# 18 C.F.R. § 292.201 (2026): Scope

> Federal · Regulations · In force

URL: https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_201

## Section

- **Citation:** 18 C.F.R. § 292.201 (2026)
- **Heading:** Scope
- **Jurisdiction:** Federal
- **Kind:** Regulations
- **Status:** In force
- **Text as of:** August 14, 2026
- **Source:** Compiled text
- **Location:** Title 18 CFR: Conservation of Power and Water Resources / Chapter I: FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY / Part 292: REGULATIONS UNDER SECTIONS 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION / Subpart B: Qualifying Cogeneration and Small Power Production Facilities / § 292.201: § 292.201   Scope.

## Text

This subpart applies to the criteria for and manner of becoming a qualifying small power production facility and a qualifying cogeneration facility under sections 3(17)(C) and 3(18)(B), respectively, of the Federal Power Act, as amended by section 201 of the Public Utility Regulatory Policies Act of 1978 (PURPA).
[45 FR 17972, Mar. 20, 1980]

## Nearby sections

- [18 C.F.R. § 292.201 (2026) § 292.201   Scope.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_201.md)
- [18 C.F.R. § 292.202 (2026) § 292.202   Definitions.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_202.md)
- [18 C.F.R. § 292.203 (2026) § 292.203   General requirements for qualification.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_203.md)
- [18 C.F.R. § 292.204 (2026) § 292.204   Criteria for qualifying small power production facilities.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_204.md)
- [18 C.F.R. § 292.205 (2026) § 292.205   Criteria for qualifying cogeneration facilities.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_205.md)
- [18 C.F.R. § 292.207 (2026) § 292.207   Procedures for obtaining qualifying status.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_207.md)
- [18 C.F.R. § 292.208 (2026) § 292.208   Special requirements for hydroelectric small power production facilities located at a new dam or diversion.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_208.md)
- [18 C.F.R. § 292.209 (2026) § 292.209   Exceptions from requirements for hydroelectric small power production facilities located at a new dam or diversion.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_209.md)
- [18 C.F.R. § 292.210 (2026) § 292.210   Petition alleging commitment of substantial monetary resources before October 16, 1986.](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_210.md)
- [18 C.F.R. § 292.211 (2026) § 292.211   Petition for initial determination on whether a project has a substantial adverse effect on the environment (AEE petition).](https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_211.md)

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/statutes/CFR_T18_P292_S292_201. Check the current official text before relying on it. Not legal advice.
