# 40 C.F.R. § 62.15030 (2026): What are my obligations under this subpart if I reduce my small municipal waste combustion unit's combustion capacity to less than 35 tons per day?

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15030

## Section

- **Citation:** 40 C.F.R. § 62.15030 (2026)
- **Heading:** What are my obligations under this subpart if I reduce my small municipal waste combustion unit's combustion capacity to less than 35 tons per day?
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Title 40 CFR: Protection of Environment / Chapter I / Part 62 / Subpart JJJ / § 62.15030: § 62.15030   What are my obligations under this subpart if I reduce my small municipal waste combustion unit's combustion capacity to less than 35 tons per day?

## Text

If you reduce your small municipal waste combustion unit's combustion capacity to less than 35 tons per day by the final compliance date, you must comply only with the following requirements: (a) You must submit a final control plan according to the schedule in table 1 of this subpart and comply with § 62.15065(b). (b) The final control plan must, at a minimum, include two items: (1) A description of the physical changes that will be made to accomplish the reduction in combustion capacity. A permit restriction or a change in the method of operation does not qualify as a reduction in combustion capacity. (2) Calculations of the current maximum combustion capacity and the planned maximum combustion capacity after the reduction. Use the equations specified under § 62.15390(d) and (e) to calculate the combustion capacity of a municipal waste combustion unit. (c) You must complete the physical changes to accomplish the reduction in combustion capacity by the final compliance date specified in table 1 of this subpart. (d) If you comply with all of the requirements specified in paragraphs (a), (b), and (c) of this section, you are no longer subject to this subpart. (e) You must comply with the requirements specified in § 62.15395 and § 62.15400 regarding title V permitting. If you comply with all of the requirements specified in paragraphs (a), (b), and (c) of this section, you are no longer subject to title V permitting requirements as a result of this subpart. You will remain subject to title V permitting requirements, however, if you are subject as a result of one or more of the applicability criteria in 40 CFR 70.3(a) and (b) or 71.3(a) and (b).

## Nearby sections

- [40 C.F.R. § 62.15000 (2026) § 62.15000   What is the purpose of this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15000.md)
- [40 C.F.R. § 62.15005 (2026) § 62.15005   What are the principal components of this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15005.md)
- [40 C.F.R. § 62.15010 (2026) § 62.15010   Is my municipal waste combustion unit covered by this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15010.md)
- [40 C.F.R. § 62.15015 (2026) § 62.15015   Can my small municipal waste combustion unit be covered by both a State plan and this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15015.md)
- [40 C.F.R. § 62.15020 (2026) § 62.15020   Can my small municipal waste combustion unit be exempt from this subpart?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15020.md)
- [40 C.F.R. § 62.15025 (2026) § 62.15025   How do I determine if my small municipal waste combustion unit is covered by an approved and effective State or Tribal Plan?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15025.md)
- [40 C.F.R. § 62.15030 (2026) § 62.15030   What are my obligations under this subpart if I reduce my small municipal waste combustion unit's combustion capacity to less than 35 tons per day?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15030.md)
- [40 C.F.R. § 62.15035 (2026) § 62.15035   Is my small municipal waste combustion unit subject to different requirements based on plant capacity?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15035.md)
- [40 C.F.R. § 62.15040 (2026) § 62.15040   What are the requirements for meeting increments of progress and achieving final compliance?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15040.md)
- [40 C.F.R. § 62.15045 (2026) § 62.15045   When must I complete each increment of progress?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15045.md)
- [40 C.F.R. § 62.15050 (2026) § 62.15050   What must I include in the notifications of achievement of my increments of progress?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15050.md)
- [40 C.F.R. § 62.15055 (2026) § 62.15055   When must I submit the notifications of achievement of increments of progress?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15055.md)
- [40 C.F.R. § 62.15060 (2026) § 62.15060   What if I do not meet an increment of progress?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15060.md)
- [40 C.F.R. § 62.15065 (2026) § 62.15065   How do I comply with the increment of progress for submittal of a final control plan?](https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15065.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/CFR_T40_P62_S62_15030. Check the current official text before relying on it. Not legal advice.