## Text

Long Range
Transportation
Plan
for the
Pyramid Lake
Paiute
Reservation

Prepared for:
The Pyramid Lake Paiute Tribe
By:Lumos & Associates, Inc
8/2/11
UPDATED By PLPT
5/10/18

Long Range Transportation Plan for the Pyramid Lake Paiute Reservation
Table of Contents
Executive Summary……………………………………………………………………………………….…..1
Purpose and Scope
Study Period and Study Methodology
Summary of Transportation Plan
Introduction…………………………………………………………………………………………………………3
Purpose of the Study
Description of the Long Range Transportation Planning Study and Project Priority List
Organization of Study
Part One – Existing Conditions…………………………………………………………………………...5
1.1.
Background Data
1.1.1. Community Profile
1.1.2. Economy and Demographics
1.1.3. Physical Characteristics of Tribal Land
1.1.4. Land Ownership
1.1.5. Existing Land Use
1.2
Transportation System
1.2.1 Existing Transportation System
1.2.2 Overview of System
1.2.3 Road Maintenance
1.2.4 Road Construction
1.2.5 Roadway Functional Classification
1.2.6 Road Inventory
1.2.7 Rights-of-way
1.2.8 Traffic Control
1.2.9 Drainage and Bridges
1.2.10 Street Lighting
1.2.11 Public Transit, School Bus and Mail Routes
1.2.12 Bicycle and Pedestrian Routes
1.2.13 Pyramid Lake National Scenic Byway
1.2.14 Motor Vehicle Accident Data
1.2.15 Traffic Hazards
1.2.16 Law Enforcement
1.3
Existing Traffic Volume
1.3.1
Methodology and Results of Traffic Study
Part Two – Long Range Transportation Plan……………………………………………………..23
2.1
Land Use Plan
2.1.1 Background on Pyramid Lake Tribe Planning Efforts
2.1.2 Goals and Objectives
2.1.3 Short and Long Range Development Plans
2.1.4 Assumptions for the Years 2015 (five-year) and 2030 (20-year)
2.2
Projected Travel Demand
2.2.1 Projected Traffic Volumes and Analysis of Demand and Capacity
2.3
Method Used To Identify Potential Transportation Improvement Projects
Table of Contents
Long Range Transportation Plan for the Pyramid Lake Paiute Reservation

i

2.4

Recommended Transportation Plan
2.4.1 Transportation Improvement Issues Identified through Planning Process
2.4.2 Transportation Improvement Projects Priority List
2.4.3 Government Agency Responsibility
2.4.4 Proposed Revisions to BIA and Non-BIA Road System

2.5

Plan Implementation And Updating
2.5.1 Funding
2.5.2 Plan Updating
2.5.3 Procedures For Development of Roads and Transportation Improvements

FIGURES
1. Age Distribution of Pyramid Lake Reservation Residents
2. Pyramid Lake Recreational Permits, 2005-2009
3. Pyramid Lake Proposed BIA and Non-BIA IRR Road System Mileage
4. PLPT Road Maintenance Funding
5. NDOT FY 2011 Projects
6. PLPT Road Construction Funding, 2005-2010
7. Proposed IRR System Revisions
8. PLPT Road Segments with “Severe Drainage Problems”
9. Traffic Crashes on State Routes on the Pyramid Lake Reservation
10. Transportation Improvement Projects (Roads) Priority List (Resolution PL 42 11)
adopted May 6, 2011)
11. Other Pyramid Lake Paiute Tribe Transportation Improvement Projects; Non-Roadway
Projects, Unprioritized. Not part of Priority List (Resolution PL 42 11) Adopted byTribal
Council May 6, 2011 UPDATED May 10, 2018
MAPS
1. Location Map
2. Map Index
3. Existing Conditions - Northern Region
4. Existing Conditions -Sutcliffe Region Lake Access
5. Existing Conditions -Sutcliffe
6. Existing Conditions -Southern Lake Region
7. Existing Conditions -North Nixon Region
8. Existing Conditions -South Nixon Region
9. Existing Conditions -Between Nixon and Wadsworth
10. Existing Conditions -Wadsworth Area
11. Existing Conditions -Interstate 80 to Sparks
12. 20-Year Transportation Plan – Northern Region
13. 20-Year Transportation Plan – Sutcliffe Region Lake Access
14. 20-Year Transportation Plan – Sutcliffe
15. 20-Year Transportation Plan – Southern Lake Region
16. 20-Year transportation Plan -North Nixon Region
17. 20-Year transportation Plan -South Nixon Region
18. 20-Year transportation Plan -Between Nixon and Wadsworth
19. 20-Year transportation Plan -Wadsworth Area
Table of Contents
Long Range Transportation Plan for the Pyramid Lake Paiute Reservation

ii

20. 20-Year transportation Plan -Interstate 80 to Sparks
APPENDICES
A. Information Sources and References
B. Draft Road Inventory Comparison Listing
C. Maintenance Costs
D. Link to 25 CFR Part 17: Indian Reservation Roads Program
E. Functional Classifications
F. Traffic Accident Overview
G. Travel Demand Study
H. Public Workshop Materials
I. Transportation Project Assumptions and Cost Calculations
J. Pyramid Lake Paiute Transit Facility (UPDATED May 10, 2018)

Table of Contents
Long Range Transportation Plan for the Pyramid Lake Paiute Reservation

iii

EXECUTIVE SUMMARY
Purpose and Scope
The purpose of this study is to identify and evaluate present and future transportation
needs of the Pyramid Lake Paiute Tribe. Present needs are determined by evaluating present
conditions including traffic volume, existing hazards, the conditions of roads and other
transportation infrastructure, and the current goals of the Pyramid Lake Tribe. Future needs
are evaluated based on the Tribe’s social, economic and development goals and objectives,
including specific development proposals, and the land use and transportation plans of the
surrounding area.
Transportation planning on the tribal level is a critical part of the overall system of
prioritizing and funding transportation improvements on tribal lands. Federal transportation
legislation, implemented by BIA regulations, requires that tribal transportation improvement
projects, in order to be funded by federal sources, must be a part of an adopted Long Range
Transportation Plan (LRTP). The LRTP is the result of a transportation planning process with a
20-year time horizon. The planning effort for the Tribe began with an update to the inventory of
the Indian Reservation Roads (IRR) system on the Pyramid Lake Reservation. It continued with
the preparation of this Long Range (20-Year) Transportation Planning Study. The study
includes a Transportation Im provem ent Projects Priority List that will be forwarded to
the BIA for the preparation of an IRR Transportation Improvement Plan (TIP) for the Pyramid
Lake Paiute Tribe.
Study Period and Study Methodology
The Transportation Planning Study was a three-part process. In the first part, consultants
Lumos & Associates, Inc. gathered data about existing conditions on the Reservation including
the existing transportation system; existing Reservation and surrounding land use and natural
resources; regional context, and demographics. The second part of the study was a
comprehensive study and analysis of transit and transportation needs, including analysis of the
condition of existing roads, as reported in the road inventory update, meetings with tribal
leaders and staff, and a public workshop. In the final phase of work, Lumos developed a list of
priority transportation projects and finalized the plan.
Summary of Transportation Plan
The current condition of the Tribe’s transportation system, the Tribe’s short and long
range development plans, and potential future traffic levels were described and evaluated
during the planning process. The following transportation issues were identified:
•
•
•
•
•
•
•
•

Road and traffic safety, especially on state highways
Need for transportation improvements to serve economic development goals
Pedestrian safety improvements
Condition of unpaved roads
Safety signage
Regular roadway maintenance
Safety improvements around schools and preschools
Potential need for a public transit system

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 1 of 35
2/8/12

•

Maintenance and continued development of tourism infrastructure

Proposed transportation improvements were then identified. In Resolution PL 42 11
adopted on May 6, 2011, the Pyramid Lake Tribal Council approved the following list of priority
transportation improvements. The projects are presented in more detail in FIGURE 10 in this
report.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

(0035-010) Wadsworth By-pass
(0205-010) Pelican Point Access
(0101-105) Capitol Hill Road
(P101-050) Administration building parking areas
(No route number yet) Wadsworth Community Center access loop and parking
(0102) all sections Ranch/Big Bend Road
(0201-030) Lakeview Drive
(0021-010) Warrior Point
(0002-010 and 020) Pyramid Lake Road
(0005-010) Pyramid Road

Tribal staff and consultants also identified several non-road transportation improvement
projects. While not currently a part of the adopted priority list, these projects are listed and
described in FIGURE 11 of this report.
The Tribe expects that transportation improvement projects and programs contained in
this Transportation Plan will be implemented using the funding sources identified in the
Transportation Improvement Projects Priority List. Projects potentially funded by the BIA will be
added to the BIA regional IRR Transportation Improvement Program (TIP). The Tribe will
receive funding for these projects based upon the allocation formula described in section 1.2.3
of this report.
For any projects on non-BIA IRR roads, the Tribe will coordinate with the Nevada
Department of Transportation, Washoe County and Lyon County to identify funding for priority
tribal transportation projects.
Some of the projects might take place as a part of tribal development efforts. In this case,
transportation improvements might be funded and constructed, at least partly, by the
developer, and subsequently maintained by businesses on the site. Some transportation
projects or maintenance improvements might be made as a part of an overall capital
improvements program.
The priority list will be updated periodically to reflect the completion of current projects
and the inclusion of new priority projects, contingent on anticipated available funding. The
Transportation Plan will be reviewed and updated every five years, based upon the direction of
the Tribal Council and/or tribal staff.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 2 of 35
2/8/12

INTRODUCTION
Purpose of the Study
The purpose of this study is to identify and evaluate present and future transportation
needs of the Pyramid Lake Paiute Tribe. Present needs are determined by evaluating present
conditions including traffic volume, existing hazards, the conditions of roads and other
transportation infrastructure, and the current goals of the Pyramid Lake Tribe (Tribe). Future
needs are evaluated based on the Tribe’s social, economic and development goals and
objectives, including specific development proposals, and also the land use and transportation
plans of the surrounding area.
Description of the Long Range Transportation Planning Study and Project Priority
List
Transportation planning on the tribal level has become a critical part of the overall
system of prioritizing and funding transportation improvements on tribal lands. Federal
regulations require that transportation improvement projects on routes within the Tribe’s IRR
System that are going to be funded with Federal sources be part of an adopted Long Range
Transportation Plan (LRTP) and be included in the Region’s IRR TIP. The TIP is the result of a
transportation planning process with a 20-year time horizon. The planning effort for the Tribe
began with an update to the inventory of the Indian Reservation Roads (IRR) system on the
Pyramid Lake Reservation. It continued with the preparation of this Long R ange (20-Year)
Transportation Planning Study. The study includes a Transportation Projects Priority
List that will be used by the Tribe and by the BIA to program projects for tribal and agency
Transportation Improvement Programs (TIPs ).
Organization of Study
The Transportation Planning Study was a three-part process. In the first part, consultants
Lumos & Associates, Inc. (Lumos) gathered data about existing conditions on the Reservation
including the existing transportation system; existing Reservation and surrounding land use
and resources; regional context; and demographics.
The second part of the study was a comprehensive study and analysis of transit and
transportation needs, including analysis of the condition of existing roads as reported in the
road inventory update, meetings with tribal leaders and staff, and a public workshop. This
workshop took place on May 15, 2010. Also in this phase, Lumos evaluated road maintenance
needs in the context of available BIA funding, and identified and evaluated community
development patterns that could affect future travel demand.
In the final phase of work, Lumos developed a list of priority transportation projects and
finalized the plan. This plan was presented to the Pyramid Lake Tribal Council. Any subsequent
comments and changes by Tribal staff or the BIA will be incorporated into the plan at a later
date.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 3 of 35
2/8/12

Regional Context
The Pyramid Lake Reservation is located in northwestern Nevada, approximately 35
miles northeast of Reno. It is mostly adjacent to Washoe County, but portions of the
Reservation are adjacent to Lyon, Storey and Pershing Counties. At 475,000 acres, the Pyramid
Lake Reservation is the largest reservation in Nevada.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 4 of 35
2/8/12

PART ONE – EXISTING CONDITIONS
1.1.

BACKGROUND DATA

1.1.1. Community Profile
Location
The 475,000-acre Pyramid Lake Reservation is located in northwestern Nevada,
approximately 35 miles northeast of Reno. See Map 1 – Location Map.
History and Government
The Pyramid Lake Paiute Tribe are Northern Paiute people. The bands of Paiute people
who lived in the vicinity of
territory incorporated about 2,000 square miles, including both Pyramid and Winnemucca
Lakes.
In 1859, the U.S. Commissioner of Indian Affairs reserved for the Pyramid Lake Paiute
Tribe 470,000 acres of land surrounding Pyramid Lake. In 1874, President Ulysses S. Grant
signed an Executive Order confirming the status of the Tribal Reservation.
The Pyramid Lake Paiute Tribe is organized pursuant to the provisions of Section 16 of
the Indian Reorganization Act of 1934, and is a federally recognized tribe. It is governed by a
ten-member Tribal Council consisting of a Chairman, Vice-Chairman, and eight Council
Members. The Tribe operates under a Constitution and By-Laws approved on January 26, 1936.
1.1.2.

Economy and Demographics

Regional Context
The Pyramid Lake Reservation is located adjacent to Washoe, Lyon, Storey and Pershing
Counties in northwestern Nevada. During the 1990-2008 period, the population and economy of
these counties boomed: the population of Washoe County increased from 257,120 in 1990 to
423,833 in 2008; Lyon County grew from 20,590 to 55,820; and Storey County grew from
2,560 to 4,384 people. Since then the population of these areas has decreased 1.7% in Washoe
County; 3.6% in Lyon County; and 1.5% in Storey County.
With the development of the 30,000-acre Tahoe Reno Industrial Center in Lyon and
Storey Counties, and the Nevada Industrial Park near the town of Fernley, the area south of the
Reservation along the Interstate Highway 80 corridor became a center for manufacturing and
logistics, with Fortune 500 companies including Amazon.com, Trex, Johns Manville, MSC
Industrial Direct, UPS Worldwide Logistics, Quebecor World Nevada, and Sherwin-Williams
locating facilities there.
During the period 2001 – 2007, the number of jobs in Lyon County grew by 26%, a total
of 3,932 new jobs. The industry sectors that contributed the most to this growth were real
estate rental and leasing; manufacturing; construction; arts, entertainment and recreation; and
accommodation and food services. Since the region was heavily concentrated in real estate and
construction-related employment, the economic recession that began in 2007 has hit the region
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 5 of 35
2/8/12

hard resulting in the population losses cited above, and unemployment rates in January, 2010
of 19% in Lyon County, 14% in Storey County, and 13.5% in Washoe County.
Tribe and Tribe Demographics

Population

Total Pyramid Lake Paiute tribal membership is 2,161 people. The year 2000 U.S. Census
shows a total population of 1,734 individuals on the Pyramid Lake Reservation. As the following
chart shows, the Reservation has a relatively young population, with a median age of 32 years.
Figure 1

Age Distribution of Pyramid Lake Reservation Residents
300

285

250
202
Number

200

150

182
146

156

168

156

102

94

100

102

68
48
50

25

0
Under 5 to 9
5 years years

Age Range

10 to
14
years

15 to
19
years

20 to
24
years

25 to
34
years

35 to
44
years

45 to
54
years

55 to
59
years

60 to
64
years

65 to
74
years

75 to
84
years

SOURCE: U.S. Census Bureau, Quick Tables, DP-1 Profile of General Demographic
Characteristics: 2000, Pyramid Lake Reservation, NV http://factfinder.census.gov;
accessed 3/17/10

85
years
and
over

Housing
There are three communities on the Pyramid Lake Reservation: Wadsworth on the
southern end of the reservation close to Interstate Highway 80 and the Big Bend of the Truckee
River; Nixon, the Tribe’s administrative center, about five miles from the southern shore of
Pyramid Lake, and Sutcliff, on the southwestern shore of the lake. Most of the Reservation
population resides in these communities, with over 50% of the population in Wadsworth, 25%
in Nixon, and 16% in Sutcliffe. Between 1963 and 2000, 440 new homes were constructed on
the Reservation. Of these, 382 are considered mutual help units and 58 are rental units. More
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 6 of 35
2/8/12

recently, five new homes were constructed through the BIA’s Housing Improvement Program,
and renovations of existing units regularly take place.

Economy and Employment
Outdoor recreation is a primary driver of the Reservation economy. Pyramid Lake is a
recreational resource that attracts visitors from throughout northern Nevada and beyond for
fishing, boating, bird watching, camping, and other outdoor pursuits. The Tribe continues to
implement economic development and resource protection strategies centered on the unique
lake and its scenic and natural resources. These include a fisheries program with three
hatcheries that raise Lahontan cutthroat trout and cui-ui; small businesses at Sutcliffe catering
to recreationists; designation of portions of State Routes 445 and 447 as the Pyramid Lake
National Scenic Byway; a newly-developed mountain bike trail that follows the Truckee River
between Wadsworth and the northern shore of Pyramid Lake; a tribal museum in Nixon; the Big
Bend RV park at Big Bend on the Truckee River near Wadsworth; and a gas
station/convenience store in Wadsworth. The Tribe requires permits for all recreational use on
the Reservation. The table below shows recreational permits issued over the most recent 5-year
period.
Figure 2

Total Visitors
Source:

Pyramid Lake Recreational Permits, 2005-2009
2009
2008
2007
2006
74,287
72,555
73,944
68,669

2005
58,695

Johnnie Garcia, PLPT Transportation Planner

Agriculture also contributes to the Reservation economy. Several tribal members belong to
the Pyramid Lake Cattlemen’s Cooperative Association, grazing around 1,600 head of cattle on
300,000 acres of range on the Reservation, and raising hay for winter feed in agricultural areas
near Nixon and Wadsworth. There is a sand-and gravel operation operated by RMC Nevada,
Inc.– the Paiute Pit – located on the Truckee River on the Reservation. Approximately 25% of
the population works for the tribal government or other governmental operations including the
two schools on the Reservation, Pyramid Lake High School in Nixon and Natchez Elementary
School in Wadsworth.
In the community of Nixon, the primary employment is tribal government or agriculture.
Some additional employment is provided by a combined gas station and convenience store.
Sutcliffe is the principal gateway to Pyramid Lake, thus the Sutcliffe economy is primarily based
on recreation and small commercial enterprises. Wadsworth, with over 50% of the
Reservation’s population, is the largest town on the Reservation. A tribal smoke shop, gas
station and convenience store is located in Wadsworth and provides some employment for tribal
members. Wadsworth is close to the recently developed industrial centers in Lyon and Storey
County, and close to I-80, so many Wadsworth residents commute off the Reservation to jobs
in adjoining counties. Employment includes office and sales occupations, construction, service
industries, and professional or other management occupations.
Unemployment on the Reservation has historically been high, with unemployment rates
between 30 and 40 percent.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 7 of 35
2/8/12

Commuting
U.S. Census 2000 reports that 95.5% of workers drive alone to work, the rest walk to
work, carpool, or work at home. The mean travel time to work is 27 minutes.
1.1.3.

Physical Characteristics of Tribal Land; Natural Resources

475,000-acre Pyramid Lake Reservation lies in northern Nevada within the Basin and
Range physiographic province, an area characterized by alternating, north-south-trending
mountain ranges and flat valley floors. The Reservation covers one of these valley floors including 117,400-acre Pyramid Lake - and portions of adjoining mountain ranges and valleys.
Elevations range from 3820 feet at lake level to 8182 feet at Tohakum Peak east of Pyramid
Lake. Winnemucca Lake (since diversion of the Truckee River a dry playa moistened only by
seasonal precipitation) is located on the eastern boundary of the Reservation and the Smoke
Creek Desert lies to the northwest. Pyramid Lake still receives water from the Truckee River,
but its level has dropped nearly eighty feet since the Derby Dam diversion was installed in
1905. Similar to other Great Basin lakes, Pyramid Lake has no outlet.
The Pyramid Lake Reservation has a semi-arid climate, with an annual precipitation range
of less than seven inches in the basins and up to eighteen inches in the mountains. Most
precipitation falls as snow in the mountains, providing stream runoff with peak flow in early
spring. Summers are dry, with very little rainfall in July and August.
Pyramid Lake is noted for its interesting tufa formations, which are formed when calciumrich spring water comes into contact with the carbonates in the water of the lake. The Pyramid,
which gives the lake its name, is one such formation. The Reservation also contains several
areas of geothermal activity.
Pyramid La
harvested these abundant fish at their spawning grounds at the mouth of the Truckee River.
Diversion of Truckee River water by the U.S. Bureau of Reclamation’s Newlands Project in 1905
reduced water flows to the lake by around fifty percent, resulting in the loss of the Pyramid
Lake strain of Lahontan cutthroat and a drastic reduction in the cui-ui population. Since then,
the Pyramid Lake Tribe has made concerted efforts to restore the land and waters of their
Reservation, including a successful fisheries program to restore the lake’s fish populations.
Much of the Pyramid Lake Reservation consists of rangeland with native plant
communities consisting of sagebrush and salt shrub communities and associated species,
depending on elevation and exposure. The condition of the rangeland has been affected by
periodic droughts and overgrazing, in some places, by cattle and feral horses. Wildfires have
also burned areas of the Reservation. The resulting vegetation is thus a mixture of the native
perennial herbaceous vegetation, and invasive species resulting from drought, wildfire, and
grazing.
1.1.4.

Land Ownership

While most of the Pyramid Lake Reservation consists of tribal lands (lands held in trust
for the Pyramid Lake Tribe by the U.S. Government), due to the settlement history of the area,
there are several inholdings of private land within the Reservation boundary – these are
referred to as “fee lands” by the Tribe. The “fee lands” consist of ranches on the western side
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 8 of 35
2/8/12

of Pyramid Lake and plots of land within and adjacent to the community of Wadsworth and
along the Truckee River. The Tribe is acquiring these “fee lands” as they become available, and
has also acquired adjacent lands that are part of their traditional homeland.
1.1.5.

Existing Land Use

Land on the Pyramid Lake Reservation is used for open range livestock grazing;
residential areas; agriculture; recreation; administrative and public uses including administration
buildings, schools, parks, and public works facilities; and some small commercial areas. Certain
areas of the Reservation are reserved for traditional or ceremonial uses. The rangeland is
divided into management units based on the nature and location of the grazing resource.
Resource management strategies for the rangeland and other areas of the Reservation are
presented in a Pyramid Lake Indian Reservation Comprehensive Resource Management Plan
adopted in 2005.
Pyramid Lake’s General Land Use Plan designates Pyramid Lake, the Truckee River and
its shoreline for recreation and wildlife; Sutcliffe, Nixon, Wadsworth and adjacent lands for
residential communities; an area to the northeast of the lake as critical wildlife habitat; and the
rest of the Reservation for grazing and wildlife habitat. Certain areas along the Truckee River
and the “fee lands” (described above) were not designated any land use.
In 2001 the Tribe completed a 50-year Land Use Plan for each of the three communities
on the Reservation. The Resource Management Plan and the Land Use Plan describe land uses
in the three Reservation communities as follows.

Wadsworth

Wadsworth is predominately a residential community housing over 50% of the
Reservation population. A number of tribal facilities including the I-80 Smokeshop; Big Bend
Ranch RV Park; a sewage treatment plant, and solid waste transfer facility are located in
Wadsworth. The Paiute Pit is located near Wadsworth. Natchez Elementary School and a U.S.
Post Office also are located in Wadsworth.

Nixon

Nixon is the seat of tribal government, holding the Pyramid Lake Tribal Headquarters
which includes the main administrative office, the Housing Authority, Tribal Police, Tribal Court,
and the Natural Resources Division. Nixon also holds a U.S. Post Office, the Tribal Visitor Center
and Museum, a Head Start Program, the Pyramid Lake Junior Senior High School, the Nixon
Store, and the Pyramid Lake Health Clinic. There also are housing areas in Nixon. A fishery
facility is located at Marble Bluff north of Nixon, and is operated jointly by the Tribe and the
U.S. Fish and Wildlife Service. Alfalfa is grown on agricultural fields on the Truckee River near
Nixon.

Sutcliffe

Sutcliffe is located on the western shore of Pyramid Lake. It is the main access to the
lake and is a destination for recreationists. Pyramid Lake Fisheries offices are located here, as
well as the David Dunn LCT Hatchery, the Koch Cui-ui Hatchery, a ranger station, a
campground, and a marina operated by a private business under lease from the Tribe. Housing
for some tribal members is located in Sutcliffe. Sutcliffe is served by a solid waste transfer
station and a sewage lagoon system. Some private in-holdings (“fee lands”) are also located in
the Sutcliffe area.
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 9 of 35
2/8/12

Surrounding Land Use
The Pyramid Lake Reservation is surrounded on all sides by public land managed by the
Bureau of Land Management (BLM). There are scattered parcels of private land within the
public land area, and to the south and east the public land is interspersed with a great deal of
private land in a “checkerboard” land ownership pattern. All of this land is currently
undeveloped and in rural land uses including grazing, some resource extraction, and open
space. The combination of currently poor economic conditions, steep slopes, lack of
infrastructure, and the presence of large amounts of public land make it likely that Washoe
County and Pershing County lands adjacent to the Pyramid Lake Reservation will generally
remain undeveloped, and will be used for rural uses only.
The Reservation is located adjacent to the Warm Springs, High Desert, and Truckee
Canyon planning areas of Washoe County. Washoe County’s Comprehensive Land Use and
Transportation Plan describes several land use groups and their accompanying appropriate level
of development. Washoe County lands adjacent to the Pyramid Lake Reservation fall within the
“Rural Lands Group.” According to the Washoe County plan, “The rural lands group recognizes
the important contributions that ranching and other rural activities make to Washoe County.
The rural lands group is intended to preserve areas where agriculture, grazing and/or open
space predominate; and to discourage suburban sprawl into areas that lack essential
infrastructure and services for intensification, or that have resource constraints such as steep
slopes. In limited cases, rural resorts or low intensity commercial or industrial uses may be
appropriate when they respect the greater purpose of the land group.”
Closer to the towns and cities of Sparks, Reno, and Fernley (on the southwest and
southern sides of the reservation) the open space and public land gives way to private land.
The Sun Valley, Spanish Springs and Fernley areas experienced much urban growth during the
1990’s and 2000’s, resulting in an expansion of urban and suburban land uses closer to the
Reservation. In Spanish Springs and Sun Valley most of this land use is suburban residential
development with associated commercial areas. In Lyon and Storey Counties, land close to the
Reservation along the Highway 80 corridor has been developed with several large business and
industrial parks.
To the northwest of the Reservation lies Honey Lake, the town of Herlong, and the
Sierra Army Depot. The Sierra Army Depot receives, stores, maintains, and treats munitions
from military and non-military sources. Operations at the depot have resulted in the generation
of various kinds of contaminants across the installation and surrounding areas including the
northern part of the Pyramid Lake Reservation.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 10 of 35
2/8/12

1.2

TRANSPORTATION SYSTEM

1.2.1 Existing Transportation System
Public roads within the Pyramid Lake Indian Reservation current (2010) IRR system
were constructed by the State, BIA and Tribe; and maintained by the State and the BIA. A
summary of this system, by ownership and surface Type, is shown in Figure 3.
Figure 3
Current Indian Reservation Road System Characteristics
Jurisdiction
BIA Roads
State Highways
County Roads
Tribal Roads
Urban Roads
TOTAL
BIA Roads as
% of Total

Paved
29.4
72.6
0.0
0.0
0.0
102.0

Road Mileage by Surface Type*
Total
Gravel Concrete Earth Primitive/Trail Proposed
29.1
0.0
71.0
9.0
13.5
152.0
0.0
0.0
0.0
0.0
0.0
72.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
29.1
0
71.0
9.0
13.5
224.6

28.0%

100%

N/A

100%

100%

100%

67.7%

*IRR mileage figures based on 2010 Miles of Road by Organizational Responsibility and Surface Type report from BIA
Division of Transportation’s Road Inventory Field Data System (RIFDS).

1.2.2 Road Maintenance
BIA System
The BIA is obligated by CFR 25, Part 170 to maintain the BIA Road System to a safe and
satisfactory condition based upon the availability of funds and the roads’ as-built condition.
Road maintenance funds are appropriated by Congress and allocated to the BIA separately from
construction funds.
Road maintenance funds are used to maintain an optimal level of road maintenance, at
the least cost, based on the road condition. BIA road engineers/managers work with tribes in
determining the level of maintenance to be performed within budgetary constraints, and
establish a road maintenance program for each tribe. Maintenance priorities are frequently
based on the need to provide community members safe access to and from homes and
facilities. Emergency conditions have the highest priority for road maintenance funding. Other
priorities are determined by roadway surface type and level of use.
BIA policies and regulations state that road maintenance activities can include the
preservation and repair of the road surface, blading roadway shoulders and ditches, clearing
drainage structures, snow removal, and the installation/replacement of traffic control,
directional and street signs. In practice, however, surface preservation and repair is frequently
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 11 of 35
2/8/12

funded using construction funding, while maintenance funding covers regular, annual activities
such as snow removal.
Funds for the maintenance of BIA roads on the Pyramid Lake Reservation are provided to
the Tribe under a PL 93-638 (Indian Self-Determination and Education Assistance Act) Contract
by the BIA’s Western Nevada Agency. The Pyramid Lake Paiute Tribe has a maintenance
department with a two-person maintenance crew and one snowplow. Maintenance activities
consist of winter snow plowing, debris clearing, and blading of dirt roads. In the years 20052010, the Tribe received the following for road maintenance.
Figure 4: PLPT Road Maintenance Funding
2005
2006
2007
2008
2009
2010

$64,797
$54,466
$129,617
$110,380
$109,607
$194,900

SOURCE: Johnnie Garcia, PLPT Transportation Planner

The funds were used for purchasing supplies and equipment used for maintaining the
current inventory of BIA Reservation Roads. The table in Appendix C shows estimated permile maintenance costs for paved Pyramid Lake roads. The estimated per-mile annual cost of
road maintenance is $6,325. This includes only preservation and repair of the road surface.
State System
State Routes 445, 446 and 447 cross the Reservation and provide access to Reservation
towns and other areas of the Reservation. Interstate Highway 80 crosses the Reservation on its
southern edge. These roads are constructed and maintained by NDOT. SR 445, 446, and 447
are classified by the Nevada Department of Transportation (NDOT) as Minor Arterials from
where they enter the Reservation to the various Reservation towns. Gerlach Road between
Nixon and Gerlach (the continuation of SR 447) is classified as a Rural Major Collector, and
Surprise Valley Road (the continuation of the road traversing the western shore of the lake that
starts out as SR 445 and 446) between Pyramid and the Cedarville Highway north of the
Reservation is classified as a Rural Minor Collector. I-80 is classified as an Interstate Highway.
Maintenance of the state roadways is carried out by the NDOT. NDOT monitors state
highways annually in a Pavement Management System, in which the “health” of the pavement
is assessed based on measured pavement distress. The distresses and other factors are
summed, and a repair strategy is assigned. Prioritization of projects is based on the points
assigned in the Pavement Management System evaluation, as well as the pavement age, traffic
loading, and maintenance costs. Once pavement maintenance project priorities are determined,
the projects are included NDOT’s Annual Work Program.
NDOT’s FY 2011 Annual Work Program (AWP) for Washoe County shows the following
projects on the Pyramid Lake Reservation:

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 12 of 35
2/8/12

Figure 5: NDOT FY 2011 Projects
NDOT PROJECT NUMBER
WA20090179-11
WA20100199-11
WA20100173-11
WA20100208-11

LOCATION
1-80 from 1.41 mile east of
Painted Rock Interchange to
Lyon/Storey county line
SR446 2.8 miles east of
junction SR445
SR446 Nixon
12.94 miles north of junction
SR446

DESCRIPTION
Coldmill resurfacing
Construct energy dissipation
structure and stabilize
embankment
Bridge maintenance
Remove and replace cattle
guard

SOURCE: Nevada Department of Transportation Annual Work Program

County Roads
Washoe County owns and maintains nineteen county roads on the Pyramid Lake
Reservation in the community of Wadsworth. Washoe County also maintains portions of State
Route 33, an unpaved road which runs along the northwest boundary of the Reservation, and
Olinghouse Road, an unpaved road near Wadsworth.
1.2.3

Road Construction

Current or Recently Completed Projects
The Tribe is currently carrying out the following road transportation improvement
projects:
1.
2.
3.
4.
5.

ARRA Restoration & Repair roads project
ARRA Safety No. 1
ARRA Pelican Point Design
Wadsworth Bypass Road Construction beginning with the design.
Long Range Transportation Plan with Inventory Update.
(SOURCE: Johnnie Garcia, PLPR Transportation Planner)

Construction - BIA System
BIA roads on the Pyramid Lake Reservation’s inventoried IRR road system are constructed
with federal funding from the Indian Reservation Roads portion of the Federal Lands Highway
Program. These funds are administered and allocated by the BIA. The Transportation Equity Act
for the 21st Century (TEA-21) required the Secretary of the Interior to enter into negotiated
rulemaking with tribal governments to develop new IRR Program regulations and establish a
new funding formula. The result of this negotiated rulemaking, a “Final Rule”, which contained
a new funding allocation process, went into effect on November 13, 2004. (See Appendix D)
While new federal transportation legislation -- “SAFETEA-LU” and other successor legislation–
has since been passed, the funding allocation formula remains and is expected to remain
essentially the same under the new legislation. BIA has also received funding for transportation
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 13 of 35
2/8/12

improvements through the American Recovery and Reinvestment Act of 2009, and several
transportation improvement projects on tribal land currently (2010) are being completed with
this funding source.

Relative Need Distribution Factor (RNDF)
A certain percentage of the overall transportation funding allocation is set aside to be used
for tribal transportation planning. Of the remainder of the funds, 5% are set aside in a
discretionary pool to be used for high priority projects. The rest of the funds are allocated to
tribes based upon a “Relative Need Distribution Factor” (RNDF). The population data used
in the RNDF is the American Indian and Alaska Native Service population developed by the
Department of Housing and Urban Development (HUD), under the Native American Housing
Assistance and Self-Determination Act (NAHASDA). This is a mathematical formula that
calculates the “relative need” of tribes for transportation funding based upon
• Cost to construct (CTC) – 50%
• Vehicle Miles Traveled (VMT)– 30%
• Population – 20%
The CTC is the cost required to improve a transportation facility from its existing condition
to a condition that would meet adequate standards. The VMT is estimated by the BIA using
traffic counts conducted during the road inventory times the length of the IRR roads in the
inventory. Using this formula, annual funding for the Pyramid Lake Tribe has been as follows:
Figure 6:
Pyramid Lake Paiute Tribe
2005-2010 IRR Program Funding

Fiscal
Year
2005
2006
2007
2008
2009
2010
Totals

IRR Const.

PAF

$430,909
$437,423
$370,609
$291,285
$290,339
$258,502

$5,246
$11,926
$22,592
$31,878
$42,156
$41,735

(2%) Tribal
Trans Plng
$10,276
$10,557
$9,083
$7,281
$7,307
$6,500

$2,079,067

$155,533

$51,004

Annual Total
$446,431
$459,906
$402,284
$331,444
$339,802
$306,737
$2,285,604

Source: Bob Maxwell, Regional Transportation Planner, BIA-WRO Division of Transportation

This includes a 2% set-aside for transportation planning purposes. If unused, the
allocated funds can be carried over from year to year.
BIA construction funds are allocated to self-governance tribes according to BIA
procedures; for other tribes, construction funds are allocated to regional offices. Tribes can
issue bonds or obtain loans to finance road construction projects, using IRR funds as collateral,
and then repay the bonds or loans as the annual allocation of construction funds is received.
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 14 of 35
2/8/12

It becomes clear from the formula that the larger the tribal population, the higher the
traffic counts, and the more miles of inventoried roads, the more transportation funding a tribe
will receive. This puts small tribes at a disadvantage: it is conceivable that some tribes may
never receive enough funding under this formula to complete high-priority transportation
projects, even if they are critical to health and safety.

IRR High Priority Project Program (IRRHPP)
This program is a set aside of IRR funding, within the IRR Program annual Tribal
Transportation Allocation Methodology (TTAM), that is meant to be used by tribes whose annual
allocation of IRR construction funds is insufficient to complete their highest priority project
and/or by any tribe impacted by an emergency/disaster to make repairs to any IRR facility.
IRRHPP funds are allocated to tribes on a competitive basis following the submission and
approval of applications to BIADOT, and cannot exceed $1,000,000 per project. Approved
IRRHPP funding is obligated and distributed to tribes by the BIA regional offices.

The Role of Transportation Planning
It is important to note that transportation planning on the tribal and reservation level is
an important part of this funding allocation system. Only projects in a FHWA-approved
transportation improvement plan (TIP) are eligible for funding, and these projects are identified
through the long-range transportation planning process. This requirement became quite clear
with language in the SAFETEA-LU legislation stating that IRR funds “shall only be expended on
projects identified in a transportation improvement program approved by the Secretary [of the
Interior].” [Federal Highway Administration]
Nevada Department of Transportation (NDOT) Planning and Construction
NDOT's mission is to efficiently plan, design, construct and maintain a safe and effective
seamless transportation system for Nevada's economic, environmental and social needs. NDOT
administers and implements programs for the planning, development, construction, and
operation of the state's transportation system. The transportation planning process sets the
stage for fulfilling this mission by balancing needs with limited resources.
Specific
transportation improvement projects are set forth in the State Transportation Improvement
Program (STIP) and Annual Work Program (AWP).
The STIP is the instrument used to implement the plans resulting from the statewide
transportation planning process. The planning process sets long-range funding strategies
statewide, and the transportation needs identified are used in developing a financially
constrained STIP. The Annual Work Program lists transportation projects that NDOT intends to
work on during the current fiscal year. The Short Range Element (SRE) consists of projects
scheduled for the second and third years and the Long Range Element (LRE) are projects NDOT
plans on working on, when funding is identified in the fourth through tenth years.
SAFETEA-LU included a new emphasis on consultation during the planning process with
agencies, including tribal agencies, charged with natural and cultural resource preservation, and
a new requirement to consult with representatives of bicycle and pedestrian users and the
disabled.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 15 of 35
2/8/12

Planned NDOT Road/Transit Projects in the Area
In addition to the projects described in the previous section, several projects to add
lanes to SR 445, the Pyramid Highway through Sparks and Spanish Springs are shown in the
Long Range Element. The estimated cost of these projects is around $325 million, to take place
in many phases. There is no committed funding source yet, nor are construction dates shown.
While this work will not take place on the Reservation, it is listed here because, by widening
and adding lanes to the existing highway, the projects may both shorten the time it takes to
drive to the Reservation from the cities of the Truckee Meadows, and potentially induce growth
in the further-out subdivisions of the Spanish Springs area. Both of these effects may in turn
affect the type and amount of automobile traffic on the Pyramid Lake Reservation.
1.2.4 Roadway Functional Classification
Roads are classified as to the functions they perform with regard to the movement of
traffic and access to property. These functional classifications become important to
transportation planning when new roadways are being designed and developed. The type of
land use and the overall population of an area served by a road determine its functional
classification. The function of a road serving a few houses is to provide access to those houses,
while the function of an arterial highway is to provide higher-speed travel for a greater volume
and variety of traffic through an area.
Within the IRR system there are two types of road classifications: State Highway
Classifications and BIA Road Classifications. Both the state and the BIA use functional
classifications as the basis for classifying their roads: these systems are similar, but the road
types are given different names or labels.
A description of the two systems of functional classifications is in Appendix E. BIA
functional classifications of all Pyramid Lake Reservation roads are shown in Appendix B.

1.2.5 Road Inventory
A physical inventory of the public roads serving the Pyramid Lake Reservation was
performed by Lumos & Associates in 2010. This inventory found that there were approximately
106.4 miles of public roads and trails that were eligible to be included in the IRR system and
25.6 miles of existing BIA roads that needed to be deleted and/or removed from the BIA system
and placed in the County Road System. Future changes to the IRR inventory – for example;
new roads, corrected road mileage, updated traffic data, etc. – should be added annually, as
needed, to maintain a current IRR inventory. An Inventory Comparison List identifying all the
proposed IRR system revisions are contained in Appendix B, which lists BIA, Tribal and State
Route Numbers, road names (if any), BIA functional Classification, Length, Surface Type and
Construction Need. A summary of proposed mileage revisions to the Pyramid Lake Tribe’s IRR
system are shown in Figure 7.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 16 of 35
2/8/12

FIGURE 7
PROPOSED IRR SYSTEM REVISIONS
SUMMARY OF PROPOSED BIA ROAD SYSTEM MILEAGE
REVISIONS
Existing BIA DOT Inventory
Roads to be Added to BIA System
Roads to be Deleted from BIA System
Other Route Mileage Corrections (Net Deletion)
Proposed BIA Road System

Miles
152.0
0.0
(5.6)
(1.3)
145.1

SUMMARY OF PROPOSED TRIBAL SYSTEM MILEAGE
REVISIONS
Existing BIA DOT Inventory
Roads to be Added to Tribal System
Roads to be Deleted from Tribal System
Tribal Trails to be Added - Tahoe Pyramid Bikeway (TPB)

Miles
0.0
40.8
0
14.5

Other Tribal Route Mileage Corrections (Net Deletion)
Proposed Tribal (IRR) System

0.0
55.3

SUMMARY OF PROPOSED NON-BIA IRR SYSTEM MILEAGE
REVISIONS
Miles
Existing non-BIA Inventory
Roads to be Added to non-BIA IRR System
Roads to be Deleted from non-BIA IRR System
Other Route Mileage Corrections (Net Deletion)
Proposed Non-BIA (IRR) System
TOTAL IRR SYSTEM

72.5
48.7
0.0
1.4
122.6
323.0

1.2.6 Rights-of-way
The only right-of-way issue identified on the Pyramid Lake Reservation was the lack of
valid rights-of-way on housing subdivision streets constructed by the Indian Housing Authority
and unimproved BIA and Tribal roads. A valid right-of-way (grant of easement) approved by
the Superintendent – Western Nevada Agency, must be in place before IRR funds or any other
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 17 of 35
2/8/12

federal funds can be expended to improve these roads. This applies to both BIA and tribal
roads. A valid right-of-way is also needed to transfer ownership and maintenance responsibility
from the Tribe to the BIA.
1.2.7 Traffic Control
Traffic control devices on the Reservation consist of stop and yield signs, and speed limit
signs.
1.2.8 Drainage and Bridges

Bridges: The Reservation’s BIA IRR system includes a bridge over the Truckee River in
Nixon as well as smaller bridges and culverts over irrigation ditches and drainages throughout
the Reservation.
Drainage: The current road inventory revealed “Severe drainage problems” on the following
road segments.
Figure 8: PLPT Road Segments with “Severe Drainage Problems”
Route Number
0002
0002

Section Number
040
050

Name (if named)
The Willows Road (beach access)
Beach access
break-off from "Recreational
Road"
Unnamed
Unnamed
Sand Road
Sweetwater
Winnemucca Street
unnamed access road to rodeo
grounds (Ranch Road extension)
Road along Separator Beach
Road along Separator Beach
Beachfront road connects Pelican
Beach to Windless Bay fishing
area
Olinghouse Road
Day Care facility parking lot
(Nixon)

0006

026

0008
0008
0008
0011
0101

020
025
040
010
170

0102

240

0205
0205

007
008

0205

040

9035

810

P101

055

P102

101

Day Care facility parking lot
(Wadsworth)

T100

100

Tahoe Pyramid Bikeway #10

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 18 of 35
2/8/12

In addition, the PLPT Transportation Planner lists the following drainage problems based
upon field observations:

1. 9th street east portion in Wadsworth

2.
3.
4.
5.
1.2.9

Road to the Tribal Administration Offices
Parking area at the Tribal Court House
Route #3 Wadsworth near the Paiute pit gravel quarry
Culvert pipes on S. Hollywood Road and W. Pyramid Lake Road are nearing
their life expectancy and need replacing.

Street Lighting

Street lights are located in the housing subdivisions, Tribal yards, Tribal administration
buildings, Tribal Clinic, Tribal enterprises, and the Pyramid Lake High School. In the
transportation workshop held on May 15, 2010, participants suggested that streetlights be
installed at the bus stop in front of Natchez School in Wadsworth, and also at the intersection of
Highway 40 and State Route 447 in Wadsworth for safety and visibility.
1.2.10 Public Transit, School Bus and Mail Routes
Natchez Elementary in Wadsworth has 141 students in grades K through 6 using bus routes
on the Reservation. Students in Nixon and Wadsworth have the choice to go to and are bused
to Mendive Middle School in Sparks, Reed High School in Sparks, Fernley Intermediate School,
Fernley High School, or Pyramid Lake High School. Sutcliffe Students can attend and are bused
to Alice Taylor Elementary in Spanish Springs, Shaw Middle School in Spanish Springs, and
Spanish Springs High School or Pyramid Lake High School in Nixon. U.S. Mail deliveries on the
reservation are to post offices in Nixon and Wadsworth. The Pyramid Lake Tribe provides
transportation for elders as needed to the senior center.
1.2.11 Bicycle and Pedestrian Routes
Most bicycle and pedestrian use on the Reservation takes place in the three towns. Most of
the residential streets on the Reservation have either curb and gutter or dirt shoulders, with no
sidewalks. Children walk to the Natchez Elementary School in Wadsworth: pedestrian
crosswalks across SR 447 by Natchez School have warning lights and signs. A recreational
mountain bike trail runs from Wadsworth to the south shore of Pyramid Lake. Running along
the west side of the Truckee River, the trail is about 26 miles long, alternating between dirt and
paved surfaces.
.
1.2.12 Pyramid Lake National Scenic Byway
Portions of State Routes 445, 446, and 447 on the Pyramid Lake Reservation are
designated as a National Scenic Byway. The National Scenic Byways Program is part of the U.S.
Department of Transportation, Federal Highway Administration. The program is a grass-roots
collaborative effort established to help recognize, preserve and enhance selected roads
throughout the United States. The U.S. Secretary of Transportation recognizes certain roads as
All-American Roads or National Scenic Byways based on one or more archeological, cultural,
historic, natural, recreational and scenic qualities. The Pyramid Lake route was designated as a
Scenic Byway in September, 1996.
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 19 of 35
2/8/12

1.2.13 Motor Vehicle Accident Data
A March 18, 2010 memo from Sergeant S. Miller of the tribal police (Appendix F)
describes motor vehicles crashes on the Reservation in the period 2005-2010. In that period,
the tribal police investigated approximately 200 accidents. The Nevada Highway Patrol
investigated approximately 20 accidents outside of the annual “Burning Man” event (in which
thousands of event participants drive through the Pyramid Lake Reservation in route to the
Black Rock Desert north of the Reservation) and 90 accidents during Burning Man. There were
three fatal accidents in the 2005-2010 time period. The memo lists and describes 5 frequent
accident sites – they are all on State Routes 445 and 447. Accident causes include narrow
roadway with restricted vision, soft shoulders, curves, and driving too fast for conditions.
Crash data for 2005-2010 were obtained from NDOT for state highways on the
Reservation. The table below shows the number of crashes on each State Route during that
period.
Figure 9: Traffic Crashes on State Routes
on the Pyramid Lake Reservation, 2005-2010
Route Number
SR 427
SR 445*
SR 446
SR447*

Number of Crashes
13
18
3
113

* includes portion north of Reservation boundary
SOURCE: Nevada Department of Transportation

Most crashes took place on SR 447. This is the longest route on the Reservation. The
crashes were predominately single-car accidents. The most common vehicle factor was failure
to keep in proper lane and run off road. The most common “most harmful event” in injury
crashes was vehicle rollover. Weather did not appear to be an important factor, as most crashes
took place in clear weather with good visibility. Under “driver factor” the most common was
“apparently normal,” followed by “fatigued driver.” Only three drivers were reported as had
been drinking. Crashes on SR 445 and 446 had similar factors. There were few crashes on
SR427, but more 2-vehicle crashes in proportion to the total number – this may be because the
route segment is more urban.
1.2.14 Traffic Hazards
According to law enforcement reports and tribal staff and member observations, traffic
hazards on the Reservation are as follows:
o Narrow roadway, soft shoulders or no shoulders, and debris on roadway (Dead Ox area)
on portions of SR 447 and SR 445.
o Inadequate street lighting in some areas leading to hazardous conditions for drivers and
pedestrians.
o The annual Burning Man event which brings thousands of participants across the
Reservation who have come from long distances and who are not accustomed to local
driving conditions.
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 20 of 35
2/8/12

o

o
o

Dust blowing from trucks hauling material from quarries on and adjacent to the
Reservation, which often but temporarily diminishes visibility on Reservation highways
used by these trucks.
Not enough marked and signed pedestrian crosswalks and other pedestrian improvements
across and along state highways through the residential areas.
Missing speed limit and other traffic signs.

1.2.15 Law Enforcement
The Pyramid Lake Tribe exercises civil and criminal jurisdiction over Indians and civil
jurisdiction over non-Indians where the non-Indians have caused an event to occur within the
Reservation that gives rise to some legal claim. Law enforcement is provided by tribal police
officers. Their services are supplied by the BIA under a contract with the Tribe.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 21 of 35
2/8/12

1.3

EXISTING TRAFFIC VOLUME

1.3.1

Methodology and Results of Traffic Study

Methodology

The Federal Highway Administration’s publication Developing a Long Range
Transportation Plan – Information Tools for Tribal Governments was reviewed for guidelines,

recommendations and scope. Data sources were identified and reviewed for their ability to
function as indicators of travel demand. Due to the rural nature of the PLPT Reservation and
the availability of data, a simplified historical trend analysis was selected.
Population and Annual Average Daily Traffic (AADT) information sources were identified
and found to have enough historical data to support a trend analysis. Population data was
supported by three sources; the U.S. Census, PLPT, and BIA Labor Force Reports. The numbers
for tribal enrollment were utilized instead of numbers for total eligible for services due to the
consistency of the tribal enrollment numbers, as the total eligible for services varied greatly
from year to year. Datasets for the following years were obtained based on availability: 1990,
1993, 2000, 2001, 2003, 2004 and 2005. Population for years where datasets were not
available was derived by establishing trends and applying the growth factors accordingly.

Results

The Travel Demand study reviewed the recent trends in population and traffic to
establish a growth rate which was then applied to current information to project population and
traffic in the future, to the years 2020 and 2030. The recent population and traffic growth was
consistent with the BIA’s annual growth rate of 2.0%.
Accident occurrences and history were evaluated to assess the location, type and cause
of accidents. Corrective measures to reduce accidents on the Reservation may be beneficial to
motorists and the population in general. While traffic accidents and their causes may be due to
operator error, an evaluation of existing conditions per the 2010 NDOT Road Design Guide is
recommended if not already completed.
The PLPT Reservation experiences increased traffic on weekends and holidays from
recreational users traveling to and from Pyramid Lake. Increase education, patrol and
enforcement may be beneficial to reducing accidents and enhancing visitor experiences.
In an effort to enhance mobility for the residents and visitors to the PLPT Reservation, a
ride share program or mobility center may be a beneficial and relatively cost effective means of
providing additional opportunities for residents to get to their destinations. Bicycling and
pedestrian facilties should be enhanced and incorporated into new development and roadway
reconstruction efforts, particularly around schools and between housing and commercial land
uses.
The full Travel Demand study is included as Appendix G

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 22 of 35
2/8/12

PART TWO – TRANSPORTATION PLAN
2.1.1

Background on Pyramid Lake Tribe Planning Efforts

The Pyramid Lake Paiute Tribe does not regulate development through a land use plan
implemented by zoning regulations. Instead, the Tribe has a 50-year map that depicts areas for
different land uses around the existing communities of Wadsworth, Sutcliffe, and Nixon. All
other land on the Reservation is designated on the maps as land to be used for livestock
grazing.
In 2005 the Pyramid Lake Paiute Tribe, in partnership with the Natural Resources
Conservation Service, prepared a Comprehensive Resource Management Plan for the Pyramid
Lake Reservation. This plan lays out resource management objectives for the Pyramid Lake
Reservation.
Currently (November, 2010), the Tribe is preparing a Pyramid Lake Economic Development
Plan. In November 1990 Congress passed Public Law 101-618, the Truckee-Carson-Pyramid
Lake Water Settlement Act. Section 208(3)a of PL-101-618 requires that the Tribe adopt an
Economic Development Plan that identifies and outlines long-term profit making opportunities
for the Tribe and optimal employment opportunities for Tribal Members and establishes a high
quality recreational area at Pyramid Lake. This Economic Development Plan has two sections.
The first, a Strategic Development Plan, was completed and approved by the Tribal Council on
July 2, 2010. The second part of the plan, an Investment and Management Plan, will be
completed in 2011. The recently completed Strategic Plan identifies ways to create jobs and
growth on the Reservation through generalized goals and policies. The Investment and
Management Plan will lay out specific strategies to accomplish the goals. The purpose of the
plan is to create long term profit-making opportunities, to create optimum employment
opportunities, and to establish a high quality recreation area at Pyramid Lake for the Pyramid
Lake Paiute Tribe and its Members.
2.1.2 Long Range Transportation Plan Goals and Objectives
Based on an evaluation of existing conditions and a review of existing Tribal plans,
transportation goals and objectives were drafted. Tribal staff reviewed the draft goals and
objectives and changed them to make them more consistent with tribal policies and responsive
to tribal needs. In addition, tribal staff and tribal member ideas gathered at a transportation
workshop held on May 15, 2010, were used to formulate the goals and objectives.
Goal 1 Provide tribal members with safe, convenient access to administration areas, housing,
and other tribal services.
Objective 1.1
Objective 1.2
Objective 1.3

Provide paved, improved parking areas for all Tribal public facilities
including community centers, schools, and administrative areas.
Improve and pave existing parking area at Tribal Administration area in
Nixon.
Regularly maintain roads serving housing areas and tribal services.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 23 of 35
2/8/12

Objective 1.4
Objective 1.5

In all transportation improvements and maintenance, ensure that safe
and convenient access by bicycling and walking is provided and/or
maintained.
Improve school bus stops.

Goal 2 Implement transportation improvement projects and programs that enhance the safety
of all users, including pedestrians and bicyclists, as well as motorists, should be top a
priority.
Objective 2.1

Objective 2.2

Objective 2.3
Objective 2.4

Develop a Safe Routes to School plan for Natchez School in Wadsworth,
and implement the plan, including infrastructure improvements and inschool programs educating families about and encouraging safe biking
and walking.
Develop a Tribal Highway Safety Improvement Program (THSIP) to
identify and decrease the potential for motor vehicle crashes on the
Pyramid Lake Reservation, including road safety audits for identified
sections of concern including Dead Ox and Marble Bluff areas.
Work with the Nevada Department of Transportation to monitor and
verify traffic counts on State Routes on the Reservation.
Work with the Nevada Department of Transportation to improve and
widen shoulders on State Routes on the Reservation to minimize rollover
crashes.

Goal 3 Assure that all proposed transportation improvement projects are consistent with the
Tribe’s Economic Development Plan, and help move the Tribe toward attainment of
those goals.
Objective 3.1
Objective 3.2

Objective 3.3
Objective 3.4

Develop a system of regular communication between tribal transportation
planning and economic development staff regarding coordination of
transportation improvements with economic development.
Development plans for new tribal enterprises and other industrial and/or
commercial areas should include traffic studies estimating the traffic
generated by the new facilities and plans for transportation improvements
providing access to the facilities.
Access to and within tribal enterprise, industrial, and commercial areas by
all transportation modes including pedestrian, public transit, and bicycling
should be considered and accommodated in development plans.
When planning for and developing energy projects on the Reservation,
the potential impact of heavy construction and maintenance vehicles on
Reservation roads should be assessed and a plan should be in place for
A. Repairing road damage from heavy construction traffic after the
construction is completed, and
B. Maintaining roads subject to heavy truck traffic during the
operation of the energy production facility.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 24 of 35
2/8/12

Goal 4 Carry out transportation improvement projects that would improve the recreational
resources of the Pyramid Lake Reservation, including construction and rehabilitation of
boat docks; providing appropriate access to camping, fishing, and scenic areas;
providing parking for recreational visitors; providing interpretive opportunities such as
scenic turnouts and gateway features; and providing recreational trails are high
transportation improvement priorities.
Objective 4.1

Objective 4.2
Objective 4.3

Objective 4.4
Objective 4.5
Objective 4.7

Goal 5

In coordination with economic development staff and tribal leaders,
continue to develop and implement an interpretive plan for the Pyramid
Lake Scenic Byway, including the design of gateway features or signage,
kiosks, an interpretive center, and scenic turnouts.
In coordination with economic development staff and tribal leaders,
develop a phased plan to improve recreational access to the lake and
other recreational areas on the Reservation.
Programs developed to provide long term maintenance and management
of recreational facilities should include strategies for the regular
maintenance and management of transportation improvements serving
those facilities.
Expand a voluntary trailhead registration system to track use of the
Tahoe Pyramid Bikeway on the Reservation.
Evaluate need for more boat docks on Pyramid Lake to enhance
recreational access and safety/emergency response.
In coordination with economic development staff, promote Pyramid Lake
and the Pyramid Lake Scenic Highway as destinations for guided tours
and tour bus routes.

Assure that all transportation improvement projects are context sensitive and
enhance, rather than detract from, the scenic, natural and cultural resources of
Pyramid Lake.

Objective 5.1

Objective 5.2
Objective 5.3

In planning for and designing transportation improvements, develop a
system to coordinate with tribal natural resources staff, cultural resources
staff, elders and tribal leaders, and outside specialists regarding the
location of critical natural and cultural resources, the potential impact of
the proposed improvement on these resources, and strategies for
mitigating the impact.
Develop a cultural resources inventory that can be used so transportation
improvement projects are located and designed to minimize impact on
cultural resources.
All transportation improvement projects will comply with federal and tribal
environmental laws and regulations.

Goal 6 Consider the impact of transportation availability on tribal members’ access to higher
education opportunities, job training, health care and employment, and consider
implementing a transit service to provide access for tribal members to these and other
opportunities and services.
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 25 of 35
2/8/12

Objective 6.1

Objective 6.2

Study the feasibility of initiating a public transit service for tribal members
to access services on and outside of the Reservation. In developing this
plan, work cooperatively with social service providers to identify potential
transit service users, funding opportunities, and the potential for joint
operation of the service.
Study the feasibility of initiating mass transit for recreational visitors
including park and ride facilities in Wadsworth, and transportation to/from
the Reno Tahoe Airport and from resort/casinos.

Goal 7 In drafting and implementing future land use plans for the Reservation, consider the
interrelationship of land use and transportation and develop the land use plans in
coordination with updates to this Long-Range Transportation Plan.
Objective 7.1

Work with transportation, planning, natural resources, and cultural
advisory committees in evaluating transportation improvement projects.

Goal 8 Provide appropriate transportation improvements to serve ranching and agriculture.
Objective 8.1
Objective 8.2

Coordinate with the Pyramid Lake Cattlemen’s Association to identify,
improve, and regularly maintain roads critical to the operation of
agricultural and grazing uses.
Remove unnecessary cattleguards.

Goal 9 Regularly maintain existing transportation improvements (roads, parking areas, bus
stops, scenic turnouts, bike paths, sidewalks).
Objective 9.1
Objective 9.2
Objective 9.3

Draft and implement a road and transportation maintenance plan and/or
a pavement management program
Maintenance should consist of not only regular surface repair and snow
removal when necessary, but also litter and debris pick-up, clearing of
drainage structures, and removal of invasive plants.
Work with the BIA and NDOT to identify and obtain adequate funding to
carry out Reservation transportation maintenance needs.

Goal 10 Improve pedestrian and bicycle conditions on the Pyramid Lake Reservation.
Objective 10.1
Objective 10.2
Objective 10.3

Evaluate need for and potential locations of new walking paths, sidewalks
and bicycle trails throughout the Reservation.
Develop a “rails to trails” bicycle and pedestrian trail along the abandoned
railroad grade through Wadsworth, to provide nonmotorized access to the
school and community center, housing areas, and recreation.
Develop a plan to improve, maintain, and extend the Tahoe Pyramid
Bikeway. This plan should include.
A. An evaluation of the present location of the bikeway and
alternatives for redesign and/or relocation of the facility to

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 26 of 35
2/8/12

minimize impact on the privacy of tribal members residing
in the housing areas on the Reservation
B. Preliminary and/or final design of a continuation of the
bikeway along the western shore of Pyramid Lake to
Sutcliffe.
C. An assessment of the potential impact of the bikeway
extension on the Reservation’s natural and cultural
resources and a plan to mitigate the impact.
D. Design of interpretive/directional signs or features.
E. Plans for special events on the bikeway.
F. Continued coordination with the nonprofit Tahoe Pyramid
Bikeway organization regarding volunteer bikeway
construction and maintenance and special events.
G. A plan for maintenance of the bikeway.
H. Identification of funding sources for the construction of the
bikeway extension and for ongoing maintenance.
2.1.3 Short and Long Range Development Plans
Overall, tribal economic development goals consist of the following:
“To create long term profit-making opportunities, to create optimum employment
opportunities, and to establish a high quality recreation area at Pyramid Lake for the Pyramid
Lake Paiute Tribe and its Members.”
Tribal resource management goals include the following:
“To enhance natural resources that sustain agricultural productivity and environmental quality
while supporting economic development, recreation and scenic beauty…to sustain the ecology
of the entire watershed encompassing the Pyramid Lake Reservation…to maintain and improve
the biotic and abiotic conditions of the Pyramid Lake ecosystem…to improve conditions in the
Lower Truckee River and in Pyramid Lake so Lahontan cutthroat trout and cui-ui
populations…are self-sustaining.”
As this Long Range Transportation Plan, as well as the Comprehensive Resource
Management Plan and the Economic Development Plan are implemented, the following future
conditions on the Reservation may occur.
2.1.4 Assumptions for the Years 2015 (five-year) and 2030 (20-year)
Year 2015
It is assumed that by the year 2015:
The Tribe’s Economic Development Plan has been completed and is in the process of
being implemented.
• The Wadsworth Bypass project has been completed.
•

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 27 of 35
2/8/12

•
•

•
•

•

Projects to improve the safety of students walking to Natchez School in Wadsworth have
been completed.
A phased plan for recreational improvements has been completed and some recreational
development projects providing access to Pyramid Lake, including potentially a new paved
road to Pelican Point, and new, appropriately-sized parking lots for recreational visitors,
have been completed.
Use of the Tahoe Pyramid Bikeway has increased, and a plan is being implemented to
extend the facility north to Sutcliffe.
A geothermal, solar, or wind energy project on the Reservation will be either in final
planning and construction phases or completed.
The Tribe has assessed the feasibility of a public transit system providing access to
destinations on and off the Reservation, and depending on the results of the feasibility
study, has either sought other means to increase tribal member access to employment
and other services, or received funding for, designed, and implemented the transit system.

It is assumed that by the year 2030:
•
•
•
•
•
•
•

A comprehensive strategy to develop and manage the Reservation’s recreational resources
has been designed and implemented, including new boat docks, parking areas, camping
areas, trails, and interpretive facilities.
New commercial enterprises have been developed on the Reservation to serve
Reservation residents, recreational visitors, and others.
The industrial park near Wadsworth has been developed and partly occupied.
The Reservation now holds one or more completed and functioning alternative energy
facilities.
Tribal members continue to relocate back to the Reservation due to improved jobs and
housing, business development, and educational opportunities.
Grazing and other agricultural use, with improved grazing conditions and possibly new
crops, continues as a major use of Reservation land outside of existing communities.
Pyramid Lake continues to hold a thriving fishery that draws visitors both regionally and
nationally.

2.2

PROJECTED TRAVEL DEMAND

2.2.1

Projected Traffic Volumes and Analysis of Demand and Capacity

In the Road Inventory Update, Lumos and Associates was directed by BIA/WRO to use a
standard 2% annual growth rate to project the 20-year Average Daily Traffic (ADT) on
Reservation and Colony roads. The Travel Demand Study (Appendix G) shows that this
standard growth rate is consistent with the actual growth rate on the Reservation. As the Travel
Demand Study indicates, at this growth rate, Reservation roads will continue to exhibit the
current minimal traffic congestion: they will remain rural roads.
However, the Travel Demand Study also shows that since Pyramid Lake is a recreational
destination from adjacent cities, weekend daily traffic increases dramatically – up to a sevenfold
increase - on busy holiday weekends. If the population of the adjoining urban areas begins to
grow again after the 2009 recession, and if the Tribe implements improvements and programs
designed to draw recreational visitors to Pyramid Lake, segments of the Reservation road
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 28 of 35
2/8/12

system will become more congested on weekends, potentially resulting in increased crashes
and slower travel speeds.
In addition, the Tribe’s economic development plans call for industrial development in
designated areas. Without plans for the development, it is not yet possible to estimate potential
traffic volume added by the development. If significant commercial, residential or industrial
development projects do take place on the Reservation within the 20-year time frame of this
plan, the Tribe should determine during the process of project planning and development
whether a separate travel demand analysis should be prepared and incorporated into the Long
Range Transportation Plan.
2.3

METHOD USED TO IDENTIFY POTENTIAL TRANSPORTATION
IMPROVEMENT PROJECTS

In addition to evaluating Tribal development plans and future traffic generation, Lumos
used the following strategies to further identify and define transportation needs and potential
transportation improvement projects:
• Existing priority list
In May 2009, the Pyramid Lake Tribal Council adopted a revised Transportation
Improvement Projects Priority List. The projects currently on this list were taken as a
starting point in formulating an expanded and revised list based on the information
developed in the planning process.
• Review of Road Inventory
In the 2010 draft road inventory update, roadway conditions were evaluated and
potential hazards identified. Lumos reviewed this information to identify road segments
most in need of repair or reconstruction.
• Review of previous plan
In 2004 Ayala and Associates completed a Transportation Plan for the Pyramid Lake
Tribe. Lumos evaluated the potential transportation projects in that plan in light of the
Tribe’s current needs and priorities.
• Staff meetings and review
Lumos met several times with tribal leaders and staff to further identify and evaluate
potential projects. In these meetings, consultants and staff reviewed tribal plans and
priorities and conditions on the ground.
• Transportation Workshop, public review
On May 15, 2010 a transportation workshop was held at the tribal headquarters in Nixon
on the Pyramid Lake Reservation. Attendees were given the opportunity to comment on
traffic safety hazards, transportation needs, and potential transportation improvement
projects on the reservation. Six tribal members and/or staff attended and commented on
many aspects of transportation on the Reservation. Materials from the workshop are in
Appendix H. Tribal members and the public were also given the opportunity to review
and comment upon this draft plan. A notice of the review period and availability of the
document, with any comments, are in Appendix H.
• Plan Goals and Objectives
The goals and objectives listed in Section 2.1.2, above, were reviewed to identify
potential transportation projects that would implement the goals or objectives.
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 29 of 35
2/8/12

2.4

RECOMMENDED TRANSPORTATION PLAN

2.4.1

Transportation Improvement Issues Identified through Planning Process
The following transportation issues were identified through the planning process.

Road and traffic safety, especially on state highways
•
Several safety issues were identified. These include uneven cattleguard grates on state
highways; lack of adequate street lighting in some areas; sharp curves; the huge seasonal
influx of traffic travelling to the Burning Man festival in the Black Rock Desert each September;
debris on the highway; soft shoulders, nonexistent shoulders, and narrow travel lanes in some
areas
Need for transportation improvements to serve economic development goals
•
The Tribe has ambitious economic development goals for the Reservation. Coordination among
planning, transportation, and economic development staff should take place to assure that
transportation system improvements are coordinated with economic development projects.
Pedestrian safety improvements
•
Staff and tribal members identified insufficient safety improvements for pedestrians in places
where state highways go through the Reservation towns.
Condition of unpaved roads
•
Many of the roads on the Pyramid Lake roadway system are unpaved, either graded dirt/gravel
or primitive/unimproved. Many of these roads are used by recreational visitors and tribal
members to access lakeshore recreational areas, so they get moderately heavy use, and
consequently develop washouts, washboarding, and potholes.
Safety Signage
•
The Road Inventory Update noted a lack of safety signs on Reservation roads, and many
existing signs were damaged.
Regular roadway maintenance
•
Regular maintenance of existing Reservation roads was identified as a priority, so members
could safely access homes, services, and administrative areas.
•
Safety improvements around schools and preschools.
Pyramid Street, the location of the Wadsworth Headstart, has no safety signage, no marked
crosswalks, and no sidewalks to allow safer access to the preschool by students, parents, and
teachers. Other schools need safer pedestrian and bicycle access as well.
Potential need for a public transit system
•
Some participants indicated a need for a public transportation system to increase transportation
options for tribal members – especially to work and schools.
Maintenance and continued development of tourism infrastructure
•
Roads accessing recreation areas, the Tahoe Pyramid Bike Trail, boats docks, trailer and
recreational vehicle parking, and the Pyramid Lake Scenic Byway should be regularly
maintained, and improved in order make Pyramid Lake a high-quality recreational destination
while protecting and interpreting the scenic resources.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 30 of 35
2/8/12

2.4.2

Transportation Improvement Projects Priority List

Tribal priority lists are analyzed and used by the BIA to generate an IRR TIP for the
tribes that identify anticipated preconstruction and construction project costs and the
disbursement of funds for pre-construction and construction activities based on the Tribe’s
annual percent share of IRR program funds.
In Resolution PL 42 11 adopted on May 6, 2011, the Pyramid Lake Tribal Council
approved a list of ten priority transportation improvements. These projects are presented in
detail in FIGURE 10. The location and length in miles of the project are given (if applicable).
The project, the need for the project, and the areas or population served by the project are
described. Cost estimates (for planning purposes only) are given for each project. The potential
responsible agency and funding source are listed for each project. In Resolution PL 42 11 the
Tribe assigned a priority to each project: these priorities are shown in the chart in column one.
The Tribe expects and requests that projects will become part of a regional BIA Transportation
Improvement Program (TIP) and will be funded with the Tribe’s annual RNDF funding
allocations, or from other sources specified in the list.
The proposed transportation
improvement projects also are shown on the 20-Year Transportation Plan Maps 12
Through 20.
Tribal staff and consultants also identified several non-road transportation improvement
projects. While not currently a part of the adopted priority list, these projects are listed and
described in FIGURE 11 of this report.
2.4.3

Government Agency Responsibility

Indian Reservation Road transportation studies such as this one are intended to serve
Indian reservations that have previously lacked this planning tool. Long Range Transportation
Planning Studies consisting of 20-Year Transportation Plans implemented by 5-Year
Transportation Improvement Programs are standard transportation planning practice for
municipalities, counties, and states. Indian Reservation Road transportation studies are
somewhat different, however, than those conducted by other government entities because they
may include roads maintained and improved by several different government entities.
It is critical to note that this long-range study is not intended to relieve the Washoe
County Regional Transportation Commission, Storey and Lyon Counties, the state of Nevada, or
any federal land management agencies of their responsibility to obligate a fair share of federal
aid highway funds for the improvement and maintenance of state and county roadways within
and adjacent to the Pyramid Lake Reservation. As described in Section 1.2, government entities
share responsibility for maintenance and improvements of roads providing access to or on the
Pyramid Lake Reservation. NDOT maintains State Routes 445, 446, and 447 and Interstate 80.
Lyon County and Storey County maintain roads providing access to housing, commercial, and
industrial areas adjacent to the Reservation.
NDOT roadway improvements are made based upon the planning process described in
Section 1.2.1. Improvements made by the counties (or in Washoe County, by the Washoe
County Regional Transportation Commission) are considered in a transportation planning
process by which they are placed by priority in a five-year Transportation Improvement
Program. BIA road system projects are given consideration based upon a five-year priority list
submitted to the BIA by Tribes. In Figure 11 potential responsible agencies and funding
sources are listed for each project.
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 31 of 35
2/8/12

2.4.4

Proposed Revisions to BIA and non-BIA Road System

Figure 3 show the mileage that was added to and deleted from the BIA and non-BIA
IRR system on the Pyramid Lake Reservation in the latest Road Inventory Update.

2.5
2.5.1

PLAN IMPLEMENTATION AND UPDATING
Funding

The Pyramid Lake Tribe expects that transportation improvement projects and programs
contained in this Long Range Transportation Planning Study and Transportation Improvement
Projects Priority List will be implemented using the funding sources identified in the Priority List.
Projects potentially funded by the BIA will be added to the BIA regional IRR TIP. The Pyramid
Lake Paiute Tribe will receive funding for these projects based upon the allocation formula
described in section 1.2.3
For projects on non-BIA IRR roads, the Tribe or Tribe will coordinate with the Nevada
Department of Transportation and/or the county to identify funding for priority tribal
transportation projects.
Some of these projects might take place as a part of tribal development projects. In this
case, transportation improvements might be funded and constructed, at least partly, by the
developer, and subsequently maintained by businesses on the site. For projects on the
Reservation but not on the BIA or IRR system, improvements might be made as a part of an
overall capital improvements program.
Pedestrian and bicycle improvements can be funded both as a part of road improvement
projects as they are completed, or separate funding can be sought from other sources, such as
Transportation Enhancements (TE), Safe Routes to Schools (SRTS), or Recreational Trails (Rec
trails). These are federal programs administered by NDOT or Nevada state parks. TE funds
enhancements to transportation systems including bicycle and pedestrian facilities; SRTS
provides funding for programs and projects that enhance and encourage walking and bicycling
to school, and Rec Trails provides funding for recreational trails including bicycle and walking
paths.
For potential improvements to the Pyramid Lake Scenic Byway, the Secretary of
Transportation makes discretionary grants to States and Indian tribes to implement projects on
highways designated as National Scenic Byways or All-American Roads, or as State or Indian
tribe scenic byways. Projects submitted for consideration should benefit the byway traveler’s
experience, whether it will help manage the intrinsic qualities that support the byway’s
designation, shape the byway’s story, interpret the story for visitors, or improve visitor facilities
along the byway.
It also is suggested that the Tribe coordinate with the BIA to identify critical projects that
may become a part of national economic recovery efforts, if the efforts continue.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 32 of 35
2/8/12

2.5.2

Plan Updating

The priority list will be updated periodically to reflect the completion of current projects
and the inclusion of new priority projects, contingent on anticipated available funding. The
Transportation Plan will be reviewed and updated every five years, and may be updated sooner
if there are additions to the Tribe’s land base, major changes in land use and/or economic
development strategies, or when changes in the regional economy and transportation system
necessitate an earlier update. These changes, redrafts, or revisions will be initiated based upon
the direction of the Tribal Council and/or tribal staff.
2.5.3

Transportation improvement Program

The BIA Regional Office is required to produce and submit an annual four-year IRR-TIP
for each Tribe within its jurisdiction to BIADOT and FHWA for review and approval. The current
year TIP amount for each Tribe must equal their current year allocation, and the TIP amounts
for the +1, +2 + 3 years must be within plus or minus ten percent (±10) of their current year
allocation. The IRR-TIP is generated by the Control Schedule/Transportation Improvement Plan
System (CSTIPS) program which is used to enter relevant project information and yearly cost
estimates for project activities.
A Tribal TIP is a multi-year, financially constrained, list of proposed transportation
projects to be implemented during a 3 to 5 year period on roads with or providing access to
Indian trust land. It is developed from a Tribal transportation improvement priority list and must
be consistent with the Tribe’s Long Range Transportation Plan. Projects on the Tribal TIP must
be on route in the IRR inventory. It may also contain projects funded by the Tribe and other
Federal, State, and/or township DOT’s initiated by or developed in cooperation with the Tribe.
Only those projects approved by the sponsoring governmental entity may be included in a
Tribal TIP. An “Example” Tribal TIP form is contained in Appendix I. Tribal TIP’s containing
IRR funded projects need to be submitted to the BIA Regional Office for inclusion in the IRR
TIP and must contain relevant project information needed by the BIA to enter the project in the
IRR TIP. Information needed by the BIA is identified in the Project Detail Report for BIA Funded
Projects form which is also contained in Appendix I.
IRR funded projects identified in the Tribal TIP are reviewed by the Region BIA Office to
insure that they contain sufficient project information to create or update a project in the IRR
TIP, and that the project totals are within plus or minus ten percent (±10) of the Tribe’s annual
share of IRR funds. Acceptable Tribal TIP projects are included in the IRR TIP unchanged.
Tribal TIPs requiring additional project information or that have project totals exceeding their
annual share are returned to the Tribe for correction and re-submittal.
2.5.4

Procedures For Development of Roads and Transportation Improvements

For the most part, tribal governments have not established policies or guidelines to
monitor and control the construction of roads and other transportation improvements. It is the
recommendation of this study that the Tribe adopt a process for approving and monitoring
transportation improvement projects to ensure that the improvements will be constructed to an
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 33 of 35
2/8/12

adequate standard, and properly maintained. The essential elements of such a process are
outlined below.
Design Standards
The first element of the process is to define what is expected. When a transportation
project is submitted for review, it should be given conditional approval only, subject to the
improvements being constructed to proper standards. Roads should be designed to meet
minimum geometric and structural standards for the anticipated volume and vehicle loads.
Pedestrian improvements such as sidewalks, multi-use paths for non-motorized transportation,
and improvements associated with public transit also should also be designed to meet proper
standards; these are generally determined based on the location of the facility and the type of
use it will receive. Standards for roadways and other transportation improvements should be
adopted by the Tribe and made available to developers. The Tribe could use, as a basis for its
standards, those currently in place in Washoe County, BIA standards, or State standards.
These design standards could be adopted “as-is,” or modified based upon the specific
needs of the Tribe. Most cities in Nevada have adopted either NDOT or local standards, so
developers and design engineers should be familiar with the requirements.
Plan Submittal and Review
The second element in the approval process is the submittal and review of construction
documents (plans and specifications). The Tribe should employ experienced staff or consultants
to review proposals and to ensure that the plans and specifications meet minimum design
standards. Road plans and plans for other transportation improvements should only be
approved for construction if they conform to minimum design standards based on anticipated
use and traffic loads. The Tribe should also seek review and approval of construction
documents from the BIA if the Tribe anticipates adding the road or improvement to the BIA
road system.
Construction Monitoring
Another essential step is the monitoring of the actual construction. The project should be
inspected periodically by a qualified representative of the Tribe to ensure that construction is
proceeding in accordance with approved plans and specifications. A final inspection should be
performed prior to acceptance of responsibility for maintenance of the road or other
transportation improvement. The Tribe should consider requiring a performance bond. Common
in most jurisdictions, a performance bond is held until the improvement has been accepted and
conditions for release have been met.
Maintenance Funding
The process should also address a method for financing the long-term maintenance of roads
and other transportation improvements. For example, the Tribe could generate revenue for
maintenance of transportation improvements by assessing a fee or tax on private properties or
leases that benefit from the improvement, similar to a local ad valorem, or “property” tax.
Revenues from this fee or tax could be deposited into a fund reserved for maintenance of
Long Range Transportation Plan for the Pyramid Lake Reservation
Page 34 of 35
2/8/12

improvements. Or alternatively, a portion of tribal enterprise revenues could be deposited into a
fund dedicated to maintenance of the transportation improvements.

Long Range Transportation Plan for the Pyramid Lake Reservation
Page 35 of 35
2/8/12

Long Range Transportation Plan for the Pyramid Lake Reservation

Figure 10

Pyramid Lake Paiute Tribe Transportation Improvement Projects (Roads) Priority List (Resolution PL 42 11 Adopted May 6, 2011)
Priority

Project Name

Location

BIA Route Number

BIA Section Number

Route Name

Route
Classification

Length (miles)

Width of
Pavement (ft)

Condition

Project Description

Serves

1

Wadsworth By-pass

Wadsworth

0035

010

Wadsworth By-Pass

5

3.00 miles

proposed road proposed road

new road to link SR 427 and SR447, bypassing center of
Wadsworth

2

Pelican Point Access

Sutcliffe

0205

010

Pelican Point Road

5

1.00 mile

31 (currently
unpaved)

improve/pave existing gravel road to principal recreational recreational visitors and tribal economic
access point to Pyramid Lake
development goals

3

Capital Hill Road

Nixon

0101

105

Capital Hill Road

3

0.05 miles

4

Administration building
Nixon
parking areas

P101

050

administration building
parking areas

9

0.1

unpaved

5

Wadsworth Community
Center access loop and Wadsworth
parking

planned route not yet on
inventory

not yet on inventory

Wadsworth Community
Center Loop and
Parking

5

`approx 0.2 miles

standard

6

Ranch/Big Bend Road

Wadsworth

0102

all sections

Big Bend Road - also
called Ranch Road

5

.05 miles

7

Lakeview Drive

Sutcliffe

0201

030

Lakeview Drive

5

0.15 miles

8

Warrior Point

Sutcliffe

0021

010

Warrior Point

5

road north from Sutcliffe
to Honey Lake, Smoke
Creek desert

9

Pyramid Lake Road

Sutcliffe

0002

010 and 020

10

Pyramid Road

Nixon

0005

010

gravel road to beach access
and boat ramp

town of Wadsworth, Reservation
residents, recreational visitors

ADT* Project justification

Potential Funding Source
and/or Responsible Agency

BIA/FHWA RNDF annual
traffic safety - by routing state highway traffic
funding allocation for Pyramid
around Wadsworth, traffic safety - for pedestrians
Lake Tribe; BIA - IRRHPP;
and bicyclists as well as motorists - will be
NDOT - project submittal
improved
process
BIA/FHWA RNDF annual
By improving recreational access to Pyramid
funding allocation for Pyramid
Lake, this project will help implement the Pyramid Lake Tribe; BIA - IRRHPP;
Lake Tribe's economic development goals.
NDOT - project submittal
process
BIA/FHWA RNDF annual
Improve all-weather access and parking to key
funding allocation for Pyramid
administrative area
Lake Tribe
BIA/FHWA RNDF annual
Improve all-weather access and parking to key
funding allocation for Pyramid
administrative area
Lake Tribe
BIA/FHWA RNDF annual
To allow tribal members access to a community
funding allocation for Pyramid
center offering educational, administrative,
Lake Tribe; Indian Community
recreational, and cultural activities.
Development Block Grant
(HUD)

Estimated
Cost

$ 4,796,000

$

933,000

$

70,600

$

50,400

$

257,000

gravel/dirt road, no shoulders,
hill, leads to tribal administration grade, drain, pave road
area
parking area for tribal
grade, drain, pave, and stripe parking lot
administration buildings is
unpaved

Tribal administrative area including
administrative offices, council chambers,
tribal housing authority
Tribal administraton area including
administrative offices, council chambers,
tribal housing authority

proposed access loop road and develop access loop road and parking to serve proposed
parking
community center in Wadsworth

will serve a community center serving all
tribal members especially Wadsworth
residents

Widen paved sections to 2-lane paved road with
Pavement is in fair condition, but shoulders; pave dirt section that leads to rodeo grounds;
narrow single-lane road
develop loop road with parking to access pow wow
grounds

serves Big Bend RV park, youth
treatment center, tribal victims services,
pow wow grounds, rodeo grounds

To improve access to critical economic/
recreational development area, also to social
services facilities.

BIA/FHWA RNDF annual
funding allocation for Pyramid
Lake Tribe

$ 1,396,000

30 (existing
gravel road
width)

gravel/dirt road leads to beach
and camping

pave existing dirt road and improve parking for
recreational users

recreation area/ lakeshore

economic/ recreational development

BIA/FHWA RNDF annual
funding allocation for Pyramid
Lake Tribe

$

1.4

21 (existing
gravel road
width)

dirt/ gravel road - main beach
access

grade, drain and pave existing beach/ camping access
road. Provide parking at road terminus for beach access.

principal beach access for Reservation
residents and recreational visitors

By improving recreational access to Pyramid
BIA/FHWA RNDF annual
Lake, this project will help implement the Pyramid funding allocation for Pyramid
Lake Tribe's economic development goals.
Lake Tribe

$ 1,184,000

4

11

22 (existing
gravel road
width)

dirt/ gravel road

Pave unpaved section on Reservation or carry out regular Northern access to Reservation. Also
blading to improve surface and minimize washboarding
serves Aster Pass Geothermal Project.

It is important to maintain this road that provides
access to northern Reservation areas, as well as BIA/FHWA RNDF annual
providing northern entry to Reservation. Also
funding allocation for Pyramid
serves important geothermal resource sites (Aster Lake Tribe
Pass) and important cultural site (The Needles)

$108,000
(annual
grading) to
$8,899,000
(paving)

5

12.00 miles

dirt road

grade, drain, gravel and regularly blade existing dirt road

provides access to The Pyramid and the
Stone Mother, important scenic and
cultural features on the Reservation

economic/ recreational development

BIA/FHWA RNDF annual
funding allocation for Pyramid
Lake Tribe

498,000

$ 2,071,000

2/8/2012

Figure 11
Priority Non- Road Projects

Other Pyramid Lake Paiute Tribe Transportation Improvement Projects, Non-roadway Projects, Unprioritized. Not part of Priority List (Resolution PL 42 11) Adopted byTribal Council May 6, 2011
Project Name

Location

Wadsworth and Nixon
Safe Routes to School
Programs

Wadsworth and
Nixon:

Preventative
Maintenance Program

all Reservation

BIA Route Number (if
applicable)

0102 and 0447
and 0447

0101

BIA Section Number (if
Applicable)

Route Name (if
Applicable)

T100

all sections

Project Description

Serves

Project justification

Potential Funding Source
and/or Responsible Agency

Estimated
Cost

working with administrators and parents at Natchez Elementary School, Pyramid Lake High
School and the two preschool/ daycare facilities, the Pyramid Lake transportation department will
elementary school and HeadStart preschool in Wadsworth; day care facility and High School in Nixon:
state highway and local streets with inadequate facilities to allow safer use by bicyclists and pedestrians, initiate a Safe Routes to School plan and program at the schools that will include enhanced traffic
enforcement; engineering (design and installation of bicycle and pedestrian safety features); and
especially parents and children walking to school
education and encouragement to walk to school (by way of in-school and after-school programs)

students and families of Natchez School
existing unsafe conditions for children, family and
and Wadsworth Head Start preschool.
youth bicyclists and pedestrians in and around four
Students and families of Pyramid Lake High
schools.
School and Nixon Day care facility.

Safe Routes to School grant
through NDOT; tribal funding

to be
determined
once Safe
Routes plan is
completed

roads will be evaluated for best repair/maintenance strategy (14 road segments currently have SCI of
"poor"; 68 have SCI of "fair")

a plan/strategy to evaluate, repair,and maintain reservation roads

all Reservation

this strategy will provide the tribe with a system to
evaluate and forecast road surface
repair/maintenance needs and to repair/maintain
roads in the most timely cost-effective manner.

BIA/FHWA RNDF annual
funding allocation for Pyramid
Lake Tribe - 2% planning setaside

to be
determined

There is currently no public transportation system serving the Reservation

1. Carry out needs assessment and route/fare study; 2. Identify and apply for funding; 3. if/when
funding is received, purchase vehicles, hire and train drivers, etc.

Reservation residents especially lowincome, elderly and disabled.

community development; economic development

Federal Transit Administration
(FTA) Tribal Transit Program

Tahoe Pyramid Bikeway

existing route between Wadsworth and Nixon has infrequent maintenance, minimal signs. No
improvements at all yet north of Nixon

Draft a regular maintenance plan or schedule; evaluate need for and install additional directional,
trailhead, and interpretive signs; do an alignment/ feasibility study for Nixon- Sutcliffe – north
route; and design an alternative alignment that bypasses Nixon residential areas including Basin
Street and homes along west Pyramid Lake Road

recreational users

Recreation; economic development; safety

Transportation Enhancements;
Recreational Trails program
(Land and Water Conservation
Fund)

$

trails not yet named

no existing trails

In this project tribal staff will identify potential locations for recreational trails in scenic areas of the
Tribal members and recreational visitors
Reservation and seek funding for trail design and construction.

Recreational/ economic development; public health

Recreational trails program

to be
determined
when trail
locations are
identified

Pyramid Lake Scenic
Byway

Scenic Byway has inadequate signs and interpretive facilities to draw visitors and to explain scenic and
historical/cultural features of Pyramid Lake

In coordination with economic development staff and tribal leaders,and following an existing
interpretive plan for the Pyramid Lake Scenic Byway, design gateway features or signage, kiosks,
an interpretive center, and scenic turnouts, and seek funding for improvements

reservation visitors

economic development, development of scenic
recreational resource.

National Scenic Byways
discretionary grant program;
Transportation Enhancements
(TE)

$

193,000

100
0101- Pyramid Street and SR
066, 063, 060,and 0447- 447; High School Road
and SR 447
810, 820

between Reservation
Public transportation
towns and surrounding
system for Pyramid Lake
urban areas

Tahoe Pyramid Bikeway:
existing section
Tahoe Pyramid Bikeway Wadsworth to Nixon;
proposed route Nixon to
Sutcliffe and north.

Condition

60,000

Recreational Trails
Project

to be determined

Pyramid Lake Scenic
Byway Improvements

Scenic Byway

Safety signage

all Reservation

many roads are missing traffic signs, especially stop; yield; curve warning signs

this project would evaluate current signage on the Reservation, then install missing signs.

Highway Safety improvement
safety for road users. Lack of stop, yield, speed, and
all Reservation and all Reservation visitors Program (HSIP) through NDOT;
curve warning signs may lead to increased crashes;
$
safety
Indian Highway Safety Grant
reinstalling these signs should diminish crashes.
(FHWA) tribal funds

49,000

Streetlights

Wadsworth at intersection
of Old Highway 40 and
SR 447; Wadsworth - in
front of Natchez School
by bus stop

inadequate lighting at a key intersection and at an elementary school

install 2-4 streetlights

Schoolchildren; Wadsworth residents; all
users of SR447

safety

Highway Safety improvement
Program (HSIP) through NDOT;
$
Indian highway Safety Grant
(FHWA) tribal funds

48,000

bridge over Truckee River is gone

replace bridge

rural housing

Provides access to rural housing. Also provides
alternate bridge over Truckee River for potential
emergency access.

BIA bridge replacement program $ 4,038,000

there are three boat docks currently - at Sutcliffe, Warrior Point, and Pelican Point

Using existing boat dock studies done by the Tribe construct a new boat dock for recreational
boaters, public safety and fisherman on Pyramid Lake. Design dock. Identify funding sources.
Apply for grant funding.

recreational boating

Economic/ recreational development

not yet identified. Potentially
tribal economic development
funding

Design and construct airstrip adjacent to Nixon with a single paved runway and a base building

tribal members and recreational visitors.

economic/ recreational development; emergency
medical transport

Valley Road bridge
replacement

Truckee River between
Nixon and Wadsworth

New Boat Docks

to be determined

Nixon Airstrip

Nixon

Bicycle and pedestrian
improvements

SR 445, 446, 447

SR 447 and SR 427

0006

020

all Reservation

Cattleguards on state
highways

SR 447, 445, 427, 446

Traffic Safety Review
Program

all Reservation

Seat belt awareness
campaign

all Reservation

as necessary

Valley Road Bridge

FAA Airport Capital
Improvement Grant

Nixon Airstrip

no existing airstrip

all as necessary

Reservation roads lack pedestrian and bicycle improvements including bike lanes, sidewalks, safety
signage, and pavement markings/crosswalks

this project would evaluate bike and pedestrian use on the Reservation, and identify improvements
all Reservation residents, especially those
in key use areas (Nixon, Wadsworth, Sutcliffe) to improve safety for bicyclists and pedestrians
who walk or bicycle
using Reservation roads.

currently Reservation roads have few or no facilities
to accommodate safer bicycling and walking, yet
there are places - especially in the three towns on the Transportation Enhancements;
RNDF annual funding allocation
Reservation, where people bike and walk. This
for Pyramid Lake Tribe - 2%
program would identify areas of bicycle and
planning set-aside
pedestrian use, and design and construct
improvements that would enhance safe bicycle and
pedestrian use.

SR 447, 445, 427, 446

unnecessary cattleguards in some areas, some cattleguards not at road surface level due to resurfacing

Evaluate cattleguards. Remove those that are no longer necessary. Repair uneven surfaces on
those that are not at road surface level

all Reservation residents and visitors

Safety

all

Single-car crashes - often run-off-the-road,rollover crashes -are the most frequent crash type on state
highways on the reservation. NDOT crash data indicate portions of state highways on the reservation
where accidents are most frequent

evaluate and install safety improvements including pavement markings, warning signs with current
retroreflective standards, curve delineation treatments; edge lines, barriers and rumble stripes in all reservation residents and visitors
high-accident portions of state highways and other local roads

Safety.

Single-car crashes - often run-off-the-road,rollover crashes -are the most frequent crash type on state
highways on the reservation. NDOT crash data indicate portions of state highways on the reservation
where accidents are most frequent

safety

to be
determined
once location
and number of
docks are
determined
$ 5,819,000

Appendix A
Long Range Transportation Plan for the Pyramid Lake Reservation
Information Sources and References
1. American Traffic Safety Services Association, Low Cost Local Road Safety Solutions
2. Ayala and Associates, Pyramid Lake Paiute Tribe Transportation Plan 2004
3. Carey, Scott H., Pyramid Lake Tribal Planner, Volume #1: Pyramid Lake Strategic
Economic Development Plan (Third draft) June, 2010
4. Federal Highway Administration, PEDSAFE: Pedestrian Safety Guide and
Countermeasure Selection System http://www.walkinginfo.org/pedsafe/index.cfm
5. Fernley Chamber of Commerce http://www.fernleychamber.org/ accessed 3/17/10
6. Garcia, Johnnie, Pyramid Lake Tribal Transportation Planner, interviews, email, and
correspondence, September 2009 - March 2011
7. Knack, Martha C. and Omer C. Stewart, As Long as the River Shall Run: An
Ethnohistory of Pyramid Lake Indian Reservation, University of Nevada Press, 1999
8. Nevada Department of Employment, Training and Rehabilitation, Nevada Workforce
Informer, Local Area Unemployment Statistics. http://www.nevadaworkforce.com
accessed 3/17/10
9. Nevada Department of Transportation, Crash Data, State Highways 427, 445, 446,
447, 2005-2009
10. Nevada Department of Transportation,Washoe County Annual Work Program (AWP)

for 2010, 2011, 2012, 2013,and Long Range Element (beyond 2013)

http://www.nevadadot.com/traveler/construction_projects/awp/
11. Nevada Regional Economic Analysis Project, NV-REAP: Shift-Share Analysis of Lyon
County Employment Growth http://www.pnreap.org/PNREAP.Report accessed
3/17/10
12. Nevada State Demographer, Population estimates of Nevada's Counties Cities and

Unincorporated Towns from July 1986 to July 2009

http://www.nsbdc.org/what/data_statistics/demographer/pubs/ accessed 3/17/10
13. Pyramid Lake Paiute Tribe, USDA Natural Resources Conservation Service, Pyramid
Lake Indian Reservation Comprehensive Resource Management Plan, September,
2005
14. Safe Routes to School National Partnership, Implementing Safe Routes to School in

Low-Income Schools and Communities: A Resource Guide for Volunteers and
Professionals, June, 2010
15. U.S. Census Bureau, Quick Tables, DP-1 Profile of General Demographic
Characteristics: 2000, Pyramid Lake Reservation, NV http://factfinder.census.gov

accessed 3/17/10
16. U.S. Census Bureau, Quick Tables, QT-P23 Journey to Work: 2000
http://factfinder.census.gov accessed 3/22/10
17. U.S. Department of Transportation, Rural Safety Initiative, February, 2008
18. U.S. Department of Transportation, Federal Highway Administration, Federal and
Tribal Lands Road Safety Audits: Case Studies, December, 2009

Appendix A
Long Range Transportation Plan for the Pyramid Lake Reservation
Information Sources and References
pg. 1

19. Washoe County, Nevada GIS Department, Online Map Warehouse, maps showing

land use, land ownership, and other features adjacent to the Pyramid Lake
reservation http://wcgisweb.washoecounty.us/website/Map_Warehouse/viewer.htm
20. Washoe County, “2008/2009 Washoe County Maintained Paved Streets,
Wadsworth,” (list) “Washoe County Maintained Unpaved Streets, 2008/2009,” (list)
“Washoe County Roads NW Reservation” (map) (emailed by Johnnie Garcia, Pyramid
Lake Tribal Transportation Planner)

Appendix A
Long Range Transportation Plan for the Pyramid Lake Reservation
Information Sources and References
pg. 2

Appendix B
Long Range Transportation Plan for Pyramid Lake Paiute Tribe
Reservation Road System

PYRAMID LAKE PAIUTE TRIBE
INVENTORY UPDATE COMPARISON LIST
Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Denotes Tribal Sections within BIA System Routes (See Tribal Route list for Mileages)
2011 Inventory
Update

Existing D.O.T.
Inventory

Route

Section

Route

Section

0002

010

0002

010

4

4

7.3

7.3

1

3

1

1

0002

020

0002

010

4

4

4.1

4.1

1

3

1

1

11.4

11.4

0003

010

0003

010

5

5

6.6

6.7

5

5

1

1

0003

020

0003

020

5

5

0.9

1.4

5

5

1

1

0003

030

0003

030

5

5

1.4

0.7

5

5

1

1

Little Nixon Road

0003

035

0003

030

5

5

0.8

0.8

5

5

1

1

Little Nixon Road

9.7

9.6

010

0004

010

5

5

1.3

1.3

5

5

1

1

W. Pyramid Lake Road

0004

020

1

DELETE

0005

010

Class

Subtotal

Subtotal
0004

5

Subtotal
0005

010

Length

5

5

Surface Type

3.5
1.3

4.8

8.1

9.0

Const. Need

3

1

Section Name

Hill Ranch Road

1

1

1

Unnamed
Unnamed

0005

015

0005

020

5

5

6.1

6.1

1

1

1

1

0005

016

0005

020

5

5

1.7

1.7

1

1

1

1

Unnamed

0005

020

0005

020

5

5

10.1

9.1

1

1

1

1

Unnamed

0005

025

0005

020

5

5

1

1

1

1

Unnamed

4

1

Subtotal

4.7

4.6

30.7

30.5

0.9

0.9

0006

010

0006

010

5

5

0006

020

0006

020

5

5

0006

030

0006

030

5

5

2.1

2.1

5

0006

040

0006

040

5

5

0.4

0.4

3.4

3.4

12.5

13.9

12.5

13.9

Subtotal
0007

010

0007

010

5

5

Subtotal

1

Valley Road

4

4

Bridge 334H

5

1

1

Hollywood Road

4

5

1

1

Eagle St.

3

3

1

1

Unnamed

0008

010

0008

010

5

5

2.7

2.7

3

1

1

1

Unnamed

0008

020

0008

020

5

5

10.5

10.5

1

1

1

1

Unnamed

0008

025

0008

020

5

5

6.6

6.6

1

1

1

1

Unnamed

0008

030

5

1

2

Unnamed

0008

040

5

1

2

Unnamed

Subtotal

19.8

19.8

0009

010

0009

010

5

5

11.3

11.3

1

1

1

1

Sheep Pass Road

0009

020

0009

020

5

5

2.6

2.6

9

9

1

1

Sheep Pass Road

0009

030

0009

030

5

5

2.2

2.2

9

1

1

1

Sheep Pass Road

16.1

16.1

010

0010

010

5

5

6.4

4.2

1

9

1

1

Fox Springs Road

6.4

4.2

010

0011

010

5

5

6.8

6.8

1

1

1

1

Sweet Water Road

6.8

6.8

Subtotal
0010
Subtotal
0011
Subtotal
0012

010

0012

010

5

5

0.2

0.2

3

5

1

1

Railroad Ave.

0012

020

0012

010

5

5

1.1

1.2

5

1

1

1

Railroad Ave.

0012

030

0012

020

5

5

1.0

1.0

5

1

1

1

W. Pyramid Lake Road

2.3

2.4

Subtotal

Page 1 of 10

02/16/2011

Appendix B
Long Range Transportation Plan for Pyramid Lake Paiute Tribe
Reservation Road System

PYRAMID LAKE PAIUTE TRIBE
INVENTORY UPDATE COMPARISON LIST
Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Denotes Tribal Sections within BIA System Routes (See Tribal Route list for Mileages)
2011 Inventory
Update

Existing D.O.T.
Inventory

Route

Section

Route

Section

0013

010

0013

010

5

5

0.8

0.8

5

5

1

1

Border Street

0013

020

0013

020

5

5

0.3

0.3

5

1

1

1

James Ranch Road

1.1

1.1

0031

010

0031

010

5

5

0.4

0.3

5

5

1

1

Basin Road

0031

020

0031

020

5

5

0.4

0.4

5

5

1

1

Basin Road

0.8

0.7
0.3

3

3

1

1

Cottonwood

5

5

1

1

Unnamed

0

0

4

4

Proposed Road

0

0

4

4

Wadsworth Bypass

3

1

1

1

Cedar Lane

Class

Subtotal

Subtotal
0032

0032

010

5

5

0.3
0.3

0.3

010

0033

010

5

5

0.7

0.7

0.7

0.7

8.4

10.0

8.4

10.0

1.6

3.0

1.6

3.0

0.2

0.2

Subtotal
0034

010

0034

010

5

5

Subtotal
0035

Surface Type

010

Subtotal
0033

Length

010

0035

010

5

5

Subtotal
0101

010

3

3

Const. Need

Section Name

0101

010

0101

020

0101

020

3

3

0.3

0.3

5

5

1

1

Moccasin Lane

0101

030

0101

030

3

3

0.2

0.2

5

5

1

1

Unnamed

0101

040

0101

040

3

3

0.1

0.1

5

5

1

1

Corral Road

0101

050

0101

050

3

3

0.1

0.1

5

5

1

1

Cactus Circle

0101

060

0101

060

3

3

0.3

0.3

5

5

1

1

State Circle

0101

063

101

060

3

3

0.3

0.2

5

5

1

1

0101

064

5

5

2

State Street
IHS Clinic Road

0101

065

5

1

2

IHS Clinic Road

0101

066

3

5

2

Unnamed road to High School

0101

067

3

5

2

Unnamed road to High School

0101

070

0101

070

5

3

0.1

0.1

5

5

1

1

Alkali

0101

080

0101

080

3

3

0.1

0.1

5

5

1

1

Sage Hen Court

0101

090

0101

090

3

3

0.1

0.1

5

5

1

1

Sage Hen Court

0101

100

0101

100

3

3

0.1

0.1

5

5

1

1

0101

105

0101

110

0101

110

3

3

0.1

0.1

5

5

1

1

Freemont Church Street

0101

120

0101

120

3

3

0.2

0.3

5

5

1

1

Hillside Drive

0101

130

0101

130

3

3

0.2

0.2

5

5

1

1

Paiute Street

0101

140

0101

140

3

3

0.1

0.1

5

5

1

1

Anaho Circle

0101

150

0101

150

3

3

0.1

0.1

5

5

1

1

Wishbone Road

0101

155

0101

150

1

3

0.3

0.2

5

5

1

1

Wishbone Road.

0101

160

0101

160

3

3

0.7

0.7

4

5

1

1

Arrow Street

0101

170

0101

170

3

3

0.3

0.3

1

5

1

1

Winnemucca Street

0101

180

0101

180

3

3

0.4

0.3

4

5

1

1

Winnemucca Street

4.3

4.1

Subtotal

3

3

Page 2 of 10

2

Church Street
Capitol Hill Road

02/16/2011

Appendix B
Long Range Transportation Plan for Pyramid Lake Paiute Tribe
Reservation Road System

PYRAMID LAKE PAIUTE TRIBE
INVENTORY UPDATE COMPARISON LIST
Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Existing
D.O.T.

Inventory
Update

Denotes Tribal Sections within BIA System Routes (See Tribal Route list for Mileages)
2011 Inventory
Update

Existing D.O.T.
Inventory

Route

Section

Route

Section

0102

010

0102

010

3

3

0.2

0.2

5

5

1

1

Rabbit Drive

0102

020

0102

020

3

3

0.4

0.4

5

5

1

1

Rabbit Circle

Class

Length

Surface Type

Const. Need

Section Name

0102

023

3

5

2

Antelope Circle

0102

025

3

0

4

Proposed Extension to 5th Street

0102

030

0102

030

3

3

0.4

0.3

0102

035

0102

035

3

3

0.5

0.5

0102

040

0102

040

3

3

0.3

0.4

5

5

5

5

1

1

4th Street

4

4

Proposed 4th Street extension

1

1

5th Street

0102

043

3

5

2

Owl Circle

0102

045

3

5

2

Fifth Street

0102

047

3

5

2

Short Street

0102

049

0102

050

0102

050

3

3
3

0.3

0.4

5

5
5

1

1

Jackson Street

0102

060

0102

060

3

3

0.2

0.2

5

5

1

1

8th Street

0102

065

0102

070

0102

073

3
0102

070

3

2

5
3

0.2

0.1

3

5

5

5

1

Brady Street

075

3

5

2

3

5

2

0102

080

3

0.5

0.5

5

5

8th Street
Numa

077

3

1

2

0102

080

Unnamed road connecting Rabbit and Jackson/8th

2

0102

0102

Coyote Street

1

Brady Street
1

Railroad Circle

0102

085

5

5

2

Sagebrush Street

0102

086

3

5

2

Sagebrush Street

0102

087

0102

090

0102

090

3

5
3

0.1

0.1

5

5
5

1

1

6th Street

0102

100

0102

100

3

3

0.1

0.1

5

5

1

1

Pyramid Street

0102

110

0102

110

3

3

0.1

0.1

5

5

1

1

8th St

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/tribal%3Apyramid_lake%3A7739aa968ca51387. Public record. Not legal advice.