# 46 C.F.R. § 159.005-12 (2026): Plans

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_12

## Section

- **Citation:** 46 C.F.R. § 159.005-12 (2026)
- **Heading:** Plans
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Title 46 CFR: Shipping / Chapter I: COAST GUARD, DEPARTMENT OF HOMELAND SECURITY / Part 159: APPROVAL OF EQUIPMENT AND MATERIALS / Subpart 159.005: Subpart 159.005—Approval Procedures / § 159.005-12: § 159.005-12   Plans.

## Text

(a) Each set of plans under § 159.005-9(a)(5)(ii) for equipment must include the following:
(1) An assembly drawing or general arrangement drawing.
(2) A description of each component of the equipment that includes the name, the manufacturer, and the part identification of each component in—
(i) A detail drawing;
(ii) A bill of material or parts list; or
(iii) A specification for that component.
(3) A list of the drawings and specifications in the set of plans, including each revision, and the date of that list.
(4) If a manufacturer's instructions or manual is required in the applicable subpart, a copy of the instructions or manual.
(b) [Reserved]

## Nearby sections

- [46 C.F.R. § 159.005-1 (2026) § 159.005-1   Purpose.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_1.md)
- [46 C.F.R. § 159.005-3 (2026) § 159.005-3   Application for preapproval review.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_3.md)
- [46 C.F.R. § 159.005-5 (2026) § 159.005-5   Preapproval review: Contents of application.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_5.md)
- [46 C.F.R. § 159.005-7 (2026) § 159.005-7   Preapproval review: Coast Guard action.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_7.md)
- [46 C.F.R. § 159.005-9 (2026) § 159.005-9   Approval inspections and tests.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_9.md)
- [46 C.F.R. § 159.005-11 (2026) § 159.005-11   Approval inspection or test report: Contents.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_11.md)
- [46 C.F.R. § 159.005-12 (2026) § 159.005-12   Plans.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_12.md)
- [46 C.F.R. § 159.005-13 (2026) § 159.005-13   Equipment or material: Approval.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_13.md)
- [46 C.F.R. § 159.005-15 (2026) § 159.005-15   Approval of equipment or material: Suspensions, withdrawals, and terminations.](https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_15.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/CFR_T46_P159_S159_005_12. Check the current official text before relying on it. Not legal advice.
