# 45 C.F.R. § 2102.13 (2026): Project eligibility criteria for placement on a Consent Calendar

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/CFR_T45_P2102_S2102_13

## Section

- **Citation:** 45 C.F.R. § 2102.13 (2026)
- **Heading:** Project eligibility criteria for placement on a Consent Calendar
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Title 45 CFR: Public Welfare / Chapter XXI: COMMISSION OF FINE ARTS / Part 2102: MEETINGS AND PROCEDURES OF THE COMMISSION / Subpart B: Procedures on Submissions of Plans or Designs / § 2102.13: § 2102.13   Project eligibility criteria for placement on a Consent Calendar.

## Text

With respect to submissions to the Commission for projects that meet the following criteria, the Secretary, at his/her discretion and in coordination with the Commission's staff, may place these projects on a Consent Calendar according to § 2102.14.
(a) Additions to buildings of less than 25 percent (%) of the original structure and no more than 25,000 sq. ft.;
(b) New construction of less than 25,000 sq. ft.;
(c) Window replacement projects;
(d) Cellular or other communications antenna installations or replacements;
(e) New or replacement signs;
(f) Cleaning, routine maintenance, repairs or replacement-in-kind of exterior finish materials;
(g) Temporary utility or construction structures;
(h) And does not include new physical perimeter security items.
[70 FR 49194, Aug. 23, 2005]

## Nearby sections

- [45 C.F.R. § 2102.10 (2026) § 2102.10   Timing, scope and content of submissions for proposed projects involving land, buildings, or other structures.](https://www.frixlaw.com/law-library/statutes/CFR_T45_P2102_S2102_10.md)
- [45 C.F.R. § 2102.11 (2026) § 2102.11   Scope and content of submissions for proposed medals, insignia, coins, seals, and the like.](https://www.frixlaw.com/law-library/statutes/CFR_T45_P2102_S2102_11.md)
- [45 C.F.R. § 2102.12 (2026) § 2102.12   Responses of Commission to submissions.](https://www.frixlaw.com/law-library/statutes/CFR_T45_P2102_S2102_12.md)
- [45 C.F.R. § 2102.13 (2026) § 2102.13   Project eligibility criteria for placement on a Consent Calendar.](https://www.frixlaw.com/law-library/statutes/CFR_T45_P2102_S2102_13.md)
- [45 C.F.R. § 2102.14 (2026) § 2102.14   Consent Calendar and Appendices procedures.](https://www.frixlaw.com/law-library/statutes/CFR_T45_P2102_S2102_14.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/CFR_T45_P2102_S2102_13. Check the current official text before relying on it. Not legal advice.
