# 60 FR 17902: Standard Design Certification for the U.S. Advanced Boiling Water Reactor Design

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-8379

## Section

- **Citation:** 60 FR 17902
- **Heading:** Standard Design Certification for the U.S. Advanced Boiling Water Reactor Design
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Federal Register / Vol. 60 / 60 FR 17902

## Text

Part III

Nuclear Regulatory Commission

_______________________________________________________________________

10 CFR Part 52

_______________________________________________________________________

Standard Design Certifications: System 80+ Design and U.S. Advanced
Boiling Water Reactor Design; Proposed Rules

Rules

NUCLEAR REGULATORY COMMISSION

10 CFR PART 52

RIN 3150-AE87

Standard Design Certification for the U.S. Advanced Boiling Water
Reactor Design

AGENCY: Nuclear Regulatory Commission.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Nuclear Regulatory Commission (NRC or Commission) proposes
to approve by rulemaking a standard design certification for the U.S.
Advanced Boiling Water Reactor (ABWR) design. The applicant for
certification of the U.S. ABWR design was GE Nuclear Energy. The NRC is
proposing to add a new appendix to 10 CFR part 52 for the design
certification. This action is necessary so that applicants or licensees
intending to construct and operate a U.S. ABWR design may do so by
appropriately referencing the proposed appendix. The public is invited
to submit comments on this proposed design certification rule (DCR) and
the design control document (DCD) that is incorporated by reference
into the DCR (refer to Sections IV and V). The Commission also invites
the public to submit comments on the environmental assessment for the
U.S. ABWR design (refer to Section VI).

DATES: The comment period expires on August 7, 1995. Comments received
after this date will be considered if it is practical to do so, but the
Commission is only able to assure consideration for comments received
on or before this date. In addition, interested parties may request an
informal hearing before the Atomic Safety and Licensing Board Panel, in
accordance with 10 CFR 52.51, on matters pertaining to this design
certification rulemaking (refer to Section V). Requests for an informal
hearing must be submitted by August 7, 1995.
ommission is only able to assure consideration for comments received
on or before this date. In addition, interested parties may request an
informal hearing before the Atomic Safety and Licensing Board Panel, in
accordance with 10 CFR 52.51, on matters pertaining to this design
certification rulemaking (refer to Section V). Requests for an informal
hearing must be submitted by August 7, 1995.

ADDRESSES: Mail written comments and requests for an informal hearing
to: The Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555, Attention: Docketing and Service
Branch. Comments may also be delivered to 11555 Rockville Pike,
Rockville, MD, between 7:30 am and 4:15 pm on Federal workdays. Copies
of comments received will be available for examination and copying at
the NRC Public Document Room (PDR) at 2120 L Street NW. (Lower Level),
Washington, DC. A copy of the environmental assessment and the design
control document is also available for examination and copying at the
PDR.

FOR FURTHER INFORMATION CONTACT: Harry S. Tovmassian, Office of Nuclear
Regulatory Research, telephone (301) 415-6231, Jerry N. Wilson, Office
of Nuclear Reactor Regulation, telephone (301) 415-3145, or Geary S.
Mizuno, Office of the General Counsel, telephone (301) 415-1639, U.S.
Nuclear Regulatory Commission, Washington, DC 20555.
SUPPLEMENTARY INFORMATION:

Table of Contents

I. Background.
II. Public comment summary and resolution
Tovmassian, Office of Nuclear
Regulatory Research, telephone (301) 415-6231, Jerry N. Wilson, Office
of Nuclear Reactor Regulation, telephone (301) 415-3145, or Geary S.
Mizuno, Office of the General Counsel, telephone (301) 415-1639, U.S.
Nuclear Regulatory Commission, Washington, DC 20555.
SUPPLEMENTARY INFORMATION:

Table of Contents

I. Background.
II. Public comment summary and resolution.
Topic 1--Acceptability of a Two-Tiered Design Certification Rule
Structure
Topic 2--Acceptability of the Process and Standards for Changing
Tier 2 Information
Topic 3--The Acceptability of a Tier 2 Exemption
Topic 4--Acceptability of Using a Change Process, Similar to the
One in 10 CFR 50.59 Applicable to Operating Reactors, Prior to the
Issuance of a Combined License that References a Certified Design
Topic 5--The Acceptability of Identifying Selected Technical
Positions From the FSER as ``Unreviewed Safety Questions'' that
Cannot Be Changed Under a ``Section 50.59-Like'' Change Process
Topic 6--Need for Modifications to 10 CFR 52.63(b)(2) If the
Two-Tiered Structure for the Design Certification Rule is Approved
Topic 7--Whether the Commission Should Either Incorporate or
Identify the Information in Tier 1 or Tier 2 or Both in the Combined
License
Topic 8--Acceptability of Using Design Specific Rulemakings
Rather Than Generic Rulemaking for the Technical Issues Whose
Resolution Exceeds Current Requirements
Topic 9--The Appropriate Form and Content of a Design Control
Document
III. Section-by-section discussion of design certification rule.
A. Scope.
B. Definitions.
C. [Reserved].
D. Contents of the design certification.
E. Exemptions and applicable regulations.
F. Issue resolution for the design certification.
G. Duration of the design certification.
H. Change process.
I. Records and reports.
J. Applicability of a DCR in 10 CFR Part 50 licensing
proceedings.
IV. Specific requests for comments.
V. Comments and hearings in the design certification rulemaking.
A
ed].
D. Contents of the design certification.
E. Exemptions and applicable regulations.
F. Issue resolution for the design certification.
G. Duration of the design certification.
H. Change process.
I. Records and reports.
J. Applicability of a DCR in 10 CFR Part 50 licensing
proceedings.
IV. Specific requests for comments.
V. Comments and hearings in the design certification rulemaking.
A. Opportunity to submit written and electronic comments.
B. Opportunity to request hearing.
C. Hearing process.
D. Resolution of issues for the final rulemaking.
E. Access to proprietary information in rulemaking.
F. Ex parte and separation of functions restrictions.
VI. Finding of no significant environmental impact: availability.
VII. Paperwork reduction act statement.
VIII. Regulatory analysis.
IX. Regulatory Flexibility Act certification.
X. Backfit analysis.

I. Background

On September 29, 1987, General Electric Company applied for
certification of the U.S. ABWR standard design with the NRC. The
application was made in accordance with the procedures specified in 10
CFR part 50, appendix O, and the Policy Statement on Nuclear Power
Plant Standardization, dated September 15, 1987. The application was
docketed on February 22, 1988 (Docket No. STN 50-605).
On May 18, 1989 (54 FR 15372), the NRC added 10 CFR part 52 to its
regulations to provide for the issuance of early site permits, standard
design certifications, and combined licenses for nuclear power
reactors. Subpart B of 10 CFR part 52, established the process for
obtaining design certifications. A major purpose of this rule was to
achieve early resolution of licensing issues and to enhance the safety
and reliability of nuclear power plants
rt 52 to its
regulations to provide for the issuance of early site permits, standard
design certifications, and combined licenses for nuclear power
reactors. Subpart B of 10 CFR part 52, established the process for
obtaining design certifications. A major purpose of this rule was to
achieve early resolution of licensing issues and to enhance the safety
and reliability of nuclear power plants.
On December 20, 1991, GE Nuclear Energy (GE), an operating
component of General Electric Company's power systems business,
requested that its application, originally submitted pursuant to 10 CFR
part 50, appendix O, be considered as an application for design
approval and subsequent design certification pursuant to 10 CFR 52.45.
Notice of receipt of this request was published in the Federal Register
on March 20, 1992 (57 FR 9749), and a new docket number (52-001) was
assigned. GE's application, the ABWR Standard Safety Analysis Report
(SSAR) up to and including amendment 35 (Revision 7) and the Certified
Design Material, Revision 6, is available for inspection and copying at
the PDR.
The NRC staff issued a final safety evaluation report (FSER)
related to the certification of the U.S. ABWR design in July 1994
(NUREG-1503). The FSER documents the results of the NRC staff's safety
review of the U.S. ABWR design against the requirements of 10 CFR part
52, subpart B, and delineates the scope of the technical details
considered in evaluating the proposed design. A copy of the FSER may be
obtained from the Superintendent of Documents, Government Printing
Office, Mail Stop SSOP, Washington, DC 20402-9328 or the National
Technical Information Service, Springfield, VA 22161.
The final design approval (FDA) for the U.S. ABWR design was issued on
July 13, 1994, and published in the Federal Register on July 20, 1994
(59 FR 37058). A revised version of the FDA was issued on November 23,
1994 and published in the Federal Register on December 1, 1994 (59 FR
61647)
top SSOP, Washington, DC 20402-9328 or the National
Technical Information Service, Springfield, VA 22161.
The final design approval (FDA) for the U.S. ABWR design was issued on
July 13, 1994, and published in the Federal Register on July 20, 1994
(59 FR 37058). A revised version of the FDA was issued on November 23,
1994 and published in the Federal Register on December 1, 1994 (59 FR
61647).
Since the issuance of 10 CFR part 52, the NRC staff has been
working to implement subpart B with issues such as the acceptability of
using a two-tiered design certification rule and the level of design
detail required for design certification. The NRC staff originally
proposed a design certification rule for evolutionary standard plant
designs in SECY-92-287, ``Form and Content for a Design Certification
Rule.'' On March 26, 1993, the NRC staff issued SECY-92-287A in which
it responded to issues on SECY-92-287, which were put forth by the
Commission and to specific questions raised by Commissioner Curtiss in
a letter dated September 9, 1992. Subsequently, the NRC staff modified
the draft rule in SECY-92-287 to incorporate Commission guidance and
published a draft-proposed design certification rule in the Federal
Register on November 3, 1993 (58 FR 58665), as an Advanced Notice of
Proposed Rulemaking (ANPR) for public comment. On November 23, 1993,
the NRC staff discussed this ANPR in a public workshop entitled
``Topics Related to Certification of Evolutionary Light Water Reactor
Designs.'' All holders of operating licenses or construction permits
were informed of the issuance of the ANPR and the planned public
workshop through the issuance of NRC Administrative Letter 93-05 on
October 29, 1993
for public comment. On November 23, 1993,
the NRC staff discussed this ANPR in a public workshop entitled
``Topics Related to Certification of Evolutionary Light Water Reactor
Designs.'' All holders of operating licenses or construction permits
were informed of the issuance of the ANPR and the planned public
workshop through the issuance of NRC Administrative Letter 93-05 on
October 29, 1993. Separate announcements of the workshop were also sent
to the Union of Concerned Scientists, the Nuclear Information and
Resource Service, the Natural Resources Defense Council, the Public
Citizen Litigation Group, the Ohio Citizens for Responsible Energy
(OCRE), and the State of Illinois Department of Nuclear Safety on
October 18, 1993. An official transcript of the workshop proceedings is
available in the PDR.

Rulemaking Procedures

10 CFR part 52 provides for Commission approval of standard designs
for nuclear power facilities (e.g., design certification) through
rulemaking. In accordance with the Administrative Procedure Act (APA),
part 52 provides the opportunity for the public to submit written
comments on the proposed design certification rule. However, part 52
goes beyond the requirements of the APA by providing the public with an
opportunity to request a hearing before the Atomic Safety and Licensing
Board in a design certification rulemaking. While part 52 describes a
general framework for conducting a design certification rulemaking,
Sec. 52.51(a) states that more detailed procedures for the conduct of
each design certification will be specified by the Commission.
To assist the Commission in developing the detailed rulemaking
procedures, the NRC's Office of General Counsel (OGC) prepared a paper,
SECY-92-170 (May 8, 1992), which identified issues relevant to design
certification rulemaking procedures, and provided OGC's preliminary
analyses and recommendations with respect to those issues
each design certification will be specified by the Commission.
To assist the Commission in developing the detailed rulemaking
procedures, the NRC's Office of General Counsel (OGC) prepared a paper,
SECY-92-170 (May 8, 1992), which identified issues relevant to design
certification rulemaking procedures, and provided OGC's preliminary
analyses and recommendations with respect to those issues. SECY-92-170
was made public by the Commission, and a Commission meeting on this
paper was held on June 1, 1992.
Thereafter, in SECY-92-185 (May 19, 1992), OGC proposed holding a
public workshop for the purpose of facilitating public discussion on
the issues raised in SECY-92-170 and obtaining public comments on those
issues. The Commission approved OGC's proposal (See the May 28, 1992,
Memorandum from Samuel J. Chilk to William C. Parler). Notice of the
workshop was published in the Federal Register on June 9, 1992 (57 FR
24394). The notice also provided for a 30-day period following the
workshop for the public to submit written comments on SECY-92-170. A
transcript was kept of the workshop proceedings and placed in the PDR.
Nearly 50 non-NRC individuals attended the workshop; an additional
eight persons requested copies of SECY-92-170 and workshop materials
but did not attend. The workshop was organized in a panel format, with
representatives from OCRE (Susan Hiatt), NUMARC (Robert Bishop), GE and
Westinghouse--two design certification vendors (Marcus Rowden and
Barton Cowan), the State of Illinois Department of Nuclear Safety
(Stephen England), the State of New York Public Service Commission
(James Brew), the Administrative Conference of the United States
(William Olmstead), OGC, the NRC Staff, and a moderator. Eleven written
comments were received after the workshop, three from OCRE (OCRE August
1992 Comments; OCRE September 1992 Letter; OCRE October 1992 Letter),
NUMARC, Winston and Strawn, the State of Illinois Department of Nuclear
Safety, Westinghouse Energy Systems, the U.S
(James Brew), the Administrative Conference of the United States
(William Olmstead), OGC, the NRC Staff, and a moderator. Eleven written
comments were received after the workshop, three from OCRE (OCRE August
1992 Comments; OCRE September 1992 Letter; OCRE October 1992 Letter),
NUMARC, Winston and Strawn, the State of Illinois Department of Nuclear
Safety, Westinghouse Energy Systems, the U.S. Department of Energy,
Asea Brown Boveri-Combustion Engineering (ABB-CE), and AECL
Technologies1. Mr. Rowden submitted an additional comment on
behalf of NUMARC which addresses proprietary information.

\1\AECL is the vendor for the CANDU 3 design.
---------------------------------------------------------------------------

OGC's final analyses and recommendations for design certification
rulemaking procedures were set forth in SECY-92-381 (November 10,
1992). This paper was prepared after consideration of the panel
discussions at the public workshop and the written comments received
after the workshop. On April 30, 1993, the Commission issued a
Memorandum to the General Counsel which sets forth the Commission's
determinations with respect to the procedural issues raised by the
General Counsel's paper. Section V. below, ``Comments and Hearings in
the Design Certification Rulemaking,'' describes the procedures to be
utilized in this design certification rulemaking.

II. Public Comment Summary and Resolution
93, the Commission issued a
Memorandum to the General Counsel which sets forth the Commission's
determinations with respect to the procedural issues raised by the
General Counsel's paper. Section V. below, ``Comments and Hearings in
the Design Certification Rulemaking,'' describes the procedures to be
utilized in this design certification rulemaking.

II. Public Comment Summary and Resolution

The public comment period for the ANPR for rulemakings to grant
standard design certification for evolutionary light water reactor
designs expired on January 3, 1994. Six comment letters were received.
Five comment letters were from the nuclear industry (i.e., vendors,
utilities, and industry representatives) and one from a public interest
organization. Most of the commenters addressed the nine topics upon
which the NRC sought the public's views. The Commission has carefully
considered all the comments and wishes to express its sincere
appreciation of the often considerable efforts of the commenters.
In the following public comment summary and resolution and in the
section-by-section discussion (Section III below), the discussion
refers to ``Commission approval'' of NRC staff-proposed positions or
recommendations. This should be understood as meaning the Commission's
tentative approval of those positions or recommendations for purposes
of: (i) The NRC staff's review of the ABWR design certification
application, and (ii) preparation of this notice of proposed
rulemaking. The public may submit comments and request an informal
hearing with respect to any of the ``Commission approved'' positions or
recommendations (comments and hearings are discussed in further detail
in Section V).
All of the commenters supported the basic concept of the design
certification rulemaking approach including the two-tiered structure
for design information. The Nuclear Management and
Resources Council, which has since been subsumed within the Nuclear
Energy Institute (NEI), commented for the nuclear industry
commendations (comments and hearings are discussed in further detail
in Section V).
All of the commenters supported the basic concept of the design
certification rulemaking approach including the two-tiered structure
for design information. The Nuclear Management and
Resources Council, which has since been subsumed within the Nuclear
Energy Institute (NEI), commented for the nuclear industry. GE Nuclear
Energy, Westinghouse, and ABB-CE stated that they participated in the
preparation of the NEI comments and fully supported them. One
additional letter addressing the U.S. ABWR rulemaking was received from
Marcus Rowden of the law firm of Fried, Frank, Harris, Shriver &
Jacobson, dated September 20, 1994. This letter was written on behalf
of GE Nuclear Energy and contained a proposed draft rule for the NRC
staff's consideration in the U.S. ABWR rulemaking process. Mr. Rowden's
proposed rule is different in some aspects from the rule proposed by
the NRC staff in this Federal Register notice. The issues raised by the
significant differences between Mr. Rowden's proposed rule and the
proposed rule in this Federal Register notice have been appropriately
considered and discussed in the following public comment summary and
resolution or in the section-by-section discussion:
Topic 1--Acceptability of a Two-Tiered Design Certification Rule
Structure
Comment Summary. On behalf of the nuclear industry, NEI stated that
a two-tiered structure to a design certification rule is practical and
fully consistent with the intent and requirements of 10 CFR part 52.
OCRE stated that it fully supports the concept set forth in the ANPR
provided that the Tier 2 information is subject to public challenge in
the standard design certification and any associated hearing.
Response
lf of the nuclear industry, NEI stated that
a two-tiered structure to a design certification rule is practical and
fully consistent with the intent and requirements of 10 CFR part 52.
OCRE stated that it fully supports the concept set forth in the ANPR
provided that the Tier 2 information is subject to public challenge in
the standard design certification and any associated hearing.
Response. Although a two-tiered structure for design certification
rules was not envisioned or subsequently deemed necessary to implement
standard design certifications under 10 CFR part 52, the Commission
approved the use of a two-tiered structure for a design certification
rule in its SRM of February 15, 1991, on SECY-90-377, ``Requirements
for Design Certification Under 10 CFR part 52,'' in response to a
request from NEI dated August 31, 1990. Since then, the NRC staff has
worked to develop a two-tiered rule that achieves industry's goal of
issue preclusion for a greater amount of information than was
originally planned for design certification, while retaining
flexibility for design implementation.
Tier 1 information is defined in section 2(b) of the proposed rule
and is treated as the certified information that is controlled by the
change standards of 10 CFR 52.63. Tier 2 information is defined in
section 2(c) of the proposed rule and consists primarily of the
information submitted in an application for design certification. The
information in the two tiers is interdependent. Therefore, an applicant
for a construction permit, operating license, or combined license (COL)
that references this design certification must reference both tiers of
information. The consolidation of both tiers of information into a
Design Control Document (DCD) will provide an effective means of
maintaining this information and facilitating its incorporation into
the rule by reference
ent. Therefore, an applicant
for a construction permit, operating license, or combined license (COL)
that references this design certification must reference both tiers of
information. The consolidation of both tiers of information into a
Design Control Document (DCD) will provide an effective means of
maintaining this information and facilitating its incorporation into
the rule by reference. All matters covered in each tier, including the
determination of what information should be placed in each tier, are
subject to public challenge in the design certification rulemaking and
any associated hearing.
Topic 2--Acceptability of the Process and Standards for Changing Tier 2
Information
Comment Summary. NEI concurs in the process and standards to be
used by COL holders and applicants for evaluating and implementing
changes to Tier 2 information via the so-called ``Sec. 50.59-like''
change process. However, NEI does not agree with the statement in the
ANPR (Section A.13(d)(3)) that ``changes properly implemented through
this ``Sec. 50.59-like'' process cause a loss of finality relative to
the affected portion of the design or are subject to subsequent legal
challenge.'' NEI contends that these changes would be sanctioned
through the design certification rule and that the only issue
entertainable at the time of the COL licensing proceeding would be
whether the licensee complied with the ``Sec. 50.59-like'' change
process. Likewise, changes made subsequent to COL issuance could be
challenged in the part 52 proceeding before fuel-load authorization
only on the basis that the change resulted in noncompliance with
applicable acceptance criteria. However, NEI recognizes that changes
from Tier 2 that require NRC approval would be subject to a hearing
opportunity as specified in 10 CFR part 52.
OCRE stated that it is important that applicant or licensee
initiated changes to Tier 2 information made pursuant to the
``Sec
l-load authorization
only on the basis that the change resulted in noncompliance with
applicable acceptance criteria. However, NEI recognizes that changes
from Tier 2 that require NRC approval would be subject to a hearing
opportunity as specified in 10 CFR part 52.
OCRE stated that it is important that applicant or licensee
initiated changes to Tier 2 information made pursuant to the
``Sec. 50.59-like'' process will no longer be afforded the issue
preclusion protection of 10 CFR 52.63. To do otherwise would turn the
two-tiered system into a double standard in which utilities could
deviate from the standard design but the public could not challenge
these deviations. Permitting site-specific litigation of these changes
would also serve to discourage changes.
Response. In order to implement the two-tiered structure for design
certification rules, the Commission proposes a change process for Tier
2 information that has the same elements as the Tier 1 change process.
Specifically, the Tier 2 change process has provisions for generic
changes, plant-specific changes, and exemptions similar to those in 10
CFR 52.63. Although the NRC staff proposed that the backfitting
standards for making generic changes to Tier 2 information should be
less stringent than those for Tier 1 information, the Commission
disapproved this proposal in its SRM on SECY-92-287A, dated June 13,
1993, and stated that ``the backfitting standards of 10 CFR 52.63
should be applied for such changes to Tier 2.'' As a result, the NRC
staff adopted the backfitting standards of 10 CFR 52.63 in the Tier 2
change process proposed in the ANPR, except that the additional factor
regarding ``any decrease in safety that may result from the reduction
in standardization'' was not adopted for plant-specific changes and
exemptions in order to achieve additional flexibility for Tier 2
information
nges to Tier 2.'' As a result, the NRC
staff adopted the backfitting standards of 10 CFR 52.63 in the Tier 2
change process proposed in the ANPR, except that the additional factor
regarding ``any decrease in safety that may result from the reduction
in standardization'' was not adopted for plant-specific changes and
exemptions in order to achieve additional flexibility for Tier 2
information.
The Tier 2 change process also has a provision similar to 10 CFR
50.59 that allows changes to Tier 2 information by an applicant or
licensee, without prior NRC approval, subject to certain restrictions.
The Commission approved this process in its SRM on SECY-90-377, dated
February 15, 1991, provided ``that such changes open the possibility
for challenge in a hearing.'' The NRC staff followed the Commission's
guidance in developing the process in ANPR Section A.13(d)(3) that
allows certain changes to Tier 2 information, without prior NRC
approval. This section of the ANPR states that ``Tier 2 changes will no
longer be considered matters resolved in connection with the issuance
or renewal of a design certification within the meaning of 10 CFR
52.63(a)(4).'' The NRC staff included this provision to meet Commission
guidance and to restrain Tier 2 changes in order to maintain the
benefits of standardization, as discussed in SECY-92-287. Also, changes
may be challenged in individual COL proceedings since the changes
depart from the design information approved in the design certification
rulemaking. Therefore, the Commission agrees with the OCRE position on
issue preclusion and specifically invites comments on this provision
(see Section IV).
Topic 3--The Acceptability of a Tier 2 Exemption
Comment Summary. NEI supports the inclusion of the provision that
an applicant or licensee may request, and the NRC may
grant, an exemption to Tier 2 information
the design certification
rulemaking. Therefore, the Commission agrees with the OCRE position on
issue preclusion and specifically invites comments on this provision
(see Section IV).
Topic 3--The Acceptability of a Tier 2 Exemption
Comment Summary. NEI supports the inclusion of the provision that
an applicant or licensee may request, and the NRC may
grant, an exemption to Tier 2 information. OCRE indirectly supports the
Tier 2 exemption provision but recommends that the sentence: ``These
Tier 2 changes will no longer be considered matters resolved in
connection with the issuance or renewal of a design certification
within the meaning of 10 CFR 52.63(a)(4)'' also be included in the
section A.13(d)(2) of the ANPR on exemptions from Tier 2 information,
for clarity, and because 10 CFR 52.63(b)(1) does not mention the two-
tiered system.
Response. In SECY-92-287A, the NRC staff proposed the addition of
an exemption provision to the Tier 2 change process so that the change
process for both tiers would have the same elements and to provide
additional flexibility to applicants or licensees that reference a
design certification rule. The Commission deferred its decision on an
exemption to the Tier 2 change process in its SRM dated June 23, 1993,
and requested the NRC staff to solicit public comments on this issue.
Because no commenter objected to the addition of a Tier 2 exemption
process and NEI supported the proposal, the provision was retained in
the proposed rule. However, OCRE proposed that Tier 2 exemptions lose
issue preclusion consistent with Tier 1 exemptions. Because that is
consistent with the NRC staff's approach to Tier 2 changes and the
Commission's guidance in its SRM on SECY-90-377 (see response to topic
#2), OCRE's proposal has been incorporated into the proposed rule
supported the proposal, the provision was retained in
the proposed rule. However, OCRE proposed that Tier 2 exemptions lose
issue preclusion consistent with Tier 1 exemptions. Because that is
consistent with the NRC staff's approach to Tier 2 changes and the
Commission's guidance in its SRM on SECY-90-377 (see response to topic
#2), OCRE's proposal has been incorporated into the proposed rule.
The additional standard in the Tier 1 exemption process, which
requires that ``any decrease in safety that may result from the
reduction in standardization caused by the exemption'' outweighs the
special circumstances in 10 CFR 50.12, was not included in the Tier 2
exemption process because the Commission views Tier 2 information as
more detailed descriptions of Tier 1 information that should have a
less stringent change standard than Tier 1 and the industry requested
additional flexibility for Tier 2 information. Therefore, the proposed
Tier 2 change process uses the same standard that is used for Part 50
exemptions, namely 10 CFR 50.12. The Commission believes that the loss
of issue preclusion for Tier 2 exemptions will help minimize the
consequences of the loss of standardization caused by these exemptions.
Topic 4--Acceptability of Using a Change Process, Similar to the one in
10 CFR 50.59 Applicable to Operating Reactors, Prior to the Issuance of
a Combined License that References a Certified Design.
Comment Summary. NEI concurs in the NRC's proposal to have the
``Sec. 50.59-like'' change process apply to both COL applicants and
licensees.
Response. In its SRM on SECY-92-287A, dated June 23, 1993, the
Commission approved the NRC staff's proposal to extend the use of the
``Sec. 50.59-like'' change process for Tier 2 information to applicants
that reference a certified design. Because NEI and other commenters
supported this proposal, this additional flexibility has been retained
for the proposed rule
L applicants and
licensees.
Response. In its SRM on SECY-92-287A, dated June 23, 1993, the
Commission approved the NRC staff's proposal to extend the use of the
``Sec. 50.59-like'' change process for Tier 2 information to applicants
that reference a certified design. Because NEI and other commenters
supported this proposal, this additional flexibility has been retained
for the proposed rule.
Topic 5--The Acceptability of Identifying Selected Technical Positions
From the FSER as ``Unreviewed Safety Questions'' That Cannot Be Changed
Under a ``Section 50.59-Like'' Change Process
Comment Summary. NEI commented that the proposal to predesignate
changes to certain design aspects as constituting ``unreviewed safety
questions'' is unnecessary and is tantamount to the creation of a third
tier of information, which runs counter to the two-tier structure. NEI
proposed that the selected Tier 2 material be designated, not broadly
in the rule, but specifically in the SSAR/FSER and the DCD as requiring
NRC staff notification before implementing the changes. NEI argued that
at the time of notification, the NRC staff could decide whether the
proposed change constitutes an ``unreviewed safety question,'' and the
applicant or COL holder would be prohibited from making the change
without either NRC staff concurrence or a successful appeal of the NRC
staff's determination. NEI also envisioned a time, subsequent to
completion of designs and the inspections, tests, analyses, and
acceptance criteria (ITAAC), when the change restriction for selected
Tier 2 material will no longer be necessary. NEI further stated that,
whether or not the Commission adopts NEI's proposal, the NRC staff
should be limited to design areas discussed with plant designers when
designations of ``unreviewed safety questions'' are made
mpletion of designs and the inspections, tests, analyses, and
acceptance criteria (ITAAC), when the change restriction for selected
Tier 2 material will no longer be necessary. NEI further stated that,
whether or not the Commission adopts NEI's proposal, the NRC staff
should be limited to design areas discussed with plant designers when
designations of ``unreviewed safety questions'' are made. Also, these
special designations should be as narrow and specific as practicable to
avoid the inadvertent broadening of this special category of Tier 2
design information and the excessive restrictions against change that
would result.
Response. The NRC's proposal to predesignate certain Tier 2
information that cannot be changed without prior NRC approval does not
create a third tier of information or conflict with the two-tiered rule
structure. In fact, this so-called Tier 2* information was created as a
consequence of industry's implementation of the two-tiered rule
structure. Specifically, industry's desire to minimize the amount of
information in Tier 1 and to use design acceptance criteria in lieu of
design information in certain areas resulted in the need to identify
significant Tier 2 information that could not be changed by an
applicant or licensee without prior NRC approval. The previous
reference to ``identified unreviewed safety questions'' in the ANPR was
made to indicate that the process for changing the so-called Tier 2*
information would be the same as for changing other Tier 2 information
that an applicant or licensee determines to constitute an unreviewed
safety question. Therefore, there is no third tier of information.
Rather, some Tier 2 information cannot be changed without prior NRC
approval and the remainder can. This is no different than the
information in a Final Safety Analysis Report relative to the process
in 10 CFR 50.59
e as for changing other Tier 2 information
that an applicant or licensee determines to constitute an unreviewed
safety question. Therefore, there is no third tier of information.
Rather, some Tier 2 information cannot be changed without prior NRC
approval and the remainder can. This is no different than the
information in a Final Safety Analysis Report relative to the process
in 10 CFR 50.59.
The Commission agrees with NEI that it would be clearer to future
users of the certified design if the specific information that has been
designated as requiring prior NRC approval (Tier 2*) is identified in
the DCD rather than summarized in the design certification rule (DCR).
However, the requirement for prior NRC approval does need to be
specified in the DCR for the Tier 2 change process. Therefore, the NRC
instructed the applicants to identify the Tier 2* information in the
DCD.
In response to NEI's request, the DCR will not identify the Tier 2*
information as an unreviewed safety question because that designation
is not required; only prior NRC approval is required. Therefore, the
Tier 2 change process has been revised to state that Tier 2*
information identified in the DCD cannot be changed without prior NRC
approval. Although Tier 2* changes may not result in unreviewed safety
questions, the public will be afforded an opportunity to challenge the
changes (see response to topic #2). The Commission also that the
predesignation of some of the Tier 2* information can expire when the
plant first achieves 100% power while other Tier 2* information must
remain in effect throughout the life of the plant that references the
DCR. This is because there is sufficient information in some of the
related areas of Tier 1 to control changes after the
plant is completed. The appropriate expiration point is designated in
their DCDs
f some of the Tier 2* information can expire when the
plant first achieves 100% power while other Tier 2* information must
remain in effect throughout the life of the plant that references the
DCR. This is because there is sufficient information in some of the
related areas of Tier 1 to control changes after the
plant is completed. The appropriate expiration point is designated in
their DCDs.
The NEI proposal to require notification of the NRC rather than
requiring NRC approval prior to changing the Tier 2* information would
create an unnecessary burden on the NRC in the Tier 2 change process.
The Commission has already determined that the predesignated Tier 2*
information is significant and cannot be changed before NRC approval.
Therefore, the Commission has not adopted the ``notification''
proposal. Also, the designation of Tier 2* information is not an
excessive restriction on the change process. Rather, it compensates for
industry's request to minimize the amount of information in Tier 1.
Topic 6--Need for Modifications to 10 CFR 52.63(b)(2) If the Two-Tiered
Structure for the Design Certification Rule is Approved
Comment Summary. OCRE commented that modifications to Sec. 52.63
are not necessary because the design certification rules would also
become regulations. NEI commented that changes to 10 CFR part 52 are
not needed at this time but that some changes to part 52 may be
identified as appropriate for future consideration based on experience
with the initial design certifications.
Response. When part 52 was written, Sec. 52.63(b)(2) was intended
to be the change process for information that was not referenced in the
design certification rule (non-certified information). Now that the
Commission has decided to implement a two-tiered rule structure as
described in the response to Topic #1, the two-tiered change process
applies to all information referenced by the design certification rule.
Therefore, there does not appear to be a need for Sec
the change process for information that was not referenced in the
design certification rule (non-certified information). Now that the
Commission has decided to implement a two-tiered rule structure as
described in the response to Topic #1, the two-tiered change process
applies to all information referenced by the design certification rule.
Therefore, there does not appear to be a need for Sec. 52.63(b)(2) in a
two-tiered rule structure.
In the absence of any perceived need for changes to 10 CFR
52.63(b)(2) to accommodate the two-tiered concept in design
certification, the Commission does not intend to modify 10 CFR part 52
at this time. However, as NEI suggests, the Commission is evaluating
the need for changes to part 52 as it gains experience with the initial
design certification reviews.
Topic 7--Whether the Commission Should Either Incorporate or Identify
the Information in Tier 1 or Tier 2 or Both in the Combined License
Comment Summary. On the question of whether Tier 1 or Tier 2
information should be incorporated in the combined license (COL) or
identified in the COL, NEI stated that this question need not be
resolved for design certification purposes but provided two
alternatives for future NRC consideration. Alternative one would be to
incorporate Tier 1 information and identify Tier 2 information in the
COL. The second alternative would be to incorporate both tiers of
information in the rule, provided that the Tier 2 change provisions are
incorporated in the rule as well.
OCRE stated that both Tier 1 and Tier 2 information should be
incorporated in the COL because both tiers contain important design
information.
Response. The NRC is deferring the decision on this issue because
resolution of this issue is not needed to develop a design
certification rule. However, because the commenters all supported
incorporation of both tiers of information, the NRC staff will evaluate
that option for a combined license under subpart C of 10 CFR part 52
e COL because both tiers contain important design
information.
Response. The NRC is deferring the decision on this issue because
resolution of this issue is not needed to develop a design
certification rule. However, because the commenters all supported
incorporation of both tiers of information, the NRC staff will evaluate
that option for a combined license under subpart C of 10 CFR part 52.
Topic 8--Acceptability of Using Design Specific Rulemakings Rather Than
Generic Rulemaking for the Technical Issues Whose Resolution Exceeds
Current Requirements
Comment Summary. NEI, GE Nuclear Energy, and Westinghouse Electric
Corporation took exception with the NRC position on the issue of
designating severe accident and technical requirements, beyond those in
current regulations as ``applicable regulations'' in the design
certification rule. NEI stated that ``Commission approved NRC staff
positions will be reflected in a design certification rule by means of
design provisions contained in Tier 1 and Tier 2 of the DCD
incorporated in the rule.'' NEI argued that the NRC staff's proposed
approach would result in needless duplication, complexity, and delay
because matters that have been agreed to in detail would then be
formulated in broadly stated positions requiring another round of
extensive discussions to reach agreement in a process equivalent to a
series of complex, discrete rulemakings. In addition, NEI stated that
these ``broadly stated, free standing applicable regulations carry the
potential for new and diverse interpretations by the NRC staff during
the life of the design certification.'' These interpretations may be at
odds with the understandings that translated into specific Tier 1 and
Tier 2 requirements in the DCD
alent to a
series of complex, discrete rulemakings. In addition, NEI stated that
these ``broadly stated, free standing applicable regulations carry the
potential for new and diverse interpretations by the NRC staff during
the life of the design certification.'' These interpretations may be at
odds with the understandings that translated into specific Tier 1 and
Tier 2 requirements in the DCD. GE Nuclear Energy reiterated these
comments but added that ``The course proposed by the NRC staff would
enormously complicate pre-rulemaking preparation, the conduct of the
rulemakings themselves and COL licensing and post-licensing facility
construction and operation. It would, moreover, impose schedule delays
and generate needless duplication, if not outright conflicts.'' Also,
NEI saw little difference between the proposal to incorporate
applicable regulations in design certification rules and the similar
effect of proceeding with generic severe accident rulemaking.
OCRE stated that the resolution of technical issues whose
resolution exceeds current requirements will likely be design-specific
and therefore, it may make little difference whether the rulemakings
are design-specific or generic. OCRE further stated that, if the NRC
wants all plants constructed after a certain date to incorporate
certain design features or otherwise address certain technical issues,
then a generic rulemaking may be the safest and most cost-effective way
to accomplish this goal. OCRE also noted that a generic rule would
cover an applicant that might decide not to use a standard certified
design.
Response. The Commission has used design-specific rulemaking rather
than generic rulemaking for the selected technical and severe accident
issues that go beyond current requirements for light-water reactors
(LWRs). The Commission adopted this approach, early in the review
process, because it believed that the new requirements would be design-
specific, as OCRE stated
andard certified
design.
Response. The Commission has used design-specific rulemaking rather
than generic rulemaking for the selected technical and severe accident
issues that go beyond current requirements for light-water reactors
(LWRs). The Commission adopted this approach, early in the review
process, because it believed that the new requirements would be design-
specific, as OCRE stated. Also, the NRC was concerned that generic
rulemakings would cause significant delay in the design certification
reviews. The Commission approved this approach in its SRM on SECY-91-
262, dated January 28, 1992, and has continued to support this approach
for evolutionary LWRs, as stated in its SRM on SECY-93-226, dated
September 14, 1993. The Commission has deferred its decision on the
need for generic rulemaking for advanced LWRs.
Both the industry and OCRE concluded that there would be little
difference in the requirements for the certified designs, regardless if
the approach was generic or design-specific. The Commission agrees that
at the conclusion of the design certification rulemaking the effect of
the new regulations is basically the same but that the specific wording
of the regulations may have been different if generic rulemaking was
used.
In implementing the goals of 10 CFR part 52 and the Commission's
Severe Accident Policy Statement (50 FR 32138; August 8, 1985), the NRC
staff set out to achieve a higher level of safety performance for both
evolutionary and passive LWR designs in the area of severe accidents
and in other selected areas. The NRC staff proposed new
requirements to implement these goals in various
Commission papers, such as SECY-90-016 and SECY-93-087. The NRC staff
then selected the applicable requirements for each evolutionary design
and evaluated the design information that describes how those
requirements were met in the FSERs for the U.S. ABWR and System 80+
designs
ccidents
and in other selected areas. The NRC staff proposed new
requirements to implement these goals in various
Commission papers, such as SECY-90-016 and SECY-93-087. The NRC staff
then selected the applicable requirements for each evolutionary design
and evaluated the design information that describes how those
requirements were met in the FSERs for the U.S. ABWR and System 80+
designs. In the proposed rule for each design, the NRC has identified
these requirements as applicable regulations in order to specify the
requirements that were applicable and in effect at the time the
certification was issued for the purposes of Secs. 52.48, 52.54, 52.59,
and 52.63.
These applicable regulations, which were identified in each FSER,
are set forth in the design certification rule, with minor editing, to
achieve codification through the design certification rulemaking. These
codified regulations, which supplement the list of regulations in
Sec. 52.48, become part of the Commission's regulations that are
``applicable and in effect at the time the certification was issued.''
Without this complete list of applicable regulations, the NRC staff
could not perform reviews in accordance with Secs. 52.59 and 52.63. By
codifying these requirements, the NRC intends to make it clear that for
the purpose of renewal of a certified design under Sec. 52.59, these
requirements are part of the applicable regulations in effect at the
time that the design certification was first issued. The NRC also
intends to make it clear that the Commission may, pursuant to
Sec. 52.63(a) (1) and (3), impose modification of Tier 1 information or
to issue a plant-specific order, respectively, to ensure that the
certified design or the plant complies with the applicable regulations
of the design certification rule
lations in effect at the
time that the design certification was first issued. The NRC also
intends to make it clear that the Commission may, pursuant to
Sec. 52.63(a) (1) and (3), impose modification of Tier 1 information or
to issue a plant-specific order, respectively, to ensure that the
certified design or the plant complies with the applicable regulations
of the design certification rule. The rationale is that the Commission
could not, without re-reviewing the merits of each position, impose a
change to Tier 1 information or issue a plant-specific order merely
because the modification was necessary for compliance with a matter
involving these proposed requirements. Also, the Commission would not
have a complete baseline of regulations for evaluating proposed changes
from the public, applicants, or licensees, thereby degrading the
predictability of the licensing process.
The codification of these proposed requirements, in reference to
Sec. 52.48, is also necessary for two other reasons. First, it serves
as a basis for obtaining public comment on the proposed adoption of the
requirements as applicable regulations. Second, it provides
confirmation that the requirements are being adopted by the Commission
as applicable regulations under Sec. 52.54 for the design certification
being approved. In the absence of this codification, a design
certification applicant could argue that the Commission cannot lawfully
condition approval of the design certification on compliance with the
proposed requirements used during its review of the design. This is
because the requirements are not ``applicable standards and
requirements of the * * * Commission's regulations'' without further
Commission action under Sec. 52.54.
By identifying the regulations that are applicable to each design,
the Commission has improved the stability and predictability of the
licensing process
ith the
proposed requirements used during its review of the design. This is
because the requirements are not ``applicable standards and
requirements of the * * * Commission's regulations'' without further
Commission action under Sec. 52.54.
By identifying the regulations that are applicable to each design,
the Commission has improved the stability and predictability of the
licensing process. By approving the design information that describes
how these regulations were met, the Commission has minimized the
potential for a differing interpretation of the regulations. Finally,
the NRC staff told NEI in a meeting on April 25, 1994, and in a letter
dated July 25, 1994, that the industry-proposed alternative to
applicable regulations was unacceptable. The NRC staff stated that
design information cannot function as a surrogate for design-specific
(applicable) regulations because this information describes only one
method for meeting the regulation and would not provide a basis for
evaluating proposed changes to the design information. Therefore,
consideration of the comments on Topic #8 has not altered the
Commission's decision to proceed with design-specific rulemaking for
the proposed requirements and to publish the appropriate applicable
regulations in each design certification rule.
Topic 9--The Appropriate Form and Content of a Design Control Document
Comment Summary. Concerning the form and content of the DCD, NEI
envisioned a document that consisted of three parts including an
introductory section, Tier 1 information, and Tier 2 information. NEI
also proposed an algorithm that described the industry's view of the
contents of a DCD.
NEI stated that, based on its interactions with the NRC staff on
the guidance for preparing a DCD, two main issues have emerged. The
first issue is the nature and treatment for rulemaking purposes of
secondary references contained in the DCD. At issue is the extent to
which references to codes, standards, Regulatory Guides, etc
thm that described the industry's view of the
contents of a DCD.
NEI stated that, based on its interactions with the NRC staff on
the guidance for preparing a DCD, two main issues have emerged. The
first issue is the nature and treatment for rulemaking purposes of
secondary references contained in the DCD. At issue is the extent to
which references to codes, standards, Regulatory Guides, etc. need to
be explicitly ``incorporated by reference'' in specific design
certification rules (DCRs). It is industry's position that the burden
of incorporating these secondary references into the rule would
outweigh the increase in regulatory certainty and predictability that
such an effort would provide. The second issue relates to the
regulatory significance of information contained in the DCD and, in
particular, design Probabilistic Risk Assessment (PRA) information.
Specifically, NEI is concerned with the inclusion of the design PRA in
the DCD and a perceived requirement to use the PRA to support the
``50.59-like'' change process.
Response. As defined in SECY-92-287, the DCD is the master document
that contains the Tier 1 and 2 information referenced by the design
certification rule. The NRC staff has had several meetings with the
design certification applicants on the preparation of a DCD and
provided guidance to the applicants in letters dated August 26, 1993;
August 3 and 5, 1994; and October 4, 1994. Although the Commission
agrees with NEI on the basic form of the DCD, it does not agree with
NEI's proposed algorithm on the contents of a DCD.
Because the DCD is the master reference document, it should, to the
extent possible, retain as much of the applicant's standard safety
analysis report (SSAR), as required in 10 CFR 52.47. Due to the
requirement that all information incorporated in the rule be publicly
available, proprietary and safeguards information cannot be included in
the DCD
proposed algorithm on the contents of a DCD.
Because the DCD is the master reference document, it should, to the
extent possible, retain as much of the applicant's standard safety
analysis report (SSAR), as required in 10 CFR 52.47. Due to the
requirement that all information incorporated in the rule be publicly
available, proprietary and safeguards information cannot be included in
the DCD. Also, the NRC concluded that the detailed methodology and
quantitative portions of the design PRA do not need to be included in
the DCD but the assumptions, insights, and discussions of PRA analyses
must be retained in the DCD. The NRC also decided that COL applicants
and licensees will be encouraged, but not required, to use the PRA to
support the change process. This position was predicated in part upon
NEI's acceptance, in conceptual form, of a future generic rulemaking
that requires a COL applicant or holder to have a plant-specific PRA
that updates and supersedes the design PRA to account for site-specific
and detailed as-built aspects of the plant. The Commission approved the
requirement for a plant-specific PRA in its SRM on SECY-94-182,
``Probabilistic Risk Assessment (PRA) Beyond Design Certification,'' in
approving the development of a generic ``Operational Rule'' that would
apply to all COL applicants and holders. The remainder of the
applicant's SSAR, including all of the assumptions, issue resolutions,
and safety analyses, should be retained in the DCD.
With regard to NEI's concern with secondary references, the NRC
staff met with NEI on January 6, 1994, and issued a letter to NEI on
May 3, 1994, that documented an agreement with the
industry on the resolution of this issue. The agreement states that
combined license (COL) applicants and licensees who reference a DCR
will treat these secondary references as requirements, in the context
that they are described in the documents referenced in the DCD
e NRC
staff met with NEI on January 6, 1994, and issued a letter to NEI on
May 3, 1994, that documented an agreement with the
industry on the resolution of this issue. The agreement states that
combined license (COL) applicants and licensees who reference a DCR
will treat these secondary references as requirements, in the context
that they are described in the documents referenced in the DCD.
However, these secondary references will not be incorporated by
reference in the DCR, and thus there is no issue preclusion for
secondary references. With the above stated guidance, the NRC believes
that the appropriate form and content of a DCD has been defined.

III. Section-by-Section Discussion of Design Certification Rule

Pursuant to 10 CFR part 52, subpart B, the NRC has been working for
some time to develop a rule that will achieve the Commission's goals
for standard design certifications. Therefore, this proposed rule seeks
to achieve the early resolution of safety issues and to enhance the
safety and reliability of nuclear power plants. The Commission also
expects to achieve a more predictable and stable licensing process
through the certification of standard designs by rulemaking. An
applicant for a combined license (COL) that references a design
certification rule (DCR) must meet the requirements in the DCR and in
the design control document that is incorporated by reference in the
DCR.
The NRC staff's first proposal of a standard design certification
rule was provided in Enclosure 1 to SECY-92-287, dated August 18, 1992.
This proposal was modified based on Commission guidance, and an updated
version was published in appendix 2 to the ANPR. The proposed rule in
this Federal Register notice has the same basic form and content as the
ANPR version, but there has been some reorganization of the contents.
The following discusses the purpose and key aspects of each section of
the rule and also discusses issues raised on those sections that are
not covered in the public comment summary
version was published in appendix 2 to the ANPR. The proposed rule in
this Federal Register notice has the same basic form and content as the
ANPR version, but there has been some reorganization of the contents.
The following discusses the purpose and key aspects of each section of
the rule and also discusses issues raised on those sections that are
not covered in the public comment summary. Changes made to the ANPR
version of the proposed rule for the sake of clarity, brevity,
consistency, or organization are not discussed below.
All references to the proposed rule are to the provisions in
proposed appendix A to 10 CFR part 52.

A. Scope

The purpose of Section 1 of the proposed rule entitled, ``Scope,''
is to identify the standard plant design that is to be approved by this
design certification rule. The applicant for certification of the
design is also identified in this section. While the design
certification applicant does not have special rights pursuant to this
rule, the implementation of 10 CFR 52.63(c) depends on whether an
applicant for a COL contracts with the design certification applicant
to provide the certified design. If the COL applicant does not use the
design certification applicant to provide the design, then it may have
to meet the requirements in 10 CFR 52.63(c). Also, the proposed rule
imposes a requirement on the design certification applicant in Section
9(a)(1). Therefore, identification of the design certification
applicant is necessary to implement this rule.
Because the requirements of 10 CFR 52.63(c) apply to an applicant
for a COL, the NRC proposes that this requirement be added to 10 CFR
part 52 of subpart C, specifically to a new section 10 CFR 52.79(e).
The NRC requests comments on the desirability of making this change to
10 CFR part 52 (refer to Section IV).
B. Definitions
esign certification
applicant is necessary to implement this rule.
Because the requirements of 10 CFR 52.63(c) apply to an applicant
for a COL, the NRC proposes that this requirement be added to 10 CFR
part 52 of subpart C, specifically to a new section 10 CFR 52.79(e).
The NRC requests comments on the desirability of making this change to
10 CFR part 52 (refer to Section IV).
B. Definitions

The terms Tier 1, Tier 2, and Tier 2* are defined in Section 2, of
the proposed rule entitled ``Definitions,'' because these concepts were
not envisioned at the time that 10 CFR part 52 was developed. The
design certification applicants and the NRC used these terms in
implementing the two-tiered rule structure that was proposed by
industry after the issuance of part 52 (refer to discussion on Topic
#1). The design control document (DCD) contains both the Tier 1 and 2
information, along with an introduction. After the issuance of the
ANPR, the phrase Tier 2* was added to the list of definitions. Some of
the information in Tier 2 that requires special treatment in the change
process was commonly referred to as Tier 2* during the design review.
Therefore, the Commission believes that it would be useful to define
and use this phrase in the proposed rule. Further information on
changes to or departures from information in the DCD is provided below
in the discussion on Section 8, ``Change Process.'' The NRC requests
suggestions on other words or phrases that may need to be defined in
this rule (refer to Section IV).

C. [Reserved]

The purpose of Section 3, ``Information collection requirements,''
in the proposed rule was originally intended to provide the citation
for the control number which has been assigned by the Office of
Management and Budget when it approved the information collection
requirements in this rulemaking. Because this citation has been placed
in Sec. 52.8, section 3 to the rule is no longer necessary.

D. Contents of the Design Certification
llection requirements,''
in the proposed rule was originally intended to provide the citation
for the control number which has been assigned by the Office of
Management and Budget when it approved the information collection
requirements in this rulemaking. Because this citation has been placed
in Sec. 52.8, section 3 to the rule is no longer necessary.

D. Contents of the Design Certification

Section 4 of the proposed rule entitled, ``Contents of the design
certification,'' identifies the design-related information that is
incorporated by reference into this rule (4(a)) and includes some
related provisions of the proposed rule (4(b) and (c)). Both tiers of
design-related information have been combined into a single document,
called the design control document (DCD), in order to effectively
control this information and facilitate its incorporation into the rule
by reference (refer to Topic #9 for discussion on the DCD). The DCD was
prepared to meet the requirements of the Office of the Federal Register
(OFR) for incorporation by reference (1 CFR part 51). Section 4(a) of
this proposed rule would incorporate the DCD by reference upon approval
of the Director, OFR. The legal effect of incorporation by reference is
that the material is treated as if it were published in the Federal
Register. This material, like any other properly issued regulation, has
the force and effect of law.
An applicant for a construction permit or COL that references this
design certification rule must conform with the requirements in the
proposed rule and the DCD. The master DCD for this design certification
will be archived at NRC's central file with a matching copy at OFR.
Copies of the up-to-date DCD will also be maintained at the NRC's
Public Document Room and library. Questions concerning the accuracy of
information in an application that references this design certification
will be resolved by checking the master DCD in NRC's central file
he DCD. The master DCD for this design certification
will be archived at NRC's central file with a matching copy at OFR.
Copies of the up-to-date DCD will also be maintained at the NRC's
Public Document Room and library. Questions concerning the accuracy of
information in an application that references this design certification
will be resolved by checking the master DCD in NRC's central file. If a
generic change (rulemaking) is made to the DCD pursuant to the change
process in Section 8 of the proposed rule, then at the completion of
the rulemaking the NRC will change its copies of the DCD and notify the
OFR and design certification applicant to change their copies.
The applicant for this design certification rule is responsible for
preparing the DCD in accordance with NRC and OFR requirements and
maintaining an up-to-date copy pursuant to Section 9(a)(1) of the
proposed rule. Plant-specific changes to and departures from the DCD
will be maintained by the applicant or licensee that references this
design certification pursuant to Section 9(a)(2) of the proposed rule.
In order to meet the requirements of OFR for incorporation by
reference, the originator of the DCD (design
certification applicant) must make the document available upon request
after the final design certification rule is issued. Therefore, the
proposed rule states that copies of the DCD can be obtained from the
applicant or an organization designated by the applicant. The applicant
for this design certification has stated that it plans to request
distribution of its DCD by the National Technical Information Service
(NTIS). If the applicant selects an organization, such as NTIS, to
distribute the DCD, then the applicant must provide that organization
with an up-to-date copy. A copy of the DCD must also be made available
at the NRC and OFR.
The DCD contains an introduction that explains the purpose and uses
of the DCD and two tiers of design-related information
the National Technical Information Service
(NTIS). If the applicant selects an organization, such as NTIS, to
distribute the DCD, then the applicant must provide that organization
with an up-to-date copy. A copy of the DCD must also be made available
at the NRC and OFR.
The DCD contains an introduction that explains the purpose and uses
of the DCD and two tiers of design-related information. The
significance of designating design information as Tier 1 or Tier 2 is
that different change processes and criteria apply to each tier, as
explained in Section H ``change process'' below. The introduction to
the DCD is neither Tier 1 nor Tier 2 information, and is not part of
the information in the DCD that is incorporated by reference into this
design certification rule. Rather, the DCD introduction constitutes an
explanation of requirements and other provisions of this design
certification rule. If there is a conflict between the explanations in
the DCD introduction and the explanations of this design certification
rule in these statements of consideration (SOC), then this SOC is
controlling.
The Tier 1 portion of the design-related information contained in
the DCD is certified by this rule. This information consists of an
introduction to Tier 1, the certified design descriptions and
corresponding inspections, tests, analyses, and acceptance criteria
(ITAAC) for systems and structures of the design, design material
applicable to multiple systems of the design, significant interface
requirements, and significant site parameters for the design. The NRC
staff's evaluation of the Tier 1 information, including a description
of how this information was developed is provided in Section 14.3 of
the FSER.
The information in the Tier 1 portion of the DCD was extracted from
the detailed information contained in the application for design
certification
sign, significant interface
requirements, and significant site parameters for the design. The NRC
staff's evaluation of the Tier 1 information, including a description
of how this information was developed is provided in Section 14.3 of
the FSER.
The information in the Tier 1 portion of the DCD was extracted from
the detailed information contained in the application for design
certification. The Tier 1 information addresses the most safety-
significant aspects of the design, and was organized primarily
according to the structures and systems of the design. Additional
design material and related ITAAC is also provided in Tier 1 for
selected design and construction activities that are applicable to
multiple systems of the design. The Tier 1 design descriptions serve as
design commitments for the lifetime of a facility referencing the
design certification, and the ITAAC verify that the as-built facility
conforms with the approved design and applicable regulations. In
accordance with 10 CFR 52.103(g), the Commission must find that the
acceptance criteria in the ITAAC are met before operation. After the
Commission has made the finding required by 10 CFR 52.103(g), the ITAAC
do not constitute regulatory requirements for subsequent modifications.
However, subsequent modifications to the facility must comply with the
Tier 1 design descriptions, unless changes are made in accordance with
the change process in Section 8 of this proposed rule.
The Tier 1 interface requirements are the most significant of the
interface requirements for the standard design, which were submitted in
response to 10 CFR 52.47(a)(1)(vii), that must be met by the site-
specific portions of a facility that references the design
certification. The Tier 1 site parameters are the most significant site
parameters, which were submitted in response to 10 CFR
52.47(a)(1)(iii), that must be addressed as part of the application for
a construction permit or COL
standard design, which were submitted in
response to 10 CFR 52.47(a)(1)(vii), that must be met by the site-
specific portions of a facility that references the design
certification. The Tier 1 site parameters are the most significant site
parameters, which were submitted in response to 10 CFR
52.47(a)(1)(iii), that must be addressed as part of the application for
a construction permit or COL.
Tier 2 is the portion of the design-related information contained
in the DCD that is approved by this rule but is not certified. Changes
to or departures from the certified design material (Tier 1) must
comply with Section 8(a) of this proposed rule. Changes to or
departures from the approved information (Tier 2) must comply with
Section 8(b) of this proposed rule. Tier 2 includes the information
required by 10 CFR 52.47 and supporting information on the inspections,
tests, and analyses that will be performed to demonstrate that the
acceptance criteria in the ITAAC have been met. Compliance with the
more detailed Tier 2 information provides a sufficient method, but not
the only acceptable method, for complying with the more general design
requirements included in Tier 1. A supplementary description of Tier 2
information is provided in the DCD introduction. If an applicant or
licensee used methods other than those described in Tier 2, then the
alternative method would be open to staff review and a possible subject
for a hearing.
When completing the design information for a plant, an applicant
for a COL must conform with all of the requirements in the DCD, unless
the information in the DCD is changed pursuant to the process in
Section 8 of this proposed rule. The change process defines the
procedural differences between Tier 1 and 2
lternative method would be open to staff review and a possible subject
for a hearing.
When completing the design information for a plant, an applicant
for a COL must conform with all of the requirements in the DCD, unless
the information in the DCD is changed pursuant to the process in
Section 8 of this proposed rule. The change process defines the
procedural differences between Tier 1 and 2. Accordingly, an applicant
for a construction permit or COL, or licensee that references this
certified design must conform with all of the requirements from the
DCD, including the codes, standards, and other guidance documents that
are referenced from the DCD (so-called secondary references). The
industry agreed to treat these secondary references as requirements
even though they are not incorporated by reference, in the context as
described in the DCD, as set forth in a letter from Dennis Crutchfield
of the NRC to Joe Colvin of the Nuclear Energy Institute, dated May 3,
1994.
An applicant for a construction permit or COL that references this
proposed rule must also describe those portions of the plant design
which are site-specific, and demonstrate compliance with the interface
requirements, as required by 10 CFR 52.79(b). The COL applicant does
not need to conform with the conceptual design information in the DCD
that was provided by the design certification applicant in response to
10 CFR 52.47(a)(1)(ix). The conceptual design information, which are
examples of site-specific design features, was required to facilitate
the design certification review, and it is neither Tier 1 nor 2. The
introduction to the DCD identifies the location of the conceptual
design information and explains that this information is not applicable
to a COL application.
An applicant must address COL Action Items, which are identified in
the DCD as COL License Information, in its COL application
n features, was required to facilitate
the design certification review, and it is neither Tier 1 nor 2. The
introduction to the DCD identifies the location of the conceptual
design information and explains that this information is not applicable
to a COL application.
An applicant must address COL Action Items, which are identified in
the DCD as COL License Information, in its COL application. The COL
Action Items (COL License Information) identify matters that need to be
addressed by an applicant or licensee that references the design
certification, as required by 10 CFR 52.77 and 52.79. A further
explanation of the status of the COL License Information is provided in
the DCD introduction. Also, the detailed methodology and quantitative
portions of the design-specific probabilistic risk assessment (PRA), as
required by 10 CFR 52.47(a)(1)(v), was not included in the DCD. The NRC
agreed with the design certification applicant's request to delete this
information because conformance with the deleted portions of the PRA is
not required. The NRC's position is also predicated in part upon NEI's
acceptance, in conceptual form, of a future generic rulemaking that
requires a COL applicant or licensee to have a plant-specific PRA that
updates and supersedes the design-specific PRA and
maintain it throughout the operational life of the plant.
The application for design certification contained proprietary and
safeguards information. This information was part of the NRC staff's
bases for its safety findings in the FSER. However, because of OFR
requirements, this information could not be included in the DCD.
Therefore, the proprietary and safeguards information, or its
equivalent, that was provided in the design certification application
but not included in the DCD, must be included as part of a COL
application. The NRC considers this information to be requirements for
plants that reference this rule
e FSER. However, because of OFR
requirements, this information could not be included in the DCD.
Therefore, the proprietary and safeguards information, or its
equivalent, that was provided in the design certification application
but not included in the DCD, must be included as part of a COL
application. The NRC considers this information to be requirements for
plants that reference this rule. Since this information was not
included in the DCD or otherwise approved by OFR for ``incorporation by
reference,'' it would not have issue preclusion in a construction
permit or COL proceeding.
There is other information that is within the scope of the
certified design (i.e. as-built, as-procured, and evolving technology
design information) that must be developed by a COL applicant or
holder. This detailed design information must be completed in
accordance with the requirements in the DCD and the acceptance criteria
in ITAAC, including DAC. Since the Tier 1 and 2 information is solely
contained within the DCD, the remainder of the design-related
information that is developed by a COL applicant or holder that
references this proposed rule will not be either Tier 1 or 2
information, whether it is within the scope of the design certification
or not. Therefore, the change process in Section 8 of this proposed
rule will not control this COL information. Although the change process
for this COL information does not need to be developed until a COL
application is submitted, the NRC is interested in the public's view on
how this information should be controlled (refer to Section IV).
The purpose of Section 4(b) of this proposed rule is to ensure that
an applicant that references this design certification references both
tiers of information in the DCD. The two tiers of information were
developed together and both tiers of information are needed to complete
the design of a plant that references the rule
w on
how this information should be controlled (refer to Section IV).
The purpose of Section 4(b) of this proposed rule is to ensure that
an applicant that references this design certification references both
tiers of information in the DCD. The two tiers of information were
developed together and both tiers of information are needed to complete
the design of a plant that references the rule. For example, the ITAAC
in Tier 1 contains not only the acceptance criteria for verifying that
the as-built plant conforms with the approved design, but it also
contains various design processes with acceptance criteria (DAC), for
completing selected areas of the plant design. The DAC are described in
Section 14.3 of the SSAR and FSER. The NRC staff relied on DAC for its
evaluation of selected design areas where the applicant for design
certification did not provide complete design information. Also, the
Tier 2 information contains explanations and procedures on how to
implement ITAAC. Therefore, the Commission proposes that an applicant
could not reference this design certification rule without meeting
ITAAC, even though it is not a requirement in 10 CFR part 50 (See
Section J for further discussion).
The applicant for design certification initially prepared the DCD
to be consistent with the SSAR and the NRC staff's FSER. The applicant
for design certification made some corrections and clarifications to
the DCD since the completion of the SSAR and issuance of the FSER. If
there is an inconsistency between the SSAR and the FSER, or between
either of these documents and the DCD, then the DCD is the controlling
document. That is the purpose of Section 4(c) of this proposed rule.

E. Exemptions and Applicable Regulations
licant
for design certification made some corrections and clarifications to
the DCD since the completion of the SSAR and issuance of the FSER. If
there is an inconsistency between the SSAR and the FSER, or between
either of these documents and the DCD, then the DCD is the controlling
document. That is the purpose of Section 4(c) of this proposed rule.

E. Exemptions and Applicable Regulations

The purpose of Section 5 of the proposed rule entitled,
``Exemptions and applicable regulations,'' of the proposed rule is to
identify the complete set of regulations that were applicable and in
effect at the time the design certification was issued for the purposes
of 10 CFR 52.48, 52.54, 52.59, and 52.63. In accordance with 10 CFR
52.48, the NRC staff used the technically relevant regulations (safety
standards) in 10 CFR parts 20, 50, 73, and 100 in performing its review
of the application for design certification. The effective date of the
applicable regulations is the date of the FSER, as set forth in Section
5(b) of the proposed rule. During its review of the application for
design certification, the NRC staff identified certain regulations for
which application of the regulation to the standard design would not
serve or was not necessary to achieve the underlying purpose of the
regulation. These proposed exemptions to the NRC's current regulations
are identified in Section 5(a) of this proposed rule. The basis for
these exemptions is provided in the FSER.
In implementing the goals of 10 CFR part 52 and the Commission's
Severe Accident Policy Statement, the NRC staff set out to achieve a
higher level of safety performance for both evolutionary and passive
LWR standard designs in the area of severe accidents and in other
selected areas
are identified in Section 5(a) of this proposed rule. The basis for
these exemptions is provided in the FSER.
In implementing the goals of 10 CFR part 52 and the Commission's
Severe Accident Policy Statement, the NRC staff set out to achieve a
higher level of safety performance for both evolutionary and passive
LWR standard designs in the area of severe accidents and in other
selected areas. As a result, the NRC staff proposed new requirements in
various Commission papers, such as SECY-90-016 and SECY-93-087, to be
used in the design certification review and treated as applicable
regulations in the design certification rulemaking (refer to discussion
on Topic #8). The bases for these requirements are set forth in SECY-
90-016 and SECY-93-087. The Commission approved the use of these
proposed regulations for purposes of the design certification review in
the respective SRMs. These proposed regulations deviated from or were
not embodied in current regulations applicable to the standard design.
The NRC staff then selected proposed regulations that were applicable
to the design under review and reviewed the design pursuant to these
applicable regulations. The FSER identifies the applicable regulations
that were used and describes how these regulations were met by the
design-related information in the SSAR. The Commission approved the
evaluation of the design pursuant to the applicable regulations in its
approval to publish the FSER.
These proposed applicable regulations are identified in Section
5(c) of this proposed rule to achieve codification through the design
certification rulemaking. The proposed applicable regulations in
Section 5(c) are substantively the same as those in the FSER but have
been edited for clarity
evaluation of the design pursuant to the applicable regulations in its
approval to publish the FSER.
These proposed applicable regulations are identified in Section
5(c) of this proposed rule to achieve codification through the design
certification rulemaking. The proposed applicable regulations in
Section 5(c) are substantively the same as those in the FSER but have
been edited for clarity. These codified requirements, which supplement
the regulations in Section 5(b), will become part of the Commission's
regulations that were ``applicable and in effect at the time the
certification was issued,'' if the Commission adopts them in the final
design certification rule. The Commission requests comments on whether
each specific applicable regulation is justified (refer to Section IV).
The codification of these additional requirements, in reference to
10 CFR 52.48, is necessary for two reasons. First, it serves as a basis
for obtaining public comment on the adoption of the proposed
requirements as applicable regulations. Second, it provides
confirmation that the requirements are being adopted by the Commission
as applicable regulations under Sec. 52.54 for the design certification
being approved. In the absence of this codification, a design
certification applicant could argue that the Commission cannot lawfully
condition approval of the design certification on compliance with the
requirements used during its review of the design. This is because the
proposed requirements, without further Commission action, could be
argued as not being ``applicable standards and requirements of the * *
* Commission's regulations'' under Sec. 52.54. Also,
without codification of the applicable regulations, the NRC could not
perform its reviews in accordance with Secs. 52.59 and 52.63. By
codifying these requirements, the NRC intends that for renewal of a
certified design under Sec
hout further Commission action, could be
argued as not being ``applicable standards and requirements of the * *
* Commission's regulations'' under Sec. 52.54. Also,
without codification of the applicable regulations, the NRC could not
perform its reviews in accordance with Secs. 52.59 and 52.63. By
codifying these requirements, the NRC intends that for renewal of a
certified design under Sec. 52.59, these requirements are part of the
applicable regulations in effect at the time that the design
certification was first issued.
The Commission may, pursuant to Sec. 53.63(a)(1) and (3), impose a
modification of Tier 1 information or issue a plant-specific order,
respectively, to ensure that the certified design or the plant complies
with the applicable regulations of the design certification rule. The
rationale is that the Commission could not, without re-reviewing the
merits of each position, impose a change to Tier 1 information or issue
a plant-specific order merely because the modification was necessary
for compliance with a matter involving these requirements. Also, the
Commission would not have a complete list of regulations for use in
evaluating requested changes from the public, applicants, or licensees,
thereby degrading the predictability of the licensing process.
By identifying the regulations that are applicable to each design,
the Commission has improved the stability and predictability of the
licensing process. By approving the design information that describes
how these regulations were met, the Commission has minimized the
potential for a differing interpretation of the regulations. Finally,
the NRC rejected NEI's proposed alternative to applicable regulations
in a meeting on April 25, 1994 and in a letter dated July 25, 1994.
NEI's proposal to use design information as a surrogate for design-
specific (applicable) regulations is not workable for proposed changes,
because the design information only represents one way of implementing
a regulation
tion of the regulations. Finally,
the NRC rejected NEI's proposed alternative to applicable regulations
in a meeting on April 25, 1994 and in a letter dated July 25, 1994.
NEI's proposal to use design information as a surrogate for design-
specific (applicable) regulations is not workable for proposed changes,
because the design information only represents one way of implementing
a regulation. The NRC would need the regulation for the design feature
in order to evaluate a proposed change to the design information.

F. Issue Resolution for the Design Certification

The purpose of Section 6 of the proposed rule entitled, ``Issue
resolution for the design certification'' is to identify the issues
that are considered resolved, if the Commission adopts a final design
certification rule, and therefore, these issues receive issue
preclusion within the scope and intent of 10 CFR 52.63(a)(4).
Specifically, all nuclear safety issues arising from the Atomic Energy
Act that are associated with the information in the NRC staff's FSER or
the applicant's DCD are resolved within the meaning of
Sec. 52.63(a)(4). All issues arising under the National Environmental
Policy Act of 1969 associated with the information in the NRC staff's
environmental assessment or the severe accident design alternatives in
the applicant's Technical Support Document are also resolved within the
scope and intent of Sec. 52.63(a)(4). The issues that are associated
with information that is not included in the DCD, such as proprietary
information, do not have issue preclusion within the meaning of 10 CFR
52.63(a)(4).

G. Duration of the Design Certification
al assessment or the severe accident design alternatives in
the applicant's Technical Support Document are also resolved within the
scope and intent of Sec. 52.63(a)(4). The issues that are associated
with information that is not included in the DCD, such as proprietary
information, do not have issue preclusion within the meaning of 10 CFR
52.63(a)(4).

G. Duration of the Design Certification

The purpose of Section 7 of the proposed rule entitled, ``Duration
of the design certification,'' is in part to specify the time period
during which the standard design certification may be referenced by an
applicant for a construction permit or COL, pursuant to 10 CFR 52.55.
This section of the rule also states that the design certification
remains valid for an applicant or licensee that references the design
certification until their application is withdrawn or their license
expires. Therefore, if an application references this design
certification during the 15-year period, then the design certification
rule continues in effect until the application is withdrawn or the
license issued on that application expires. Also, the design
certification continues in effect for the referencing license if the
license is renewed. The Commission intends for the proposed rule to
remain valid for the life of the plant that references the design
certification to achieve the benefits of standardization and licensing
stability. This means that rulemaking changes to or plant-specific
departures from information in the DCD must be made pursuant to the
change process in Section 8 of this proposed rule for the life of the
plant.

H. Change Process
s for the proposed rule to
remain valid for the life of the plant that references the design
certification to achieve the benefits of standardization and licensing
stability. This means that rulemaking changes to or plant-specific
departures from information in the DCD must be made pursuant to the
change process in Section 8 of this proposed rule for the life of the
plant.

H. Change Process

The purpose of Section 8 of the proposed rule entitled, ``Change
Process'' is to set forth the process for requesting rulemaking changes
to or plant-specific departures from information in the DCD. The
Commission has developed a more restrictive change process than for
plants that were licensed pursuant to 10 CFR part 50, in order to
achieve a more stable licensing process for applicants and licensees
that reference a design certification rule. The change process in
Section 8 is substantively the same as the process proposed in the
ANPR.2 As a result, Section 8(a) provides the process for changing
Tier 1 information and Section 8(b) provides the process for changing
Tier 2 information. The change process for Tier 1 information uses the
change process developed by the Commission in the 10 CFR part 52
rulemaking for certified design-related information. Therefore, the
provisions in Section 8(a) of the proposed rule simply refer to the
appropriate sections in 10 CFR 52.63. A description of the Tier 1
information that is controlled by Section 8(a) is provided in the above
discussion on contents of the design certification (III.D).
nge process developed by the Commission in the 10 CFR part 52
rulemaking for certified design-related information. Therefore, the
provisions in Section 8(a) of the proposed rule simply refer to the
appropriate sections in 10 CFR 52.63. A description of the Tier 1
information that is controlled by Section 8(a) is provided in the above
discussion on contents of the design certification (III.D).

\2\This change process has been reorganized for clarity and
conformance to the two-tiered rule structure, and to distinguish
between generic changes to Tier 1 and 2 information, which are
accomplished via rulemaking, and plant-specific departures from Tier
1 and 2 information, which may be accomplished by the process
defined in Section 8 of this proposed rule. For brevity, this SOC
refers to both aspects as constituting the ``change process'' for
this design certification rule.
---------------------------------------------------------------------------

As discussed in Topic #2, the NRC developed a change process for
Tier 2 that has the same elements as the Tier 1 change process.
Specifically, the Tier 2 change process in Section 8(b) has provisions
for generic changes, plant-specific orders, and exemptions similar to
those in 10 CFR 52.63, but some of the standards for plant-specific
orders and exemptions are different. The standards that must be met in
order to justify a generic change to either Tier 1 or 2 information are
the same. When NEI proposed a two-tiered structure for design
certification rules in its letter of August 31, 1990, it also stated
that ``NRC backfits involving matters described in the first tier would
be governed by the provisions of Sec. 52.63, whereas Sec. 50.109 would
govern backfitting as respects the second tier.'' As a result, the NRC
staff used the backfit standards in Sec. 50.109 for generic changes to
Tier 2 in its proposed design certification rule in SECY-92-287
ves this is acceptable
because the Tier 2 information is not as safety significant as the Tier
1 information. Therefore, Sections 8(b) (3) and (4) of the proposed
rule do not require the additional consideration of the reduction in
standardization caused by proposed departures from Tier 2 information.
A generic change to either Tier 1 or 2 information in the DCD is
accomplished by rulemaking. Any person seeking to make a generic change
to the DCD, including the applicant for this design certification, must
submit a petition pursuant to 10 CFR 2.802. This petition must describe
how the proposed change meets the standards in 10 CFR 52.63(a)(1) for
justifying a generic change to the DCD. Any generic changes to the DCD
resulting from the rulemaking will be noticed in the Federal Register.
The NRC will update the master DCD in its central files and the copies
in the NRC Library and public document room (refer to the discussion in
III.D). Under Sections 8(a) (2) and (b)(2) generic changes to Tier 1
and 2, respectively, will be applicable to all plants referencing the
design certification. However, if the NRC determines that a generic
change is not technically relevant to a particular plant, based on
plant-specific changes made pursuant to Section 8, then the generic
rulemaking will indicate that the change will not be applicable to that
plant. If the proposed change to the DCD also results in a violation of
an underlying regulation that is applicable to this design
certification, then an exemption to that regulation is also required.
A plant-specific departure from either Tier 1 or 2 information in
the DCD does not require rulemaking. Any person requesting a Commission
order directing a plant-specific change, including the applicant for
this design certification, must submit a petition pursuant to 10 CFR
2.206. This petition must describe how the proposed change meets the
standards in 10 CFR 52.63(a)(3) or Section 8(b)(3) for departures from
Tier 1 or Tier 2 information, respectively
n
the DCD does not require rulemaking. Any person requesting a Commission
order directing a plant-specific change, including the applicant for
this design certification, must submit a petition pursuant to 10 CFR
2.206. This petition must describe how the proposed change meets the
standards in 10 CFR 52.63(a)(3) or Section 8(b)(3) for departures from
Tier 1 or Tier 2 information, respectively. By contrast an applicant or
licensee that references this design certification rule may request
exemptions from Tier 1 or 2 information pursuant to 10 CFR 52.63(b)(1)
or Section 8(b)(4) of this rule, respectively. The NRC recognized that
there may be special circumstances pertaining to a particular applicant
or licensee that would justify an exemption from the DCD. The request
must describe how the exemption from Tier 1 or 2 meets the standards in
10 CFR 52.63(b)(1) or Section 8(b)(4) of this proposed rule,
respectively. The exemption may be contested in a hearing if the
exemption is granted in connection with issuance of a construction
permit, operating license, or combined license; it may also be
contested in a hearing if the exemption also requires the issuance of a
license amendment. If a plant-specific change or exemption from the DCD
also results in a violation of the underlying regulation that is
applicable to this design certification, then an exemption to that
regulation is also required.
In addition to the plant-specific changes described above, an
applicant or licensee that references this design certification rule
may depart from Tier 2 information, without prior NRC approval pursuant
to Section 8(b)(5) of this proposed rule. However, the Commission
believes that these changes should open the possibility for challenge
in a hearing (refer to discussion on Topic #2). The Commission approved
the use of this ``Sec. 50.59-like'' change process in its SRMs on SECY-
90-377 and SECY-92-287A
certification rule
may depart from Tier 2 information, without prior NRC approval pursuant
to Section 8(b)(5) of this proposed rule. However, the Commission
believes that these changes should open the possibility for challenge
in a hearing (refer to discussion on Topic #2). The Commission approved
the use of this ``Sec. 50.59-like'' change process in its SRMs on SECY-
90-377 and SECY-92-287A. The NRC is interested in the public's view on
how these changes could be challenged in a hearing (refer to Section
IV).
As in 10 CFR 50.59, an applicant or licensee cannot make changes
that involve an unreviewed safety question (USQ) or technical
specifications, without prior NRC approval. Also, for changes pursuant
to Section 8(b)(5), an applicant or licensee cannot make changes to
Tier 1 or Tier 2* information without prior NRC approval. If the
proposed change does not involve these factors, then the NRC will allow
changes to previously approved information in Tier 2 without prior NRC
approval. However, if the change involves an issue that the NRC staff
has not previously approved, then NRC approval is required. The process
for evaluating proposed tests or experiments not described in Tier 2
will be developed for an operating or combined license that references
this design certification (refer to Section IV).
The restriction on changing Tier 1 information is included in the
process in Section 8(b)(5) because this information can only be changed
pursuant to Section 8(a) of the proposed rule. Whereas, the restriction
on changing Tier 2* information resulted from the development of the
Tier 1 information in the DCD. A description of the Tier 1 information
is provided in the discussion in Section III.D on contents of the
design certification
tion is included in the
process in Section 8(b)(5) because this information can only be changed
pursuant to Section 8(a) of the proposed rule. Whereas, the restriction
on changing Tier 2* information resulted from the development of the
Tier 1 information in the DCD. A description of the Tier 1 information
is provided in the discussion in Section III.D on contents of the
design certification. During the development of the Tier 1 information,
the applicant for design certification requested that the amount of
information in Tier 1 be minimized to provide additional flexibility
for the applicant or licensee that references this design
certification. Also, many codes, standards, and design processes, which
were not specified in Tier 1, that are acceptable for meeting ITAAC
were specified in Tier 2. The result of these actions is that certain
relatively significant information only exists in Tier 2 and the NRC
staff did not want this significant information changed without prior
NRC approval. The NRC specified this information in its FSER and the
design certification applicant has identified this information in its
DCD. This information has come to be known as Tier 2* information and
it has compensated for industry's desire to minimize the amount of
information in Tier 1.
In the ANPR, the NRC referred to the Tier 2* information as pre-
identified unreviewed safety questions (USQs) because there was already
an established procedure in 10 CFR 50.59 for FSAR changes that
constitute USQs, which require NRC approval. NEI stated in its comments
on the ANPR that it was not necessary to create an artificial set of
USQs in order to accomplish the NRC's objective of requiring prior
approval. Therefore, the proposed rule was changed from the ANPR to
simply state that the Tier 2* information can not be changed without
prior NRC approval
FR 50.59 for FSAR changes that
constitute USQs, which require NRC approval. NEI stated in its comments
on the ANPR that it was not necessary to create an artificial set of
USQs in order to accomplish the NRC's objective of requiring prior
approval. Therefore, the proposed rule was changed from the ANPR to
simply state that the Tier 2* information can not be changed without
prior NRC approval. Also, NEI requested in its comments that the Tier
2* information not be identified in the design certification rule, as
was proposed in the ANPR, and that an expiration date be considered for
the restriction in the change process for Tier 2* information. NRC
agrees that Tier 2* information can be identified in the DCD and
Section 8(b)(5) of the proposed rule was changed accordingly. The NRC
also reevaluated the duration of the change restriction for Tier 2*
information and determined that some of the Tier 2* information can
expire when the plant first achieves 100% power while other Tier 2*
information must remain in effect throughout the life of the plant that
references the DCR. The DCD sets forth an expiration
date for some of the Tier 2* information.
As part of this rulemaking, the NRC is seeking public comments on
the appropriate regulatory process to use for review of proposed
changes to Tier 2* information. Currently, pursuant to 10 CFR 50.59,
the NRC approves changes to FSAR information that constitute a USQ or
involve technical specifications through the issuance of license
amendments
ation
date for some of the Tier 2* information.
As part of this rulemaking, the NRC is seeking public comments on
the appropriate regulatory process to use for review of proposed
changes to Tier 2* information. Currently, pursuant to 10 CFR 50.59,
the NRC approves changes to FSAR information that constitute a USQ or
involve technical specifications through the issuance of license
amendments. However, if an applicant or licensee requests NRC approval
for a proposed change to Tier 2* information, should the NRC review
process be similar to that for a USQ? While it is clear that these
proposed changes would all involve significant design-related
information and that prior review of proposed departures from Tier 2*
information is necessary, the NRC has not determined if it is always
appropriate to process the approved changes as either an amendment to
the license application or an amendment to the license, with the
requisite hearing rights. Therefore, the NRC requests the public's view
on the preferred regulatory process for these changes (refer to Section
IV).
An applicant or licensee that plans to depart from Tier 2
information, pursuant to Section 8(b)(5), must prepare a safety
evaluation which provides the bases for the determination that the
proposed change does not involve an unreviewed safety question, a
change to Tier 1 or Tier 2* information, or a change to the technical
specifications. In order to achieve the Commission's goals for design
certification, the evaluation needs to consider all of the matters that
were resolved in the DCD, including the generic issues discussed in
Chapter 20 of the FSER. The benefits of the early resolution of safety
issues would be lost if changes were made to the DCD that violated
these resolutions without NRC approval
chnical
specifications. In order to achieve the Commission's goals for design
certification, the evaluation needs to consider all of the matters that
were resolved in the DCD, including the generic issues discussed in
Chapter 20 of the FSER. The benefits of the early resolution of safety
issues would be lost if changes were made to the DCD that violated
these resolutions without NRC approval. The evaluation of the resolved
issues needs to consider the proposed change over the full range of
power operation from startup to shutdown, including issues resolved
under the heading of shutdown risk, as it relates to anticipated
operational occurrences, transients, and design basis accidents. The
evaluation should consider the tables in Sections 14.3 and 19.8 of the
DCD to ensure that the proposed change does not impact Tier 1. These
tables contain various cross-references from the plant safety analyses
in Tier 2 to the important parameters that were included in Tier 1.
Although many issues and analyses could have been cross-referenced, the
listings in these tables were developed only for key plant safety
analyses for the design. GE provided more detailed cross-references to
Tier 1 for these analyses in a letter dated March 31, 1994, and ABB-CE
provided more detailed cross-references in a letter dated June 10,
1994. The NRC does not endorse NSAC-125, ``Guidelines for 10 CFR 50.59
Safety Evaluations,'' for performing the safety evaluations required by
Section 8(b)(5) of the proposed rule. However, the NRC will work with
industry, if it is desired, to develop an appropriate guidance document
for implementing Section 8 after the final rule is issued.
During the review of its DCD, GE requested that the determination
of whether a proposed departure from Tier 2 information that involves
severe accident issues constitutes a USQ use criteria that are
different from the criteria for USQ determinations proposed in the ANPR
(10 CFR 50.59(a)(2))
to develop an appropriate guidance document
for implementing Section 8 after the final rule is issued.
During the review of its DCD, GE requested that the determination
of whether a proposed departure from Tier 2 information that involves
severe accident issues constitutes a USQ use criteria that are
different from the criteria for USQ determinations proposed in the ANPR
(10 CFR 50.59(a)(2)). GE argued that not all increases in the
probability or consequences of severe accidents are significant from a
safety standpoint. Minor increases in the probability of some accident
scenarios will not affect the overall core damage frequency or the
conclusions of the severe accident evaluations. Therefore, GE proposed
that changes to Tier 2 information that result in insignificant
increases in the probability or consequences of severe accidents not
constitute a USQ.
The NRC believes that it is important to preserve and maintain the
resolution of severe accident issues just like all other safety issues
that were resolved during the design certification review (refer to SRM
on SECY-90-377). However, because of the increased uncertainty in
severe accident issue resolutions, the NRC has proposed, in Section
8(b)(5), separate criteria for determining whether a departure from
information associated with severe accident issues constitutes a USQ.
The new criteria in Section 8(b)(5)(iii) will only apply to Tier 2
information that is associated with the severe accident issues
discussed in the section of the DCD identified in the rule. The
criteria for USQ determinations in Section 8(b)(5)(ii), which are the
same as those proposed in the ANPR, will apply to other Tier 2
information. If the proposed departure from Tier 2 information involves
the resolution of other safety issues in addition to the severe
accident issues, then the USQ determination should be based upon the
criteria in Section 8(b)(5)(ii)
ntified in the rule. The
criteria for USQ determinations in Section 8(b)(5)(ii), which are the
same as those proposed in the ANPR, will apply to other Tier 2
information. If the proposed departure from Tier 2 information involves
the resolution of other safety issues in addition to the severe
accident issues, then the USQ determination should be based upon the
criteria in Section 8(b)(5)(ii). The NRC is interested in the public's
view on whether the Tier 2 information involving resolutions of severe
accident issues should be treated differently for USQ determinations
than all other safety issues? If so, are the proposed criteria in
Section 8(b)(5)(iii) sufficient to determine if a proposed departure
from information associated with severe accident issues constitutes a
USQ? (Refer to Section IV).
The NRC is also proposing two additional provisions to the change
process that were not in the ANPR. The first is Section 8(b)(5)(iv),
which provides that changes made pursuant to Section 8(b)(5) do not
also require an exemption from the design certification rule. Because
the Tier 2 information is incorporated by reference into the design
certification, a departure from Tier 2 pursuant to Section 8(b)(5)
would also require an exemption from the design certification rule
absent this proposed provision. The second provision is Section 8(c),
which makes it clear that proposed changes to requirements in this
design certification rule that are neither Tier 1 nor Tier 2 must be
done by exemption pursuant to 10 CFR 50.12. Such requirements include
the recordkeeping and reporting requirements in Section 9 of this
proposed rule.

I. Records and Reports
fication rule
absent this proposed provision. The second provision is Section 8(c),
which makes it clear that proposed changes to requirements in this
design certification rule that are neither Tier 1 nor Tier 2 must be
done by exemption pursuant to 10 CFR 50.12. Such requirements include
the recordkeeping and reporting requirements in Section 9 of this
proposed rule.

I. Records and Reports

The purpose of Section 9 of this proposed rule entitled, ``Records
and Reports,'' is to set forth the requirements for maintaining records
of DCD changes and submitting reports to the NRC. This section is
similar to the requirements for records and reports in 10 CFR part 50
and Sec. 52.63(b)(2), with the following differences. Section 9(a)(1)
requires an applicant for design certification to maintain an up-to-
date copy of the DCD that includes all generic changes to Tier 1 and 2
information that are made by rulemaking. This will ensure that the
design certification applicant provides up-to-date versions of the DCD
to prospective applicants that want to reference this design
certification or to other interested parties who want copies of the
DCD. Section 9(a)(2) requires an applicant or licensee that references
this design certification to maintain an up-to-date plant-specific
version of the DCD that includes both generic changes to the DCD, as
well as plant-specific departures from the DCD. This ensures that the
plant records which include an accurate DCD reflecting information
specific to the plant as well as changes to the DCD.
The proposed rule also establishes reporting requirements in
Section 9(b) for applicants or licensees that reference this design
certification rule. The requirements in Section 9(b) are similar to the
reporting requirements in 10 CFR part 50, except that they include
reporting of changes to or departures from the plant-specific DCD
rmation
specific to the plant as well as changes to the DCD.
The proposed rule also establishes reporting requirements in
Section 9(b) for applicants or licensees that reference this design
certification rule. The requirements in Section 9(b) are similar to the
reporting requirements in 10 CFR part 50, except that they include
reporting of changes to or departures from the plant-specific DCD. In
addition, the reporting requirements in Section 9(b)
vary according to whether the changes are made as part of an
application, during plant construction, or during operation. Also, the
reporting frequency of summary reports of departures from and periodic
updates to the DCD increases during plant construction. If an applicant
that references this design certification rule decides to adopt
departures from the DCD that were developed, but not approved pursuant
to Section 8 of this proposed rule, before its application (i.e., first
of a kind engineering), then the proposed departures from the DCD must
be submitted with the initial application for a construction permit or
combined license.
For currently operating plants, a licensee is required to maintain
records of the basis for any design change made to the plant pursuant
to 10 CFR 50.59. Further, a licensee is required to provide a summary
of these changes to the NRC annually or along with updates to the final
safety analysis report pursuant to 10 CFR 50.71. The proposed rule
allows departures from the DCD during the periods of application,
construction, and operation of the plant. Therefore, the proposed rule
requires timely submittal of summary reports of departures from, as
well as updates to, the DCD during each of these intervals, consistent
with the Commission's guidance on reporting frequency in its SRM on
SECY-90-377
ant to 10 CFR 50.71. The proposed rule
allows departures from the DCD during the periods of application,
construction, and operation of the plant. Therefore, the proposed rule
requires timely submittal of summary reports of departures from, as
well as updates to, the DCD during each of these intervals, consistent
with the Commission's guidance on reporting frequency in its SRM on
SECY-90-377.
NEI proposed reporting of design changes at a 6-month interval, in
its comments on the ANPR, to ``avoid unnecessarily diverting owner/
operator resources to meet excessive reporting requirements.'' The NRC
modified the provisions in the proposed rule to relax the reporting
requirements before issuance of a construction permit or combined
license. During this interval, summary reports of changes and updates
to the DCD should be submitted to the NRC as part of the amendments to
the construction permit or combined license application. However, the
NRC does not agree with the NEI proposal for semi-annual reporting of
design changes during plant construction because it does not provide
for sufficiently timely notification of design changes. Therefore, the
Commission retained the requirement for quarterly reporting of changes
in the proposed rule during this interval. Also, the NRC relaxed the
provisions in Section 9(b) so that during operation of a plant, the
reporting requirements are the same as for currently operating plants.
The NRC Commission believes that quarterly reporting of design
changes during the period of construction are necessary to closely
monitor the status and progress of the construction of the plant. As
required by 10 CFR 52.99, the NRC must find that the ITAAC have been
successfully met. The ITAAC verify that the as-built facility conforms
with the approved design and emphasize design reconciliation and design
verification of the as-built plant
g of design
changes during the period of construction are necessary to closely
monitor the status and progress of the construction of the plant. As
required by 10 CFR 52.99, the NRC must find that the ITAAC have been
successfully met. The ITAAC verify that the as-built facility conforms
with the approved design and emphasize design reconciliation and design
verification of the as-built plant. To make its finding, the NRC must
tailor its inspection program to monitor the plant construction and
adjust its program to accommodate changes. Quarterly reporting of
design changes will facilitate these adjustments in a timely manner and
aids in a common understanding of the plant as the changes are being
made. This is particularly important in times where the number of
design changes could be significant, such as during the procurement of
components and equipment, detailed design of the plant at the start of
construction, and during pre-operational testing.
Section 9(c) of the proposed rule requires that records are kept
for the lifetime of a facility, as in 10 CFR part 50 and
Sec. 52.63(b)(2).
J. Applicability of a DCR in 10 CFR Part 50 Licensing Proceedings

Several provisions in 10 CFR part 52, subpart B, suggest that
design certification rules (DCRs) may be referenced not only in
combined license proceedings under 10 CFR part 52, subpart C, but also
in licensing proceedings under 10 CFR part 50. Section 52.63(c) states:

The Commission will require, prior to granting a construction
permit, combined license, or operating license which references a
standard design certification, that information normally contained
in certain procurement specifications and construction and
installation specifications be completed and available for audit if
such information is necessary for the Commission to make its safety
determination, including the determination that the application is
consistent with the certified design. (Emphasis supplied.)
nces a
standard design certification, that information normally contained
in certain procurement specifications and construction and
installation specifications be completed and available for audit if
such information is necessary for the Commission to make its safety
determination, including the determination that the application is
consistent with the certified design. (Emphasis supplied.)

See also Secs. 52.41, 52.55(b), 52.55(c), 52.63(a)(4), 52.63(b)(1).
However, these provisions in 10 CFR part 52, subpart B, are
inconsistent in identifying the type of part 50 proceeding in which
design certification rules may be referenced. For example, although
Sec. 52.63(c) (quoted above) and Sec. 52.55(c) explicitly provide for
referencing of design certification rules in 10 CFR part 50
construction permit proceedings, Secs. 52.55(b), 52.63(a)(4) and
52.63(b)(1) refer only to operating license proceedings. Section
52.63(a)(4) is illustrative:

Except as provided for in 10 CFR 2.758, in making the findings
required for issuance of a combined license or operating license, or
for any hearing under Sec. 52.103, the Commission shall treat as
resolved those matters resolved in connection with the issuance or
renewal of a design certification. (Emphasis supplied.)

Therefore, some might question whether the Commission intended
construction permits applicants under 10 CFR part 50 to have the option
of referencing design certification rules. However, the Commission has
not identified any regulatory or policy reasons for precluding a
construction permit applicant from referencing a design certification
rule while allowing an operating license applicant to do so. Thus, the
Commission believes that 10 CFR part 52 provides the discretion to
authorize a construction permit applicant under 10 CFR part 50 to
reference a design certification rule.
Assuming that the Commission has such discretion, there are a
number of issues that present themselves
pplicant from referencing a design certification
rule while allowing an operating license applicant to do so. Thus, the
Commission believes that 10 CFR part 52 provides the discretion to
authorize a construction permit applicant under 10 CFR part 50 to
reference a design certification rule.
Assuming that the Commission has such discretion, there are a
number of issues that present themselves. Should the Commission
exercise its discretion to allow construction permit applicants to
reference this design certification rule? Should the Commission require
that if a design certification rule is to be relied upon in part 50
licensing proceedings, it must be referenced in both the construction
permit and operating license applications? Would it make sense to allow
an operating license applicant to reference a design certification if
the underlying construction permit did not reference the design
certification? The Commission recognizes that consideration of these
issues depends in part upon the legal significance of a design
certification in the 10 CFR part 50 licensing proceeding, as well as
its significance for the permittee or licensee once the construction
permit or operating license is granted. In particular, 10 CFR part 52,
subpart B, does not say what the legal effect is (if any) of ITAAC in a
part 50 operating license proceeding in which

[Text truncated at 120,000 characters. The full text is on the page linked above.]

## Nearby sections

- [60 FR 89 Proposed Tolerance Revocation for Folpet; Extension of Comment Period and Request for Additional Information](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_94-32285.md)
- [60 FR 91 Television Broadcasting Services: Albion, Nebraska](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_94-32275.md)
- [60 FR 389 Airworthiness Directives; McDonnell Douglas Model DC-10 Series Airplanes and Model KC-10A (Military) Airplanes](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-62.md)
- [60 FR 393 Airworthiness Directives; Textron Lycoming LTS101 Series Turboshaft and LTP101 Series Turboprop Engines](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-64.md)
- [60 FR 397 Mark to Market for Dealers in Securities](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-13.md)
- [60 FR 1958 Designation of Lightering Zones](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-159.md)
- [60 FR 2033 Airworthiness Directives; Boeing Model 747 Series Airplanes Equipped With General Electric Model CF6-80C2 Series Engines or Pratt & Whitney Model PW4000 Series Engines](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-307.md)
- [60 FR 2067 Approval and Promulgation of Air Quality Implementation Plans; Maryland; VOC RACT Catch-ups and Stage I Vapor Recovery](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-287.md)
- [60 FR 2070 Listing Endangered and Threatened Species; Shortnose Sturgeon in the Kennebec River System (Maine)](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-275.md)
- [60 FR 2364 Anchorage Regulations; Regulated Navigation Areas and Limited Access Areas (CGD 86-079)](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-435.md)
- [60 FR 2365 Cable Compulsory License: Notice of Inquiry Regarding Merger of Cable Systems and Individual Pricing of Broadcast Signals](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-439.md)
- [60 FR 2563 Approval and Promulgation of Implementation Plans; California State Implementation Plan Revision, Placer County Air Pollution Control District (PCAPCD) and San Diego County Air Pollution Control District (SDCAPCD)](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-521.md)
- [60 FR 2630 Federal Acquisition Regulation; Protests, Disputes, and Appeals](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-482.md)
- [60 FR 2727 Acquisition Regulation; Acquisition and Use of Environmentally Preferable Products and Services](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-681.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/FR_PRORULE_95-8379. Check the current official text before relying on it. Not legal advice.