements shall be installed as detailed in Table 402.4.1.1.
and are inspected and verified with a checklist incorporated into the
Quality Assurance Inspection Checklist and part of the “finished home” file
for the building/dwelling. All elements of the air barrier shall be listed and
installed per the manufacturer's installation instructions. A completed air
barrier checklist shall be kept on file with the Division of Housing and the
manufacturer’s quality assurance program.
Construction Standards and Procedures for U.S. Housing and Urban
Development (HUD) Homes
These standards and procedures are available through HUD at: https://www.hud.gov.
Pursuant to sections 24-32-3302(12), 24-32-3302(13), 24-32-3302(20), 24-32-3302(32),
24-32-3305(5), 24-32-3306(1), 24-32-3307(2), 24-32-3309(1)(a), and 24-32-3327,
C.R.S., the State Housing Board adopts the following requirements for manufactured
homes constructed to the “National Manufacturing Housing Construction and Safety
Standards Act of 1974”, 42 U.S.C. sec. 5401 et seq. (manufactured from June 15, 1976
to present):
2.8
Compliance with Title 24: Housing and Urban Development; Subtitle B—
Regulations Relating to Housing and Urban Development (Continued); Chapter
XX—Office of Assistant Secretary for Housing—Federal Housing Commissioner,
Department of Housing and Urban Development; Part 3280—Manufactured
Home Construction and Safety Standards, of Title 24.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
pliance with Title 24: Housing and Urban Development; Subtitle B—
Regulations Relating to Housing and Urban Development (Continued); Chapter
XX—Office of Assistant Secretary for Housing—Federal Housing Commissioner,
Department of Housing and Urban Development; Part 3280—Manufactured
Home Construction and Safety Standards, of Title 24.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

22
2.9
Compliance with Part 3282—Manufactured Home Procedural and Enforcement
Regulations of the same title, subtitle, and chapter in Rule 2.8 above as applied
and enforced as the state administrative agency for the federal government.
2.10 Compliance with Part 3286—Manufactured Home Installation Program of the
same title, subtitle, and chapter in in Rule 2.8 above, which is inspected and
enforced through application of the Division of Housing’s adopted Manufactured
Housing Installation Codes.
2.11 Compliance with Part 3288—Manufactured Home Dispute Resolution Program of
the same title, subtitle, and chapter in Rule 2.8 above as applied and enforced as
the state administrative agency for the federal government.
Manufactured Home and Tiny Home Installation Standards
These standards and guidelines are available through the Division of Housing in the
form of the “Manufactured Home and Tiny Home Installation Handbook” located at:
https://www.colorado.gov/dola/division-housing.
2.12 Pursuant to section 24-32-3310, C.R.S., nothing in this rule is intended to
interfere with the right of a local jurisdiction to enforce its rules governing the
installation of a manufactured home or tiny home as long as those rules are not
inconsistent with this rule. Pursuant to section 24-32-3318, C.R.S., a local
jurisdiction may not adopt less stringent standards for the installation of a
manufactured home or tiny home than those adopted by the Division and may
not adopt a different standard without express consent by the Division
rules governing the
installation of a manufactured home or tiny home as long as those rules are not
inconsistent with this rule. Pursuant to section 24-32-3318, C.R.S., a local
jurisdiction may not adopt less stringent standards for the installation of a
manufactured home or tiny home than those adopted by the Division and may
not adopt a different standard without express consent by the Division. However,
a local jurisdiction may adopt unique public safety requirements related to
geographic or climatic conditions such as weight restrictions for snow loads or
wind shear factors subject to the conditions outlined in section 24-32-3318,
C.R.S.
2.12.1 Factory-built residential structures (modular) must be installed on a
permanent foundation approved through the local jurisdiction. In areas
where no building codes have been adopted, the foundation must be
designed and approved by a State of Colorado licensed engineer unless
plans are approved by the Division and in compliance with its adopted
International Residential Code (IRC) foundation prescriptive requirements.
2.13 Primary Standards (required for all new homes):
2.13.1 The current written installation instructions provided by the manufacturer
of the home.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

23
2.13.1.1
An installation of a HUD-code home in this state must be
performed in strict accordance with the applicable manufacturer's
installation instructions. The value of the allowable bearing capacity
of the soil the home will rest on must be recorded by the installer on
the Installation Authorization form or other Division-approved form
and justification for higher values also provided if it is determined to
be other than 1,500 psf
home in this state must be
performed in strict accordance with the applicable manufacturer's
installation instructions. The value of the allowable bearing capacity
of the soil the home will rest on must be recorded by the installer on
the Installation Authorization form or other Division-approved form
and justification for higher values also provided if it is determined to
be other than 1,500 psf.
2.14 Alternate Standards (for older homes or homes that do not include the
manufacturer’s installation instructions) – installation must be in accordance with
the following alternate standards adopted by the Division and State Housing
Board:
2.14.1 Modular Homes and Tiny Homes
2.14.1.1
Structural attachment requirements approved by a State of
Colorado actively licensed engineer.
2.14.1.2
Current version of the International Residential Code (IRC)
as adopted by the State Housing Board.
2.14.2 Mobile and HUD-code Homes
2.14.2.1
National Fire Protection Association (NFPA) 225, Model
Manufactured Home Installation Standard 2013 Edition, including
any revisions, additions, and deletions identified below.
2.14.2.1.1
Section 4.4.4 Site suitability with home design
Revise to read as follows:
The installer shall verify data plates provided with a
HUD-code home prior to installation in the state of
Colorado. The data plate shall be matched with the
home (serial numbers). The data plate shall indicate
the following minimums:
Wind Zone: I
Thermal Zone:
III
Roof Load:
Middle (30 PSF)

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
with home design
Revise to read as follows:
The installer shall verify data plates provided with a
HUD-code home prior to installation in the state of
Colorado. The data plate shall be matched with the
home (serial numbers). The data plate shall indicate
the following minimums:
Wind Zone: I
Thermal Zone:
III
Roof Load:
Middle (30 PSF)

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

24
If the data plate does not meet these minimum
requirements, the installer shall not set the home. The
installer is required to check with the local jurisdiction
where the home will be located to determine if it is
designed for the area’s proven snow or wind load
since some parts of the state are subjected to heavy
snow and/or high winds.
2.14.2.1.2
Section 5.3 Fire separation distance
Revise to read as follows:
Fire separation distances shall comply with local rules
or regulations. In their absence, the most current
version of the International Residential Code (IRC) as
adopted by the Housing Board applies.
2.14.2.1.3
Section 5.5.2
Revise to read as follows:
Soil that supports footings and foundations shall be
capable of accommodating all loads required by this
standard. To help prevent settling or sagging, the
foundation must be constructed on firm, undisturbed
soil or 90% compacted soil. The design bearing
capacity of the soil shall be determined in accordance
with Section 5.6.
2.14.2.1.4
Section 5.6 Investigation and Bearing Capacity of
Soil
Revise as follows:
Soils that appear to be composed of peat, organic
clays, uncompacted fill, expansive or other unusual
conditions shall have a licensed engineer determine
the classification and maximum allowable soil bearing
capacity.
Otherwise the bearing capacity of the soil shall be
assumed to be 1,500 psf.
A larger bearing capacity for the soil may be used as
follows provided the class of soil is known:

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
uncompacted fill, expansive or other unusual
conditions shall have a licensed engineer determine
the classification and maximum allowable soil bearing
capacity.
Otherwise the bearing capacity of the soil shall be
assumed to be 1,500 psf.
A larger bearing capacity for the soil may be used as
follows provided the class of soil is known:

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

25
Sandy gravel and/or gravel, very dense or cemented
sands (GW, GP, SW, SP, GM, SM) ------------- 2,000
psf
Sedimentary and foliated rock----------------------------
4,000 psf
When a value other than 1,500 psf is determined for
the soil bearing capacity it shall be recorded by the
installer on the Division of Housing’s Installation
Authorization form and justification for higher values
shall also be provided.
2.14.2.1.5
Section 5.8.1 Vapor retarder
Revise as follows:
If the space under the home is to be enclosed with
skirting or other material, a vapor retarder that keeps
ground moisture out of the home shall be installed
unless specifically allowed to be omitted by the
authority having jurisdiction.
2.14.2.1.6
Section 5.8.3.2
Revise as follows:
The vapor retarder may be placed directly beneath
footings, or otherwise installed around or over
footings placed at grade, and around anchors or other
obstructions. Any voids or tears in the vapor retarder
must be repaired.
2.14.2.1.7
Section 6.2.3.1.2
Delete this section.
2.14.2.1.8
Section 6.2.3.1.3.1
Revise as follows:
Tables 6.2.3.1.3(a), 6.2.3.1.3(b), and 6.2.3.1.3(c) for
pier capacities, as replaced in Appendix A, shall be
used when the manufacturer’s installation instructions
are not available.
2.14.2.1.9
Section 6.2.3.1.3.2

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
rder
must be repaired.
2.14.2.1.7
Section 6.2.3.1.2
Delete this section.
2.14.2.1.8
Section 6.2.3.1.3.1
Revise as follows:
Tables 6.2.3.1.3(a), 6.2.3.1.3(b), and 6.2.3.1.3(c) for
pier capacities, as replaced in Appendix A, shall be
used when the manufacturer’s installation instructions
are not available.
2.14.2.1.9
Section 6.2.3.1.3.2

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

26
Revise as follows:
Manufactured piers shall be rated at least to the
capacities given in Tables 6.2.3.1.3(a), 6.2.3.1.3(b),
and 6.2.3.1.3(c), as replaced in Appendix A, and
locally constructed piers shall be designed to transmit
these loads safely as required by 6.2.3.2.
2.14.2.1.10 Section 6.2.3.2.2.2
Revise as follows:
Caps shall be of solid masonry of at least 4 in. (100
mm) nominal thickness, or of treated or hardwood
dimensional lumber at least 2 in. (50mm) nominal
thickness, or of ½” thick steel.
2.14.2.1.11 Section 6.2.3.2.3.1
Revise as follows:
Nominal 4 in. x 6in. (100mmx 150mm) hardwood
shims shall be used to level the home and fill any
gaps between the base of the I-beam and the top of
the pier cap. Any of the following hardwood species
may be used: Ash, Beech, Birch, Hickory, Oak, Rock
Elm, Black or Red Maple, or Sweetgum.
2.14.2.1.12 Section 6.2.3.2.3.3
Revise as follows:
Hardwood (species identified in the amendment to
Section 6.2.3.2.3.1 above) or treated wood plates
shall be used to fill in any remaining vertical gap no
thicker than 2”. The maximum total gap to be filled
with shims and plates shall be 2”.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
, Rock
Elm, Black or Red Maple, or Sweetgum.
2.14.2.1.12 Section 6.2.3.2.3.3
Revise as follows:
Hardwood (species identified in the amendment to
Section 6.2.3.2.3.1 above) or treated wood plates
shall be used to fill in any remaining vertical gap no
thicker than 2”. The maximum total gap to be filled
with shims and plates shall be 2”.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

27
2.14.2.1.13 Section 6.2.5.5
Revise as follows:
All homes. Supports shall be placed on both sides of
side wall exterior doors and any other side wall
openings greater than 48 in. (such as entry and
sliding glass doors), and under porch posts, factory
installed fireplaces and wood stoves. Size perimeter
piers under openings based on Table 6.2.3.1.3(b), as
replaced in Appendix A, “Exterior wall” where the
actual side wall opening shall be less than or equal to
the spacing selected from the table.
Homes requiring perimeter blocking. Refer to
Figure 6.2.5.3 and Figure 6.2.5.4 and Table
6.2.3.1.3(b), as replaced in Appendix A, for homes
requiring perimeter blocking in addition to sidewall
opening blocking described above.
2.14.2.1.14 Section 6.3.1.2.2
Delete this section.
2.14.2.1.15 Section 6.5.2
Delete this section.
2.14.2.1.16 Section 7.2
Revise as follows:
The home shall be installed and leveled by installation
personnel approved by the State of Colorado to install
manufactured homes.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
ocking in addition to sidewall
opening blocking described above.
2.14.2.1.14 Section 6.3.1.2.2
Delete this section.
2.14.2.1.15 Section 6.5.2
Delete this section.
2.14.2.1.16 Section 7.2
Revise as follows:
The home shall be installed and leveled by installation
personnel approved by the State of Colorado to install
manufactured homes.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

28
2.14.2.1.17 Section 7.3
Revise as follows:
The interconnection of multi-section homes shall be
completed in accordance with the manufacturer’s
installation instructions. When the manufacturer’s
installation instructions are not available, the
interconnection of multi-section homes shall be in
accordance with Table 7.3, as provided in Appendix
A, or per the requirements approved by a State of
Colorado licensed engineer.
2.14.2.1.18 Section 7.5 Anchoring Instructions
Section 7.5.1 Security against the wind
Section 7.5.1.1
Revise as follows:
After blocking and leveling, the installer shall secure
the manufactured home against wind per Section
7.5.2 or Section 7.5.3. Anchorage shall be for Wind
Zone I. Homes that are designed for Wind Zone II and
III must be anchored per the Manufacturer’s
Installation Instructions or the requirements of a
professional engineer.
2.14.2.1.19 Section 7.5.2 Proprietary Anchorage Systems
Add the following:
A proprietary anchorage system may be used to resist
overturning and lateral movement (sliding) caused by
wind as long as it complies with all of the following:
1.
The system shall be listed by a nationally
recognized third-party agency for anchoring
manufactured homes.
2.
The system shall be evaluated and approved
by a licensed professional engineer.
3.
The system shall be recognized as acceptable
for use by the Division of Housing.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
d by
wind as long as it complies with all of the following:
1.
The system shall be listed by a nationally
recognized third-party agency for anchoring
manufactured homes.
2.
The system shall be evaluated and approved
by a licensed professional engineer.
3.
The system shall be recognized as acceptable
for use by the Division of Housing.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

29
4.
The installer shall follow the requirements in
the anchorage system installation instructions.
2.14.2.1.20 Section 7.5.3 Ground Anchor System
Section 7.5.3.1 Specifications for Tie-Down Straps
and Anchors
Add the following:
Straps and anchors are to have corrosion protection
at least equivalent to that provided by a coating of
zinc on steel of not less than 0.30 oz/ft2 of surface
coated. Straps and anchoring equipment must be
capable of resisting a minimum ultimate load of 4,725
lbs and a working load of 3,150 lbs as installed;
determined by a licensed professional engineer,
architect or tested by a nationally recognized third-
party agency. Straps are to be 1.25”x0.035” or larger
steel strapping conforming to ASTM D 3953, Type 1,
Grade 1, Finish B. Anchors are to be installed in
accordance with their listing or certification to their full
depth.
2.14.2.1.21 Section 7.5.3.2 Number and Location of Anchors
Section 7.5.3.2.1 Transverse Anchorage
Add the following:
The number and location of anchors and anchor
straps for securing single-section and multi-section
manufactured homes in the transverse direction shall
conform to the manufacturer’s installation instructions.
When relocating the home or when the
manufacturer’s installation instructions are not
available, the number and location of anchors and
anchor straps shall conform to Table 7.5.3.2.1, Figure
7.5.3.2.1(a), and Figure 7.5.3.2.1(b), as provided in
Appendix A.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
sverse direction shall
conform to the manufacturer’s installation instructions.
When relocating the home or when the
manufacturer’s installation instructions are not
available, the number and location of anchors and
anchor straps shall conform to Table 7.5.3.2.1, Figure
7.5.3.2.1(a), and Figure 7.5.3.2.1(b), as provided in
Appendix A.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

30
2.14.2.1.22 Section 7.5.3.2.2 Longitudinal Anchorage
Add the following:
The number and location of anchors and anchor
straps for securing single-section and multi-section
manufactured homes in the longitudinal direction shall
conform to the manufacturer’s installation instructions.
When relocating the home or when the
manufacturer’s installation instructions are not
available, the number and location of longitudinal
anchors and anchor straps shall conform to Table
7.5.3.2.2 and Figure 7.5.3.2.1(a), as provided in
Appendix A.
2.14.2.1.23 Section 7.5.3.2.3 Anchor Installation
Add the following:
The installed ground anchor type and size/length
must be listed for use in the soil class at the site and
for the minimum and maximum angle permitted
between the diagonal strap and the ground and all
ground anchors must be installed in accordance with
their listing or certification and the ground anchor
manufacturer installation instructions. Unless the
foundation system is frost-protected to prevent the
effects of frost heave, the ground anchors shall be
installed below the frost line. Ground anchor stabilizer
plates shall be installed in accordance with the anchor
and plate manufacturer installation instructions.
2.14.2.1.24 Section 7.5.3.2.4 Side wall or over the roof straps
Add the following:
If sidewall, over-the-roof, mate-line, or shear wall
straps are installed on the home, they must be
connected to an anchoring assembly.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
stabilizer
plates shall be installed in accordance with the anchor
and plate manufacturer installation instructions.
2.14.2.1.24 Section 7.5.3.2.4 Side wall or over the roof straps
Add the following:
If sidewall, over-the-roof, mate-line, or shear wall
straps are installed on the home, they must be
connected to an anchoring assembly.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

31
2.14.2.1.25 Section 7.6.3 Expanding Rooms
Revise as follows:
Expanding rooms shall be installed in accordance
with the manufacturer’s instructions. When the
manufacturer’s instructions are not available,
perimeter blocking shall be installed in accordance
with Table 6.2.3.1.3(b), as replaced in Appendix A,
and anchors shall be installed in accordance with
Section 7.5.3.2.
2.14.2.1.26 Section 7.7.4.2
Revise (2) as follows:
(2) Walls-200.
2.14.2.1.27 Section 8.1 Installation of Site-Installed Features
Revise as follows:
Carports, awnings, porches, roof covers, and other
similar attachments or additions shall not be
supported by a manufactured home unless the home
was specifically designed to accommodate such
attachments or the attachment is designed by a
licensed professional engineer. Non-structural
connections for flashings and coverings at the
junction are acceptable.
2.14.2.1.28 Section 8.4
Delete this section.
2.14.2.1.29 Section 8.8.3
Revise as follows:
Access opening(s) not less than 18 inches in width
and 24 inches in height must be provided and located
so that any utility connections are accessible.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
gineer. Non-structural
connections for flashings and coverings at the
junction are acceptable.
2.14.2.1.28 Section 8.4
Delete this section.
2.14.2.1.29 Section 8.8.3
Revise as follows:
Access opening(s) not less than 18 inches in width
and 24 inches in height must be provided and located
so that any utility connections are accessible.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

32
2.14.2.1.30 Section 8.9 Telephone and Cable TV
Revise as follows:
Telephone, cable TV, and similar wiring shall be
installed per the Authority Having Jurisdiction (AHJ)
requirements and the National Electric Code (NEC).
2.14.2.1.31 Section 9.4 Range, Cooktop, Oven Venting, and
other Fixtures or Appliances
Add new Section 9.4.3 to read as follows:
If other fixtures or appliances are to be site-installed,
follow the manufacturer’s installation instructions. Use
only products listed for manufactured homes and
follow all applicable local codes.
2.14.2.1.32 Section 9.7 Furnace, Water Heater, and other Fuel
Fired Appliances
Add this new section to read as follows:
Verify appliance is installed per the manufacturer’s
installation instructions including any combustion air
requirements. Verify flues are in place and are
properly connected and extend through the roof with
flashing and caps.
2.14.2.1.33 Section 10.4.2 Orifices and Regulations
Revise as follows:
Before making any connection to the site supply, the
inlet orifices of all gas-burning appliances shall be
checked to ensure they are correctly set-up for the
type of gas to be supplied and are sized correctly for
the altitude above sea level where the home is set.
The manufacturer’s installation instructions for the
appliance shall be followed.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
ng any connection to the site supply, the
inlet orifices of all gas-burning appliances shall be
checked to ensure they are correctly set-up for the
type of gas to be supplied and are sized correctly for
the altitude above sea level where the home is set.
The manufacturer’s installation instructions for the
appliance shall be followed.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

33
2.14.2.1.34 Chapter 11 Life Safety Features
Revise as follows:
2.14.2.1.34.1 Smoke Alarms
Verify smoke alarms are installed to
protect the living area, rooms designed
for sleeping, on upper levels, and in the
basement for homes installed over a
basement. Verify smoke alarms are
installed and operating properly to meet
the requirements of 24 CFR 3280.
2.14.2.1.34.2 Carbon Monoxide Alarms
An approved carbon monoxide alarm
shall be installed outside of each
separate sleeping area within 15 feet of
the entrance to the bedrooms in
dwelling units within which fuel-fired
appliances are installed and in dwelling
units that have attached garages.
2.14.2.1.34.3 Fire Separation Distance
Fire separation distances shall comply
with local rules or regulations. In their
absence, the most current version of the
International Residential Code (IRC) as
adopted by the State Housing Board,
shall apply.
2.14.2.2
Permanent Foundations Guide for Manufactured Housing
(4930.3G), , published by the U.S. Department of Housing and
Urban Development (HUD), including any revisions, additions, and
deletions identified below, or the most recent version.
2.14.2.2.1
Appendix B – Foundation Design Load Tables
Revised as follows:
In the multi-section tables under the marriage wall
opening width (ft.), the values given for required
effective footings area – Aftg (sq.ft.), shall be divided
by 2.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
including any revisions, additions, and
deletions identified below, or the most recent version.
2.14.2.2.1
Appendix B – Foundation Design Load Tables
Revised as follows:
In the multi-section tables under the marriage wall
opening width (ft.), the values given for required
effective footings area – Aftg (sq.ft.), shall be divided
by 2.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

34
2.15 ICC/MBI 1200 – 2021 Standard for Off-site Construction: Planning, Design,
Fabrication and Assembly. LINK
2.16 ICC/MBI 1205 – 2021 Standard for Off-site Construction: Inspection and
Regulatory Compliance. LINK
2.17 ICC/MBI 1210 – 2023 Standard for Mechanical, Electrical, Plumbing Systems,
Energy Efficiency and Water Conservation in Off-site Construction. LINK
2.18 ICC 2023 G6 Guideline on Advanced Panelization for Buildings. LINK
2.19 Colorado Model Electric Ready and Solar Ready Code. LINK
2.20 Upon written request, the Division of Housing will consider modifications to the
standards or alternate materials and methods of construction. The Division of
Housing will require that sufficient evidence or proof be submitted to support and
substantiate the modification or alternate request.
2.20.1 The Division of Housing may approve any such modification or alternate,
provided the Division of Housing finds that the proposed modification or
alternate conforms with the intent and purpose of the standards and is
equivalent in suitability, strength, effectiveness, durability, safety, and
sanitation.
2.20.2 The approval of any modification and/or alternate by the Division of
Housing will be made in writing and is required prior to commencing the
work in question
te,
provided the Division of Housing finds that the proposed modification or
alternate conforms with the intent and purpose of the standards and is
equivalent in suitability, strength, effectiveness, durability, safety, and
sanitation.
2.20.2 The approval of any modification and/or alternate by the Division of
Housing will be made in writing and is required prior to commencing the
work in question.
2.20.3 In the event that a local jurisdiction has declared a state of emergency,
and met the written request and evidence or proof submitted to support
and substantiate the request as stated in Rule 2.20, and provided the
Division of Housing makes the findings required by Rule 2.20.1, the
Division may for a period of 180 days allow a modification to the
standards, or alternate materials and methods of construction. Additional
180 day extensions may be requested in writing by the local jurisdiction to
DOH. Requests from the local jurisdiction should include a copy of the
approved local jurisdiction codes and explanation of the requested
changes and any site specific information. Requests will not be accepted
that are more stringent than the current adopted codes. These structures
will receive an Emergency Response Unit insignia from the Division of
Housing.
Rule 3.
Fees.
Pursuant to sections 24-32-3309(1)(a), 24-32-3315(5), and 24-32-3323(3), C.R.S., the
State Housing Board establishes the following schedule of fees, which are not subject to
refund, are due in advance, and must accompany the appropriate application, except for
certain inspection fees:

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

35
3.1
Annual registration fees:
3.1.1 Plant/Manufacturer:

$773.00
3.1.1.1 Plant/Manufacturer Three Year

$2,319.00
3.1.2 Inspection Agency:

$322.00
3.1.3 Seller:

$200.00
3.1.4 Installer (Individual or business):
ject to
refund, are due in advance, and must accompany the appropriate application, except for
certain inspection fees:

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

35
3.1
Annual registration fees:
3.1.1 Plant/Manufacturer:

$773.00
3.1.1.1 Plant/Manufacturer Three Year

$2,319.00
3.1.2 Inspection Agency:

$322.00
3.1.3 Seller:

$200.00
3.1.4 Installer (Individual or business):

$250.00
3.1.4.1
A business entity will pay an initial annual registration fee of
$250. The annual renewal fee shall be $250. Additional qualifying
individuals may be added to the business entity registration during
the annual registration cycle for a processing fee of $100. Addition
of additional qualified individuals will not change the renewal cycle
of business entity installer registration.
3.1.5 Independent Inspector:

$450.00
3.1.6 Late re-registration fee

$125.00
3.2
Plan checking fees:
3.2.1 Finished space:

$0.32 per sq. ft. ($100
min.)
3.2.2 Unfinished space (attics, lofts, garages, etc.):
$0.13 per sq. ft.

3.3
Supplemental plan check fee (renewal, etc.):

$0.13 per sq. ft.
($100 min.)
3.3.1 2nd Resubmittal Plan Check Fee

$127.00
3.3.2 Revision Fee

$75 per hour ($100 min)
3.4
Third party oversight plan check fee (includes audits):
$0.19 per sq. ft.
($150 min.)
3.5
Insignia fees:
3.5.1 Primary Insignia:

$161.00
3.5.2 Additional Floor Tag:

$161.00
3.5.3 Inspection-only Tag:

$161.00

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

36
3.5.4 Component-only Insignia:

$161.00
3.5.5 Modification Insignia:

$161.00
3.5.6 Installation Insignia (free for participating jurisdictions):
$78.00
3.6
Inspection fees:
3.6.1 In-Plant/Factory inspection fee:
nsignia fees:
3.5.1 Primary Insignia:

$161.00
3.5.2 Additional Floor Tag:

$161.00
3.5.3 Inspection-only Tag:

$161.00

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

36
3.5.4 Component-only Insignia:

$161.00
3.5.5 Modification Insignia:

$161.00
3.5.6 Installation Insignia (free for participating jurisdictions):
$78.00
3.6
Inspection fees:
3.6.1 In-Plant/Factory inspection fee:

$438.00 per
inspection
3.6.2 Oversight inspection fee, including re-inspections:
$348.00 per
inspection/address
(A)
An additional Multi-Box fee is required if the unit has more than 3
boxes – add $32.00 per box.
(B) Multi-family IBC Inspection Fee
$348 per dwelling unit plus an
additional multi-box fee is required if the unit has more than 3
boxes – add $32 per box. An all-day (up to 8 hours) fee may be
determined if necessary. Multi-day fees will require extra fees for
lodging/food.
3.6.3 Special inspection fee:
(A)
In-State: $75.00 per hour, per inspection, plus trip expenses
of travel, food, lodging, parking, car-rental, etc., as allowed in
state fiscal rules for per diem and travel.
(B)
Out-of-State units manufactured in Colorado:
$438.00 per
inspection/unit
3.6.4 Modification inspection fee:

$219.00
3.6.5 Installation inspection fee (residential):
(A)
Final or Foundation (Rough or Final):

$258.00
Additional box fee if more than three units
(B)
Re-inspection fee:

$258.00
(C)
Multi-family Installation Fee
$348.00 per building plus an
additional multi-box fee is required if the building has more than 3
boxes – add $32 per box. An all-day (up to 8 hours) fee may be
determined if necessary. Multi-day fees will require extra fees for
lodging/food.
(D) Installation Authorization Fee $25.00

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

37
3.6.6 Non Compliance/Prohibited Sale/Red Tag fee:
$322.00
3.6.7 Cancelled Inspection fee – same day
e is required if the building has more than 3
boxes – add $32 per box. An all-day (up to 8 hours) fee may be
determined if necessary. Multi-day fees will require extra fees for
lodging/food.
(D) Installation Authorization Fee $25.00

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

37
3.6.6 Non Compliance/Prohibited Sale/Red Tag fee:
$322.00
3.6.7 Cancelled Inspection fee – same day

Full fee
3.7
Certificate of Occupancy fee (only applies to hotels, motels, and multi-family
structures in those areas of the state where no standards exist):
$161.00
3.8
Waiver of fees:
3.8.1 Pursuant to section 24-32-3315(7)(a), the Division of Housing does not
charge for certification of installers.
3.8.2 The Division of Housing waives the fee for certification of an independent
inspector.
3.8.3 The Division of Housing does not charge for installer or inspector exams.
3.8.4 The Division of Housing may waive fees for plan reviews and unit
certifications that are subsidized under local, state, or federal housing
programs for low-income households, and being constructed by the State
of Colorado, a local government, or a nonprofit agency.
3.8.5 The Division of Housing waives the insignia fee for local jurisdictions that
perform installation inspections as authorized participating jurisdictions.
3.9
As-built structures
3.9.1 As-built structures will be charged double the respective fee for each unit if
found to not have gone through the proper approved procedures here
within these rules for plan approval, manufacturer registration, inspections,
or reporting.
Rule 4.
Factory-Built Residential Structures (Modular and Tiny Homes) and
Non-Residential Structures (Commercial) Requirements
4.1
Every “factory-built structure” as defined in section 24-32-3302(11), C.R.S., that
is manufactured, sold, offered for sale, or occupied in this state must display an
insignia issued by the Division of Housing certifying that the structure is
constructed in compliance with the codes adopted by the State Housing Board
dular and Tiny Homes) and
Non-Residential Structures (Commercial) Requirements
4.1
Every “factory-built structure” as defined in section 24-32-3302(11), C.R.S., that
is manufactured, sold, offered for sale, or occupied in this state must display an
insignia issued by the Division of Housing certifying that the structure is
constructed in compliance with the codes adopted by the State Housing Board.
This does not apply to factory-built structures manufactured or sold for
transportation to and installation in another state. However, if the unit were to
return to Colorado for use, then it would require an insignia issued by the Division
of Housing. To assist with the certification process, pursuant to section 24-32-
3303(1)(a), C.R.S., a “manufacturer” as defined in section 24-32-3302(23),
C.R.S., is required to be “registered” (based on qualifications) or “certified”
(based on performance) with the Division of Housing.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

38
4.1.1 Registration or certification is for a specific manufacturing facility location,
and is not transferable to any other location including those of the same
manufacturer.
4.1.2 A registered or certified manufacturer is required to inform the Division of
Housing of a change in ownership, address, or location within ten (10)
business days of such change.
4.1.3 Tiny Homes built for personal use, not to be sold, and not to be
permanently installed outside the jurisdiction site location within 1 year of
the date it received certification for construction, may be inspected and
certified for construction and installation. Must be built to the Division of
Housing approved Rules and inspected at all stages of construction by the
local authority acting as a third party agency approved by the Division of
Housing or inspected by the Division of Housing at all phases of
construction
tion within 1 year of
the date it received certification for construction, may be inspected and
certified for construction and installation. Must be built to the Division of
Housing approved Rules and inspected at all stages of construction by the
local authority acting as a third party agency approved by the Division of
Housing or inspected by the Division of Housing at all phases of
construction. The approval does not guarantee local approval in
jurisdictions outside of the certifying jurisdiction, please check those local
codes and ordinances prior to relocating outside the jurisdiction of
approval.
4.1.3.1
Limited to one structure per household. More than one
structure will be considered manufacturing and must register as a
manufacturer per Rule 4.
4.1.4 Tiny Homes built for personal use and only intended for use within the
jurisdiction it is built in, is regulated by the local building department,
follows the local codes and ordinances, and will not be certified by the
Division as a state approved structure.
4.2
Registered/Certified manufacturers are required to have that facility’s production
approved through an initial review of its Quality Control (QC) program and the
Quality control personnel that ensure construction code compliance. The Division
of Housing must be notified of any changes to the QC program or personnel.
4.3
The manufacturer’s QC department must perform “no cover” inspections for all
phases of construction on all structures and witness all required tests, regardless
of whether the facility is registered or certified.
4.4
Upon the manufacturer’s receipt of the approved plans and manual, the third
party agency may proceed with QA, rough, and final inspections with registered
manufacturers, or if the manufacturer is certified, to include factory oversight
inspections.
4.5
Manufacturers who sell direct to purchasers of one or two family dwellings must
register as a Seller with the Division of Housing and follow all statutory and
Administrative Rules requirements. See Rule 5.
manual, the third
party agency may proceed with QA, rough, and final inspections with registered
manufacturers, or if the manufacturer is certified, to include factory oversight
inspections.
4.5
Manufacturers who sell direct to purchasers of one or two family dwellings must
register as a Seller with the Division of Housing and follow all statutory and
Administrative Rules requirements. See Rule 5.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

39
4.5.1 The exception is if the purchaser is a developer who in turn plans to resell
the home to the end-user; the developer in that scenario is required to be
a registered seller with the Division of Housing.
4.5.2 Manufacturers who receive down payments or deposits from registered
sellers or directly from intended home-owners, must provide the following
protections for down payments in excess of the cost of materials,
construction, design, and administration of the specific home ordered by
the consumer:
(1)
Provide to the Division of Housing a letter of credit or surety bond in
the amount of $100,000 which the Division of Housing may call
upon after an enforcement action for cancellation or failure to
deliver a unit when the down payment is not returned.
(2)
Make available to the Division of Housing upon request an
accounting of deposits received, and amounts spent for materials,
construction, design and administration for each unit from time of
deposit received to delivery of the unit IF the Division requests this
information as part of an audit to verify compliance.
4.6
In order to provide efficiency, manufacturers building multi-family or commercial
units as a part of a development project of 5 or more units must contact the
Division of Housing and provide a project plan that includes: project schedule,
production schedule, on-site construction items, and installation plan and
schedule. It is recommended to contact the Division of Housing early in the plan
process, even before all the required documents are available
ulti-family or commercial
units as a part of a development project of 5 or more units must contact the
Division of Housing and provide a project plan that includes: project schedule,
production schedule, on-site construction items, and installation plan and
schedule. It is recommended to contact the Division of Housing early in the plan
process, even before all the required documents are available. The Division will
evaluate the materials provided, meet with the respective parties, and determine
a total estimated fee schedule. Overnight stays by inspectors may require
additional expenses. Following the installation, it is recommended that a follow
up meeting be conducted with all applicable parties to check the status of the
project plan.
Manufacturer Registration
4.7
Once issued by the Division of Housing’s Building Codes & Standards Section, a
registration is active for one (1) year or three (3) years after completing the first
year and must be successfully renewed in order to continue manufacturing
structures in the state of Colorado or shipping them into the state. Three year
registrations will require an email or letter regarding any material changes (or no
changes) to operations annually. For three year registrations, it is the
responsibility of the manufacturer to ensure annual payment is paid in a timely
manner or forfeit the remaining registration period. Notifications are only sent as
a courtesy, for all registration types, when the Registration period is going to
expire at 60 days and 30 days prior to the expiration date and when it expires.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
, it is the
responsibility of the manufacturer to ensure annual payment is paid in a timely
manner or forfeit the remaining registration period. Notifications are only sent as
a courtesy, for all registration types, when the Registration period is going to
expire at 60 days and 30 days prior to the expiration date and when it expires.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

40
4.8
At the time of registration, all manufacturers are required to have Division of
Housing approval, in writing, of the third party agency or agencies that will
conduct the production inspections and certification of Colorado units on behalf
of the Division of Housing. A manufacturer is also required to request approval of
the Division of Housing thirty (30) days prior to any subsequent change of its
third party agency.
Certified Manufacturer Status
4.9
A manufacturer must maintain an active Colorado registration for each
manufacturing facility requesting Certified status.
4.9.1 Out of state registered manufacturers must utilize a third party agency to
submit a recommendation for certified manufacturer status to the Division
of Housing.
4.9.2 In-state registered manufactures may utilize a third party agency to submit
a certified manufacturer recommendation OR request certified
manufacturer status from the Division of Housing.
4.9.3 Each manufacturing location will require a separate certified manufacturer
recommendation.
4.9.4 The Division of Housing and authorized third party agencies will utilize the
following criteria for approval of registered manufacturers requesting
certified manufacturer status.
(A)
Verify accountable personnel are capable of identifying and
addressing non-conforming items.
(B)
Verify that training has been achieved for all accountable
personnel.
(C)
Verify an established and functioning quality assurance program
(D)
Verify that the last three units delivered to Colorado have
completed production in compliance of (A), (B), and (C) above
ting
certified manufacturer status.
(A)
Verify accountable personnel are capable of identifying and
addressing non-conforming items.
(B)
Verify that training has been achieved for all accountable
personnel.
(C)
Verify an established and functioning quality assurance program
(D)
Verify that the last three units delivered to Colorado have
completed production in compliance of (A), (B), and (C) above.
4.9.5 Manufactures who previously qualified for the Division of Housing’s
Certified Factory Status may continue with this status for one year, but are
required to complete the new certified manufacturer status by July 1,
2024.
4.9.6 Recommendations received from a third party agency will be reviewed,
and if deemed compliant, approved by the Division of Housing and a letter
will be sent to the recommending agency, the certified manufacturer and
the third party agency doing production inspections.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

41
4.10 All certified manufacturers are registered manufacturers and must follow all
registered manufacturer requirements unless specifically exempted or changed
in these rules.
4.11 Certified manufacturer status for a specific facility is considered ongoing unless
the manufacturer fails to perform as described in 4.12. An annual letter will be
required from the manufacturer regarding any changes, or stating no changes, in
the quality assurance program in order to continue certified manufacturer status.
4.12 The Division of Housing may immediately seek summary suspension to remove
the designation of certified manufacturer status for failure to remedy any of the
following conditions after notice from the Division of Housing:
4.12.1 The change of a third party agency or change in that entity’s status.
4.12.2 The change of a facility location.
4.12.3 The manufacturer has had insignias of approval removed pursuant to
Division of Housing procedures
k summary suspension to remove
the designation of certified manufacturer status for failure to remedy any of the
following conditions after notice from the Division of Housing:
4.12.1 The change of a third party agency or change in that entity’s status.
4.12.2 The change of a facility location.
4.12.3 The manufacturer has had insignias of approval removed pursuant to
Division of Housing procedures.
4.12.4 Failure to remedy manufacturing defects or deficiencies as identified by
the Division of Housing and failure to provide a quality assurance program
update on corrective actions taken to remedy identified defects or
deficiencies.
4.12.5 Notification by a third party agency regarding failure to meet quality control
guidelines.
4.12.6 The factory is not in compliance with “Performance Criteria for Monitoring
Manufacturers and Third Party Inspection Agencies”.
4.12.6.1
The “Performance Criteria for Monitoring Manufacturers and
Third Party Inspection Agencies” utilizes a combination of
qualitative analysis based on deficiencies identified during
inspection, qualitative analysis based on systematic failures and
recurring serious deficiencies,
4.13 A registered manufacturer whose status as a certified manufacturer has been
removed by the Division of Housing will resume operations on a higher frequency
of inspections until its performance improves and is recommended for
reinstatement of its certified manufacturer status pursuant to Rule 4.9 of these
rules.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
ious deficiencies,
4.13 A registered manufacturer whose status as a certified manufacturer has been
removed by the Division of Housing will resume operations on a higher frequency
of inspections until its performance improves and is recommended for
reinstatement of its certified manufacturer status pursuant to Rule 4.9 of these
rules.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

42
Renewal
4.14 Each manufacturer is required to resubmit its quality control manual (and when
applicable, plans) for approval prior to the registration expiration date that is
stamped on the quality control manual. This Quality Control manual resubmission
is required regardless of when plans are approved or structures shipped. Failure
to comply with this requirement will result in that manufacturer’s registered
location having to comply with the initial registration inspection requirements.
4.14.1 The registration expiration date for all manufacturers is determined by the
expiration date that is stamped on the quality control manual. Plans that
are submitted at the time of registration or within the registration period
shall have the same expiration date as the quality control manual.
4.14.2 It is the responsibility of the manufacturer to submit to the Division of
Housing the quality control manual for approval within the authorized sixty
(60) day renewal window prior to the expiration date.
Plan Review
4.15 All registered or certified manufacturers must obtain prior approval of each set of
designs from the Division of Housing or third party agency before constructing
structures under those plans.
4.15.1 The Division of Housing will expedite the review and approval of plans
from registered or certified manufacturers whose plans have been
reviewed and pre-approved by a third party agency who accepts
responsibility and liability in ensuring compliance with requirements of
these rules and applicable codes
vision of Housing or third party agency before constructing
structures under those plans.
4.15.1 The Division of Housing will expedite the review and approval of plans
from registered or certified manufacturers whose plans have been
reviewed and pre-approved by a third party agency who accepts
responsibility and liability in ensuring compliance with requirements of
these rules and applicable codes.
4.15.2 Life safety corrections will be sent back to the manufacturer and the third
party agency that pre-approved the plans. Third party agencies who
continue to pre-approve plans after notification of life safety plan
corrections must provide a report on internal quality assurance corrective
actions taken to the Division of Housing.
4.15.3 The Division of Housing and third party agencies will utilize redline
comments for minor changes and corrections.
4.16 Plan approvals are granted to a manufacturer for a specific manufacturing facility
and are not transferable to other manufacturing facilities including those of the
same manufacturer.
4.17 Applications for plan review and approval must be submitted electronically to the
Division of Housing and must be accompanied by the appropriate fees from Rule
3 of these rules.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

43
4.17.1 The application must include the quality control manual; it must meet or
exceed the minimum requirements as specified by the Division of
Housing.
4.17.1.1
On-site Construction (OC) as defined in Rule 1.21 of these
rules, must be clearly denoted on the submitted plans for
determination of the model as an “OC)” structure. The manufacturer
is required to follow the Division of Housing “On-site Construction
Procedures” when the model is determined to be an OC.
Determination of a model as an OC may happen during plan
approval or after plan approval
7.1.1
On-site Construction (OC) as defined in Rule 1.21 of these
rules, must be clearly denoted on the submitted plans for
determination of the model as an “OC)” structure. The manufacturer
is required to follow the Division of Housing “On-site Construction
Procedures” when the model is determined to be an OC.
Determination of a model as an OC may happen during plan
approval or after plan approval.
4.17.2 All applications must list an officer of the manufacturer that is in a
responsible position with the authority to commit the manufacturer to
comply with the rules and regulations that govern the regulation of its
factory-built structures and tiny homes.
4.17.3 Factory-built structure and tiny home plans will meet any unique local
government standards regarding wildfire risk.
4.17.4 Plans are approved only for a specific address unless the climatic and
geographic design and wildfire risk conditions are equal to or less
stringent than what was approved.
4.17.4.1
Should the program approve zones, regions, or designates
certain areas for modular or tiny home construction, the applicable
climatic, geographic design, and wildfire risk for the zone will be
approved for any location within the zone, region or designated
area. Specific address location will be provided by the manufacturer
or registered seller before the home is installed.
4.17.5 Multi-family plans submitted for review must include the applicable
sections required by the Division of Housing plan review checklist
icable
climatic, geographic design, and wildfire risk for the zone will be
approved for any location within the zone, region or designated
area. Specific address location will be provided by the manufacturer
or registered seller before the home is installed.
4.17.5 Multi-family plans submitted for review must include the applicable
sections required by the Division of Housing plan review checklist.
Included in that submittal, the plans must have a separate section that
clearly describes the details for the installation of that building including
but not limited to structural connection hardware and fasteners, sheer wall
schedules, hold down schedules, plating and drag requirements and all
connections that need to be inspected during the setting of the modular
units, and must provide a separate manufacturer installation handbook
that is clearly referenced on the cover sheet of the plan set, preferably
where the building codes are referenced.
4.18 An application will expire and all fees forfeited if it is not completed within 120
days of the initial application date.
4.18.1 Expired applications must be resubmitted as new applications
electronically with documentation and fees.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

44
4.19 In order to be considered approved, plans and quality control manuals must be
stamped by the Division of Housing or third party agency. Revisions, additions, or
deletions will not be acceptable without prior approval.
4.19.1 An approved copy of the quality control manual and plan must be retained
at the place of manufacture.
4.19.1.1
They must be kept on file within the specific location of
manufacture for the purpose of construction and inspection by
Division of Housing inspectors or the third party agency.
4.19.2 All third party agency approvals must be submitted to the Division of
Housing for review and oversight approval.
4.20 Plan approval does not guarantee a manufactured structure constructed from the
approved plan will also be approved
on file within the specific location of
manufacture for the purpose of construction and inspection by
Division of Housing inspectors or the third party agency.
4.19.2 All third party agency approvals must be submitted to the Division of
Housing for review and oversight approval.
4.20 Plan approval does not guarantee a manufactured structure constructed from the
approved plan will also be approved. All structures must also undergo an
inspection and receive an insignia of approval in order to be considered certified
by the State of Colorado. A plan approval does not prevent the Division of
Housing or the third party agency from requiring the correction of errors found in
the plans or the unit itself, when found in violation of these rules.
4.21 Revisions to the approved plan are required where the manufacturer proposes a
change in structural, plumbing, heating, electrical, or fire life safety systems.
Such changes must become part of the approved plan unless the Division of
Housing determines that the change constitutes a new model. If determined a
new model, the interim change will be processed as a new application. Any
difference in fees will also be assessed.
4.22 The Division of Housing will approve unchanged plan renewals it previously
reviewed and approved, provided there has been no change in adopted codes
and the manufacturer’s officer in Rule 4.17.2 above certifies in writing that the
plans are identical to those previously approved by the Division of Housing. A
“Supplemental Plan Check Fee” will apply for plan renewals.
4.22.1 Should it be determined by the Division of Housing that unauthorized
changes have been made to an approved plan, the manufacturer will be
subject to a “Red Tag Fee” for every structure built to the changed plans,
and the Division may require additional inspections to ensure the code
compliance of the structures
vision of Housing. A
“Supplemental Plan Check Fee” will apply for plan renewals.
4.22.1 Should it be determined by the Division of Housing that unauthorized
changes have been made to an approved plan, the manufacturer will be
subject to a “Red Tag Fee” for every structure built to the changed plans,
and the Division may require additional inspections to ensure the code
compliance of the structures.
4.23 When amendments to these regulations require changes to be made to an
approved plan, the Division of Housing will notify the manufacturer of the
requirement and allow it a reasonable time to submit revised plans for review and
approval. Revised plans will be processed as interim changes with the
appropriate fees assessed.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

45
4.24 Approved plans expire with the factory registration. Plans must be resubmitted
and the Supplemental Plan Check Fee will apply. New plans approved within 120
days of the manufacturers’ registration expiration date will not be required to
resubmit plans for renewal until the next registration cycle. If the manufacturer
fails to register on time, due to fault of their own, those plans are no longer valid
and will be required to be renewed. The asset for that structure is required to
have been created and construction started before the expiration to be exempt
from the renewal process for that specific plan and structure.
4.25 Tiny home plans must include: details on the vehicle chassis, including drawings
and connections, and whether the tiny home is going to be installed on a
permanent or temporary foundation.
Inspections
4.26 All structures manufactured, sold, or offered for sale in the state of Colorado
must display the Division of Housing insignia of approval affixed either by the
Division of Housing, an authorized third party agency, or by a certified
manufacturer. These insignias certify that the unit is constructed in compliance
with applicable codes and regulations adopted by the State Housing Board
pections
4.26 All structures manufactured, sold, or offered for sale in the state of Colorado
must display the Division of Housing insignia of approval affixed either by the
Division of Housing, an authorized third party agency, or by a certified
manufacturer. These insignias certify that the unit is constructed in compliance
with applicable codes and regulations adopted by the State Housing Board. This
does not apply to factory-built structures or tiny homes manufactured or sold for
transportation to and installation in another state. However, if the unit were to
return to Colorado for use, then it would require an insignia issued by the Division
of Housing.
4.26.1 Registered (non-certified) and certified manufacturers must apply for
Colorado insignias through the Division of Housing and submit the
appropriate fees provided in Rule 3 of these rules.
4.26.1.1
For units that are completed at the manufacturing facility (are
not OC units), insignias will be affixed to each structure only upon
final inspection approval by the Division of Housing or an
authorized third party agency
4.26.1.2
For units that have on-site construction items, insignias will
be affixed to each structure after an OC inspection by the Division
of Housing or a third party agency or a local building department
that has agreed to accept responsibility for the inspection of the OC
items.
4.26.1.3
Insignias affixed by an authorized third party agency or a
certified manufacturer must be reported to the Division of Housing,
including the insignia number, type of insignia of approval affixed
(residential or commercial), manufacturer, serial number, date of
manufacture of the structure, and the first destination of the shipped
structure. A manufacturer is required to provide a copy of its
monthly production report.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
t be reported to the Division of Housing,
including the insignia number, type of insignia of approval affixed
(residential or commercial), manufacturer, serial number, date of
manufacture of the structure, and the first destination of the shipped
structure. A manufacturer is required to provide a copy of its
monthly production report.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

46
4.26.1.3.1
The Division of Housing may elect to not issue
additional insignias of approval to a third party agency or
certified manufacturer if all insignias affixed are not timely
and completely reported.
4.27.2 Insignias are assigned for use at a specific location and cannot be
transferable or used on an unapproved structure. Colorado insignias of
approval issued for one type of certification may not be used on a
structure of another (different) type. A silver 3”x5” primary insignia (one or
two family dwellings, except tiny homes) documenting manufacturer and
design information is required for each structure to be installed in the
state, or a blue 3”x5” primary insignia (commercial) documenting
manufacturer and design information is required for each box to be
installed in the state. A primary pink 3”x5” insignia will be required for each
Tiny Home. A primary black 3x5 insignia will be attached to the primary
box or Division of Housing approved location of each multi-family dwelling
unit. A primary light green 3”x5” insignia will be adhered to the primary box
of Emergency Response Units.
4.27.2.1
For residential only - each additional habitable floor section
requires a silver 2”x2” “Additional Floor Tag” insignia7
4.27.2.2
For commercial only – an approved modification requires a
green/silver 3”x5” “Modification” insignia.
4.27.2.3
For commercial only – components of a structure requires a
purple 3”x5” “Component-only” insignia.
4.27.2.4
Both – factory-built structures inspected for another state
requires a dark green 2”x2” “Inspection-only” insignia
requires a silver 2”x2” “Additional Floor Tag” insignia7
4.27.2.2
For commercial only – an approved modification requires a
green/silver 3”x5” “Modification” insignia.
4.27.2.3
For commercial only – components of a structure requires a
purple 3”x5” “Component-only” insignia.
4.27.2.4
Both – factory-built structures inspected for another state
requires a dark green 2”x2” “Inspection-only” insignia.
4.27.2.5
For Emergency Response Units – each additional box
section requires a light green 2”x2” “Additional Floor Tag” insignia.
4.27.3 The primary insignia for residential and tiny homes must be permanently
affixed inside the kitchen sink cabinet or inside the vanity cabinet if there is
no kitchen sink. For certified manufacturers, this must occur prior to
structures being removed from the production location that is certified.
Additional Floor Tag insignias, if applicable, are to be permanently affixed
and located directly under the primary insignia.
4.27.3.1
The primary insignia must contain the serial number, date of
manufacture, wind design speed, roof design load, seismic zone,
and construction codes.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

47
4.27.4 Colorado insignias are the property of the State of Colorado and may be
confiscated by the Division of Housing upon any violation of these rules.
Defaced, marked in error, or voided insignias must be returned to the
Division of Housing without refund.
4.27.5 Dates on insignia are completion dates.
4.27.6 For installation and inspection insignias, the name of the installer or
inspector is required. Not the company name.
4.28 Whenever an on-site inspection reveals that a structure fails to comply with any
provision of these rules, the Division of Housing or the third party agency may
affix a “Red Tag Notice” on the structure. All manufacturers must correct any
construction code violations within thirty (30) calendar days of inspection. Life
safety corrections may require less than 30 days to correct
company name.
4.28 Whenever an on-site inspection reveals that a structure fails to comply with any
provision of these rules, the Division of Housing or the third party agency may
affix a “Red Tag Notice” on the structure. All manufacturers must correct any
construction code violations within thirty (30) calendar days of inspection. Life
safety corrections may require less than 30 days to correct. An extension may be
granted when submitted in writing to the Division of Housing.
4.28.1 Once notified of a “Red Tag Notice” by the Division of Housing or the third
party agency and the specific violation(s), the affected parties must
resolve the issue(s) with the entity that posted the notice.
4.28.2 Within five (5) working days, the affected parties or their agents must
notify, in writing, the Division of Housing or the third party agency of the
action taken to correct the violation(s) and what steps have been taken by
management to preclude the recurrence of the violation(s). Failure to
respond within five (5) days may cause revocation of an affected party’s
status.
4.28.3 A structure posted with a “Red Tag Notice” cannot be sold, offered for
sale, or have occupancy in the state of Colorado, nor can it be moved or
caused to be moved without the prior written approval of the Division of
Housing or the third party agency.
4.28.4 All structures posted with a “Red Tag Notice” must be corrected or
removed from the state (with prior written approval of the Division of
Housing or the third party agency). All structures that are corrected will be
re-inspected to assure compliance with the codes and regulations, and a
re-inspection fee will be assessed.
4.28.4.1
Multiple violations may result in the Division of Housing
suspending plan reviews submitted by the manufacturer until all
issues are addressed.
4.28.5 A “Red Tag Notice” may be removed only by an authorized representative
of the Division of Housing or the third party inspection agency.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
nd a
re-inspection fee will be assessed.
4.28.4.1
Multiple violations may result in the Division of Housing
suspending plan reviews submitted by the manufacturer until all
issues are addressed.
4.28.5 A “Red Tag Notice” may be removed only by an authorized representative
of the Division of Housing or the third party inspection agency.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

48
4.29 Factory-built structures may not be modified, prior to or during, installation at a
site without approval from the Division of Housing. Once installed and its
installation certified (factory-built residential structures only), any substantial
alternation or repair made to the construction of the structure (both residential
and nonresidential) already certified by the Division of Housing and on-site is
under the jurisdiction of the local building department.
4.30 The Division of Housing and/or the third party agency retained by the
manufacturer will conduct certification and production inspections of all
manufacturers engaged in manufacturing or offering for sale factory-built
structures in the state of Colorado. This inspection will include the quality control
program and systems testing. This does not apply to factory-built structures
manufactured or sold for transportation to and installation in another state.
However, if the unit were to return to Colorado for use, then it would require an
insignia issued by the Division of Housing.
4.30.1 Payment of the fees provided in Rule 3 is required if utilizing the services
of an inspector from the Division of Housing. This cost is not refundable.
4.30.2 All in-state manufacturers shall have the option to contract with a third
party agency or continue to use the Division of Housing to perform
certifications and in-plant production inspections, to evaluate its
registered/certified location’s Quality Control procedures, approve
manufacturer engineering manuals and installation instructions and/or
approve construction plans
is not refundable.
4.30.2 All in-state manufacturers shall have the option to contract with a third
party agency or continue to use the Division of Housing to perform
certifications and in-plant production inspections, to evaluate its
registered/certified location’s Quality Control procedures, approve
manufacturer engineering manuals and installation instructions and/or
approve construction plans.
4.30.3 Out of state manufacturers are required to obtain the services of a third
party inspection agency to perform certifications and in-plant production
inspections, to evaluate the plant’s Quality Control procedures, and may
use an approved third party agency to approve manufacturer engineering
manuals, installation instructions, and/or approve construction plans.
4.30.3.1
Another state where a registered/certified manufacturer is
located may act as a third party agency for certifications, in-plant
production inspections and evaluations of their Quality Control
procedures provided it enters into a memorandum of understanding
with the Division of Housing and the manufacturer follows all
requirements for that entity.

4.31 A third party agency may consist of one of the following entities (any exceptions
must have prior approval by the Division of Housing):
(A)
States – must enter into a memorandum of understanding with Colorado.
(B)
Local Government – must adopt Division-approved local ordinance or rule.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing
r follows all
requirements for that entity.

4.31 A third party agency may consist of one of the following entities (any exceptions
must have prior approval by the Division of Housing):
(A)
States – must enter into a memorandum of understanding with Colorado.
(B)
Local Government – must adopt Division-approved local ordinance or rule.

CODE OF COLORADO REGULATIONS
8 CCR 1302-14
Division of Housing

49
(C)
Firms – must currently be listed with a national listing agency such as the
International Code Council (ICC), International Accreditation Service
(IAS), or other Division-approved entity

[Text truncated at 120,000 characters. The full text is on the page linked above.]

## Nearby sections

- [8 CCR 1302-1 FACTORY BUILT HOUSING CONSTRUCTION CODE AND MULTIPLE DWELLING CODE [Repealed eff. 11/30/2003]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_1.md)
- [8 CCR 1302-2 RESOLUTION NO..26 - RECREATIONAL AND PARK TRAILER VEHICLES [Repealed eff. 11/30/2003]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_2.md)
- [8 CCR 1302-3 RESOLUTION NO. 25 - FACTORY BUILT HOUSING [Repealed eff. 11/30/2003]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_3.md)
- [8 CCR 1302-4 RESOLUTION NO. 10 - MANUFACTURED HOME CONSTRUCTION STANDARDS AND PROCEDURAL REGULATIONS [Repealed and recodified as 8 CCR 1302-14 eff. 07/01/2018]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_4.md)
- [8 CCR 1302-6 RESOLUTION NO. 24 - FACTORY BUILT NONRESIDENTIAL STRUCTURE [Repealed eff. 11/30/2003]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_6.md)
- [8 CCR 1302-7 RESOLUTION NO. 38 - MANUFACTURED HOUSING INSTALLATIONS [Repealed and recodified as 8 CCR 1302-14 eff. 07/01/2018]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_7.md)
- [8 CCR 1302-10 RESOLUTION NO. 29 - ON-SITE CONSTRUCTION AND SAFETY CODES [Repealed eff. 11/30/2003]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_10.md)
- [8 CCR 1302-11 RESOLUTION NO. 35 - FACTORY BUILT NONRESIDENTIAL STRUCTURES [Repealed and recodified as 8 CCR 1302-14 eff. 07/01/2018]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_11.md)
- [8 CCR 1302-12 RESOLUTION NO. 34 - FACTORY BUILT HOUSING [Repealed and recodified as 8 CCR 1302-14 eff. 07/01/2018]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_12.md)
- [8 CCR 1302-13 RESOLUTION NO. 32 - RECREATIONAL AND PARK TRAILER VEHICLES [Repealed eff. 11/30/2003]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_13.md)
- [8 CCR 1302-14 NON-RESIDENTIAL AND RESIDENTIAL FACTORY-BUILT STRUCTURES AND TINY HOMES; SELLERS OF MANUFACTURED HOMES AND TINY HOMES; MANUFACTURED HOME, TINY HOME, AND MULTI-FAMILY STRUCTURE INSTALLATIONS](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_14.md)
- [8 CCR 1302-15 MOBILE HOME PARK OVERSIGHT PROGRAM](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_15.md)
- [8 CCR 1302-16 HOUSING INVESTMENT TRUST FUND INCOME LIMITS AND DEFINITION OF A SINGLE PERSON AS AN ELIGIBLE ENTITY FOR ASSISTANCE](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_16.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_8_CCR_1302_14. Check the current official text before relying on it. Not legal advice.