DEPARTMENT OF TRANSPORTATION Federal Railroad Administration 49 CFR Part 213 [Docket No. FRA-2011-0058, Notice No. 1] RIN 2130-AC28 Track Safety Standards; Improving Rail Integrity AGENCY:
Federal Railroad Administration (FRA), Department of Transportation (DOT).

ACTION:
Notice of proposed rulemaking (NPRM).

SUMMARY:
FRA is proposing to amend the Federal Track Safety Standards to promote the safety of railroad operations by enhancing rail flaw detection processes. In particular, FRA is proposing minimum qualification requirements for rail flaw detection equipment operators, as well as revisions to requirements for effective rail inspection frequencies, rail flaw remedial actions, and rail inspection records. In addition, FRA is proposing to remove regulatory requirements concerning joint bar fracture reporting. This rulemaking is intended to implement section 403 of the Rail Safety Improvement Act of 2008 (RSIA).

DATES:
(1) Written comments must be received by December 18, 2012. Comments received after that date will be considered to the extent possible without incurring additional delay or expense.
(2) FRA anticipates being able to resolve this rulemaking without a public, oral hearing. However if FRA receives a specific request for a public, oral hearing prior to November 19, 2012, one will be scheduled and FRA will publish a supplemental notice in the Federal Register to inform interested parties of the date, time, and location of any such hearing.

ADDRESSES:
Comments: Comments related to this Docket No. FRA-2011-0058, Notice No. 1 may be submitted by any of the following methods:
• Federal eRulemaking Portal: Go to www.Regulations.gov. Follow the online instructions for submitting comments.
• Mail: Docket Management Facility, U.S. Department of Transportation, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590-0001.
• Hand Delivery: Docket Management Facility, U.S
his Docket No. FRA-2011-0058, Notice No. 1 may be submitted by any of the following methods:
• Federal eRulemaking Portal: Go to www.Regulations.gov. Follow the online instructions for submitting comments.
• Mail: Docket Management Facility, U.S. Department of Transportation, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590-0001.
• Hand Delivery: Docket Management Facility, U.S. Department of Transportation, West Building, Ground floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC, between 9 a.m. and 5 p.m. ET, Monday through Friday, except Federal holidays.
• Fax: 202-493-2251.
Instructions: All submissions must include the agency name and docket number or Regulatory Identification Number (RIN) for this rulemaking. Please note that all comments received will be posted without change to www.Regulations.gov , including any personal information provided. Please see the discussion under the Privacy Act heading in the Supplementary Information section of this document.
Docket: For access to the docket to read background documents or comments received, go to www.Regulations.gov at any time or visit the Docket Management Facility, U.S. Department of Transportation, West Building, Ground floor, Room
FOR FURTHER INFORMATION CONTACT:
Carlo Patrick, Staff Director, Office of Railroad Safety, FRA, 1200 New Jersey Avenue SE., Washington, DC 20590 (telephone: 202-493-6399); or Elisabeth Galotto, Trial Attorney, Office of Chief Counsel, FRA, 1200 New Jersey Avenue SE., Washington, DC 20950 (telephone: 202-493-0270).

SUPPLEMENTARY INFORMATION:
Table of Contents for Supplementary Information
I. Executive Summary II. Rail Integrity Overview A. Derailment in 2001 near Nodaway, Iowa B. Derailment in 2006 near New Brighton, Pennsylvania C. Office of Inspector General Report: Enhancing the Federal Railroad Administration's Oversight of Track Safety Inspections, February 24, 2009 D. General Factual Background on Rail Integrity E. Statutory Mandate To Conduct this Rulemaking III
nformation
I. Executive Summary II. Rail Integrity Overview A. Derailment in 2001 near Nodaway, Iowa B. Derailment in 2006 near New Brighton, Pennsylvania C. Office of Inspector General Report: Enhancing the Federal Railroad Administration's Oversight of Track Safety Inspections, February 24, 2009 D. General Factual Background on Rail Integrity E. Statutory Mandate To Conduct this Rulemaking III. Overview of FRA's Railroad Safety Advisory Committee (RSAC) IV. RSAC Track Safety Standards Working Group V. Track Inspection Time Study VI. Section-by-Section Analysis VII. Regulatory Impact and Notices A. Executive Orders 12866 and 13563 and DOT Regulatory Policies and Procedures B. Regulatory Flexibility Act and Executive Order 13272 C. Paperwork Reduction Act D. Environmental Impact E. Federalism Implications F. Unfunded Mandates Reform Act of 1995 G. Energy Impact H. Privacy Act Statement I. Executive Summary
The Track Safety Standards Working Group (Working Group) of FRA's Railroad Safety Advisory Committee (RSAC) was formed on February 22, 2006. On October 27, 2007, the Working Group formed two subcommittees: the Rail Integrity Task Force (RITF) and the Concrete Crosstie Task Force. The RITF was tasked to review the reuse of plug rail and the requirements for internal rail flaw inspections. The RITF met 11 times between November 2007 and April 2010. On September 23, 2010 and December 14, 2010, and the RSAC voted to approve the Working Group's recommended text and adopt it as their recommendation to FRA. The RSAC recommendation formed the basis of this NPRM.
This NPRM proposes requirements related to the following subject areas: defective rails, the inspection of rail, qualified operators, and inspection records. The NPRM also addresses the mandate of section 403 of the Rail Safety Improvement Act of 2008, and removes the joint bar fracture report requirement
t it as their recommendation to FRA. The RSAC recommendation formed the basis of this NPRM.
This NPRM proposes requirements related to the following subject areas: defective rails, the inspection of rail, qualified operators, and inspection records. The NPRM also addresses the mandate of section 403 of the Rail Safety Improvement Act of 2008, and removes the joint bar fracture report requirement. The following is a brief overview of the proposal organized by the subject area:
• Defective Rails
FRA is proposing to provide railroads with a four-hour period in which to verify that a suspected defect exists in the rail section. The primary purpose of the four-hour deferred-verification option is to assist the railroads in improving detector car utilization and production, increase the opportunity to detect larger defects, and ensure that all of the rail the detector car travels over while in service is inspected. Additionally, FRA proposes revisions to the remedial action table in areas such as transverse defects, longitudinal weld defects, and crushed head defects.
• Inspection of Rail
Currently, Class 4 and 5 track, as well as Class 3 track over which passenger trains operate, are required to be tested for internal rail defects at least once every accumulation of 40 million gross tons (mgt) or once a year (whichever time is shorter). Class 3 track over which passenger trains do not operate are required to be tested at least once every accumulation of 30 mgt or once per year (whichever time is longer). When this standard was drafted, railroads were already initiating and implementing the development of a performance-based risk management concept for determination of rail inspection frequency that is often referred to as the “self-adaptive scheduling method.” Under this method, inspection frequency is established based annually on several factors, including the total detected defect rate per test, the rate of service failures between tests, and the accumulated tonnage between tests
development of a performance-based risk management concept for determination of rail inspection frequency that is often referred to as the “self-adaptive scheduling method.” Under this method, inspection frequency is established based annually on several factors, including the total detected defect rate per test, the rate of service failures between tests, and the accumulated tonnage between tests. The railroads then utilize this information to generate and maintain a service failure performance target.
The proposed changes in this NPRM seek to codify standard industry good practices. The NPRM proposes to require railroads to maintain service failure rates of no more than 0.1 service failure per year per mile of track for all Class 4 and 5 track; no more than 0.09 service failure per year per mile of track for all Class 3, 4, and 5 track that carries regularly-scheduled passenger trains or is a hazardous material route; and no more than 0.08 service failure per year per mile of track for all Class 3, 4, and 5 track that carries regularly-scheduled passenger trains and is a hazardous material route.
The NPRM also proposes that internal rail inspections on Class 4 and 5 track, or Class 3 track with regularly-scheduled passenger trains or that is a hazardous materials route, not exceed a time interval of 370 days between inspections or a tonnage interval of 30 million gross tons (mgt) between inspections, whichever is shorter. Internal rail inspections on Class 3 track without regularly-scheduled passenger trains and that is not a hazardous materials route must be inspected at least once each calendar year, with no more than 18 months between inspections, or at least once every 30 mgt, whichever interval is longer, with the additional provision that inspections cannot be more than 5 years apart
ns, whichever is shorter. Internal rail inspections on Class 3 track without regularly-scheduled passenger trains and that is not a hazardous materials route must be inspected at least once each calendar year, with no more than 18 months between inspections, or at least once every 30 mgt, whichever interval is longer, with the additional provision that inspections cannot be more than 5 years apart.
• Qualified Operators
FRA proposes to add a new provision requiring that each provider of rail flaw detection have a documented training program to ensure that a flaw detection equipment operator is qualified to operate each of the various types of equipment currently utilized in the industry for which he or she is assigned to operate.
• Removing the Requirement of a Joint Bar Fracture Report
This NPRM proposes removing the requirement that railroads generate a Joint Bar Fracture Report (Fracture Report) for every cracked or broken continuous welded rail (CWR) joint bar that the track owner discovers during the course of an inspection. The RSAC Working Group ultimately determined that the reports were providing little useful research data to prevent future failures of CWR joint bars. Instead, the Group recommended that a new study be conducted to determine what conditions lead to CWR joint bar failures and include a description of the overall condition of the track in the vicinity of the failed joint(s); photographic evidence of the failed joint, track geometry (gage, alignment, profile, cross-level) at the joint location; and the maintenance history at the joint location.
• Inspection Records
FRA proposes to require that the railroad's rail inspection records include the date of inspection, track identification and milepost for each location tested, type of defect found and size if not removed prior to traffic, and initial remedial action as required by § 213.113. FRA also proposes that all tracks that do not receive a valid
• Section 403 of the RSIA
On October 16, 2008, the RSIA (Pub. L
oposes to require that the railroad's rail inspection records include the date of inspection, track identification and milepost for each location tested, type of defect found and size if not removed prior to traffic, and initial remedial action as required by § 213.113. FRA also proposes that all tracks that do not receive a valid
• Section 403 of the RSIA
On October 16, 2008, the RSIA (Pub. L. 110-432, Division A) was enacted. Section 403(a) of the RSIA required the Secretary to conduct a study of track issues, known as the Track Inspection Time Study (Study). The Study was to determine whether track inspection intervals needed to be amended; whether track remedial action requirements needed to be amended; whether different track inspection and repair priorities and methods were required; and whether the speed of track inspection vehicles should be regulated. As part of the study, section 403(b) instructed the Secretary to consider “the most current rail flaw, rail defect growth, rail fatigue, and other relevant track- or rail-related research and studies,” as well as new inspection technologies, and National Transportation Safety Board (NTSB) and FRA accident information. The study was completed and presented to Congress on May 2, 2011. Section 403(c) of the RSIA further provides that FRA prescribe regulations based on the results of the Study two years after its completion.
On August 16, 2011, RSAC accepted RSAC task 11-02, which was generated in response to the RSIA and to address the recommendations of the Study. After several meetings, the Association of American Railroads (AAR) together with the Brotherhood of Maintenance of Way Employes Division (BMWED) stated that FRA had met its obligations under section 403(c) of the RSIA through its rulemakings on vehicle/track interaction (VTI), concrete crossties, and the proposals contained in this NPRM related to rail integrity. They also stated that additional action on RSAC task 11-02 was unnecessary and recommended that the task should be closed
otherhood of Maintenance of Way Employes Division (BMWED) stated that FRA had met its obligations under section 403(c) of the RSIA through its rulemakings on vehicle/track interaction (VTI), concrete crossties, and the proposals contained in this NPRM related to rail integrity. They also stated that additional action on RSAC task 11-02 was unnecessary and recommended that the task should be closed. FRA took the proposal under advisement after the February meeting and conducted its own analysis as to the fulfillment of the mandates under section 403. FRA concluded that these statutory obligations were being fulfilled and on April 13, 2012, the Working Group approved a proposal to conclude RSAC task 11-02. On April 26, 2012, the RSAC concluded that FRA's recent and ongoing rulemakings were sufficiently addressing the statutorily-mandated topics and that no additional work by the RSAC was necessary. Thus, the full RSAC approved the proposal and closed RSAC task 11-02.
• Economic Impact
The bulk of the proposed regulation revises FRA's Track Safety Standards by codifying current industry good practices. In analyzing the economic impacts of the proposed rule, FRA does not believe that any existing operation will be adversely affected by these changes, nor does FRA believe that the changes will induce any costs.
Through its regulatory evaluation, FRA has explained what the likely benefits for this proposed rule would be, and has provided a cost-benefit analysis. FRA anticipates that this rulemaking would enhance the current Track Safety Standards by allocating more time to rail inspections, increasing the opportunity to detect larger defects sooner, providing assurance that qualified operators are inspecting the rail, and causing inspection records to be updated with more useful information. The main benefit associated with this proposed rule is derived from granting the railroads a four-hour window to verify some defects found in a rail inspection
ting more time to rail inspections, increasing the opportunity to detect larger defects sooner, providing assurance that qualified operators are inspecting the rail, and causing inspection records to be updated with more useful information. The main benefit associated with this proposed rule is derived from granting the railroads a four-hour window to verify some defects found in a rail inspection. Without the additional time to verify a defect, railroads currently must stop their inspection anytime a suspect defect is identified, and then resume their inspection after the defect is verified. The defects subject to the proposed deferred verification allowance are usually considered less likely to cause immediate rail failure, and require less restrictive remedial action. The additional time permits railroads to avoid the cost of paying their internal inspection crews or renting a rail car flaw detector an additional half day, saving the industry $8,400 per day. FRA believes the value of the anticipated benefits would easily justify the cost of implementing the rule as proposed.
Table E1—Total Discounted Net Benefits for 20-Year Period Discount factor 7 percent 3 percent Four Hour Inspection Window $34,754,935 $46,982,768 Net Benefit 34,754,935 46,982,768 The rule's total net benefits are estimated to be about $61.3 million over a 20-year period. The benefits are approximately $47.0 million discounted at a 3 percent rate, or about $34.8 million, discounted at a 7 percent rate. FRA believes that such improvements would more than likely result from the adoption of the proposed rule by the railroad industry.
II. Rail Integrity Overview
A. Derailment in 2001 Near Nodaway, Iowa
On March 17, 2001, the California Zephyr, a National Railroad Passenger Corporation (Amtrak) passenger train carrying 257 passengers and crew members, derailed near Nodaway, Iowa. According to the NTSB, sixteen cars decoupled from the two locomotives and eleven cars went off the rails
proposed rule by the railroad industry.
II. Rail Integrity Overview
A. Derailment in 2001 Near Nodaway, Iowa
On March 17, 2001, the California Zephyr, a National Railroad Passenger Corporation (Amtrak) passenger train carrying 257 passengers and crew members, derailed near Nodaway, Iowa. According to the NTSB, sixteen cars decoupled from the two locomotives and eleven cars went off the rails. Seventy-eight people were injured and one person died from the accident. See NTSB/RAB-02-01.
The NTSB discovered a broken rail at the point of derailment. The broken pieces of rail were reassembled at the scene, and it was determined that they came from a 15 1/2 -foot section of rail that had been installed as replacement rail, or “plug rail,” at this location in February, 2001. The replacement had been made because, during a routine scan of the existing rail on February 13, 2001, the Burlington Northern and Santa Fe Railway (now BNSF Railway Company or BNSF) discovered internal defects that could possibly hinder the rail's effectiveness. A short section of the continuous welded rail that contained the defects was removed, and a piece of replacement rail was inserted. However, the plug rail did not receive an ultrasonic inspection before or after installation.
During the course of the accident investigation, the NTSB could not reliably determine the source of the plug rail. While differing accounts were given concerning the origin of the rail prior to its installation in the track, the replacement rail would most likely have been rail which was removed from another track location for reuse. Analysis of the rail found that the rail failed due to fatigue initiating from cracks associated with the precipitation of internal hydrogen. If the rail had been ultrasonically inspected prior to its reuse, it is likely that the defects could have been identified and that section of rail might not have been used as plug rail
have been rail which was removed from another track location for reuse. Analysis of the rail found that the rail failed due to fatigue initiating from cracks associated with the precipitation of internal hydrogen. If the rail had been ultrasonically inspected prior to its reuse, it is likely that the defects could have been identified and that section of rail might not have been used as plug rail.
As a result of its investigation of the Nodaway, Iowa, railroad accident, the NTSB recommended that FRA require railroads to conduct ultrasonic or other appropriate inspections to ensure that rail used to replace defective segments of existing rail is free from internal defects. See NTSB Recommendation—02-5.
B. Derailment in 2006 Near New Brighton, Pennsylvania
On October 20, 2006, Norfolk Southern Railway Company (NS) train 68QB119 derailed while crossing the Beaver River railroad bridge in New Brighton, Pennsylvania. The train was pulling eighty-three tank cars loaded with denatured ethanol, a flammable liquid. Twenty-three of the tank cars derailed near the east end of the bridge, causing several of the cars to fall into the Beaver River. Twenty of the derailed cars released their loads of ethanol, which subsequently ignited and burned for forty-eight hours. Some of the unburned ethanol liquid was released into the river and the surrounding soil. Homes and businesses within a seven-block area of New Brighton and in an area adjacent to the accident had to be evacuated for days. While no injuries or fatalities resulted from the accident, NS estimated economic and environmental damages to be $5.8 million. See NTSB/RAB-08-9 through 12.
The NTSB determined that the probable cause of the derailment was an undetected internal rail defect identified to be a detail fracture. The NTSB also noted that insufficient regulation regarding internal rail inspection may have contributed to the accident
or fatalities resulted from the accident, NS estimated economic and environmental damages to be $5.8 million. See NTSB/RAB-08-9 through 12.
The NTSB determined that the probable cause of the derailment was an undetected internal rail defect identified to be a detail fracture. The NTSB also noted that insufficient regulation regarding internal rail inspection may have contributed to the accident.
This accident demonstrates the potential for rail failure with subsequent derailment if a railroad's internal rail defect detection process fails to detect an internal rail flaw. This accident also indicates a need for adequate requirements that will ensure rail inspection and maintenance programs identify and remove rail with internal defects before they reach critical size and result in catastrophic rail failures.
C. Office of Inspector General Report: Enhancing the Federal Railroad Administration's Oversight of Track Safety Inspections
On February 24, 2009, the Office of Inspector General (OIG) for the Department of Transportation (DOT) issued a report presenting the results of its audit of FRA's oversight of track-related safety issues. The report made two findings. First, the OIG found that FRA's safety regulations for internal rail flaw testing did not require the railroads to report the specific track locations, such as milepost numbers or track miles that were tested during these types of inspections. Second, the OIG found that FRA's inspection data systems did not provide adequate information for determining the extent to which FRA's track inspectors have reviewed the railroads' records for internal rail flaw testing and visual track inspections to assess compliance with safety regulations
ck locations, such as milepost numbers or track miles that were tested during these types of inspections. Second, the OIG found that FRA's inspection data systems did not provide adequate information for determining the extent to which FRA's track inspectors have reviewed the railroads' records for internal rail flaw testing and visual track inspections to assess compliance with safety regulations. The OIG recommended that FRA revise its track safety regulations for internal rail flaw testing to require railroads to report track locations covered during internal rail flaw testing, and that FRA develop specific inspection activity codes for FRA inspectors to use to report on whether the record reviews FRA inspectors conduct were for internal rail flaw testing or visual track inspections. Enhancing the Federal Railroad Administration's Oversight of Track Safety Inspections, Department of Transportation, Office of Inspector General, CR-2009-038, February 24, 2009.
D. General Factual Background on Rail Integrity 1
1 This section is primarily based on information from two sources: Progress in Rail Integrity Research, DOT/FRA/Ord-01/18, D. Jeong 2001; and I. H. H. A. Guidelines to Best Practices for Heavy Haul Railway Operations; Infrastructure Construction and Maintenance Issues, Section 4.3.1 Rail Defect Detection and Technologies, Carlo M. Patrick, R. Mark Havira, Gregory A. Garcia, Library of Congress Control No. 2009926418, 2009.
The single most important asset to the railroad industry is its rail infrastructure, and historically the primary concern of the railroad companies is the probability of rail flaw development, broken rails, and subsequent derailments. This has resulted in railroads improving their rail maintenance practices, purchasing more wear-resistant rail, improving flaw-detection technologies, and increasing rail inspection frequencies in an effort to prevent rail defect development
ructure, and historically the primary concern of the railroad companies is the probability of rail flaw development, broken rails, and subsequent derailments. This has resulted in railroads improving their rail maintenance practices, purchasing more wear-resistant rail, improving flaw-detection technologies, and increasing rail inspection frequencies in an effort to prevent rail defect development. The direct cost of an undetected rail failure is the difference between the cost of replacing the rail failure on an emergency basis, and the cost of the organized replacement of detected defects. However, a rail defect that goes undetected and results in a train derailment can cause considerable additional costs such as excessive service interruption, extensive traffic rerouting, environmental damage, and potential injury and loss of life.
To maximize the life of rail, railroads must accept a certain rate of defect development. This results in the railroad relying on regular rail inspection cycles, and strategically renewing rail that is obviously showing evidence of fatigue. The development of internal rail defects is an inevitable consequence of the accumulation and effects of fatigue under repeated loading. The challenge for the railroad industry is to avoid the occurrence of rail service failure due to the presence of an undetected defect. Rail service failures are expensive to repair and can lead to costly service disruptions and possibly derailments.
The effectiveness of a rail inspection program depends on the test equipment being properly designed and capable of reliably detecting rail defects of a certain size and orientation, while also ensuring that the test frequencies correspond to the growth rate of critical defects. The objective of a rail inspection program is to reduce the annual costs resulting from broken rails, which involve several variables.
The predominant factor that determines the risk of rail failure is the rate of development of internal flaws
detecting rail defects of a certain size and orientation, while also ensuring that the test frequencies correspond to the growth rate of critical defects. The objective of a rail inspection program is to reduce the annual costs resulting from broken rails, which involve several variables.
The predominant factor that determines the risk of rail failure is the rate of development of internal flaws. Internal rail flaws have a period of origin and a period often referred to as slow crack growth life. The risk is introduced when internal flaws remain undetected during their growth to a critical size. This occurs when the period between when the crack develops to a detectable size is significantly shorter than the required test interval.
In practice, the growth rate of rail defects is considered highly inconsistent and unpredictable. Rail flaw detection in conjunction with railroad operations often presents some specific problems. This is a result of high traffic volumes that load the rail and accelerate defect growth, while at the same time decreasing the time available for rail inspection. Excessive wheel loading can result in stresses to the rail that can increase defect growth rates. Consequently, heavy axle loading can lead to rail surface fatigue that may prevent detection of an underlying rail flaw by the test equipment. Most railroads attempt to control risk by monitoring test reliability through an evaluation process of fatigue service failures that occur soon after testing, and by comparing the ratio of service failures or broken rails to detected rail defects.
The tonnage required to influence defect development is also considered difficult to predict; however, once initiated, transverse defect development is influenced by tonnage. Rapid growth rates can also be associated with rail where high-tensile residual stresses are present in the railhead and in CWR in lower temperature ranges where the rail is in high longitudinal tension
tected rail defects.
The tonnage required to influence defect development is also considered difficult to predict; however, once initiated, transverse defect development is influenced by tonnage. Rapid growth rates can also be associated with rail where high-tensile residual stresses are present in the railhead and in CWR in lower temperature ranges where the rail is in high longitudinal tension.
It is common for railroads to control risk by monitoring the occurrence of both detected and service defects. For U.S. railroads, risk is typically evaluated to warrant adjustment of test frequencies. The railroads attempt to control the potential of service failure by testing more frequently.
In general, the approach in conducting rail integrity research is focused to confirm whether rail defects can be detected by periodic inspection before they grow large enough to cause a rail failure. In the context of rails, damage tolerance is the capability of the rail to resist failure and continue to operate safely with damage (i.e., rail defects). This implies that a rail containing a crack or defect is weaker than a normal rail, and that the rail's strength decreases as the defect grows. As growth continues, the applied stresses will eventually exceed the rail's strength and cause a failure. Such information can be used to establish guidelines for determining the appropriate frequency of rail inspections to mitigate the risk of rail failure from undetected defects.
Current detection methods that are performed in the railroad industry utilize various types of processes with human involvement in the interpretation of the test data
tually exceed the rail's strength and cause a failure. Such information can be used to establish guidelines for determining the appropriate frequency of rail inspections to mitigate the risk of rail failure from undetected defects.
Current detection methods that are performed in the railroad industry utilize various types of processes with human involvement in the interpretation of the test data. These include the:
• Portable test process, which consists of an operator pushing a test device over the rail at a walking pace while visually interpreting the test data;
• Start/stop process, where a vehicle-based flaw detection system tests at a slow speed (normally not exceeding 20 mph) gathering data that is presented to the operator on a test monitor for interpretation;
• Chase car process, which consists of a lead test vehicle performing the flaw detection process in advance of a verification chase car; and
• Continuous test process, which consists of operating a high-speed, vehicle-based test system non-stop along a designated route, analyzing the test data at a centralized location, and subsequently verifying suspect defect locations.
The main technologies utilized for non-destructive testing on U.S. railroads are the ultrasonic and induction methods. Ultrasonic technology is the primary technology used, and induction technology is currently used as a complimentary system. As with any non-destructive test method, these technologies are susceptible to physical limitations that allow poor rail head surface conditions to negatively influence the detection of rail flaws. The predominant types of these poor rail head surface conditions are shells, engine driver burns, spalling, flaking, corrugation, and head checking. Other conditions that are encountered include heavy lubrication or debris on the rail head.
Induction testing requires the introduction of a high-level, direct current into the top of the rail and establishing a magnetic field around the rail head
. The predominant types of these poor rail head surface conditions are shells, engine driver burns, spalling, flaking, corrugation, and head checking. Other conditions that are encountered include heavy lubrication or debris on the rail head.
Induction testing requires the introduction of a high-level, direct current into the top of the rail and establishing a magnetic field around the rail head. An induction sensor unit is then passed through the magnetic field. The presence of a rail flaw will result in a distortion of the current flow, and it is this distortion of the magnetic field that is detected by the search unit.
Ultrasonics can be briefly described as sound waves, or vibrations, that propagate at a frequency that is above the range of human hearing, normally above a range of 20,000 Hz, or cycles per second. The range normally utilized during current flaw detection operations is 2.25 MHz (million cycles per second) to 5.0 MHz. Ultrasonic waves are generated into the rail by piezo-electric transducers that can be placed at various angles with respect to the rail surface. The ultrasonic waves produced by these transducers normally scan the entire rail head and web, as well as the portion of the base directly beneath the web. Internal rail defects represent a discontinuity in the steel material that constitutes the rail. This discontinuity acts as a reflector to the ultrasonic waves, resulting in a portion of the wave being reflected back to the respective transducer. These conditions include rail head surface conditions, internal or visible rail flaws, weld upset/finish, or known reflectors within the rail geometry such as drillings or rail ends. The information is then processed by the test system and recorded in the permanent test data record. Interpretation of the reflected signal is the responsibility of the test system operator.
Railroads have always inspected track visually to detect rail failures, and have been using crack-detection devices in rail-test vehicles since the 1930s
hin the rail geometry such as drillings or rail ends. The information is then processed by the test system and recorded in the permanent test data record. Interpretation of the reflected signal is the responsibility of the test system operator.
Railroads have always inspected track visually to detect rail failures, and have been using crack-detection devices in rail-test vehicles since the 1930s. Meanwhile, trends in the railroad industry have been to increase traffic density and average axle loads. Current rail integrity research recognizes and addresses the need to review and update rail inspection strategies and subsequent preventive measures. This would include the frequency interval of rail inspection, remedial action for identified rail defects, and improvements to the performance of the detection process.
FRA has sponsored research related to railroad safety for several decades. One part of this research program is focused on rail integrity. The general objectives of FRA rail integrity research have been to improve railroad safety by reducing rail failures and the associated risks of train derailment, and to do so more efficiently through new maintenance practices that increase rail service life. Brief descriptions of the studies conducted by FRA focus on four different areas: Analysis of rail defects; residual stresses in rail; strategies for rail testing; and other areas related to rail integrity, which include advances in nondestructive inspection techniques and feasibility of advanced materials for rail, rail lubrication, rail grinding, and wear. Moreover, rail integrity research is an ongoing effort, and will continue as annual tonnages and average axle loads increase on the nation's railroads.
Due to the limitations of current technology to detect internal flaws beneath surface conditions and in the base flange area, FRA's research has been focusing on other rail flaw detection technologies
l, rail lubrication, rail grinding, and wear. Moreover, rail integrity research is an ongoing effort, and will continue as annual tonnages and average axle loads increase on the nation's railroads.
Due to the limitations of current technology to detect internal flaws beneath surface conditions and in the base flange area, FRA's research has been focusing on other rail flaw detection technologies. One laser-based ultrasonic rail defect detection prototype, which is being developed by the University of California-San Diego under an FRA Office of Research and Development grant, has produced encouraging results in ongoing field testing. The project goal is to develop a rail defect detection system that provides better defect detection reliability and a higher inspection speed than is currently achievable. The primary target is the detection of transverse defects in the rail head. The method is based on ultrasonic guided waves, which can travel below surface discontinuities, hence minimizing the masking effect of transverse cracks by surface shelling. The inspection speed can be improved greatly also because guided waves run long distances before attenuating.
Non-destructive test systems perform optimally on perfect test specimens. However, rail in track is affected by repeated wheel loading that results in the plastic deformation of the rail running surface that can create undesirable surface conditions as described previously. These conditions can influence the development of rail flaws. These conditions can also affect the technologies currently utilized for flaw detection by limiting their detection capabilities. Therefore, it is important that emerging technology development continue, in an effort to alleviate the impact of adverse rail surface conditions.
E. Statutory Mandate To Conduct This Rulemaking
The first Federal Track Safety Standards (Standards) were published on October 20, 1971, following the enactment of the Federal Railroad Safety Act of 1970, Public Law 91-458, 84 Stat
ion capabilities. Therefore, it is important that emerging technology development continue, in an effort to alleviate the impact of adverse rail surface conditions.
E. Statutory Mandate To Conduct This Rulemaking
The first Federal Track Safety Standards (Standards) were published on October 20, 1971, following the enactment of the Federal Railroad Safety Act of 1970, Public Law 91-458, 84 Stat. 971 (October 16, 1970), in which Congress granted to FRA comprehensive authority over “all areas of railroad safety.” See 36 FR 20336. FRA envisioned the new Standards to be an evolving set of safety requirements See 49 CFR 1.49. FRA carried out this review on behalf of the Secretary, which resulted in FRA issuing a final rule amending the Standards in 1998. See 63 FR 34029, June 22, 1998; 63 FR 54078, Oct. 8, 1998.
Pursuant to 49 U.S.C. 20103, the Secretary may prescribe regulations as necessary in any area of railroad safety. As described in the next section, FRA began its examination of rail integrity issues through RSAC on October 27, 2007. Then, on October 16, 2008, the RSIA was enacted. As previously noted, section 403(a) of the RSIA required the Secretary to conduct a study of track issues known as the Track Inspection Time Study (Study). In doing so, section 403(b) required the Secretary to consider “the most current rail flaw, rail defect growth, rail fatigue, and other relevant track- or rail-related research and studies” as part of the Study. The Study was completed and submitted to Congress on May 2, 2011. Section 403(c) also required the Secretary to promulgate regulations based on the results of the study. As delegated by the Secretary, see 49 CFR 1.49, FRA utilized its advisory committee, RSAC and its Rail Integrity Task Force, to help develop the information necessary to fulfill the RSIA's mandates in this area.
FRA notes that section 403 of the RSIA contains one additional mandate, which FRA has already fulfilled, promulgating regulations for concrete crossties
ased on the results of the study. As delegated by the Secretary, see 49 CFR 1.49, FRA utilized its advisory committee, RSAC and its Rail Integrity Task Force, to help develop the information necessary to fulfill the RSIA's mandates in this area.
FRA notes that section 403 of the RSIA contains one additional mandate, which FRA has already fulfilled, promulgating regulations for concrete crossties. On April 1, 2011, FRA published a final rule on concrete crosstie regulations per this mandate in section 403(d). That final rule specifies requirements for effective concrete crossties, for rail fastening systems connected to concrete crossties, and for automated inspections of track constructed with concrete crossties. See 76 FR 18073. FRA received two petitions for reconsideration in response to that final rule, and responded to them by final rule published on September 9, 2011. See 76 FR 55819.
III. Overview of FRA's Railroad Safety Advisory Committee (RSAC)
In March 1996, FRA established RSAC, which provides a forum for developing consensus recommendations to the Administrator of FRA on rulemakings and other safety program issues. RSAC includes representation from all of the agency's major stakeholders, including railroads, labor organizations, suppliers and manufacturers, and other interested parties. An alphabetical list of RSAC members follows:
AAR; American Association of Private Railroad Car Owners; American Association of State Highway and Transportation Officials (AASHTO); American Chemistry Council; American Petrochemical Institute; American Public Transportation Association (APTA); American Short Line and Regional Railroad Association (ASLRRA); American Train Dispatchers Association; Amtrak; Association of Railway Museums; Association of State Rail Safety Managers (ASRSM); BMWED; Brotherhood of Locomotive Engineers and Trainmen (BLET); Brotherhood of Railroad Signalmen (BRS); Chlorine Institute; Federal Transit Administration;* Fertilizer Institute; High Speed Ground Transportation Association; Inst
egional Railroad Association (ASLRRA); American Train Dispatchers Association; Amtrak; Association of Railway Museums; Association of State Rail Safety Managers (ASRSM); BMWED; Brotherhood of Locomotive Engineers and Trainmen (BLET); Brotherhood of Railroad Signalmen (BRS); Chlorine Institute; Federal Transit Administration;* Fertilizer Institute; High Speed Ground Transportation Association; Institute of Makers of Explosives; International Association of Machinists and Aerospace Workers; International Brotherhood of Electrical Workers; Labor Council for Latin American Advancement;* League of Railway Industry Women;* National Association of Railroad Passengers; National Association of Railway Business Women;* National Conference of Firemen & Oilers; National Railroad Construction and Maintenance Association; NTSB;* Railway Supply Institute; Safe Travel America; Secretaria de Comunicaciones y Transporte;* Sheet Metal Workers International Association; Tourist Railway Association Inc.; Transport Canada;* Transport Workers Union of America; Transportation Communications International Union/BRC; Transportation Security Administration; and United Transportation Union (UTU). *Indicates associate, non-voting membership. When appropriate, FRA assigns a task to RSAC, and after consideration and debate, RSAC may accept or reject the task. If the task is accepted, RSAC establishes a working group that possesses the appropriate expertise and representation of interests to develop recommendations to FRA for action on the task. These recommendations are developed by consensus. A working group may establish one or more task forces to develop facts and options on a particular aspect of a given task. The task force then provides that information to the working group for consideration.
If a working group comes to a unanimous consensus on recommendations for action, the package is presented to the full RSAC for a vote. If the proposal is accepted by a simple majority of RSAC, the proposal is formally recommended to FRA
forces to develop facts and options on a particular aspect of a given task. The task force then provides that information to the working group for consideration.
If a working group comes to a unanimous consensus on recommendations for action, the package is presented to the full RSAC for a vote. If the proposal is accepted by a simple majority of RSAC, the proposal is formally recommended to FRA. FRA then determines what action to take on the recommendation. Because FRA staff members play an active role at the working group level in discussing the issues and options and in drafting the language of the consensus proposal, FRA is often favorably inclined toward the RSAC recommendation.
However, FRA is in no way bound to follow the recommendation, and the agency exercises its independent judgment on whether a recommended rule achieves the agency's regulatory goals, is soundly supported, and is in accordance with policy and legal requirements. Often, FRA varies in some respects from the RSAC recommendation in developing the actual regulatory proposal or final rule. Any such variations would be noted and explained in the rulemaking document issued by FRA. However, to the maximum extent practicable, FRA utilizes RSAC to provide consensus recommendations with respect to both proposed and final agency action. If RSAC is unable to reach consensus on a recommendation for action, the task is withdrawn and FRA determines the best course of action.
IV. RSAC Track Safety Standards Working Group
The Track Safety Standards Working Group (Working Group) was formed on February 22, 2006. On October 27, 2007, the Working Group formed two 2 the task statement description for the RITF was to review the controls applied to the reuse of plug rail and ensure a common understanding within the regulated community concerning requirements for internal rail flaw inspections
ety Standards Working Group
The Track Safety Standards Working Group (Working Group) was formed on February 22, 2006. On October 27, 2007, the Working Group formed two 2 the task statement description for the RITF was to review the controls applied to the reuse of plug rail and ensure a common understanding within the regulated community concerning requirements for internal rail flaw inspections.
2 After the accident in Nodaway, the NTSB recommended that FRA “[r]equire railroads to conduct ultrasonic or other appropriate inspections to ensure that rail used to replace defective segments of existing rail is free from internal defects.” NTSB Safety Recommendation R-02-5, dated March 5, 2002.
However, after the New Brighton accident, and in response to NTSB recommendations R-08-9, R-8-10, and R-08-11, 3 the RITF was given a second task on September 10, 2008, which directed the group to do the following: (1) Evaluate factors that can and should be included in determining the frequency of internal rail flaw testing and develop a methodology for taking those factors into consideration with respect to mandatory testing intervals; (2) determine whether the quality and consistency of internal rail flaw testing can be improved and how; (3) determine whether adjustments to current remedial action criteria are warranted; and (4) evaluate the effect of rail head wear, surface conditions and other relevant factors on the acquisition and interpretation of internal rail flaw test results.
3 After the New Brighton accident, the NTSB issued three additional safety recommendations dated May 22, 2008: (1) FRA should “[r]eview all railroads' internal rail defect detection and require changes to those procedures as necessary to eliminate exception to the requirement for an uninterrupted, continuous search for rail defects.” R-08-9; (2) FRA should “[r]equire railroads to develop rail inspection and maintenance programs based on damage-tolerance principles, and approve those programs
May 22, 2008: (1) FRA should “[r]eview all railroads' internal rail defect detection and require changes to those procedures as necessary to eliminate exception to the requirement for an uninterrupted, continuous search for rail defects.” R-08-9; (2) FRA should “[r]equire railroads to develop rail inspection and maintenance programs based on damage-tolerance principles, and approve those programs. Include in the requirement that railroads demonstrate how their programs will identify and remove internal defects before they reach critical size and result in catastrophic rail failures. Each program should take into account, at a minimum, accumulated tonnage, track geometry, rail surface conditions, rail head wear, rail steel specifications, track support, residual stresses in the rail, rail defect growth rates, and temperature differentials.” R-08-10; and (3) FRA should “[r]equire that railroads use methods that accurately measure rail head wear to ensure that deformation of the head does not affect the accuracy of the measurements.” R-08-11.
The RITF met on November 28-29, 2007; February 13-14, 2008; April 15-16, 2008; July 8-9, 2008; September 16-17, 2008; February 3-4, 2009; June 16-17, 2009; October 29-30, 2009; January 20-21, 2010; March 9-11, 2010; and April 20, 2010. The RITF's findings were reported to the Working Group for approval on July 28-30, 2010. The Working Group reached a consensus on the majority of the RITF's work and forwarded proposals to the full RSAC on September 23, 2010 and December 14, 2010. The RSAC voted to approve the Working Group's recommended text, which provided the basis for this NPRM
0-21, 2010; March 9-11, 2010; and April 20, 2010. The RITF's findings were reported to the Working Group for approval on July 28-30, 2010. The Working Group reached a consensus on the majority of the RITF's work and forwarded proposals to the full RSAC on September 23, 2010 and December 14, 2010. The RSAC voted to approve the Working Group's recommended text, which provided the basis for this NPRM.
In addition to FRA staff, the members of the Working Group include the following:
• AAR, including the Transportation Technology Center, Inc., and members from BNSF, Canadian National Railway (CN), Canadian Pacific Railway (CP), CSX Transportation, Inc., The Kansas City Southern Railway Company (KCS), NS, and Union Pacific Railroad Company (UP);
• Amtrak;
• APTA, including members from Northeast Illinois Regional Commuter Railroad Corporation (Metra), Long Island Rail Road (LIRR), and Southeastern Pennsylvania Transportation Authority (SEPTA);
• ASLRRA (representing short line and regional railroads);
• BLET;
• BMWED;
• BRS;
• John A. Volpe National Transportation Systems Center (Volpe Center)
• NTSB; and
• UTU.
FRA worked closely with RSAC in developing its recommendations and believes that RSAC has effectively addressed rail inspection safety issues regarding the frequency of inspection, rail defects, remedial action, and operator qualification. FRA has greatly benefited from the open, informed exchange of information during the meetings. There is a general consensus among railroads, rail labor organizations, State safety managers, and FRA concerning the primary principles set forth in this NPRM. FRA believes that the expertise possessed by RSAC representatives enhances the value of the recommendations, and FRA has made every effort to incorporate them in this proposed rule.
Nevertheless, the Working Group was unable to reach consensus on one item that FRA has elected to include in this NPRM
zations, State safety managers, and FRA concerning the primary principles set forth in this NPRM. FRA believes that the expertise possessed by RSAC representatives enhances the value of the recommendations, and FRA has made every effort to incorporate them in this proposed rule.
Nevertheless, the Working Group was unable to reach consensus on one item that FRA has elected to include in this NPRM. The Working Group could not reach consensus on the definition of “segment” length, which FRA proposes to be utilized in a new performance-based test frequency determination in § 213.237, “Inspection of Rail,” as discussed below.
V. Track Inspection Time Study
As noted previously, section 403(a) of the RSIA required the Secretary to conduct a study of track issues. The Study was to determine whether track inspection intervals needed to be amended; whether track remedial action requirements needed to be amended; whether different track inspection and repair priorities and methods were required; and whether the speed of track inspection vehicles should be more specifically regulated. In conducting the Study, section 403(b) instructed the Secretary to consider “the most current rail flaw, rail defect growth, rail fatigue, and other relevant track- or rail-related research and studies,” as well as new inspection technologies, and NTSB and FRA accident information. The Study was completed and presented to Congress on May 2, 2011. Section 403(c) further provided that FRA prescribe regulations based on the results of the Study two years after its completion.
On August 16, 2011, RSAC accepted task 11-02, which was generated in response to the RSIA and to address the recommendations of the Study
w inspection technologies, and NTSB and FRA accident information. The Study was completed and presented to Congress on May 2, 2011. Section 403(c) further provided that FRA prescribe regulations based on the results of the Study two years after its completion.
On August 16, 2011, RSAC accepted task 11-02, which was generated in response to the RSIA and to address the recommendations of the Study. Specifically, the purpose of the task was “[t]o consider specific improvements to the Track Safety Standards or other responsive actions to the Track Inspection Time Study required by § 403 (a) through (c) of the RSIA and other relevant studies and resources.” The first meeting of the Working Group assigned to the task occurred on October 20, 2011, and a second meeting was held on December 20, 2011. At the third meeting on February 7-8, 2012, the AAR together with the BMWED stated that FRA had met its obligations under section 403(c) of the RSIA through its rulemakings on vehicle/track interaction (VTI), concrete crossties, and the proposals contained in this NPRM on rail integrity. They also stated that additional action on RSAC task 11-02 was unnecessary and recommended that the task should be closed. FRA took the proposal under advisement after the February meeting and conducted its own analysis as to the fulfillment of the mandates under section 403. FRA concluded that these statutory obligations were being fulfilled and on April 13, 2012, the Working Group approved a proposal to conclude RSAC task 11-02. On April 26, 2012, the full RSAC approved the proposal and closed RSAC task 11-02. The recommendation approved by the full RSAC is described below
meeting and conducted its own analysis as to the fulfillment of the mandates under section 403. FRA concluded that these statutory obligations were being fulfilled and on April 13, 2012, the Working Group approved a proposal to conclude RSAC task 11-02. On April 26, 2012, the full RSAC approved the proposal and closed RSAC task 11-02. The recommendation approved by the full RSAC is described below.
In determining whether regulations were necessary based on the results of the Study, RSAC examined the Study's four issues for improving the track inspection process:
• Expanding the use of automated inspections;
• Developing additional training requirements for track inspectors;
• Considering a maximum inspection speed for track inspection vehicles; and
• Influencing safety culture through a safety reporting system.
The Study's first recommendation was that FRA consider expanding the use of automated inspections to improve inspection effectiveness. Specifically, the Study cited two specific track defects that are more difficult to detect through visual track inspection and could benefit from the use of automated inspection: rail seat abrasion (RSA) and torch cut bolt holes. Through discussion among the affected parties, it was determined that these areas of concern already had been covered under previous rulemaking and regulations. The Concrete Crossties final rule published on April 1, 2011, new § 213.234, “Automated inspection of track constructed with concrete crossties,” specifically employs the use of automated inspection “to measure for rail seat deterioration.” In addition, torch cut bolt holes have been prohibited on track classes 2 and above since 1999, which was codified in §§ 213.121(g) and 213.351(f), and they are easily identifiable through the rail flaw detection technology currently in use. Thus, the RSAC concluded that additional regulations to find such defects would be unnecessary
automated inspection “to measure for rail seat deterioration.” In addition, torch cut bolt holes have been prohibited on track classes 2 and above since 1999, which was codified in §§ 213.121(g) and 213.351(f), and they are easily identifiable through the rail flaw detection technology currently in use. Thus, the RSAC concluded that additional regulations to find such defects would be unnecessary.
Outside of these two specific defects, the RSAC concluded that the instant NPRM would also be revising automated inspection standards in other areas, such as ultrasonic testing. For example, this NPRM proposes changing the ultrasonic testing of rail from a standard based on time and tonnage to one based on self-adaptive performance goals. Thus, the full RSAC concluded that the use of automated inspection has been sufficiently expanded in the areas that are most ideally suited for development at this point. While FRA and RSAC noted that they may wish to make changes to the automated inspection standards in the future, FRA and RSAC nevertheless maintained that the changes stated above sufficiently satisfy the RSIA's mandate.
However, RSAC concurred with FRA, BMWED and AAR that it was important to ensure that any type of report generated from the automated inspection of track, regardless of whether it is mandated by regulation or voluntarily utilized by a railroad, be made available to track inspectors. Therefore, in this NPRM, FRA is issuing policy guidance to encourage track owners and railroads to provide the information from their automated track inspections in a usable format to those persons designated as fully qualified under the Track Safety Standards and assigned to inspect or repair the track over which an automated inspection is made
y a railroad, be made available to track inspectors. Therefore, in this NPRM, FRA is issuing policy guidance to encourage track owners and railroads to provide the information from their automated track inspections in a usable format to those persons designated as fully qualified under the Track Safety Standards and assigned to inspect or repair the track over which an automated inspection is made. This guidance is as follows:
When automated track inspection methods are used by the track owner, FRA recommends that the information from that inspection be provided or made readily available to those persons designated as fully qualified under CFR 213.7 and assigned to inspect or repair the track over which the automated inspection was made.
The second recommendation the Study addressed was whether FRA should develop additional training requirements for track inspectors. RSAC found that it was unnecessary to generate additional training standards under RSAC task 11-02 for two reasons. First, the instant NPRM proposes to create a new § 213.238 to address an area of training that requires new standards. Proposed § 213.238 defines a qualified operator of rail flaw detection equipment and requires that each provider of rail flaw detection service have a documented training program to ensure that a rail flaw detection equipment operator is qualified to operate each of the various types of equipment currently utilized in the industry for which he or she is assigned, and that proper training is provided in the use of newly-developed technologies. Second, the recently published NPRM on Training, Qualification, and Oversight for Safety-Related Railroad Employees, 77 FR 6412 (proposed Feb. 7, 2012) (to be codified at 49 CFR parts 214, 232, and 243), proposes to require that employers develop and submit for FRA review a program detailing how they will train their track inspectors
training is provided in the use of newly-developed technologies. Second, the recently published NPRM on Training, Qualification, and Oversight for Safety-Related Railroad Employees, 77 FR 6412 (proposed Feb. 7, 2012) (to be codified at 49 CFR parts 214, 232, and 243), proposes to require that employers develop and submit for FRA review a program detailing how they will train their track inspectors. As proposed in the NPRM, employees charged with the inspection of track or railroad equipment are considered safety-related railroad employees that each employer must train and qualify. The proposed formal training for employees responsible for inspecting track and railroad equipment is expected to cover all aspects of their duties related to complying with the Federal standards. FRA would expect that the training programs and courses for such employees would include techniques for identifying defective conditions and would address what sort of immediate remedial actions need to be initiated to correct critical safety defects that are known to contribute to derailments, accidents, incidents, or injuries. Id., at 6415. The RSAC found that new requirements for the training of track inspectors were being adequately addressed by this proposed NPRM on employee training standards, and thus did not believe additional action was currently necessary in this area.
The third recommendation of the Study addressed whether track hi-rail inspection speed should be specified. The Study concluded that specifying limits to hi-rail inspection speeds could be “counterproductive.” With the currently-available data in this area, the RSAC concurred with the Study's recommendation, and determined that no further action needed to be taken in this area at this time. The RSAC found that the existing reliance on the “inspector's discretion” as noted in § 213.233, should generally govern track inspection speed. FRA notes that this point will be emphasized in the next publication of FRA's Track Safety Standards Compliance Manual
the RSAC concurred with the Study's recommendation, and determined that no further action needed to be taken in this area at this time. The RSAC found that the existing reliance on the “inspector's discretion” as noted in § 213.233, should generally govern track inspection speed. FRA notes that this point will be emphasized in the next publication of FRA's Track Safety Standards Compliance Manual. FRA also makes clear that, in accordance with § 213.233, if a vehicle is used for visual inspection, the speed of the vehicle may not be more than 5 m.p.h. when passing over track crossings and turnouts.
Finally, the last recommendation of the Study addressed ways to enhance the track safety culture of railroads through programs such as a safety reporting system, like the Confidential Close Call Reporting System currently piloted by FRA. The RSAC was aware that the Risk Reduction Working Group was in the process of developing recommendations for railroads to develop risk reduction programs, which should incorporate many safety concerns in this area. Therefore, the RSAC concluded that additional, overlapping discussion was unnecessary given the specific concurrent focus of the Risk Reduction Working Group.
FRA notes that, in addition to addressing the Study's recommendations, RSAC task 11-02 also incorporated other goals Congress had for the Study, which are described in section 403(a), such as reviewing track inspection intervals and remedial action requirements, as well as track inspection and repair priorities. The RSAC concluded that FRA's recent and ongoing rulemakings are sufficiently addressing these areas and that no additional work is currently necessary. Specifically, the instant rulemaking is intended to amend inspection intervals to reflect a new performance-based inspection program, revise the remedial action table for rail, and alter inspection and repair priorities involving internal rail testing and defects such as a crushed head and defective weld
gs are sufficiently addressing these areas and that no additional work is currently necessary. Specifically, the instant rulemaking is intended to amend inspection intervals to reflect a new performance-based inspection program, revise the remedial action table for rail, and alter inspection and repair priorities involving internal rail testing and defects such as a crushed head and defective weld. The Concrete Crossties final rule also established new inspection methods and intervals requiring automated inspection, as well as new remedial actions for exceptions that can be field-verified within 48 hours. Finally, in addition to other requirements, the
Therefore, the RSAC recommended and FRA subsequently concluded that additional work on any of these areas would be unnecessary at this time, given the recent and ongoing work of the RSAC and FRA. FRA believes that its recent and ongoing rulemakings sufficiently address the statutorily-mandated topics in section 403 and that no additional work by the RSAC was currently necessary.
VI. Section-by-Section Analysis
Section 213.3 Application
FRA proposes to modify paragraph (b) to clarify the exclusion of track located inside a plant railroad's property from the application of this part. In this paragraph, “plant railroad” means a type of operation that has traditionally been excluded from the application of FRA regulations because it is not part of the general railroad system of transportation. In the past, FRA has not defined the term “plant railroad” in other regulations that it has issued because FRA assumed that its Statement of Agency Policy Concerning Enforcement of the Federal Railroad Safety Laws, The Extent and Exercise of FRA's Safety Jurisdiction, 49 CFR part 209, Appendix A (FRA's Policy Statement or the Policy Statement) provided sufficient clarification as to the definition of that term
FRA has not defined the term “plant railroad” in other regulations that it has issued because FRA assumed that its Statement of Agency Policy Concerning Enforcement of the Federal Railroad Safety Laws, The Extent and Exercise of FRA's Safety Jurisdiction, 49 CFR part 209, Appendix A (FRA's Policy Statement or the Policy Statement) provided sufficient clarification as to the definition of that term. However, it has come to FRA's attention that certain rail operations believed that they met the characteristics of a plant railroad, as set forth in the Policy Statement, when, in fact, their rail operations were part of the general railroad system of transportation (general system) and therefore did not meet the definition of a plant railroad. FRA would like to avoid any confusion as to what types of rail operations qualify as plant railroads. FRA would also like to save interested persons the time and effort needed to cross-reference and review FRA's Policy Statement to determine whether a certain operation qualifies as a plant railroad. Consequently, FRA has decided to define the term “plant railroad” in this part 213.
The proposed definition would clarify that when an entity operates a locomotive to move rail cars in service for other entities, rather than solely for its own purposes or industrial processes, the services become public in nature. Such public services represent the interchange of goods, which characterizes operation on the general system. As a result, even if a plant railroad moves rail cars for entities other than itself solely on its property, the rail operations will likely be subject to FRA's safety jurisdiction because those rail operations bring plant track into the general system
the services become public in nature. Such public services represent the interchange of goods, which characterizes operation on the general system. As a result, even if a plant railroad moves rail cars for entities other than itself solely on its property, the rail operations will likely be subject to FRA's safety jurisdiction because those rail operations bring plant track into the general system.
The proposed definition of the term “plant railroad” is consistent with FRA's longstanding policy that it will exercise its safety jurisdiction over a rail operation that moves rail cars for entities other than itself because those movements bring the track over which the entity is operating into the general system. See 49 CFR part 209, Appendix A. Indeed, FRA's Policy Statement provides that “operations by the plant railroad indicating it [i]s moving cars on * * * trackage for other than its own purposes ( e.g., moving cars to neighboring industries for hire)” brings plant track into the general system and thereby subjects it to FRA's safety jurisdiction. 49 CFR part 209, Appendix A. Additionally, this interpretation of the term “plant railroad” has been upheld in litigation before the U.S. Court of Appeals for the Fifth Circuit. See Port of Shreveport-Bossier v. Federal Railroad Administration, No. 10-60324 (5th Cir. 2011) (unpublished per curiam opinion).
FRA also makes clear that FRA's Policy Statement addresses circumstances where railroads that are part of the general system may have occasion to enter a plant railroad's property (e.g., a major railroad goes into a chemical or auto plant to pick up or set out cars) and operate over its track. As explained in the Policy Statement, the plant railroad itself does not get swept into the general system by virtue of the other railroad's activity, except to the extent it is liable, as the track owner, for the condition of its track over which the other railroad operates during its incursion into the plant
es into a chemical or auto plant to pick up or set out cars) and operate over its track. As explained in the Policy Statement, the plant railroad itself does not get swept into the general system by virtue of the other railroad's activity, except to the extent it is liable, as the track owner, for the condition of its track over which the other railroad operates during its incursion into the plant. Accordingly, the rule would make clear that the track over which a general system railroad operates would not be excluded from the application of this part, even if the track is located within the confines of a plant railroad.
Section 213.113 Defective Rails
Paragraph (a). In this paragraph, FRA is proposing to clarify that only a person qualified under § 213.7 is qualified to determine that a track may continue to be utilized once a known defective condition is identified. FRA accepts the RSAC recommendation to add “or repaired” to paragraph (a)(1) to allow railroads to use recently-developed processes that remove the defective portion of the rail section and replace that portion utilizing recently-developed weld technologies commonly referred to as “slot weld” or “wide gap weld.” These processes allow the remaining portion of non-defective rail to remain in the track.
Paragraph (b). FRA is proposing to redesignate existing paragraph (b) as paragraph (d) and add a new paragraph (b) providing that railroads have a four-hour period in which to verify that a suspected defect exists in the rail section. This would apply only to suspected defects that may require remedial action notes “C” through “I,” found in the remedial action table
rail to remain in the track.
Paragraph (b). FRA is proposing to redesignate existing paragraph (b) as paragraph (d) and add a new paragraph (b) providing that railroads have a four-hour period in which to verify that a suspected defect exists in the rail section. This would apply only to suspected defects that may require remedial action notes “C” through “I,” found in the remedial action table. This would not apply to suspected defects that may require remedial action notes “A,” “A2,” or “B.” The four-hour timeframe would provide the railroads flexibility to allow the rail flaw detector car to continue testing in a non-stop mode, without requiring verification of suspected defects that may require remedial action under notes “C” through “I,” when the track has to be cleared for train traffic movement. However, any suspected defect encountered that may require remedial action notes “A,” “A2, “or “B” would require immediate verification. This brief, deferred-verification period would also avoid the need to operate the detector car in a non-test, “run light” mode over a possibly severe defective rail condition that could cause a derailment while clearing the track.
The primary purpose of the four-hour deferred-verification option is to assist the railroads in improving detector car utilization and production, increase the opportunity to detect larger defects, and ensure that all the rail the detector car travels over while in service is inspected. FRA is in agreement with the railroad industry that most tracks are accessible by road or hi-rail, and will support a deferred-verification process where the operator can verify the suspect defect location with a portable type of test unit. FRA also agrees that if the detector car travels over the rail while in service it is more beneficial to complete the inspection over that location instead of leaving a possible serious internal defect undetected in the track.
Paragraph (c). Currently, the remedial action table and its notes are included under paragraph (a)
an verify the suspect defect location with a portable type of test unit. FRA also agrees that if the detector car travels over the rail while in service it is more beneficial to complete the inspection over that location instead of leaving a possible serious internal defect undetected in the track.
Paragraph (c). Currently, the remedial action table and its notes are included under paragraph (a). FRA is proposing to add a new paragraph (c) to contain both the table and its notes, as revised. Specifically, FRA proposes revisions to the remedial action table regarding
FRA's proposed revisions to the remedial action table would also reduce the current limit of eighty percent of the rail head cross-sectional area requiring remedial action notes “A2” or “E and H” to sixty percent of the rail head cross-sectional area. FRA reviewed the conclusions of the most recent study performed by the Transportation Technology Center, Inc., concerning the development of transverse-oriented detail fracture defects: “Improved Rail Defect Detection Technologies: Flaw Growth Monitoring and Service Failure Characterization,” AAR Report No. R-959, Davis, David D., Garcia, Gregory A., Snell, Michael E., September 2002. (A copy of this study has been placed in the public docket for this rulemaking.) The study concluded that detail fracture transverse development is considered to be inconsistent and unpredictable. Further, the average growth development of the detail fracture defects in the study exceeded five percent of the cross-sectional area of the rail head per every one mgt of train traffic. Id., at Table 1
(A copy of this study has been placed in the public docket for this rulemaking.) The study concluded that detail fracture transverse development is considered to be inconsistent and unpredictable. Further, the average growth development of the detail fracture defects in the study exceeded five percent of the cross-sectional area of the rail head per every one mgt of train traffic. Id., at Table 1. Recognizing the impact of these findings, FRA believes that detail fracture defects reported as greater than sixty percent of the cross-sectional area of the rail head necessitate the remedial actions required under this section, specifically that the railroad assign a person designated under § 213.7 to supervise each operation over the defect or apply and bolt joint bars to the defect in accordance with § 213.121(d) and (e), and limit operating speed over the defect to 50 m.p.h. or the maximum allowable speed under § 213.9 for the class of track concerned, whichever is lower.
FRA also proposes adding required remedial action for a longitudinal defect that is associated with a defective weld. This proposal is based on current industry detection and classification experience for this type of defect, and would assign remedial action for the railroads to utilize. FRA proposes adding this defect to the remedial action table and including all longitudinal defects within one group subject to identical remedial actions based on their reported sizes. These types of longitudinal defects all share similar growth rates and the same remedial actions are considered appropriate for each type.
FRA also proposes the addition of “Crushed Head” to the remedial action table. This type of defect may affect the structural integrity of the rail section and impact vehicle dynamic response in the higher speed ranges. The RITF discussed the detection and classification of this type of defect, and its addition to the table would provide railroads with a remedial action to utilize
for each type.
FRA also proposes the addition of “Crushed Head” to the remedial action table. This type of defect may affect the structural integrity of the rail section and impact vehicle dynamic response in the higher speed ranges. The RITF discussed the detection and classification of this type of defect, and its addition to the table would provide railroads with a remedial action to utilize. A crushed head defect would be identified in the table, and defined in paragraph (d) of this section, as being 3/8 inch or more in depth and 8 inches or more in length.
FRA notes that the AAR expressed some concern regarding Footnote 1 of the remedial action table, which identifies conditions that could be considered a “break out in rail head.” The AAR pointed out that there had been previous incidents where an FRA inspector would consider a chipped rail end as a rail defect under this section, and at times the railroad was issued a defect or violation regarding this condition. FRA makes clear that a chipped rail end is not a designated rail defect under this section and is not, in itself, an FRA enforceable defective condition. Therefore, FRA intends to make clear in the Track Safety Standards Compliance Manual guidance for FRA inspectors that a chipped rail end is not to be considered as a “break out in rail head.”
FRA proposes the addition of a second footnote, Footnote 2, to the remedial action table. The footnote would provide that remedial action “D” applies to a moon-shaped breakout, resulting from a derailment, with a length greater than 6 inches but not exceeding 12 inches and a width not exceeding one-third of the rail base width. FRA has proposed this change to allow relief because of the occurrence of multiple “broken base” defects that result from a dragging wheel derailment that may prevent traffic movement. FRA also recommends that track owners conduct a special visual inspection of the rail, pursuant to § 213.239, before the operation of any train over the affected track
not exceeding one-third of the rail base width. FRA has proposed this change to allow relief because of the occurrence of multiple “broken base” defects that result from a dragging wheel derailment that may prevent traffic movement. FRA also recommends that track owners conduct a special visual inspection of the rail, pursuant to § 213.239, before the operation of any train over the affected track. A special visual inspection pursuant to § 213.239, which requires an inspection be made of the track involved in a derailment incident, should be done to assess the condition of the track associated with these broken base conditions before the operation of any train over the affected track.
Revisions to the “Notes” to the Remedial Action Table
Notes A, A2, and B. Notes A, A2, and B would be published in their entirety without substantive change.
Note C. FRA proposes a revision to remedial action note C, which applies specifically to detail fractures, engine burn fractures, transverse fissures, and defective welds, and addresses defects that are discovered during an internal rail inspection required under § 213.237 and whose size is determined not to be in excess of twenty-five percent of the rail head cross-sectional area. For these specific defects, a track owner currently has to apply joint bars bolted only through the outermost holes at the defect location within 20 days after it is determined to continue the track in use. However, evaluation of recent studies on transverse defect development shows that slow crack growth life is inconsistent and unpredictable. Therefore, FRA believes waiting 20 days to repair this type of defect is too long. FRA proposes that for these specific defects a track owner must apply joint bars bolted only through the outermost holes to the defect within 10 days after it is determined to continue the track in use. FRA also proposes that when joint bars have not been applied within 10 days, the track speed must be limited to 10 m.p.h. until joint bars are applied
ays to repair this type of defect is too long. FRA proposes that for these specific defects a track owner must apply joint bars bolted only through the outermost holes to the defect within 10 days after it is determined to continue the track in use. FRA also proposes that when joint bars have not been applied within 10 days, the track speed must be limited to 10 m.p.h. until joint bars are applied. The RITF recommended this addition to allow the railroads alternative relief from remedial action for these types of defects in Class 1 and 2 track, and FRA agrees with the Task Force.
Note D. FRA proposes a revision to remedial action note D, which applies specifically to detail fractures, engine burn fractures, transverse fissures, and defective welds, and addresses defects that are discovered during an internal rail inspection required under § 213.237
Note E. Note E would be published in its entirety without substantive change.
Note F. FRA proposes to revise note F so that if the rail remains in the track and is not replaced or repaired, the re-inspection cycle starts over with each successive re-inspection unless the re-inspection reveals the rail defect to have increased in size and therefore become subject to a more restrictive remedial action. This process would continue indefinitely until the rail is removed from the track or repaired. If not inspected within 90 days, the speed would be limited to that for Class 2 track or the maximum allowable speed under § 213.9 for the class of track concerned, whichever is lower, until inspected. This change would define the re-inspection cycle and require the railroad to continue the re-inspection or apply a reduction in speed.
Note G. Note G currently requires the railroad to inspect the defective rail within thirty days after it is determined that the track should continue to be used
m allowable speed under § 213.9 for the class of track concerned, whichever is lower, until inspected. This change would define the re-inspection cycle and require the railroad to continue the re-inspection or apply a reduction in speed.
Note G. Note G currently requires the railroad to inspect the defective rail within thirty days after it is determined that the track should continue to be used. FRA proposes to revise note G so that if the rail remains in the track and is not replaced or repaired, the re-inspection cycle would start over with each successive re-inspection unless the re-inspection reveals the rail defect to have increased in size and therefore become subject to a more restrictive remedial action. This process would continue indefinitely until the rail is removed from the track or repaired. If not inspected within 30 days, the railroad would be required to limit the speed to that for Class 2 track or the maximum allowable speed under § 213.9 for the class of track concerned, whichever is lower, until inspected. This change would define the re-inspection cycle and require the railroad to continue the re-inspection or apply a reduction in speed.
Notes H and I. Notes H and I would be published in their entirety without substantive change.
Paragraph (d). FRA is proposing to redesignate paragraph (b) as paragraph (d) and to revise it to define terms used in this section and in § 213.237. Definitions currently provided in paragraph (b)(1), (b)(3) through (8), (b)(10) through (13), and (b)(15) would be published in their entirety without substantive change. However, four terms would be redefined, and all terms would be enumerated in alphabetical order.
is proposing to redesignate paragraph (b) as paragraph (d) and to revise it to define terms used in this section and in § 213.237. Definitions currently provided in paragraph (b)(1), (b)(3) through (8), (b)(10) through (13), and (b)(15) would be published in their entirety without substantive change. However, four terms would be redefined, and all terms would be enumerated in alphabetical order.
(d)(3) Compound fissure. FRA proposes to revise this definition, including removing the last sentence of the current definition, which provides that “[c]ompound fissures require examination of both faces of the fracture to locate the horizontal split head from which they originate.” Rail failure analysis where a pre-existing fatigue condition is present normally exhibits an identical identifiable defective condition on both rail fracture faces. Thus, analysis of one fracture face should be sufficient to determine the type of defect, the origin of the defect, and the size of the defect. Additionally, it is typical in the railroad industry that only one failure fracture face is retained during the subsequent repair phase of rail replacement. Therefore, FRA has determined that the examination of only one fracture face is necessary to identify the horizontal split head from which compound fissures originate, and is proposing to modify the definition accordingly.
(d)(4) Crushed head. As discussed earlier, FRA proposes the addition of “Crushed head” to the remedial action table. FRA recognizes that operators currently detect and classify this type of defect, and this addition would provide a remedial action for the railroad to use. Crushed head would be identified in the table and defined by the current industry standard as being a short length of rail, not at a joint, which has drooped or sagged across the width of the rail head to a depth of 3/8 inch or more below the rest of the rail head and 8 inches or more in length
classify this type of defect, and this addition would provide a remedial action for the railroad to use. Crushed head would be identified in the table and defined by the current industry standard as being a short length of rail, not at a joint, which has drooped or sagged across the width of the rail head to a depth of 3/8 inch or more below the rest of the rail head and 8 inches or more in length. FRA proposes that measurements taken to classify the crushed head defect not include the presence of localized chips or pitting in the rail head. FRA notes that it plans to include this language in a section on “Crushed head” in the Track Safety Standards Compliance Manual.
(d)(6) Defective weld. FRA is proposing to add required remedial action for a longitudinal defect that is associated with a defective weld. FRA has determined that the railroad industry currently detects and classifies this type of defect, and the addition would codify a specific remedial action for the railroads to utilize. FRA recognizes that these defects develop in an oblique or angular plane within the rail section and have growth rates comparable to other longitudinal-type defects. Therefore, FRA believes that the same remedial action is appropriate.
(d)(9) Flattened Rail. FRA proposes a change to the definition of flattened rail to be aligned with the current industry standard and § 213.113 Remedial Action Table requirements that the area is flattened out across the width of the rail head to a depth of 3/8 inch or more below the rest of the rail and 8 inches or more in length.
Section 213.119 Continuous Welded Rail (CWR); Plan Contents
FRA proposes removing the requirement under paragraph (h)(7)(ii) of this section to generate a Joint Bar Fracture Report (Fracture Report) for every cracked or broken CWR joint bar that the track owner discovers during the course of an inspection
to a depth of 3/8 inch or more below the rest of the rail and 8 inches or more in length.
Section 213.119 Continuous Welded Rail (CWR); Plan Contents
FRA proposes removing the requirement under paragraph (h)(7)(ii) of this section to generate a Joint Bar Fracture Report (Fracture Report) for every cracked or broken CWR joint bar that the track owner discovers during the course of an inspection. Currently under this section, any track owner, after February 1, 2010, could petition FRA to conduct a technical conference to review fracture report data submitted through December 2009 and assess the necessity for continuing to collect this data. One Class I railroad submitted a petition to FRA, and on October, 26, 2010, a meeting of the RSAC Track Standards Working Group served as a forum for a technical conference to evaluate whether there was a continued need for the collection of these reports. The Group ultimately determined that the reports were costly and burdensome to the railroads and their employees, while providing little useful research data to prevent future failures of CWR joint bars. The Group found that Fracture Reports were not successful in helping to determine the root cause of CWR joint bar failures because the reports gathered only a limited amount of information after the joint bar was already broken.
Instead, the Group recommended that a new study be conducted to determine what conditions lead to CWR joint bar failures and include a description of the
Section 213.237 Inspection of Rail
Paragraph (a). Currently, under existing paragraph (a) of this section, Class 4 and 5 track, as well as Class 3 track over which passenger trains operate, is required to be tested for internal rail defects at least once every accumulation of 40 mgt or once a year (whichever time is shorter), and Class 3 track over which passenger trains do not operate is required to be tested at least once every accumulation of 30 mgt or once per year (whichever time is longer)
ction, Class 4 and 5 track, as well as Class 3 track over which passenger trains operate, is required to be tested for internal rail defects at least once every accumulation of 40 mgt or once a year (whichever time is shorter), and Class 3 track over which passenger trains do not operate is required to be tested at least once every accumulation of 30 mgt or once per year (whichever time is longer). When this provision was drafted, railroads were already initiating and implementing the development of a performance-based risk management concept for determining rail inspection frequency, which is often referred to as the “self-adaptive scheduling method.” Under this method, inspection frequency is established based on several factors, including the total detected defect rate per test, the rate of service failures between tests, and the accumulated tonnage between tests. The railroads then utilize this information to generate and maintain a service failure performance target.
This NPRM proposes to revise paragraph (a) to require railroads to maintain service failure rates of no more than 0.1 service failure per year per mile of track for all Class 4 and 5 track; no more than 0.09 service failure per year per mile of track for all Class 3, 4, and 5 track that carries regularly-scheduled passenger trains or is a hazardous material route; and no more than 0.08 service failure per year per mile of track for all Class 3,4, and 5 track that carries regularly-scheduled passenger trains and is a hazardous material route.
The proposed changes to this section seek to codify standard industry good practices. With the implementation of the self-adaptive method, railroads generally test more frequently than currently required, and the test intervals align more closely with generally-accepted maintenance practices
ass 3,4, and 5 track that carries regularly-scheduled passenger trains and is a hazardous material route.
The proposed changes to this section seek to codify standard industry good practices. With the implementation of the self-adaptive method, railroads generally test more frequently than currently required, and the test intervals align more closely with generally-accepted maintenance practices. The frequency of rail inspection cycles vary according to the total detected defect rate per test; the rate of service failures, as defined in paragraph (j) below, between tests; and the accumulated tonnage between tests—all of which are factors that the railroad industry's rail quality managers generally consider when determining test schedules.
In 1990, as a result of its ongoing rail integrity research, FRA released report DOT/FRA/ORD-90/05; Control of Rail Integrity by Self-Adaptive Scheduling of Rail Tests; Volpe Transportation Systems Center; Oscar Orringer. The research objective was to provide the basis for a specification to adequately control the scheduling of rail tests of U.S. railroads. The research provided quantitative guidelines for scheduling rail tests based on rail defect behavior. The purpose of this method for scheduling rail tests is to establish a performance goal that is most advantageous to the control of rail flaw development and subsequent rail failure in a designated track segment. If the performance goal is not met, a responsive adjustment is triggered to the rail test schedule to ensure that the goal is met.
The research determined that a minimum requirement for annual rail testing requires a baseline figure of 0.1 service failure per mile for freight railroads. This baseline value can then be adjusted depending on characteristics of the individual railroad's operation and internal risk control factors. For instance, a railroad that handles multiple passenger trains a day may require scheduling rail test frequencies adequate to maintain a performance goal of 0.03 service failure
ires a baseline figure of 0.1 service failure per mile for freight railroads. This baseline value can then be adjusted depending on characteristics of the individual railroad's operation and internal risk control factors. For instance, a railroad that handles multiple passenger trains a day may require scheduling rail test frequencies adequate to maintain a performance goal of 0.03 service failure. The baseline value applied for determining rail test frequencies can also be adjusted based on specific conditions that may influence rail flaw development such as age of the rail, rail wear, climate, etc. As a result, the RITF reached consensus that 0.1 service failure per mile was established as an appropriate minimum performance requirement for use in the U.S. freight railroad system. The Task Force also reached consensus that the minimum performance requirement should be adjusted to no more than 0.09 service failure per year per mile of track for all Class 3, 4, and 5 track that carries regularly-scheduled passenger trains or is a hazardous material route, and no more than 0.08 service failure per year per mile of track for all Class 3, 4, and 5 track that carries regularly-scheduled passenger trains and is a hazardous material route.
Paragraph (b). Current paragraph (b) would be redesignated as paragraph (f) without substantive change. Under new paragraph (b), each rail inspection segment would be designated by the track owner. While the RITF discussed at length how best to define the term “segment” as it relates to inspection of rail under this section, ultimately the Task Force could not come to a consensus on a definition. The BMWED, NTSB and AAR were split on how best to define this term, and so no recommendation was ever made to the full RSAC
(b), each rail inspection segment would be designated by the track owner. While the RITF discussed at length how best to define the term “segment” as it relates to inspection of rail under this section, ultimately the Task Force could not come to a consensus on a definition. The BMWED, NTSB and AAR were split on how best to define this term, and so no recommendation was ever made to the full RSAC. The BMWED and NTSB were concerned that collecting service failure rates that were averaged over excessively large segments of track (such as segments longer than a subdivision length) would fail to identify discrete areas of weakness with chronically high concentrations of service failures. At the same time, the BMWED and NTSB also recognized that if a segment size was too small, one random failure could trigger a service failure rate in excess of the performance target under this section. The BMWED and NTSB recommended that FRA impose a specific, uniform segment rate to be used by all railroads that is calculated to achieve the optimal length to avoid these problems.
The AAR, on the other hand, maintained that each individual railroad is in the best position to determine its own segment lengths based on factors that are unique to the railroad's classification system. The AAR noted that each railroad has distinct segment configurations and challenges for which each railroad has developed specific approaches to identify and address them. The AAR believed that it was not possible to define a single methodology to appropriately address every railroad's specific configurations and factors, and that any approach established in a regulation would be extremely difficult and costly to implement. The AAR stated that the large amount of route miles, complex networks, and vast quantities of data being analyzed on Class I railroads requires an automated electronic approach that integrates satisfactorily with each railroad's data system, which currently Class I railroads utilize
and factors, and that any approach established in a regulation would be extremely difficult and costly to implement. The AAR stated that the large amount of route miles, complex networks, and vast quantities of data being analyzed on Class I railroads requires an automated electronic approach that integrates satisfactorily with each railroad's data system, which currently Class I railroads utilize. Arbitrary segmentation limitations developed through regulation would not be compatible with some of those systems and would create an onerous and costly burden of redesigning systems, with little overall improvement to safety, according to the AAR. The AAR maintained that each individual service failure represents a certain risk which is not affected by whether it is close to other service failures. The AAR contended that the railroads want the service failure rate to
While FRA acknowledges the BMWED's and NTSB's concerns regarding identifying localized areas of failure, FRA recognizes that railroads have designed their current segment lengths through a decade of researching their own internal system rail testing requirements. This research takes into consideration pertinent criteria such as rail age, accumulated tonnage, rail wear, track geometry, and other conditions specific to these individual railroad-defined segments. FRA believes that altering existing railroad segment lengths without extensive data and research could be financially burdensome to individual railroads and detrimental to established rail maintenance programs, without yielding significant safety benefits.
FRA believes that requiring a designated segment length that focuses on these localized areas could disrupt current engineering policies and result in problematic and costly adjustments to the railroads' current maintenance programs without providing significant safety benefits
idual railroads and detrimental to established rail maintenance programs, without yielding significant safety benefits.
FRA believes that requiring a designated segment length that focuses on these localized areas could disrupt current engineering policies and result in problematic and costly adjustments to the railroads' current maintenance programs without providing significant safety benefits. In addition, recognizing the BMWED's and NTSB's concerns, FRA believes that railroads, as well as FRA, will be able to capture rail failure data, even in large segment areas, by simply looking at rail failure records and comparing milepost locations. Therefore, FRA is not recommending a uniform segment length to be applied by all railroads. Instead, FRA recommends that railroads utilize their own designated segment lengths, which they would be using at the time of the promulgation of the final rule arising from this NPRM. However, in order to maintain consistency and uniformity, FRA would require that if a railroad wishes to change or deviate from its segment lengths, the railroad must receive FRA approval to make that change. This would ensure that the railroad does not have the ability to freely alter the defined segment length in order to compensate for a sudden increase of detected defects and service failures that could require an adjustment to the test frequency as a result of accelerated defect development.
Paragraph (c). FRA is proposing to redesignate current paragraph (c) as paragraph (e) and revise it, as discussed below. In new paragraph (c) FRA proposes that internal rail inspections on Class 4 and 5 track, or Class 3 track with regularly scheduled passenger trains or that is a hazardous materials route, not exceed a time interval of 370 days between inspections or a tonnage interval of 30 mgt between inspections, whichever is shorter
gnate current paragraph (c) as paragraph (e) and revise it, as discussed below. In new paragraph (c) FRA proposes that internal rail inspections on Class 4 and 5 track, or Class 3 track with regularly scheduled passenger trains or that is a hazardous materials route, not exceed a time interval of 370 days between inspections or a tonnage interval of 30 mgt between inspections, whichever is shorter. The addition of this 370-day interval or 30-mgt accumulation would provide a maximum timeframe between tests on lines that may not be required to undergo testing on a more frequent basis in order to achieve the performance target rate. If limits were not set, for example, a railroad line carrying only 2 mgt a year could possibly go 15 years without testing. This length of time without testing was unacceptable to the Task Force; therefore, these proposed limits were included.
Paragraph (c) would also provide that internal rail inspections on Class 3 track without regularly-scheduled passenger trains that is not a hazardous materials route must be inspected at least once each calendar year, with no more than 18 months between inspections, or at least once every 30 mgt, whichever interval is longer, with the additional provision that inspections cannot be more than 5 years apart. The additional requirement for a maximum inspection interval of 370 days or tonnage accumulation of 30 mgt between rail inspections would provide a maximum time and tonnage interval between rail tests for low-tonnage lines. The reason why testing for internal rail defects would be decreased from 40 mgt to 30 mgt is because studies have shown that, while the predominant factor that determines the risk of rail failure is the rate of development of internal flaws, the development of internal rail flaws is neither constant nor predictable
ovide a maximum time and tonnage interval between rail tests for low-tonnage lines. The reason why testing for internal rail defects would be decreased from 40 mgt to 30 mgt is because studies have shown that, while the predominant factor that determines the risk of rail failure is the rate of development of internal flaws, the development of internal rail flaws is neither constant nor predictable. Previous studies on the development of transverse-oriented rail defects showed the average development period to be 2% of the cross-sectional area of the rail head per mgt, which meant that rail testing would have to completed within every 50 mgt. However, the RITF took into consideration the conclusions of a more recent study performed by the Transportation Technology Center, Inc., Improved Rail Defect Detection Technologies: Flaw Growth Monitoring and Service Failure Characterization, AAR Report NO. R-959, Gregory A. Garcia, Michael E. Snell, David D. Davis, September 2002, concerning the development of transverse-oriented detail fracture defects, which concluded that detail fracture transverse development averaged 5% of the cross-sectional area of the rail head per mgt. This would mean that testing would have to be done every 20 mgt. However, the study also concluded that development of internal rail flaws was considered to be inconsistent and unpredictable. Thus, as a result, consensus was reached to lower the 40-mgt limit between tests to 30 mgt.
Selecting an appropriate frequency for rail testing is a complex task involving many different factors including rail head wear, accumulated tonnage, rail surface conditions, track geometry, track support, steel specifications, temperature differentials, and residual stresses
consistent and unpredictable. Thus, as a result, consensus was reached to lower the 40-mgt limit between tests to 30 mgt.
Selecting an appropriate frequency for rail testing is a complex task involving many different factors including rail head wear, accumulated tonnage, rail surface conditions, track geometry, track support, steel specifications, temperature differentials, and residual stresses. Taking into consideration the above factors, FRA's research suggests that all of these criteria influence defect development (and ultimately rail service failure rates) and are considered in the determination of rail inspection frequencies when utilizing the performance-based self-adaptive test method.
For railroads without access to a sophisticated self-scheduling algorithm to determine testing frequencies, FRA would post an algorithm program designed by the Volpe Center on the FRA Web site. The algorithm would require five inputs: (1) Service failures per mile in the previous year; (2) detected defects per mile in the previous year; (3) annual tonnage; (4) number of rail tests conducted in the previous year; and (5) the targeted number of service failures per mile. Once the input is complete, the algorithm would take the average of two numbers when it calculates the number of rail tests. The first number would be based on the service failure rate. The second would be based on the total defect rate, which is the service defect rate plus the detected defect rate. This rate of designated tests per year for the designated segment would be the number of required tests per year enforced by FRA for the segment.
The NPRM also proposes the addition of requirements for inspection of rail intended for reuse, or “plug rail.” On March 8, 2006, FRA issued Notice of Safety Advisory 2006-02 (SA), which promulgated recommended industry guidelines for the reuse of plug rail. 71 FR 11700. The recommendations in the SA consisted of two options for assuring that reused rail was free from internal defects
he segment.
The NPRM also proposes the addition of requirements for inspection of rail intended for reuse, or “plug rail.” On March 8, 2006, FRA issued Notice of Safety Advisory 2006-02 (SA), which promulgated recommended industry guidelines for the reuse of plug rail. 71 FR 11700. The recommendations in the SA consisted of two options for assuring that reused rail was free from internal defects.
Specifically, FRA's SA recommended that the entire length of any rail that is removed from track and stored for reuse must be retested for internal flaws. FRA also recommended that, recognizing that some railroads do not have the equipment to test second-hand rail in accordance with the recommendation above, railroads were encouraged to
During some of the first RITF discussions, the NTSB expressed concern over one aspect of FRA's SA: the guidance that provides that rail is suitable for reuse if it has not accumulated more than 15 mgt since its last valid rail test. The NTSB suggested that such rail could experience up to 55 mgt before its next inspection if it were put in track at a location that had just been inspected and whose inspection frequency is every 40 mgt. The NTSB believed that all plug rail should be immediately inspected prior to reuse.
Also during RITF discussions, railroads described their method for assuring that rail intended for reuse is free of internal defects. In general, it was found that most railroads perform an ultrasonic inspection on rail intended for reuse while in the track and allow accumulation of tonnage prior to removal, or they perform an inspection and certification process of the rail after it has been taken out of service and prior to re-installation. However, the railroads stressed that plug rail inspection requirements should not be overly burdensome and should meet the same standards as any other rail inspections per the regulations
euse while in the track and allow accumulation of tonnage prior to removal, or they perform an inspection and certification process of the rail after it has been taken out of service and prior to re-installation. However, the railroads stressed that plug rail inspection requirements should not be overly burdensome and should meet the same standards as any other rail inspections per the regulations.
FRA shares the railroads' concerns about creating a standard for rail inspection that would allow 30-mgt accumulation on in-service rail, but would mandate immediate inspection of plug rail prior to reuse. Consequently, FRA's proposal allows for plug rail to be inspected at the same frequency as conventional rail. This proposal would, therefore, supersede FRA Safety Advisory 2006-02 and codify current industry practice by allowing the use of rail that has been previously tested to be placed in track and retested at the normal frequency for that track segment. Nonetheless, all else being equal, FRA does recommend that the rail be tested prior to installation in track for reuse, even though FRA believes that requiring that the railroad test the rail immediately prior to installation is too restrictive. Alternatively, FRA believes that the railroad should have knowledge of the date the rail was last tested and ensure that the maximum tonnage of 30 mgt is not exceeded prior to retesting the rail. Once the rail is installed in track, FRA expects the rail to be tested in accordance with the test frequency of the designated segment. FRA would require the railroad to have the ability to verify when the rail was last tested and the accumulated tonnage prior to installation.
Paragraph (d). Current paragraph (d) would be redesignated as paragraph (g) and revised, as discussed below. In new paragraph (d), FRA proposes restrictions that would apply if the service failure target rate is not achieved on a segment of track for two consecutive twelve-month periods
to have the ability to verify when the rail was last tested and the accumulated tonnage prior to installation.
Paragraph (d). Current paragraph (d) would be redesignated as paragraph (g) and revised, as discussed below. In new paragraph (d), FRA proposes restrictions that would apply if the service failure target rate is not achieved on a segment of track for two consecutive twelve-month periods. FRA recognizes that the service failure target rate may be exceeded within one defined twelve-month period. Therefore, the railroad would be allowed an additional year to adjust its rail integrity management program to bring the service failure rate on the offending track segment into compliance with the requirements. If the service failure target rate is exceeded for two consecutive twelve-month periods, the railroad would be required to comply with the requirements in paragraph (d) for either a minimum rail test frequency or a speed restriction on the offending track segment.
Paragraph (e). As noted above, FRA is proposing to redesignate paragraph (c) as paragraph (e) with some revision. Specifically, in paragraph (e) FRA proposes to require that each defective rail be marked with a highly visible marking on both sides of the web and base except that, where a side or sides of the web and base are inaccessible because of permanent features, the highly visible marking would be placed on or next to the head of the rail. This option to mark the rail head in certain situations would provide an alternative to the railroad in areas where the web or base may not be accessible. Current paragraph (e) would be redesignated as paragraph (h) and revised, as discussed below.
Paragraph (f). As stated above, FRA proposes to redesignate current paragraph (b) as paragraph (f) without substantive change.
Paragraph (g). Paragraph (g) would address the case where a valid search for internal rail defects could not be made because of rail surface conditions
may not be accessible. Current paragraph (e) would be redesignated as paragraph (h) and revised, as discussed below.
Paragraph (f). As stated above, FRA proposes to redesignate current paragraph (b) as paragraph (f) without substantive change.
Paragraph (g). Paragraph (g) would address the case where a valid search for internal rail defects could not be made because of rail surface conditions. Several types of technologies are presently employed to continuously search for internal rail defects, some capable of displaying and monitoring search signal returns. A continuous search is intended to mean an uninterrupted search by whatever technology is being used, so that there are no segments of rail that are not tested. If the test is interrupted, e.g., as a result of rail surface conditions that inhibit the transmission or return of the signal, then the test over that segment of rail may not be valid because it was not continuous. Therefore, as proposed in the NPRM, a valid search for internal rail defects would be defined in paragraph (j), below, as a “valid test” during which the equipment is performing as intended and equipment responses are interpreted by a qualified operator as defined in § 213.238. In conducting a valid search, the operator would need to determine that the test has not been compromised due to environmental contamination, rail conditions, or test equipment performance.
Paragraph (h). FRA proposes to redesignate current paragraph (e) as paragraph (h) and revise it. In paragraph (h), FRA proposes to specify the options available to a railroad following a non-test. These options must be exercised prior to the expiration of the time or tonnage limits specified in paragraphs (a) or (c) of this section.
Paragraph (i). FRA proposes a new paragraph (i) to require that the rail flaw detector car operator be qualified as defined in new § 213.238, “Qualified operator,” which would prescribe minimum training requirements for railroad personnel performing in this occupation.
Paragraph (j)
rcised prior to the expiration of the time or tonnage limits specified in paragraphs (a) or (c) of this section.
Paragraph (i). FRA proposes a new paragraph (i) to require that the rail flaw detector car operator be qualified as defined in new § 213.238, “Qualified operator,” which would prescribe minimum training requirements for railroad personnel performing in this occupation.
Paragraph (j). FRA proposes to add paragraph (j) to provide new definitions for terms that are used in this section and that are applicable only to this section.
Hazardous materials route. FRA proposes a definition for “hazardous material route” to be applied when determining the service failure target rate pursuant to paragraph (a) of this section.
Plug rail. FRA proposes a definition for “plug rail” to mean a length of rail that has been removed from one track location and stored for future use as a replacement rail at another location.
Service failure. FRA proposes that only the listed fatigue defects, i.e., compound fissure, transverse fissure, detail fracture, or vertical split head, are to be utilized for determining the fatigue service failure rate. Since other defect types are more likely to go undetected, and how well defects can be detected is influenced by conditions other than fatigue, they would not be included in the service failure rate calculation.
Valid search. FRA proposes a definition to ensure that a valid test under this section has been conducted. As proposed, the test equipment must perform as intended and equipment responses must be properly interpreted by a qualified operator as defined in § 213.238
s can be detected is influenced by conditions other than fatigue, they would not be included in the service failure rate calculation.
Valid search. FRA proposes a definition to ensure that a valid test under this section has been conducted. As proposed, the test equipment must perform as intended and equipment responses must be properly interpreted by a qualified operator as defined in § 213.238.
Section 213.238 Qualified Operator
FRA proposes to add this new section to require that any entity that conducts rail flaw detection have a documented training program to ensure that a flaw detection equipment operator is qualified to operate each of the various types of equipment currently utilized in the industry for which he or she is assigned, and that proper training is provided if new rail flaw detection technologies are utilized.
As proposed in paragraph (b), the operator must have documentation from his or her employer that designates his or her qualifications to perform various functions associated with the flaw detection process. Specifically, requirements are proposed to help ensure that the operator is able to determine that a valid search for internal rail flaws is conducted, the equipment is functioning properly at all times, and the operator can properly interpret the test results and understand test equipment environmental limitations.
In paragraph (c), FRA proposes that the operator must receive a minimum amount of documented, supervised training according to the rail flaw detection equipment or employer's training program. FRA understands that this training may not be entirely held within the classroom environment and is in agreement that the employer should have the flexibility to determine the training process that is appropriate for compliance. The operator would be required to demonstrate proficiency for each type of equipment the employer intends the operator to use, and documentation must be available to FRA to verify the qualification
traini

[Text truncated at 120,000 characters. The full text is on the page linked above.]

## Nearby sections

- [77 FR 234 Rules and Regulations Under the Textile Fiber Products Identification Act](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2011-33695.md)
- [77 FR 462 Regulation of Fuels and Fuel Additives: Identification of Additional Qualifying Renewable Fuel Pathways Under the Renewable Fuel Standard Program](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2011-31577.md)
- [77 FR 770 Proposed Revocation of Class E Airspace; Southport, NC, and Proposed Establishment of Class E Airspace; Oak Island, NC](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-56.md)
- [77 FR 1130 Revisions to Test Methods and Testing Regulations](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2011-31234.md)
- [77 FR 1429 Proposed Amendment of Class E Airspace; Springfield, CO](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-244.md)
- [77 FR 1654 Airworthiness Directives; Agusta S.p.A. Helicopters](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-367.md)
- [77 FR 2028 2017 and Later Model Year Light-Duty Vehicle Greenhouse Gas Emissions and Corporate Average Fuel Economy Standards; Extension of Comment Period](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-617.md)
- [77 FR 2481 United States Standards for Condition of Food Containers](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-833.md)
- [77 FR 2493 Special Local Regulations for Marine Events; Spa Creek and Annapolis Harbor, Annapolis, MD](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-784.md)
- [77 FR 2662 Airworthiness Directives; Bombardier, Inc. Airplanes](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-857.md)
- [77 FR 2674 Airworthiness Directives; Glasflugel Gliders](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-928.md)
- [77 FR 2676 Competitive Postal Products](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-851.md)
- [77 FR 2928 Airworthiness Directives; Airbus Airplanes](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-1131.md)
- [77 FR 3159 Electronic Export Application and Certification Charge; Flexibility in the Requirements for Export Inspection Marks, Devices, and Certificates; Egg Products Export Certification](https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-1158.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/FR_PRORULE_2012-25620. Check the current official text before relying on it. Not legal advice.