# 50 C.F.R. § 86.73 (2026): How long must I operate and maintain a BIG-funded facility, and who is responsible for the cost of facility operation and maintenance?

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_73

## Section

- **Citation:** 50 C.F.R. § 86.73 (2026)
- **Heading:** How long must I operate and maintain a BIG-funded facility, and who is responsible for the cost of facility operation and maintenance?
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Title 50 CFR: Wildlife and Fisheries / Chapter I: UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR / Part 86: BOATING INFRASTRUCTURE GRANT PROGRAM / Subpart F: Grant Administration / § 86.73: § 86.73   How long must I operate and maintain a BIG-funded facility, and who is responsible for the cost of facility operation and maintenance?

## Text

(a) You must operate and maintain a BIG-funded facility for its authorized purpose for its useful life. See §§ 86.3, 86.43(f), and 86.74.
(b) Catastrophic events may shorten the useful life of a BIG-funded facility. If it is not feasible or is cost-prohibitive to repair or replace the BIG-funded facility, you may ask to revise the grant to reduce the useful-life obligation.
(c) You are responsible for the costs of the operation and maintenance of the BIG-funded facility for its useful life, except as allowed at § 86.14(b).

## Nearby sections

- [50 C.F.R. § 86.70 (2026) § 86.70   What standards must I follow when constructing a BIG-funded facility?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_70.md)
- [50 C.F.R. § 86.71 (2026) § 86.71   How much time do I have to complete the work funded by a BIG grant?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_71.md)
- [50 C.F.R. § 86.72 (2026) § 86.72   What if I cannot complete the project during the period of performance?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_72.md)
- [50 C.F.R. § 86.73 (2026) § 86.73   How long must I operate and maintain a BIG-funded facility, and who is responsible for the cost of facility operation and maintenance?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_73.md)
- [50 C.F.R. § 86.74 (2026) § 86.74   How do I determine the useful life of a BIG-funded facility?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_74.md)
- [50 C.F.R. § 86.75 (2026) § 86.75   How should I credit BIG?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_75.md)
- [50 C.F.R. § 86.76 (2026) § 86.76   How can I use the logo for BIG?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_76.md)
- [50 C.F.R. § 86.77 (2026) § 86.77   How must I treat program income?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_77.md)
- [50 C.F.R. § 86.78 (2026) § 86.78   How must I treat income earned after the period of performance?](https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_78.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/CFR_T50_P86_S86_73. Check the current official text before relying on it. Not legal advice.
