# 40 C.F.R. § 62.15130 (2026): What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15130

## Section

- **Citation:** 40 C.F.R. § 62.15130 (2026)
- **Heading:** What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Title 40 CFR: Protection of Environment / Chapter I / Part 62 / Subpart JJJ / § 62.15130: § 62.15130   What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?

## Text

(a) Each chief facility operator and shift supervisor must obtain and maintain a current provisional operator certification from either the American Society of Mechanical Engineers QRO-1-1994 or a State certification program in Connecticut and Maryland (if the affected facility is located in either of the respective States). If ASME certification is chosen, proceed in accordance with ASME QRO-1-1994. Standard for the Qualification and Certification of Resource Recovery Facility Operators. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C.552(a) and 1 CFR part 51. You may obtain a copy from the American Society of Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may inspect a copy at the Office of Air Quality Planning and Standards Air Docket, EPA, 109 T.W. Alexander Drive, Room C521C, RTP, NC 27709 or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. (b) Each chief facility operator and shift supervisor must obtain a provisional certification by the later of three dates: (1) For Class I units, 12 months after the effective date of this subpart. For Class II units, 18 months after the effective date of this subpart. (2) Six months after the municipal waste combustion unit starts up. (3) Six months after they transfer to the municipal waste combustion unit or 6 months after they are hired to work at the municipal waste combustion unit. (c) Each chief facility operator and shift supervisor must take one of two actions: (1) Obtain a full certification from the American Society of Mechanical Engineers. (2) Schedule a full certification exam with the American Society of Mechanical Engineers (QRO-1-1994 (incorporated by reference in § 60.17 of subpart A of 40 CFR part 60))
hey are hired to work at the municipal waste combustion unit. (c) Each chief facility operator and shift supervisor must take one of two actions: (1) Obtain a full certification from the American Society of Mechanical Engineers. (2) Schedule a full certification exam with the American Society of Mechanical Engineers (QRO-1-1994 (incorporated by reference in § 60.17 of subpart A of 40 CFR part 60)). (d) The chief facility operator and shift supervisor must obtain the full certification or be scheduled to take the certification exam by the later of the following dates: (1) For Class I units, 12 months after the effective date of this subpart. For Class II units, 18 months after the effective date of this subpart. (2) Six months after the municipal waste combustion unit starts up. (3) Six months after they transfer to the municipal waste combustion unit or 6 months after they are hired to work at the municipal waste combustion unit. [68 FR 5158, Jan. 31, 2003, as amended at 69 FR 18803, Apr. 9, 2004]

## Nearby sections

- [40 C.F.R. § 62.15000 (2026) § 62.15000   What is the purpose of this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15000.md)
- [40 C.F.R. § 62.15005 (2026) § 62.15005   What are the principal components of this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15005.md)
- [40 C.F.R. § 62.15010 (2026) § 62.15010   Is my municipal waste combustion unit covered by this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15010.md)
- [40 C.F.R. § 62.15015 (2026) § 62.15015   Can my small municipal waste combustion unit be covered by both a State plan and this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15015.md)
- [40 C.F.R. § 62.15020 (2026) § 62.15020   Can my small municipal waste combustion unit be exempt from this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15020.md)
- [40 C.F.R. § 62.15025 (2026) § 62.15025   How do I determine if my small municipal waste combustion unit is covered by an approved and effective State or Tribal Plan?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15025.md)
- [40 C.F.R. § 62.15030 (2026) § 62.15030   What are my obligations under this subpart if I reduce my small municipal waste combustion unit's combustion capacity to less than 35 tons per day?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15030.md)
- [40 C.F.R. § 62.15035 (2026) § 62.15035   Is my small municipal waste combustion unit subject to different requirements based on plant capacity?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15035.md)
- [40 C.F.R. § 62.15040 (2026) § 62.15040   What are the requirements for meeting increments of progress and achieving final compliance?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15040.md)
- [40 C.F.R. § 62.15045 (2026) § 62.15045   When must I complete each increment of progress?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15045.md)
- [40 C.F.R. § 62.15050 (2026) § 62.15050   What must I include in the notifications of achievement of my increments of progress?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15050.md)
- [40 C.F.R. § 62.15055 (2026) § 62.15055   When must I submit the notifications of achievement of increments of progress?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15055.md)
- [40 C.F.R. § 62.15060 (2026) § 62.15060   What if I do not meet an increment of progress?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15060.md)
- [40 C.F.R. § 62.15065 (2026) § 62.15065   How do I comply with the increment of progress for submittal of a final control plan?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15065.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15130. Check the current official text before relying on it. Not legal advice.