# 4 CCR 723-3: RULES REGULATING ELECTRIC UTILITIES

> Colorado · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_3

## Section

- **Citation:** 4 CCR 723-3
- **Heading:** RULES REGULATING ELECTRIC UTILITIES
- **Jurisdiction:** Colorado
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Code of Colorado Regulations / 700 Department of Regulatory Agencies / 723 Public Utilities Commission / 4 CCR 723-3

## Text

1
Department of Regulatory Agencies
Public Utilities Commission
RULES REGULATING ELECTRIC UTILITIES
4 CCR 723-3
[Editor’s Notes follow the text of the rules at the end of this CCR Document.]
BASIS, PURPOSE, AND STATUTORY AUTHORITY.
The basis and purpose of these rules is to describe the electric service to be provided
by jurisdictional utilities and master meter operators to their customers; to designate the
manner of regulation over such utilities and master meter operators; and to describe the
services these utilities and master meter operators shall provide. In addition, these rules
identify the specific provisions applicable to public utilities or other persons over which
the Commission has limited jurisdiction. These rules address a wide variety of subject
areas including, but not limited to, service interruption, meter testing and accuracy,
safety, customer information, customer deposits, rate schedules and tariffs,
discontinuance of service, master meter operations, flexible regulation, procedures for
administering the Low-Income Energy Assistance Act, electric service low-income
program, cost allocation between regulated and unregulated operations, recovery of
costs, the acquisition of renewable energy, small power producers and cogeneration
facilities, and appeals regarding local government land use decisions. The statutory
authority for these rules can be found at §§ 29-20-108, 40-1-103.5, 40-2-108, 40-2-
124(2), 40-2-202, 40-2-203, 40-3-102, 40-3-102.5, 40-3-103, 40-3-104.3, 40-3-106, 40-
3-111, 40-3-114, 40-4-101, 40-4-106, 40-4-108, 40-4-109, 40-5-103, 40-7-113.5, 40-7-
116.5, 40 8.7 105(5), and 40-9.5-107(5), C.R.S.
GENERAL PROVISIONS
3000. Scope and Applicability.
al government land use decisions. The statutory
authority for these rules can be found at §§ 29-20-108, 40-1-103.5, 40-2-108, 40-2-
124(2), 40-2-202, 40-2-203, 40-3-102, 40-3-102.5, 40-3-103, 40-3-104.3, 40-3-106, 40-
3-111, 40-3-114, 40-4-101, 40-4-106, 40-4-108, 40-4-109, 40-5-103, 40-7-113.5, 40-7-
116.5, 40 8.7 105(5), and 40-9.5-107(5), C.R.S.
GENERAL PROVISIONS
3000. Scope and Applicability.
(a)
Absent a specific statute, rule, or Commission Order which provides otherwise,
all rules in this Part 3 (the 3000 series) shall apply to all jurisdictional electric
utilities and electric master meter operators and to Commission proceedings
concerning electric utilities or electric master meter operators providing electric
service.
(b)
The following rules in this Part 3 shall apply to cooperative electric associations
which have elected to exempt themselves from the Public Utilities Law pursuant
to § 40-9.5-103, C.R.S.
(I)
Paragraphs 3002 (a)(I), (a)(II), (a)(IV), (a)(V), (a)(XVI), (b), and (c)
concerning the filing of applications for certificate of public convenience
Code of Colorado Regulations
Secretary of State
State of Colorado

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
2
and necessity for franchise or service territory, for certificate amendments,
to merge or transfer, or for appeals of local government actions.
(II)
Paragraphs 3005 (a)(III), (IV), (d), (e), (g), and (h) concerning records
under RUS accounting system and preservation of records.
(III)
Paragraphs 3006 (a), (b), (c), (d), and (e) concerning the filing of annual
reports, designation for service of process, and election of applicability of
Title 40, Article 8.5.
(IV)
Paragraphs 3008 (b) and (d) concerning incorporation by reference.
(V)
Rules 3100 and 3103 concerning application for and amendment of a
certificate of public convenience and necessity relating to a franchise
ds.
(III)
Paragraphs 3006 (a), (b), (c), (d), and (e) concerning the filing of annual
reports, designation for service of process, and election of applicability of
Title 40, Article 8.5.
(IV)
Paragraphs 3008 (b) and (d) concerning incorporation by reference.
(V)
Rules 3100 and 3103 concerning application for and amendment of a
certificate of public convenience and necessity relating to a franchise.
(VI)
Rules 3101 and 3103 concerning application for and amendment of a
certificate of public convenience and necessity relating to service territory.
(VII)
Rule 3104 concerning application to transfer assets, to obtain a controlling
interest, or to merge with another entity.
(VIII) Rule 3204 concerning incidents occurring in connection with the operation
of facilities.
(IX)
Paragraphs 3207 (a) and (b) concerning construction and expansion of
distribution facilities.
(X)
Rules 3250 through 3253 concerning major event reporting.
(XI)
Rule 3411 concerning the Low-Income Energy Assistance Act unless the
cooperative electric association has exempted themselves pursuant to
paragraph 3411(a).
(XII)
Rules 3650(b), 3651, 3652, 3654(b), (d) through (i), and (l); 3655(h)-(m);
3659(a)(I) through (a)(V), (b) and (d) through (i), 3660(l), 3661(b), (c), (g),
and (i), 3662(a)(I), (a)(II), (a)(IV) through (a)(X), (a)(XIII), (a)(XV), (b), (d)
and (e), and 3667.
(XIII) Rules 3700 through 3707 concerning appeals of local governmental land
use decisions actions.
selves pursuant to
paragraph 3411(a).
(XII)
Rules 3650(b), 3651, 3652, 3654(b), (d) through (i), and (l); 3655(h)-(m);
3659(a)(I) through (a)(V), (b) and (d) through (i), 3660(l), 3661(b), (c), (g),
and (i), 3662(a)(I), (a)(II), (a)(IV) through (a)(X), (a)(XIII), (a)(XV), (b), (d)
and (e), and 3667.
(XIII) Rules 3700 through 3707 concerning appeals of local governmental land
use decisions actions.
(c)
The following rules in this Part 3 shall apply to cooperative electric generation
and transmission associations.
(I)
Paragraphs 3002 (a)(III), (a)(XVI), (b), and (c) concerning the filing of
applications for certificates of public convenience and necessity for
facilities or for appeals of local government actions.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
3
(II)
Paragraph 3006(j) concerning the filing of electric resource planning
reports.
(III)
Rule 3102 concerning applications for certificates of public convenience
and necessity for facilities.
(IV)
Rule 3103 concerning amendments to certificates of public convenience
and necessity for facilities.
(V)
Rule 3104 concerning application to transfer, to obtain a controlling
interest, or to merger with another entity.
(VI)
Rule 3200 concerning construction, installation, maintenance, and
operation of facilities.
(VII)
Rule 3204 concerning incidents occurring in connection with the operation
of facilities.
(VIII) Rule 3205 concerning construction or expansion of generating capacity.
(IX)
Rule 3206 concerning construction or extension of transmission facilities.
(X)
Paragraph 3253(a) concerning major event reporting.
(XI)
Rules 3602, 3605, and 3618(a) concerning electric resource planning.
(XII)
Rules 3650(e), 3651, 3652, 3662(f), and 3668(d) concerning the RES.
(XIII) Rules 3700 through 3707 concerning appeals of local government actions.
(XIV) Rules 3750 through 3757 concerning regional electricity market
participation.
nsion of transmission facilities.
(X)
Paragraph 3253(a) concerning major event reporting.
(XI)
Rules 3602, 3605, and 3618(a) concerning electric resource planning.
(XII)
Rules 3650(e), 3651, 3652, 3662(f), and 3668(d) concerning the RES.
(XIII) Rules 3700 through 3707 concerning appeals of local government actions.
(XIV) Rules 3750 through 3757 concerning regional electricity market
participation.
(d)
The following rules in this Part 3 shall apply to municipally owned utilities, which
are qualifying retail utilities:
(I)
Rules 3650(c), 3651, 3652, 3653, 3654(b), (c), (d) through (i) and (l);
3659(a)(I) through (a)(V), (b), (d) through (i), 3666, and 3668(d).
(e)
The following rules in this Part 3 shall apply to municipally owned utilities which
are not qualifying retail utilities.
(I)
Paragraph 3650(d).

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
4
3001. Definitions.
The following definitions apply throughout this Part 3, except where a specific rule or
statute provides otherwise. In addition to the definitions here, the definitions found in the
Public Utilities Law and Part 1 apply to these rules. In the event of a conflict between
these definitions and a statutory definition, the statutory definition shall apply. In the
event of a conflict between these definitions and a definition in Part 1, these definitions
shall apply.
(a)
“Advanced metering infrastructure” means an integrated system of smart electric
utility meters and communication networks that enables two-way communication
between an electric utility's data systems and the meter's internet protocol
address and allows the electric utility to measure electricity usage and/or connect
or disconnect service remotely.
tion in Part 1, these definitions
shall apply.
(a)
“Advanced metering infrastructure” means an integrated system of smart electric
utility meters and communication networks that enables two-way communication
between an electric utility's data systems and the meter's internet protocol
address and allows the electric utility to measure electricity usage and/or connect
or disconnect service remotely.
(b)
“Affiliate” of a utility means a subsidiary of a utility, a parent corporation of a
public utility, a joint venture organized as a separate corporation or partnership to
the extent of the individual utility’s involvement with the joint venture, a subsidiary
of a parent corporation of a utility or where the utility or the parent corporation
has a controlling interest over an entity.
(c)
“Aggregated data” means customer data, alone or in combination with non-
customer data, resulting from processing (e.g., average of a group of customers)
and/or the compilation of customer data of one or more customers from which all
unique identifiers and personal information has been removed.
(d)
“Applicant for service” means a person who applies for utility service and who
either has taken no previous utility service from that utility or has not taken utility
service from that utility within the most recent 30 days.
(e)
"Base rate" means charges used to recover costs of utility infrastructure and
operations, including a return on capital investment, not otherwise recovered
through a utility rate adjustment mechanism.
(f)
"Basis point" means one-hundredth of a percentage point (100 basis points = one
percent).
(g)
"Benefit of service" means the use of utility service by each person of legal age
who resides at a premises to which service is delivered and who is not registered
with the utility as the customer of record.
(h)
"Commission" means the Colorado Public Utilities Commission.
ty rate adjustment mechanism.
(f)
"Basis point" means one-hundredth of a percentage point (100 basis points = one
percent).
(g)
"Benefit of service" means the use of utility service by each person of legal age
who resides at a premises to which service is delivered and who is not registered
with the utility as the customer of record.
(h)
"Commission" means the Colorado Public Utilities Commission.
(i)
"Contracted agent" means any person that has contracted with a utility in
compliance with rule 3030 to assist in the provision of regulated utility services
(e.g., an affiliate or vendor).

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
5
(j)
“Craft labor certification” means all documentation and certification of payroll
required for an energy sector public works project.
(k)
"Customer" means any person who is currently receiving utility service. Any
person who moves within a utility’s service territory and obtains utility service at a
new location within 30 days shall be considered a "customer." Unless stated in a
particular rule, "customer" applies to any class of customer as defined by the
Commission or by utility tariff.
(l)
"Customer data" means customer-specific data or information, excluding
personal information as defined in paragraph 1004(x), that is:
(I)
collected from the electric meter by the utility and stored in its data
systems (e.g., kWh, kW, voltage, VARs and power factor);
(II)
combined with customer-specific energy usage information on bills issued
to the customer for regulated utility service when not publicly or lawfully
available to the general public; or
(III)
about the customer’s participation in regulated utility programs, such as
renewable energy, demand-side management, load management, or
energy efficiency programs.
Wh, kW, voltage, VARs and power factor);
(II)
combined with customer-specific energy usage information on bills issued
to the customer for regulated utility service when not publicly or lawfully
available to the general public; or
(III)
about the customer’s participation in regulated utility programs, such as
renewable energy, demand-side management, load management, or
energy efficiency programs.
(m)
"Distribution facilities" are those lines designed to operate at the utility's
distribution voltages in the area as defined in the utility’s tariffs including
substation transformers that transform electricity to a distribution voltage and also
includes other equipment within a transforming substation which is not integral to
the circuitry of the utility’s transmission system.
(n)
"Emergency or safety event or circumstance" means a manmade or natural
emergency event or safety circumstance:
(I)
that prevents utility staff from being able to safely travel to or work at a
customer's residence or place of business for purposes of reconnecting or
making necessary repairs prior to reconnecting utility service; or
(II)
for which a utility has dispatched utility staff members to help respond to
the emergency or safety event or circumstance and, due to the timing or
number of utility staff dispatched, the utility lacks sufficient trained staff to
reconnect or make necessary repairs prior to reconnecting utility service at
a customer's residence or place of business; and
(III)
includes a severe weather event that one or more reputable weather
forecasting sources forecasts to occur in the following twenty-four hours
and that is more likely than not to result in dangerous travel or on-site
outdoor or indoor work conditions for individuals in the path of the weather
event.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
6
(o)
"Energy assistance organization" means the nonprofit corporation established for
low-income energy assistance pursuant to § 40-8.5-104, C.R.S.
owing twenty-four hours
and that is more likely than not to result in dangerous travel or on-site
outdoor or indoor work conditions for individuals in the path of the weather
event.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
6
(o)
"Energy assistance organization" means the nonprofit corporation established for
low-income energy assistance pursuant to § 40-8.5-104, C.R.S.
(p)
“Energy Sector Public Works (ESPW) project” is a project pursuant to § 24-92-
301, C.R.S., et seq., that for purposes of these rules:
(I)
for an investor-owned utility:
(A)
has the purpose of generating, transmitting, or distributing
electricity to provide energy to Colorado individual consumers and
businesses;
(B)
is built by or for a utility, including any project for which energy is
purchased through a power purchase or similar agreement;
(C)
has a total project cost of $1,000,000 or greater, of which the utility
will request Commission approval for ratepayers to pay at least
$500,000;
(D)
is included for approval through any proceeding conducted by the
Commission as part of an electric resource acquisition pursuant to
rule 3600 et seq., or a request for a certificate of public
convenience and necessity pursuant to § 40-5-101, C.R.S., et seq.;
and
(E)
consists of either:
(i)
electric power generation with a nameplate generation
capacity of one megawatt or higher, or an energy storage
system as defined by § 40-2-202, C.R.S., with an energy
rating of one megawatt of power capacity or four megawatt
hours of usable energy capacity or higher; or
st for a certificate of public
convenience and necessity pursuant to § 40-5-101, C.R.S., et seq.;
and
(E)
consists of either:
(i)
electric power generation with a nameplate generation
capacity of one megawatt or higher, or an energy storage
system as defined by § 40-2-202, C.R.S., with an energy
rating of one megawatt of power capacity or four megawatt
hours of usable energy capacity or higher; or
(ii)
pollution controls, electric transmission, electric vehicle
charging infrastructure, or carbon capture and storage; and
(II)
for a cooperative electric generation and transmission association, any
project in Colorado that:
(A)
has the purpose of generating or distributing electricity for the
purposes of providing energy to Colorado individual consumers and
businesses from utility customer funding of $500,000 or more as
approved by a cooperative electric association that is built by or for
a utility;
(B)
has a total project cost of $1,000,000 or greater; and
(C)
consists of either:

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
7
(i)
electric power generation with a nameplate generation
capacity of one megawatt or higher, or an energy storage
system as defined by § 40-2-202, C.R.S., with an energy
rating of one megawatt of power capacity or four megawatt
hours of usable energy capacity or higher; or
(ii)
pollution controls, electric transmission, electric vehicle
charging infrastructure, or carbon capture and storage.
(q)
"Energy storage system" means a commercially available technology that is
capable of retaining energy, storing the energy for a period of time, and
delivering the energy as electricity after storage by chemical, thermal,
mechanical, or other means.
(r)
"Financial security" includes any stock, bond, note, or other evidence of
indebtedness.
charging infrastructure, or carbon capture and storage.
(q)
"Energy storage system" means a commercially available technology that is
capable of retaining energy, storing the energy for a period of time, and
delivering the energy as electricity after storage by chemical, thermal,
mechanical, or other means.
(r)
"Financial security" includes any stock, bond, note, or other evidence of
indebtedness.
(s)
"Generation facility" means a power plant that converts a primary energy
resource into electricity. Primary energy resources include, but are not limited to:
nuclear resources, coal, natural gas, hydro, wind, solar, biomass, and
geothermal.
(t)
"Heavy load" means not less than 60 percent, but not more than 100 percent, of
the nameplate-rated capacity of a meter.
(u)
"Income qualified utility customer” or “low income customer” is a customer
meeting the requirements of § 40-3-106(1)(d)(II), C.R.S.
(v)
"Informal complaint" means an informal complaint as defined and discussed in
the Commission’s Rules Regulating Practice and Procedure.
(w)
"Light load" means approximately five to ten percent of the nameplate-rated
capacity of a meter.
(x)
"Load" means the power consumed by an electric utility customer over time
(measured in terms of either demand or energy or both).
(y)
"Local government" means any Colorado county, municipality, city and county,
home rule city or town, home rule city and county, or city or town operating under
a territorial charter.
s approximately five to ten percent of the nameplate-rated
capacity of a meter.
(x)
"Load" means the power consumed by an electric utility customer over time
(measured in terms of either demand or energy or both).
(y)
"Local government" means any Colorado county, municipality, city and county,
home rule city or town, home rule city and county, or city or town operating under
a territorial charter.
(z)
"Local office" means any Colorado office operated by a utility at which persons
may make requests to establish or to discontinue utility service. If the utility does
not operate an office in Colorado, "local office" means any office operated by a
utility at which persons may make requests to establish or to discontinue utility
service in Colorado.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
8
(aa)
"Main service terminal" means the point at which the utility’s metering
connections terminate.
(bb)
"Major event" means an event as defined in and consistent with IEEE Standard
Number 1366-2003, Guide for Electric Power Distribution Reliability Indices.
(cc)
"MVA" means mega-volt amperes and is the vector sum of the real power and
the reactive power.
(dd)
"Non-standard customer data" means all customer data that are not standard
customer data.
(ee)
"Output" means the energy and power produced by a generation system.
(ff)
"Past due" means the point at which a utility can affect a customer’s account for
regulated service due to non-payment of charges for regulated service.
(gg)
"Powerline trail" means a multimodal trail that is: eight feet in width or wider;
made of hard surface such as concrete or compacted gravel; used for
recreational purposes or commuting in a manner that does not involve a motor
vehicle; and located in an existing transmission or future transmission corridor
er’s account for
regulated service due to non-payment of charges for regulated service.
(gg)
"Powerline trail" means a multimodal trail that is: eight feet in width or wider;
made of hard surface such as concrete or compacted gravel; used for
recreational purposes or commuting in a manner that does not involve a motor
vehicle; and located in an existing transmission or future transmission corridor.
(hh)
“Project labor agreement,” pursuant to § 24-92-303(9), C.R.S., means a pre-hire
collective bargaining agreement between a lead contractor and construction
labor organization(s) covering the affected trades necessary to perform work on
a project that establishes the terms and conditions of employment of the
construction workforce and includes provisions that:
(I)
set forth effective, immediate, and mutually binding procedures for
resolving jurisdictional labor disputes and grievances arising before the
completion of work;
(II)
contain guarantees against strikes, lockouts, or similar actions;
(III)
ensure a reliable source of trained, skilled, and experienced construction
craft labor;
(IV)
further public policy objectives regarding improved employment
opportunities for minorities, women, or other economically disadvantaged
populations in the construction industry, including persons from
disproportionately impacted communities, to the extent permitted by state
and federal law;
(V)
permit the selection of the lowest qualified responsible bidder or lowest
qualified responsible offeror without regard to union or non-union status at
other construction sites; and
(VI)
include other terms as the parties deem appropriate.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
9
oportionately impacted communities, to the extent permitted by state
and federal law;
(V)
permit the selection of the lowest qualified responsible bidder or lowest
qualified responsible offeror without regard to union or non-union status at
other construction sites; and
(VI)
include other terms as the parties deem appropriate.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
9
(ii)
"Principal place of business" means the place, in or out of the State of Colorado,
where the executive or managing principals who directly oversee the utility's
operations in Colorado are located.
(jj)
"Property owner" means the legal owner of government record for a parcel of real
property within the service territory of a utility. A utility may rely upon the records
of a county clerk for the county within which a parcel of property is located to
determine ownership of government record.
(kk)
"Qualifying communication" means one of the following methods of
communicating with a utility customer about a possible upcoming disconnection
of service:
(I)
a physical visit to the customer's premises during which a utility
representative speaks with the customer and provides the customer utility
assistance information or, if the customer is not available to speak, leaves
notice of proposed disconnection and utility assistance information for the
customer's review; or
(II)
a telephone call, text, or e-mail to the customer’s last-known telephone
number or email address in which:
(A)
the utility representative provides the customer with notice of
proposed disconnection and utility assistance information; and
(B)
the utility representative either speaks directly with the customer
over the telephone or the customer receives the utility
representative’s text or email.
(ll)
"Rate adjustment mechanism" or "rate rider" means a charge added to a utility
bill to recover a specific cost that is not part of the base rate
the customer with notice of
proposed disconnection and utility assistance information; and
(B)
the utility representative either speaks directly with the customer
over the telephone or the customer receives the utility
representative’s text or email.
(ll)
"Rate adjustment mechanism" or "rate rider" means a charge added to a utility
bill to recover a specific cost that is not part of the base rate.
(mm) "Reference standard" means suitable indicating electrical equipment permanently
mounted in a utility's laboratory and used for no purpose other than testing
rotating standards.
(nn)
"Regulated charges" means charges billed by a utility to a customer if such
charges are approved by the Commission or contained in a tariff of the utility.
(oo)
"RFP" means request for proposals.
(pp)
"Rotating standard" means a portable meter used for testing service meters.
(qq)
"RUS" means the Rural Utilities Service of the United States Department of
Agriculture, or its successor agencies.
(rr)
"Service connection" is the location on the customer’s premises/facilities at which
a point of delivery of power between the utility and the customer is established.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
10
For example, in the case of a typical residential customer served from overhead
secondary supply, this is the location at which the utility’s electric service drop
conductors are physically connected to the customer’s electric service entrance
conductors.
(ss)
"Standard customer data" means customer data maintained by a utility in its
systems in the ordinary course of business.
(tt)
"Test year" means a twelve-month period that is examined to determine a utility's
costs of service in a rate case.
(uu)
"Third-party" means a person who is not the customer, an agent of the customer
who has been designated by the customer with the utility and is acting of the
customer’s behalf, a regulated utility serving the customer, or a contracted agent,
of the utility.
ourse of business.
(tt)
"Test year" means a twelve-month period that is examined to determine a utility's
costs of service in a rate case.
(uu)
"Third-party" means a person who is not the customer, an agent of the customer
who has been designated by the customer with the utility and is acting of the
customer’s behalf, a regulated utility serving the customer, or a contracted agent,
of the utility.
(vv)
"Transmission corridor" means a tract of land owned, occupied, or leased by a
transmission provider as defined in § 33-45-102(11), C.R.S., or covered by an
easement or right-of-way held by a transmission provider, where an electric
transmission line is constructed, operated, or maintained at a voltage of 69
kilovolts or above.
(ww) "Transmission facilities" are those lines and related substations designed and
operating at voltage levels above the utility's voltages for distribution facilities,
including but not limited to related substation facilities such as transformers,
capacitor banks, or breakers that are integral to the circuitry of the utility’s
transmission system.
(xx)
"Unique identifier" means a customer’s name, mailing address, telephone
number, or email address that is displayed on a bill.
(yy)
"Unregulated charges" means charges that are billed by a utility to a customer
and that are not regulated or approved by the Commission, are not contained in
a tariff filed with the Commission, and are for service or merchandise not
required as a condition of receiving regulated utility service.
(zz)
"Utility assistance information" means information that a utility representative
provides a customer informing the customer that the customer may contact 1-
866-HEAT-HELP (1-866-432-8435) to determine if the customer qualifies for
utility bill payment assistance.
(aaa) "Utility" means any public utility as defined in § 40-1-103, C.R.S., providing
electric, steam, or associated services in the state of Colorado
stance information" means information that a utility representative
provides a customer informing the customer that the customer may contact 1-
866-HEAT-HELP (1-866-432-8435) to determine if the customer qualifies for
utility bill payment assistance.
(aaa) "Utility" means any public utility as defined in § 40-1-103, C.R.S., providing
electric, steam, or associated services in the state of Colorado.
(bbb) "Utility service" or "service" means a service offering of a utility, which service
offering is regulated by the Commission.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
11
(ccc) "Whole building data" means the sum of the monthly electric use for either all
meters at a building on a parcel or real property or all buildings on a parcel of real
property.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
12
3002. Applications.
(a)
Any person may seek Commission action regarding any of the following matters
through the filing of an appropriate application to request a(n):
(I)
issuance or extension of a certificate of public convenience and necessity
for a franchise, as provided in rule 3100;
(II)
issuance or extension of a certificate of public convenience and necessity
for service territory, as provided in rule 3101;
(III)
issuance of a certificate of public convenience and necessity for
construction of facilities, as provided in rule 3102;
(IV)
amendment of a certificate of public convenience and necessity in order to
change, extend, curtail, abandon, or discontinue any service or facility, as
provided in rule 3103;
(V)
transfer of a certificate of public convenience and necessity, to obtain a
controlling interest in any utility, to transfer assets within the jurisdiction of
the Commission or stock, or to merge a utility with another entity, as
provided in rule 3104;
(VI)
issuance, or assumption of any financial security or to create a lien
pursuant to § 40-1-104, as provided in rule 3105;
(VII)
flexible regulatory treatment to provide service without reference to tariff
ty, to obtain a
controlling interest in any utility, to transfer assets within the jurisdiction of
the Commission or stock, or to merge a utility with another entity, as
provided in rule 3104;
(VI)
issuance, or assumption of any financial security or to create a lien
pursuant to § 40-1-104, as provided in rule 3105;
(VII)
flexible regulatory treatment to provide service without reference to tariffs,
as provided in rule 3106;
(VIII) approval of an air quality improvement program, as provided for in rule
3107;
(IX)
approval of a new tariff or an amendment of a tariff for a rate adjustment
mechanism on less than statutory notice, as provided in rule 3109;
(X)
variance of voltage standards, as provided in rule 3202;
(XI)
approval of meter and equipment testing practices, as provided in rule
3303;
(XII)
approval of a meter sampling program, as provided in rule 3304;
(XIII) approval of a refund plan, as provided in rule 3410;
(XIV) approval of a Low-Income Energy Assistance Plan, as provided in rule
3411;

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
13
(XV) approval of a cost assignment and allocation manual, as provided in rule
3503;
(XVI) approval of or for amendment to a least-cost resource plan, as provided in
rules 3603, 3618, and 3619;
(XVII) approval of a compliance plan, as provided in rule 3657;
(XVIII) appeal of local government land use decision, as provided in rule 3703; or
(XIX) matter not specifically described in this rule, unless such matter is required
to be submitted as a petition under rule 1304, as a motion, or as some
other specific type of submittal.
-cost resource plan, as provided in
rules 3603, 3618, and 3619;
(XVII) approval of a compliance plan, as provided in rule 3657;
(XVIII) appeal of local government land use decision, as provided in rule 3703; or
(XIX) matter not specifically described in this rule, unless such matter is required
to be submitted as a petition under rule 1304, as a motion, or as some
other specific type of submittal.
(b)
In addition to the requirements of specific rules, all applications shall include, in
the following order and specifically identified, the following information, either in
the application or in appropriately identified attachments:
(I)
the name and address of the applying utility;
(II)
the name(s) under which the applying utility is, or will be, providing service
in Colorado;
(III)
the name, address, telephone number, and e-mail address of the applying
utility's representative to whom all inquiries concerning the application
should be made;
(IV)
a statement that the applying utility agrees to answer all questions
propounded by the Commission staff concerning the application;
(V)
a statement that the applying utility shall permit the Commission or
Commission staff to inspect the applying utility's books and records as part
of the investigation into the application;
(VI)
a statement that the applying utility understands that, if any portion of the
application is found to be false or to contain material misrepresentations,
any authorities granted pursuant to the application may be revoked upon
Commission order;
(VII)
in lieu of the separate statements required by subparagraphs (b)(IV)
through (VI) of this rule, a utility may include a statement that it has read,
and agrees to abide by, the provisions of subparagraphs (b)(IV) through
(VI) of this rule;
(VIII) a statement describing the applying utility’s existing operations and
general service area in Colorado;
cation may be revoked upon
Commission order;
(VII)
in lieu of the separate statements required by subparagraphs (b)(IV)
through (VI) of this rule, a utility may include a statement that it has read,
and agrees to abide by, the provisions of subparagraphs (b)(IV) through
(VI) of this rule;
(VIII) a statement describing the applying utility’s existing operations and
general service area in Colorado;

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
14
(IX)
for applications listed in subparagraphs (a)(I), (II), (III), (V), and (VI) of this
rule, a copy of the applying utility's or parent company’s and consolidated
subsidiaries’ most recent audited balance sheet, income statement,
statement of retained earnings, and statement of cash flows so long as
they provide Colorado specific financial information;
(X)
a statement indicating the town or city, and any alternative town or city, in
which the applying utility prefers any hearings be held; and
(XI)
acknowledgment that, by signing the application, the applying utility
understands that:
(A)
the filing of the application does not by itself constitute approval of
the application;
(B)
if the application is granted, the applying utility shall not commence
the requested action until the applying utility complies with
applicable Commission rules and any conditions established by
Commission order granting the application;
(C)
if a hearing is held, the applying utility must present evidence at the
hearing to establish its qualifications to undertake, and its right to
undertake, the requested action; and
(D)
in lieu of the statements contained in subparagraphs (b)(XI)(A)
through (C) of this rule, an applying utility may include a statement
that it has read, and agrees to abide by, the provisions of
subparagraphs (b)(XI)(A) through (C) of this rule
pplying utility must present evidence at the
hearing to establish its qualifications to undertake, and its right to
undertake, the requested action; and
(D)
in lieu of the statements contained in subparagraphs (b)(XI)(A)
through (C) of this rule, an applying utility may include a statement
that it has read, and agrees to abide by, the provisions of
subparagraphs (b)(XI)(A) through (C) of this rule.
(XII)
An attestation which is made under penalty of perjury; which is signed by
an officer, a partner, an owner, an employee of, an agent for, or an
attorney for the applying utility, as appropriate, who is authorized to act on
behalf of the applying utility; and which states that the contents of the
application are true, accurate, and correct. The application shall contain
the title and the complete address of the affiant.
(c)
In addition to the requirements of specific rules, all applications shall include the
information listed in subparagraphs (a)(I) through (V) of rule 1310. Applying
utilities may either include the information in the application itself, or incorporate
the information by reference to the miscellaneous proceeding created under rule
1310.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
15
(d)
Customer notice. Except as required or permitted by § 40-3-104, C.R.S., if the
applicant is required by statute, Commission rule, or order to provide notice to its
customers of the application, the applicant shall, within seven days after filing an
application with the Commission, cause to have published notice of the filing of
the application in each newspaper of general circulation in the municipalities
impacted by the application. The applicant shall provide proof of such customer
notice within 14 days of the publication in the newspaper. Failure to provide such
notice or failure to provide the Commission with proof of notice may cause the
Commission to deem the application incomplete
published notice of the filing of
the application in each newspaper of general circulation in the municipalities
impacted by the application. The applicant shall provide proof of such customer
notice within 14 days of the publication in the newspaper. Failure to provide such
notice or failure to provide the Commission with proof of notice may cause the
Commission to deem the application incomplete. The applicant may also be
required by statute, Commission rule, or order to provide additional notice to its
customers of the application by first-class mailing or by hand-delivery. Both the
newspaper notice and any additional customer notice(s) shall include the
following.
(I)
The title “Notice of Application by [Name of the Utility] to [Purpose of
Application]”.
(II)
State that [Name of Utility] has applied to the Colorado Public Utilities
Commission for approval to [Purpose of Application]. If the utility
commonly uses another name when conducting business with its
customers, the “also known as” name should also be identified in the
notice to customers.
(III)
Provide a brief description of the proposal and the scope of the proposal,
including an explanation of the possible impact upon persons receiving the
notice.
(IV)
Identify which customer class(es) will be affected and the monthly
customer rate impact by customer class, if customers’ rates are affected
by the application.
(V)
Identify the proposed effective date of the application.
(VI)
Identify that the application was filed on less than statutory notice or if the
applicant requests an expedited Commission decision, as applicable.
(VII)
State that the filing is available for inspection in each local office of the
applicant and at the Colorado Public Utilities Commission.
(VIII) Identify the proceeding number, if known at the time the customer notice is
provided.
pplication.
(VI)
Identify that the application was filed on less than statutory notice or if the
applicant requests an expedited Commission decision, as applicable.
(VII)
State that the filing is available for inspection in each local office of the
applicant and at the Colorado Public Utilities Commission.
(VIII) Identify the proceeding number, if known at the time the customer notice is
provided.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
16
(IX)
State that any person may file written comment(s) or objection(s)
concerning the application with the Commission. As part of this statement,
the notice shall identify both the address and e-mail address of the
Commission and shall state that the Commission will consider all written
comments and objections submitted prior to the evidentiary hearing on the
application.
(X)
State that if a person desires to participate as a party in any proceeding
before the Commission regarding the filing, such person shall file an
intervention in accordance with the rule 1401 of the Commission’s Rules
of Practice and Procedure or any applicable Commission order.
(XI)
State that the Commission may hold a public hearing in addition to an
evidentiary hearing on the application and that if such a hearing is held
members of the public may attend and make statements even if they did
not file comments, objections or an intervention. State that if the
application is uncontested or unopposed, the Commission may determine
the matter without a hearing and without further notice.
(XII)
State that any person desiring information regarding if and when hearings
may be held shall submit a written request to the Commission or,
alternatively, shall contact the External Affairs section of the Commission
at its local or toll-free phone number. Such statement shall also identify
both the local and toll-free phone numbers of the Commission’s External
Affairs section.
3003. [Reserved].
3004. Disputes and Informal Complaints.
mation regarding if and when hearings
may be held shall submit a written request to the Commission or,
alternatively, shall contact the External Affairs section of the Commission
at its local or toll-free phone number. Such statement shall also identify
both the local and toll-free phone numbers of the Commission’s External
Affairs section.
3003. [Reserved].
3004. Disputes and Informal Complaints.
(a)
For purposes of this rule, “dispute” means a concern, difficulty, or problem which
needs resolution and which a customer or a person applying for service brings
directly to the attention of the utility without the involvement of Commission staff
or the Commission.
(b)
A dispute may be initiated orally or in writing. Using the procedures found in rule
1301, a utility shall conduct a full and prompt investigation of all disputes
concerning utility service.
(c)
In accordance with the procedures in rule 1301, each utility shall conduct a full
and prompt investigation of all informal complaints concerning utility service.
(d)
A utility shall comply with all rules regarding the timelines for responding to
informal complaints.
(e)
If a current customer, or an applicant for service that is not a current customer, is
dissatisfied with the utility's proposed adjustment or disposition of a dispute, the

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
17
utility shall inform the person, customer or applicant for service of the right to
make an informal complaint to the External Affairs section of the Commission
and shall provide to the person, customer or applicant for service the address
and toll free number of the Commission’s External Affairs section.
ion of a dispute, the

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
17
utility shall inform the person, customer or applicant for service of the right to
make an informal complaint to the External Affairs section of the Commission
and shall provide to the person, customer or applicant for service the address
and toll free number of the Commission’s External Affairs section.
(f)
Each utility shall keep a record of each informal complaint and of each dispute.
The record shall show the name and address of the initiating customer or person
applying for service, the date and character of the issue, and the adjustment or
disposition made. This record shall be open at all times to inspection by the
person who initiated the informal complaint or dispute, by the Commission, and
by Commission staff.
3005. Records.
(a)
Except as a specific rule may require, every utility shall maintain, for a period of
not less than three years, and shall make available for inspection at its principal
place of business during regular business hours, the following:
(I)
records concerning disputes and informal complaints, which records are
created pursuant to rule 3004;
(II)
records of daily load and monthly plant output, which records are created
pursuant to rule 3201;
(III)
records of service voltage measurements, which records are created
pursuant to paragraph 3202(a);
(IV)
records concerning interruptions of service, which records are created
pursuant to rule 3203;
(V)
records concerning certification and calibration of meter testing
equipment, which records are created pursuant to rule 3303;
(VI)
records concerning meter testing upon customer request, which records
are created pursuant to rule 3305;
(VII)
records concerning meters and their associated testing, which records are
created pursuant to rule 3306;
(VIII) customer billing records, which records are created pursuant to paragraph
3401(a);
(IX)
customer deposit records, which records are created pursuant to rule
3403;
(X)
records and supporting documentatio
testing upon customer request, which records
are created pursuant to rule 3305;
(VII)
records concerning meters and their associated testing, which records are
created pursuant to rule 3306;
(VIII) customer billing records, which records are created pursuant to paragraph
3401(a);
(IX)
customer deposit records, which records are created pursuant to rule
3403;
(X)
records and supporting documentation concerning its cost assignment and
allocation manual and fully-distributed cost study pursuant to paragraphs
3503(g) and 3504(e), for so long as the manual and study are in effect or

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
18
are the subject of a complaint or a proceeding before the Commission;
and
(XI)
records concerning the utility’s inspection of Qualifying Facilities, which
records are created pursuant to paragraphs 3927(c) and (e).
(b)
A utility shall maintain at each of its local offices and at its principal place of
business all tariffs filed with the Commission and applying to Colorado rate
areas. If the utility maintains a website, it shall also maintain its current and
complete tariffs on its website.
(c)
Each utility shall maintain its books of account and records in accordance with
the provisions of 18 C.F.R. Part 101, the Uniform System of Accounts, amended
as of April 1, 2014. A utility shall maintain its books of accounts and records
separately from those of its affiliates.
(d)
Each cooperative electric association which is a RUS borrower shall maintain its
books of account and records in accordance with the provisions of 7 C.F.R. Part
1767, effective as of May 27, 2008.
(e)
Each non-RUS borrower cooperative electric association shall maintain its books
of account and records either consistent with the provisions of 18 C.F.R. Part
125, effective as of April 1, 2004, or consistent with the provisions of 7 C.F.R.
Part 1767, effective as of May 27, 2008.
ooks of account and records in accordance with the provisions of 7 C.F.R. Part
1767, effective as of May 27, 2008.
(e)
Each non-RUS borrower cooperative electric association shall maintain its books
of account and records either consistent with the provisions of 18 C.F.R. Part
125, effective as of April 1, 2004, or consistent with the provisions of 7 C.F.R.
Part 1767, effective as of May 27, 2008.
(f)
Each utility shall preserve its records in accordance with the provisions of 18
C.F.R. Part 125, the Preservation of Records of Public Utilities and Licensees,
amended as of August 7, 2000.
(g)
Each cooperative electric association that is a RUS borrower shall preserve its
records in accordance with the provisions of Rural Utilities Service Bulletin 180-2,
effective June 26, 2003.
(h)
Each non-RUS borrower cooperative electric association shall preserve records
consistent with the provisions of 18 C.F.R. Part 101, effective as of April 1, 2014.
3006. Annual Reports and Cooperative Electric Association Reports.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
19
(a)
On or before April 30th of each year, each utility shall file with the Commission an
annual report for the preceding calendar year. The utility shall submit the annual
report on forms prescribed by the Commission; shall properly complete the
forms; and shall ensure the forms are verified and signed by a person authorized
to act on behalf of the utility; and shall file the forms in accordance with
subparagraph 1204(a)(III) of the Commission’s Rules of Practice and Procedure.
If the Commission grants the utility an extension of time to file the annual report,
the utility nevertheless shall file with the Commission, on or before April 30, the
utility's total gross operating revenue from intrastate utility business transacted in
Colorado for the preceding calendar year.
orms in accordance with
subparagraph 1204(a)(III) of the Commission’s Rules of Practice and Procedure.
If the Commission grants the utility an extension of time to file the annual report,
the utility nevertheless shall file with the Commission, on or before April 30, the
utility's total gross operating revenue from intrastate utility business transacted in
Colorado for the preceding calendar year.
(b)
If a certified public accountant prepares an annual report for a utility, the utility
either shall file two copies of the report with the Commission or shall file it
through the Commission’s E-Filings System within 30 days after publication.
(c)
A cooperative electric association shall file with the Commission a report listing
its designation of service of process.
(d)
A cooperative electric association shall file with the Commission a report of
election to be governed by § 40-8.5-102, C.R.S., pertaining to unclaimed monies.
This report shall be filed within 60 days of the election.
3007. [Reserved].
3008. Incorporation by Reference.
(a)
The Commission incorporates by reference 18 C.F.R. Part 101 (as published on
April 1, 2014) regarding the Uniform System of Accounts Prescribed for Public
Utilities and Licensees Subject to the Provisions of the Federal Power Act. No
later amendments to or editions of 18 C.F.R. Part 101 are incorporated into these
rules.
(b)
The Commission incorporates by reference 7 C.F.R. Part 1767 (as published on
May 27, 2008) regarding the Uniform System of Accounts Prescribed for RUS
Electric Borrowers. No later amendments to or editions of 7 C.F.R. Part 1767 are
incorporated into these rules.
(c)
The Commission incorporates by reference 18 C.F.R. Part 125 (as published on
August 7, 2000) regarding the Preservation of Records of Public Utilities and
Licensees. No later amendments to or editions of 18 C.F.R. Part 125 are
incorporated into these rules.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
20
editions of 7 C.F.R. Part 1767 are
incorporated into these rules.
(c)
The Commission incorporates by reference 18 C.F.R. Part 125 (as published on
August 7, 2000) regarding the Preservation of Records of Public Utilities and
Licensees. No later amendments to or editions of 18 C.F.R. Part 125 are
incorporated into these rules.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
20
(d)
The Commission incorporates by reference RUS Bulletin 180-2 (as published on
June 26, 2003) regarding Record Retention Recommendations for RUS Electric
Borrowers. No later amendments to or editions of RUS Bulletin 180-2 are
incorporated into these rules.
(e)
The Commission incorporates by reference the National Electrical Safety Code,
2012 edition, published by the Institute of Electrical and Electronics Engineers
and endorsed by the American National Standards Institute. No later
amendments to or editions of the National Electrical Safety Code are
incorporated into these rules.
(f)
The Commission incorporates by reference 18 C.F.R., Subchapter K, Part 292,
Subparts A, B and C (as published on February 21, 2012) regarding §§ 201 and
210 of the Public Utility Regulatory Policies Act of 1978. No later amendments to
or editions of 18 C.F.R., Subchapter K, Part 292, Subparts A, B and C are
incorporated into these rules.
(g)
Any material incorporated by reference in this Part 3 may be examined at the
offices of the Commission, 1560 Broadway, Suite 250, Denver, Colorado 80202,
during normal business hours, Monday through Friday, except when such days
are state holidays. . Incorporated standards shall be available electronically and
provided in certified copies, at cost, upon request. Restrictions on the provision of
physical copies due to copyright protections may apply
3 may be examined at the
offices of the Commission, 1560 Broadway, Suite 250, Denver, Colorado 80202,
during normal business hours, Monday through Friday, except when such days
are state holidays. . Incorporated standards shall be available electronically and
provided in certified copies, at cost, upon request. Restrictions on the provision of
physical copies due to copyright protections may apply. The Director or the
Director’s designee will provide information regarding how the incorporated
standards may be examined at any state public depository library The standards
and regulations are also available from the agency, organization or association
originally issuing the code, standard, guideline or rule as follows: Code of Federal
Regulations: www.govinfo.gov/help/cfr; United States Department of Agriculture
Rural Development: www.rd.usda.gov/publications/regulations-
guidelines/bulletins/electric; and National Electrical Safety Code:
www.standards.ieee.org.
CIVIL PENALTIES
3009. Definitions.
The following definitions apply to rules 3009, 3010, and 3976, unless a specific statute
or rule provides otherwise. In the event of a conflict between these definitions and a
statutory definition, the statutory definition shall apply.
(a)
“Civil penalty” means any monetary penalty levied against a public utility because
of intentional violations of statutes in Articles 1 to 7 and 15 of Title 40, C.R.S.,
Commission rules, or Commission orders.
(b)
“Civil penalty assessment” means the act by the Commission of imposing a civil
penalty against a public utility after the public utility has admitted liability or has
been adjudicated by the Commission to be liable for intentional violations of

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
21
statutes in Articles 1 to 7 and 15 of Title 40, C.R.S., Commission rules, or
Commission orders.
y assessment” means the act by the Commission of imposing a civil
penalty against a public utility after the public utility has admitted liability or has
been adjudicated by the Commission to be liable for intentional violations of

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
21
statutes in Articles 1 to 7 and 15 of Title 40, C.R.S., Commission rules, or
Commission orders.
(c)
“Civil penalty assessment notice” means the written document by which a public
utility is given notice of an alleged intentional violation of statutes in Articles 1 to 7
and 15 of Title 40, C.R.S., Commission rules, or Commission orders and of a
proposed civil penalty.
(d)
“Intentional violation.” A person acts “intentionally” or “with intent” when his
conscious objective is to cause the specific result proscribed by the statute, rule,
or order defining the violation.
3010. Regulated Electric Utility Violations, Civil Enforcement, and Enhancement
of Civil Penalties.
(a)
The Commission may impose a civil penalty in accordance with the requirements
and procedures contained in § 40-7-113.5, C.R.S., § 40-7-116.5, C.R.S., and
paragraph 1302(b), 4 Code of Colorado Regulations 723-1, for intentional
violations of statutes in Articles 1 to 7 and 15 of Title 40, C.R.S., Commission
rules, or Commission orders as specified in §§ 40-7-113.5 and 40-7-116.5,
C.R.S., and in these rules.
(b)
The Director of the Commission or his or her designee shall have the authority to
issue civil penalty assessments for the violations enumerated in § 40-7-113.5,
C.R.S., subject to hearing before the Commission. When a public utility is cited
for an alleged intentional violation, the public utility shall be given notice of the
alleged violation in the form of a civil penalty assessment notice.
(b)
The Director of the Commission or his or her designee shall have the authority to
issue civil penalty assessments for the violations enumerated in § 40-7-113.5,
C.R.S., subject to hearing before the Commission. When a public utility is cited
for an alleged intentional violation, the public utility shall be given notice of the
alleged violation in the form of a civil penalty assessment notice.
(c)
The public utility cited for an alleged intentional violation may either admit liability
for the violation pursuant to § 40-7-116.5(1)(c) or the public utility may contest
the alleged violation pursuant to § 40-7-116.5(1)(d), C.R.S. At any hearing
contesting an alleged violation, trial staff shall have the burden of demonstrating
a violation by a preponderance of the evidence.
(d)
In any written decision entered by the Commission pursuant to § 40-6-109,
C.R.S., adjudicating a public utility liable for an intentional violation of a statute in
Articles 1 to 7 and 15 of Title 40, C.R.S., a Commission rule, or a Commission
order, the Commission may impose a civil penalty of not more than two thousand
dollars, pursuant to § 40-7-113.5(1), C.R.S. In imposing any civil penalty
pursuant to § 40-7-113.5(1), C.R.S., the Commission shall consider the factors
set forth in paragraph 1302(b).
(e)
The Commission may assess doubled or tripled civil penalties against any public
utility, as provided by § 40-7-113.5(3), C.R.S., § 40-7-113.5(4), C.R.S., and this
rule.
vil penalty of not more than two thousand
dollars, pursuant to § 40-7-113.5(1), C.R.S. In imposing any civil penalty
pursuant to § 40-7-113.5(1), C.R.S., the Commission shall consider the factors
set forth in paragraph 1302(b).
(e)
The Commission may assess doubled or tripled civil penalties against any public
utility, as provided by § 40-7-113.5(3), C.R.S., § 40-7-113.5(4), C.R.S., and this
rule.
(f)
The Commission may assess any public utility a civil penalty containing doubled
penalties only if:

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
22
(I)
the public utility has admitted liability by paying the civil penalty
assessment for, or has been adjudicated by the Commission in an
administratively final written decision to be liable for, engaging in prior
conduct that constituted an intentional violation of a statute in Articles 1 to
7 and 15 of Title 40, C.R.S., a Commission rule, or a Commission order;
(II)
the conduct for which doubled civil penalties are sought violates the same
statute, rule, or order as conduct for which the public utility has admitted
liability by paying the civil penalty assessment, or conduct for which the
public utility has been adjudicated by the Commission in an
administratively final written decision to be liable; and
(III)
the conduct for which doubled civil penalties are sought occurred within
one year after conduct for which the public utility has admitted liability by
paying the civil penalty assessment, or conduct for which the public utility
has been adjudicated by the Commission in an administratively final
written decision to be liable.
ion in an
administratively final written decision to be liable; and
(III)
the conduct for which doubled civil penalties are sought occurred within
one year after conduct for which the public utility has admitted liability by
paying the civil penalty assessment, or conduct for which the public utility
has been adjudicated by the Commission in an administratively final
written decision to be liable.
(g)
The Commission may assess any public utility a civil penalty containing tripled
penalties only if:
(I)
the public utility has admitted liability by paying the civil penalty
assessment for, or has been adjudicated by the Commission in an
administratively final written decision to be liable for, engaging in prior
conduct that constituted two or more prior intentional violations of a statute
in Articles 1 to 7 and 15 of Title 40, C.R.S., a Commission rule, or a
Commission order;
(II)
the conduct for which tripled civil penalties are sought violates the same
statute, rule, or order as conduct for which the public utility has either
admitted liability by paying the civil penalty assessment or been
adjudicated by the Commission in an administratively final written decision
to be liable, in at least two prior instances; and

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
23
(III)
the conduct for which tripled civil penalties are sought occurred within one
year after the two most recent prior instances of conduct for which the
public utility has either admitted liability by paying the civil penalty
assessment, or been adjudicated by the Commission in an
administratively final written decision to be liable.
(h)
When more than two instances of prior conduct exist, the Commission shall only
consider those instances occurring within one year prior to the date of such
alleged conduct for which tripled civil penalties are sought.
(i)
Nothing in this rule shall preclude the assessment of tripled penalties when
doubled and tripled penalties are sought in the same civil penalty assessment
notice.
be liable.
(h)
When more than two instances of prior conduct exist, the Commission shall only
consider those instances occurring within one year prior to the date of such
alleged conduct for which tripled civil penalties are sought.
(i)
Nothing in this rule shall preclude the assessment of tripled penalties when
doubled and tripled penalties are sought in the same civil penalty assessment
notice.
(j)
The Commission shall not issue a decision on doubled or tripled penalties until
after the effective date of the administratively final Commission decision upon
which the single civil penalty was based.
(k)
The civil penalty assessment notice shall contain the maximum penalty amount
provided by rule for each individual violation noted, with a separate provision for
a reduced penalty of 50 percent of the penalty amount sought if paid within ten
days of the public utility’s receipt of the civil penalty assessment notice.
(l)
The civil penalty assessment notice shall contain the maximum amount of the
penalty surcharge pursuant to § 24-34-108(2), C.R.S., if any.
(m)
A penalty surcharge referred to in paragraph (l) of this rule shall be equal to the
percentage set by the Department of Regulatory Agencies on an annual basis.
The surcharge shall not be included in the calculation of the statutory limits set in
§ 40-7-113.5(5), C.R.S.
(n)
Nothing in these rules shall affect the Commission’s ability to pursue other
remedies in lieu of issuing civil penalties.
3011. – 3024.
[Reserved].
CUSTOMER DATA ACCESS AND PRIVACY
3025. Scope and Applicability.
The basis and purpose of these rules is to describe the protection of and limited access
to customer data for electric utilities over which the Commission has jurisdiction. These
rules are applicable to all utilities except for certain provisions as defined in the rule
dies in lieu of issuing civil penalties.
3011. – 3024.
[Reserved].
CUSTOMER DATA ACCESS AND PRIVACY
3025. Scope and Applicability.
The basis and purpose of these rules is to describe the protection of and limited access
to customer data for electric utilities over which the Commission has jurisdiction. These
rules are applicable to all utilities except for certain provisions as defined in the rule. For
the purpose of the Customer Data Access and Privacy Rules, electric utilities are
classed into two tiers: a Tier I electric utility serves more than 150,000 electric
customers; a Tier II electric utility serves 150,000 or fewer electric customers.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
24
3026. Customer Data.
A utility shall maintain standard customer data sufficient to allow a customer to
understand his or her energy usage at a level of detail commensurate with the meter or
network technology used to serve the customer.
3027. Privacy, Access, and Disclosure.
(a)
A utility shall protect customer data in the utility’s possession or control to
maintain the privacy of customers, while providing reasonable access to that
data. A utility is only authorized to use customer data to provide regulated utility
service in the ordinary course of business.
(b)
A utility shall not disclose customer data unless such disclosure conforms to
these rules, except as required by law or to comply with Commission rule.
Illustratively, this includes responses to requests of the Commission, warrants,
subpoenas, court orders, or as authorized by § 16-15.5-102, C.R.S.
ed to use customer data to provide regulated utility
service in the ordinary course of business.
(b)
A utility shall not disclose customer data unless such disclosure conforms to
these rules, except as required by law or to comply with Commission rule.
Illustratively, this includes responses to requests of the Commission, warrants,
subpoenas, court orders, or as authorized by § 16-15.5-102, C.R.S.
(c)
A utility shall include in its tariffs a description of customer data that the utility is
able to provide to the customer or to any third party recipient to whom the
customer has authorized disclosure of the customer’s data within the utility’s
technological and data capabilities. At a minimum, the utility’s tariff must provide
the following:
(I)
a description of standard customer data and non-standard customer data
and the frequency of customer data updates that will be available (annual,
monthly, daily, etc.);
(II)
the method and frequency of customer data transmittal and access
available (electronic, paper, etc.) as well as the security protections or
requirements for such transmittal;
(III)
a timeframe for processing requests;
(IV)
any rate associated with processing a request for non-standard customer
data; and
(V)
any charges associated with obtaining non-standard customer data.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
25
(d)
As part of basic utility service, a utility shall provide access to the customer’s
standard customer data in electronic machine-readable form, without additional
charge, to the customer or to any third party recipient to whom the customer has
authorized disclosure of the customer’s customer data. Such access shall
conform to nationally recognized open standards and best practices. The utility
shall provide access in a manner that ensures adequate protections for the
utility’s system security and the continued privacy of the customer data during
transmission.
arge, to the customer or to any third party recipient to whom the customer has
authorized disclosure of the customer’s customer data. Such access shall
conform to nationally recognized open standards and best practices. The utility
shall provide access in a manner that ensures adequate protections for the
utility’s system security and the continued privacy of the customer data during
transmission.
(e)
Nothing in these rules shall limit a customer’s right to provide his or her customer
data to anyone.
(f)
A utility and each of its directors, officers and employees that discloses customer
data pursuant to a customer’s authorization in accordance with these data
privacy rules shall not be liable or responsible for any claims for loss or damages
resulting from the utility’s disclosure of customer data.
3028. Customer Notice.
(a)
A utility shall provide each year to its customers a written notice complying with
this rule. The utility shall conspicuously post on its website notice of its privacy
and security policies governing access to and disclosure of customer data and
aggregated data to third parties. This notice shall:
(I)
explain what is available to customers, as standard and/or non-standard
customer data (e.g., 15 minute versus hourly data);
(II)
describe the frequency that the utility can provide customer data based on
a request for standard data (e.g., on a weekly or monthly basis);
(III)
advise customers that their customer data may provide insight into their
activities within the premises receiving service;
(IV)
inform customers that the privacy and security of their customer data will
be protected by the utility while in its possession;
(V)
explain that customers can access their standard customer data, as
identified by the utility’s tariff, without additional charge;
(VI)
advise customers that their customer data will not be disclosed to third
parties, except:
(A)
as necessary to provide regulated utility services to the customers;
(B)
as otherwise permitted or required by law or Commission rule; or
lity while in its possession;
(V)
explain that customers can access their standard customer data, as
identified by the utility’s tariff, without additional charge;
(VI)
advise customers that their customer data will not be disclosed to third
parties, except:
(A)
as necessary to provide regulated utility services to the customers;
(B)
as otherwise permitted or required by law or Commission rule; or

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
26
(C)
pursuant to the authorization given by the customer in accordance
with these rules.
(VII)
describe the utility’s policies regarding how a customer can authorize
access and disclosure of his or her customer data to third parties. With
regard to such third party data disclosure, the notice shall:
(A)
inform customers that declining a request for disclosure of
customer data to a third party will not affect the provision of utility
service that the customer receives from the utility; and
(B)
explain that any customer consent for access to, disclosure of, or
use of a customer’s customer data by a third party may be
terminated or limited by the customer of record at any time and
inform the customers of the process for doing so.
(VIII) explain that aggregated data does not contain customer identifying
information and inform customers that customer data may be used to
create aggregated data that will not contain customer identifying
information;
(IX)
explain that the utility may provide aggregated data to third parties, subject
to its obligation under paragraph 3033(a);
(X)
be viewable on-line and printed in ten point or larger font;
(XI)
be sent either separately or included as an insert in a regular monthly bill,
or, for those customers who have consented to receive e-bills, such notice
may be sent electronically separately from an e-bill, conspicuously marked
and stating clearly that important information on the utility’s privacy
practices is contained therein;
(XII)
be available in English and Spanish
point or larger font;
(XI)
be sent either separately or included as an insert in a regular monthly bill,
or, for those customers who have consented to receive e-bills, such notice
may be sent electronically separately from an e-bill, conspicuously marked
and stating clearly that important information on the utility’s privacy
practices is contained therein;
(XII)
be available in English and Spanish. The customer notice may also be
translated to a language other than English or Spanish by a third party or
the utility. Forms translated to other languages in accordance with this rule
must be accepted by utilities, and may be relied upon, after the English
version of the form, the translated version of the form, and an affidavit
attesting to the accurate and complete translation from the English version
of the form, have been provided to the Commission and the utility
possessing the data. Such affidavit must be executed by an interpreter on
the active roster of interpreters maintained by the Office of Language
Access of the Colorado Judicial Branch. If the utility incurs a cost for
translation made at the request of a third party, it may charge the
requestor for such cost and may include a reasonable administrative fee in
addition to the translation cost; and
(XIII) provide a customer service phone number and web address where
customers can direct additional questions or obtain additional information

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
27
regarding their customer data, the disclosure of customer data or
aggregated data, or the utility’s privacy policies and procedures with
respect to customer data or aggregated data.
3029. Customer Consent Form for the Disclosure of their Customer Data to Third
Party Recipients by a Utility.
ns or obtain additional information

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
27
regarding their customer data, the disclosure of customer data or
aggregated data, or the utility’s privacy policies and procedures with
respect to customer data or aggregated data.
3029. Customer Consent Form for the Disclosure of their Customer Data to Third
Party Recipients by a Utility.
(a)
A utility shall make available to any third party a consent form for the disclosure
of customer data that is maintained by the Commission and available from the
Commission’s website. The form shall be available electronically from the utility.
The consent form shall be provided in a non-electronic format by a utility upon
request from a customer or third party.
(b)
In addition to the Commission supplied form, a utility may create and make
available a consent form that:
(I)
includes the same information contained in the annual notice provided
pursuant to subparagraphs 3028(a)(V), (VI), (VII), and (XIII);
(II)
provides spaces for the following required information regarding the third
party recipient of the customer data:
(A)
the name, including trade name if applicable, physical address,
mailing address, e-mail address, and telephone number;
(B)
the uses of the data for which the customer is allowing disclosure;
(C)
the time period (e.g., months, years) for which data are being
requested;
(D)
the description of the data that are being requested;
(III)
states that the consent is valid until terminated;
(IV)
states that the customer must notify the utility service provider in writing
(electronically or non-electronically) to terminate the consent including
appropriate utility contact information;
(V)
states any additional terms except an inducement for the customer’s
disclosure;
(VI)
be viewable on-line and printed in ten point or larger font; and
(VII)
provides notice to the customer that the utility shall not be responsible for
monitoring or taking any steps to ensure that the third party to whom the
data is disclosed
rminate the consent including
appropriate utility contact information;
(V)
states any additional terms except an inducement for the customer’s
disclosure;
(VI)
be viewable on-line and printed in ten point or larger font; and
(VII)
provides notice to the customer that the utility shall not be responsible for
monitoring or taking any steps to ensure that the third party to whom the
data is disclosed is maintaining the confidentiality of the data or using the
data as intended by the customer.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
28
(c)
A utility may make available an electronic customer consent process for
disclosure of customer data to a third party (e.g., a utility controlled web portal)
that authenticates the customer identity. The contents of the electronic consent
process must generally follow the format of the model consent to disclose
customer data form, be clear, and include the elements to be provided pursuant
to paragraph (a) of this rule. No utility is required to provide an electronic consent
process in a language other than English.
(d)
A utility may make available an in-person consent process for disclosure of
customer data.
(e)
A consent form may be submitted to the utility through electronic or non-
electronic methods.
(f)
The scope of consent given shall be defined by the terms of the consent form,
except that changes of contact names for an organization, trade name, or utility
over time do not invalidate consent as to the respective organization, trade
name, or utility. Because the contact named for an organization, trade name, or
utility is a representative of the respective organization, trade name, or utility,
consent terminates as to such contact when the relationship with the
organization, trade name, or utility terminates. Modifications to the consent form
over time do not invalidate previous consent. Consent need not be provided on
new forms so long as the data provided remains within the scope of consent.
e name, or
utility is a representative of the respective organization, trade name, or utility,
consent terminates as to such contact when the relationship with the
organization, trade name, or utility terminates. Modifications to the consent form
over time do not invalidate previous consent. Consent need not be provided on
new forms so long as the data provided remains within the scope of consent.
(g)
Customer consent forms shall be available in English and Spanish. Customer
consent forms may be translated into languages other than English or Spanish
by a third party or the utility. Forms translated to other languages in accordance
with this rule must be accepted by utilities, and may be relied upon, after the
English version of the form, the translated version of the form, and an affidavit
attesting to the accurate and complete translation from the English version of the
form, have been provided to the Commission and the utility possessing the data.
Such affidavit must be signed by an interpreter on the active roster of interpreters
maintained by the Office of Language Access of the Colorado Judicial Branch. If
a utility incurs a cost for a translation at the request of a third party, it may charge
the requestor for such cost and may include a reasonable administrative fee in
addition to the translation cost.
(h)
Any customer consent forms made available from the Commission’s website
shall be presumed to comply with these rules.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
29
3030. Access to Customer Data for the Provision of Regulated Utility Service.
it may charge
the requestor for such cost and may include a reasonable administrative fee in
addition to the translation cost.
(h)
Any customer consent forms made available from the Commission’s website
shall be presumed to comply with these rules.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
29
3030. Access to Customer Data for the Provision of Regulated Utility Service.
(a)
A utility may disclose customer data to a contracted agent, provided that the
contract requires the agent to:
(I)
implement and maintain data security procedures and practices to protect
the customer data from unauthorized access, destruction, use,
modification, or disclosure that are equal to or greater than the data
privacy and security policies and procedures used by the utility internally
to protect customer data;
(II)
use customer data solely for the purpose of the contract and prohibit the
use of customer data for a secondary commercial purpose not related to
the purpose of the contract without first obtaining the customer’s consent
as provided for in these rules;
(III)
return to the utility or destroy any customer data that is no longer
necessary for the purpose for which it was transferred; and
(IV)
execute a non-disclosure agreement with the utility.
(b)
The utility shall maintain records of the disclosure of customer data to contracted
agents for a minimum of three years. Such records shall include all contracts with
the contracted agent and executed non-disclosure agreements.
3031. Local Government Access to Customer Data from a Utility for Audit.
ose for which it was transferred; and
(IV)
execute a non-disclosure agreement with the utility.
(b)
The utility shall maintain records of the disclosure of customer data to contracted
agents for a minimum of three years. Such records shall include all contracts with
the contracted agent and executed non-disclosure agreements.
3031. Local Government Access to Customer Data from a Utility for Audit.
(a)
A utility may disclose customer data to a local government either with an audit
required to be provided pursuant to a final Commission decision (e.g., a decision
approving a franchise agreement) or as reasonably necessary for an audit
conducted by a governmental entity of franchise fees paid to them by the utility,
provided that:
(I)
disclosure is not otherwise prohibited by a final Commission decision (e.g.,
Commission-approved franchise between the utility and the local
government);
(II)
disclosure is made to a designated auditor or auditor’s office, who is either
an employee or agent of the local government;
(III)
the auditor collects and uses the customer data solely for the purpose of
reviewing or conducting the audit and is prohibited from disclosing or
using the customer data for a purpose not related to the audit;
(IV)
the local government implements and maintains data security procedures
and practices to protect the customer data from unauthorized access,
destruction, use, or modification;

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
30
(V)
the local government destroys or returns to the utility any customer data
no longer necessary for the purpose for which it was transferred unless
state law or the municipality’s state-mandated retention schedule requires
otherwise;
(VI)
the local government agrees not to permit access to the data by anyone
that has not agreed to abide by the terms pursuant to which the data was
provided by the utility
local government destroys or returns to the utility any customer data
no longer necessary for the purpose for which it was transferred unless
state law or the municipality’s state-mandated retention schedule requires
otherwise;
(VI)
the local government agrees not to permit access to the data by anyone
that has not agreed to abide by the terms pursuant to which the data was
provided by the utility. This includes, but is not limited to, all interns,
subcontractors, staff, other workforce members, and consultants;
(VII)
the local government agrees that any recipient of the data pursuant to this
rule does not obtain any right, title or interest in any of the data provided
by the utility;
(VIII) governing law or a non-disclosure agreement executed with the utility
requires that the local government, at a minimum, comply with the
requirements of this rule; and
(IX)
the data requested is for utility customers served in the boundaries of the
local government.
(b)
The utility shall maintain records of all disclosures of customer data to local
government requestors for a minimum of three years.
(c)
Availability of customer data pursuant to this rule does not preclude a local
government from requesting other data reports.
3032. Third Party Access to Customer Data from a Utility.
(a)
Except as provided in this rule, paragraph 3027(b), rule 3030, and rule 3031, a
utility shall not disclose customer data to any third party unless the customer or a
third party acting on behalf of a customer submits a paper or electronic signed
consent to disclose customer data form that has been executed by the customer
of record.
(b)
Incomplete or non-compliant consent to disclose customer data forms are not
valid and shall be rejected by the utility.
3030, and rule 3031, a
utility shall not disclose customer data to any third party unless the customer or a
third party acting on behalf of a customer submits a paper or electronic signed
consent to disclose customer data form that has been executed by the customer
of record.
(b)
Incomplete or non-compliant consent to disclose customer data forms are not
valid and shall be rejected by the utility.
(c)
The utility shall maintain records of all of the disclosures of customer data to third
party requestors. Such records shall include a copy of the customer’s signed
consent to disclose customer data form all identifying documentation produced
by the third party requestor, the customer's agreed upon terms of use, the date(s)
and frequency of disclosure, and a description of the customer data disclosed.
(d)
The utility shall maintain records of customer data disclosures for a minimum of
three years and shall make the records of the disclosure of a customer’s
customer data available for review by the customer within five business days of

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
31
receiving a paper or electronic request from the customer, or at such greater time
as is mutually agreed between the utility and the customer.
3033. Requests for Aggregated Data Reports from a Utility.
(a)
A utility shall not disclose aggregated data unless the recipient is authorized to
receive all customer data within the aggregated data, that the disclosure
otherwise conforms to this rule and rules 3031, 3034, and 3035. In aggregating
customer data to create an aggregated data report, a utility must ensure the data
does not include any personal information or a unique identifier.
m a Utility.
(a)
A utility shall not disclose aggregated data unless the recipient is authorized to
receive all customer data within the aggregated data, that the disclosure
otherwise conforms to this rule and rules 3031, 3034, and 3035. In aggregating
customer data to create an aggregated data report, a utility must ensure the data
does not include any personal information or a unique identifier.
(b)
At a minimum, a particular aggregation must contain at least fifteen customers;
and, within any customer class no single customer’s customer data or premise
associated with a single customer’s customer data may comprise 15 percent or
more of the total customer data aggregated per customer class to generate the
aggregated data report (the “15/15 Rule”).
(c)
If an aggregated data report cannot be generated in compliance with paragraph
3033(b), the utility shall notify the requestor that the aggregated data, as
requested, cannot be disclosed and identify the reason(s) the request was
denied. The requestor shall be given an opportunity to revise its aggregated data
request in order to address the identified reason(s). An aggregated data request
may be revised by expanding the number of customers or premise accounts in
the request, expanding the geographic area included in the request, combining
different customer classes or rate categories, or other applicable means of
aggregating.
(d)
A utility shall include in its tariffs a description of standard and non-standard
aggregated data reports available from the utility to any requestor
uest
may be revised by expanding the number of customers or premise accounts in
the request, expanding the geographic area included in the request, combining
different customer classes or rate categories, or other applicable means of
aggregating.
(d)
A utility shall include in its tariffs a description of standard and non-standard
aggregated data reports available from the utility to any requestor. At a minimum,
the utility’s tariff shall provide the following:
(I)
a description of standard and non-standard aggregated data reports
available from the utility including all available selection parameters
(customer data or other data);
(II)
the frequency of data collection (annual, monthly, daily, etc.);
(III)
the method of transmittal available (electronic, paper, etc.) and the
security protections or requirements for such transmittal;
(IV)
the charge for providing a standard aggregated data report or the hourly
charge for compiling a non-standard aggregated data report;
(V)
the timeframe for processing requests; and
(VI)
a request form for submitting a data request for aggregated data reports to
the utility identifying any information necessary from the requestor in order
for the utility to process the request.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
32
(e)
If a utility is unable to fulfill a non-standard aggregated data report request
because it does not have and/or does not elect to or cannot obtain all of the data
the requestor wishes to include in the aggregated data report, then the utility may
contract with a contracted agent to include the additional data and process it
along with the customer data in the utility’s possession, to generate a non-
standard aggregated data report.
(f)
A utility and each of its directors, officers and employees that discloses
aggregated data as provided in these data privacy rules shall not be liable or
responsible for any claims for loss or damages resulting from the utility’s
disclosure of aggregated data.
ional data and process it
along with the customer data in the utility’s possession, to generate a non-
standard aggregated data report.
(f)
A utility and each of its directors, officers and employees that discloses
aggregated data as provided in these data privacy rules shall not be liable or
responsible for any claims for loss or damages resulting from the utility’s
disclosure of aggregated data.
(g)
A utility shall not provide aggregated customer data in response to multiple
overlapping requests from or on behalf of the same requestor that have the
potential to identify customer data.
3034. Property Owner Request for Whole Building Energy Use Data from a Utility.
(a)
If requested by a property owner or its authorized agent, a Tier I utility shall
provide whole building energy use data to the property owner or its authorized
agent so long as:
(I)
the whole building energy use data contains at least four customers or
tenants, which may include the property owner’s own account; and no
single customer’s customer data, unless it is the property owner’s,
comprises more than 50 percent of the whole building energy use data
used to generate the whole building energy use data report;
(II)
the property owner agrees to not disclose the whole building energy use
data except for the purposes of building benchmarking, identifying energy
efficiency projects, and energy management; and
(III)
the property owner signs a non-disclosure agreement with the utility
requiring the property owner, at a minimum to:
(A)
take appropriate administrative, technical, and physical safeguards
to protect the whole building data from any unauthorized use or
disclosure to protect the data from unauthorized access,
destruction, use, modification, or disclosure;
(B)
only use the whole building energy use data for the purposes of
building benchmarking, identifying energy efficiency projects,
energy management, and complying with laws or ordinances;
(C)
agree to not attempt to determine an individual utility customer’s
energy use from the whole build
e or
disclosure to protect the data from unauthorized access,
destruction, use, modification, or disclosure;
(B)
only use the whole building energy use data for the purposes of
building benchmarking, identifying energy efficiency projects,
energy management, and complying with laws or ordinances;
(C)
agree to not attempt to determine an individual utility customer’s
energy use from the whole building energy use data and not to use
the information to contact the subject of the information;

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
33
(D)
agree to not use the whole building energy use data for a
secondary commercial purpose not related to the authorized
purpose without first obtaining the customer’s consent as provided
for in these rules;
(E)
destroy any whole building energy use data that is no longer
necessary for the purpose for which it was transferred;
(F)
agree not to permit access to the whole building data by anyone
that has not agreed to abide by the terms pursuant to which the
data was provided by the utility. This includes, but is not limited to,
all interns, subcontractors, staff, other workforce members, and
consultants; and
(G)
agree that any recipient of the whole building data pursuant to this
rule does not obtain any right, title or interest in any of the data
provided by the utility.
(b)
Upon request by a property owner or its authorized agent, a Tier II utility shall
provide whole building energy use data upon the same conditions to the extent
of, and based upon, information available in the ordinary course of business.
(c)
A utility shall provide a requested whole building energy use data report in
electronic, machine readable format that conforms to nationally recognized open
standards and best practices.
wner or its authorized agent, a Tier II utility shall
provide whole building energy use data upon the same conditions to the extent
of, and based upon, information available in the ordinary course of business.
(c)
A utility shall provide a requested whole building energy use data report in
electronic, machine readable format that conforms to nationally recognized open
standards and best practices.
(d)
A utility may charge a property owner or its authorized agent for the development
of a whole building energy use data report. Such rate shall be determined in a
utility tariff as a non-standard aggregated data report. Alternatively, the utility
need not charge the customer if the cost to charge a property owner or its
authorized agent is greater than the cost to develop a whole building energy use
data report.
(e)
Availability of whole building energy use data pursuant to this rule does not
preclude a property owner from requesting other data reports.
3035. Community Energy Reports
(a)
A Tier I utility shall generate a community energy report for each local
government, other than a Colorado county, included in its service territory with
50,000 or more residents. A Tier I utility shall generate a community energy
report for each Colorado county included in its service territory with 100,000 or
more residents. Any local government with fewer than 50,000 residents and
Colorado county with fewer than 100,000 residents or a minority of whom are
served by a Tier I utility shall be treated as if it had 50,000 or more residents
served by the Tier I upon request from the local government or county. Such
requests shall be made by January 31 of the calendar year following the
reporting year and shall continue in effect until such time as the request is
00 residents and
Colorado county with fewer than 100,000 residents or a minority of whom are
served by a Tier I utility shall be treated as if it had 50,000 or more residents
served by the Tier I upon request from the local government or county. Such
requests shall be made by January 31 of the calendar year following the
reporting year and shall continue in effect until such time as the request is

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
34
withdrawn or cancelled by the local government. All population thresholds shall
be based on the most recent population estimate from the Colorado State
Demography Office and where the utility serves the majority of the population.
(b)
On or before June 1 of every year, a Tier I utility shall make publicly available for
download all community energy reports generated for the prior year. Reports
shall be available in an electronic machine-readable form that conforms to
nationally recognized open standards and best practices.
(c)
The community energy report shall include the following information or
aggregated data for the utility and its customers and specific to the local
government for the prior calendar year:
(I)
the annual kilowatt hours consumed by customers, provided by
residential, commercial, and industrial classes, and street lighting;
(II)
the average number of customers in the residential, commercial, industrial
class, and street lighting;
(III)
the utility’s emissions factor;
(IV)
the utility’s electric generation resource mix;
(V)
the total capacity of retail renewable distributed generation (as defined at
paragraph 3652(ff)) installed in the local government’s jurisdiction and the
total annual kilowatt hours produced from that generation; and
(VI)
the total annual energy saved (in kilowatt hours) from energy efficiency
measures installed.
(d)
A local government may submit, or have another local government submit on its
behalf, GIS data to define its jurisdictional boundaries prior to the issuance of the
community energy report.
in the local government’s jurisdiction and the
total annual kilowatt hours produced from that generation; and
(VI)
the total annual energy saved (in kilowatt hours) from energy efficiency
measures installed.
(d)
A local government may submit, or have another local government submit on its
behalf, GIS data to define its jurisdictional boundaries prior to the issuance of the
community energy report.
(e)
Upon request by a local government, a Tier II utility shall generate a community
energy report, in accordance with this rule, consistent with the utility’s meter,
network, or data capabilities. Such requests shall be made by January 31 of the
calendar year following the reporting year and shall continue in effect until such
time as the request is withdrawn or cancelled by the local government. On or
before June 1 of every year, the utility shall make publicly available for download
all community energy reports generated for the prior year. Reports shall be
available in an electronic machine-readable form that conforms to nationally
recognized open standards and best practices.
(f)
Availability of the community energy report pursuant to this rule does not
preclude a local government from requesting other data reports.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
35
3036. – 3099.
[Reserved].
OPERATING AUTHORITY
3100. Certificate of Public Convenience and Necessity for a Franchise.
(a)
A utility seeking authority to provide service pursuant to a franchise shall file an
application pursuant to this rule. When a utility enters into a franchise agreement
with a municipality for the first time, it shall obtain authority from the Commission
pursuant to § 40-5-102, C.R.S. prior to providing service under that initial
franchise agreement. A utility maintains the right and obligation to serve a
municipality within its service territory after the expiration of any franchise
agreement.
rsuant to this rule. When a utility enters into a franchise agreement
with a municipality for the first time, it shall obtain authority from the Commission
pursuant to § 40-5-102, C.R.S. prior to providing service under that initial
franchise agreement. A utility maintains the right and obligation to serve a
municipality within its service territory after the expiration of any franchise
agreement.
(b)
An application for certificate of public convenience and necessity to exercise
franchise rights shall include, in the following order and specifically identified, the
following information, either in the application or in appropriately identified
attachments:
(I)
the information required in paragraphs 3002(b) and 3002(c);
(II)
a statement of the facts (not conclusory statements) relied upon by the
applying utility to show that the public convenience and necessity require
the granting of the application;
(III)
a statement describing the franchise rights proposed to be exercised. The
statement shall include a description of the type of utility service to be
rendered and a description of the city or town sought to be served;
(IV)
a certified copy of the franchise ordinance; proof of publication, adoption,
and acceptance by the applying utility; a statement as to the number of
customers served or to be served and the population of the city or town;
and any other pertinent information;
(V)
a statement describing in detail the extent to which the applying utility is
an affiliate of any other utility which holds authority duplicating in any
respect the authority sought;
(VI)
a copy of a feasibility study for areas previously not served by the applying
utility, which study shall at least include estimated investment, income,
and expense
or town;
and any other pertinent information;
(V)
a statement describing in detail the extent to which the applying utility is
an affiliate of any other utility which holds authority duplicating in any
respect the authority sought;
(VI)
a copy of a feasibility study for areas previously not served by the applying
utility, which study shall at least include estimated investment, income,
and expense. An applying utility may request that its most recent audited
balance sheet, income statement, statement of retained earnings, and
statement of cash flows be submitted in lieu of a feasibility study; and
(VII)
a statement of the names of public utilities and other entities of like
character providing similar service in or near the area sought to be served.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
36
3101. Certificate of Public Convenience and Necessity for Service Territory.
(a)
A utility seeking authority to provide service in a new service territory shall file an
application pursuant to this rule. A utility cannot provide service to a new
geographic area without authority from the Commission, unless the utility extends
its facilities and service:
(I)
within a city and county or city or town within which the utility has lawfully
commenced operations;
(II)
into territory contiguous to the utility’s facility, line, plant, or system that is
not served by a public utility providing the same commodity or service; or
(III)
within or to territory already served by the utility and the extension is
necessary in the ordinary course of business.
vice:
(I)
within a city and county or city or town within which the utility has lawfully
commenced operations;
(II)
into territory contiguous to the utility’s facility, line, plant, or system that is
not served by a public utility providing the same commodity or service; or
(III)
within or to territory already served by the utility and the extension is
necessary in the ordinary course of business.
(b)
An application for certificate of public convenience and necessity to provide
service in a new territory shall include, in the following order and specifically
identified, the following information, either in the application or in appropriately
identified attachments:
(I)
the information required in paragraphs 3002(b) and 3002(c);
(II)
a statement of the facts (not conclusory statements) relied upon by the
applying utility to show that the public convenience and necessity require
the granting of the application;
(III)
a description of the type of utility service to be rendered and a description
of the area sought to be served;
(IV)
a map showing the specific geographic area that the applying utility
proposes to serve. If the applying utility intends to phase in service in the
territory over time, specific areas and proposed in-service dates shall be
included. The map shall describe the geographic areas in section,
township, and range convention;
(V)
a statement describing in detail the extent to which the applying utility is
an affiliate of any other utility which holds authority duplicating in any
respect the territory sought;
(VI)
a statement of the names of public utilities and other entities of like
character providing similar service in or near the area involved in the
application; and
reas in section,
township, and range convention;
(V)
a statement describing in detail the extent to which the applying utility is
an affiliate of any other utility which holds authority duplicating in any
respect the territory sought;
(VI)
a statement of the names of public utilities and other entities of like
character providing similar service in or near the area involved in the
application; and

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
37
(VII)
a copy of a feasibility study for the proposed area to be served, which
shall at least include estimated investment, income, and expense. An
applying utility may request that its most recent audited balance sheet,
income statement, statement of retained earnings, and statement of cash
flows be submitted in lieu of a feasibility study.
3102. Certificate of Public Convenience and Necessity for Facilities.
(a)
A utility seeking authority to construct and to operate a facility or an extension of
a facility pursuant to § 40-5-101, C.R.S., shall file an application pursuant to this
rule. The utility need not apply to the Commission for approval of construction
and operation of a facility or an extension of a facility which is in the ordinary
course of business. The utility shall apply to the Commission for approval of
construction and operation of a facility or an extension of a facility which is not in
the ordinary course of business.
(b)
An application for certificate of public convenience and necessity to construct and
to operate facilities or an extension of a facility pursuant to § 40-5-101, C.R.S.,
shall include, in the following order and specifically identified, the following
information, either in the application or in appropriately identified attached
exhibits:
(I)
The information required in rules 3002(b) and 3002(c)
(b)
An application for certificate of public convenience and necessity to construct and
to operate facilities or an extension of a facility pursuant to § 40-5-101, C.R.S.,
shall include, in the following order and specifically identified, the following
information, either in the application or in appropriately identified attached
exhibits:
(I)
The information required in rules 3002(b) and 3002(c).
(II)
A statement of the facts (not conclusory statements) relied upon by the
applying utility to show that the public convenience and necessity require
the granting of the application or citation to any Commission decision that
is relevant to the proposed facilities.
(III)
A description of the proposed facilities to be constructed.
(IV)
Estimated cost of the proposed facilities to be constructed. If the facility is
a transmission facility, the estimated costs shall be itemized as land costs,
substation costs, and transmission line costs.
(V)
Anticipated construction start date, construction period, and in-service
date.
(VI)
A map showing the general area or actual locations where facilities will be
constructed, population centers, major highways, and county and state
boundaries.
(VII)
As applicable, electric one-line diagrams.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
38
(VIII) For requests for construction or expansion of generating facilities,
including pollution control, fuel conversion upgrades, and conversion of
coal-fired plants to natural gas plants, the application shall include
information about Best Value Employment metrics consistent with
paragraph 3211(a) or, in the alternative, information to demonstrate that
the project qualifies for an exemption under paragraph 3211(e)
for construction or expansion of generating facilities,
including pollution control, fuel conversion upgrades, and conversion of
coal-fired plants to natural gas plants, the application shall include
information about Best Value Employment metrics consistent with
paragraph 3211(a) or, in the alternative, information to demonstrate that
the project qualifies for an exemption under paragraph 3211(e). If the
information required in paragraph 3211(a) is not available at the time an
application is filed because relevant contracts have not yet been entered
into, the applicant shall file a status report in the proceeding within 45 days
after the last contract has been entered into that identifies how selected
contractor(s) meet Best Value Employment metrics.
(IX)
The application shall address whether it includes one or more projects that
are also ESPW projects, and if so, the applicant shall further attest that
material contract terms that comply with paragraph 3211(b) have been or
will be included in any relevant contracts and that such terms will be
required to be included in any relevant subcontracts.
(X)
As applicable, information on alternatives studied, costs for those
alternatives, and criteria used to rank or eliminate alternatives, including,
to the extent feasible, information on Best Value Employment metrics
pursuant to paragraph 3211(a).
(XI)
As applicable, a report of prudent avoidance measures considered and
justification for the measures selected to be implemented.
(XII)
For transmission construction or extension, the utility shall also comply
with rule 3206.
atives, and criteria used to rank or eliminate alternatives, including,
to the extent feasible, information on Best Value Employment metrics
pursuant to paragraph 3211(a).
(XI)
As applicable, a report of prudent avoidance measures considered and
justification for the measures selected to be implemented.
(XII)
For transmission construction or extension, the utility shall also comply
with rule 3206.
(c)
For an application for a certificate of public convenience and necessity for
construction or extension of transmission facilities, the applying utility shall
describe its actions and techniques relating to cost-effective noise mitigation with
respect to the planning, siting, construction, and operation of the proposed
transmission construction or extension. The applying utility shall provide
computer studies which show the potential noise levels expressed in db(A) and
measured at the edge of the transmission line right-of-way. These computer
studies shall be the output of utility standard programs, such as EPRI’s EMF
Workstation 2.51 ENVIRO Program -- Bonneville Power Administration model.
The steps and techniques may include, without limitation, the following:
(I)
Bundled conductors.
(II)
Larger conductors.
(III)
Design alternatives considering the spatial arrangement of phasing of
conductors.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
39
(IV)
Corona-free attachment hardware.
(V)
Conductor quality.
(VI)
Handling and packaging of conductor.
(VII)
Construction techniques.
(VIII) Line tension.
, without limitation, the following:
(I)
Bundled conductors.
(II)
Larger conductors.
(III)
Design alternatives considering the spatial arrangement of phasing of
conductors.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
39
(IV)
Corona-free attachment hardware.
(V)
Conductor quality.
(VI)
Handling and packaging of conductor.
(VII)
Construction techniques.
(VIII) Line tension.
(d)
For an application for a certificate of public convenience and necessity for
construction or extension of transmission facilities, the applying utility shall
describe its actions and techniques relating to prudent avoidance with respect to
planning, siting, construction, and operation of the proposed construction or
extension. As used in this paragraph, “prudent avoidance” means the striking of a
reasonable balance between the potential health effects of exposure to magnetic
fields and the cost and impacts of mitigation of such exposure, by taking steps to
reduce the exposure at reasonable or modest cost. The steps and techniques
may include, without limitation, the following:
(I)
Design alternatives considering the spatial arrangement of phasing of
conductors.
(II)
Routing lines to limit exposures to areas of concentrated population and
group facilities such as schools and hospitals.
(III)
Installing higher structures.
(IV)
Widening right of way corridors.
(V)
Burying lines.
(e)
Within 30 days of final Commission approval of an application pursuant to this
rule, or after the last contract has been entered into, that includes one or more
ESPW projects, the applicant or its contractor(s) shall notify the Division of Labor
Standards and Statistics within the Colorado Department of Labor and
Employment (CDLE) about the project to facilitate the collection of craft labor
certification(s).

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
40
3103. Certificate Amendments for Changes in Service, in Service Territory, or in
Facilities.
e applicant or its contractor(s) shall notify the Division of Labor
Standards and Statistics within the Colorado Department of Labor and
Employment (CDLE) about the project to facilitate the collection of craft labor
certification(s).

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
40
3103. Certificate Amendments for Changes in Service, in Service Territory, or in
Facilities.
(a)
A utility seeking authority to do the following shall file an application pursuant to
this rule: amend a certificate of public convenience and necessity in order to
extend, to restrict, to curtail, or to abandon or to discontinue without equivalent
replacement any service, service area, or facility. A utility shall not extend,
restrict, curtail, or abandon or discontinue without equivalent replacement, any
service, service area, or facility not in the ordinary course of business without
authority from the Commission.
(b)
An application to amend a certificate of public convenience and necessity in
order to change, to extend, to restrict, to curtail, to abandon, or to discontinue
any service, service area, or facility without equivalent replacement shall include,
in the following order and specifically identified, the following information, either
in the application or in appropriately identified attachments:
(I)
all information required in paragraphs 3002(b) and 3002(c);
(II)
if the application for amendment pertains to a certificate of public
convenience and necessity for facilities, all of the information required in
rule 3102;
(III)
if the application for amendment pertains to a certificate of public
convenience and necessity for franchise rights, all of the information
required in rule 3100;
(IV)
if the application for amendment pertains to a certificate of public
convenience and necessity for service territory, all of the information
required in rule 3101;
(V)
if the application for amendment pertains to a service, the application shall
include:
(A)
the requested effective date for the extension, restriction,
cu
sity for franchise rights, all of the information
required in rule 3100;
(IV)
if the application for amendment pertains to a certificate of public
convenience and necessity for service territory, all of the information
required in rule 3101;
(V)
if the application for amendment pertains to a service, the application shall
include:
(A)
the requested effective date for the extension, restriction,
curtailment, or abandonment or discontinuance without equivalent
replacement of the service; and
(B)
a description of the extension, restriction, curtailment, or
abandonment or discontinuance without equivalent replacement
sought. This shall include maps, as applicable. This shall also
include a description of the applying utility's existing operations and
general service area.

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
41
(c)
Customer notice of application. In addition to complying with the notice
requirements of the Commission’s Rules Regulating Practice and Procedure, a
utility applying to curtail, restrict, abandon or discontinue service without
equivalent replacement shall prepare a written notice as provided in
subparagraphs 3002(d)(I) - (XII) and shall mail or deliver the notice at least 30
days before the application's requested effective date to each of the applying
utility's affected customers. The customer notice shall include a statement
detailing the requested restriction, curtailment, or abandonment or
discontinuance without equivalent replacement.
(d)
If no customers will be affected by the grant of the application, the notice must
meet the requirements of subparagraphs 3002(d)(I) – (XII) and shall be mailed to
the Board of County Commissioners of each affected county, and to the mayor of
each affected city, town, or municipality.
3104. Transfers, Controlling Interest, and Mergers.
andonment or
discontinuance without equivalent replacement.
(d)
If no customers will be affected by the grant of the application, the notice must
meet the requirements of subparagraphs 3002(d)(I) – (XII) and shall be mailed to
the Board of County Commissioners of each affected county, and to the mayor of
each affected city, town, or municipality.
3104. Transfers, Controlling Interest, and Mergers.
(a)
A utility seeking authority to do any of the following shall file an application
pursuant to this rule: transfer a certificate of public convenience and necessity;
transfer or obtain a controlling interest in a utility, whether the transfer of control
is effected by the transfer of assets, by the transfer of stock, by merger or by
other form of business combination; or transfer assets subject to the jurisdiction
of the Commission outside the normal course of business. A utility cannot
transfer a certificate of public convenience and necessity; transfer or obtain a
controlling interest in any utility; or transfer assets outside the normal course of
business without authority from the Commission.
(b)
An application to transfer a certificate of public convenience and necessity, to
transfer or obtain a controlling interest in a utility, or to transfer assets subject to
the jurisdiction of the Commission shall include, in the following order and
specifically identified, the following information, either in the application or in
appropriately identified attachments:
(I)
the information required in paragraphs 3002(b) and 3002(c), as pertinent
to each party to the transaction;
(II)
a statement showing accounting entries, under the Uniform System of
Accounts, including any plant acquisition adjustment, gain, or loss
proposed on the books by each party before and after the transaction
which is the subject of the application;
(III)
any agreement for merger, sales agreement, or contract of sale pertinent
to the transaction which is the subject of the application;
(IV)
facts showing that the transaction which is the subject of t
Uniform System of
Accounts, including any plant acquisition adjustment, gain, or loss
proposed on the books by each party before and after the transaction
which is the subject of the application;
(III)
any agreement for merger, sales agreement, or contract of sale pertinent
to the transaction which is the subject of the application;
(IV)
facts showing that the transaction which is the subject of the application is
not contrary to the public interest;

Code of Colorado Regulations
4 CCR 723-3
Public Utilities Commission
42
(V)
an evaluation of the benefits and detriments to the customers of each
party and to all other persons who will be affected by the transaction which
is the subject of the application; and
(VI)
a comparison of the kinds and costs of service rendered before and after
the transaction which is the subject of the application.
(c)
An application to transfer a certificate of public convenience and necessity, an
application to transfer assets subject to the jurisdiction of the Commission, or an
application to transfer or obtain control of the utility may be made by joint or
separate application of the transferor and the transferee.
(d)
When control of a utility is transferred to another entity, or the utility’s name is
changed, the utility which will afterwards operate under the certificate of public
convenience and necessity shall file with the Commission a tariff adoption notice,
shall post the tariff adoption notice in a prominent public place

[Text truncated at 120,000 characters. The full text is on the page linked above.]

## Nearby sections

- [4 CCR 723-1 RULES OF PRACTICE AND PROCEDURE](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_1.md)
- [4 CCR 723-2 RULES REGULATING TELECOMMUNICATIONS SERVICES AND PROVIDERS OF TELECOMMUNICATIONS SERVICES](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_2.md)
- [4 CCR 723-3 RULES REGULATING ELECTRIC UTILITIES](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_3.md)
- [4 CCR 723-4 RULES REGULATING GAS UTILITIES](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_4.md)
- [4 CCR 723-5 RULES REGULATING WATER, AND COMBINED WATER AND SEWER UTILITIES](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_5.md)
- [4 CCR 723-10 AUTHORITY OF THE PUC TO FLEXIBLY REGULATE GAS, ELECTRIC, OR STEAM UTILITIES [Repealed eff. 04/01/2006]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_10.md)
- [4 CCR 723-11 RULES REGULATING PIPELINE OPERATORS AND GAS PIPELINE SAFETY](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_11.md)
- [4 CCR 723-12 PROVISION OF CERTAIN PRODUCTS AND SERVICES WITHIN OPEN NETWORK ARCHITECTURE [Repealed eff. 04/01/2006]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_12.md)
- [4 CCR 723-13 RULES FOR ADMINISTERING THE LOW-INCOME TELEPHONE ASSISTANCE FUND [Repealed eff. 04/01/2006]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_13.md)
- [4 CCR 723-14 RULES FOR SAFETY PROGRAM STANDARDS FOR RAIL FIXED GUIDEWAY SYSTEMS [Repealed eff. 04/01/2006]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_14.md)
- [4 CCR 723-15 RULES SAFETY FOR MOTOR VEHICLE CARRIERS AND ESTABLISHING CIVIL PENALTIES [Repealed eff. 04/01/2006]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_15.md)
- [4 CCR 723-16 CLAIM OF CONFIDENTIALITY OF INFO SUBMITTED TO THE COLO PUBLIC UTILITIES COMM [Repealed eff. 04/01/2006]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_16.md)
- [4 CCR 723-17 GAS TRANSPORTATION RULES [Repealed eff. 04/01/2006]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_17.md)
- [4 CCR 723-18 OPERATOR SERVICES FOR TELECOMMUNICATIONS PROVIDERS AND TELEPHONE UTILITIES [Repealed eff. 04/01/2006]](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_18.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_4_CCR_723_3. Check the current official text before relying on it. Not legal advice.