# September 2026 Update

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/tribal%3Aport_gamble_sklallam%3A0237dae04dfa4a69

## Record

- **Collection:** Tribal code
- **Document type:** Tribal code

## Text

September 2026 Update

Long Range Transportation
Plan

Port Gamble S'Klallam Tribe

Prepared for:
Port Gamble S’Klallam Tribe
31912 Little Boston Road E
Kingston, WA 98346

Prepared by:

September 2026
KH 090225140
Copyright © Kimley-Horn and Associates, Inc.

September 2026 Update

for

Long Range Transportation Plan

Prepared for:
Port Gamble S’Klallam Tribe
31912 Little Boston Road E
Kingston, WA 98346

Prepared by:
Kimley-Horn and Associates, Inc.
2828 Colby Avenue
Suite 200
Everett, Washington 98201
(425) 708-8275

This document, together with the concepts and designs presented herein, as an instrument of
service, is intended only for the specific purpose and client for which it was prepared. Reuse of and
improper reliance on this document without written authorization and adaptation by Kimley-Horn
and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.

© September 2026
KH 090225140
Long Range Transportation Plan
September 2026 Update

September 2026
KH 090225140

T ABLE OF C ONTENTS
EXECUTIVE SUMMARY ............................................................................................................................... 1
Program Objectives ...................................................................................................................... 1
Program Goal................................................................................................................................. 1
Plan Recommendations ............................................................................................................... 1
1

COMMUNITY PROFILE......................................................................................................................... 2
1.1 Introduction .......................................................................................................................... 2
1.2 Scope of Study ...................................................................................................................... 2
1.3 Study Area ............................................................................................................................. 2
1.4 Tribal History ........................................................................................................................ 4
1.5 Tribal Government ............................................................................................................... 4
1.6 Climate ................................................................................................................................... 5
1.7 Demographics ...................................................................................................................... 6
1.8 Employment.......................................................................................................................... 7
1.9 Land Use ................................................................................................................................ 8

2

EXISTING TRANSPORTATION SYSTEM.................................................................................................16
2.1 Tribal Transportation Program ........................................................................................16
2.2 Transportation Inventory ..................................................................................................16
2.2.1

State Routes ...........................................................................................................43

2.2.2

County Routes .......................................................................................................44

2.2.3

BIA Routes ..............................................................................................................56

2.2.4

Tribal Roads ...........................................................................................................56

2.2.5

Commercial/Business Park Roads ......................................................................57

2.2.6

Bridges and Docks ................................................................................................57

2.2.7

Marine Access ........................................................................................................57

2.2.8

Non-motorized Facilities ......................................................................................58

2.2.9

Public Transit .........................................................................................................58

2.2.10 Shuttles, Vans, and Shared Rides........................................................................61
Long Range Transportation Plan
September 2026 Update

September 2026
Page i

KH 090225140

2.3 Collision History..................................................................................................................61
2.3.1

Collision Locations ................................................................................................61

2.3.2

Collision Severity ...................................................................................................63

2.3.3

Collision Type .........................................................................................................66

2.3.4

Fatal and Major Injury Collisions.........................................................................69

2.3.5

Collision Trends .....................................................................................................71

2.4 Existing Traffic Operations................................................................................................72

3

2.4.1

Analysis Parameters .............................................................................................72

2.4.2

Traffic Volumes ......................................................................................................72

2.4.3

Roadway Operations ............................................................................................73

2.4.4

Intersection Operations .......................................................................................76

FUTURE CONDITIONS .......................................................................................................................79
3.1 Future Land Use .................................................................................................................79
3.1.1

Housing Development..........................................................................................81

3.1.2

Tribal Government Center ...................................................................................81

3.1.3

Community Trails ..................................................................................................81

3.1.4

Expand Reservation ..............................................................................................82

3.2 Transportation Need Analysis ..........................................................................................87
3.2.1

Traffic Patterns ......................................................................................................87

3.2.2

Social and Economic Development ....................................................................87

3.2.3

Health and Safety ..................................................................................................89

3.2.4

Environmental Concerns......................................................................................89

3.2.5

Scenic Byways and Tourism.................................................................................89

3.2.6

Development and Protection of Natural Resources ........................................90

3.2.7

Energy Conservation.............................................................................................90

3.2.8

Integration with Land Use Planning ...................................................................90

3.3 Future Transportation Improvements ............................................................................90
3.3.1

Kitsap County Six-Year Transportation Improvement Program ....................91

3.3.2

WSDOT STIP ...........................................................................................................91

Long Range Transportation Plan
September 2026 Update

September 2026
Page ii

KH 090225140

3.3.3

WSDOT Route Development Plans .....................................................................91

3.3.4

The Olympic Region Financially Constrained 20-Year Mobility Strategies ...92

3.3.5

PGST Comprehensive Plan ..................................................................................92

3.4 Future Traffic Operations..................................................................................................93
3.4.1

Future Roadway Operations................................................................................94

3.4.2

Future Intersection Operations...........................................................................97

3.4.3

Future Improved Intersection Operations ........................................................99

3.5 Nonmotorized Element .................................................................................................. 101
4

TRANSPORTATION IMPROVEMENT PROGRAM ................................................................................. 103
4.1 Road Standards ............................................................................................................... 103
4.2 Prioritization of Needs.................................................................................................... 103
4.2.1

Balancing Safety and Capacity Needs ............................................................. 104

4.2.2

Criteria for Evaluating Priorities ....................................................................... 105

4.3 Short-Term Improvements ............................................................................................ 105
4.4 Long-Term Improvements ............................................................................................. 105
4.5 Tribal Transportation Improvement Program ............................................................ 106
5

FUNDING AND IMPLEMENTATION................................................................................................... 107
5.1 Federal-Aid Highway Program ...................................................................................... 107
5.2 Federal Lands Highway Program .................................................................................. 107
5.3 Tribal Transportation Program ..................................................................................... 107
5.4 State and Federal Funds ................................................................................................ 108
5.5 Kitsap County................................................................................................................... 108
5.6 Bureau of Indian Affairs ................................................................................................. 108
5.7 Port Gamble S’Klallam Tribe .......................................................................................... 109

6

RECOMMENDATIONS..................................................................................................................... 110

Long Range Transportation Plan
September 2026 Update

September 2026
Page iii

KH 090225140

L IST OF F IGURES
Figure 1-1: Aerial View of Port Gamble S’Klallam Reservation (July 2025) .................................. 3
Figure 1-2: Conceptual Master Plan.................................................................................................. 9
Figure 1-3: Forest Lands ...................................................................................................................10
Figure 1-4: Red Cedar Subdivision ..................................................................................................11
Figure 1-5: Business Park Master Plan ...........................................................................................12
Figure 1-6: Warrior Ridge Master Plan ...........................................................................................13
Figure 1-7: 2021 Warrior Ridge Dev Plan .......................................................................................13
Figure 1-8: Heronswood Master Plan .............................................................................................14
Figure 1-9: Administration Campus Redevelopment Project .....................................................15
Figure 1-10. Raccoon Town ..............................................................................................................15
Figure 2-1: Kitsap County Transportation Network .....................................................................55
Figure 2-2: Port Gamble S’Klallam Tribe Transportation Network .............................................56
Figure 2-3: Kitsap Transit Route #307 ............................................................................................58
Figure 2-4: Kitsap Transit Route #391 ............................................................................................59
Figure 2-5: Collision Heat Map ........................................................................................................62
Figure 2-6: Collision Severity Map ...................................................................................................65
Figure 2-7: Collision Type .................................................................................................................66
Figure 2-8: Top Collision Types ........................................................................................................67
Figure 2-9: Active Transportation Collisions ..................................................................................68
Figure 2-10: Fatal and Major Injury Collisions Map ......................................................................70
Figure 2-11: Collision Contributing Factors ...................................................................................71
Figure 2-12: Existing Weekday 2026 PM Peak Hour Volumes ....................................................74
Figure 3-1: 2018 Adopted Land Use Plans for Business Park, Warrior Ridge, and
Heronswood.......................................................................................................................................80
Figure 3-2: PGST Land Purchase 924 acres ...................................................................................85
Figure 3-3: Land Purchase 924 acres..............................................................................................86
Figure 3-4: Tribal Admin Campus Map ...........................................................................................88
Figure 3-5: Kitsap County Kingston 2026-2031 TIP.......................................................................91
Long Range Transportation Plan
September 2026 Update

September 2026
Page iv

KH 090225140

Figure 3-6: Future 2046 PM Peak Hour Volumes ..........................................................................98
Figure 3-7: Tribal Concept Trail Plan Map ................................................................................... 102

L IST OF T ABLES
Table 1-1: US Census 2024 “American Community Survey estimate” ......................................... 6
Table 1-2: Enrollment Population Projections ................................................................................ 7
Table 1-4: Employment Status........................................................................................................... 8
Table 2-1: Route Summary...............................................................................................................17
Table 2-2: Collision Severity .............................................................................................................63
Table 2-3: Key Intersection Collision Severity................................................................................63
Table 2-4: Key Intersection Collision Rates ....................................................................................64
Table 2-5: Fatal and Major Injury Summary ..................................................................................69
Table 2-6: Roadway Level of Service Criteria .................................................................................73
Table 2-7: Current Roadway Level of Service ................................................................................75
Table 2-8: Level of Service Criteria for Stop-Sign Controlled Intersections ..............................76
Table 2-9: Existing Roadway PM Peak Hour LOS - 2026 ..............................................................77
Table 3-1: Tribal Lands as of July 2025 ...........................................................................................82
Table 3-2: Projected Roadway LOS - 2036 .....................................................................................95
Table 3-3: Projected Roadway LOS - 2046 .....................................................................................96
Table 3-4: Projected Intersection PM Peak Hour LOS – 2036 and 2046....................................97
Table 3-5: Hansville Road at Little Boston Road - Projected Roundabout LOS - 2035 ............99
Table 3-6: Hansville Road at 288th Street - Projected Signal LOS – 2046 ...................................99
Table 3-7: Hansville Road at 288th Street - Projected Roundabout LOS - 2046 ..................... 100
Table 3-8: Hansville Road at SR-104 - Projected Roundabout LOS - 2046 ............................. 100
Table 4-1: PGST Priority List .......................................................................................................... 104

Long Range Transportation Plan
September 2026 Update

September 2026
Page v

KH 090225140

L IST OF A PPENDICES
TRIBAL TRANSPORTATION PROGRAM INVENTORY ..................................................................................... A
BUREAU OF INDIAN AFFAIRS FUNCTIONAL CLASSIFICATION ....................................................................... B
STATE HIGHWAY LOG .............................................................................................................................. C
COUNTY ROAD LOG AND COUNTY SIX-YEAR TIP ...................................................................................... D
TURNING MOVEMENT TRAFFIC COUNTS AND DIAGRAMS ........................................................................... E
CAPACITY ANALYSIS WORKSHEETS AND ROADWAY SEGMENT CALCULATIONS ............................................. F
2018 MASTER PLAN ............................................................................................................................... G
PORT GAMBLE S’KLALLAM TRIBE TRANSPORTATION IMPROVEMENT PROGRAM ......................................... H

Long Range Transportation Plan
September 2026 Update

September 2026
Page vi

KH 090225140

EXECUTIVE SUMMARY
The Long-Range Transportation Plan (LRTP) is prepared in order to plan, develop, and
maintain a public transportation network that serves the needs of the community. The
transportation network should complement the social and economic development goals of
the Port Gamble S’Klallam Tribe (PGST). In addition, the transportation network should
provide for the safe and efficient movement of Tribal members, goods, and services in the
community and throughout the region. The transportation program objectives and goals
are listed below:

Program Objectives
⚫

To identify and map key transportation routes, facilities, services, and needs

⚫

To provide safe and convenient public access within the Reservation

⚫

To prioritize transportation projects

⚫

To increase the effectiveness of local and regional transportation improvement
funding

⚫

To assist in the economic development of the Reservation

Program Goal
PGST’s goal is to develop and maintain a transportation network that safely and efficiently
provides access throughout the Reservation and provides links to the adjacent
transportation networks maintained by Kitsap County (County) and Washington State
(State) agencies. This update was prepared to address Tribal transportation issues,
develop strategies for multimodal transportation, and establish both short- and long-term
Transportation Improvement Programs (TIP). This LRTP is expected to be updated every
five years and look forward at a long-term 20-year program. The short-term TIP is reviewed
and approved by Tribal Council on an annual basis.

Plan Recommendations
The Plan recommends that the following actions be taken to meet the Plan objectives:
⚫

Adopt the LRTP by resolution

⚫

Maintain and update a National Tribal Transportation Program Facility Inventory
(NTTFI)

⚫

Maintain and update a TIP annually

⚫

Coordinate with local agencies and Tribal organizations

⚫

Prepare preliminary cost estimates/seek alternate funding

Long Range Transportation Plan
September 2026 Update

September 2026
Page 1

KH 090225140

1

COMMUNITY PROFILE

1.1

Introduction

PGST is one of two federally recognized tribes located in the Kitsap County area of
Washington State. PGST depends on a range of transportation facilities for access to
services such as housing, jobs, food, health care and social services, recreation, and
subsistence harvest and hunting. Access to these services and facilities depends upon a
network of existing roads including Tribal, Bureau of Indian Affairs (BIA), County, and State
routes as well as marine access via harbors, designated boat launches, and docks. Access
to services also depends upon a network of public, non-profit, and private services such as
public transit, vanpools, Tribal van services, and informal ridesharing. Together this system
of infrastructure and services provides transportation access for the Tribal community. The
health and welfare of Tribal members and the larger community as a whole is dependent
on a well-maintained and easily accessible transportation network.
A portion of this LRTP has been adopted from the PGST’s website, history book, and other
Tribal documents. Thank you to the staff who provided resources and time to review and
comment on the document’s accuracy.

1.2

Scope of Study

The key elements of this study address:
⚫

Roadway and intersection safety and capacity analysis for a 20-year forecast (2046)

⚫

Identification of Tribal transportation issues

⚫

Development of strategies for multi-modal transportation

⚫

Updating the existing inventory of the Port Gamble S’Klallam Reservation road
system, including County and State roads that provide critical access to the
Reservation

⚫

Prioritization of short-term and long-term transportation projects

⚫

Development of a Multi-Year TIP

1.3

Study Area

The Study Area covers the PGST Reservation (trust lands) and adjacent Tribal ownership.
The entire Reservation is in trust status. The Reservation in trust status comprises
approximately 1,707 acres in North Kitsap County, Washington, including adjacent
tidelands. The original trust lands were comprised of 1,230 acres of land and 67 acres of
Long Range Transportation Plan
September 2026 Update

September 2026
Page 2

KH 090225140

tidelands. In 2012, 390 acres of land purchased from the Washington State Department of
Natural Resources (DNR) was brought into trust status. In 2014, 20 acres of land purchased
from Pope Resources was brought into trust status. PGST owns an additional 61 acres of
Off-Reservation Trust Lands and an additional 1,300 acres of Off-Reservation Fee Lands.
These are located adjacent to the trust lands to the north, east, and south. Figure 1-1
shows the boundaries of the Reservation.
Figure 1-1: Aerial View of Port Gamble S’Klallam Reservation (July 2025)

Long Range Transportation Plan
September 2026 Update

September 2026
Page 3

KH 090225140

The transportation network serving PGST extends beyond the boundaries of the Study
Area to include County and State roads that provide access to jobs, housing, and essential
services.

1.4

Tribal History

The PGST Reservation is located on the Kitsap Peninsula in north Kitsap County,
Washington. The Reservation is home to the Port Gamble S'Klallam Tribe, one of at least 28
federally recognized tribes in the state. The peninsula is surrounded by salt water which
supports a large number of fish and shellfish species that have always supported PGST’s
way of life. The Reservation and local lands and waters have been heavily impacted by a
nearby former lumber mill that operated for over 150 years, heavy marine industrial
activities, and a local landfill.
It is well accepted that the S’Klallam people lived along the shores of Hood Canal and Port
Gamble Bay. This is confirmed by historic maps and documents from the first explorers
and founders of the town of Port Gamble. The western shores of Port Gamble Bay
harbored a S’Klallam village which was occupied by PGST prior to 1853, when the Pope &
Talbot timber mill began construction. The S’Klallam people were persuaded to move
across the bay to Point Julia, with promises of lumber for house construction, firewood,
and Christmas presents.
From 1853 to 1935, Point Julia was a Tribal village site with numerous wood homes, other
outbuildings, paths, and water systems. In 1935, the village site was deemed unsuitable for
habitation by the U.S. government and was burned down. The federal government finally
bought land from Pope & Talbot in 1938 to create what is now the Port Gamble S’Klallam
Reservation.
Much of the culture of the Native American people living on the Reservation is centered on
the shoreline environment. The shoreline is surrounded by mixed residential, commercial,
and industrial uses. Tribal members continue to rely on fish and shellfish from Port Gamble
Bay for their cultural and economic well-being, just as they have for many thousands of
years.

1.5

Tribal Government

The Port Gamble S’Klallam Tribe is a sovereign nation, which exercises full control over its
land and natural resources. The entire Reservation is owned by PGST; there is no individual
or private ownership of land on the Reservation. The Reservation was set aside for the

Long Range Transportation Plan
September 2026 Update

September 2026
Page 4

KH 090225140

exclusive use and benefit of the Port Gamble S'Klallam people in 1938 and has remained in
100% Tribal trust status since its inception.
PGST is a signatory to the Point No Point Treaty of 1855 with the United States Federal
Government. The Treaty set aside rights for tribes to continue access to their customary
fishing and hunting areas. Tribes retained aboriginal, treaty-protected rights to fish at usual
and accustomed grounds and to hunt and gather on all open and unclaimed lands. PGST
protects its natural resources on and off the Reservation through careful management and
enforcement.
A six-member Tribal Council was delegated legislative authority by the General Council and
actively governs PGST. In 1992, PGST became one of the first Self-Governance tribes in the
United States and has assumed control of its BIA and Indian Health Services (IHS)
programs. Under Self-Governance, PGST has been able to dramatically improve and
expand programs and services. Other "firsts" include the first Tribal Temporary Assistance
to Needy Families (TANF) program in Washington, the first TANF Tribe in the state to
operate a federally funded child support program, an award-winning health clinic, and an
acclaimed dental clinic.

1.6

Climate

The climate of Kitsap County is greatly tempered by winds from the Pacific Ocean.
Summers are warm but not hot, and winters are cool but not commonly freezing. Summers
are dry, but the rest of the year rains are frequent, especially late in fall and in the winter
season. The prevailing wind is from the south-southwest. In most winters one or more
storms bring strong and sometimes damaging winds. Some years the accompanying
rainfall causes serious flooding.
Kitsap County gets an average of 49 inches of rain per year. The US average is 37 inches.
Snowfall in Kitsap County is 7 inches. The average US city gets 25 inches of snow per year.
The number of days with any measurable precipitation in Kitsap County is 161.
On average, there are 153 sunny days per year in Kitsap County. The July high is around 75°
F with average summer temperatures of 62° F. The January low is 34° F with an average
winter temperature of 40° F. The comfort index, which is based on humidity during the hot
months, is 71 out of 100, where higher is more comfortable. The US average on the
comfort index is 44.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 5

KH 090225140

1.7

Demographics

PGST is located within the rapidly growing area of Central Puget Sound. The Reservation is
in a rapidly developing portion of Kitsap County located within the larger Puget Sound
region. As of 2025, Kitsap County had a population of approximately 283,374 according to
the US Census Bureau. The population is expected to grow to 303,528 by 2030 according to
the Washington State Office of Financial Management.
It is important to note that the availability of rental housing on the Reservation as well as
individual lot assignments on the Reservation play a significant role in Reservation
population. There are a number of families who live off the Reservation that would like to
move onto the Reservation, should housing become available. In the event that the rate of
housing construction on the Reservation increases, a significant jump in population is likely
to occur.
PGST is comprised of about 1,556 enrolled Tribal members as provided by the Tribal
Enrollment Office. Less than half of the Tribal members reside on the Reservation, along
with other Native Americans and non-Indians. The latest US Census information (2024
American Community Survey 5-Year Estimate) provides an estimate of total population and
a breakdown by age group on the Reservation:
Table 1-1: US Census 2024 “American Community Survey estimate”
Age Group Living on

No. of

Reservation

People

Under 20

176

20-24

39

25-34

81

35-44

70

45-54

85

55 & Over

173

TOTAL

624

Source: https://data.census.gov/table/ACSDP5Y2024.DP05?g=040XX00US53_160XX00US5355612

PGST is comprised of about 1,556 enrolled Tribal members as provided by the Tribal
Enrollment Office. Using a straight projection of 4.4% yearly growth rate, it is estimated that
by 2046, there will be an estimated 1,467 Reservation residents, 2,215 Tribal members
living off the Reservation for a total of approximately 3,681 total Tribal members,
summarized in Table 1-2.
Long Range Transportation Plan
September 2026 Update

September 2026
Page 6

KH 090225140

Table 1-2: Enrollment Population Projections
Tribal Members Living on

Tribal Members Living off

Total Tribal

the Reservation

the Reservation

Members

2026

620

936

1,556

2031

769

1,161

1,930

2036

954

1,440

2,393

2041

1,183

1,786

2,968

2046

1,467

2,215

3,681

Year

Currently, approximately 40% of the Tribal members live on the Reservation. Reservation
population projection shown in PGST is comprised of about 1,556 enrolled Tribal members
as provided by the Tribal Enrollment Office. Using a straight projection of 4.4% yearly
growth rate, it is estimated that by 2046, there will be an estimated 1,467 Reservation
residents, 2,215 Tribal members living off the Reservation for a total of approximately
3,681 total Tribal members, summarized in Table 1-2.
Table 1-2 assumes that the current percentage of 40% stays constant through 2046. If
more than 40% of Tribal enrollment choose to live on the Reservation in the coming years,
the 2046 Reservation population estimate could be substantially higher.
The US Census American Community Survey estimate identified the median income on the
Reservation at $70,000 in 2024, which is $10,734 less than the national average. The
Washington state median household was $98,141 in 2024 and Kitsap County posted a
median income of $104,272 in 2025.
The U.S. Census Bureau “2024 American Community Survey 5-Year Estimates” identifies
that 20% of Reservation families live below the poverty line. This is more than one and a
half times the national average of 12.5%.

1.8

Employment

The Port Gamble area and the Reservation’s early enterprise centered on the timber and
fishing industries. Seasonal employment, scarce job opportunities, and the closure of
lumber mills have contributed to high unemployment rates. Fishing and shellfish is central
to PGST’s way of life from historic, cultural, and natural resource perspectives. A reduction
in salmon and other harvestable species has a disproportionately high impact on the
historical employment of Tribal members.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 7

KH 090225140

Major employers for Tribal members are Tribal government and its associated agencies,
individual treaty fishing enterprises, and local area businesses.
According to the Bureau of Labor Statistics, the April 2026 unemployment rate was 4.3%.
The Tribal unemployment rate was estimated to be 10.6% in 2024.
Table 1-3: Employment Status
Employment Status

2024 Estimate

Population 16 years and over

488

In labor force

283

Employed

252

Unemployed

30

Unemployment Rate

1.9

10.6%

Land Use

The majority of the Reservation is actively managed as forest land, with the remaining area
in residential, office, commercial, and other resource uses (See Figure 1-2 2007
Conceptual Master Plan). Approximately 870 acres are forest land, and 259 acres are
Riparian and Wildlife Reserve Areas (See Figure 1-3 Forest Land Use Classification). These
general land use designations were refined in 2018 with the adoption of three master
plans that provided more specific development guidance for the business park, Warrior
Ridge area, and Heronswood Gardens.
Reservation population is concentrated along the shoreline and clustered along the
southeastern and northwestern portions of the Reservation. All lands within the
Reservation are owned by PGST; there is no individual ownership within the Tribal
boundaries.
A designated Business Park area is located northwest of the Little Boston Road and
Hansville Road intersection. Gliding Eagle Market and Gas Station is located at this corner.
The Point Casino (Casino), an expanded Tribal casino, was built in 2013, and a new 94-room
associated hotel was added in 2016. Access to the Casino/hotel is from Hansville Road to
Salish Lane.
In 2016, the old wastewater treatment facility off of Little Boston Road NE was demolished
and a new one was constructed in the business park area behind (west of) the Casino and
hotel.
Long Range Transportation Plan
September 2026 Update

September 2026
Page 8

KH 090225140

Figure 1-2: Conceptual Master Plan

Long Range Transportation Plan
September 2026 Update

September 2026
Page 9

KH 090225140

Figure 1-3: Forest Lands

Long Range Transportation Plan
September 2026 Update

September 2026
Page 10

KH 090225140

As of 2026, there are several new developments in various stages of construction.
Red Cedar Subdivision (Also known as “East Salmonberries”) is a planned 29-lot residential
subdivision under construction on Little Boston Road NE. The roadway and utilities are
installed and units are under construction by individual Tribal members (Figure 1-4).
Figure 1-4: Red Cedar Subdivision

Long Range Transportation Plan
September 2026 Update

September 2026
Page 11

KH 090225140

A Tribal Business Park is planned for the old “Ravenwood” site adjacent to the Gliding
Eagle store. Kickoff meetings to begin architecture and engineering for the business park
are scheduled for early March 2021 (Figure 1-5).
Figure 1-5: Business Park Master Plan

A new development on Warrior Ridge (“DNR land purchase”) is in progress. Phases 1 and 2
of the anticipated ten phases have been completed for the project as of the date of this
document and 37 single family housing units, four apartment buildings, and four duplexes
have been constructed. A new road system is also planned for Warrior Ridge, detailed in
the Warrior Ridge Master Plan (2018), which will provide an alternative connection from
Little Boston Road NE down to NE 228th Street (Figure 1-6 & Figure 1-7). This roadway
system will be multi-use and publicly accessible. The planned roadways may help improve
circulation and increase roadway capacity within the Reservation.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 12

KH 090225140

Figure 1-6: Warrior Ridge Master Plan

Figure 1-7: 2021 Warrior Ridge Dev Plan

Long Range Transportation Plan
September 2026 Update

September 2026
Page 13

KH 090225140

A new development at Heronswood is in progress. The project includes development of a
new access road, conference/wedding center and upgraded electrical, water, and sewer
service (Figure 1-8) Construction has yet to start as of the date on this report.
Figure 1-8: Heronswood Master Plan

Long Range Transportation Plan
September 2026 Update

September 2026
Page 14

KH 090225140

As of early 2026, the PGST Administration Campus Redevelopment Project is in the
planning phase and will include a new administration building, gym, community center, a
subterranean garage, parking lot, and open space amenities (Figure 1-9).
Figure 1-9: Administration Campus Redevelopment Project

A new residential development known as High-Kwh-S-Tah-Wn or Raccoon Town is
currently beginning construction and is anticipated to be finished by the end of 2026. When
completed, Raccoon Town will include 39 new residential lots.
Figure 1-10. Raccoon Town

Long Range Transportation Plan
September 2026 Update

September 2026
Page 15

KH 090225140

2

EXISTING TRANSPORTATION SYSTEM

2.1

Tribal Transportation Program

The Tribal Transportation Program (TTP) was established in 23 U.S.C. 202 to address the
transportation needs of Tribal communities. The stated purpose of the program is to
provide adequate and safe transportation and public road access to and within Indian and
Native Alaskan communities. The prime objectives of the program are to contribute to the
economic development, self-determination, and employment of Indians and Native
Americans.
Implementation of the TTP is under the Infrastructure Investment and Jobs Act (IIJA) Moving
Ahead for Progress in the 21st Century Act (MAP-21) (P.L. 117-58). IIJA provides TTP funding
through 2026. IIJA is administered by the Federal Highway Administration (FHWA). The IIJA
retains the statutory formula from MAP-21 as follows:
⚫

27% of funding based on PGST’s approved road mileage

⚫

39% of funding based on PGST’s most recent Native American Housing Assistance
and Self Determination Act (NAHASDA) population

⚫

34% of funding based on PGST’s Relative Need Distribution Factor (RNDF) and
Population Adjustment Factor (PAF) amounts from FY05 to FY12

TTP funds are 100% federal share. They may be used to satisfy local match requirements
on construction projects. The transportation planning requirements of the TTP Program
continue under the TTP. Funds must be expended on projects and activities identified on a
federally approved TIP. Road inventory will continue to be a major part of the
transportation planning, as it still accounts for 27% of the federal share of funds.

2.2

Transportation Inventory

The Transportation Network is made up of State, County, BIA, and Tribal roads and
bridges. Roads provide access to residential housing, recreation activities, commercial
enterprises, jobs, shopping, hospitals, and other essential services. Roads also provide
access to pedestrian and bicycle transportation facilities; public transportation and Tribal
transportation; and boat ramps, providing a link to marine access which is critical to
fishermen, shellfish harvesters, and other commercial and subsistence marine related
activities.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 16

KH 090225140

Table 2-1: Route Summary
Route

1

2

Section

10

10

Name
HOOD CANAL
DRIVE

POINT JULIA ROAD

Length

Ownership

0.4

0.3

BIA

BIA

BOAT RAMP
2

20

ACCESS-POINT

0.0

BIA

JULIA ROAD
2

30

3

10

3

20

POINT JULIA ROAD
TRIBAL CENTER
ROAD
TRIBAL CENTER
ROAD

0.1

BIA

Class

Construction
Need

Rural

BIA

Major

Improvement

Arterial

Needed

Rural

BIA

Major

Improvement

Arterial

Needed

Rural Local
Road
Rural Local
Road

BIA
Improvement
Needed
BIA
Improvement
Needed

0.1

BIA

Residential

Acceptable

0.1

BIA

Residential

Improvement

BIA
Needed

TRIBAL CENTER
3

30

ROAD PARKING

0.1

BIA

Other

Acceptable

LOT
BIA
4

10

CHURCH LANE

0.1

BIA

Residential

Improvement
Needed
BIA

4

20

CHURCH LANE

0.1

BIA

Residential

Improvement
Needed

5

5

10

20

S'KALLAM HILL
LANE
S'KALLAM HILL
LANE

BIA
0.1

BIA

Residential

Improvement
Needed
BIA

0.1

BIA

Residential

Improvement
Needed
BIA

6

10

IRONWOOD LANE

0.1

BIA

Residential

Improvement
Needed

Long Range Transportation Plan
September 2026 Update

September 2026
Page 17

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction
Need
BIA

7

10

TYEE LANE

0.1

BIA

Residential

Improvement
Needed

8

9

10

10

10

10

CUBBY SPARKS
PLACE
SALMON BERRIES
LANE
BOSTON LANE
CUL-DE-SAC

BIA
0.1

BIA

Residential

Improvement
Needed
BIA

0.1

BIA

Residential

Improvement
Needed
BIA

0.1

BIA

Residential

Improvement
Needed
BIA

11

10

BOSTON LANE

0.1

BIA

Residential

Improvement
Needed
Other

12

10

GLIDING EAGLE

0.1

Tribal

Residential

Improvement
Needed

12

15

GLIDING EAGLE

0.1

Tribal

Residential

Proposed
Road
Other

12

20

GLIDING EAGLE

0.1

Tribal

Other

Improvement
Needed

13

13

13

14
15

10

20

30

10
10

FUTURE ROAD

FUTURE ROAD

FUTURE ROAD

KWAYACHEN
COURT
BUD PURSER LANE

0.6

0.3

0.3

BIA

BIA

BIA

Major

Improvement

Arterial

Needed

Rural

BIA

Major

Improvement

Arterial

Needed

Rural

BIA

Major

Improvement

Arterial

Needed
BIA

0.1

BIA

Residential

Improvement
Needed

0.6

Long Range Transportation Plan
September 2026 Update

BIA

Rural

BIA

Residential

Acceptable

September 2026
Page 18

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction
Need
BIA

16

10

BEAR RIDGE DRIVE

0.2

BIA

Residential

Improvement
Needed
BIA

17

10

BEAR RIDGE

0.1

BIA

Residential

Improvement
Needed
BIA

18

10

SALISH LOOP

0.2

BIA

Residential

Improvement
Needed
Proposed

18

20

SALISH LOOP

0.1

BIA

Residential

19

10

SALISH LANE

0.1

BIA

Residential

Acceptable

20

10

RAVEN WOOD

0.5

BIA

Residential

Improvement

Road
BIA
Needed
BIA

21

10

EAGLEWOOD

0.1

BIA

Residential

Improvement
Needed

22

23

10

10

KLOOMACHIN
PLACE NE
HOOD CANAL
LANE

0.2

BIA

0.4

BIA

FUTURE ROAD

0.5

BIA

25

20

FUTURE ROAD

0.3

BIA

30

30

20

30

FUTURE ROAD

FUTURE ROAD

FUTURE ROAD

0.1

0.1

0.2

Long Range Transportation Plan
September 2026 Update

Residential

Improvement
Needed

10

10

Acceptable
BIA

25

30

Residential

BIA

BIA

BIA

Rural Local

Proposed

Road

Road

Rural Local

Proposed

Road

Road

Rural Local
Road
Rural Local
Road
Rural Local
Road

Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

September 2026
Page 19

KH 090225140

Route

31

31

40

100

100

Section

10

20

10

10

20

Name

FUTURE ROAD

FUTURE ROAD

FUTURE ROAD

NE BOSTON LANE

NE BOSTON LANE

Length

Ownership

0.1

0.1

0.4

0.2

0.4

BIA

BIA

BIA

BIA

BIA

Class
Rural Local
Road
Rural Local
Road
Rural Local
Road

Construction
Need
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

Rural

BIA

Major

Improvement

Arterial

Needed

Rural

BIA

Major

Improvement

Arterial

Needed
BIA

100

30

NE BOSTON LANE

0.1

BIA

Residential

Improvement
Needed

110

200

300

10

10

10

400

10

500

10

TIDEWINDS LOOP
SANITATION
ACCESS
NOO-KAYET
BUSINESS PARK
WARRIOR RIDGE
ROAD
HERONSWOOD
ROAD

0.1

0.2

BIA

BIA

Rural Local

Proposed

Road

Road

Rural Local
Road
Rural

0.5

Tribal

Minor
Arterial

0.1

Tribal

Residential

0.3

Tribal

Residential

BIA
Improvement
Needed
Proposed
Road
Proposed
Road
Proposed
Road
Substandard

1170

10

SEABECK
HIGHWAY NW

0.2

County

City Minor

With No

Arterial

Improvement
Planned

1170

20

SEABECK
HIGHWAY NW

Rural
1.6

Minor
Arterial

Long Range Transportation Plan
September 2026 Update

County

Substandard
With No
Improvement
Planned
September 2026

Page 20

KH 090225140

Route

1170

1170

1170

1170

1170

1170

1170

1342

1342

Section

30

40

50

60

70

80

90

10

20

Name

SEABECK
HIGHWAY NW

SEABECK
HIGHWAY NW

SEABECK
HIGHWAY NW

SEABECK
HIGHWAY NW

SEABECK
HIGHWAY NW

SEABECK
HIGHWAY NW

SEABECK
HIGHWAY NW

NEWBERRY HILL
ROAD NW

NEWBERRY HILL
ROAD NW

Length

Ownership

Rural
1.2

County

Minor
Arterial
Rural

1.8

County

Minor
Arterial
Rural

0.2

County

Minor
Arterial
Rural

1.7

County

Minor
Arterial
Rural

0.7

County

Minor
Arterial
Rural

0.9

County

Minor
Arterial
Rural

1.7

County

Minor
Arterial
Rural

1.7

County

Minor
Arterial
Rural

0.5

County

Minor
Arterial

Long Range Transportation Plan
September 2026 Update

Class

Construction
Need
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned

September 2026
Page 21

KH 090225140

Route

1342

1342

1342

1342

1354

1354

1354

1354

1354

Section

30

40

50

60

10

20

30

40

50

Name

NEWBERRY HILL
ROAD NW

NEWBERRY HILL
ROAD NW

NEWBERRY HILL
ROAD NW

NEWBERRY HILL
ROAD NW

ANDERSON HILL
ROAD NW

ANDERSON HILL
ROAD NW

ANDERSON HILL
ROAD NW

ANDERSON HILL
ROAD NW

ANDERSON HILL
ROAD NW

Length

Ownership

Rural
0.5

County

Minor
Arterial
Rural

0.1

County

Minor
Arterial
Rural

0.2

County

Minor
Arterial
Rural

0.3

County

Minor
Arterial
Rural

1.1

County

Major
Arterial
Rural

1.6

County

Major
Arterial
Rural

0.5

County

Major
Arterial
Rural

0.2

County

Major
Arterial
Rural

0.6

County

Major
Arterial

Long Range Transportation Plan
September 2026 Update

Class

Construction
Need
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned

September 2026
Page 22

KH 090225140

Route

1354

1354

Section

60

70

Name

ANDERSON HILL
ROAD NW

ANDERSON HILL
ROAD NW

Length

Ownership

Class
Rural

0.3

County

Major
Arterial
Rural

0.3

County

Major
Arterial

Construction
Need
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard

1951

10

SILVERDALE WAY
NW

0.7

County

Major

With No

Arterial

Improvement
Planned
Substandard

1951

20

SILVERDALE WAY
NW

0.2

County

Major

With No

Arterial

Improvement
Planned
Substandard

1951

30

SILVERDALE WAY
NW

0.2

County

Major

With No

Arterial

Improvement
Planned
Substandard

1951

40

SILVERDALE WAY
NW

0.3

County

Major

With No

Arterial

Improvement
Planned
Substandard

1951

50

SILVERDALE WAY
NW

0.4

County

Major

With No

Arterial

Improvement
Planned
Substandard

1951

60

SILVERDALE WAY
NW

0.3

County

Major

With No

Arterial

Improvement
Planned
Substandard

1951

70

SILVERDALE WAY
NW

0.7

County

Major

With No

Arterial

Improvement
Planned

1951

80

SILVERDALE WAY
NW

0.8

Long Range Transportation Plan
September 2026 Update

County

Major

Substandard

Arterial

With No

September 2026
Page 23

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction
Need
Improvement
Planned
Substandard

1951

90

SILVERDALE WAY
NW

0.8

County

Major

With No

Arterial

Improvement
Planned
Substandard

1951

100

SILVERDALE WAY
NW

0.5

County

Major

With No

Arterial

Improvement
Planned
Substandard

1951

110

SILVERDALE WAY
NW

0.2

County

Major

With No

Arterial

Improvement
Planned

2001

2001

2001

2001

2001

2001

2001

2001

10

20

30

40

50

60

70

80

FOREST ROAD BR1

FOREST ROAD BR2

FOREST ROAD BR3

FOREST ROAD BR4

FOREST ROAD BR5

FOREST ROAD BR6

FOREST ROAD BR7

FOREST ROAD BR8

1.7

0.1

0.3

0.1

0.1

0.1

0.2

0.1

Long Range Transportation Plan
September 2026 Update

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road

Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

September 2026
Page 24

KH 090225140

Route

2001

2001

2001

2001

2001

2001

2002

2003

2003

2003

2003

2004

Section

90

100

110

120

130

140

10

10

20

30

40

10

Name

FOREST ROAD BR9

FOREST ROAD
BR10
FOREST ROAD
BR11
FOREST ROAD
BR12
FOREST ROAD
BR13
FOREST ROAD
BR14

FOREST ROAD BR2

FOREST ROAD BR3

FOREST ROAD BR4

FOREST ROAD BR5

FOREST ROAD BR6

FOREST ROAD BR4

Length

Ownership

0.1

0.3

0.1

0.1

0.1

0.1

0.2

0.6

0.2

0.1

0.1

0.4

Long Range Transportation Plan
September 2026 Update

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Class
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road

Construction
Need
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

September 2026
Page 25

KH 090225140

Route

2004

2005

2006

2006

2006

2007

2007

2007

2007

2008

2008

2008

Section

20

10

10

20

30

10

20

30

40

10

20

30

Name

FOREST ROAD BR4

FOREST ROAD BR5

FOREST ROAD BR6

FOREST ROAD BR6

FOREST ROAD BR6

FOREST ROAD BR7

FOREST ROAD BR7

FOREST ROAD BR7

FOREST ROAD BR7

FOREST ROAD BR8

FOREST ROAD BR8

FOREST ROAD BR8

Length

Ownership

0.1

0.3

0.4

0.1

0.4

1.0

0.1

0.1

0.1

0.5

0.1

0.1

Long Range Transportation Plan
September 2026 Update

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Class
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road

Construction
Need
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

September 2026
Page 26

KH 090225140

Route

2008

2008

2008

2009

2009

2010

2011

Section

40

50

60

10

20

10

10

3001

10

3001

20

3002

3002

10

20

Name

FOREST ROAD BR8

FOREST ROAD BR8

FOREST ROAD BR8

FOREST ROAD BR9

FOREST ROAD BR9

FOREST ROAD
BR10
FOREST ROAD
BR11
GLIDING EAGLE
TRAIL 3001
GLIDING EAGLE
TRAIL 3001
GLIDING EAGLE
TRAIL 3002
GLIDING EAGLE
TRAIL 3002

Length

Ownership

0.1

0.1

0.1

0.3

0.2

0.4

0.4

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Class
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road

0.3

Tribal

Non-Road

0.4

Tribal

Non-Road

30

TRAIL PEDESTRIAN

0.3

Tribal

Non-Road

40

GLIDING EAGLE
TRAIL 3002

Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Proposed
Road
Proposed
Road
Improvement
BIA

0.9

Tribal

Non-Road

Improvement
Needed

0.0

Tribal

Non-Road

1.1

Tribal

Non-Road

Long Range Transportation Plan
September 2026 Update

Other

Needed

BRIDGE
3002

Need

Other

GLIDING EAGLE
3002

Construction

Proposed
Road
Proposed
Road

September 2026
Page 27

KH 090225140

Route

3002

Section

50

3003

10

3004

10

Name
CAMPUS
SIDEWALK
GLIDING EAGLE
TRAIL 3003
GLIDING EAGLE
TRAIL 3004

Length

Ownership

Class

Construction
Need
BIA

0.2

BIA

Non-Road

Improvement
Needed

1.6

Tribal

Non-Road

0.2

Tribal

Non-Road

Proposed
Road
Proposed
Road
Substandard

5527

10

TRACYTON
BOULEVARD NW

0.4

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5527

20

TRACYTON
BOULEVARD NW

0.3

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5527

30

TRACYTON
BOULEVARD NW

0.5

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5527

40

TRACYTON
BOULEVARD NW

0.9

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5527

50

TRACYTON
BOULEVARD NW

0.4

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5527

60

TRACYTON
BOULEVARD NW

1.0

County

City Minor

With No

Arterial

Improvement
Planned

5729

5729

10

20

BROWNSVILLE
HIGHWAY NE
BROWNSVILLE
HIGHWAY NE

0.4

0.7

Long Range Transportation Plan
September 2026 Update

County

County

City Minor
Arterial
City Minor
Arterial

Other
Improvement
Needed
Other
Improvement
Needed

September 2026
Page 28

KH 090225140

Route

5729

5729

5729

5729

5729

5729

5772

5772

5772

5772

Section

30

40

50

60

70

80

10

20

30

40

Name
BROWNSVILLE
HIGHWAY NE
BROWNSVILLE
HIGHWAY NE
BROWNSVILLE
HIGHWAY NE
BROWNSVILLE
HIGHWAY NE
BROWNSVILLE
HIGHWAY NE
BROWNSVILLE
HIGHWAY NE

MYHRE ROAD NW

MYHRE ROAD NW

MYHRE ROAD NW

MYHRE ROAD NW

Length

Ownership

0.2

0.1

0.6

0.5

1.4

0.7

0.2

0.6

0.2

0.1

County

County

County

County

County

County

County

County

County

County

Class
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City
Collector

Construction
Need
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Substandard

5774

10

BUCKLIN HILL
ROAD NW

0.3

County

Major

With No

Arterial

Improvement
Planned
Substandard

5774

20

BUCKLIN HILL
ROAD NW

0.3

County

Major

With No

Arterial

Improvement
Planned

Long Range Transportation Plan
September 2026 Update

September 2026
Page 29

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction
Need
Substandard

5774

30

BUCKLIN HILL
ROAD NW

0.2

County

Major

With No

Arterial

Improvement
Planned
Substandard

5774

40

BUCKLIN HILL
ROAD NW

0.3

County

Major

With No

Arterial

Improvement
Planned
Substandard

5774

50

BUCKLIN HILL
ROAD NW

0.6

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5774

60

BUCKLIN HILL
ROAD NW

0.7

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5905

10

CENTRAL VALLEY
ROAD NW

0.6

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5905

20

CENTRAL VALLEY
ROAD NW

0.5

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5905

30

CENTRAL VALLEY
ROAD NW

0.3

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5905

40

CENTRAL VALLEY
ROAD NW

0.6

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5905

50

CENTRAL VALLEY
ROAD NW

0.5

County

City Minor

With No

Arterial

Improvement
Planned

5905

60

CENTRAL VALLEY
ROAD NW

0.2

Long Range Transportation Plan
September 2026 Update

County

City Minor

Substandard

Arterial

With No

September 2026
Page 30

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction
Need
Improvement
Planned
Substandard

5905

70

CENTRAL VALLEY
ROAD NW

1.1

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5905

80

CENTRAL VALLEY
ROAD NW

1.5

County

City Minor

With No

Arterial

Improvement
Planned
Substandard

5905

90

CENTRAL VALLEY
ROAD NW

1.1

County

City Minor

With No

Arterial

Improvement
Planned

5970

5970

7037

7037

7037

7037

7037

10

20

10

20

30

40

50

SCANDIA ROAD
NW
SCANDIA ROAD
NW

MILLER BAY ROAD
NE

MILLER BAY ROAD
NE
MILLER BAY ROAD
NE
MILLER BAY ROAD
NE
MILLER BAY ROAD
NE

0.4

0.7

County

Collector
City
Collector
Rural

2.2

County

Major
Arterial

0.1

0.3

0.1

0.7

Long Range Transportation Plan
September 2026 Update

County

City

County

County

County

County

Other
Improvement
Needed
Other
Improvement
Needed
Substandard
With No
Improvement
Planned

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

September 2026
Page 31

KH 090225140

Route

7037

7037

7037

7040

7040

7040

7040

7040

7040

7040

7040

7040

Section

60

70

80

10

20

30

40

50

60

70

80

90

Name
MILLER BAY ROAD
NE
MILLER BAY ROAD
NE
MILLER BAY ROAD
NE
HANSVILLE ROAD
(KITSAP COUNTY)
HANSVILLE ROAD
(KITSAP COUNTY)
HANSVILLE ROAD
(KITSAP COUNTY)
HANSVILLE ROAD
(KITSAP COUNTY)
HANSVILLE ROAD
(KITSAP COUNTY)
HANSVILLE ROAD
(KITSAP COUNTY)
HANSVILLE ROAD
(KITSAP COUNTY)
HANSVILLE ROAD
(KITSAP COUNTY)
HANSVILLE ROAD
(KITSAP COUNTY)

Length

Ownership

0.2

0.9

0.8

1.9

0.4

0.1

0.3

0.1

1.3

0.2

2.0

1.2

Long Range Transportation Plan
September 2026 Update

County

County

County

County

County

County

County

County

County

County

County

County

Class

Construction
Need

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

September 2026
Page 32

KH 090225140

Route

7165

7165

7250

7250

7319

Section

10

20

10

20

10

Name
STOTTLEMEYER
ROAD NE
STOTTLEMEYER
ROAD NE
BIG VALLEY ROAD
NE
BIG VALLEY ROAD
NE
NE DELANEY
ROAD

Length

Ownership

1.4

1.8

2.4

2.4

0.3

County

County

County

County

County

Class

Construction
Need

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local
Road

Other
Improvement
Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local
Road

Other
Improvement
Needed
Substandard

7420

10

VIKING WAY NW

0.8

County

Major

With No

Arterial

Improvement
Planned
Substandard

7420

20

VIKING WAY NW

0.1

County

Major

With No

Arterial

Improvement
Planned
Substandard

7420

30

VIKING WAY NW

1.2

County

Major

With No

Arterial

Improvement
Planned

7441

7466

7466

10

10

20

LITTLE VALLEY
ROAD NE
GUNDERSON
ROAD NE
GUNDERSON
ROAD NE

0.3

1.3

1.0

Long Range Transportation Plan
September 2026 Update

County

County

County

City
Collector

Other
Improvement
Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

September 2026
Page 33

KH 090225140

Route

7466

7479

7479

7479

7521

7715

7715

7715

7715

7726

7726

7726

Section

30

10

20

30

10

10

20

30

40

10

20

30

Name
GUNDERSON
ROAD NE
PORT GAMBLE
ROAD NE
PORT GAMBLE
ROAD NE
PORT GAMBLE
ROAD NE
HIGHLAND ROAD
NE
LINCOLN ROAD
NE
LINCOLN ROAD
NE
LINCOLN ROAD
NE
LINCOLN ROAD
NE
NW PIONEER HILL
ROAD
NW PIONEER HILL
ROAD
NW PIONEER HILL
ROAD

Length

Ownership

0.1

1.3

2.8

1.3

1.1

1.1

0.2

0.3

0.3

0.5

0.2

0.7

Long Range Transportation Plan
September 2026 Update

County

County

County

County

County

County

County

County

County

County

County

County

Class

Construction
Need

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road

Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

City Minor
Arterial
City
Collector
Rural Local
Road
Rural Local
Road

Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

September 2026
Page 34

KH 090225140

Route

7765

7765

7822

7822

7822

7822

7852

7855

7858

7889

7903

7963

Section

10

20

10

20

30

40

10

10

10

10

10

10

Name
WAGHORN ROAD
NW
WAGHORN ROAD
NW

PIONEER WAY NW

PIONEER WAY NW

PIONEER WAY NW

PIONEER WAY NW

WESLEY WAY NW

PARK STREET NW

FERRY STREET NW

FALKNER ROAD NE

BEACH DRIVE NE

WHITFORD ROAD
NE

Length

Ownership

0.5

0.6

0.7

0.9

0.1

0.5

0.3

0.1

0.1

0.7

0.8

0.2

Long Range Transportation Plan
September 2026 Update

County

County

County

County

County

County

County

County

County

County

County

County

Class
Rural Local
Road
Rural Local
Road
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City Minor
Arterial
City
Collector
City
Collector
City
Collector
City
Collector
City
Collector
Rural Local
Road

Construction
Need
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

September 2026
Page 35

KH 090225140

Route

7966

8163

8163

8163

8369

8442

8580

8583

8601

8616

8625

8625

Section

10

10

20

30

10

10

10

10

810

10

810

820

Name
WHEELER STREET
NE
NE JEFFERSON
POINT ROAD
NE JEFFERSON
POINT ROAD
NE JEFFERSON
POINT ROAD
NE BARBER CUT
OFF ROAD

2ND STREET NE

288TH STREET NE

GAMBLE BAY
ROAD NE
GAMBLE PLACE NE
(KITSAP COUNTY)
NE ECOLOGY
ROAD
LITTLE BOSTON
ROAD NE
LITTLE BOSTON
ROAD NE

Length

Ownership

0.5

1.1

0.1

0.6

1.0

0.3

0.8

1.5

County

County

County

County

County

County

County

City
Collector
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road

Construction
Need
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other

1.2

County

Residential

Improvement
Needed

0.3

3.5

1.0

Long Range Transportation Plan
September 2026 Update

County

Class

County

County

County

Rural Local
Road

Other
Improvement
Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

September 2026
Page 36

KH 090225140

Route

8630

8630

8630

8663

8667

8667

8667

8667

8668

8668

8687

Section

10

20

30

10

10

20

30

40

10

20

10

Name

NE EGLON ROAD

NE EGLON ROAD

NE EGLON ROAD

HOFFMAN ROAD
NE
NE WEST
KINGSTON ROAD
NE WEST
KINGSTON ROAD
NE WEST
KINGSTON ROAD
NE WEST
KINGSTON ROAD
NE SOUTH
KINGSTON ROAD
NE SOUTH
KINGSTON ROAD

LUDLOW DRIVE NE

Length

Ownership

1.3

0.4

0.1

1.2

1.1

0.5

0.3

0.3

1.6

1.3

0.3

County

County

County

County

County

County

County

County

County

County

County

HOOD CANAL
8696

10

DRIVE (KITSAP

2.0

COUNTY)

Long Range Transportation Plan
September 2026 Update

County

Class
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road

Construction
Need
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local
Road

Other
Improvement
Needed

Rural

Other

Major

Improvement

Arterial

Needed

September 2026
Page 37

KH 090225140

Route

Section

Name

Length

Ownership

HOOD CANAL
8696

8696

20

30

Major

Improvement

COUNTY)

Arterial

Needed

HOOD CANAL

Rural

Other

Major

Improvement

Arterial

Needed

DRIVE (KITSAP

DRIVE (KITSAP

0.4

1.3

County

County

DRIVE (KITSAP

1.3

County

COUNTY)
8716

8750

8750

8940

8940

8950

8950

8992

810

10

20

10

20

10

20

10

Need
Other

HOOD CANAL
40

Construction

Rural

COUNTY)
8696

Class

CLIFFSIDE DRIVE
(KITSAP COUNTY)
NE TWIN SPITS
ROAD
NE TWIN SPITS
ROAD
NE BUCK LAKE
ROAD
NE BUCK LAKE
ROAD
NE POINT NO
POINT ROAD
NE POINT NO
POINT ROAD
FOULWEATHER
BLUFF ROAD NE

0.6

2.0

1.6

0.9

0.1

0.7

0.3

1.1

County

County

County

County

County

County

County

County

Rural Local
Road

Other
Improvement
Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road
Rural Local
Road

Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Other
Improvement
Needed
Substandard

9003

10

SR 3

0.1

State

Major

With No

Arterial

Improvement
Planned

Long Range Transportation Plan
September 2026 Update

September 2026
Page 38

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction
Need
Substandard

9003

12

SR 3

0.0

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

13

SR 3

3.7

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

15

SR 3

0.0

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

18

SR 3

2.1

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

20

SR 3

0.0

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

22

SR 3

0.6

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

23

SR 3

0.0

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

25

SR 3

2.4

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

26

SR 3

0.0

State

Major

With No

Arterial

Improvement
Planned

Long Range Transportation Plan
September 2026 Update

September 2026
Page 39

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction
Need
Substandard

9003

27

SR 3

1.2

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

28

SR 3

0.0

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

29

SR 3

0.9

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

30

SR 3

2.9

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

32

SR 3

0.0

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

36

SR 3

4.3

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

40

SR 3

0.0

State

Major

With No

Arterial

Improvement
Planned
Substandard

9003

50

SR 3

7.1

State

Major

With No

Arterial

Improvement
Planned
Substandard

9104

10

STATE ROUTE 104

5.1

State

Major

With No

Arterial

Improvement
Planned

9104

20

STATE ROUTE 104

0.0

Long Range Transportation Plan
September 2026 Update

State

Major
Arterial

Acceptable

September 2026
Page 40

KH 090225140

Route

Section

Name

Length

Ownership

9104

21

STATE ROUTE 104

0.0

State

9104

23

STATE ROUTE 104

0.0

State

Class
Major
Arterial
Major
Arterial

Construction
Need
Acceptable
Acceptable
Substandard

9104

30

STATE ROUTE 104

0.2

State

Major

With No

Arterial

Improvement
Planned

Rural
9104

32

STATE ROUTE 104

8.1

State

Major
Arterial
Rural

9104

40

STATE ROUTE 104

0.5

State

Major
Arterial
Rural

9104

50

STATE ROUTE 104

0.3

State

Major
Arterial

Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard
With No
Improvement
Planned
Substandard

9104

55

STATE ROUTE 104

0.4

State

City

With No

Collector

Improvement
Planned
Substandard

9104

60

STATE ROUTE 104

0.4

State

Other

With No
Improvement
Planned
Substandard

9305

20

STATE ROUTE 305

2.5

State

Major

With No

Arterial

Improvement
Planned
Substandard

9305

30

STATE ROUTE 305

1.2

State

Major

With No

Arterial

Improvement
Planned

Long Range Transportation Plan
September 2026 Update

September 2026
Page 41

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction
Need
Substandard

9305

40

STATE ROUTE 305

0.5

State

Major

With No

Arterial

Improvement
Planned
Substandard

9305

45

STATE ROUTE 305

0.4

State

Major

With No

Arterial

Improvement
Planned
Substandard

9305

50

STATE ROUTE 305

0.3

State

Major

With No

Arterial

Improvement
Planned
Substandard

9307

10

STATE ROUTE 307

0.1

State

Major

With No

Arterial

Improvement
Planned
Substandard

9307

20

STATE ROUTE 307

0.1

State

Major

With No

Arterial

Improvement
Planned

Rural
9307

21

STATE ROUTE 307

1.5

State

Minor
Arterial

Substandard
With No
Improvement
Planned
Substandard

9307

25

STATE ROUTE 307

0.9

State

Major

With No

Arterial

Improvement
Planned
Substandard

9307

30

STATE ROUTE 307

2.7

State

Major

With No

Arterial

Improvement
Planned

A detailed description of the current condition of each of the roads is included in the
approved NTTFI in Appendix A (Inventory Data Sheets). A description of the BIA Functional
Classifications is included in Appendix B. Route descriptions or narratives are summarized
below.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 42

KH 090225140

2.2.1

State Routes

The 2024 State Highway Log Planning Report was consulted for highway data.
Portions of four State highways have been incorporated into the NTTFI system (as agreed
by Letter of Understanding from the Washing State Department of Transportation
[WSDOT], dated August 22, 2007). Detailed capital projects and planning activities are
described below. Relevant portions of the WSDOT 2024 Highway Log are included in
Appendix C.

State Route 3: MP 34.51 to MP 60.02

Route N o. 9003

SR-3 is a State highway which runs in a north-south direction. It is classified by the State as
U1 – Urban Principal Arterial. The length of this route included in the inventory is 25.3 miles,
excluding bridges. The portion of SR-3 included in the TTP begins at the intersection with SR16, south of Bremerton, and continues north to the end of the route at the intersection of
SR-104, at the easterly end of the Hood Canal Bridge. The inventory includes Sections 010
through 050. As a State highway, all sections are eligible for federal funds.
In April 2005, a SR-3 Route Development Plan was published. The long-term improvements
recommended for SR-3 include: reconfigure the intersection of SR-3 and SR-104, construct
a holding lane for traffic stopped at bridge openings, construct southbound climbing lane
between Big Valley Road and Pioneer Way, reconfigure Kitsap Memorial Park access to the
Kinman Road/Big Valley intersection with SR-3, install traffic lights at Pioneer Hill Road,
Pioneer Way, and Big Valley Road (two of three were installed in 2008), and construct a
four-lane facility.

State Route 104: MP 8.87 to MP 24.86

Route N o. 9104

SR-104 is included in the NTTFI from the intersection of Beaver Valley Road (SR-19) in
Jefferson County to the Kingston Ferry Terminal in Kitsap County. The route is further
divided into Sections 010 through 060. This route is 14.7 miles long (excluding bridges). The
route is classified by the State as U1 - Urban Principal Arterial. As a State highway, all
sections are eligible for federal funds.
The County and WSDOT have identified circulation improvements in the Kingston area,
including SR-104. SR-104 is currently configured as a two-lane, one-way ingress and twolane, one-way egress from the Kingston Ferry Terminal and the downtown Kingston area.
In 2011, a Feasibility Study for Realignment looked at five alternatives plus a non-motorized
plan element. Most of the options include realigning ferry traffic to alternate routes and
freeing Main Street for local, transit, bicycle, and pedestrian traffic. Currently a holding lane
Long Range Transportation Plan
September 2026 Update

September 2026
Page 43

KH 090225140

is used to manage ferry traffic and a realignment project for SR-104 is in the
preconstruction phase.

State Route 305: MP 7.05 to MP 13.52

Route N o. 9305

SR-305 is included in the TTP from the western margin of the Agate Pass Bridge to the
intersection of SR-3. The route is entirely located within Kitsap County, including a portion
located within the city limits of Poulsbo. Sections 010 through 050 make up this portion of
the route. This route is 4.9 miles long. The route is classified by the State as U1 - Urban
Principal Arterial. As a State highway, all sections are eligible for federal funds.
In 2012, WSDOT analyzed six design alternatives for the intersection of SR-305 and
Suquamish Way. Alternatives varied from No Build to Lane Widening to a Roundabout. The
Roundabout has been selected as the preferred alternative in part because it is the most
successful design solution for alleviating traffic congestion and providing safe access for
motorized and non-motorized travelers. As of 2026, plans for construction of the
roundabout have been put on hold.

State Route 307: MP 0.00 to MP 5.25

Route N o. 9305

SR-307 is included in the TTP from the intersection of SR-305 to the intersection of SR-104,
Sections 010 through 030 (MP 0.00 to MP 5.25). This route is 5.3 miles long. As a State
highway, all sections are eligible for federal funds. The route is classified by the State as U1
- Urban Principal Arterial.

2.2.2

County Routes

Kitsap County Routes
Portions of 50 County roads have been incorporated into the TTP system (as agreed by
Letter of Understanding from the County, dated June 30, 2009) and accepted by the BIA.
Relevant portions of the County Road Log and County Six-Year TIP are included in
Appendix D.

Seabeck Highway NW

Route N o. 1170

Seabeck Highway NW is a County road that runs in a southeast to northwest direction. It is
classified by the County as Rural Minor Arterial changing to a Rural Major Collector. This
route connects the Silverdale area to Seabeck, which contains several access points to the
marine water of Hood Canal. It is a two-lane roadway in good condition. This route is
divided into Sections 10 through 90.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 44

KH 090225140

Newberry Hill Road

Route N o. 1342

Newberry Hill Road is a County road that runs in a southeast to northwest direction. It is
classified by the County as Urban Minor Arterial. This route runs east from Seabeck
Highway NW (Route 1170) and terminates at Silverdale Way (Route 1951) near Dyes Inlet. It
is a three-lane roadway (including a center turn lane) in good condition. This route is
divided into Sections 10 through 60.

NW Anderson Hill Road

Route N o. 1354

NW Anderson Hill Road is a County road that runs in an easterly direction from Seabeck
Highway (Route 1170). It is classified by the County as Rural Major Collector and becomes
an Urban Minor Arterial as it approaches Silverdale. This route also terminates at Silverdale
Way (Route 1951). It is a two-lane roadway in good condition. This route is divided into
Sections 10 through 70.

Silverdale Way NW

Route N o. 1951

Silverdale Way NW is a County road that runs in a southeast to northwest direction. It is
classified by the County as Urban Principal Arterial. This route runs through the Silverdale
area which contains numerous shopping malls, a hospital, and recreational opportunities. It
begins at the eastern terminus of Newberry Hill Road and extends northeasterly until its
terminus at the intersection with State Highway 308. This route is divided into Sections 10
through 110. It is a five-lane roadway (including a center turn lane) in good condition. The
road continues northerly from the terminus of Silverdale Way but is named Viking Way NW
(Route 7420). This route is divided into Sections 10 through 110.

Tracyton Boulevard NW

Route N o. 5527

Tracyton Boulevard NW is a County road that runs in a northerly direction. It is classified by
the County as Urban Minor Arterial. This route runs along the eastern shore of Dyes Inlet. It
begins at the intersection with NE Riddell Road and extends northerly until its terminus at
the intersection with NW Bucklin Hill Road (Route 5774). It is a two-lane roadway in good
condition. This route is divided into Sections 10 through 60.

Brownsville Highway NE

Route N o. 5729

Brownsville Highway NE is a County road that runs in a meandering fashion near the
western shore of Port Orchard Bay. It is classified by the County as Urban Minor Arterial.
This route begins at the intersection with SR-303 (Waaga Way) and extends northerly until
its terminus at the intersection with SR-308 (NW Luoto Road). The terminus of the route is

Long Range Transportation Plan
September 2026 Update

September 2026
Page 45

KH 090225140

located at the southern margin of Dogfish Bay. It is a two-lane roadway in good condition.
This route is divided into Sections 10 through 80.

NW Myrhe Road

Route N o. 5772

NW Myhre Road is a County road that runs in a northerly and then westerly direction. It is
classified by the County as Urban Minor Arterial. This route begins at the intersection with
NW Bucklin Hill Road (Route 5774) and extends northerly until its terminus west of its
intersection with Silverdale Way NW (Route 1951). The start of the route is coincident with
the northerly terminus of Tracyton Boulevard NW (Route 5527). It is a three-lane roadway
(including center turn lane) in good condition. This route is divided into Sections 10 through
40.

NW Buckli n Hill Road

Route N o. 5774

NW Bucklin Hill Road is a County road that runs in an easterly direction. It is classified by
the County as Urban Principal Arterial changing to Urban Minor Arterial. This route begins
at the intersection with NW Anderson Hill Road (Route 1354) and extends east to intersect
with Central Valley Road (Route 5905). It is initially a two-lane roadway and becomes a fourlane roadway with the change in classification. It is generally in good condition. This route is
divided into Sections 10 through 60.

Central Valley Road NW

Route N o. 5905

Central Valley Road NW is a County road that runs northerly. It is classified by the County as
Urban Minor Arterial. This route begins at the intersection with NW Nichols Avenue and
extends northerly until its terminus at the intersection with SR-308 (NW Luoto Road). It is a
two-lane roadway in good condition. This route is divided into Sections 10 through 90.

NW Scandia Road

Route N o. 5970

NW Scandia Road is a County road that runs easterly for the first section, then veers
southerly for the second section. It is classified by the County as Urban Local Access. This
route begins at the intersection with Viking Way NW and extends until its terminus at the
intersection with SR-308 (NW Luoto Road). It is a two-lane roadway in good condition. This
route is divided into Sections 10 through 20.

Miller Bay Road NE

Route N o. 7037

Miller Bay Road NE is a County road that runs in a north-south direction. It is classified
Rural Major Collector. This route begins at the intersection with Augusta Avenue NE and

Long Range Transportation Plan
September 2026 Update

September 2026
Page 46

KH 090225140

extends northerly until its terminus at the intersection with SR-104 (Route 9104). It is a twolane roadway in good condition. This route is divided into Sections 10 through 80.

Hansville Road NE

Route N o. 7040

Hansville Road NE is a County roadway which runs in a north-south direction. It is classified
as a Rural Major Collector by the County. It is a two-lane roadway in good condition, with
wide paved shoulders. The posted speed limit is 45 miles per hour (mph), slowing to 35
mph near SR-104, where a left-turn-lane is provided. Hansville Road provides access from
SR-104 to the Reservation. Hansville Road continues north and provides access to the
community of Hansville, recreation, and fishing opportunities. This route is divided into
Sections 10 through 90.

Stottlemeyer Road NE

Route N o. 7165

Stottlemeyer Road NE is a County road which runs in a northly direction. The road
intersects with NE Lincoln Road and extends north to its terminus at the intersection with
NE Gunderson Road. The route is classified by the County as Rural Major Collector. The
road is a two-lane road. This route is divided into Sections 10 through 20. The road is
considered to be in good condition.

Big Valley Road NE

Route N o. 7250

Big Valley Road NE is a County road that runs northerly in a meandering fashion. It is
classified by the County as Rural Minor Collector. This route begins at the intersection with
SR-307 (Route 9307) and extends northerly until its terminus at the intersection with SR-3
(Route 9003). It is a two-lane roadway in good condition. This route is divided into Sections
10 through 20.

NE Delaney Road

Route N o. 7319

NE Delaney Road is a County road that runs easterly from the southwestern corner of the
Reservation. It is classified by the County as Rural Local Access. This route begins at the
intersection with Hansville Road NE and extends until it dead ends. It is a two-lane roadway
in good condition. This route is defined by one section - Section 10.

Viking Way NW

Route N o. 7420

Viking Way NW is a County road that runs in a northerly direction. It begins as an extension
of Silverdale Way NW (Route 1951). It is classified by the County as Urban Minor Arterial.
This route extends northerly, and enters the city of Poulsbo, where County ownership

Long Range Transportation Plan
September 2026 Update

September 2026
Page 47

KH 090225140

terminates. It is a two-lane roadway in good condition. This route is divided into Sections 10
through 30.

Little Valley Road NE

Route N o. 7441

Little Valley Road NE is a County road that runs in a northerly direction. The road begins at
the northern limits of the city of Poulsbo, near the intersection with Forest Rock Hills Lane.
The road terminates at the intersection with SR-307 (Bond Road NE, Route 9307). Big Valley
Road NE (Route 7250) continues to the north. This route is a two-lane roadway in fair
condition. This route is defined by Section 10.

Gunderson Road NE

Route N o. 7466

Gunderson Road NE is a County road which runs in an easterly direction. The road
intersects with SR-307 (Bond Road NE, Route 9307) to the west and extends east to its
terminus at the intersection with Miller Bay Road NE. The route is classified by the County
as Rural Major Collector. The road is a two-lane road. This route is divided into Sections 10
through 30. The road is considered to be in good condition.

Port Gamble Road NE

Route N o. 7479

Port Gamble Road NE is a County road which runs in a northerly direction. The road
intersects with Essex Avenue NE to the south and extends to its terminus at the
intersection with State Highway 104. The route is classified by the County as Rural Local
Access. The road is a two-lane road in good condition. This route is divided into Sections 10
through 30.

Highland Road NE

Route N o. 7521

Highland Road NE is a County road that runs in a northerly direction. The road begins at
the intersection with NE Crawford Drive. The road terminates at the intersection with SR104 (Route 9104). This route provides access to Wolfle Elementary School and is a two-lane
roadway in good condition. This route is defined by Section 10.

NE Lincol n Road

Route N o. 7715

NE Lincoln Road is a County road that runs in an easterly direction. It is classified by the
County as Rural Major Collector. This route begins at the northeastern boundary of the city
of Poulsbo and extends east to terminate at Central Valley Road (Route 5905). It is a twolane roadway generally in good condition. This route is divided into Sections 10 through 40.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 48

KH 090225140

NW Pioneer Hill Road

Route N o. 7726

NW Pioneer Hill Road is a County road that runs in an easterly direction. It is classified by
the County as Rural Local Access. This route begins at the intersection with Pioneer Way
NW (Route 7822) and extends east to intersect with SR-3 (Route 9003). It is a two-lane
roadway. It is generally in good condition. This route is divided into Sections 10 through 30.

Waghorn Road NW

Route N o. 7765

Port Gamble Road NE is a County road which runs in a northerly direction. The road
intersects with NW Pioneer Hill Road to the south and extends to its terminus at the
intersection with Pioneer Way NW. The route is classified by the County as Rural Local
Access. The road is a two-lane road in good condition. This route is divided into Sections 10
and 20.

Pioneer Way NW

Route N o. 7822

Pioneer Way NW is a County road that runs in an easterly direction. It is classified by the
County as Rural Major Collector and Urban Minor Arterial. This route begins at the
intersection with SR-3 (Route 9003) and extends west and south to intersect with Aldo
Road. It is a two-lane roadway. It is generally in good condition. This route is divided into
Sections 10 through 40.

NW Wesley Way

Route N o. 7852

NW Wesley Way is a County road that runs in a northwesterly direction. It is classified by
the County as Urban Local Access. The road begins at the intersection with Lofall Road NW.
The road terminates at Hood Canal shoreline access. This route is a two-lane roadway in
good condition. This route is defined by Section 10.

NW Park Street

Route N o. 7855

NW Park Street is a County road that runs in an easterly direction. It is classified by the
County as Urban Local Access. The road begins at the intersection with NW Ferry Street
(Route 7858). The road terminates at NE Park Street, which provides access to a State park
and the shoreline. This route is a two-lane roadway in good condition. This route is defined
by Section 10.

NW Ferry Street

Route N o. 7858

NW Ferry Street is a County road that runs in a northeasterly direction. It is classified by the
County as Urban Local Access. The road begins at the intersection with NW Wesley Way

Long Range Transportation Plan
September 2026 Update

September 2026
Page 49

KH 090225140

(Route 7852). The road terminates at NW Park Street (Route 7858). This route is a two-lane
roadway in good condition. This route is defined by Section 10.

Falkner Road NE

Route N o. 7889

Falkner Road NE is a County road that runs in an easterly and then southerly direction. It is
classified by the County as Urban Local Access. This route begins and ends at intersections
with SR-3 (Route 9003). It is a two-lane roadway. It is generally in good condition. This route
is defined by Section 10.

Beach Drive NE

Route N o. 7903

Beach Drive NE is a County road that runs in a northeasterly direction. It is classified by the
County as Urban Local Access. This route begins and ends at dead ends but is accessed by
several residential roads. It is a two-lane roadway considered to be in good condition. This
route is defined by Section 10.

Whitford Road NE

Route N o. 7963

Whitford Road NE is a County road that runs in a northerly direction. It is classified by the
County as Rural Local Access. The road begins at the intersection with Wheeler Street NE
(Route 7966). The road terminates at the shore of Hood Canal and provides access to
fishing and other marine activities. This route is a two-lane roadway in good condition. This
route is defined by Section 10.

Wheeler Street NE

Route N o. 7966

Wheeler Street NE is a County road that runs in a northerly then westerly direction. It is
classified by the County as Rural Local Access. The road begins at the intersection with SR104 (Route 9104). The road terminates at a dead end. This route is a two-lane roadway in
good condition. This route is defined by Section 10.

NE Jefferson Poi nt Road

Route N o. 8163

NE Jefferson Point Road is a County road that runs in an easterly and then southerly
direction. It is classified by the County as Rural Local Access. This route begins at the
intersection with South Kingston Road NE, extends east to a 90-degree bend, then
continues south and east to terminate at the intersection with NE Klabo Road. It is a twolane roadway generally in good condition. This route is divided into Sections 10 through 30.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 50

KH 090225140

NE Barber Cut Off Road

Route N o. 8369

NE Barber Cut Off Road is a County road that runs in a southerly and then an easterly
direction. It is classified by the County as Rural Local Access. NE Barber Cut Off Road
provides access to an elementary school. This route begins at the intersection with SR-104
(Route 9104), meanders south and east to terminate at the intersection with NE West
Kingston Road. It is a two-lane roadway generally in good condition. This route is divided
into a single section - Section 10.

2nd Street NE

Route N o. 8442

2nd Street NE is a County road that runs in a northeasterly direction. The road begins at the
intersection with Washington Boulevard NE. The road terminates at the intersection with
SR-104 (Route 9104). This road provides access into the community of Kingston. It is
classified by the County as Rural Local Access. This route is a two-lane roadway in fair
condition. This route is defined by Section 10.

NE 288th Street

Route N o. 8580

NE 288th Street is a County road that runs in an easterly direction. The road begins at the
intersection with Hansville Road NE (Route 7040) and terminates at the intersection with
Gamble Bay Road NE. This route is a two-lane roadway in good condition. It is classified by
the County as Rural Local Access. This route is defined by Section 10.

Gamble Bay Road NE

Route N o. 8583

Gamble Bay Road NE is a County road that runs in a southwesterly direction. The road
begins at the intersection with NE 288th Street (Route 8580) and terminates at the
intersection with SR-104 (Route 9104). This route is a two-lane roadway in good condition.
It is classified by the County as Rural Local Access. This route is defined by Section 10.

Gamble Place NE

Route N o. 8601

Gamble Place NE is located in the southeast portion of the Reservation. The road intersects
with Little Boston Road NE (Route 8625) on the north and extends south to a dead end.
Gamble Place NE is a County road classified as Rural Local Access. The route is a two-lane
roadway in good condition. This route is divided into a single section - Section 10.

NE Ecol ogy Road

Route N o. 8616

NE Ecology Road is a County road that runs easterly from its intersection with Hansville
Road NE (Route 7040). This route was formerly named NE Solid Waste Site Road. It is
classified by the County as Rural Local Access. This route dead ends at a closed dump and
Long Range Transportation Plan
September 2026 Update

September 2026
Page 51

KH 090225140

is currently used as a transfer station. It is a two-lane roadway in good condition. This route
is defined by one section - Section 10.

Little Boston Road NE

Route N o. 8625

Little Boston Road NE is located west of Hansville Road NE (Route 7040) and is classified as
a Rural Local Access and Rural Minor Collector by the County. It provides access into and
through the Reservation and functions as a collector for all local roads within the
Reservation. It is a two-lane roadway with paved shoulders and starts and ends at
intersections with Hansville Road. It is defined by Sections 810 through 820.

NE Eglon Road

Route N o. 8630

NE Eglon Road is a County road that runs in an easterly direction. It is classified by the
County as Rural Local Access. This route begins at the intersection with Hansville Road NE
(Route 7040) and continues east to its second section, where the road makes a 90-degree
bend to the south. The road terminates at an intersection with Hoffman Road NE It is a
two-lane roadway generally in good condition. This route is divided into Sections 10
through 30.

Hoffman Road NE

Route N o. 8663

Hoffman Road NE is a County road that runs in a southerly and then easterly direction. The
road begins at the intersection with NE Eglon Road (Route 8630) and continues to its
terminus at the intersection with Sunrise Beach Drive NE. It is classified by the County as
Rural Local Access. This route is a two-lane roadway in good condition. This route is defined
by Section 10.

NE West Kingston Road

Route N o. 8667

NE West Kingston Road is a County road that runs in an easterly direction. It is classified by
the County as Rural Major Collector. This route begins at the intersection with Miller Bay
Road NE (Route 7037) and extends east to provide access to several schools. It is a two-lane
roadway. The route terminates in the community of Kingston at the intersection with SR104 (Route 9104). It is generally in good condition. This route is divided into Sections 10
through 40.

NE South Kingston Road

Route N o. 8668

NE South Kingston Road is a County road that runs in a southeasterly direction. It is
classified by the County as Rural Minor Collector. This route begins at the intersection with
NE West Kingston Road (Route 8667) and extends southeast and then southwest to the
Long Range Transportation Plan
September 2026 Update

September 2026
Page 52

KH 090225140

community of Indianola. It is a two-lane roadway, generally in good condition. This route is
divided into Sections 10 through 20.

Ludlow D rive NE

Route N o. 8687

Ludlow Drive NE is a County road that runs in a southerly direction. The road begins at the
intersection with Sunrise Beach Drive NE continues to its terminus at a dead end, which
provides access to the shoreline at Puget Sound. It is classified by the County as Rural Local
Access. This route is a narrow two-lane roadway in fair condition. This route is defined by
Section 10.

Hood Canal Drive NE

Route N o. 8696

Hood Canal Drive NE is a County road that runs in a northerly direction. It is classified by
the County as Rural Minor Collector. This route is a two-lane roadway in good condition.
This route is defined by Section 10 through Section 30. The road terminates at an
intersection with NE Twin Spits Road (Route 8750).
Hood Canal Drive is a County road that intersects the PGST-owned Hood Canal Drive. In
2006, PGST closed vehicle access to the portion of Hood Canal Drive outside the
Reservation boundary. Pedestrian access is still available across the Reservation boundary.

Cliffside Drive NE

Route N o. 8716

Cliffside Drive is a County road that runs in an easterly direction. The route begins at its
intersection with Hood Canal Drive NE (Route 8696). Cliffside Drive intersects Little Boston
Road NE (Route 8625) on its eastern margin. It is classified by the County as Rural Minor
Collector. This route is a two-lane roadway in good condition. This route is defined by
Section 810.

NE Twin Spits Road

Route N o. 8750

NE Twin Spits Road is a County road which runs in a westerly direction. The road intersects
with Hansville Road NE (Route 7040) and extends to its terminus at the intersection with
the shoreline of Hood Canal. The route is classified by the County as Rural Minor Collector.
The road is a two-lane road in good condition. This route is divided into Sections 10 and 20.

NE Buck Lake Road

Route N o. 8940

NE Buck Lake Road is a County road which runs in an easterly direction. The road intersects
with Hansville Road NE (Route 7040) and extends west, makes a 90-degree turn to the
south, and terminates at Buck Lake County Park. The route is classified by the County as

Long Range Transportation Plan
September 2026 Update

September 2026
Page 53

KH 090225140

Rural Local Access. The road is a two-lane road in good condition. This route is divided into
Sections 10 and 20.

NE Point No Point Road

Route N o. 8950

NE Point No Point Road is a County road that runs in an easterly direction. It is classified by
the County as Rural Local Access. This route begins at the intersection with Hansville Road
NE (Route 7040) and continues east to terminate at Point No Point Park. It is a two-lane
roadway generally in fair condition. This route is divided into Sections 10 through 20.

Foulweather Bluff Road NE

Route N o. 8992

Foulweather Bluff Road NE is a County road that runs in a northerly direction. The road
begins at the intersection with NE Twin Spits Road (Route 8750) and continues to its
terminus at a dead end. It is classified by the County as Rural Local Access. This route is a
two-lane roadway in good condition. This route is defined by Section 10.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 54

KH 090225140

Figure 2-1: Kitsap County Transportation Network

Long Range Transportation Plan
September 2026 Update

September 2026
Page 55

KH 090225140

2.2.3

BIA Routes

Figure 2-2: Port Gamble S’Klallam Tribe Transportation Network

2.2.4

Tribal Roads

Forest Service Roads

Route N o. 2001 -2011

Series “2000” roads on the Reservation are either forest roads, or other service and
emergency access roads. In general, these roads are gravel or dirt and in poor to fair
condition. These roads are owned by PGST.
For details of each of the local service roads on the reservation, see the TTP Inventory in
Appendix A.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 56

KH 090225140

2.2.5

Commercial/Business Park Roads

Salish Lane

Route N o. 0019

This road is located in the mid-eastern portion of the Reservation. Salish Lane provides
access to the Casino. The road intersects with Hansville Road (located within County rightof-way). Tribal members use Salish Lane for access to commercial enterprises and
recreation.

Gliding Eagle

Route N o. 0012

PGST has developed a gas station and convenience store. This road is located in the
southeastern portion of the Reservation, is composed of two sections, and each section is
0.1 miles long. The southern terminus intersects Little Boston Road NE. The eastern
terminus intersects Hansville Road. The road continues to the north and terminates at the
southern margin of Ravenwood Street. Tribal members use Gliding Eagle for access to
services.

2.2.6

Bridges and Docks

There are numerous bridges located within the state routes listed above, as well as the
Kingston Ferry Terminal. The scope of this plan does not include a detailed discussion of
these bridges, which are maintained by WSDOT.
There is one bridge within the Reservation boundaries located adjacent to Route 0002,
Point Julia Road. The bridge provides access for both recreational activities and commercial
enterprises. The bridge is owned and maintained by PGST.
The current trails plan calls for extending the bicycle/walking trail that starts at the
Wellness Center access road and terminates at Middle Creek. A new bridge will have to be
constructed to span Middle Creek to complete the trail. This new section has been named
“Little Boston Pedestrian Facility.”

2.2.7

Marine Access

Point Julia serves the fishing community and recreation boats. There are two boat ramps
on Point Julia: The North Boat Ramp and the South Boat Ramp. The North Boat Ramp was
replaced in 2017 and the South Boat Ramp was replaced in 2022.
In addition, Tribal members access marine activities from many County Roads. Tribal
members require access to the shoreline to reach their usual and accustomed (U&A)
fishing and shellfish harvest areas.
Long Range Transportation Plan
September 2026 Update

September 2026
Page 57

KH 090225140

2.2.8

Non-motorized Facilities

In the last five years, several pedestrian facilities have been constructed on the
Reservation. However, there is still a need to provide additional pedestrian facilities to
provide safe access throughout the community.
Pedestrian safety is of utmost priority to PGST, and this is reflected in the Priority List.
Series “3000” routes on the Reservation are pedestrian and mixed-use facilities. Proposed
routes are included in the TTP to qualify for funding through the BIA. Funding has been
received in the past from the WSDOT Pedestrian & Bicycle Safety Program to construct a
portion of the mixed-use route along Little Boston Road.

2.2.9

Public Transit

Kitsap Transit
The public transit provider in Kitsap County is Kitsap Transit. Currently, Kitsap Transit does
not provide direct service to the Reservation. However, Kitsap Transit Routes 307 and 391
provide daily service to the Kingston area along Miller Bay Road and SR-104 (See Figure 2-3
and Figure 2-4). A park & ride is located at "George's Corner" at the intersection of SR-104
and Hansville Road and is served by Bus Route #391 and #307.
Figure 2-3: Kitsap Transit Route #307

Long Range Transportation Plan
September 2026 Update

September 2026
Page 58

KH 090225140

Figure 2-4: Kitsap Transit Route #391

Long Range Transportation Plan
September 2026 Update

September 2026
Page 59

KH 090225140

Route #391 Kingston/Bainbridge operates weekdays between the Kingston ferry
terminal and the Bainbridge ferry, and Route #307 Kingston/North Viking Ferry provides
service between Poulsbo and Kingston. Kitsap Transit also makes connections with
Jefferson County Transit in Poulsbo for service to Port Townsend and Port Ludlow. All bus
schedules are coordinated with morning and evening commuter ferries.
Kitsap Transit provides vanpools for peak hour commuters and offers the "Worker/Driver
Program". This service is designed to transport employees to and from various worksites,
with the route ending at the driver's place of employment. Worker/Driver Port Gamble
Route originates at “George’s Corner” park and ride and transports employees to
Charleston Base.
As reported in the 2022-2027 Transit Development Plan, Kitsap Transit provided countywide mobility service through the use of fixed route service, ACCESS buses, VanLink social
service agency vanpools, worker/driver service, general public dial-a-ride service, ondemand and foot ferry service where applicable.

Public Transportation (Transit) on Indian Reservations
In 2012, PGST prepared a Transit Study Plan with funds from a Transit Planning Grant from
the Federal Transit Administration (FTA). The purpose of this study was to analyze and
recommend a comprehensive system of transit alternatives that best meet the needs of
the Tribal community over the next five years. This study identified the transit alternatives
available to PGST, described the preferred alternative, and presented a plan for
implementation of that preferred alternative.
The goals of the federal Tribal Transit Program are: 1) to enhance the access of public
transportation on and around Indian reservations in nonurbanized areas to health care,
shopping, education, employment, public services, and recreation; 2) to assist in the
maintenance, development, improvement, and use of public transportation systems in
rural and small urban areas; 3) to encourage and facilitate the most efficient use of all
federal funds used to provide passenger transportation in nonurbanized areas through the
coordination of programs and services; and 4) to provide for the participation of private
transportation providers in nonurbanized transportation to the maximum extent feasible.
As with many tribes, PGST is looking at the efficacy of coordinating transit service to
support its community. The Reservation is currently within the Kingston on-demand service
area and the on-demand fast ferry commuter service area. Tribal and community members
would benefit from links to surrounding areas for business, employment, medical, and
educational trips. The plan determined that a two-phase program would best meet the
Long Range Transportation Plan
September 2026 Update

September 2026
Page 60

KH 090225140

needs of PGST. Phase I includes coordination and utilization of existing services, both those
available through Kitsap Transit and the various departments within the PGST. Phase II
recommends an extension of Kitsap Transit service, to be negotiated with the agency
directly. Phase II is subject to transit demand, funding availability, and negotiations with
Kitsap Transit.

2.2.10 Shuttles, Vans, and Shared Rides
PGST operates a van for elderly pickup. This is an example of a Tribally owned and
operated transportation option. The Youth Services program is also seeking funding for a
van to serve the youth population.

2.3

Collision History

Collision data for the PGST was requested from WSDOT, which maintains a database of
collisions occurring in all of the State. Collision data was requested from WSDOT for the
PGST Reservation as well as major roadways leading to the Reservation for the years 2021
through 2025. The data represents all reported, vehicle-involved collisions. A total of 192
crashes were reported from 2021 to 2025, which included one fatal crash, eight major
injury crashes, and 183 other injury type collisions. It should be noted that historically,
reservation collisions across the nation are significantly under reported.

2.3.1

Collision Locations

A total of 192 crashes were reported from 2021 to 2025. Figure 2-5 shows the location of
crashes within the study area over the five-year period as a heat map. The heat map
indicates Hansville Road has a high concentration of crashes, particularly at the
intersections of SR-104, 288th Street, Little Boston Road NE, and Eglon Road. The
intersection of SR-104 and 288th Street also has a high concentration of crashes based on
the heat map. All these locations are discussed in further detail in the report.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 61

KH 090225140

Figure 2-5: Collision Heat Map

Long Range Transportation Plan
September 2026 Update

September 2026
Page 62

KH 090225140

2.3.2

Collision Severity

The collisions within the PGST Reservation as well as major roadways leading to the
Reservation were analyzed based on crash severity. Table 2-3 summarizes the number of
collisions per year by severity. Figure 2-6 shows the location of collisions by severity.
Table 2-2: Collision Severity
Severity

2021

2022

2023

2024

2025

Total

(K) Fatal Injury

0

0

0

0

(A) Suspected Major Injury

1
4
5
17
27

1
7
8
26
42

2
9
4
23
38

10
6
26
42

1
4
8
5
25
43

1
8
38
28
117
192

(B) Suspected Minor Injury
(C) Possible Injury
(O) PDO / No Injury
Total

The collision data shows there was one fatal injury collision (0.5% of collisions), eight
suspected major injury collisions (4% of collisions), 38 suspected minor injury collisions
(20% of collisions), 28 possible injury collisions (14% of collisions), and 117 no apparent
injury/property damage only collisions (61% of collisions).
Table 2-3 summarizes the number of crashes based on severity at the intersections with
the most reported crashes.
Table 2-3: Key Intersection Collision Severity
Major

Minor

Possible

PDO / No

Injury

Injury

Injury

Injury

0

0

1

0

4

5

0

0

0

0

2

2

0

0

2

2

3

7

0

0

5

9

21

35

0

1

0

1

5

7

Fatal
Hansville Road NE at
Eglon Road
Hansville Road NE at
Little Boston Road NE
Hansville Road NE at
288th St
Hansville Road NE at
SR-104
SR-104 at
288th St

Total

The intersection of Hansville Road NE at SR-104 had 35 crashes reported at the intersection
over a five-year period. However, the table shows zero crashes were fatal or major injury.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 63

KH 090225140

The calculated crash rate in Million Entering Vehicles (MEV) for the intersection is included
in Table 2-4.
Table 2-4: Key Intersection Collision Rates
Total

Years

5

28391

5

0.97

2

129582

5

0.08

7

120271

5

0.32

35

212602

5

0.90

7

84691,3

5

0.50

Collisions
Hansville Road NE at
Eglon Road
Hansville Road NE at
Little Boston Road NE
Hansville Road NE at
288th St
Hansville Road NE at
SR-104
SR-104 at
288th St

Collision

Volume

Rate (MEV)

1

Calculated using average daily trips (ADTs) provided in Section 2.4.3
Calculated by multiplying peak hour turning movement counts by K factor
3
Calculated using WSDOT provided ADT
2

The Collision rate, which adjusts for total entering traffic volumes, shows a MEV of 0.90 for
the intersection of Hansville Road NE at SR-104. Typically, a rate of less than 1.0 and a
frequency less than 10 collisions a year at a signalized intersection would indicate that
additional analysis is not required. However, this intersection is very close to both those
general guidelines. Additionally, the capacity review indicated the SR-104 at Hansville
intersection expected to fail standard level of service thresholds within about 10 years. This
intersection should be placed on the 6-year TIP for an updated intersection control
evaluation (ICE) for safety and capacity.
The intersection of Hansville Road NE at Eglan Road has the highest collision rate of the
study intersections but is still below the 1.0 significance rate. Additionally, the intersection
of Hansville Road NE at Eglan Road has a collision frequency of 1.0 collisions per year,
which is well below the 5 per year frequency normally used as a concern measure for
unsignalized intersections. This should undergo periodic collision history monitoring and
be evaluated further in the next strategic safety plan update.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 64

KH 090225140

Figure 2-6: Collision Severity Map

Long Range Transportation Plan
September 2026 Update

September 2026
Page 65

KH 090225140

2.3.3

Collision Type

The number of collisions by type are summarized in Figure 2-7. The data shows the top
collision types are fixed object (28% of collisions), rear end (26% of collisions), roadway
departure (12% of collisions), angle (12% of collisions), and left-turn (8% of collisions).
Figure 2-8 illustrates the top collision types by location. A majority of the rear end and leftturn collision types occur along Hansville Road. The high number of fixed object and
highway departure should be further evaluated in the next strategic safety plan or a road
safety audit for the entire length of Hansville north of SR-104 and Little Boston Road to
identify specific location improvements that would reduce fixed object and roadway
departure collisions.
Figure 2-7: Collision Type

Active transportation road users include people walking and those riding bicycles. Of the
192 reported collisions, three collisions were active transportation related. One collision
involved a major injury with a pedestrian, one collision involved a major injury with a pedal
cyclist, and one collision involved a minor injury crash with a pedal cyclist. Figure 2-9
illustrates the active transportation related crashes by location and severity. The three
active transportation crashes occurred on Hansville Road between Little Boston Road NE
and 288th Street.

Long Range Transportation Plan
September 2026 Update

September 2026
Page 66

KH 090225140

Figure 2-8: Top Collision Types

Long Range Transportation Plan
September 2026 Update

September 2026
Page 67

KH 090225140

Figure 2-9: Active Transportation Collisions

Long Range Transportation Plan
September 2026 Update

September 2026
Page 68

KH 090225140

2.3.4

Fatal and Major Injury Collisions

Of the 192 reported crashes within the PGST Reservation, as well as major roadways
leading to the Reservation, one collision involved a fatal injury, and eight collisions involved
a major injury. Table 2-7 summarizes the reported fatal and major injury collisions. Figure
2-10 shows the fatal and major injury collisions by location. There are no specific clusters of
fatality or major collisions, thus no specific trends.
Table 2-5: Fatal and Major Injury Summary

Date

8/6/2025

1/1/2021

7/12/2022

3/24/2023

10/19/2023

1/2/2025

5/19/2025

7/16/2025

10/3/2025

Location

Severity

Hansville Road north of

(K) Fatal

288th Street

Injury

Hansville Road NE at

(A) Major

Evening Star Lane

Injury

SR-104 at 288th Street

Collision
Type

Secondary

Contributing

Contributing

Factor

Factor

Other
Pedal cyclist

Contributing

-

Circ Not Listed
Under
Pedestrian

Influence of

-

Alcohol

(A) Major

Left turn

Injury

Hansville Road NE at

(A) Major

QC Opposite

Sunnywoods Lane

Injury

Direction

Hansville Road NE north

(A) Major

of Ohman Road

Injury

Hansville Road NE north

(A) Major

of Hunt Club Lane

Injury

Hansville Road NE north

(A) Major

Roadway

of Ohman Road

Injury

Departure

Hansville Road NE north

(A) Major

Parked

of Eglon Road

Injury

Vehicle

Hood Canal Place at

(A) Major

Hood Canal Drive

Injury

Fixed Object

Improper
Turn/Merge

-

Other

Under

Contributing

Influence of

Circ Not Listed

Drugs

Apparently Ill

-

Other
Head on

Contributing

-

Circ Not Listed

Fixed Object

Long Range Transportation Plan
September 2026 Update

Primary

Other
Contributing

-

Circ Not Listed
Other
Contributing

Apparently Ill

Circ Not Listed
Under

Exceeding

Influence of

Stated Speed

Alcohol

Limit

September 2026
Page 69

KH 090225140

Figure 2-10: Fatal and Major Injury Collisions Map

Long Range Transportation Plan
September 2026 Update

September 2026
Page 70

KH 090225140

2.3.5

Collision Trends

The reported collision contributing factors are summarized in Figure 2-11. The top
contributing factors for collisions within the PGST Reservation, as well as major roadways
leading to the Reservation, are distraction (19% of collisions), alcohol impairment (13% of
collisions), exceeding speeds (9% of collisions), vehicle failing to yield right-of-way (7% of
collisions), drowsiness (6% of collisions), and vehicles following too closely (6% of collisions).
The top contributing factors indicate high-risk behavior by drivers contributing to collisions.
When the Tribe updates their Strategic Safety Plan, additional public input will be evaluated
with the collision data to determine appropriate enforcement engineering,
education/encouragement and emergency services options to improve the traveling
public’s safety on the Reservation and its approach roads.
Figure 2-11: Collision Contributing Factors

Long Range Transportation Plan
September 2026 Update

September 2026
Page 71

KH 090225140

2.4

Existing Traffic Operations

2.4.1

Analysis Parameters

Congestion at intersections and along roadways is generally measured in terms of level of
service (LOS). Level of Service is a qualitative term describing operating conditions a driver
will experience while traveling on a particular road or highway during a specific time
interval. In accordance with the Transportation Research Board’s Highway Capacity Manual
(HCM), 7th Edition, road facilities and intersections are rated between LOS A and LOS F,
with LOS A being free flow and LOS F being forced flow or over-capacity conditions.
The County has established the following performance standards: 85% of the County Road
lane miles in the transportation network must be at or below maximum LOS/volume-to-capacity
standards. Conversely, 15% of the lane miles will be permitted to exceed LOS/volume-to-capacity
standards. A roadway will be considered deficient when the average for the link falls below
LOS D in urban areas and LOS C in rural areas.
For the purposes of this study, the County roads and intersections providing direct access
to the Reservation were reviewed to determine what improvements may be needed to
meet the stated goals of the LRTP.

2.4.2

Traffic Volumes

The traffic volumes used in the analysis were collected from multiple sources. These traffic
volumes were used for the base-year operations analysis, and as the basis for futureyear traffic volume projections.
Traffic count data is collected by WSDOT for state routes and is available online through
the WSDOT Traffic count data webpage.
Traffic count data for County roads were provided by the County for the following locations
and dates:
⚫

Hansville Road between North of Eglon Road and SR-104 (April 2026)

⚫

Hansville Road North of Buck Lake Road (November 2023)

⚫

Twin Spirits Road East of Hood Canal Drive (2019)

⚫

Gamble Bay Road North of Grove Lane (June 2025)

⚫

288th Street West of Hansville Road (April 2026)

⚫

Hansville Road Little Boston Analysis Report (2025)

Long Range Transportation Plan
September 2026 Update

September 2026
Page 72

KH 090225140

Existing turning movement counts at the following intersections were collected by the
independent count firm Traffic Data Gathering (TDG) in April 2026:
⚫

Little Boston Road NE at NE Boston Lane

⚫

Little Boston Road NE at Admin Center North Driveway

⚫

Little Boston Road NE at Admin Center South Driveway

⚫

Hansville Road NE at Casino South Driveway

⚫

SR-104 at Hansville Road NE

In addition, traffic counts collected in June 2025 for the Hansville Road Little Boston Road
Analysis Report (Transpo Group, 2025) were used in the analysis of this report, relevant
count data from the original report included in Appendix E.
The traffic data collected in 2019, 2023, and 2025 is still relevant in 2026. Growth on the
Reservation has not increased enough to have a measurable impact on older traffic data.
The existing 2026 PM peak hour volumes are shown in Figure 2-12.Traffic count data is
provided in Appendix E.

2.4.3

Roadway Operations

The current operation of the Reservation roadway network has been assessed using a link
capacity analysis. Each roadway in Kitsap County has an assigned maximum vehicle
carrying capacity for ADT. The capacity was assigned based on the revised Florida
Department of Transportation (DOT) System Planning Office Capacity Tables. These
capacities represent land use assessment that is either urban, rural, or rural transitioning
to urban. Roadway link LOS analysis is used to assess if facilities are meeting the LOS
standards.
Roadway travel volumes are compared to roadway capacity to develop the volume-tocapacity (V/C) ratio. The V/C ratios relate directly to measures of LOS as shown in Table 2-6.
Table 2-6: Roadway Level of Service Criteria
V/C Ratio Range

LOS

.60 and below

A

.60 to .69

B

.70 to .79

C

.80 to .89

D

.90 to .99

E

1.00 and above

F

Long Range Transportation Plan
September 2026 Update

September 2026
Page 73

KH 090225140

Figure 2-12: Existing Weekday 2026 PM Peak Hour Volumes

Long Range Transportation Plan
September 2026 Update

September 2026
Page 74

KH 090225140

Table 2-7 provides a summary of the current roadway LOS for Hansville Road, which is the
main access to the Reservation, and other approach roads to the Reservation. The reserve
c

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/tribal%3Aport_gamble_sklallam%3A0237dae04dfa4a69. Public record. Not legal advice.
