# 18 C.F.R. § 292.203 (2026): General requirements for qualification

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_203

## Section

- **Citation:** 18 C.F.R. § 292.203 (2026)
- **Heading:** General requirements for qualification
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Title 18 CFR: Conservation of Power and Water Resources / Chapter I: FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY / Part 292: REGULATIONS UNDER SECTIONS 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION / Subpart B: Qualifying Cogeneration and Small Power Production Facilities / § 292.203: § 292.203   General requirements for qualification.

## Text

(a)
Small power production facilities.
Except as provided in paragraph (c) of this section, a small power production facility is a qualifying facility if it:
(1) Meets the maximum size criteria specified in § 292.204(a);
(2) Meets the fuel use criteria specified in § 292.204(b); and
(3) Unless exempted by paragraph (d), has filed with the Commission a notice of self-certification, pursuant to § 292.207(a); or has filed with the Commission an application for Commission certification, pursuant to § 292.207(b)(1), that has been granted.
(b)
Cogeneration facilities.
A cogeneration facility, including any diesel and dual-fuel cogeneration facility, is a qualifying facility if it:
(1) Meets any applicable standards and criteria specified in §§ 292.205(a), (b) and (d); and
(2) Unless exempted by paragraph (d), has filed with the Commission a notice of self-certification, pursuant to § 292.207(a); or has filed with the Commission an application for Commission certification, pursuant to § 292.207(b)(1), that has been granted.
(c)
Hydroelectric small power production facilities located at a new dam or diversion.
(1) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by means of a new dam or diversion (as that term is defined in § 292.202(p)) is a qualifying facility if it meets the requirements of:
(i) Paragraph (a) of this section; and
(ii) Section 292.208.
(2) [Reserved]
(d)
Exemptions and waivers from filing requirement.
(1) Any facility with a net power production capacity of 1 MW or less is exempt from the filing requirements of paragraphs (a)(3) and (b)(2) of this section.
(2) The Commission may waive the requirement of paragraphs (a)(3) and (b)(2) of this section for good cause. Any applicant seeking waiver of paragraphs (a)(3) and (b)(2) of this section must file a petition for declaratory order describing in detail the reasons waiver is being sought.
[Order 732, 75 FR 15965, Mar. 30, 2010]

## Nearby sections

- [18 C.F.R. § 292.201 (2026) § 292.201   Scope.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_201.md)
- [18 C.F.R. § 292.202 (2026) § 292.202   Definitions.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_202.md)
- [18 C.F.R. § 292.203 (2026) § 292.203   General requirements for qualification.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_203.md)
- [18 C.F.R. § 292.204 (2026) § 292.204   Criteria for qualifying small power production facilities.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_204.md)
- [18 C.F.R. § 292.205 (2026) § 292.205   Criteria for qualifying cogeneration facilities.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_205.md)
- [18 C.F.R. § 292.207 (2026) § 292.207   Procedures for obtaining qualifying status.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_207.md)
- [18 C.F.R. § 292.208 (2026) § 292.208   Special requirements for hydroelectric small power production facilities located at a new dam or diversion.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_208.md)
- [18 C.F.R. § 292.209 (2026) § 292.209   Exceptions from requirements for hydroelectric small power production facilities located at a new dam or diversion.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_209.md)
- [18 C.F.R. § 292.210 (2026) § 292.210   Petition alleging commitment of substantial monetary resources before October 16, 1986.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_210.md)
- [18 C.F.R. § 292.211 (2026) § 292.211   Petition for initial determination on whether a project has a substantial adverse effect on the environment (AEE petition).](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_211.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_203. Check the current official text before relying on it. Not legal advice.
