# 1 CCR 303-1: RULES PERTAINING TO THE ADMINISTRATION OF THE PUBLIC SCHOOL CAPITAL CONSTRUCTION ASSISTANCE BOARD

> Colorado · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_1_CCR_303_1

## Section

- **Citation:** 1 CCR 303-1
- **Heading:** RULES PERTAINING TO THE ADMINISTRATION OF THE PUBLIC SCHOOL CAPITAL CONSTRUCTION ASSISTANCE BOARD
- **Jurisdiction:** Colorado
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Code of Colorado Regulations / 300 Department of Education / 303 Division of Public School Capital Construction Assistance / 1 CCR 303-1

## Text

PUBLIC SCHOOL FACILITY CONSTRUCTION GUIDELINES
1 CCR 303-1
[Editor’s Notes follow the text of the rules at the end of this CCR Document.]
_________________________________________________________________________
Article 1 - Purpose and Authority to Promulgate Rules
1.1.
Purpose
1.1.1.
Section 22-43.7-107(1)(a), C.R.S. states, The board shall establish public school facility
construction guidelines for use by the board in assessing and prioritizing public school
capital construction needs throughout the state as required by section 22-43.7-108,
C.R.S. reviewing applications for financial assistance, and making recommendations to
the state board regarding appropriate allocation of awards of financial assistance from
the assistance fund only to applicants. The board shall establish the guidelines in rules
promulgated in accordance with article 4 of title 24, C.R.S.
1.1.2.
Section 22-43.7-107(1)(b), C.R.S. states, It is the intent of the general assembly that the
Public School Facility Construction Guidelines established by the board be used only for
the purposes specified in section 1.1.1 above.
1.1.3.
The Public School Facility Construction Guidelines shall identify and describe the capital
construction, renovation, and equipment needs in public school facilities and means of
addressing those needs that will provide educational and safety benefits at a reasonable
cost.
1.2.
Statutory Authority
1.2.1.
Section 22-43.7-106(2)(i)(I) C.R.S. states, the board may promulgate rules in accordance
with article 4 of title 24, C.R.S. The board is directed to establish Public School Facility
Construction Guidelines in rule pursuant to 22-43.7-107(1)(a), C.R.S.
Article 2 - Definitions
2.1.
The definitions provided in 22-43.7-103, C.R.S., shall apply to these rules. The following
additional definitions shall also apply:
“C.R.S.” means Colorado Revised Statutes.
“ES” means Elementary School.
“F.T.E.s” means Full Time Equivalent Students
ard is directed to establish Public School Facility
Construction Guidelines in rule pursuant to 22-43.7-107(1)(a), C.R.S.
Article 2 - Definitions
2.1.
The definitions provided in 22-43.7-103, C.R.S., shall apply to these rules. The following
additional definitions shall also apply:
“C.R.S.” means Colorado Revised Statutes.
“ES” means Elementary School.
“F.T.E.s” means Full Time Equivalent Students.
“Gross Square Feet (GSF)” means the total area of the building (inclusive of all levels as
applicable) of a building within the outside faces of the exterior walls, including all vertical
circulation and other shaft (HVAC) areas connecting one floor to another.
“Guidelines” means the Public School Facility Construction Guidelines.
Code of Colorado Regulations
Secretary of State
State of Colorado

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

2
“Historical significance” means having importance in the history, architecture, archaeology, or
culture of this state or any political subdivision thereof or of the United States, as determined by
the state historical society.
“HS” means High School.
“K12” means Kindergarten through 12th Grade School that is under all one facility / campus.
“MS” means Middle School.
“SF” means Square Foot.
“S.T.E.M.” means Science, Technology, Engineering, & Mathematics.
Article 3 - Codes, Documents and Standards incorporated by reference
3.1.
The following materials are incorporated by reference within the Public School Facility
Construction Guidelines:
3.1.1.
ASHRAE 90.1-2013 Energy Standard for Buildings Except Low-Rise Residential
Buildings.
3.1.2.
ASHRAE Standard Benchmark Energy Utilization Index (October 2009).
3.1.3.
ASHRAE Standard 189.1 - 2011 Standard for the Design of High-Performance Green
Buildings.
3.1.4.
ANSI/ASA S12.60-2010/ Part 1, Acoustical Performance Criteria, Design Requirements,
and Guidelines for Schools, Part 1 Permanent Schools
3.1.5
90.1-2013 Energy Standard for Buildings Except Low-Rise Residential
Buildings.
3.1.2.
ASHRAE Standard Benchmark Energy Utilization Index (October 2009).
3.1.3.
ASHRAE Standard 189.1 - 2011 Standard for the Design of High-Performance Green
Buildings.
3.1.4.
ANSI/ASA S12.60-2010/ Part 1, Acoustical Performance Criteria, Design Requirements,
and Guidelines for Schools, Part 1 Permanent Schools
3.1.5.
International Code Council’s International Plumbing Code (2015) amended by Rules and
Regulations of the Colorado State Plumbing Board 3 CCR 720-1, 2016-4-1
3.1.6.
National Fire Protection Association (NFPA) 70: National Electrical Code (2014).
3.1.7.
National Fire Protection Association (NFPA) 13: Standard for the Installation of Sprinkler
Systems, 2013 Edition
3.1.8.
National Fire Protection Association (NFPA) 72: National Fire Alarm and Signaling Code,
2013 Edition.
3.1.9.
National Fire Protection Association (NFPA) 80: Standard for Fire Doors and Other
Opening Protectives, 2016 Edition
3.1.10. ASHRAE Standard 62.1-2013 Ventilation for Acceptable Indoor Air Quality (2013).
3.1.11. Colorado Department of Public Health and Environment which references Air Quality,
Hazardous Waste, Public and environmental health, Radiation Control, Solid Waste and
Water Quality.
3.1.12. International Fire Code (IFC) – 2015 Edition, First Printing: May 2014 (Copyright 2014 by
International Code Council, Inc. - Washington, D.C.), including Appendices B and C.
3.1.13. International Mechanical Code - 2015 Edition, First Printing: May 2014 (Copyright 2014
by International Code Council, Inc. - Washington, D.C.)

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
(IFC) – 2015 Edition, First Printing: May 2014 (Copyright 2014 by
International Code Council, Inc. - Washington, D.C.), including Appendices B and C.
3.1.13. International Mechanical Code - 2015 Edition, First Printing: May 2014 (Copyright 2014
by International Code Council, Inc. - Washington, D.C.)

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

3
3.1.14. International Energy Conservation Code (IECC) - 2015 Edition, First Printing: May 2014
(Copyright 2014 by International Code Council, Inc. - Washington, D.C.)
3.1.15. International Existing Building Code – 2015 Edition, First Printing: May 2014 (Copyright
201 by International Code Council, Inc. - Washington, D.C.)
3.1.16. All projects shall be constructed and maintained in accordance with the codes and
regulations as currently adopted by the Colorado Division of Fire Prevention & Control
which incorporates current building, fire, existing building, mechanical, and energy
conservation codes.
3.2.
The Division shall maintain copies of the complete texts of the referenced incorporated materials,
which are available for public inspection during regular business hours with copies available at a
reasonable charge. Interested parties may inspect the referenced incorporated materials by
contacting the Director of the Division of Public School Capital Construction Assistance, 1580
Logan Street, Suite 310, Denver, Colorado 80203.
3.3.
This rule does not include later amendments or editions of the incorporated material.
Article 4 - These Guidelines are not mandatory standards to be imposed on school districts,
charter schools, institute charter schools, the boards of cooperative services or the
Colorado School for the Deaf and Blind. As required by statute, the Guidelines address:
4.1
Health and safety issues, including security needs and all applicable health, safety and
environmental codes and standards as required by state and federal law. Public school facility
accessibility.
4.1.1
Sound building structures
schools, institute charter schools, the boards of cooperative services or the
Colorado School for the Deaf and Blind. As required by statute, the Guidelines address:
4.1
Health and safety issues, including security needs and all applicable health, safety and
environmental codes and standards as required by state and federal law. Public school facility
accessibility.
4.1.1
Sound building structures. Each building should be constructed and maintained with
sound structural foundation, floor, wall and roof systems.
4.1.1.1 - All building structures shall conform to all applicable codes adopted by the
Colorado Division of Fire Prevention and Control in 8 CCR 1507-30.
4.1.2
Classroom Acoustics. To address issues of reverberation time and background noise in
classrooms refer to ANSI/ASA S12.60-2010/ Part 1, American National Standard
Acoustical Performance Criteria, Design Requirements, and Guidelines for Schools, Part
1: Permanent Schools.
4.1.3
Roofs. A weather-tight roof that drains water positively off the roof and discharges the
water off and away from the building. All roofs shall be installed by a qualified contractor
who is approved by the roofing manufacturer to install the specified roof system and shall
receive the specified warranty upon completion of the roof. The National Roofing
Contractors Association divides roofing into two generic classifications: low-slope roofing
and steep-slope roofing. Low-slope roofing includes water impermeable, or weatherproof
types of roof membranes installed on slopes of less than or equal to 3:12 (fourteen
degrees). Steep slope roofing includes water-shedding types of roof coverings installed
on slopes exceeding 3:12 (fourteen degrees).
4.1.3.1 - Low slope roofing systems:
4.1.3.1.1
- Built-up – minimum 4 ply, type IV fiberglass felt, asphalt BUR
system. Gravel or cap sheet surfacing required.
4.1.3.1.2
- Ethylene Propylene Diene Monomer - minimum 60 mil EPDM
membrane, with a ballasted or adhered system.
es). Steep slope roofing includes water-shedding types of roof coverings installed
on slopes exceeding 3:12 (fourteen degrees).
4.1.3.1 - Low slope roofing systems:
4.1.3.1.1
- Built-up – minimum 4 ply, type IV fiberglass felt, asphalt BUR
system. Gravel or cap sheet surfacing required.
4.1.3.1.2
- Ethylene Propylene Diene Monomer - minimum 60 mil EPDM
membrane, with a ballasted or adhered system.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

4
4.1.3.1.3
- Poly Vinyl Chloride - minimum 60 mil PVC membrane adhered
or mechanically attached systems.
4.1.3.1.4
- Thermal Polyolefin - minimum 60 mil membrane adhered or
mechanically attached systems.
4.1.3.1.5
- Polymer-modified bitumen sheet membrane - Styrene-
Butadiene-Styrene (SBS) membranes only, to be used only as a
component of a built-up system noted above.
4.1.3.2 - Steep slope roofing systems:
4.1.3.2.1
- Asphalt shingles - minimum 50 year spec asphalt shingles, UL
Class A.
4.1.3.2.2
- Clay tile and concrete tile - minimum 50 year spec clay or
concrete tile, UL Class A.
4.1.3.2.3
- Metal roof systems for steep-slope applications - minimum 24
gage prefinished steel, standing seam roof system with a minimum 1.5”
seam height.
4.1.3.2.4
- Slate - ¼” minimum thickness, 50 year spec. UL Class A.
4.1.3.2.5
- Synthetic shingles - minimum 50 year spec, UL Class A.
4.1.4
Electrical Systems – Power Distribution and Utilization. Safe and secure electrical service
and distribution systems shall be designed and installed to meet the National Electrical
Code (NEC, NFPA 70); edition as enforced by the Colorado State Buildings Programs
(SBP), unless otherwise more stringent based on local Authority Having Jurisdiction
(AHJ), and ANSI/ASHRAE/IES Standard 90.1-2013 “Energy Standard for Buildings
Except Low-Rise Residential Buildings”.
4.1.4.1 – Energy use intensity should not exceed the U.S
ll be designed and installed to meet the National Electrical
Code (NEC, NFPA 70); edition as enforced by the Colorado State Buildings Programs
(SBP), unless otherwise more stringent based on local Authority Having Jurisdiction
(AHJ), and ANSI/ASHRAE/IES Standard 90.1-2013 “Energy Standard for Buildings
Except Low-Rise Residential Buildings”.
4.1.4.1 – Energy use intensity should not exceed the U.S. Department of Energy (DOE)
building benchmarks, and shall conform to ASHRAE Standard Benchmark
Energy Utilization Index (October 2009).
4.1.4.2 - Emergency lighting shall operate when normal lighting systems fail in locations
and shall conform to all applicable codes adopted by the Colorado Division of
Fire Prevention and Control in 8 CCR 1507-30.
4.1.5
Lighting Systems. Lighting systems shall be designed and installed to achieve
appropriate lighting levels utilizing energy-efficient lighting fixtures and energy-saving
automatic and manual control systems.
4.1.5.1 - Lighting systems shall be designed and installed to meet the National Electrical
Code (NEC, NFPA 70) edition as enforced by the Colorado State Buildings
Programs (SBP), unless otherwise more stringent based on local Authority
Having Jurisdiction (AHJ).
4.1.5.2 – Illuminance levels shall meet the requirements for applicable spaces as
recommended within in the Illuminating Engineering Society (IES) Handbook,
and dictated by the Rules and Regulations Governing Schools in the State of
Colorado 6 CCR 1010-6.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
n local Authority
Having Jurisdiction (AHJ).
4.1.5.2 – Illuminance levels shall meet the requirements for applicable spaces as
recommended within in the Illuminating Engineering Society (IES) Handbook,
and dictated by the Rules and Regulations Governing Schools in the State of
Colorado 6 CCR 1010-6.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

5
4.1.5.3 – Lighting power density shall not exceed the values indicated in
ANSI/ASHRAE/IES Standard 90.1-2013.
4.1.5.4 - Lighting Control Systems shall be provided to comply with ANSI/ASHRAE/IES
Standard 90.1-2013.
4.1.6
Mechanical Systems – Heating, Ventilation, and Air Conditioning (HVAC). Safe and
energy efficient mechanical systems shall be designed and installed to provide proper
ventilation, and maintain the building temperature and relative humidity, while achieving
appropriate sound levels.
4.1.6.1 – Mechanical systems shall be designed and installed to meet the International
Mechanical Code, International Fuel Gas Code, International Building Code, and
other Codes as adopted by the Colorado Division of Fire Prevention and Control
in 8 CCR 1507.
4.1.6.2 - Healthy building indoor air quality (IAQ) shall be provided through the use of the
mechanical heating, ventilation and air conditioning (HVAC) systems, or by
operable windows, and by reducing air infiltration and water penetration with a
tight building envelope, in compliance with the enforced International Building
Code and ASHRAE Standard 62. 1- 2013.
4.1.6.3 - Mechanical systems shall comply with: ASHRAE Standard 62.1-2013
Ventilation for Acceptable Indoor Air Quality, ASHRAE Standard 90.1-2013
Energy Standard for Buildings Except Low-Rise Residential Buildings, and
ASHRAE Standard 189.1-2014 Standard for the Design of High-Performance
Green Buildings
in compliance with the enforced International Building
Code and ASHRAE Standard 62. 1- 2013.
4.1.6.3 - Mechanical systems shall comply with: ASHRAE Standard 62.1-2013
Ventilation for Acceptable Indoor Air Quality, ASHRAE Standard 90.1-2013
Energy Standard for Buildings Except Low-Rise Residential Buildings, and
ASHRAE Standard 189.1-2014 Standard for the Design of High-Performance
Green Buildings.
4.1.6.4 Sound levels due to mechanical equipment shall comply with Occupational
Safety & Health Administration Standard 1910.95 and ANSI/ASA Standard
S12.60-2010 Part 1 for acoustical considerations within school facilities.
4.1.7
Plumbing Systems - Waste Water, Storm water, Domestic Water and Plumbing
Supporting HVAC shall be in compliance with Division of Fire Prevention and Control in 8
CCR1507 and the Colorado Department of Health & Environment regulations.
4.1.8
Fire Protection Systems. Building fire detection, alarm and emergency notification
systems in all school facilities shall be designed in accordance with State requirements.
Exceptions where code required systems are not mandatory and the occupancy
classification according to the International Building Code 2015 does not warrant a
system. All fire management systems shall conform to all applicable codes adopted by
the Colorado Division of Fire Prevention and Control in 8 CCR 1507-30 and the adopted
Fire Code.
4.1.8.1 - Types of fire alarm notifications systems.
4.1.8.1.1
– Internal audible and visual alarms.
4.1.8.1.2
– External alarm monitoring and dispatch via internet / modem,
telephone, radio, or cellular monitoring systems.
4.1.8.2 - Automatic Sprinkler Systems in Group E Occupancy a sprinkler system shall be
provided as noted in the adopted Fire Code. Refer to the adopted Fire Code for
exceptions.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
4.1.8.1.2
– External alarm monitoring and dispatch via internet / modem,
telephone, radio, or cellular monitoring systems.
4.1.8.2 - Automatic Sprinkler Systems in Group E Occupancy a sprinkler system shall be
provided as noted in the adopted Fire Code. Refer to the adopted Fire Code for
exceptions.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

6
4.1.8.2.1
All Group E fire areas greater than 12,000 square feet in area.
4.1.8.2.2
Throughout every portion of educational buildings below the
lowest level of exit discharge serving that portion of the building.
4.1.8.3 - Types of Fire Protection Water Supplies.
4.1.8.3.1
- Fire hydrants.
4.1.8.3.2
- Static fire water storage tanks.
4.1.9
Means of egress. A continuous and unobstructed path of vertical and horizontal egress
travel from any occupied portion of a building or structure to a public way. A means of
egress consists of three separate and distinct parts: the exit access, the exit and the exit
discharge. Reference 2015 International Building Code, Chapter 2, Definitions. A building
code analysis shall be conducted to determine all code requirements.
4.1.10 Facilities with safely managed hazardous materials. Potential hazardous materials in
building components, which are identified in the Asbestos Hazard Emergency Response
Act (AHERA) report, may include: asbestos, radon, lead, lamps and devices containing
mercury. Additional hazardous materials may include: science chemicals, cleaning
chemicals, blood-borne pathogens, acid neutralization tank for science departments, and
bulk fuel storage (UST/AST) management that may be stored by the occupant.
4.1.10.1
- Public schools shall comply with all AHERA criteria and develop,
maintain, and update an asbestos management plan, to be kept on record at the
school district. This should include a building survey of the exterior of the
building, and identification of all friable, non-friable, and trace asbestos materials
s, and
bulk fuel storage (UST/AST) management that may be stored by the occupant.
4.1.10.1
- Public schools shall comply with all AHERA criteria and develop,
maintain, and update an asbestos management plan, to be kept on record at the
school district. This should include a building survey of the exterior of the
building, and identification of all friable, non-friable, and trace asbestos materials.
Reference regulation Number 8, Control of Hazardous Air Pollutants, 5 CCR
1001-10.
4.1.10.2
- All new facilities and additions shall conduct radon testing following
completion of construction within nineteen months after occupancy as required
by Colorado Department of Public Health and Environment, 6 CCR 1010-6.
4.1.10.3
- Lead based paint. All schools shall conform to the regulations adopted
by the Colorado Air Quality Control Commission governing the abatement of
lead-based paint from target housing (constructed prior to 1978) and child-
occupied facilities, reference C.R.S. 25-5-1101.
4.1.11 Security. The degree of resistance to, or protection from, harm. It applies to any
vulnerable and valuable asset; such as a person, building or dwelling. Security provides
“a form of protection where a separation is created between the assets and the threat.”
These separations are generically called “controls,” and sometimes include changes to
the asset or the threat. These separations and degrees of resistance can be achieved
through several models and techniques.
4.1.11.1
- Video Management Systems (VMS).

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
is created between the assets and the threat.”
These separations are generically called “controls,” and sometimes include changes to
the asset or the threat. These separations and degrees of resistance can be achieved
through several models and techniques.
4.1.11.1
- Video Management Systems (VMS).

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

7
4.1.11.1.1
- Cameras. Video cameras are typically used to implement a
video management system. In new construction, these should be internet
protocol (IP) cameras on Power over Ethernet (PoE) cabling
infrastructure, with color CCD, day-night operation and supplemental IR
illuminators and environmental accessories as required for application,
Cameras should support motion activation, digital zoom and focus, and
standard video compression. Fixed and pan-tilt-zoom (PTZ) cameras
shall be considered to meet requirements. Consideration shall be given
to cameras with integral audio microphones.
4.1.11.1.2
- Monitoring & Recording Systems. - A central video
management system should be capable of monitoring live feeds from
multiple cameras from a central location and remote locations, recording
all video, searching and reviewing recorded video, and exporting video to
portable digital media. A minimum of 30 days of storage of all videos at
15fps (frames per second) is required.
4.1.11.2
- Controlled Access.
4.1.11.2.1
- General Requirements
4.1.11.2.1.1
- The number of entryways into the building or onto the
campus should be limited. New construction shall be designed to
restrict normal entrance to only one or two locations, with no
recessed doorways, provided that sufficient entryways are
available for fire department access and shall conform to all
applicable codes adopted by the Colorado Division of Fire
Prevention and Control in 8 CCR 1507-30.
4.1.11.2.1.2
- All exterior doors shall be locking and equipped with
panic bars to open readily from the egress side
o
restrict normal entrance to only one or two locations, with no
recessed doorways, provided that sufficient entryways are
available for fire department access and shall conform to all
applicable codes adopted by the Colorado Division of Fire
Prevention and Control in 8 CCR 1507-30.
4.1.11.2.1.2
- All exterior doors shall be locking and equipped with
panic bars to open readily from the egress side. Panic bars
should utilize flush push bar hardware to prevent chaining doors
shut.
4.1.11.2.1.2.1
- Unless a door is intended for ingress, exterior
doors should not have handles and locks on the outside.
In all cases exposed hardware should be minimized,
provided that sufficient entryways are available for fire
department access and shall conform to all applicable
codes adopted by the Colorado Division of Fire
Prevention and Control in 8 CCR 1507-30.
4.1.11.2.1.3
- Doors should be constructed of steel, aluminum alloy,
or solid-core hardwood. If necessary, glass doors should be fully
framed and equipped with burglar-resistant tempered glass.
Translucent glass should be avoided in all cases.
4.1.11.2.1.4
- Exit doors with panic push-bars should be “Access
Control Doors” per the codes adopted by the Colorado Division
of Fire Prevention and Control in 8 CCR 1507-30, to prevent
easy access by criminals and vandals, or in a lock-down / lock-
out situation.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
ss should be avoided in all cases.
4.1.11.2.1.4
- Exit doors with panic push-bars should be “Access
Control Doors” per the codes adopted by the Colorado Division
of Fire Prevention and Control in 8 CCR 1507-30, to prevent
easy access by criminals and vandals, or in a lock-down / lock-
out situation.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

8
4.1.11.2.1.5
- Heavy-duty metal or solid-core wooden doors should
be used at entrances in areas containing expensive items. These
areas include classrooms, storerooms, and custodians’ rooms.
Interior doorway doors should also be heavy-duty metal or solid-
core wooden doors.
4.1.11.2.1.6
- Door hinges should have non-removable pins.
4.1.11.2.1.7
- Door frames should be constructed of pry-proof
material.
4.1.11.2.1.8
- Armored strike plates shall be securely fastened to the
door frame in direct alignment to receive the latch easily.
4.1.11.3
- Automated Locking Mechanisms.
4.1.11.3.1.1
Use of automated locking mechanisms (electronic
access control) should be considered for exterior doors identified
for entry and select interior doors associated with the main entry
vestibule.
4.1.11.3.1.2
Acceptable automated electronic access control systems
include RF-based proximity credential readers and biometric
scanning devices. If the electronic access control systems are to
be utilized the following shall apply:
4.1.11.3.1.2.1
- School personnel may be issued credentials
for authenticating their identity in order to maintain
efficient access to school facilities.
4.1.11.3.1.2.2
Students are not necessarily expected to carry
electronic access control credentials. During normal
arrival times, electronic locking systems may be
disengaged via a timer while entries are monitored by
school personnel.
4.1.11.3.1.2.3
All exterior doors shall utilize door position
switches to notify staff of open doors and eliminate “door
propping”.
4.1.11.3.1.2.4
Doors utilizing electronic access controls shall
“fail secure” from the unsecure side
onic access control credentials. During normal
arrival times, electronic locking systems may be
disengaged via a timer while entries are monitored by
school personnel.
4.1.11.3.1.2.3
All exterior doors shall utilize door position
switches to notify staff of open doors and eliminate “door
propping”.
4.1.11.3.1.2.4
Doors utilizing electronic access controls shall
“fail secure” from the unsecure side. Free egress shall
not be inhibited from the secure side in any scenario.
4.1.11.4
Manual Locking Devices
4.1.11.4.1
Use of a manual locking mechanism, such as traditional cylinder
and key locks, should be provided for all interior doors requiring access
control.
4.1.11.4.2
Manual and Electronic access control should not be used on the
same door.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

9
4.1.11.5
Emergency Lockdown
4.1.11.5.1
All exterior doors shall be able to be quickly and automatically
secured from a position of safety (Administrative desk, Principal’s office,
etc) without traveling to each individual exterior door.
4.1.11.5.2
Interior doors to occupied spaces shall be capable of quickly
being secured from the inside by school personnel. Locking of doors may
be done via manual deadbolt or automatic locking mechanism. Locking
mechanism shall not interfere with automatic closing and latching
functions required by the fire code and may have door sidelights, or door
vision glass that allow line of sight into the corridors during emergencies,
and shall conform to all applicable codes adopted by the Colorado
Division of Fire Prevention and Control in 8 CCR 1507-30.
4.1.11.6
Intrusion Detection
4.1.11.6.1
A system shall be put in place to identify, alarm, and notify
authorities in the case of unauthorized entry.
4.1.11.7
Alarm System
Passive infrared (PIR) sensors shall be located interior to all building
entries to monitor human movement
nd shall conform to all applicable codes adopted by the Colorado
Division of Fire Prevention and Control in 8 CCR 1507-30.
4.1.11.6
Intrusion Detection
4.1.11.6.1
A system shall be put in place to identify, alarm, and notify
authorities in the case of unauthorized entry.
4.1.11.7
Alarm System
Passive infrared (PIR) sensors shall be located interior to all building
entries to monitor human movement.
4.1.11.7.1.1
– An alarm keypad shall be located at selected building
entries to arm and disarm the intrusion detection system.
4.1.11.7.1.2
– A manual alarm device shall be located in a position of
safety (Administrative desk, Principal’s office, etc.) to force
intrusion detection system into alarm status.
4.1.11.7.1.3
– The intrusion detection shall notify local authorities or
monitoring company upon alarm status.
4.1.11.8

Security Integration
4.1.11.8.1
The Video Management System (VMS), Access Control System,
and Intrusion Detection System may be components of an integrated
security solution.
4.1.11.9

- Main Entry Physical Security
4.1.11.9.1
- Building vestibules. Where appropriate, buildings shall employ
double entry door designs that provide a secured area for visitors to
authenticate and gain clearance. Known as “man traps”, security
vestibules solve several common security issues such as students
opening doors for visitors, visitors bypassing check-in points, direct
access to the interior from attackers, piggy-back entrances, and propped
doors.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
area for visitors to
authenticate and gain clearance. Known as “man traps”, security
vestibules solve several common security issues such as students
opening doors for visitors, visitors bypassing check-in points, direct
access to the interior from attackers, piggy-back entrances, and propped
doors.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

10
4.1.11.9.2
- Video based entrance intercom systems. Building designs shall
allow for school personnel to be able to monitor incoming visitors from a
safe location out of reach, or line of site from incoming visitors who have
not yet been authenticated or cleared for entry. These entry points shall
use remote video and access control technology to conduct multi-factor
authentication of incoming visitors (e.g. visual verification and ID,
PIN/password and ID, or biometric and other form of visual
identification).
4.1.11.9.2.1
- Video based entrance systems shall use IP technology
to allow access control to be conducted by school personnel
from multiple locations, so that multiple personnel can provide
coverage for screening incoming visitors.
4.1.11.9.3
- Line of sight. The front entrance should be designed to
maximize the line of sight distance for school occupants to detect an
intruder from each relevant perimeter (e.g. classroom to hallway, office
or guard station to entryway, or entryway to exterior fence access, or
exterior fence access to property perimeter).
4.1.11.10
- Event alerting and notification (EAN) system. An EAN system that
utilizes an intercom / phone system with communication devices located in all
classrooms and throughout the school to provide efficient inter-school
communications, and communication with local fire, police, and medical agencies
during emergency situations.
4.1.11.11
- Secure sites should include the following:
4.1.11.11.1
- Locations to avoid.
4.1.11.11.2
- Location of utilities.
4.1.11.11.3
- Roof access.
4.1.11.11.4
- Lighted walkways.
4.1.11.11.5
- Secured playgrounds
l
classrooms and throughout the school to provide efficient inter-school
communications, and communication with local fire, police, and medical agencies
during emergency situations.
4.1.11.11
- Secure sites should include the following:
4.1.11.11.1
- Locations to avoid.
4.1.11.11.2
- Location of utilities.
4.1.11.11.3
- Roof access.
4.1.11.11.4
- Lighted walkways.
4.1.11.11.5
- Secured playgrounds.
4.1.11.11.6
- Bollards at main entrances and shop areas with overhead
doors.
4.1.11.11.7
- Signage.
4.1.12 Health code standards. Schools, including labs, shops, vocational and other areas with
hazardous substances shall conform to the Department Of Public Health and
Environment, Division of Environmental Health and Sustainability, 6 CCR 1010-6 Rules
and Regulations Governing Schools in the State of Colorado.
4.1.13 Food preparation equipment and maintenance. Food preparation and associated facilities
equipped and maintained to provide sanitary facilities for the preparation, distribution, and
storage of food as required by Department Of Public Health And Environment, Division of
Environmental Health and Sustainability, 6 CCR 1010-6 Rules and Regulations
Governing Schools in the State of Colorado.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

11
4.1.14 Health care room. A separate health care room shall be provided and shall comply with
the Department Of Public Health and Environment, Division of Environmental Health and
Sustainability, 6 CR 1010-6 Rules and Regulations Governing Schools in the State of
Colorado.
4.1.15 A site that safely separates pedestrian and vehicular traffic and is laid out with the
following guidelines:
4.1.15.1
- Physical routes for basic modes (busses, cars, pedestrians, and
bicycles) of traffic should be separated as much as possible from each other
, Division of Environmental Health and
Sustainability, 6 CR 1010-6 Rules and Regulations Governing Schools in the State of
Colorado.
4.1.15 A site that safely separates pedestrian and vehicular traffic and is laid out with the
following guidelines:
4.1.15.1
- Physical routes for basic modes (busses, cars, pedestrians, and
bicycles) of traffic should be separated as much as possible from each other. If
schools are located on busy streets and/or high traffic intersections, coordinate
with the applicable municipality or county to provide for adequate signage, traffic
lights, and crosswalk signals to assist school traffic in entering the regular traffic
flow.
4.1.15.2
- When possible, provide a dedicated bus staging and unloading area
located away from students, staff, and visitor parking.
4.1.15.3
- Provide an adequate driveway zone for stacking cars on site for parent
drop-off/pick-up zones. Drop-off area design should not require backward
movement by vehicles, and be one-way in a counterclockwise direction where
students are loaded and unloaded directly to the curb/sidewalk. Students should
not have to load or unload where they have to cross a vehicle path before
entering the building. It is recommended all loading areas have “No Parking”
signs posted.
4.1.15.4
- Provide well-maintained sidewalks and a designated safe path leading
to the school entrance(s).
4.1.15.5
- Building service loading areas and docks should be independent from
other traffic and pedestrian crosswalks. If possible, loading areas shall be located
away from school pedestrian entries.
4.1.15.6
- Facilities should provide bicycle access and storage if appropriate.
4.1.15.7
- Fire lanes shall conform to all applicable codes adopted by the
Colorado Division of Fire Prevention and Control in 8 CCR 1507-30 or the local
fire department. Local fire department must adhere to the codes adopted by
DFPC
alks. If possible, loading areas shall be located
away from school pedestrian entries.
4.1.15.6
- Facilities should provide bicycle access and storage if appropriate.
4.1.15.7
- Fire lanes shall conform to all applicable codes adopted by the
Colorado Division of Fire Prevention and Control in 8 CCR 1507-30 or the local
fire department. Local fire department must adhere to the codes adopted by
DFPC.
4.1.15.8
- Playgrounds shall comply with the ICC A117.1-2009 Accessible and
Usable Buildings and Facilities and shall conform to all applicable codes adopted
by the Colorado Division of Fire Prevention and Control in 8 CCR 1507-30.
4.1.16 Severe weather preparedness.
4.1.16.1
- Designated emergency shelters shall conform to all applicable codes
adopted by the Colorado Division of Fire Prevention and Control in 8 CCR 1507-
30 and ICC 500.
4.2
Technology, including but not limited to telecommunications and internet connectivity technology
and hardware, devices or equipment necessary for individual student learning and classroom
instruction, including access to electronic instructional materials, or necessary for professional
use by a classroom teacher.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

12
4.2.1
Educational facilities for individual student learning, classroom instruction, online
instruction and associated technologies, connected to the Colorado institutions of higher
education distant learning networks “Internet” and “Internet two.”
4.2.2 Educational facilities shall be supplied with standards-based wired and wireless network
connectivity.
4.2.3
Security and associated filtering and intrusion control for internal voice, video and data
networks shall be provided
on, online
instruction and associated technologies, connected to the Colorado institutions of higher
education distant learning networks “Internet” and “Internet two.”
4.2.2 Educational facilities shall be supplied with standards-based wired and wireless network
connectivity.
4.2.3
Security and associated filtering and intrusion control for internal voice, video and data
networks shall be provided.
4.2.4
External internet service provider (ISP) connection and internal wide area network (WAN)
connections meeting or exceeding recommended guidelines of the state education
technology education directors association (SETDA) broadband imperative, and devices
meeting or exceeding recommended specifications according to the most current version
of technology guidelines for the partnership for assessment of readiness for college and
careers (PARCC) assessments.
4.2.5
Provide school administrative offices with web-based activity access.
4.2.6
Building shall be constructed with long-term sustainable technology infrastructure.
Facilities should be built with sufficient data cabling and/or conduit and power
infrastructure to allow for maximum flexibility as technological systems are upgraded and
replaced in the future. A plan for technology lifecycle review intervals should be put in
place for review at 2-4 year intervals.
4.2.6.1 Applicable Standards. The design and installation of technology systems shall
comply with:
4.2.6.1.1
ANSI/TIA/EIA-568-C
4.2.6.1.2
ANSI/TIA/EIA-569
4.2.6.1.3
ANSI/TIA/EIA-606-B
4.2.6.1.4
ANSI/TIA/EIA-607-B
4.2.6.1.5
ANSI/BICSI 001-2009, Information Transport Systems Design
Standard for K-12 Educational Institutions.
4.2.7
Telecom Equipment Rooms
4.2.7.1 - Uninterruptible power supplies (UPS). Telecom Rooms (TRs) and Equipment
Rooms (ERs) shall be provided with UPS equipment to provide continuous clean
power to communications systems for a minimum of 90 minutes.
4.2.7.2 - Generators
NSI/TIA/EIA-607-B
4.2.6.1.5
ANSI/BICSI 001-2009, Information Transport Systems Design
Standard for K-12 Educational Institutions.
4.2.7
Telecom Equipment Rooms
4.2.7.1 - Uninterruptible power supplies (UPS). Telecom Rooms (TRs) and Equipment
Rooms (ERs) shall be provided with UPS equipment to provide continuous clean
power to communications systems for a minimum of 90 minutes.
4.2.7.2 - Generators. A backup generator shall be considered for providing backup
power to telecommunications systems of backup power is required beyond 9
minutes, or if the generator is already located for other purposes.
4.2.7.3 - Heating, Ventilation and Air Conditioning (HVAC). Mechanical equipment shall
be used to accommodate heating loads within TRs and ERs. Ventilation-only
systems may be used in spaces with limited equipment, active cooling systems
should be considered for larger rooms. Maintained space temperatures shall
target 65 degrees F. peak space temperatures shall not exceed 90 degrees F.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

13
4.2.7.3.1
Direct evaporative cooling systems shall not be used, due to lack
of control on humidity levels.
4.2.7.4 - Alarms shall be provided to notify assigned school personnel if environmental
conditions approach or exceed bounds of operational conditions.
4.2.8
Connectivity standards.
4.2.8.1 - Wireless. Data cabling shall be planned to support appropriately spaced
multiple-antenna wireless networking infrastructure allowing for wireless access
points to support expected quantity of connected devices and required
bandwidth. Support for 802.11b/g/n, 802.11ac, and/or newer protocols are
recommended.
4.2.8.2 - Wired.
4.2.8.2.1
- Cabling. All new runs of copper data cable should be Category
6 cable or newer standards. Any data outlet should be supplied by two
cables. Unshielded twisted pair (UTP) shall be used unless local
conditions warrant otherwise.
4.2.8.2.2
- Telecom Rooms (TRs) and Equipment Rooms (ERs)
bandwidth. Support for 802.11b/g/n, 802.11ac, and/or newer protocols are
recommended.
4.2.8.2 - Wired.
4.2.8.2.1
- Cabling. All new runs of copper data cable should be Category
6 cable or newer standards. Any data outlet should be supplied by two
cables. Unshielded twisted pair (UTP) shall be used unless local
conditions warrant otherwise.
4.2.8.2.2
- Telecom Rooms (TRs) and Equipment Rooms (ERs). TRs and
ERs shall be connected by conduit and a combination of copper and
fiber optic cable to allow for maximum data performance and
upgradeability.
4.2.8.2.3
- TR to classroom. Classrooms should have a data outlet on the
wall at the front and back of the room at a minimum for network/ internet
access. Additional cabling may be warranted for security, audiovisual
and special systems purposes.
4.2.8.2.4
- TR to office, and library or technology/media centers. Any
areas designed for independent work or study should have a dedicated
data outlet with two copper cable runs each.
4.2.8.2.5
- TR to common areas, auditorium, and cafeteria. Common
areas should contain data outlets located as required to support program
and curriculum requirements.
4.3
Building site requirements. Functionality of existing and planned public school facilities for core
educational programs, particularly those educational programs for which the State Board has
adopted state model content standards. Capacity of existing and planned public school facilities,
taking into consideration potential expansion of services for the benefit of students such as full-
day kindergarten and preschool- and school-based health services and programs.
4.3.1
Traditional education model, S.T.E.M. & Montessori / Expeditionary education models.
4.3.1.1 - Minimum occupancy requirements for schools:

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

14
F.T.E.s
Total GSF
Total GSF
Total GSF
Total GSF
100
15,064

16,102

19,183

16,393

200
29,197

31,813

38,030

32,298

300
42,401

47,136

56,540

47,715

400
54,674
al education model, S.T.E.M. & Montessori / Expeditionary education models.
4.3.1.1 - Minimum occupancy requirements for schools:

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

14
F.T.E.s
Total GSF
Total GSF
Total GSF
Total GSF
100
15,064

16,102

19,183

16,393

200
29,197

31,813

38,030

32,298

300
42,401

47,136

56,540

47,715

400
54,674

62,068

74,713

62,645

500
66,017

76,610

92,550

77,087

600
76,429

90,763

110,050

91,041

700
85,912

104,526

127,214

104,508

800
94,464

117,899

144,041

117,488

900
102,086

130,883

160,531

129,979

1000
108,778

143,476

176,685

141,984

1100
114,540

155,680

192,502

153,500

1200
119,371

167,494

207,982

164,529

Median Gross Square Foot (GSF) Per Pupil
159

161

137

132

127

123

118

Traditional ES (K-5)
GSF/Pupil
151

146

141

Traditional HS (9-12)
Traditional K-12
Traditional MS (6-8)
173

175

177

178

180

182

183

185

187

188

190

192

GSF/Pupil
GSF/Pupil
GSF/Pupil
155

153

151

149

147

145

161

164

149

152

154

157

159

137

140

142

144

147

157

113

109

104

99

143

142

140

F.T.E.s
Exp.
Mtsri.
S.T.E.M.
Exp.
Mtsri.
S.T.E.M.
Exp.
Mtsri.
S.T.E.M.
Exp.
Mtsri.
S.T.E.M.
100
160
161
156
171
169
166
203
198
201
174
172
180
200
155
156
151
169
167
164
202
196
199
171
170
177
300
150
151
146
167
165
162
200
194
197
169
167
175
400
145
146
141
164
163
160
198
192
195
166
164
172
500
140
141
137
162
161
158
196
191
194
163
162
169
600
135
136
132
160
159
156
194
189
192
161
159
167
700
130
131
127
158
157
154
193
187
190
158
157
164
800
125
126
122
156
155
152
191
185
188
156
154
161
900
120
121
117
154
153
150
189
184
187
153
152
159
1000
115
116
113
152
151
148
187
182
185
151
149
156
1100
110
111
108
150
149
146
186
180
183
148
146
153
1200
105
106
103
148
147
144
184
179
181
145
144
151
Median Gross Square Foot Per Pupil - Alternate Programs (Expeditionary (Exp.), Montessori (Mtsri.), S.T.E.M.)
Alt. ES (GSF/Pupil)
Alt. MS (GSF/Pupil)
Alt. HS (GSF/Pupil)
Alt
88
156
154
161
900
120
121
117
154
153
150
189
184
187
153
152
159
1000
115
116
113
152
151
148
187
182
185
151
149
156
1100
110
111
108
150
149
146
186
180
183
148
146
153
1200
105
106
103
148
147
144
184
179
181
145
144
151
Median Gross Square Foot Per Pupil - Alternate Programs (Expeditionary (Exp.), Montessori (Mtsri.), S.T.E.M.)
Alt. ES (GSF/Pupil)
Alt. MS (GSF/Pupil)
Alt. HS (GSF/Pupil)
Alt. K12 (GSF/Pupil)

F.T.E.s
Auditorium
Auditorium
Auditorium
Auditorium
100
1,300

1,500

1,700

1,700

200
1,600

1,800

2,000

2,000

300
1,900

2,100

2,300

2,300

400
2,400

2,600

2,800

2,800

500
2,700

2,900

3,100

3,100

600
3,000

3,200

3,400

3,400

700
3,900

3,900

3,900

3,900

800
4,200

4,200

4,200

4,200

900
4,500

4,500

4,500

4,500

1000
4,800

4,800

4,800

4,800

1100
5,100

5,100

5,100

5,100

1200
5,400

5,400

5,400

5,400

Square Foot Values - Assembly
7,200

ES Assembly
MS Assembly
HS Assembly
K12 Assembly
6,600

6,000

5,400

4,800

Cafeteria
Cafeteria
Cafeteria
Cafeteria
7,200

6,600

6,000

5,400

4,800

4,200

3,600

3,000

2,400

1,800

1,200

675

3,000

2,400

1,800

1,200

675

4,200

3,600

3,000

2,400

1,800

1,200

675

4,200

3,600

3,000

2,400

1,800

7,200

6,600

6,000

5,400

4,800

1,200

675

7,200

6,600

6,000

5,400

4,800

4,200

3,600

- Cafeteria Capacity assumes three (3) seatings without a secondary function overlay.
- Auditorium Capacity SF is sized for 1/3 of General enrollment and is inclusive of stage (size varies: 1,000 to 1,800); Basis is 9 SF
per seat (1/3 FTES) plus stage at various sizes, stage includes a small amount of storage or similar support.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

15
F.T.E.s
Total SF
Total SF
Total SF
Total SF
Kindergarten
1,140

-

-

1,140

Grade 1
960

-

-

960

Grade 2
960

-

-

960

Grade 3
960

-

-

960

Grade 4
900

-

-

900

Grade 5
900

-

-

900

Grade 6
-

900

-

900

Grade 7
-

840

-

840

Grade 8
-

840

-

840

Grade 9
-

-

840

840

Grade 10
-

-
OLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

15
F.T.E.s
Total SF
Total SF
Total SF
Total SF
Kindergarten
1,140

-

-

1,140

Grade 1
960

-

-

960

Grade 2
960

-

-

960

Grade 3
960

-

-

960

Grade 4
900

-

-

900

Grade 5
900

-

-

900

Grade 6
-

900

-

900

Grade 7
-

840

-

840

Grade 8
-

840

-

840

Grade 9
-

-

840

840

Grade 10
-

-

840

840

Grade 11
-

-

840

840

Grade 12
-

-

840

840

Montessori
1,200

1,200

1,200

1,200

Expeditionary
1,080

1,080

1,080

1,080

Square Foot (SF) Values - Core Classrooms (Minimum (Min) classroom size = 675 sf)
ES Min (24-30 FTES)
SF/Pupil
SF/Pupil
SF/Pupil
SF/Pupil
30

30

32

32

32

K12 Min (24-30 FTES)
HS Min (24-30 FTES)
MS Min (24-30 FTES)
36

40

-

-

-

-

-

-

-

-

-

28

28

30

-

-

28

-

38

36

40

-

-

-

-

-

-

-

-

-

-

36

40

28

28

28

36

40

28

28

28

28

28

28

30

30

-

-

-

-

30

32

32

32

38

F.T.E.s
Total SF
Total SF
Total SF
Total SF
Comp/Tech
-

-

Music
-

-

Science
Lecture
Art
Gym / MP
Special Ed
VoAg
-

-

-

-

Media Center
"Gymatorium"
Square Foot (SF) Values - Exploratory Spaces (minimum size = 675 sf)
1200 sf (30 occ)
-

37

3,000 SF (50'x60')
2400 sf (60 occ)
-

37

5,400 SF (60'x90')
4,400 SF (See notes)
4,400 SF (See notes)
-

40

35

32

35

28

38

35

30

K12 Min (24-30 F.T.E.s)
HS Min (24-30 F.T.E.s)
MS Min (24-30 F.T.E.s)
ES Min (24-30 F.T.E.s)
SF/Pupil
SF/Pupil
SF/Pupil
SF/Pupil
44

35

32

32

28

28

-

3600 sf (60 occ)
60

37

7,300 SF (70'x104')
45

28

44

35

3600 sf (60 occ)
60

37

7,300 SF (70'x104')
45

40
F (50'x60')
2400 sf (60 occ)
-

37

5,400 SF (60'x90')
4,400 SF (See notes)
4,400 SF (See notes)
-

40

35

32

35

28

38

35

30

K12 Min (24-30 F.T.E.s)
HS Min (24-30 F.T.E.s)
MS Min (24-30 F.T.E.s)
ES Min (24-30 F.T.E.s)
SF/Pupil
SF/Pupil
SF/Pupil
SF/Pupil
44

35

32

32

28

28

-

3600 sf (60 occ)
60

37

7,300 SF (70'x104')
45

28

44

35

3600 sf (60 occ)
60

37

7,300 SF (70'x104')
45

40

- ES Gymnasium basis is 50'X60' play area; Capacity Assumes (GE*.25)/7 periods (without fixed seats)
- MS Gymnasium basis is 60’X90’ play area; Capacity Assumes (GE*.5)/7 periods (without fixed seats)
- HS Gymnasium basis is 70’X104’ practice gym; Capacity Assumes (GE*.5)/7 periods (with limited fixed seats) Note: National
Federation of State High School Association’s standards outline an “ideal” court for high school age as 84'x50' (and not greater than
94'x50')
- “Gymatorium” basis is 50'x60' play area and 1000 SF platform stage with 400 SF storage
Office - large
Space Type:
Office - typical
Instruction - sm group
Storage
Staff toilets
Team planning (conf)
Work room
Instructor / Support Areas
Notes:
Multiple may be required due to scale
Multiple indivual (or in aggregate) may be required due to scale
12-16 occupants (assembly use)
16 occupants (classroom use)
Ave per instructor
Square Feet
50
50
320
240
250
150
120

These facility area standards are copyrighted by Cuningham Group Architecture, Inc. and may not be
reproduced or distributed without inclusion of “Copyright 2014 Cuningham Group Architecture, Inc.”. The
data was derived from a multi-year national facility area standards study, supported in part by the
Colorado League of Charter Schools.
4.3.2
Other rooms.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
m Group Architecture, Inc. and may not be
reproduced or distributed without inclusion of “Copyright 2014 Cuningham Group Architecture, Inc.”. The
data was derived from a multi-year national facility area standards study, supported in part by the
Colorado League of Charter Schools.
4.3.2
Other rooms.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

16
4.3.2.1 - Facilities with preschools shall comply with Rules Regulating Child Care
Centers (Less Than 24-Hour Care) 12 CCR 2509-8 and shall comply with the
Colorado Department of Public Health and Safety’s Regulations Governing Child
Care, 6 CCR 1010-7.
4.3.2.2 - Special education classrooms. Special Education classrooms and facilities
meeting or exceeding the accessibility and adaptive needs of the current and
reasonably anticipated student population, in accordance with Section 504 and
Title II of the Americans with Disabilities Act, the Exceptional Children’s
Educational Act, and Individuals with Disabilities Education Act.
4.4
Building performance standards and guidelines for green building and energy efficiency.
Section 24-30-1305.5 C.R.S., requires all new facilities, additions, and renovation projects funded
with 25% or more of state funds to conform with the High Performance Certification Program
(HPCP) policy adopted by the Office of the State Architect (OSA) if:
•
The new facility, addition, or renovation project contains 5,000 or more building square
feet; and
•
The project includes an HVAC system; and
•
If increased initial cost resulting from HPCP can be recouped by decreased operational
costs within 15 years, and
•
In the case of a renovation project, the cost of the renovation exceeds 25% of the current
value of the property.
4.4.1
High Performance Certification Programs
ddition, or renovation project contains 5,000 or more building square
feet; and
•
The project includes an HVAC system; and
•
If increased initial cost resulting from HPCP can be recouped by decreased operational
costs within 15 years, and
•
In the case of a renovation project, the cost of the renovation exceeds 25% of the current
value of the property.
4.4.1
High Performance Certification Programs.
4.4.1.1 The Department of Personnel and Administration, Office of the State Architect
has determined the following three guidelines as meeting the High Performance
Certification Program (HPCP) requirements per C.R.S.24-30-1305.5; the U.S.
Green Building Council, Leadership in Energy and Environmental Design – New
Construction (USGBC LEED™-NC) guideline with Gold as the targeted
certification level; and the Green Building Initiative (GBI), Green Globes guideline
with Three Globes the targeted certification level; and for the Colorado
Department of Education, K-12 construction, the Collaborative for High
Performance Schools (US-CHPS) is an optional guideline with Verified Leader as
the targeted certification level.
4.4.1.2 – LEED, or Leadership in Energy and Environmental Design (for schools) is a
globally recognized symbol of excellence in green building.
4.4.1.2.1
LEED is an internationally recognized certification system that
measures a building using several metrics, including: energy savings,
water efficiency, sustainable land use, improved air quality, and
stewardship of natural resources.
4.4.1.2.2
Points are awarded on a 100-point scale, and credits are
weighted to reflect their potential environmental impacts. Different levels
of certification are granted based on the total number of earned points.
The four progressive levels of certification from lowest to highest are:
certified, silver, gold and platinum.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
ed on a 100-point scale, and credits are
weighted to reflect their potential environmental impacts. Different levels
of certification are granted based on the total number of earned points.
The four progressive levels of certification from lowest to highest are:
certified, silver, gold and platinum.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

17
4.4.1.3 United States Collaborative for High Performance Schools (US-CHPS). US-
CHPS reflects the three priority outcomes of the Core Criteria. These are, in
order of importance.
4.4.1.3.1
Maximize the health and performance of students and staff.
4.4.1.3.2
Conserve energy, water and other resources in order to save
precious operating dollars.
4.4.1.3.3
Minimize material waste, pollution and environmental
degradation created by a school.
4.4.1.3.4
The CHPS National Technical Committee has weighted the
available point totals for prerequisites and credits in seven categories to
reflect these three priorities.
4.4.2
Renewable energy strategies.
4.4.2.1 - Solar Photovoltaic / Solar Thermal.
4.4.2.1.1
SB 20-124 Requires consultation with the incumbent electric
utility regarding energy efficiency; beneficial electrification, as defined in
section 40-3.2-106 (6)(a); and renewable distributed generation
opportunities.
4.4.2.2 - Geothermal / Geo exchange.
4.4.2.3 - Wind.
4.4.2.4 - Passive Solar Design.
4.4.3
Energy management plan.
4.4.3.1 - Energy programs assist with creating a culture of energy efficiency within a
school. Reference Energy Star Guidelines for Energy Management to help
develop a plan.
4.4.4
Other energy efficient options.
4.4.4.1 - ENERGY STAR Labeled HVAC / mechanical systems.
4.4.4.2 - Windows, doors, and skylights (collectively known as fenestration).
4.4.4.3 - Building Envelope
3
Energy management plan.
4.4.3.1 - Energy programs assist with creating a culture of energy efficiency within a
school. Reference Energy Star Guidelines for Energy Management to help
develop a plan.
4.4.4
Other energy efficient options.
4.4.4.1 - ENERGY STAR Labeled HVAC / mechanical systems.
4.4.4.2 - Windows, doors, and skylights (collectively known as fenestration).
4.4.4.3 - Building Envelope.
4.4.4.3.1
- The interface between the interior of the building and the
outdoor environment, including the walls, roof, and foundation – serves
as a thermal barrier and plays an important role in determining the
amount of energy necessary to maintain a comfortable indoor
environment relative to the outside environment.
4.4.4.3.2
- Roof. Roof design and materials can reduce the amount of air
conditioning required in hot climates by increasing the amount of solar
heat that is reflected, rather than absorbed, by the roof. For example,

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

18
roofs that qualify for ENERGY STAR® are estimated to reduce the
demand for peak cooling by 10 to 15 percent.
4.4.4.3.3
- Insulation is important throughout the building envelope.
4.4.4.4 - Lighting.
4.4.4.4.1
- Light emitting diodes (LEDs), compact fluorescents (CFLs) and
fluorescent lighting should be considered over traditional incandescent
lighting.
4.4.4.4.5
- Commissioning, retro commissioning and re-commissioning.
4.4.4.4.5.1
- Commissioning ensures that a new building operates initially as
the owner intended and that building staff are prepared to operate and
maintain its systems and equipment.
4.4.4.4.5.2
- Retro commissioning is the application of the commissioning
process to existing buildings.
4.4.4.4.5.3
- Re-commissioning is another type of commissioning that
occurs when a building that has already been commissioned, undergoes
another commissioning process.
4.4.4.4.6
- Measurement and verification
d that building staff are prepared to operate and
maintain its systems and equipment.
4.4.4.4.5.2
- Retro commissioning is the application of the commissioning
process to existing buildings.
4.4.4.4.5.3
- Re-commissioning is another type of commissioning that
occurs when a building that has already been commissioned, undergoes
another commissioning process.
4.4.4.4.6
- Measurement and verification.
4.4.4.4.6.1
Measurement and verification (M&V) is the term given to the process for
quantifying savings delivered by an Energy Conservation Measure (ECM), as
well as the sub-sector of the energy industry involved with this practice. M & V
demonstrates how much energy the ECM has avoided using, rather than the total
cost saved.
4.4.4.4.7
- Landscaping
4.4.4.4.7.1
Irrigation: Consider water management which could include reducing
storm-water run-off, preventing erosion and decreasing the effects of soil
expansion.
4.4.4.4.7.2
Plant Materials: Consider Native materials, Xeriscaping.
4.4.4.4.7.3
Grass/ Sod Areas: Consider use of grass/ sod areas, consider water use,
alternate options if planting sports fields.
4.4.4.4.8
– Permitting
4.4.4.4.8.1
Application for public school construction projects permits can be made
at the DFPC website, www.colorado.gov/dfpc > Sections > Fire & Life Safety >
Permits and Construction > School Construction.
4.4.4.4.8.2
If a local building department has entered into a memorandum of
understanding (MOU) with DFPC, that local building department is considered a
Prequalified Building Department (PBD). A School District may, at its discretion,
choose to apply for permit through DFPC or the PBD that has jurisdiction of
construction projects for the location of the school construction project. The list of
PBD’s is available on the DFPC website, School Construction.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance
alified Building Department (PBD). A School District may, at its discretion,
choose to apply for permit through DFPC or the PBD that has jurisdiction of
construction projects for the location of the school construction project. The list of
PBD’s is available on the DFPC website, School Construction.

CODE OF COLORADO REGULATIONS
1 CCR 303-1
Division of Public School Capital Construction Assistance

19
4.5
The historic significance of existing public school facilities and their potential to meet current
programming needs by rehabilitating such facilities.
4.5.1
Buildings that are 50 years or older at the time of application may be subject to the State
Register Act 24-80.1-101 to 108 in determining if the affected properties have historical
significance.
4.5.1.1 - Historical significance means having importance in the history,
architecture, archaeology, or culture of this state or any political
subdivision thereof or of the United States, as determined by the state
historical society.
4.5.2
When determining if a facility should be replaced, the cost to rehabilitate versus the cost to
replace should be evaluated.

## Nearby sections

- [1 CCR 303-1 RULES PERTAINING TO THE ADMINISTRATION OF THE PUBLIC SCHOOL CAPITAL CONSTRUCTION ASSISTANCE BOARD](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_1_CCR_303_1.md)
- [1 CCR 303-2 RULES PERTAINING TO THE CAPITAL CONSTRUCTION ASSISTANCE FULL-DAY KINDERGARTEN FACILITY PROGRAM](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_1_CCR_303_2.md)
- [1 CCR 303-3 BUILDING EXCELLENT SCHOOLS TODAY GRANT PROGRAM](https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_1_CCR_303_3.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/STATE_CO_CCR_1_CCR_303_1. Check the current official text before relying on it. Not legal advice.
