# 48 C.F.R. § 209.105-1 (2026): Obtaining information

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_105_1

## Section

- **Citation:** 48 C.F.R. § 209.105-1 (2026)
- **Heading:** Obtaining information
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Title 48 CFR: Federal Acquisition Regulations System / Chapter 2: DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE / Part 209: CONTRACTOR QUALIFICATIONS / Subpart 209.1: Subpart 209.1—Responsible Prospective Contractors / § 209.105-1: Obtaining information.

## Text

(1) For guidance on using the Exclusions section of the System for Award Management, see PGI 209.105-1.
(2) A satisfactory performance record is a factor in determining contractor responsibility (see FAR 9.104-1(c)).
(i) One source of information relating to contractor performance is the Contractor Performance Assessment Reporting System (CPARS), available at
https://www.cpars.gov/.
(ii) Information relating to contract terminations for cause and for default is also available through the Federal Awardee Performance and Integrity Information System (FAPIIS) module of CPARS, available at
https://sam.gov
(see FAR subpart 42.15). This termination information is just one consideration in determining contractor responsibility.
(iii) Contracting officers shall consider the supplier risk assessment available in the Supplier Performance Risk System at
https://piee.eb.mil/
when determining responsibility. See 204.7603(c).
[74 FR 2415, Jan. 15, 2009, as amended at 76 FR 76319, Dec. 7, 2011; 78 FR 28757, May 16, 2013; 79 FR 17445, Mar. 28, 2014; 84 FR 48508, Sept. 13, 2019; 88 FR 17339, Mar. 22, 2023]

## Nearby sections

- [48 C.F.R. § 209.101 (2026) Definitions.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_101.md)
- [48 C.F.R. § 209.104-1 (2026) General standards.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_104_1.md)
- [48 C.F.R. § 209.104-4 (2026) Subcontractor responsibility.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_104_4.md)
- [48 C.F.R. § 209.104-70 (2026) Solicitation provision.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_104_70.md)
- [48 C.F.R. § 209.105-1 (2026) Obtaining information.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_105_1.md)
- [48 C.F.R. § 209.105-2 (2026) Determinations and documentation.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_105_2.md)
- [48 C.F.R. § 209.105-2-70 (2026) Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS).](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_105_2_70.md)
- [48 C.F.R. § 209.106 (2026) Preaward surveys.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_106.md)
- [48 C.F.R. § 209.170-0 (2026) Scope.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_170_0.md)
- [48 C.F.R. § 209.170-1 (2026) Definitions.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_170_1.md)
- [48 C.F.R. § 209.170-2 (2026) Restriction.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_170_2.md)
- [48 C.F.R. § 209.170-3 (2026) Waiver of restriction.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_170_3.md)
- [48 C.F.R. § 209.170-4 (2026) Solicitation provision.](https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_170_4.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/CFR_T48_P209_S209_105_1. Check the current official text before relying on it. Not legal advice.
