# 88 FR 28656: Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to the Coastal Virginia Offshore Wind Commercial Project Offshore of Virginia

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-08924

## Section

- **Citation:** 88 FR 28656
- **Heading:** Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to the Coastal Virginia Offshore Wind Commercial Project Offshore of Virginia
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Federal Register / Vol. 88 / 88 FR 28656

## Text

DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration 50 CFR Part 217 [Docket No. 230424-0110] RIN 0648-BL74 Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to the Coastal Virginia Offshore Wind Commercial Project Offshore of Virginia AGENCY:
National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce.

ACTION:
Proposed rule; proposed letter of authorization; request for comments.

SUMMARY:
NMFS has received a request from the Virginia Electric and Power Company, doing business as Dominion Energy Virginia (Dominion Energy), for Incidental Take Regulations (ITR) and an associated Letter of Authorization (LOA) pursuant to the Marine Mammal Protection Act (MMPA). The requested regulations would govern the authorization of take, by Level A harassment and Level B harassment, of small numbers of marine mammals over the course of 5 years (2024-2029) incidental to construction of the Coastal Virginia Offshore Wind Commercial (CVOW-C) project offshore of Virginia within the Bureau of Ocean Energy Management (BOEM) Commercial Lease of Submerged Lands for Renewable Energy Development on the Outer Continental Shelf (OCS) Lease Area OCS-A 0483 (Lease Area) and associated Export Cable Routes. Project activities likely to result in incidental take include pile driving activities (impact and vibratory) and site assessment surveys using high-resolution geophysical (HRG) equipment. NMFS requests comments on its proposed rule. NMFS will consider public comments prior to making any final decision on the promulgation of the requested ITR and issuance of the LOA; agency responses to public comments will be summarized in the final notice of our decision. The proposed regulations, if promulgated, would be effective February 5, 2024, through February 4, 2029.

DATES:
Comments and information must be received no later than June 5, 2023
ider public comments prior to making any final decision on the promulgation of the requested ITR and issuance of the LOA; agency responses to public comments will be summarized in the final notice of our decision. The proposed regulations, if promulgated, would be effective February 5, 2024, through February 4, 2029.

DATES:
Comments and information must be received no later than June 5, 2023.

ADDRESSES:
Submit all electronic public comments via the Federal e-Rulemaking Portal. Go to www.regulations.gov and enter NOAA-NMFS-2023-0030 in the Search box. Click on the “Comment” icon, complete the required fields, and enter or attach your comments.
Instructions: Comments sent by any other method, to any other address or individual, or received after the end of the comment period, may not be considered by NMFS. All comments received are a part of the public record and will generally be posted for public viewing on www.regulations.gov without change. All personal identifying information ( e.g., name, address), confidential business information, or otherwise sensitive information submitted voluntarily by the sender will be publicly accessible. NMFS will accept anonymous comments (enter “N/A” in the required fields if you wish to remain anonymous).
FOR FURTHER INFORMATION CONTACT:
Kelsey Potlock, Office of Protected Resources, NMFS, (301) 427-8401.

SUPPLEMENTARY INFORMATION:

Availability
A copy of Dominion Energy's Incidental Take Authorization (ITA) application and supporting documents, as well as a list of the references cited in this document, may be obtained online at: https://www.fisheries.noaa.gov/national/marine-mammal-protection/incidental-take-authorizations-other-energy-activities-renewable . In case of problems accessing these documents, please call the contact listed above (see FOR FURTHER INFORMATION CONTACT ).
Purpose and Need for Regulatory Action
This proposed rule, if promulgated, would provide a framework under the authority of the MMPA (16 U.S.C. 1361 et seq
heries.noaa.gov/national/marine-mammal-protection/incidental-take-authorizations-other-energy-activities-renewable . In case of problems accessing these documents, please call the contact listed above (see FOR FURTHER INFORMATION CONTACT ).
Purpose and Need for Regulatory Action
This proposed rule, if promulgated, would provide a framework under the authority of the MMPA (16 U.S.C. 1361 et seq. ) to allow for the authorization of take of marine mammals incidental to construction of the CVOW-C project within the Lease Area and along export cable corridors to landfall locations in Virginia. NMFS received a request from Dominion Energy for 5-year regulations and a LOA that would authorize take of individuals of 21 species of marine mammals (seven species by Level A harassment and Level B harassment and 21 species by Level B harassment only), comprising 22 stocks, incidental to Dominion Energy's construction activities. No mortality or serious injury is anticipated or proposed for authorization. Please see below for definitions of harassment. Please see the Legal Authority for the Proposed Action section below for definitions of harassment, serious injury, and incidental take.
Legal Authority for the Proposed Action
The MMPA prohibits the “take” of marine mammals, with certain exceptions. Sections 101(a)(5)(A) and (D) of the MMPA (16 U.S.C. 1361 et seq. ) direct the Secretary of Commerce (as delegated to NMFS) to allow, upon request, the incidental, but not intentional, taking of small numbers of marine mammals by U.S. citizens who engage in a specified activity (other than commercial fishing) within a specified geographical region if certain findings are made, regulations are promulgated (when applicable), and public notice and an opportunity for public comment are provided
merce (as delegated to NMFS) to allow, upon request, the incidental, but not intentional, taking of small numbers of marine mammals by U.S. citizens who engage in a specified activity (other than commercial fishing) within a specified geographical region if certain findings are made, regulations are promulgated (when applicable), and public notice and an opportunity for public comment are provided.
Authorization for incidental takings shall be granted if NMFS finds that the taking will have a negligible impact on the species or stock(s) and will not have an unmitigable adverse impact on the availability of the species or stock(s) for taking for subsistence uses (where relevant). Further, NMFS must prescribe the permissible methods of taking and other “means of effecting the least practicable adverse impact” on the affected species or stocks and their habitat, paying particular attention to rookeries, mating grounds, and areas of similar significance, the availability of the species or stocks for taking for certain subsistence uses (referred to as “mitigation”), and requirements pertaining to the mitigation, monitoring and reporting of the takings are set forth.
As noted above, no serious injury or mortality is anticipated or proposed for authorization in this proposed rule. Relevant definitions of MMPA statutory and regulatory terms are included below:
• Take —to harass, hunt, capture, or kill, or attempt to harass, hunt, capture, or kill any marine mammal (16 U.S.C. 1362, 50 CFR 216.3);
• Incidental taking —an accidental taking. This does not mean that the taking is unexpected, but rather it includes those takings that are infrequent, unavoidable or accidental (see 50 CFR 216.103);
• Serious Injury —any injury that will likely result in mortality (50 CFR 216.3);
• Level A harassment —any act of pursuit, torment, or annoyance which has the potential to injure a marine mammal or marine mammal stock in the wild (16 U.S.C
This does not mean that the taking is unexpected, but rather it includes those takings that are infrequent, unavoidable or accidental (see 50 CFR 216.103);
• Serious Injury —any injury that will likely result in mortality (50 CFR 216.3);
• Level A harassment —any act of pursuit, torment, or annoyance which has the potential to injure a marine mammal or marine mammal stock in the wild (16 U.S.C. 1362); and
• Level B harassment —any act of pursuit, torment, or annoyance which has the potential to disturb a marine mammal or marine mammal stock in the wild by causing disruption of behavioral patterns, including, but not limited to, migration, breathing, nursing, breeding, feeding, or sheltering (16 U.S.C. 1362).
Section 101(a)(5)(A) of the MMPA and the implementing regulations at 50 CFR part 216, subpart I, provide the legal basis for proposing and, if appropriate, issuing 5-year regulations and associated LOA. This proposed rule also establishes required mitigation, monitoring, and reporting requirements for Dominion Energy's proposed activities.
Summary of Major Provisions Within the Proposed Rule
The major provisions of this proposed rule include:
• Authorize take of marine mammals by Level A harassment and/or Level B harassment. No mortality or serious injury of any marine mammal is proposed to be authorized;
• Establish a seasonal moratorium on pile driving during the months of highest North Atlantic right whale ( Eubalaena glacialis ) presence in the project area (November 1st-April 30th);
• Require both visual and passive acoustic monitoring by trained, NOAA Fisheries-approved Protected Species Observers (PSOs) and Passive Acoustic Monitoring (PAM) operators before, during, and after the in-water construction activities;
• Require training for all Dominion Energy personnel that would clearly articulate all relevant responsibilities, communication procedures, marine mammal monitoring and mitigation protocols, reporting protocols, safety, operational procedures, and requirements of the ITA an
vers (PSOs) and Passive Acoustic Monitoring (PAM) operators before, during, and after the in-water construction activities;
• Require training for all Dominion Energy personnel that would clearly articulate all relevant responsibilities, communication procedures, marine mammal monitoring and mitigation protocols, reporting protocols, safety, operational procedures, and requirements of the ITA and ensure that all requirements are clearly understood by all participating parties;
• Require the use of sound attenuation device(s) during all vibratory and impact pile driving of wind turbine generators (WTG) and offshore substations (OSS) foundation piles to reduce noise levels;
• Delay the start of pile driving if a North Atlantic right whale is observed at any distance by the PSO on the pile driving or dedicated PSO vessel;
• Delay the start of pile driving if other marine mammals are observed entering or within their respective clearance zones;
• Shut down pile driving (if feasible) if a North Atlantic right whale is observed or if other marine mammals enter their respective shut down zones;
• Conduct sound field verification monitoring during a minimum of three WTGs and all three OSS foundation installation events to measure in situ noise levels for comparison against the model results;
• Implement soft starts during impact pile driving and using the least hammer energy possible;
• Implement ramp-up for high-resolution geophysical (HRG) site characterization survey equipment prior to operating at full power;
• Implement various vessel strike avoidance measures;
• Increase awareness of North Atlantic right whale presence through monitoring of the appropriate networks and VHF Channel 16, as well as reporting any sightings to the sighting network;
• Implement Best Management Practices (BMPs) during fisheries monitoring research surveys and activities to reduce the risk of marine mammals being considered at-risk or of interacting with deployed gear; and
• Require frequent scheduled and situationa
t whale presence through monitoring of the appropriate networks and VHF Channel 16, as well as reporting any sightings to the sighting network;
• Implement Best Management Practices (BMPs) during fisheries monitoring research surveys and activities to reduce the risk of marine mammals being considered at-risk or of interacting with deployed gear; and
• Require frequent scheduled and situational reporting including, but not limited to, information regarding activities occurring, marine mammal observations and acoustic detections, and sound field verification monitoring results.
National Environmental Policy Act (NEPA)
To comply with the National Environmental Policy Act of 1969 (NEPA; 42 U.S.C. 4321 et seq. ) and NOAA Administrative Order (NAO) 216-6A, NMFS must evaluate the proposed action ( i.e., promulgation of regulations and subsequent issuance of a 5-year LOA) and alternatives with respect to potential impacts on the human environment.
Accordingly, NMFS proposes to adopt the BOEM Environmental Impact Statement (EIS), provided our independent evaluation of the document finds that it includes adequate information analyzing the effects of promulgating the proposed regulations and LOA issuance on the human environment. NMFS is a cooperating agency on BOEM's EIS. BOEM's CVOW-C Draft Environmental Impact Statement for Commercial Wind Lease OCS-A 0483 (DEIS), was made available for public comment through a Notice of Availability on December 16, 2022 (87 FR 77135), available at https://www.boem.gov/renewable-energy/state-activities/CVOW-C . The DEIS had a 60-day public comment period; the comment period was open from December 16, 2022 to February 14, 2023. Additionally, BOEM held three virtual public hearings on January 25, 2023, January 31, 2023, and February 2, 2023.
Information contained within Dominion Energy's ITA application and this proposed rule collectively provide the environmental information related to these proposed regulations and associated 5-year LOA for public review and comment
as open from December 16, 2022 to February 14, 2023. Additionally, BOEM held three virtual public hearings on January 25, 2023, January 31, 2023, and February 2, 2023.
Information contained within Dominion Energy's ITA application and this proposed rule collectively provide the environmental information related to these proposed regulations and associated 5-year LOA for public review and comment. NMFS will review all comments submitted in response to this proposed rule prior to concluding our NEPA process or making a final decision on the requested 5-year ITR and associated LOA.
Fixing America's Surface Transportation Act (FAST-41)
This project is covered under Title 41 of the Fixing America's Surface Transportation Act, or “FAST-41.” FAST-41 includes a suite of provisions designed to expedite the environmental review for covered infrastructure projects, including enhanced interagency coordination as well as milestone tracking on the public-facing Permitting Dashboard. FAST-41 also places a 2-year limitations period on any judicial claim that challenges the validity of a Federal agency decision to issue or deny an authorization for a FAST-41 covered project (42 U.S.C. 4370m-6(a)(1)(A)).
Dominion Energy's proposed project is listed on the Permitting Dashboard. Milestones and schedules related to the environmental review and permitting for the CVOW-C project can be found at https://www.permits.performance.gov/permitting-project/coastal-virginia-offshore-wind-commercial-project .
Summary of Request
On February 16, 2022, NMFS received a request from Dominion Energy for the promulgation of a 5-year ITR and issuance of an associated LOA to take marine mammals incidental to construction activities associated with the CVOW-C project offshore of Virginia in the Lease Area and associated export cable routes
ermitting-project/coastal-virginia-offshore-wind-commercial-project .
Summary of Request
On February 16, 2022, NMFS received a request from Dominion Energy for the promulgation of a 5-year ITR and issuance of an associated LOA to take marine mammals incidental to construction activities associated with the CVOW-C project offshore of Virginia in the Lease Area and associated export cable routes. Dominion Energy's request is for the incidental, but not intentional, take of a small number of 21 marine mammal species (comprising 22 total stocks) by Level B harassment and by Level A harassment for seven marine mammal species, comprising 7 stocks. Neither Dominion Energy nor NMFS expects serious injury or mortality to result from the specified activities, and Dominion Energy did not request and NMFS is not proposing to authorize mortality or serious injury of any marine mammals species or stock.
In response to our comments and following extensive information exchanges with NMFS, Dominion Energy submitted a final, revised application on August 5, 2022, that NMFS deemed adequate and complete on August 12, 2022. The final version of the application is available on NMFS' website at https://www.fisheries.noaa.gov/action/incidental-take-authorization-dominion- .
On September 15, 2022, NMFS published a notice of receipt (NOR) of the adequate and complete application in the Federal Register (87 FR 56634), requesting comments and soliciting information related to Dominion Energy's request during a 30-day public comment period. During the NOR public comment period, NMFS received one public comment letter from another Federal agency (the United States Geological Survey (USGS)) and one public comment letter from an environmental non-government organization (the Southern Environmental Law Center). NMFS has reviewed all submitted material and has taken these into consideration during the drafting of this proposed rule
eriod. During the NOR public comment period, NMFS received one public comment letter from another Federal agency (the United States Geological Survey (USGS)) and one public comment letter from an environmental non-government organization (the Southern Environmental Law Center). NMFS has reviewed all submitted material and has taken these into consideration during the drafting of this proposed rule.
In June 2022, Duke University's Marine Spatial Ecology Laboratory released updated habitat-based marine mammal density models (Roberts et al., 2016; Robert and Halpin, 2022). Because Dominion Energy applied marine mammal densities to their analysis in their application, Dominion Energy submitted a final Updated Density and Take Estimation Memo (herein referred to as Updated Density and Take Estimation Memo) on January 10, 2023 that included marine mammal densities and take estimates based on these new models which NMFS posted on our website in May 2023.
In January 2023, BOEM informed NMFS that the proposed activity had changed from what is presented in the adequate and complete MMPA application. Specifically, the changed proposed activity involved the reduction of maximum WTGs built (from 205 to 202 WTGs) as under the original Project Design Envelope (PDE) and the OSSs would be located in the vessel transit routes. Under the 202 build-out, three WTGs would be removed and the three OSSs would be shifted into these WTG positions. However, in late-January 2023, Dominion Energy confirmed that their Preferred Layout of 176 WTGs is the base case for construction, but that they could possibly need up to 7 WTGs re-piled in alternate positions due to unstable sediment conditions, which could necessitate up to 183 independent piling events. WTG positions have been removed from consideration for one or more of the following reasons: impracticable due to foundation technical design risk, shallow gas presence, commercial shipping and navigation risk concerns, erosion risk, and presence of a designated fish haven
piled in alternate positions due to unstable sediment conditions, which could necessitate up to 183 independent piling events. WTG positions have been removed from consideration for one or more of the following reasons: impracticable due to foundation technical design risk, shallow gas presence, commercial shipping and navigation risk concerns, erosion risk, and presence of a designated fish haven. Based on the information provided, NMFS carried forward the analysis assuming a total build-out of 176 WTGs plus seven re-piled WTGs (a total of 183 independent piling events for WTGs) and the 3 originally planned OSSs. Due to the significant reduction of turbines from the original proposed action found in the adequate and complete ITA application (reduction of approximately 14 percent), Dominion Energy, in consultation with NMFS, provided an updated proposed action summary, revised exposure estimates, revised take requests, and an updated piling schedule in mid-February 2023 (herein referred to as the Revised Proposed Action Memo). NMFS posted this to our website in May 2023.
NMFS has previously issued six Incidental Harassment Authorizations (IHAs) to Dominion Energy. Two of those IHAs, issued in 2018 (83 FR 39062; August 8, 2018) and 2020 (85 FR 30930, May 21, 2020) supported the development of the Coastal Virginia Offshore Wind project, known as the CVOW Pilot Project (wherein two turbines were constructed). The remaining four IHAs (two of which were modified IHAs) were high resolution site characterization surveys within and around the CVOW-C Lease Area (see 85 FR 55415, September 8, 2020; 85 FR 81879, December 17, 2020 (modified 2020 IHA); 86 FR 21298, April 22, 2021 (modified 2021 IHA); and 87 FR 33730, June 3, 2022).
To date, Dominion Energy has complied with all the requirements ( e.g., mitigation, monitoring, and reporting) of the previous IHAs. Information regarding Dominion Energy's take estimates and monitoring results may be found in the Estimated Take section
er 8, 2020; 85 FR 81879, December 17, 2020 (modified 2020 IHA); 86 FR 21298, April 22, 2021 (modified 2021 IHA); and 87 FR 33730, June 3, 2022).
To date, Dominion Energy has complied with all the requirements ( e.g., mitigation, monitoring, and reporting) of the previous IHAs. Information regarding Dominion Energy's take estimates and monitoring results may be found in the Estimated Take section. The monitoring reports can be found on NMFS' website, along with the relevant, previously issued IHAs: https://www.fisheries.noaa.gov/national/marine-mammal-protection/incidental-take-authorizations-other-energy-activities-renewable.
On August 1, 2022, NMFS announced proposed changes to the existing North Atlantic right whale vessel speed regulations (87 FR 46921; August 1, 2022) to further reduce the likelihood of mortalities and serious injuries to endangered right whales from vessel collisions, which are a leading cause of the species' decline and a primary factor in an ongoing Unusual Mortality Event. Should a final vessel speed rule be issued and become effective during the effective period of this ITR (or any other MMPA incidental take authorization), the authorization holder would be required to comply with any and all applicable requirements contained within the final rule. Specifically, where measures in any final vessel speed rule are more protective or restrictive than those in this or any other MMPA authorization, authorization holders would be required to comply with the requirements of the rule. Alternatively, where measures in this or any other MMPA authorization are more restrictive or protective than those in any final vessel speed rule, the measures in the MMPA authorization would remain in place
l vessel speed rule are more protective or restrictive than those in this or any other MMPA authorization, authorization holders would be required to comply with the requirements of the rule. Alternatively, where measures in this or any other MMPA authorization are more restrictive or protective than those in any final vessel speed rule, the measures in the MMPA authorization would remain in place. The responsibility to comply with the applicable requirements of any vessel speed rule would become effective immediately upon the effective date of any final vessel speed rule and, when notice is published on the effective date, NMFS would also notify Dominion Energy if the measures in the speed rule were to supersede any of the measures in the MMPA authorization such that they were no longer required.
Description of the Specified Activities
Overview
Dominion Energy's CVOW-C project would allow the Commonwealth of Virginia to meet its clean energy goal of achieving 100 percent clean energy by 2045 through the implementation of up to 5,200 megawatts (MW) of offshore wind-generated energy, as established in the Virginia Clean Economy Act (HB 1526/SB 851; https://lis.virginia.gov/cgi-bin/legp604.exe?201+ful+CHAP1193+hil&201+ful+CHAP1193+hil ). To achieve this, Dominion Energy has proposed to construct and operate CVOW-C in state and Federal waters of the Atlantic Ocean in the Lease Area that is capable of producing between 2,500 and 3,000 MW of renewable energy and would be the largest offshore wind project in the United States at the time of its construction.
Dominion Energy's precursor pilot project ( i.e., CVOW Pilot Project) was a 12 MW, two-turbine test project and the first to be installed in Federal waters. Designed as a research/test project, the two turbines associated with the CVOW Pilot Project became operational in October 2020 approximately 27 miles (mi; 43.45 kilometers (km)) off of Virginia Beach, Virginia. Information on this Pilot Project was used to inform the proposed CVOW-C project
CVOW Pilot Project) was a 12 MW, two-turbine test project and the first to be installed in Federal waters. Designed as a research/test project, the two turbines associated with the CVOW Pilot Project became operational in October 2020 approximately 27 miles (mi; 43.45 kilometers (km)) off of Virginia Beach, Virginia. Information on this Pilot Project was used to inform the proposed CVOW-C project. More information on the Pilot Project can be found on BOEM's website ( https://www.boem.gov/renewable-energy/state-activities/coastal-virginia-offshore-wind-project-cvow ) and in the IHA authorized by NMFS in May 2020 for BOEM Lease Area OCS-A-0497 ( https://www.fisheries.noaa.gov/action/incidental-take-authorization-dominion-energy-virginia-offshore-wind-construction-activities ).
CVOW-C would consist of several different types of permanent offshore infrastructure, including up to 176 wind turbine generators (WTGs; e.g., such as the Siemens Gamesa SG-14-222 DD 14-MW model with power boost technology potentially allowing up to 14.7-MW, equating to a total of 2,587.2-MW for full build-out), three offshore substations (OSS), and inter-array and substation interconnect cables. Dominion Energy plans to install WTG and OSS foundations via a joint-installation approach using both vibratory and impact pile driving. Dominion Energy would also conduct the following supporting activities: temporarily install and remove, by vibratory pile driving, up to nine cofferdams to connect the offshore export cables to onshore facilities; temporarily install and remove, by impact pile driving and a pipe thruster, respectively, up to 108 goal posts (12 goal posts for each of nine Direct Pipe locations) to guide casing pipes; permanently install scour protection around WTG and OSS foundations; permanently install and perform trenching, laying, and burial activities associated with the export cables from the OSSs to shore-based switching and sub-stations and WTG inter-array cables; annually perform, using active acoustic sources with freque
ts (12 goal posts for each of nine Direct Pipe locations) to guide casing pipes; permanently install scour protection around WTG and OSS foundations; permanently install and perform trenching, laying, and burial activities associated with the export cables from the OSSs to shore-based switching and sub-stations and WTG inter-array cables; annually perform, using active acoustic sources with frequencies of less than 180 kilohertz (kHz), high-resolution vessel-based site characterization geophysical (HRG) surveys; and intermittently perform, via a modified dredge, and a pot-based monitoring approach, fishery monitoring surveys to enhance existing data for specific benthic and pelagic species of concern. Vessels would transit within the project area and between ports and the wind farm to transport crew, supplies, and materials to support construction activities. All offshore cables would be connected to onshore export cables at the sea-to-shore transition point via trenchless installation ( i.e., underground tunneling utilizing micro tunnel boring installation methodologies) in a parking lot found west of the firing range at the State Military Reservation located in Virginia Beach, Virginia. From the sea-to-shore transition point, onshore underground export cables are then connected in series to switching stations/substations, overhead transmission lines, and ultimately to the grid connection.
Marine mammals exposed to elevated noise levels during impact and vibratory pile driving and site characterization surveys may be taken, by Level A harassment and/or Level B harassment, depending on the specified activity.
Dates and Duration
Dominion Energy anticipates that activities with the potential to result in incidental take of marine mammals would occur throughout all five years of the proposed regulations which, if issued, would be effective from February 5, 2024, through February 4, 2029
rization surveys may be taken, by Level A harassment and/or Level B harassment, depending on the specified activity.
Dates and Duration
Dominion Energy anticipates that activities with the potential to result in incidental take of marine mammals would occur throughout all five years of the proposed regulations which, if issued, would be effective from February 5, 2024, through February 4, 2029. Based on Dominion Energy's proposed schedule, the installation of all permanent structures would be completed by the end of October 2025. More specifically, the installation of WTG foundations is expected to occur between May 1st-October 31st of 2024 and 2025, over approximately 12 months (6 months within each year). OSS jacket foundations using pin piles would be installed between May 1st-October 31st, 2024 and 2025. However, delays due to weather or other unanticipated and unforeseen events may require Dominion Energy to install some foundations in 2026. If this occurs, foundation installation would occur between the predetermined pile driving seasonal window (May 1st-October 31st in 2026) and occur over 6 months. However, as this would represent a shift in the schedule, rather than additional piles being installed, the proposed activities would still maintain the same amount of take proposed for authorization, both annual maximum and five-year total. The temporary structures used for nearshore cable landfall construction ( i.e., temporary cofferdams and temporary goal posts) would be installed and subsequently removed between May 1st-October 31st, 2024. Lastly, Dominion Energy anticipates HRG survey activities using boomers, sparker, and Compressed High-Intensity Radiated Pulses (CHIRPs) to occur annually and across the five-year period. Up to 65 days of surveys are planned in 2024, 249 are planned in 2025, 58 are planned in 2026, and 368 survey days are planned annually in each of 2027 and 2028. No surveys are planned to occur in 2029
1st, 2024. Lastly, Dominion Energy anticipates HRG survey activities using boomers, sparker, and Compressed High-Intensity Radiated Pulses (CHIRPs) to occur annually and across the five-year period. Up to 65 days of surveys are planned in 2024, 249 are planned in 2025, 58 are planned in 2026, and 368 survey days are planned annually in each of 2027 and 2028. No surveys are planned to occur in 2029. These surveys may occur across the entire CVOW-C Lease Area and Export Cable Routes and may take place at any time of year.
Dominion Energy has provided a schedule for all of their proposed construction activities (Table 1). Based on the schedule presented, no activities (installation, removal, or HRG surveys) are planned to occur in 2029, even though part of this year would fall within the five-year effective period of the proposed regulations. This table also presents a breakdown of the timing and durations of the activities proposed to occur during the construction and operation of the CVOW-C project.
Table 1—CVOW-C's Construction and Operations Schedule During the Effective Period of the LOA a Project activity Expected timing Expected duration (approximate) Scour Protection Pre-Installation Q2 through Q4 of 2024 Q2 through Q4 of 2025 9 months. 9 months. WTG Foundation Installation b e Q2 through Q4 of 2024 Q2 through Q4 of 2025 6 months. 6 months. Scour Protection Post-installation Q2 through Q4 of 2024 Q2 through Q4 of 2025 9 months. 9 months. OSS Foundation Installation b e Q2 through Q4 of 2024 Q2 through Q4 of 2025 6 months. 6 months. Cable Landfall Construction (Goal Posts and Cofferdams) h Q1 through Q4 of 2024 6 months. HRG Surveys c d Q1 2024 through Q4 2028 Any time of year. Site Preparation Q1 2024 through Q2 2024 6 months. Inter-array Cable Installation Q2 2025 through Q4 2026 19 months. Export Cable Installation Q3 2024 through Q3 2025 14 months. Fishery Monitoring Surveys: f g Surf Clam Whelk Black Sea Bass Q2 2023 Q2 2023 through Q1 2025 Q2 2023 through Q1 2025 1 week. 24 months. 24 months
f 2024 6 months. HRG Surveys c d Q1 2024 through Q4 2028 Any time of year. Site Preparation Q1 2024 through Q2 2024 6 months. Inter-array Cable Installation Q2 2025 through Q4 2026 19 months. Export Cable Installation Q3 2024 through Q3 2025 14 months. Fishery Monitoring Surveys: f g Surf Clam Whelk Black Sea Bass Q2 2023 Q2 2023 through Q1 2025 Q2 2023 through Q1 2025 1 week. 24 months. 24 months. Note: “Q1, Q2, Q3, and Q4” each refer to a quarter of the year, starting in January and comprising 3 months each. Therefore, Q1 represents January through March, Q2 represents April through June, Q3 represents July through September, and Q4 represents October through December. a While the effective period of the proposed regulations would extend a few months into 2029, no activities are proposed to occur in 2029 by Dominion Energy so these were not included in this table. b Activities would only occur between May 1st through October 31st annually. c Activities would begin in February 2024, upon the issuance of a LOA, and continue through construction and post-construction. d For HRG surveys, Dominion Energy anticipates up to 65 days of surveys would occur during the pre-construction period (2024), up to 307 days during the primary construction years (2025 and 2026), and up to 736 days would be needed during the post-construction years (2027 and 2028) with a 50/50 split of 368 days each year. No surveys are planned for 2029. e Dominion Energy anticipates that all WTGs and OSS foundations will be installed by October 31st, 2025; however, unanticipated delays may require some foundation pile driving to occur in 2026. f Some fishery monitoring survey activities are planned prior to February 2024 but are not included here as they would not occur during the effective dates of the ITR and LOA. g Dates displayed here are for field work, as that would be the only component that could impact marine mammals
by October 31st, 2025; however, unanticipated delays may require some foundation pile driving to occur in 2026. f Some fishery monitoring survey activities are planned prior to February 2024 but are not included here as they would not occur during the effective dates of the ITR and LOA. g Dates displayed here are for field work, as that would be the only component that could impact marine mammals. h Although cable landfall activities are anticipated to occur over 9-12 months total, activities capable of harassing marine mammals would only occur for the specified duration described here as other activities necessary for landfall construction ( i.e., area preparation, material transportation, etc.) would also occur. Dominion Energy anticipates that the first 40 WTGs would become operational in 2025, after foundation installation is completed and after all necessary components (such as array cables, OSSs, export cables routes, and onshore substations) are installed. Up to 120 additional WTGs would be commissioned/operational in 2026. Dominion Energy anticipates that all turbines would be commissioned by 2027, with the last 16 being operational that year.
Specific Geographic Region
Dominion Energy would construct the CVOW-C project in Federal and state waters offshore of Virginia within the BOEM Lease Area OCS-A 0483 and associated Export Cable Routes (Figure 1). The Lease Area covers approximately 456.5 km 2 (112,799 acres) and is located approximately 27 mi (43.5 km) east of Virginia Beach, Virginia. The water depths in the Lease Area range from 19.9 m to 38.1 m (65 to 125 ft) while water depths along the Export Cable Routes range from 0 to 28 m (0 to 92 ft). Cable landfall construction work would be conducted in shallow water (temporary cofferdams would be in water 3.3 m (10.83 ft) deep, and the goal posts would be at depths of 22.9 m (75 ft))
27 mi (43.5 km) east of Virginia Beach, Virginia. The water depths in the Lease Area range from 19.9 m to 38.1 m (65 to 125 ft) while water depths along the Export Cable Routes range from 0 to 28 m (0 to 92 ft). Cable landfall construction work would be conducted in shallow water (temporary cofferdams would be in water 3.3 m (10.83 ft) deep, and the goal posts would be at depths of 22.9 m (75 ft)). Sea surface temperatures range from 32 to 88 degrees Fahrenheit (°F; 0 to 31 degrees Celsius (°C)) while the depth-averaged annual water temperature is 56.39 °F (13.55 °C) (NOAA n.d.B). Cables would come ashore adjacent to the western boundary of the State Military Reservation firing range in Virginia Beach.
Dominion Energy's specified activities would occur along a portion of the Mid-North Atlantic continental shelf that experiences various concurrent processes that shape the overall geology of the region. These processes include glacio-eustatic sea level change ( i.e., a change in sea level due to the uptake or release of water from glaciers and polar ice), drainage from Chesapeake Bay, and storm-related effects to sedimentation. The basin structure in which the CVOW-C project area is located, the Baltimore Canyon Trough, is oriented northeast to southwest and consists of a wedge of sediments that thicken to the east (Dominion Energy, 2023).
The Mid-Atlantic Bight, where the CVOW-C project would be located, spans from Cape Hatteras, North Carolina to Cape Cod, Massachusetts and continues to extend into the west Atlantic to the 100-m isobath. The oceanographic conditions along the Mid-Atlantic Bight are comparable to the conditions found along the Mid-Atlantic East Coast, where summer months are warmer and winter months are milder. The area is known for its high levels of primary productivity, specifically in the nearshore and estuarine regions, where coastal phytoplankton tend to bloom in the winter and summer
ic to the 100-m isobath. The oceanographic conditions along the Mid-Atlantic Bight are comparable to the conditions found along the Mid-Atlantic East Coast, where summer months are warmer and winter months are milder. The area is known for its high levels of primary productivity, specifically in the nearshore and estuarine regions, where coastal phytoplankton tend to bloom in the winter and summer. Given the proximity to the continental shelf, this area forms an important habitat for various benthic and fish species, as well as forms important habitat for fin whales, humpback whales, North Atlantic right whales, and other large whales as they migrate through the area. The CVOW-C project area is located within the Mid-Atlantic Bight and relatively flat with “very gentle to gentle slopes”, as described by the BOEM classification found in the CVOW-C Construction and Operations Plan (COP) (Dominion Energy, 2023). In the Export Cable Routes, the seafloor slopes are less than 1 degree (“very gentle” based again on the BOEM classification; Dominion Energy, 2023). The most significant slopes can be found on the flanks of morphological features and other topographic highs where the seabed gradient ranges up to 4 degrees (Dominion Energy, 2023). The most prominent seabed features with the project area are pronounced sand ridges that create a ridge and swale topography. In the northeastern portion of the project area, the heights of the sand ridges are lower, topographic variation across the ridges is reduced, seafloor bathymetry is deeper, and water depths are less variable.
A complete mapping of the seabed has identified a low number of boulders present on the seafloor (Dominion Energy, 2023). Only 10 boulders and 110 seabed targets interpreted as possible boulders have sizes greater than 1 m (3 ft). No patterns were identified in the location of boulders across the Lease Area and Export Cable Routes
eafloor bathymetry is deeper, and water depths are less variable.
A complete mapping of the seabed has identified a low number of boulders present on the seafloor (Dominion Energy, 2023). Only 10 boulders and 110 seabed targets interpreted as possible boulders have sizes greater than 1 m (3 ft). No patterns were identified in the location of boulders across the Lease Area and Export Cable Routes.
The seafloor in the CVOW-C project area is dynamic and changes over time due to current, tidal flows, and wave conditions. The benthic habitat of the project area contains a variety of seafloor substrates, physical features, and associated benthic organisms. The soft bottom sediments in the project area are reflective of the rest of the Mid-Atlantic Bight region, and characterized
Additional information on the underwater environment's physical resources can be found in CVOW-C's COP (Dominion Energy, 2023) available at https://www.boem.gov/renewable-energy/state-activities/coastal-virginia-offshore-wind-project-construction-and .
BILLING CODE 3510-22-P EP04MY23.081
BILLING CODE 3510-22-C Figure 1—The CVOW-C Project Area Detailed Description of Specified Activities
Below, we provide detailed descriptions of Dominion Energy's activities, explicitly noting those that are anticipated to result in the take of marine mammals and for which incidental take authorization is requested. Additionally, a brief explanation is provided for those activities that are not expected to result in the take of marine mammals.
WTG and OSS Foundations
Dominion Energy proposes to install up to 176 WTGs on monopile foundations and 3 OSSs on jacket foundations. They anticipate all WTG foundations could be installed between May 1st through October 31st in 2024 and 2025, over the course of six months in each year
ef explanation is provided for those activities that are not expected to result in the take of marine mammals.
WTG and OSS Foundations
Dominion Energy proposes to install up to 176 WTGs on monopile foundations and 3 OSSs on jacket foundations. They anticipate all WTG foundations could be installed between May 1st through October 31st in 2024 and 2025, over the course of six months in each year. However, it may be possible that monopile installation associated with the WTG foundations would need to continue into a third year (2026), depending on construction logistics and local and environmental conditions that may influence Dominion Energy's ability to maintain the planned construction schedule. If this is determined to be necessary, WTG foundations would only be installed between May 1st through September 30th of 2026. However, this schedule shift would not change NMFS' proposed determinations as the total number of piles would remain the same. While this shift is unlikely to occur, the proposed rulemaking does retain flexibility in addressing unforeseen circumstances. However, all foundations would be installed during the effective period of this proposed rule, if issued. OSS jacket foundations would most likely be installed in August 2024; however, they could be installed anytime between May 1st through October 31st. For both types of foundations, Dominion Energy has committed to not installing from November 1st through April 30th, annually.
A WTG monopile foundation typically consists of a single steel tubular section, with several sections of rolled steel plate welded together. Each monopile would have a maximum diameter tapering from 7.5 m (24.6 ft) at the top to 9.5 m (31 ft) at the seafloor (collectively referred to as a 9.5/7.5-m monopile)
n Energy has committed to not installing from November 1st through April 30th, annually.
A WTG monopile foundation typically consists of a single steel tubular section, with several sections of rolled steel plate welded together. Each monopile would have a maximum diameter tapering from 7.5 m (24.6 ft) at the top to 9.5 m (31 ft) at the seafloor (collectively referred to as a 9.5/7.5-m monopile). WTGs would be spaced approximately 0.75 nautical miles (nm; 1.39 km) in an east-west direction and 0.93 nm (1.72 km) in a north-south direction and will have an average penetration depth of 42 m (138 ft; between 30 m and 46 m per Attachment Z-3 of Appendix A in Dominion Energy's ITA application). Although only 176 WTGs would be installed, seven foundations may need to be re-installed at a different location; hence Dominion Energy has accounted for up to 183 WTG individual piling events in its analysis, which we have carried forward with in this proposed rule.
Each OSS installed by Dominion Energy would be supported by a jacket foundation. A piled jacket foundation is formed by a steel lattice construction (comprising tubular steel members and welded joints) secured to the seabed by means of hollow steel pin piles attached to the jacket. Each jacket foundation would consist of up to four pin piles. In total, Dominion Energy would install up to 3 OSSs for a total of 12 pin piles. Up to two pin piles would be installed per day. Pin piles will have a maximum diameter of 2.8 m (9.2 ft) each and will be installed vertically. The maximum penetration depth of each pin pile would be 82 m (269 ft).
Given the project area's soil conditions, the installation of both WTG monopile foundations and OSS jacket foundations would necessitate the use of both vibratory and impact pile driving to avoid pile run (also known as “punch-through”)
iles will have a maximum diameter of 2.8 m (9.2 ft) each and will be installed vertically. The maximum penetration depth of each pin pile would be 82 m (269 ft).
Given the project area's soil conditions, the installation of both WTG monopile foundations and OSS jacket foundations would necessitate the use of both vibratory and impact pile driving to avoid pile run (also known as “punch-through”). Pile run can occur when a monopile or a pin pile rapidly penetrates in an uncontrolled manner through a weak layer of soil, due to the soil resistance being lower than the weight of the pile and hammer (transferring impulsive energy to the pile). Pile runs can occur instantaneously and through a depth of meters to dozens of meters. A pile run incident can have severe negative consequences, both for the safety of personnel aboard the installation vessel and significant risk of damage to equipment. To mitigate this risk, Dominion Energy would first perform vibratory hammering, which would allow for a more controllable installation process when installing piles in soft sediments as the vibrohammer is directly in contact with the pile (see Figures 2 through 5 in Dominion Energy's ITA application), as opposed to installation using the impact hammer (see Figures 6 and 7 in Dominion Energy's ITA application). Once the pile run risk depth has been passed, the method of installation would transition from a vibratory hammer to an impact hammer. It is anticipated the transition from a vibratory hammer to an impact hammer would require approximately 1.2 hours wherein no pile driving would occur. Once installation of the monopile and/or pin pile is complete, the pile driving vessel would move to the next installation location. While Dominion Energy states that not all piles will require the use of the vibrohammer in conjunction with the impact hammer, it was considered more conservative to analyze all installed piles using this dual approach as it is not yet known how many would require the dual installation method
onopile and/or pin pile is complete, the pile driving vessel would move to the next installation location. While Dominion Energy states that not all piles will require the use of the vibrohammer in conjunction with the impact hammer, it was considered more conservative to analyze all installed piles using this dual approach as it is not yet known how many would require the dual installation method. No concurrent pile driving at multiple locations would occur.
Per monopile, use of the vibrohammer is estimated to occur for approximately 30 to 60 minutes (depending on if the pile uses a standard driving or hard-to-drive scenario, respectively) to firmly stabilize the foundation pile. A 72 minute (1.2 hour) pause to allow for the vibratory hammer to be exchanged with an impact hammer would occur. Then, the impact hammer would be used for approximately three hours (constituting approximately 3 hours for 3,240-3,720 total hammer strikes, with more strikes needed if the pile is considered difficult to install). A joint standard and hard-to-drive scenario (Scenario 3) for the installation of up to two monopiles in a single day may require up to 90 minutes of vibratory pile driving followed by up to 6,960 hammer strikes. In all situations, the impact hammer would drive the pile until it reaches its target embedment depth (approximately 42 m (138 ft) for monopiles). The three possible WTG monopile installation scenarios are laid out in Table 2 below:
Table 2—WTG Monopile Scenarios With Scenario-Specific Installation Characteristics Installation scenario Number of WTG monopiles installed Maximum vibratory hammer duration (minutes) Maximum impact hammer strikes Impact hammer energy (kJ) Scenario 1 (Standard) 1 60 3,240 4,000 Scenario 2 (Hard-to-drive) 1 30 3,720 4,000 Scenario 3 (Standard and Hard-to-drive) 2 90 6,960 4,000 For pin piles, vibratory pile driving is anticipated to require approximately 120 minutes (2 hours), a 72 minute (1.2 hours) pause in activities, and then continue with impact pile driving using a ham
es) Maximum impact hammer strikes Impact hammer energy (kJ) Scenario 1 (Standard) 1 60 3,240 4,000 Scenario 2 (Hard-to-drive) 1 30 3,720 4,000 Scenario 3 (Standard and Hard-to-drive) 2 90 6,960 4,000 For pin piles, vibratory pile driving is anticipated to require approximately 120 minutes (2 hours), a 72 minute (1.2 hours) pause in activities, and then continue with impact pile driving using a hammer energy up to 3,000 kJ, resulting in a total estimate of 15,210 hammer strikes. As with WTG foundations, the impact hammer would drive the pin pile until it reaches its target embedment depth (approximately 82 m (269 ft) for pin piles). A maximum of two pin piles would be driven per day. Each OSS jacket foundation would take approximately five days to install with a total of 30 days needed for the completion of all three OSSs (n=3) with all of their pin piles (n=12). This 30-day period does include periods of non-pile driving time where other activities related to the jacket foundations may be installed.
The current construction schedule assumes foundation installation would occur in 2024 and 2025; however, as previously discussed in the Dates and Duration section, limited installation of WTGs may need to be installed in 2026 if the project falls off of the construction schedule. Given an estimated installation schedule, Dominion Energy expects that up to 95 monopile foundations would be installed in 2024 and up to 88 monopiles would be installed in 2025. If pile driving must occur in this 3rd year, installation would only occur across a five month period (May 1st through September 30th, 2026). All WTG and OSS foundation installation would occur during daylight hours only. The only exception would be if, for safety reasons, ceasing pile driving activities would compromise both the health of humans and the environment or if ceasing the pile driving would cause instability and integrity concerns on the project. In most cases, one pile would be installed per day, although two may be installed during some months
ation installation would occur during daylight hours only. The only exception would be if, for safety reasons, ceasing pile driving activities would compromise both the health of humans and the environment or if ceasing the pile driving would cause instability and integrity concerns on the project. In most cases, one pile would be installed per day, although two may be installed during some months. No concurrent pile driving is planned or proposed to occur. The same exception described above for WTG foundations applies to OSS foundations where integrity or safety concerns may necessitate the pile to be finished after sunset. The proposed WTG and OSS pile driving schedule can be found in Table 3 below that describes the construction schedule on both an annual and monthly basis.
Table 3—Proposed Pile Driving Schedule for the CVOW-C Project of 176 WTGs and 3 OSSs, Plus 7 Possible WTG Re-Piling Events Year b Month Total proposed number of piles Number of hard-to-drive piles Number of standard piles Days when two monopiles may be installed per day 2024 May 18 5 13 1 June 25 6 19 6 July 26 7 19 6 August 2 monopiles; 12 pin piles 1 1 1 September 13 3 10 0 October 11 1 10 0 2024 Annual Total 95 monopiles; 12 pin piles a 23 72 14 2025 May 16 6 10 1 June 22 8 14 6 July 24 8 16 6 August 20 6 14 6 September 5 2 3 0 October 1 1 0 0 2025 Annual Total 88 monopiles 31 57 19 a Included only if seven re-piling events are necessary. b While Dominion Energy plans for all pile driving to be completed by the end of the 2025 piling period (end of October 2025), unforeseen circumstances may necessitate that piling would need to continue into 2026. While not planned or anticipated, the proposed rule would allow for flexibility in shifting certain activities with the understanding that the maximum estimated takes would not exceed the amount described in the proposed rule
ile driving to be completed by the end of the 2025 piling period (end of October 2025), unforeseen circumstances may necessitate that piling would need to continue into 2026. While not planned or anticipated, the proposed rule would allow for flexibility in shifting certain activities with the understanding that the maximum estimated takes would not exceed the amount described in the proposed rule. Cable Landfall Construction
To support the connection of the offshore cable with the onshore cable, Dominion Energy would install both temporary goal posts and temporary cofferdams approximately 1,000 m (3,281 ft) offshore of the State Military Reservation in Virginia Beach, Virginia. These activities are two components of a broader set of activities conducted during cable landfall construction. The goal posts and cofferdams would support work associated with installing casing pipes housing the export cables. Dominion Energy would install the 9 casing pipes approximately 50 ft apart from each other at the cable landfall construction site using a Trenchless Installation approach. Using a tunneling approach similar to horizontal directional drilling (HDD), a boring machine would excavate the ground while simultaneously pushing strings of steel casing pipes along umbilical lines
Temporary goal posts (made up of 42-in diameter steel pipe piles) would be installed between each exit location and would be used to guide the progress and movement of the casing pipes and to provide lateral stability. Temporary cofferdams are used to aid cable pull in as the cable is fed through the underground tunnel (located 6.6 ft (2 m) below the seabed). A technical description of the Trenchless Installation approach can be found in Section 1 of Dominion Energy's ITA application.
Trenchless installation requires the use of extensive equipment that would be staged at the onshore location for the cable. However, only the equipment required to extract the boring device, post-tunneling, is temporarily staged at the onshore exit location
the seabed). A technical description of the Trenchless Installation approach can be found in Section 1 of Dominion Energy's ITA application.
Trenchless installation requires the use of extensive equipment that would be staged at the onshore location for the cable. However, only the equipment required to extract the boring device, post-tunneling, is temporarily staged at the onshore exit location. Despite the extensive equipment necessary for this activity (see the ITA application for details), most of it is not expected to result in the take of marine mammals as the source levels are all generally very low. Even the pipe thruster does not vibrate or make noise and simply pushes the pipe forward with the boring device. Because of this, only the aspects for cable landfall construction that could cause the take of marine mammals ( i.e., impact and vibratory pile driving) is discussed further. The aspects of landfall construction that could cause the harassment of marine mammals is specifically due to the installation of steel pipe piles for goal posts and the installation and removal of sheet piles for cofferdams.
The goal posts would consist of 1.07 m (42 in) steel pipe piles that would be installed using an impact hammer for up to 130 minutes daily (a maximum of 2 installed per day). The duration of each strike of the impact hammer would be between 0.5-2 seconds in duration and necessitate approximately 260 strikes per pile. Up to 12 goal posts are required at each of the 9 casing pipe locations; hence 108 goal posts would be installed. Given there are 12 goal posts per each of the nine Direct Pipe locations, a total of 108 piles would be installed. Given up to 2 piles would be installed per day, there could be 520 strikes per day. To install all goal posts, Dominion Energy would conduct pile driving for 54 days
pile. Up to 12 goal posts are required at each of the 9 casing pipe locations; hence 108 goal posts would be installed. Given there are 12 goal posts per each of the nine Direct Pipe locations, a total of 108 piles would be installed. Given up to 2 piles would be installed per day, there could be 520 strikes per day. To install all goal posts, Dominion Energy would conduct pile driving for 54 days.
Once installed, the goal posts can be removed using equipment not expected to generate any underwater acoustic noise as the majority of the force applied would be to overcome the skin friction of the material that is embedded in the substrate. This is expected to consist of pulling/tugging of the piles using mechanical or hydraulic equipment and take a similar amount of time of installation ( i.e., a total of 54 days for removal, although no take is expected). Based on Dominion Energy's schedule, which includes both installation and removal of the goal posts, these activities are expected to occur in 2024, between May 1st-October 31st, and necessitate approximately 6 months for complete installation and removal. Given no take is expected from the removal of goal posts, only the 54 days for installation of 108 total pipe piles has been carried forward into the Estimated Take of Marine Mammals section.
Dominion Energy also anticipates that up to nine temporary cofferdams, which would only be installed and removed via vibratory pile driving, may be necessary during cable landfall construction activities. These would be located at the Nearshore Trenchless Installation Punch-Out location, where the export cables would transition (via underground drilling) to the onshore cable landing location, to facilitate the preferred approach of lowering of the Direct Pipe burial underground (approximately 2 m (6.6. ft) below the seabed) to reduce the need for additional cable protections and to minimize the release of sediments and drilling fluids into the water
nstallation Punch-Out location, where the export cables would transition (via underground drilling) to the onshore cable landing location, to facilitate the preferred approach of lowering of the Direct Pipe burial underground (approximately 2 m (6.6. ft) below the seabed) to reduce the need for additional cable protections and to minimize the release of sediments and drilling fluids into the water. Each temporary cofferdam would consist of 30 to 40 steel sheet piles measuring 0.51 m (20 in) in diameter arranged in a predetermined configuration (270 to 360 steel sheet piles total for all nine cofferdams). Vibratory pile drivers would be used to both install and remove the steel sheet piles. Each sheet pile would necessitate approximately 2 to 3 minutes of active drive time for installation, at a maximum installation rate of 20 sheet piles per day (up to 40-60 minutes daily). To allow for flexibility in the plan, Dominion Energy has assumed installation will take approximately 3 days (180 minutes total) per cofferdam. Removal of these sheet piles would also occur by a vibratory driver and is estimated to take approximately the same amount of time to remove as it was to install for a total of 3 days per cofferdam. A single cofferdam would take a total of 6 days to install and remove. In total, pile driving (installation and removal) associated with all cofferdams would occur over 54 non-consecutive days.
Collectively, Dominion Energy estimates that the installation and removal of all necessary components for cable landfall activities that have the potential to result in take of marine mammals ( i.e., pile driving of goal posts and cofferdams) would take 108 days. However, within this 45 week period, activities not expected to harass marine mammals would also be occurring ( e.g., area preparation, material transportation, equipment staging, etc. ) as the activities necessary for the installation and removal of all relevant goal posts and cofferdams are not consecutive
of marine mammals ( i.e., pile driving of goal posts and cofferdams) would take 108 days. However, within this 45 week period, activities not expected to harass marine mammals would also be occurring ( e.g., area preparation, material transportation, equipment staging, etc. ) as the activities necessary for the installation and removal of all relevant goal posts and cofferdams are not consecutive. Therefore, Dominion Energy has estimated that activities potentially resulting in the take of marine mammals would only be occurring for approximately 6 months between May 1st through October 31st, 2024, which is what is described here. Although temporary cofferdam installation and removal is anticipated to occur from May 1st through October 31st of 2024 and take approximately 6 months, per Dominion Energy's construction schedule, both installation and removal will not occur within a consecutive 6 days (the total number of days for installation and removal to occur) but may instead occur at different points during the 6 month estimated duration.
High-Resolution Geophysical Surveys
HRG surveys would be conducted to identify any seabed debris and to support micro-siting of the WTG and OSS foundations and all cable routes. After construction is complete, HRG surveys would be conducted to ensure that all underwater project components have been properly installed. These surveys may utilize acoustic equipment such as multibeam echosounders, side scan sonars, shallow penetration sub-bottom profilers (SBPs) ( e.g., Compressed High-Intensity Radiated Pulses (CHIRPs) non-parametric SBP), medium penetration sub-bottom profilers ( e.g., sparkers and boomers), and ultra-short baseline positioning equipment, some of which are expected to result in the take of marine mammals. Surveys would occur annually, with durations dependent on the activities occurring in that year ( i.e., construction years versus operational years)
sed High-Intensity Radiated Pulses (CHIRPs) non-parametric SBP), medium penetration sub-bottom profilers ( e.g., sparkers and boomers), and ultra-short baseline positioning equipment, some of which are expected to result in the take of marine mammals. Surveys would occur annually, with durations dependent on the activities occurring in that year ( i.e., construction years versus operational years). Of the HRG equipment types proposed for use, the following sources have the potential to result in take of marine mammals:
• Shallow penetration sub-bottom profilers (SBPs) to map the near-surface stratigraphy (top 0 to 5 m (0 to 16 ft) of sediment below seabed). A CHIRP system emits sonar pulses that increase in frequency over time. The pulse length frequency range can be adjusted to meet
• Medium penetration SBPs (boomers) to map deeper subsurface stratigraphy as needed. A boomer is a broad-band sound source operating in the 3.5 Hz to 10 kHz frequency range. This system is typically mounted on a sled and towed behind the vessel.
• Medium penetration SBPs (sparkers) to map deeper subsurface stratigraphy as needed. A sparker creates acoustic pulses from 50 Hz to 4 kHz omni-directionally from the source that can penetrate several hundred meters into the seafloor. These are typically towed behind the vessel with adjacent hydrophone arrays to receive the return signals.
Table 4 identifies all the representative survey equipment that may be used during the CVOW-C proposed project
urface stratigraphy as needed. A sparker creates acoustic pulses from 50 Hz to 4 kHz omni-directionally from the source that can penetrate several hundred meters into the seafloor. These are typically towed behind the vessel with adjacent hydrophone arrays to receive the return signals.
Table 4 identifies all the representative survey equipment that may be used during the CVOW-C proposed project.
Table 4—Acoustic Sources Planned for Use During the CVOW-C Proposed Project and Their Operational Parameters Equipment classification Representative equipment Operating frequencies (kHz) L p L p,pk Primary beam width (degrees) Pulse duration (millisecond) Subsea Positioning/ultra-short baseline (USBL) Sonardyne Ranger 2 USBL EvoLogics S2CR 35-55 48-78 188 178 191 186 90 Horizontally Omnidirectional 1 500-600 ixBlue Gaps 20-30 191 194 200 9-11 Multibeam Echosounder R2Sonics 2026 170-450 191 221 0.45 × 0.45-1 × 1 0.015-1.115 Synthetic Aperture Sonar (SAS), combined bathymetry/sidescan a Kraken Aquapix 337 210 213 >135 vertical, 1 horizontal 1-10 Side Scan Sonar a EdgeTech 4200 dual frequency 300 and 600 b 206 b 212 140 5-10 Parametric SBP Innomar SES-2000 Medium 100 2-22 241 247 2 0.07-1 NonParametric SBP EdgeTech 216 CHIRP 2-16 193 196 15-25 5-40 EdgeTech 512 CHIRP 0.5-12 c 177 c 191 16-41 20 Medium Penetration Seismic Geo Marine Dual 400 Sparker 800J 0.25-4 d 200 d 210 Omnidirectional 0.5-0.8 Applied Acoustics S-Boom (Triple Plate Boomer 1000J) 0.5-3.5 e 203 e 213 f 60 10 Magnetometer (Towed) Geometrics G882 200 192 190 7 1.13 Note: dB re 1 µPa m—decibels referenced to 1 MicroPascal at 1 meter; kHz—kilohertz. a The operating frequencies of these sources are above all relevant marine mammal hearing thresholds (>180 kHz) and are not expected to cause take by harassment of marine mammals. b The source level is based on data from Crocker and Franantonio (2016) using the EdgeTech 4200 at 100 percent power and 100 kHz as a proxy
e: dB re 1 µPa m—decibels referenced to 1 MicroPascal at 1 meter; kHz—kilohertz. a The operating frequencies of these sources are above all relevant marine mammal hearing thresholds (>180 kHz) and are not expected to cause take by harassment of marine mammals. b The source level is based on data from Crocker and Franantonio (2016) using the EdgeTech 4200 at 100 percent power and 100 kHz as a proxy. c The source level is based on data from Crocker and Franantonio (2016) using the EdgeTech 512i at 100 percent power as a proxy. d The source level is based information provided by the source manufacturer in the supplemental attachment to the ITA application called “Noise Level Stacked 400—tuned”. e The source level is based on data from Crocker and Franantonio (2016) using the Applied Acoustic S-Boom with CSP-N Energy Source set at 1,000 joules as a proxy. f The beam width is based on data from Crocker and Franantonio (2016) using the Applied Acoustics S-Boom as a proxy. As shown in Table 4 above, multibeam echosounders and side scan sonars used by Dominion Energy operate at frequencies above 180 kHz, which is outside of any marine mammal hearing range. Hence, take from these sources is not anticipated. In addition, due to the characteristics of non-impulsive sources ( i.e., Ultra-Short BaseLine (USBL), Innomar, and other parametric sub-bottom profilers), take is not anticipated due to operating characteristics like very narrow beam width which limit acoustic propagation. Finally, Dominion Energy may also use magnetometers; however, this equipment does not have an acoustic output, hence no take is anticipated. No harassment can be reasonably expected from the operation of any of these sources; therefore, they are not considered further in this proposed action. The sources that have the potential to result in harassment to marine mammals include CHIRPs, boomers, and sparkers.
HRG surveys would utilize between two or three vessels working concurrently in different sections of the Lease Area and Export Cable Routes
nt can be reasonably expected from the operation of any of these sources; therefore, they are not considered further in this proposed action. The sources that have the potential to result in harassment to marine mammals include CHIRPs, boomers, and sparkers.
HRG surveys would utilize between two or three vessels working concurrently in different sections of the Lease Area and Export Cable Routes. Both vessels would be operating several kilometers apart at any one time. On average, 58 km (36 mi) would be surveyed each survey day, per vessel, at a speed of approximately 2.4 km/hour (1.3 kts) on a 24-hour basis although some vessels may only operate during daylight hours (survey vessels operating for 12-hours). During the five-years the proposed rule would be effective an estimated area of 64,264 km 2 (24,812.5 mi 2 ; 15,879,980.2 acres) will be surveyed across the CVOW-C project area.
HRG site characterization surveys would occur annually and throughout the five years of the proposed authorization with duration dependent on the activities occurring in that year ( i.e., construction versus non-construction year). However, HRG survey activities would not commence earlier than February 5, 2024 ( i.e., the effective date of the proposed rule). The HRG survey schedule assumes 24-hour operations and does account for periods of potential downtime due to inclement weather or technical malfunctions. HRG surveys are anticipated to operate at any time of year for a maximum of 1,108 active sound source days ( i.e., days in which an acoustic source would be used) over the five-year project. Up to 65 days are anticipated pre-construction, 307 are anticipated to occur during the primary construction years (2025 and 2026), and 736 would occur the post-construction years (368 survey days annually). While the effective period of the proposed rulemaking would continue through a few months in 2029, no activities are planned to occur during this year so none are described here
-year project. Up to 65 days are anticipated pre-construction, 307 are anticipated to occur during the primary construction years (2025 and 2026), and 736 would occur the post-construction years (368 survey days annually). While the effective period of the proposed rulemaking would continue through a few months in 2029, no activities are planned to occur during this year so none are described here. An approximated schedule for Dominion Energy's HRG survey effort is shown in Table 5. As Dominion Energy is not sure of the exact geographic locations of the survey effort, these values cannot cleanly be broken up between the Lease Area and the Export Cable Routes. However, the values presented in Table 5 provide a comprehensive accounting of the total survey effort anticipated to occur, annually, by Dominion Energy.
Table 5—Proposed HRG Survey Schedule for the CVOW-C Project Survey segment Year Duration (days) a Pre-Lay Surveys 2024 65 As-Built Surveys and Pre-Lay Surveys 2025 249 As-Built Surveys 2026 58 Post-Construction Surveys 2027 368 Post-Construction Surveys 2028 368 a As multiple vessels ( i.e., two survey vessels) may be operating concurrently across the project area, each day that a survey vessel is operating counts as a single survey day. For example, if two vessels are operating in one of the Export Cable Routes and one is operating in the Lease Area, but both are operating concurrently, this counts as two survey days. Cable Laying and Installation
Cable burial operations would occur both in the Lease Area and export cable routes from the least area to shore. The inter-array cables would connect the 176 WTGs to any one of the three OSSs. Cables within the Export Cable Routes would carry power from the OSSs to shore at the landfall location near the firing range at the State Military Reservation in Virginia Beach, Virginia
and Installation
Cable burial operations would occur both in the Lease Area and export cable routes from the least area to shore. The inter-array cables would connect the 176 WTGs to any one of the three OSSs. Cables within the Export Cable Routes would carry power from the OSSs to shore at the landfall location near the firing range at the State Military Reservation in Virginia Beach, Virginia. The offshore export and inter-array cables would be buried in the seabed at a target depth of up to 0.8 m (2.6 ft) to 3 m (9.8 ft), although the exact depth will depend on the substrate in the area.
Cable laying, cable installation, and cable burial activities planned to occur during the construction of the CVOW-C project may include the following: jet plowing, jet trenching, chain cutting, hydro-plowing (simultaneous lay and burial), mechanical plowing (simultaneous lay and burial), pre-trenching (both simultaneous and separate lay and burial), mechanical trenching (simultaneous lay and burial), and/or other available technologies. As the noise levels generated from cable laying and installation work are low, the potential for take of marine mammals to result is discountable. Dominion Energy is not requesting and NMFS is not proposing to authorize take associated with cable laying activities. Therefore, cable laying activities are not analyzed further in this document.
Site/Seafloor Preparation
Prior to installation activities, Dominion Energy would conduct debris clearance, pre-lay grapnel runs, Unexploded Ordnance/Munitions and Explosives of Concern (UXO/MEC) relocation, and pre-lay surveys. While Dominion Energy does not expect any sandwave clearance or boulder removal activities to occur, planned vessel use described below in Table 6 indicates that these activities may occur. Because of this, we include additional information on what these activities may entail and how they would affect marine mammals
nce/Munitions and Explosives of Concern (UXO/MEC) relocation, and pre-lay surveys. While Dominion Energy does not expect any sandwave clearance or boulder removal activities to occur, planned vessel use described below in Table 6 indicates that these activities may occur. Because of this, we include additional information on what these activities may entail and how they would affect marine mammals.
Typically for offshore construction projects, some dredging may be required prior to cable laying due to the presence of sandwaves. Sandwave clearance is typically undertaken where cable exposure is predicted over the lifetime of a project due to seabed mobility. This facilitates cable burial below the reference seabed. Alternatively, sandwave clearance may be undertaken where slopes become greater than approximately 10 degrees (17.6 percent), which could cause instability to the burial tool. Dominion Energy does not anticipate any sandwave clearance (Dominion Energy, 2023). However, while unanticipated, if it becomes necessary to remove sandwaves, Dominion Energy will clear the area using subsea excavation methods. The work could be undertaken by traditional dredging methods such as a trailing suction hopper. Controlled flow excavation may be used to induce water currents to force the seabed into suspicion, where it would otherwise be directed to eventually settle (Dominion Energy, 2023). In some cases, pre-sweeping of the sandwaves may be necessary to provide a sufficient excavated platform at the base of the sandwave for tool installation. Surveys using multi-beams and other equipment may be necessary to inform on the seabed conditions before and after sandwave clearance and cable lay activities (Dominion Energy, 2023).
For monopile and jacket foundation installation, seafloor preparation could include required boulder clearance and removal of any obstructions within the Seafloor Preparation Area at each foundation location
ation. Surveys using multi-beams and other equipment may be necessary to inform on the seabed conditions before and after sandwave clearance and cable lay activities (Dominion Energy, 2023).
For monopile and jacket foundation installation, seafloor preparation could include required boulder clearance and removal of any obstructions within the Seafloor Preparation Area at each foundation location. Scour protection installation will occur prior to and/or after installation and will involve a rock dumping vessel placing scour at each foundation location.
For export cable installation, seafloor preparation typically includes required sandwave leveling, boulder clearance, and removal of any out of service cables. Boulder clearance trials are normally performed prior to wide-scale seafloor preparation activities to evaluate efficacy of boulder clearing techniques. Additionally, pre-lay grapnel runs may be undertaken to remove any seafloor debris along the Export Cable Routes. A specialized vessel will tow a grapnel rig along the centerline of each cable to recover any debris to the deck for appropriate licensed disposal ashore, where practicable. Concrete mattress separation layers may also be installed at cable routes prior to cable installation for both in-service assets as well as out-of-service assets that cannot be safely removed and pose a risk to the CVOW-C Export Cable Routes.
Boulder clearance may also be required in targeted locations to clear boulders along the Export Cable Routes, inter-array cable routes, and/or foundations prior to installation. Boulder removal can be performed using a combination of methods to optimize clearance of boulder debris of varying size and frequency. Removal is based on pre-surveys to identify location, size, and density of boulders. Surveys previously performed by Dominion Energy have indicated that no boulders over 0.5 m, or any other subsea obstructions, have been identified in the project area (Dominion Energy, 2023)
moval can be performed using a combination of methods to optimize clearance of boulder debris of varying size and frequency. Removal is based on pre-surveys to identify location, size, and density of boulders. Surveys previously performed by Dominion Energy have indicated that no boulders over 0.5 m, or any other subsea obstructions, have been identified in the project area (Dominion Energy, 2023). If boulders are encountered during installation activities, Dominion Energy would move them from the Export Cable Routes, using either subsea grabs, or ploughs, and then relocate them to areas as close as possible to the original location of the undersea object (Dominion Energy, 2023). Boulder removal, if necessary to occur based on information obtained during pre-construction surveys, would be performed prior to the installation of the Export Cable Routes and would be completed by a support vessel. A boulder grab or a boulder plow may be used to complete boulder removal prior to installation. A boulder grab involves a grab most likely deployed from a dynamic positioning offshore support vessel being lowered to the seabed, over the targeted boulder. Once “grabbed”, the boulder is relocated away from the cable route and/or foundation location.
Effects from seafloor preparation on marine mammals are expected to be short-term, low intensity, and unlikely to qualify as a take. Dredging, sandwave leveling, and boulder clearance is expected to be extremely localized at any given time, and NMFS expects that any marine mammals would not be exposed at levels or durations likely to disrupt behavioral patterns ( i.e., migrating, foraging, calving, etc. ). Therefore, the potential for take of marine mammals to result from these activities is so low as to be discountable. Dominion Energy did not request and NMFS is not proposing to authorize any takes associated with seabed preparation activities; therefore, they are not analyzed further in this document
or durations likely to disrupt behavioral patterns ( i.e., migrating, foraging, calving, etc. ). Therefore, the potential for take of marine mammals to result from these activities is so low as to be discountable. Dominion Energy did not request and NMFS is not proposing to authorize any takes associated with seabed preparation activities; therefore, they are not analyzed further in this document.
Vessel Operation
Dominion Energy would utilize a variety of vessels to construct the CVOW-C project. Vessels may be used for direct installation or construction activities, surveys, protected species resource monitoring, and for crew and/or supply transfers. All route plans for all vessels would be designed to meet the industry guidelines and best practices in accordance with the International Chamber of Shipping guidance. All vessels would utilize Automatic Identification Systems (AIS) for all aspects of the project, as required by the United States Coast Guard. AIS would be required to monitor the number of vessels and traffic patterns for analysis and compliance with vessel speed requirements. All vessels will operate in accordance with applicable rules and regulations for maritime operation within U.S. Federal and state waters.
The largest vessels are expected to be used during the WTG installation phase with floating/jack-up crane barges, cable-laying vessels, supply/crew vessels, and/or associated tugs and barges transporting construction equipment and materials. Large work vessels ( e.g., jack-up installation vessels and DP cable-laying vessels) for WTG and OSS foundation installation will generally transit to the work location and remain in the area until installation is complete. These large vessels will move slowly over a short distance between work locations. In contrast, other vessels will travel between several ports and the Lease Area over the course of the construction period following mandatory vessel speed restrictions (see Proposed Mitigation section)
on installation will generally transit to the work location and remain in the area until installation is complete. These large vessels will move slowly over a short distance between work locations. In contrast, other vessels will travel between several ports and the Lease Area over the course of the construction period following mandatory vessel speed restrictions (see Proposed Mitigation section). These vessels will range in size from smaller crew transport boats to tug and barge vessels. However, construction crews responsible for assembling the WTGs will hotel onboard installation vessels at sea, thus limiting the number of crew vessel transits expected during the installation of the Lease Area.
While marine mammals may respond to the presence of a vessel, given the predictable movement and ubiquitous presence of vessels in the marine environment, and especially the variable sizes, which consist of smaller support vessels that are predominate during offshore wind development, exposure to transiting vessels would not generally be expected to result in the disruption of marine mammal behavioral patterns such that a take would occur. As part of various vessel-based construction activities, including cable laying and construction material delivery, dynamic positioning thrusters may be utilized to hold vessels in position or move slowly. Sound produced through use of dynamic positioning thrusters is similar to that produced by transiting vessels, and dynamic positioning thrusters are typically operated either in a similarly predictable manner or used for short durations around stationary activities. Construction-related vessel activity, including the use of dynamic positioning thrusters, is not expected to result in take of marine mammals. Dominion Energy did not request and NMFS does not propose to authorize any take associated with vessel activity
c positioning thrusters are typically operated either in a similarly predictable manner or used for short durations around stationary activities. Construction-related vessel activity, including the use of dynamic positioning thrusters, is not expected to result in take of marine mammals. Dominion Energy did not request and NMFS does not propose to authorize any take associated with vessel activity.
Dominion Energy has executed a lease agreement for a portion of the existing Portsmouth Marine Terminal facility in the city of Portsmouth, Virginia, to serve as a Construction Port (Sections 1-3, Dominion Energy, 2023). The Construction Port would be used to stage and store the monopiles and relevant transition pieces and to stage and store and pre-assemble wind turbine generation components. Dominion Energy is also currently evaluating several alternatives to lease portions of existing port facilities in the Hampton Roads, Virginia area for an operation and maintenance facility for the CVOW-C proposed project. The preferred location is Lambert's Point, located on a brownfield site in Norfolk, Virginia, although existing facilities at the Virginia Port Authority's Portsmouth Marine Terminal or Newport News Marine Terminal may also be viable options. These ports will continue to assist Dominion Energy to support offshore construction, assembly and fabrication, crew transfers, and logistics.
Vessel types and usage estimated to occur during the entire five-year effective period of the proposed rule, if issued, is shown in Table 6. NMFS references the reader to Dominion Energy's COP for additional information on vessels planned for use during the CVOW-C proposed project (Dominion Energy, 2023)
y to support offshore construction, assembly and fabrication, crew transfers, and logistics.
Vessel types and usage estimated to occur during the entire five-year effective period of the proposed rule, if issued, is shown in Table 6. NMFS references the reader to Dominion Energy's COP for additional information on vessels planned for use during the CVOW-C proposed project (Dominion Energy, 2023).
Table 6—Proposed Project Vessel Use During the 5-Year CVOW-C Project 1 Vessel role Vessel class Number of vessels Breadth (ft) Length (ft) Draft (ft) Days on project, including spare positions Most likely operating period Frequency of transit Transit destination Scour Protection Installation Fall Pipe Vessel 1 106 507 25 657 10/2023 to 12/2024 and 02/2025 to 10/2025 Weekly Canada/USA. Transport Monopile/Transition Pieces from U.S. Port to Installation Site U.S. Barge 2 105 400 20 823 04/2024 to 12/2025 (188+17)/2 = 103 cycles in total for all barges Portsmouth, VA. Tugs for Monopile/Transition Piece Transport Barges U.S. Ocean-going Tug 3 41 132 18 823 04/2024 to 12/2025 103 + 52 = 155 cycles in total Portsmouth, VA. Monopile/Transition Piece/Offshore Substation Installation Heavy Lift Vessel (HLV) 1 161 711 36 804 04/2024 to 12/2025 Monthly Europe/Hampton Roads, VA. Noise Monitoring Crew Transfer Vessel (CTV) 2 34 84 7 512 05/2024 to 10/2024 and 05/2025 to 10/2025 Daily Portsmouth, VA. Noise Mitigation Platform Support Vessel 1 100 454 29 512 05/2024 to 10/2024 and 05/2025 to 10/2025 2 cycles in total + X due to bad weather Portsmouth, VA. Crew Transfer CTV 1 23 65 6 822 04/2024 to 12/2025 Every 2 nd day Portsmouth, VA. Jacket Installation DP HLV 1 161 710 36 Monthly Europe/Hampton Roads, VA. Noise Monitoring for Jacket Installation Crew Transfer Vessel (CTV) 2 34 84 7 Daily Portsmouth, VA. Noise Mitigation for Jacket Installation Platform Support Vessel 1 100 454 29 Daily Portsmouth, VA. Transport Jackets/TopSides From EU Port to Installation Site HLV 1 138 568 35 186 11/2024 to 04/2025 3 cycles in total Europe
Jacket Installation DP HLV 1 161 710 36 Monthly Europe/Hampton Roads, VA. Noise Monitoring for Jacket Installation Crew Transfer Vessel (CTV) 2 34 84 7 Daily Portsmouth, VA. Noise Mitigation for Jacket Installation Platform Support Vessel 1 100 454 29 Daily Portsmouth, VA. Transport Jackets/TopSides From EU Port to Installation Site HLV 1 138 568 35 186 11/2024 to 04/2025 3 cycles in total Europe. Assist Tugboat For Topside Installation U.S. Ocean-going Tug 1 35 112 19 Daily Hampton Roads, VA. Offshore Cable Commissioning (Contingency Vessel) DP2 JUV 2 230 132 20 288 11/2024 to 07/2025 N/A N/A. Nearshore Trenchless Installation Drill Rig Spread 2 40 9 N/A 262 09/2023 to 02/2024 N/A (staged at the direct pipe punch-out locations) Hampton Roads, VA. Nearshore Marine Assistance U.S. Multi Purpose Support Vessel (Multicat) 2 40 92 14 262 Weekly Portsmouth, VA. Nearshore Marine Assistance U.S. Tug (Small) 1 35 112 19 262 Weekly Portsmouth, VA. Landfall Landfall Beach Spread 1 N/A N/A N/A 523 01/2023 to 04/2024 and Weekly Hampton Roads, VA. Shore Pull-in U.S. Pull-in Support Barge 1 105 400 20 523 07/2024 to 09/2025 Weekly Portsmouth, VA. Shore Pull-in U.S. Workboat (Tug) 4 41 132 18 523 Weekly Portsmouth, VA. Cable Lift Jack-Up Installation Vessel (Contingency Vessel) JUV 1 105 144 13 Pre-lay Grapnel Run Multipurpose Support Vessel 1 59 266 19 77 Weekly Portsmouth, VA. Pre-installation Survey Survey Vessel 1 234 187 10 180 Weekly Portsmouth, VA. Cable Laying and Burial Shallow-draft Cable Lay Vessel 1 110 401 18 523 Monthly Europe/Hampton Roads, VA. Anchor Handling Multi Purpose Support Vessel (Multicat) 2 40 92 14 523 Daily Hampton Roads, VA. Transport Cable Multi Purpose Support Vessel 3 79 289 15 131 Single Trip Europe/Hampton Roads, VA. Cable Burial Hydroplow (Jetting) 1 20 53 14 523 N/A Europe/Hampton Roads, VA. Crew Transfer CTV 1 34 87 10 523 Every 2nd Day Portsmouth, VA. As-built Survey Survey Vessel 1 234 87 10 46 Weekly Portsmouth, VA
chor Handling Multi Purpose Support Vessel (Multicat) 2 40 92 14 523 Daily Hampton Roads, VA. Transport Cable Multi Purpose Support Vessel 3 79 289 15 131 Single Trip Europe/Hampton Roads, VA. Cable Burial Hydroplow (Jetting) 1 20 53 14 523 N/A Europe/Hampton Roads, VA. Crew Transfer CTV 1 34 87 10 523 Every 2nd Day Portsmouth, VA. As-built Survey Survey Vessel 1 234 87 10 46 Weekly Portsmouth, VA. Pre-lay Survey (Offshore Export Cable) Survey Vessel 34 87 10 10 180 1/2023 to 04/2024 and 08/2024 to 09/2025 and 11/2025 to 02/2026 Weekly Portsmouth, VA. Cable Laying and Burial (Offshore Export Cable) Deep-draft Cable Lay Vessel 1 106 528 22 535 Monthly Hampton Roads, VA. Cable Laying and Burial (Offshore Export Cable) Deep-draft Cable Lay Vessel 1 39 110 9 470 Monthly Europe/Hampton Roads, VA. Cable burial (Offshore Export Cable) Trenching Support or Cable Laying Vessel 1 105 529 25 604 Monthly Europe/Hampton Roads, VA-. Cable burial (Offshore Export Cable) Trenching Support or Cable Laying Vessel 1 112 561 28 605 Monthly Europe/Hampton Roads, VA-. Cable burial (Offshore Export Cable) Burial Tool (Post-lay Jetting) 2 25 46 19 1,209 Monthly Europe/Hampton Roads, VA-. Offshore Jointing Vessel (Offshore Export Cable) 1 23 565 6 Monthly Europe/Hampton Roads, VA. Pre-lay Grapnel Run (Inter Array Cable) Multipurpose Support Vessel 1 26 92 9 109 01/2023 to 04/2024 and 11/2024 to 05/2026 Weekly Portsmouth, VA. Pre-lay Survey (Inter-Array Cable) Survey Vessel 1 23 85 5 52 Weekly Portsmouth, VA. Cable Laying and burial (Inter-Array Cable) Deep-draft Cable Lay Vessel 1 106 528 25 558 Every 60 days Europe/Hampton Roads, VA. Multipurpose Service Vessel (Inter-Array Cable) W2W 2 76 292 18 303 Monthly Hampton Roads, VA. Crew Transfer (Inter-Array Cable) CTV 2 23 65 6 558 Every 2nd Day Portsmouth, VA. Cable Burial (Inter-Array Cable) Trenching Support Vessel or Cable Laying Vessel 1 105 529 37 559 Every 60 days Hampton Roads, VA
y Cable) Deep-draft Cable Lay Vessel 1 106 528 25 558 Every 60 days Europe/Hampton Roads, VA. Multipurpose Service Vessel (Inter-Array Cable) W2W 2 76 292 18 303 Monthly Hampton Roads, VA. Crew Transfer (Inter-Array Cable) CTV 2 23 65 6 558 Every 2nd Day Portsmouth, VA. Cable Burial (Inter-Array Cable) Trenching Support Vessel or Cable Laying Vessel 1 105 529 37 559 Every 60 days Hampton Roads, VA. Cable Burial (Inter-Array Cable) Burial tool (Post-lay Jetting) 1 25 46 19 558 Every 60 days Hampton Roads, VA. As-built Survey (Inter-Array Cable) Deep draft Cable Lay Vessel 1 106 528 25 38 Weekly Portsmouth, VA. WTG Installation JUV 1 184 472 23 923 08/2025 to 02/2027 Vessel 1: Every 10-14 days Vessel 2: N/A Vessel 1: Portsmouth, VA Vessel 2: N/A. Transport WTGs from U.S. port to installation site U.S. Barge 2 100 400 20 792 Approximately every 3 days Portsmouth, VA. Transport WTGs from U.S. Port to Installation Site U.S. Ocean-going Tug 2 41 132 18 792 Approximately every 3 days Portsmouth, VA. Assist Tugboat U.S. Ocean-going Tug 1 35 112 19 Approximately every 3 days Hampton Roads, VA. Commissioning Spread Multi-role subsea Support Vessel with W2W 1 52 354 18 792 08/2025 to 04/2027 Bi-weekly Portsmouth, VA. Site Security Safety vessel, Nearshore Trenchless Installation 1 Varies Varies Varies 1.8684 09/2023 to 08/2027 Bi-weekly Portsmouth, VA. Removing Sandwaves (Contingency Vessel) Trailer Suction Hopper Dredger 1 92 480 30 117.6 2023 Daily Portsmouth, VA. Boulder Pickering (Contingency Vessel) Anchor Handling Tug + Crane Barge 2 46 146 21 117.6 2023 Weekly Portsmouth, VA. Boulder Ploughing (Contingency Vessel) Anchor Handling Tug + Towed Plow 1 36 190 11 157.2 2023 Weekly Portsmouth, VA. Crossing Protection (Concrete Mattresses) Fall Pipe Vessel or Deep Draft Cable Lay Vessel 1 46 146 21 126 2024 to 2026 Between 2 and 27 cycles Portsmouth, VA. Note: N/A means not applicable and—means the information was not provided by Dominion Energy
.6 2023 Weekly Portsmouth, VA. Boulder Ploughing (Contingency Vessel) Anchor Handling Tug + Towed Plow 1 36 190 11 157.2 2023 Weekly Portsmouth, VA. Crossing Protection (Concrete Mattresses) Fall Pipe Vessel or Deep Draft Cable Lay Vessel 1 46 146 21 126 2024 to 2026 Between 2 and 27 cycles Portsmouth, VA. Note: N/A means not applicable and—means the information was not provided by Dominion Energy. 1 While most of these vessels are planned for construction, not all would be used. However, NMFS has opted to include all possible vessels with all available information to provide the best possible understanding of what vessels may be involved in the CVOW-C proposed project. Helicopter Usage
Dominion Energy may supplement vessel-based transport with helicopter usage to transfer crew to and from both the shore and the Lease Area (crew transfer vessels described in Table 6 above does not consider helicopter use and thus, is a conservative estimate). Helicopter usage would align with the best practices from the Federal Aviation Administration and other relevant stakeholders when determining routes and altitudes for travel. Helicopter use is expected primarily from 2024-2026 at a rate of up to four roundtrip flights per week, equating to 208 roundtrips annually and up to 624 roundtrips total. Project-related aircraft would only occur at low altitudes over water during takeoff and landing at an offshore location where one or more vessels are located. Helicopters produce sounds that can be audible to marine mammals; however, most sound energy from aircraft reflects off the air-water interface as only sound radiated downward within a 26-degree cone penetrates below the surface water (Urick, 1972)
related aircraft would only occur at low altitudes over water during takeoff and landing at an offshore location where one or more vessels are located. Helicopters produce sounds that can be audible to marine mammals; however, most sound energy from aircraft reflects off the air-water interface as only sound radiated downward within a 26-degree cone penetrates below the surface water (Urick, 1972). Due to the intermittent nature and the small area potentially ensonified by this sound source for a very limited duration, Dominion Energy did not request, and NMFS is not proposing to authorize take of marine mammals incidental to helicopter flights; therefore, this activity will not be discussed further in this proposed action.
Fisheries Monitoring Surveys
Dominion Energy plans to undertake fisheries monitoring surveys, in partnership with the Virginia Institute of Marine Sciences (VIMS), Atlantic surf clam ( Spisula solidissima ) fishers, black sea bass ( Centropristis striata ) fishers, whelk ( Buccinidae spp.) fishers, Rutgers University, and the Virginia Marine Resource Commission (VMRC), as required by BOEM to support the regulatory filings for renewable energy projects proposed in the Atlantic Lease Areas (30 CFR 585.627(a)(3)). Fisheries monitoring surveys have been designed in accordance with recommendations set forth by the Responsible Offshore Science Alliance (ROSA) Offshore Wind Project Monitoring Framework and Guidelines ( https://www.rosascience.org/offshore-wind-and-fisheries-resources/ ; ROSA, 2021), which is based extensively on existing BOEM guidance for providing information on fisheries during work related to offshore wind projects ( https://www.boem.gov/sites/default/files/renewable-energy-program/Regulatory-Information/BOEM-Fishery-Guidelines.pdf ; BOEM, 2019). Dominion Energy would sample black sea bass and whelks using pots with weighted groundlines and Atlantic surf clams using a novel dredge tow (designed by Rutgers University and other industry experts)
mation on fisheries during work related to offshore wind projects ( https://www.boem.gov/sites/default/files/renewable-energy-program/Regulatory-Information/BOEM-Fishery-Guidelines.pdf ; BOEM, 2019). Dominion Energy would sample black sea bass and whelks using pots with weighted groundlines and Atlantic surf clams using a novel dredge tow (designed by Rutgers University and other industry experts). The pot/trap surveys will have a two-day soak time. Dominion Energy will be using on-demand fishing systems aimed at reducing the entanglement risk to protected species. These systems include, but are not limited to, spooled systems, buoy and stowed systems, lift bag systems, and grappling (more information on these systems can be found at https://www.fisheries.noaa.gov/new-england- ). The survey tows completed by this dredge will be shorter than typical commercial tows. Dredge tows do not inherently have the potential to result in take of marine mammals. Pot-based surveys may, absent mitigation, result in the take of marine mammals. However, Dominion Energy would implement mitigation and monitoring measures to avoid taking marine mammals, including, but not limited to: monitoring for marine mammals before and during dredging and gear deployment activities, not deploying or pulling gear in certain circumstances, maintaining marine mammal watches at least 15 minute before to both the deployment and retrieval of the gear, and moving to a new sampling location if a marine mammal appears at risk of interactions with the gear. A full description of the mitigation measures can be found in the Proposed Mitigation section. Dominion Energy had also proposed to conduct trawl surveys; however, they subsequently removed trawling from their plans. Hence, trawl surveys would not occur.
With the implementation of these measures, Dominion Energy does not anticipate, and NMFS is not proposing, to authorize take of marine mammals incidental to fishery surveys
igation measures can be found in the Proposed Mitigation section. Dominion Energy had also proposed to conduct trawl surveys; however, they subsequently removed trawling from their plans. Hence, trawl surveys would not occur.
With the implementation of these measures, Dominion Energy does not anticipate, and NMFS is not proposing, to authorize take of marine mammals incidental to fishery surveys. Given no take is anticipated from these surveys, impacts from fishery surveys will not be discussed further in this document aside from listing the required mitigation measures (see Proposed Mitigation section).
Description of Marine Mammals in the Area of Specified Activities
Thirty-nine marine mammal species under NMFS' jurisdiction have geographic ranges within the western North Atlantic OCS (Hayes et al., 2022), with six of these being protected under the Endangered Species Act (ESA). However, for reasons described below, Dominion Energy has requested and NMFS proposes to authorize take of only 21 species (comprising 22 stocks) of marine mammals. Sections 3 and 4 of Dominion Energy's application summarize available information regarding status and trends, distribution and habitat preferences, and behavior and life history of the potentially affected species (Dominion Energy, 2023). NMFS fully considered all of this information, and we refer the reader to these descriptions in the application, incorporated here by reference, instead of reprinting the information. Additional information regarding population trends and threats may be found in NMFS's Stock Assessment Reports (SARs; https://www.fisheries.noaa.gov/national/marine-mammal-protection/marine-mammal-stock-assessments ) and more general information about these species ( e.g., physical and behavioral descriptions) may be found on NMFS's website ( https://www.fisheries.noaa.gov/find-species )
ormation. Additional information regarding population trends and threats may be found in NMFS's Stock Assessment Reports (SARs; https://www.fisheries.noaa.gov/national/marine-mammal-protection/marine-mammal-stock-assessments ) and more general information about these species ( e.g., physical and behavioral descriptions) may be found on NMFS's website ( https://www.fisheries.noaa.gov/find-species ).
Of the 39 marine mammal species and/or stocks with geographic ranges that include the CVOW-C project area found in the coastal and offshore waters of Virginia (Table 11 in Dominion Energy's ITA application), 17 are not expected to be present or are considered rare or unexpected in the project area based on sighting and distribution data; they are, therefore, not discussed further beyond the explanation provided here. Specifically, the following cetacean species are known to occur offshore of Virginia but are not expected to occur in the project area due to the location of preferred habitat outside the Lease Area and Export Cable Routes, based on the best available information: dwarf sperm whale ( Kogia sima ), Fraser's dolphin ( Lagenodelphis hosei ), killer whale ( Orcinus orca ), pygmy killer whale ( Feresa attenuata ), rough-toothed dolphin ( Steno bredanensis ), spinner dolphin ( Stenalla longirostris orientalis ), striped dolphin ( Stenella coeruleoalba ), white-beaked dolphin ( Lagenorhynchus albirostris ), Cuvier's beaked whale ( Ziphius cavirostris ), four species of Mesoplodont beaked whales ( Mesoplodon densitostris, M. europaeus, M. mirus, and M. bidens ), and the blue whale ( Balaenoptera musculus ). Two species of phocid pinnipeds are also uncommon in the CVOW-C project area, including: harp seals ( Pagophilus groenlandica ) and hooded seals ( Cystophora cristata )
agenorhynchus albirostris ), Cuvier's beaked whale ( Ziphius cavirostris ), four species of Mesoplodont beaked whales ( Mesoplodon densitostris, M. europaeus, M. mirus, and M. bidens ), and the blue whale ( Balaenoptera musculus ). Two species of phocid pinnipeds are also uncommon in the CVOW-C project area, including: harp seals ( Pagophilus groenlandica ) and hooded seals ( Cystophora cristata ). In addition, the Florida manatees ( Trichechus manatus; a sub-species of the West Indian manatee) has been previously documented as an occasional visitor to the Mid-Atlantic region during summer months (Morgan et al., 2002; Cummings et al., 2014). However, manatees are managed by the U.S. Fish and Wildlife Service (USFWS) and are not considered further in this document.
None of the aforementioned species were observed during HRG surveys conducted by Dominion Energy in and around Virginia from 2018-2021 based on monitoring reports received for previously issued high-resolution site characterization IHAs (85 FR 55415, September 8, 2020; 85 FR 81879, December 17, 2020; 86 FR 21298, April 22, 2021), for the construction of the CVOW Pilot Project (85 FR 30930, May 21, 2020) or Unexploded Ordnance/Munitions and Explosives of Concern (UXO/MEC)-specific surveys (83 FR 39062, August 8, 2018). However, four marine mammal species that might otherwise be considered rare were detected through PAM/visually observed by marine mammal monitors during work under these previous IHAs. These include: false killer whales (one acoustically detected, four observed), pygmy sperm whales (one acoustically detected, one observed), Clymene dolphin (five observed), and melon-headed whales (one acoustically detected, five recorded). Although these were detected in low numbers, these observations/detections did occur within locations near the CVOW-C project area where NMFS considers it reasonably likely that some individuals may be observed during the five-year effective period of the proposed rulemaking
etected, one observed), Clymene dolphin (five observed), and melon-headed whales (one acoustically detected, five recorded). Although these were detected in low numbers, these observations/detections did occur within locations near the CVOW-C project area where NMFS considers it reasonably likely that some individuals may be observed during the five-year effective period of the proposed rulemaking. Because of this, NMFS has proposed to authorize take of these species.
Table 7 lists all species and stocks for which take is expected and proposed to be authorized for this action, and summarizes information related to the population or stock, including regulatory status under the MMPA and Endangered Species Act (ESA) and potential biological removal (PBR) level, where known. PBR is defined by the MMPA as the maximum number of animals, not including natural mortalities, that may be removed from a marine mammal stock while allowing that stock to reach or maintain its optimum sustainable population (16 U.S.C. 1362(20)) and can be found in NMFS's SARs. While no mortality is anticipated or proposed for authorization here, PBR and annual serious injury and mortality from anthropogenic sources are included here as gross indicators of the status of the species and other threats.
Marine mammal abundance estimates presented in this document represent the total number of individuals that make up a given stock or the total number estimated within a particular study or survey area. NMFS's stock abundance estimates for most species represent the total estimate of individuals within the geographic area, if known, that comprises that stock. For some species, this geographic area may extend beyond U.S. waters. All managed stocks in this region are assessed in NMFS's U.S. Atlantic and Gulf of Mexico SARs
tock or the total number estimated within a particular study or survey area. NMFS's stock abundance estimates for most species represent the total estimate of individuals within the geographic area, if known, that comprises that stock. For some species, this geographic area may extend beyond U.S. waters. All managed stocks in this region are assessed in NMFS's U.S. Atlantic and Gulf of Mexico SARs. All values presented in Table 7 are the most recent available at et al., 2022) and draft 2022 SARs available online at: https://www.fisheries.noaa.gov/national/marine-mammal-protection/draft-marine-mammal-stock-assessment-reports .
Table 7—Marine Mammal Species 5 Likely to Occur Near the Project Area That May Be Taken by Dominion Energy's Proposed Activities Common name Scientific name Stock ESA/ MMPA status; strategic (Y/N) 1 Stock abundance (CV, N min , most recent abundance survey) 2 PBR Annual mortalities or serious injuries (M/SI) 3 Order Artiodactyla—Cetacea—Superfamily Mysticeti (baleen whales) Family Balaenidae: North Atlantic right whale Eubalaena glacialis Western Atlantic E, D, Y 338 (0; 332; 2020) 5 0.7 8.1 Family Balaenopteridae (rorquals): Fin whale Balaenoptera physalus Western North Atlantic E, D, Y 6,802 (0.24; 5,573; 2016) 11 1.8 Humpback whale Megaptera novaeangliae Gulf of Maine -, -, Y 1,396 (0; 1,380; 2016) 22 12.15 Minke whale Balaenoptera acutorostrata Canadian Eastern Coastal -, -, N 21,968 (0.31; 17,002; 2016) 170 10.6 Sei whale Balaenoptera borealis Nova Scotia E, D, Y 6,292 (1.02; 3,098; 2016) 6.2 0.8 Family Physeteridae: Sperm whale Physeter macrocephalus North Atlantic E, D, Y 4,349 (0.28; 3,451; 2016) 3.9 0 Family Kogiidae: Pygmy sperm whale 7 8 Kogia breviceps Western North Atlantic -, -, N 7,750 (0.38; 5,689; 2016) 46 0 Family Delphinidae: Atlantic spotted dolphin Stenella frontalis Western North Atlantic -, -, N 39,921 (0.27; 32,032; 2016) 320 0 Atlantic white-sided dolphin Lagenorhynchus acutus Western North Atlantic -, -, N 93,233 (0.71; 54,433; 2016) 544 27 Bottlenose dolphin Turs
; 2016) 3.9 0 Family Kogiidae: Pygmy sperm whale 7 8 Kogia breviceps Western North Atlantic -, -, N 7,750 (0.38; 5,689; 2016) 46 0 Family Delphinidae: Atlantic spotted dolphin Stenella frontalis Western North Atlantic -, -, N 39,921 (0.27; 32,032; 2016) 320 0 Atlantic white-sided dolphin Lagenorhynchus acutus Western North Atlantic -, -, N 93,233 (0.71; 54,433; 2016) 544 27 Bottlenose dolphin Tursiops truncatus Western North Atlantic—Offshore -, -, N 62,851 (0.23; 51,914; 2016) 519 28 Southern Migratory Coastal -, -, Y 3,751 (0.6; 185; See SAR) 23 0-18.3 Clymene dolphin 7 Stenella clymene Western North Atlantic -, -, N 4,237 (1.03; 2,071; 2016) 21 0 Common dolphin Delphinus delphis Western North Atlantic -, -, N 172,897 (0.21; 145,216; 2016) 1,452 390 False killer whale 7 Pseudorca crassidens Western North Atlantic -, -, N 1,791 (0.56; 1,154; 2016) 12 0 Melon-headed whale 7 Peponocephala electra Western North Atlantic -, -, N UNK (UNK; UNK; 2016) UNK 0 Long-finned pilot whale 6 Globicephala melas Western North Atlantic -, -, N 39,215 (0.3; 30,627; 2016) 306 29 Short-finned pilot whale 6 Globicephala macrorhynchus Western North Atlantic -, -, Y 28,924 (0.24, 23,637, See SAR) 236 136 Pantropical spotted dolphin Stenella attenuata Western North Atlantic -, D, N 6,593 (0.52, 4,367, See SAR) 44 0 Risso's dolphin Grampus griseus Western North Atlantic -, -, N 35,215 (0.19; 30,051; 2016) 301 34 Family Phocoenidae (porpoises): Harbor porpoise Phocoena phocoena Gulf of Maine/Bay of Fundy -, -, N 95,543 (0.31; 74,034; 2016) 851 16 Order Carnivora—Superfamily Pinnipedia Family Phocidae (earless seals): Gray seal 4 Halichoerus grypus Western North Atlantic -, -, N 27,300 (0.22; 22,785; 2016) 1,389 4,453 Harbor seal Phoca vitulina Western North Atlantic -, -, N 61,336 (0.08; 57,637; 2018) 1,729 339 1 ESA status: Endangered (E), Threatened (T)/MMPA status: Depleted (D). A dash (-) indicates that the species is not listed under the ESA or designated as depleted under the MMPA
ocidae (earless seals): Gray seal 4 Halichoerus grypus Western North Atlantic -, -, N 27,300 (0.22; 22,785; 2016) 1,389 4,453 Harbor seal Phoca vitulina Western North Atlantic -, -, N 61,336 (0.08; 57,637; 2018) 1,729 339 1 ESA status: Endangered (E), Threatened (T)/MMPA status: Depleted (D). A dash (-) indicates that the species is not listed under the ESA or designated as depleted under the MMPA. Under the MMPA, a strategic stock is one for which the level of direct human-caused mortality exceeds PBR or which is determined to be declining and likely to be listed under the ESA within the foreseeable future. Any species or stock listed under the ESA is automatically designated under the MMPA as depleted and as a strategic stock. 2 NMFS' marine mammal stock assessment reports can be found online at: www.fisheries.noaa.gov/national/marine-mammal-protection/marine-mammal-stock-assessments . CV is the coefficient of variation; N min is the minimum estimate of stock abundance. In some cases, CV is not applicable. 3 These values, found in NMFS' SARs, represent annual levels of human-caused mortality plus serious injury from all sources combined ( e.g., commercial fisheries, ship strike). 4 NMFS' stock abundance estimate (and associated PBR value) applies to the U.S. population only. Total stock abundance (including animals in Canada) is approximately 451,431. The annual M/SI value given is for the total stock. 5 Information on the classification of marine mammal species can be found on the web page for The Society for Marine Mammalogy's Committee on Taxonomy ( https://marinemammalscience.org/science-and-publications/list-marine-mammal-species-subspecies/ ; Committee on Taxonomy (2022)). 6 Although both species are described here, the requested take for both short-finned and long-finned pilot whales has been summarized into a single group (pilot whales spp.)
ecies can be found on the web page for The Society for Marine Mammalogy's Committee on Taxonomy ( https://marinemammalscience.org/science-and-publications/list-marine-mammal-species-subspecies/ ; Committee on Taxonomy (2022)). 6 Although both species are described here, the requested take for both short-finned and long-finned pilot whales has been summarized into a single group (pilot whales spp.). 7 While these species were not originally included in Dominion Energy's request, given recorded sightings/detections of these species during previous Dominion Energy IHAs in the same general area, NMFS has included these as species that may be harassed (by Level B harassment only) during the five-year effective period of this proposed rulemaking. 8 Estimate is for Kogia spp. only. As indicated above, all 21 species and 22 stocks in Table 7 temporally and spatially co-occur with the activity to the degree that take is reasonably likely to occur. Four of the marine mammal species for which take is requested are listed as threatened or endangered under the ESA, including North Atlantic right, fin, sei, and sperm whales. In addition to what is included in Sections 3 and 4 of Dominion Energy's ITA application ( https://www.fisheries.noaa.gov/action/incidental-take-authorization-dominion-energy-virginia-construction-coastal-virginia ), the SARs ( https://www.fisheries.noaa.gov/national/marine-mammal-protection/marine-mammal-stock-assessments ), and NMFS' website ( https://www.fisheries.noaa.gov/species-directory/marine-mammals ), we provide further detail below informing the baseline for select species ( e.g., information regarding current Unusual Mortality Events (UME) and known important habitat areas, such as Biologically Important Areas (BIAs) (Van Parijs, 2015). There are no ESA-designated critical habitats for any species within the CVOW-C project area
ttps://www.fisheries.noaa.gov/species-directory/marine-mammals ), we provide further detail below informing the baseline for select species ( e.g., information regarding current Unusual Mortality Events (UME) and known important habitat areas, such as Biologically Important Areas (BIAs) (Van Parijs, 2015). There are no ESA-designated critical habitats for any species within the CVOW-C project area.
Under the MMPA, a UME is defined as “a stranding that is unexpected; involves a significant die-off of any marine mammal population; and demands immediate response” (16 U.S.C. 1421h(6)). As of April 13, 2023, five UMEs are considered active, with four of these occurring along the U.S. Atlantic coast for various marine mammal species; of these, the most relevant to the CVOW-C project are the North Atlantic right whale and the humpback whale, given the prevalence of these species in the project area. A more recent UME is active for the Northeast pinnipeds (harbor and gray seals) but has only been recorded in Maine, which is outside the project area. Two other UMEs, one for the Atlantic minke whale from 2017-2022 and one for the Northeast pinnipeds (harbor and gray seals) from 2018-2020, are considered non-active and are pending closure. More information on UMEs, including all active, closed, or pending, can be found on NMFS' website at https://www.fisheries.noaa.gov/national/marine-life-distress/active-and-closed-unusual-mortality-events .
Below we include information for a subset of the species that presently have an active or recently closed UME occurring along the Atlantic coast, or for which there is information available related to areas of biological significance. For the majority of species potentially present in the specific geographic region, NMFS has designated only a single generic stock ( e.g., “western North Atlantic”) for management purposes. This includes the “Canadian east coast” stock of minke whales, which includes all minke whales found in U.S
lantic coast, or for which there is information available related to areas of biological significance. For the majority of species potentially present in the specific geographic region, NMFS has designated only a single generic stock ( e.g., “western North Atlantic”) for management purposes. This includes the “Canadian east coast” stock of minke whales, which includes all minke whales found in U.S. waters and is also a generic stock for management purposes. For humpback and sei whales, NMFS defines stocks on the basis of feeding locations, i.e., Gulf of Maine and Nova Scotia, respectively. However, references to humpback whales and sei whales in this document refer to any individuals of the species that are found in the specific geographic region. Any areas of known biological importance (including the BIAs identified in La Brecque et al., 2015) that overlap spatially with the project area are addressed in the species sections below.
North Atlantic Right Whale
The North Atlantic right whale has been listed as Endangered since the ESA was enacted in 1973. They were recently uplisted from Endangered to Critically Endangered on the International Union for Conservation of Nature (IUCN) Red List of Threatened Species (Cooke, 2020). The uplisting was due to a decrease in population size (Pace et al., 2017), an increase in vessel strikes and entanglements in fixed fishing gear (Knowlton et al., 2012; Daoust et al., 2017; Davis and Brillant, 2019; Sharp et al., 2019; Moore et al., 2021; Knowlton et al., 2022), and a decrease in birth rate (Pettis et al., 2021; Reed et al., 2022). The Western Atlantic stock is considered depleted under the MMPA (Hayes et al., 2022). There is a recovery plan (NOAA Fisheries, 2005) for the North Atlantic right whale, and NMFS completed 5-year reviews of the species in 2012,2017, and 2022 which concluded no change to the listing status is warranted
; Knowlton et al., 2022), and a decrease in birth rate (Pettis et al., 2021; Reed et al., 2022). The Western Atlantic stock is considered depleted under the MMPA (Hayes et al., 2022). There is a recovery plan (NOAA Fishe

[Text truncated at 120,000 characters. The full text is on the page linked above.]

## Nearby sections

- [88 FR 16 Kiwifruit Grown in California; Increased Assessment Rate](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2022-28369.md)
- [88 FR 34 Airman Certification Standards and Practical Test Standards for Airmen; Incorporation by Reference](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2022-28378.md)
- [88 FR 805 National Emission Standards for Hazardous Air Pollutants: Lime Manufacturing Plants Amendments](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2022-27994.md)
- [88 FR 820 Safeguarding the Rights of Conscience as Protected by Federal Statutes](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2022-28505.md)
- [88 FR 1149 Changes Related to Reserve Account Administration in Multi-Family Housing (MFH) Direct Loan Programs](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00140.md)
- [88 FR 1171 Consideration of Updates to Trade Practice Regulations](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00111.md)
- [88 FR 1331 Inmate Financial Responsibility Program: Procedures](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00244.md)
- [88 FR 1341 Air Plan Approval; Illinois; VOC RACT Requirements for Aerospace Manufacturing and Rework Operations](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00245.md)
- [88 FR 1532 Military Ocean Terminal Concord, California; Restricted Area](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00380.md)
- [88 FR 1543 Designation of Areas for Air Quality Planning Purposes; California; Coachella Valley Ozone Nonattainment Area; Reclassification to Extreme](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00330.md)
- [88 FR 2047 Commercial Mail Receiving Agencies](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00437.md)
- [88 FR 2050 Air Plan Approval; Virginia; 1997 8-Hour Ozone National Ambient Air Quality Standard Second Maintenance Plan for the Richmond-Petersburg Area](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00091.md)
- [88 FR 2057 Approval of the Clean Air Act, Authority for Hazardous Air Pollutants: Asbestos Management and Control; State of New Hampshire Department of Environmental Services](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00112.md)
- [88 FR 2273 Airworthiness Directives; Airbus SAS Airplanes](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-00186.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2023-08924. Check the current official text before relying on it. Not legal advice.