# Cher-Ae Heights Indian Community

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/tribal%3Acher-ae_heights%3A9072f3c83f7e23ce

## Record

- **Collection:** Tribal code
- **Document type:** Tribal code

## Text

Cher-Ae Heights Indian Community
of t he Tr inidad R ancher i a

Integrated Development Standards
October 2011

Trinidad Rancheria
P.O. Box 630
Trinidad, CA 95570
p:707.677.0211
f:707.677.3921
w: trinidad-rancheria.org

Prepared by:
Opticos Design, Inc.

October 2011
Table of Contents

District Specific Standards

General Standards

Tree Protection Standards

2-22

Review Procedures

Main Rancheria Parcel and Westhaven Parcel

1-2

Frontage Standards

2-2

Tree Protection Standards

2-23

Pre-Application Conferences

3-2

Building Form Standards: Cher-Ae Main Street

1-3

Allowed Frontages

2-3

Protection of Trees During Construction

2-23

Neighborhood Meeting/Community Meetings

3-2

Building Form Standards: Recreation & Entertainment Area 1-4

Street Standards

2-4

Tree Protection and Preservation Plan

2-23

Submitting, Accepting, and Withdrawing Applications

3-2

Open Space Standards: Bluff

1-5

Neighborhood Main Street Types

2-5

Tree Injury Mitigation

2-24

Staff Review and Action

3-3

Building Form Standards: Institutional & Cultural Area

1-6

Residential Street Types

2-6

Damage to Trees

2-24

Public Hearings

3-3

Open Space Standards

1-7

Special Street Types

2-7

Inspection Schedule

2-24

Approved Development Plans

3-3

Open Space Standards

1-8

Special Street Types

2-8

Tree Protection Standards

2-24

Land Development Plans

3-4

Open Space Standards: Courtyards

1-9

Roundabout

2-9

Architectural Standards and Guidelines

2-25

Administrative Permits

3-5

Open Space Standards: Bluffs Gathering Fields

1-10

Water Resources

2-10

Character

2-26

Appeals

3-6

Building Form Standards: Rural Residential

1-11

Existing Conditions and Potential

2-11

Massing and Scale

2-26

Interpretations

3-7

Street Network

1-12

Rainwater Capture Scenario

2-12

Roofs and Walls

2-27

Enforcement

3-7

Trinidad Pier and Harbor Parcel

1-13

Stormwater

2-13

Roofs

2-27

Building Form Standards

1-14

Stormwater Management Types

2-15

Walls

2-27

Glossary

Open Space Standards

1-15

Main Rancheria Parcel

2-16

Openings

2-28

Definitions of Specialized Terms and Phrases

Archer Road Parcel - McKinleyville

1-16

Main Rancheria Parcel

2-16

Windows

2-28

Building Form Standards

1-17

Stormwater Management Precedents

2-17

Doors

2-28

Open Space Standards

1-18

Archer Road Parcel

2-18

Attached Elements

2-29

Street Network

1-19

Archer Road Parcel

2-18

Storefronts and Awnings

2-29

Stormwater Management Precedents

2-19

Stoops and Porches

2-29

Lighting Standards

2-20

Attached Elements

2-30

Balconies and Bay Windows

2-30

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

4-2

ii

October 2011
Introduction

Purpose

Applicability

This document presents a set of development standards for the Cher-Ae Heights
Community of the Trinidad Rancheria. These development standards can be utilized
to conduct planning-level review of projects on Rancheria lands prior to their
implementation and construction. Their use helps to ensure that future development
patterns are in keeping with the community's long-term vision, as described in the
Comprehensive Plan. More specifically, these standards help to ensure the following:

These development standards are applicable to all future community development on
Rancheria and Trust property. Standards for public areas, community and commercial
facilities, new neighborhoods, and future rural development on Rancheria properties and
Trust Land are prescriptive in nature.

1.

Implementation of the Trinidad Rancheria Comprehensive Plan. These standards
help to implement the goals and policies of the Comprehensive Plan, and to help carry
out the vision for development that it describes. They also help to implement the six
Design Principles that permeate the Comprehensive Plan:
1.

Plan with Vision - “key-chok, hey-chock-see-mek” (act on purpose)

2.

Create in the Spirit of the Place - “see-shon” (be a certain way)

3.

Arrange the Right Use and the Right Size in the Right Place - “pyek-che-nee”
(careful, perfect, right)

4.

Make a Center and an Edge - “wo-gee” (in the middle) vs. “re-wo-nah” (at the end
or edge)

The Tribal Council may be exempt from the provisions of these standards when an
emergency exists such that it is impossible to submit to their normal procedures, and quick
and instant action is necessary to secure the public health, safety, or welfare of the Cher-Ae
Heights Community. The Tribal Council shall ratify such exemption after the fact at its
next regularly scheduled meeting, and shall base its ratification on specified findings of
fact related to the emergency involved.

5.

Put Your Best Face Forward - “hee-mech” (in front) vs. “per-kwery” (in back);
and, “chy-yoh” (hidden/private) vs. “wo-rue” (public/visible)

6.

Take Steps - “hlke-mah” (phasing)

2.

3.

Well-Designed Environments that Promote and Reflect Quality and Character.
These standards and guidelines promote building patterns and architectural elements
that express the Rancheria's heritage and maintain a high-quality public realm for
residents and visitors.
Green and Sustainable Development. These standards help to promote green and
sustainable development through carbon footprint reduction, water conservation
and reuse, energy conservation, renewable energy use, recycling and waste reduction,
vegetation, urban agriculture, and hazard-resilient development.

4.

Connectivity and Development Patterns that Support Walking and Bicycling.
These standards set forth locations and standards for streets, paths, and trails, and
regulate building patterns that promote pedestrian-oriented development.

5.

Environments that Promote Healthy Lifestyles. In regulating pedestrian-oriented
development these standards help to facilitate walking and bicycling as means to
obtain daily exercise and improve public health.

6.

Conservation and Protection of Natural Resources. These standards help to
designate what areas should be built upon and what areas should be maintained for
conservation.

7.

8.

Conservation and Protection of Cultural and Historic Resources. These standards
help to designate areas and spaces that should be maintained for cultural and historic
resource protection and identify new building program to house and showcase such
resources.
Safety from Fire, Flood, and Other Dangers. These standards maintain building
setbacks that separate development from fire and other dangers, and promote site
planning methods that seek to minimize excessive grading and site alteration.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Rancheria should consider when planning future development. These include standards
for parks and civic spaces, comprising location, size, and general characteristics.
Standards that are applicable throughout Rancheria holdings include the following:
1.

Frontage. Standards for different ways buildings can engage the public realm.

2.

Streets and Trails. Standards for alignments, widths, treatments, and required
elements of various scales of streets and trails.

No lands shall be developed without full compliance of these standards and all other
applicable federal standards.

3.

Standards and Guidelines for Water Management. Performance standards for
creative water capture, treatment, and reuse.

Exemptions

4.

Best Management Practices for Stormwater. Standards and guidelines for managing
stormwater, including a stormwater master plan for each address.

5.

Standards and Guidelines for Tree Protection.

6.

Architectural Design Guidelines. Guidelines and recommendations for appropriate
building types, character, materials, colors, and signage and wayfinding.

Compliance

How to Use This Document: A Quick Guide

Conflicts with (State or) Federal Law

1.

If a provision of these standards is inconsistent with a provision found in the law or
standards of the (state or) federal government, the more restrictive provision shall control,
to the extent allowed by law.

Those wishing to propose a project on Rancheria land should first locate their parcel
on the District Specific Maps, to determine the applicable address.

2.

Applicants should then comply with the appropriate standards that are specific to
their address.

3.
Where applicable, if a provision of these standards is inconsistent with a provision found
in the law or standards of the Town of Trinidad, these standards shall control, to the
extent allowed by law.

Applicants should then follow and comply with standards general to all addresses
with regards to Streets and Trails, Parks and Civic Spaces, Stormwater Management,
Water Management, and Architectural Design Guidelines.

4.

Applicants should then follow the appropriate procedures for submitting an
application for Development Review consideration and approval.

Document Organization

Other Applicable Standards

Development standards include standards that are specific to individual zones or
"addresses" within Rancheria holdings, as well as standards that are appropriate to be
applied everywhere.

These standards are intended to be used to conduct planning-level review and permitting
of projects, and serve as a prerequisite for subsequent Building, Foundation, and Grading
review and permitting. For building-level review and permitting, applicants should
reference Title 24 of the California Code of Regulations, including Part 11, the CALGreen
Standards Code, which sets forth standards for environmental efficiency in new
construction. If any conflicts between these standards and those of CCR Title 24 should
arise, those in the CCR Title 24 shall control.

Conflicts with Town of Trinidad Zoning

The Rancheria's "addresses" include the Main Parcel, which is located along Cher-Ae Road
and Scenic Drive and includes the Casino and tribal offices, the nearby Westhaven parcel
located off of Westhaven Drive, the Harbor Parcel, located at the Town of Trinidad harbor,
and the Archer Road parcel, located off of Archer Road in McKinleyville. Specific to each
"address" are standards that regulate the following:
1.

Allowed Building Placement and Orientation;

2.

Allowed Building Height and Frontage;

3.

Parking Location, Design, and Orientation; and

4.

Appropriate Land Use.

In some locations, community visions described in the comprehensive plan have
necessitated more complex standards. For these areas, additional descriptive pages follow
the standards in order to adequately describe design intent, including steps that the

Relationship to NEPA
Development on Rancheria and Trust lands is subject to the National Environmental
Protection Act, which includes compliance with the Clean Water Act, the National
Historic Preservation Act, the Pollution Prevention Act and the Threatened and
Endangered Species Act. Future development may require environmental assessments
in order to preserve sensitive environmental resources and minimize hazardous
impacts. Assessments may require stricter standards, including reduced development
footprints, increased setbacks, and limited land uses. In the event of any conflicts between
these standards and the findings of an environmental assessment under NEPA, the
environmental assessment shall control.

iii

October 2011

Trinidad Pier and Harbor
6+ acres

Main Parcel - 46.5 acres
Westhaven Drive Parcel - 8 acres
(Tribal Trust Status)

District Specific Standards
Purpose
This Chapter provides regulatory standards governing land use and building form
within the Rancheria properties. The standards found in this Chapter are a reflection
of the community vision for implementing the intent of the Comprehensive Plan. These
standards are intended to ensure that proposed development is compatible with existing
and future development, and produces an environment of desirable character.
Applicability
The requirements of this Chapter shall apply to all proposed development within Cher-Ae
Tribal holding areas, and shall be considered in combination with the general standards in
Chapter 2 (General Standards). If there is a conflict between any standards, the provisions
of this Chapter (District Specific Standards) control over the General Standards Chapter.

Archer Road McKinleyville Parcel - 27.5 acres
(Tribal Trust Status)

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-1

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

Te
h

- Pa

ane

es
W

hL

October 2011

th
e
av
e

an

riv

L an

Pa

- Pa

e

hL

D

e

n

ne

w in

-

La

Kay

h
Te

h
Pa

Ch

e

r- A

eL

an

e

Main Rancheria Parcel and Westhaven Parcel
Sc

en

ic

Dr

i ve

The Main Rancheria Parcel defines the community's identity for tribal members and
visitors alike; this site faces the need to provide both a welcoming public face for future
recreational visitors to Trinidad, and a thriving private realm capable of serving diverse
needs of its residents. This parcel is subdivided into four subdistricts, or "addresses."
The tribal and public visitor spheres interface along the main-street environment of CherAe Lane, which may house various commercial needs and small incubation spaces for new
local businesses.
The eastern recreational realm may be enhanced by new hotel accommodations and a
pedestrian promenade, taking advantage of spectacular ridge views; a new RV park may
also allow camping facilities for longer-stay visitors.
The western tribal center incorporates various community facilities in a walkable
environment, including administrative offices, a cultural museum, library, youth center,
gymnasium, pedestrian courtyard, and outdoor gathering areas with views along the
ridge.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-2

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Building Form Standards: Cher-Ae Main Street

Building Placement
Setbacks
Buildings shall face the principle streets of this address, with
entrances and openings oriented towards Cher-Ae Lane, the
new roundabout, and the new side street. Accessory Structures,
such as garages, storage sheds, fuel pumps, and utility rooms,
should be located behind or to the sides of principal buildings.

10
1

B

ew

ee

alk

Str

To
H

wy

S id

C
A

t

Front (From Back of Sidewalk)

0' min. - 5' max.

A

Between Sides of Buildings

10' min.

B

At Rear of Buildings

10' min.

C

Parking
Location and Orientation
Parking lots shall be oriented to the sides and rear of buildings.
To Institutional and Cultural Area

Front Setback

50' min.

D

Building Height and Frontage
Height
To R
e

Buildings can be up to 3 stories in height facing the principle
streets of this address. Finish floors shall be set at or near grade
level to allow for commercial storefronts. Buildings shall have tall
ground floors to accommodate commercial spaces.

D
t ion

ea

t

t Ar

alk

me n

ee

r t ain

Str

E nte

ew

a nd

S id

c re a

Main Buildings

35' or
3 stories max.

E

Ground Floor Finish Level

6" max.

F

Ceiling Height, Ground Floor

12' min.

G

Ceiling Height, Upper Floor(s)

8' min.

H

Allowed Frontage Types
Intent

Buildings shall be oriented toward the street and sidewalk with
storefront openings that may be covered with awnings, canopies,
or galleries.

The intent of this address is to create a new front door off of
Highway 101 for the Tribe. This walkable area would provide
retail service needs for the community and for visitors to the
tribal activities.

Shopfront, Gallery
Land Use

Str
ee

Description

t

The conceptual plan calls for the addition of buildings fronting
onto an extension of Cher-Ae Lane to a new interchange at
Highway 101. These buildings would contain retail services on
the ground floor and potentially commercial or residential space
above. In addition to parking placed behind the buildings, some
on street parking is provided. A pedestrian network of sidewalks
and footpaths would connect this area to other important
destinations throughout the Main Rancheria Parcel, including the
potential RV campground and the casino parking lots.

©2011 Opticos Design, Inc.

Commercial Uses

Upper Floors

Commercial and Service
Uses, with limited
Residential Uses

E

Street

Integrated Development Standards

Ground Floors

H

F

Opticos Design, Inc.

See Page 2-2

Sidewalk

G

1-3

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Building Form Standards: Recreation & Entertainment Area

Building Placement
Setbacks
Buildings shall be oriented to principal entry points and toward
ocean views. Service and maintenance areas shall be oriented
to the maximum extent possible, to the sides of buildings,
away from entrances and views. Accessory Structures, such as
garages, storage sheds, and utility rooms, should also be located
to the sides of principal buildings, away from guest areas.
Between Buildings

10' min.

At Rear of Buildings

10' min.

Parking
Location and Orientation
Building/Parking Diagram

Large parking areas shall be designed as a series of smaller
parking lots that are connected by a network of pedestrianscaled streets and blocks.
Clear pedestrian routes shall be defined leading from nearby
streets through parking areas to principle building destinations.
No less than 10% of parking areas shall be reserved for
landscaping.
Building Height and Frontage
Height
Buildings may be up to 4 stories in height. Finish floors shall be
set at or near grade level to allow for commercial storefronts.
Buildings shall have tall ground floors to accommodate
commercial spaces.

Intent
The intent of this address is to provide recreational amenities
to the tribe and guests that is compatible with the desired
character of the Rancheria.

4 stories max.

A

Ground Floor Finish Level

Varies

B

Ceiling Height, Ground Floor

12' min.

C

Ceiling Height, Upper Floor(s)

8' min.

D

Allowed Frontage Types
Buildings shall have windows and entrances facing public spaces.
Entrances may be covered with awnings, canopies, or galleries.

Description
The conceptual plan allows for the development of a new
campground, improvements to the casino's parking areas, new
public spaces that take advantage of ocean views, and the future
addition of a hotel and hospitality wing to the existing casino. In
the long term, when it is appropriate to redevelop the casino,
the area may be transformed to provide for future hospitality
and tourist-oriented amenities.

Main Buildings

Shopfront, Gallery
D

Land Use
All Floors

D

See Page 2-2
Commercial, Hospitality,
and Service Uses

A
D
B

C

Promenade

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-4

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Open Space Standards: Bluff

Southern Bluffs Overlook
Description
The bluffs around the casino provide an opportunity to take
advantage of the incredible views of the Pacific Ocean and
of distant views towards Arcata and Eureka. The existing
service lane becomes a shared roadway with limited access for
service and emergency response vehicles and will be rebuilt to
accommodate pedestrians by adding benches and overlooks. The
existing water cistern and storage shed would be fenced off from
view and would contain a service entrance. The new promenade
would terminate at two picnic pavilions that would direct users
to an overlook facing the Pacific Ocean.

e
Ch

r- A

a
eL

Standards

ne

A formalized walkway with pedestrian amenities such as
benches, overlooks and picnic shelters.
Pervious pavers can be used to reduce the stormwater runoff
and provide an aesthetically pleasing surface for the promenade.
The walkway would allow for limited truck access.
New fence to screen the existing storage shed and water
cistern.

24 feet min.

Sc

en

ic

D

riv

Permeable
Pavers

e

Patio

Hotel/Casino
Benches
View
Overlook

B lu

Opticos Design, Inc.
©2011 Opticos Design, Inc.

ff P

ro

me

Bollards
(typ.)

na

de

Integrated Development Standards

1-5

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Building Form Standards: Institutional & Cultural Area

Building Placement
Setbacks
Buildings shall face the principle streets and public spaces of
this address, with entrances and openings oriented towards the
new street network and courtyards. Accessory Structures, such
as garages, storage sheds, and utility rooms, should be located
behind or to the sides of principle buildings, away from these
spaces.
Front (From Back of Sidewalk)

0' min. - 10' max.

Between Sides of Buildings

10' min.

At Rear of Buildings

10' min.

Parking
Location and Orientation
Parking shall be organized along the street network, in a parallel,
head-in, or diagonal format.
Clear pedestrian routes shall be defined leading from parking
areas to principle building destinations.
No less than 10% of parking areas shall be reserved for
landscaping.
Building Height and Frontage
Height
Main Buildings

20' min.
3 stories max.

Accessory Structures

1 story max.

Ground Floor Finish Level Above
Grade
Intent
The intent of this address is to create a walkable environment
where Tribal Services, Community Recreation and Cultural
Heritage programs can be located, along with incubator space
for businesses, and some additional housing options for tribal
members.
Description
Uses are organized around a series of courtyards and open
spaces. The Tribal administration, library, heritage museum
and indoor recreation facilities are sited around a common
southern courtyard. The clustering of these uses provides a
central location for tribal activities to occur. A second northern
courtyard provides an address for small cottages around a
common green, with a central common area for residents to
use. All facilities would be oriented toward an improved public
green, suitable for additional community activities and potential
heritage tourism.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Residential

18" min.

Non-Residential

6" max.

Ceiling Height, Ground Floor

10' min.

Ceiling Height, Upper Floor(s)

8' min.

Allowed Frontage Types
Buildings shall be oriented toward the street and sidewalk with
storefront openings that may be covered with awnings, canopies,
or galleries. Frontage along courtyard spaces may include stoops
and porches.
Shopfront, Gallery

See Page 2-2

Stoop, Porch

See Page 2-2

Land Use
Institutional, Service, Commercial, Residential Uses

1-6

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Open Space Standards

Open Space

Street
52 feet R.O.W.

Heritage Museum

Tribal Center Courtyard, with Basketball
Gym/Kitchen depicted behind

Street

40 feet min.

52 feet R.O.W.

Stores/Businesses;
Day Care Facility

Small Cottage buildings arranged around a
Common Courtyard
60 feet min.

A

Teen Center
Street
24 feet R.O.W.

A

Tribal Center Courtyard

Common Courtyard

Section A goes from east to west looking
north. On the east, right hand side, is a
courtyard surrounded by a cluster of small
cottage buildings. The cottage buildings
face on to the common courtyard which
serves as a playground and stormwater
management feature. The western edge of
the courtyard is enclosed by the new two
story tribal office building.
Different services and amenities the tribe
offers are focused onto a common Tribal
Center courtyard.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-7

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Open Space Standards

Parking Lot

Street

Tribal Center Courtyard, with
Heritage Museum depicted behind

Tribal Office, and potential Library

66 feet R.O.W.

40 feet min.

Gymnasium with Basketball Court,
and Community Kitchen facility

Street

Mixed-Use Building,
or Library

52 feet R.O.W.

B

New Street

Tribal Center Courtyard

B

N ew

Opticos Design, Inc.
©2011 Opticos Design, Inc.

S t re e

Integrated Development Standards

t

Section B goes north to south looking
towards the west. On the south, left hand
side, is the open space that faces onto
the existing Cher-Ae Lane and a new
street provides parking and sidewalks.
A proposed new library fronts onto the
new street and onto the Tribal Center
Courtyard.

1-8

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Open Space Standards: Courtyards

Cottage Courtyard
Description
The Cottage Courtyard should provide a central open
space for residents and their families.
Standards
Units lining onto the courtyard shall have their main
entrance oriented to the courtyard, with vehicular access
provided from an alley behind.

A ll

ey

Attached Cottages/
Community Center

A

Cottage Courtyards shall have a minimum dimension of 60
feet in all directions.

Detached
Cottages

A

Cottage Courtyards shall provide spaces for passive
recreation and children's play.

A

Cottage Courtyards may be utilized to integrate
stormwater management features.
Cottage Courtyard

Detached
Cottages

A ll

ey

Tribal Offices/
Teen Services

Pe
Sto dest
C o r mw r i a n
n n at /
ec t er
ion

Tribal Offices/
Services

Tribal Offices/
Services

B
Gynasium/
Recreation

B

Tribal Center Courtyard
Commercial/
Services

Description
The Tribal Center Courtyard should provide a passive,
natural open space where the various functions of the
buildings (recreation, library, cultural) can come together,
and provide an important "front door" for visitors.
Standards
Buildings lining the Tribal Center Courtyard shall have
windows and entrances opening onto the courtyard.

Tribal Center
Courtyard

Museum/
Cultural Center

Tribal Center Courtyards shall have a minimum dimension
of 40 feet in all directions.

B

Tribal Center Courtyards shall provide spaces for
community gathering.

Library
Cultural Archives

Tribal Center Courtyards may be utilized to integrate
stormwater management features.

Gathering Fields

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-9

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Open Space Standards: Bluffs Gathering Fields

Tribal Center Bluffs Gathering Fields
Description
The bluffs around the tribal center provide the opportunity for
informal gathering. New community uses and structures should
be organized in this area, including covered picnic and barbecue
facilities.
In the future, this area may also provide cabins or similar accommodation that can be rented to travelers and guests of the tribe.
These new structures could be built to flexibly serve multiple
functions; for example, a gazebo with prime bluff views could be
used for weddings, or for other social events and gatherings.

Ch

er

-

L
Ae

an

e

Precedent - Picnic/Barbecue pavilion

The tree canopy coverage below and around the informal
gathering area should be maintained. A trail can be provided to
allow for access down to Scenic Drive.
Standards
An informal gathering space with picnic and barbecue facilities.
All parking provided on-street.
Buildings shall be organized to capitalize on views of the ocean
and landscape.

Sc

en

ic

D

riv

e

Precedent - Simple tent cabin accommodation
Hotel/Casino

B lu

ff P

ro

me

na

de

Precedent - cabin accommodation

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-10

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Building Form Standards: Rural Residential

Building Placement
Setbacks
C

B

Rural homes can be placed with a great deal of flexibility,
however they should be located in such a way that their
entrances and principal rooms are oriented towards front yards
and streets. Houses and additions on steep slopes should be
carefully placed in order to minimize excessive grading and
subsequent erosion.
Carriage Houses may be added behind or to the side of new and
existing houses to allow multiple generations to live in proximity.

A
S id
alk
ew
t
ee
Str

Front (From Back of Sidewalk)

10' min. - 25' max.

A

Between Buildings

20' min.

B

Ancillary Structures

5' min.

At Rear of Buildings

10' min.

C

Parking Location and Orientation
Location and Orientation
E

To the maximum extent possible, off-street parking should be
located to the sides and to the rear of houses.

E

Off-street parking and driveways should utilize pervious
materials.

S id

D

alk
ew t
ee
Str

Front Setback

30' min.

Side Street Setback

10' min.

Adjacent to Side or Rear Setback 5' min.

D

E

Building Height and Frontage
Height

Intent
The intent of this address is to allow for the continued use of
these lands for rural residential and complementary uses.

Main/Accessory Dwelling

2 stories max.

F

Ground Floor Finish Level

18" min.

G

Ceiling Height, Ground Floor

8' min.

H

Ceiling Height, Upper Floor(s)

8' min.

I

Allowed Frontage Types

Description

Stoop, Porch

S id

The conceptual plan calls for the residential properties in
these areas to remain in residential use, while streets and open
spaces can be gradually improved to create rain gardens and
stormwater management amenities. Additions, alterations, and
new construction in these areas should be carefully considered
and planned in order to minimize negative impacts on the
environment.

See Page 2-2

alk
ew t
ee
Str

Land Use
Residential, Home Occupation

I
F
G

Street

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

H

Sidewalk

1-11

District Specific Standards: Main Rancheria Parcel and Westhaven Parcel

October 2011

Street Network

Street Network
The Street Network plan delineates the intended street types
to be used on the Main Rancheria Parcel. Standards for the
individual street types can be found in the Streets Standards
Division of this document.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Street Type

ROW Width Key

Page

Existing Street

Varies

Commercial Street

52'-66'

2-4

Residential Street

52'

2-4

Residential Drive

Varies

2-5

Recreational Camping Drive

120'

2-6

Scenic Drive

16' or 24'

2-7

Roundabout

Varies

2-8

Special Roadway - On/Off
Ramps

Varies

1-12

District Specific Standards: Trinidad Pier and Harbor Parcel

October 2011

Trinidad Pier and Harbor Parcel
The pier parcel holds great potential as a tourism destination. Modest improvements,
such as a paved plaza, thoughtful landscaping, and informal food or retail vendors, may
enhance the experience of the harbor and encourage visitors to spend time along the
waterfront. In the long term, the existing restaurant footprint can be rebuilt as a two-story
structure. A new boardwalk may also promote increased use of the beach and provide for
recreational services such as kayaking rentals. Cultural heritage of the Trinidad Rancheria
could be incorporated into the space through design details such as the incorporation of
basket-weaving patterns in the paving of the pier plaza. Over time, the pier program could
also expand to include additional tourist attractions that showcase the rich biological
environment of the bay.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-13

District Specific Standards: Trinidad Pier and Harbor Parcel

October 2011

Building Form Standards

Building Placement
Setbacks (Distance from Property Line/ROW)
Buildings shall face principal public spaces of this address, with
entrances and openings oriented toward the pedestrian plaza.
Garages, storage sheds, and utility rooms should be located
behind or to the sides of principal buildings and accessory
structures, away from these spaces.

Disabled
Parking

Seascape
Restaurant

0' min. - 10' max.

Between Buildings

5' min.

At Rear of Buildings

5' min.

Adjacent to Side or Rear Property Line
Kiosk

Pedestrian Plaza

Service/Delivery Parking

Front

Main Building

5'

Accessory Structure

5'

Parking Location and Orientation
Kiosk

Location and Orientation
Parking shall be provided in the existing parking lot.
Clear pedestrian routes shall be defined leading from parking
areas to principle building destinations.
No less than 10% of parking areas shall be reserved for
landscaping.
Building Height and Frontage
Height

Trinid

2 stories max.

Accessory Structures

1 story max.

Ground Floor Finish Level

18" max.

B

Ceiling Height, Ground Floor

9' min.

C

Intent

Ceiling Height, Upper Floor

8' min.

D

The intent of this address is to allow for small amount of
additional pier and tourism related activities to occur.

Allowed Frontage Types

ad Pie

Main Buildings

r

Buildings shall be oriented toward public spaces and sidewalks
with storefront openings that may be covered with awnings or
canopies.

Description
The conceptual plan calls for a series of additional small
structures that can provide space for retail or food related
services. These small structures would be organized to form
a plaza space adjacent to the existing gift shop and restaurant.
Additional tourism opportunities were explored and include the
option to provide sea kayak rentals adjacent to the restaurant. In
the future, the existing restaurant footprint can be expanded and
improved to a 2-story structure.

A

Shopfront

See Page 2-2

Stoop, Porch

See Page 2-2

Land Use
D

Commercial, Service, Fishery Uses

A
C
B

Pedestrian Plaza

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-14

District Specific Standards: Trinidad Pier and Harbor Parcel

October 2011

Open Space Standards

Pier Boardwalk Plaza
Description
The new plaza for the pier is intended to create a vibrant active
waterfront that can provide visitors and users of the pier with
multiple eating and shopping opportunities. The plaza space floor
can be refinished with a decorative concrete pattern and lined
with benches and potted plants. Trails down to the pier from the
Town of Trinidad should be maintained and upgraded to allow
visitors to easily walk to and from the town.
Standards
Accessory structures shall face onto the plaza.
Vending windows shall face onto the plaza.
Loading and services shall be screened from the plaza.

Beach boardwalk with kayak rentals

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Seascape Restaurant landscape improvements

Integrated Development Standards

New food-oriented retail facilities along plaza

1-15

District Specific Standards: Archer Road Parcel - McKinleyville

October 2011

Ne
wS
t re
et

Pishka

de

s

i
Tr a

l

o
Twe - G

Pe

an
tri

h

Archer Road

Archer Road Parcel - McKinleyville
The Archer Road Parcel offers the Rancheria many opportunities for providing additional
residential units and needed park space and community amenities.
Many of the existing assignees on Archer Road have the potential to build an additional
housing unit without acquiring any further land, based on the ability to provide additional
septic tank and leach field capacity on their current land allotment.
The open field located between Pishka and Twe-Goh may offer additional residential
units with common leachfields and a community park and building to serve the local
neighborhood, while simultaneously maintaining its existing rich wooded character.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-16

District Specific Standards: Archer Road Parcel - McKinleyville

October 2011

Building Form Standards

Building Placement
Setbacks (Distance from Property Line/ROW)
C

B

Rural homes can be placed with a great deal of flexibility,
however they should be located in such a way that their
entrances and principal rooms are oriented towards front yards
and streets. Houses and additions on steep slopes should be
carefully placed in order to minimize excessive grading and
subsequent erosion.
Carriage houses and additional single-family houses may be
added behind or to the side of new and existing houses to allow
multiple generations to live in proximity, where land allotments
and sewer capacity will allow.

A
S id
ew
alk

Str
ee
t

Front (From Back of Sidewalk)

10' min. - 25' max.

A

Between Buildings

20' min.

B

Ancillary Structures

5' min.

At Rear of Buildings

10' min.

C

Adjacent to Side or Rear Property Line

E
E

Main Building

10'

Accessory Structure

5'

Parking Location and Orientation
S id

D

ew

To the maximum extent possible, off-street parking should be
located to the sides and to the rear of houses.

alk

Str
ee

Off-street parking and driveways should utilize pervious
materials.

t

Intent

Front Setback

30' min.

D

Side Street Setback

10' min.

E

Adjacent to Side or Rear
Property Line Setback

5' min.

Building Height and Frontage

The intent of this address is to allow for the continued use of
these lands for residential uses.

Height
Main/Accessory Dwelling

2 stories max.

The conceptual plan calls for the residential properties to remain
in residential use, but where feasible allow for the addition of
accessory dwelling unit for family members to live in. In addition
a new cluster of residential houses is possible between the
two existing cul-de-sacs. These residential houses would be
organized around a common park space and have a series of
common leach fields. A site along Archer Road is reserved to
provide a community space for the neighborhood.

Accessory Structure

1 story max.

Ground Floor Finish Level

18" max.

G

Ceiling Height, Ground Floor

9' min.

H

Ceiling Height, Upper Floor(s)

8' min.

I

S id

Description

F

ew

ee

alk

Str
t

Allowed Frontage Types
Stoop, Porch

See Page 2-2

Land Use
I

Residential, Institutional, Home Occupation Uses

F
G

Street

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Sidewalk

H

1-17

District Specific Standards: Archer Road Parcel - McKinleyville

October 2011

Open Space Standards

Community Green
Description
On the Archer Road site there is the potential to build a new
park and community center. The new spaces can provide
structured youth activities and non-structured recreational
activity for residents.
Standards
Playground shall be provided within the green.
Vehicles shall not park within the green.
Units shall be oriented to the green, with primary entrances and
porches facing to the park.

Community
Leach Field

Community Center
Description
The Community Center can provide some indoor and outdoor
activities for the tribe, including a half basketball court. A trail
or sidewalk should connect the community center to the two
neighboring Pishka and Twe-Goh Court.
Standards
Main entry shall face on to the new entry street.
An 8' wide trail or sidewalk shall connect the new street to
Twe-Goh Court.
Community
Green

Community Leach Fields
Ne
wS

Description

t re
et

New assignments should be designed to take advantage of the
proposed common leach fields.

Playground

Pe d

est

r

i
Tr a
ian

lt

we
oT

-G

o

Standards
Leach Fields shall be located as illustrated.
Stream Buffer and Steep Slopes
Description
In order to improve water quality and prevent flooding and
erosion, a stream buffer should be maintained.
Standards

1/2 Basketball
Court
Community
Leach Field

Community
Leach Field

New development shall be set back 50' minimum from the
centerline of the creek.
New development and/or site improvements shall avoid steep
slopes of 30% or greater.

Community Center

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

1-18

District Specific Standards: Archer Road Parcel - McKinleyville

October 2011

Street Network

Street Network
The Street Network plan delineates the intended street types to
be used on the Archer Road - McKinleyville Parcel. Standards for
the individual street types can be found in the Streets Standards
Division of this document.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Street Type

ROW Width

Key

Page

Existing Street

varies

Residential Street

52'

See Page 2-5

Green Street

40'

See Page 2-5

1-19

October 2011

General Standards
The following standards are applicable to all future development within the Rancheria
properties. These include standards for frontages, streets and thoroughfares, water
resource management, stormwater, and tree protection.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-1

General Standards: Frontage Standards

October 2011

Frontage Standards
The following standards provide the basic dimension standards for the way in which
buildings shall front onto streets and sidewalks. These standards are meant to work
in conjunction with the standards from those found in the District Specific Standards
Chapter.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-2

General Standards: Frontage Standards

October 2011

Allowed Frontages

1. Stoop

2. Porch

3. Shopfront

4. Gallery

B

C
C

D
C

D

C

D

B

D
A

B

B
Setback

ROW

Setback

Street

ROW

BTL, ROW

Street

Street

BTL, ROW

Street

A
E

A

A

A

B

E

F
E

B
Setback

Key

ROW

ROW / Property Line

Street

Setback

Key

Setback Line

ROW

ROW / Property Line

BTL, ROW

Street

Key

Setback Line

Street

ROW / Property Line

BTL, ROW

Key

Setback Line

Street

ROW / Property Line

Setback Line

Description

Description

Description

Description

Stoop: The main facade of the building is near the frontage
line and the stoop shall be elevated above the sidewalk to
ensure privacy within the building. This type is appropriate for
residential uses with small setbacks.

Porch: The main facade of the building is setback from sidewalk
or road. The resulting front yard is typically very small and can
be defined by a fence or hedge to spatially maintain the edge of
the street.

Shopfront: The main facade of the building is at or near the
frontage line with an at-grade entrance along the public way. This
type is intended for retail use. It has substantial glazing at the
sidewalk level and may include an awning that may overlap the
sidewalk. It may be used in conjunction with other frontage types.

Size

Size

Size

Gallery: The gallery element overlaps the sidewalk. This type
is intended for buildings with ground-floor commercial uses and
may be one or two stories. The gallery should extend far enough
from the building to provide adequate protection and circulation
for pedestrians and extend close enough to the curb so that a
pedestrian cannot bypass it.
Size

Width, Clear

5' min.; 8' max.

A

Width, Clear

10' min.

A

Distance between Glazing

2' max.

Depth, Clear

5' min.; 8' max.

B

Depth, Clear

7' min.

B

Ground Floor Transparency

75% min.

Depth, Clear

8' min.

A

Height, Clear

7' min.

C

Height, Clear

7' min.

C

Depth of Recessed Entries

5' max.

Ground Floor Height, Clear

11' min.

B

Height

1 story max.

Height

2 stories max.

Upper Floor Height, Clear

9' min.

C

Finish Level above Sidewalk

12" min.

Finish Level above Sidewalk

12" min.

D

Depth

4' min.

B

Height

2 stories max.

D

Miscellaneous

Furniture Area, Clear

4' x 6' min.

E

Setback from Curb

2' min.

C

Setback from Curb

2' min.; 3' max.

E

Stairs may be perpendicular or parallel to the building facade.

Path of Travel

3' wide min.

F

Height, Clear

8' min.

D

Miscellaneous

Ramps shall be parallel to facade or along the side of the building.

Miscellaneous

Miscellaneous

The entry door shall be covered or recessed to provide shelter
from the elements.

Porches are open on three sides and must have a roof.

Residential windows shall not be used.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

D

Integrated Development Standards

A

Awning

Operable and open-ended awnings are encouraged.

Upper-story galleries facing the street must not be used to meet
primary circulation requirements.
Galleries must have a consistent depth along a frontage.
Gallery must project over a sidewalk.

2-3

General Standards: Street Standards

October 2011

Street Standards
The intent of this section is to provide a catalog of street assemblies that are appropriate
to use within on the Rancheria holdings. Street assemblies are suitable for use in new
developments, as well as the retrofit of existing locations. The street assemblies are
organized into classifications, including Main Streets, Residential Streets, and Special
Streets.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-4

General Standards: Street Standards

October 2011

Neighborhood Main Street Types

I. 66' Neighborhood Main Street

2. 52' Neighborhood Main Street

1. 66' Neighborhood Main Street
Application
Design Speed

20 mph

Pedestrian Crossing Time

9 seconds

Overall Widths
Right-of-Way (ROW) Width

66'

Pavement Width

22'

Lanes
Traffic Lanes

2 @ 11'

Parking Lanes

2 @ 14', marked

Edges
Drainage Collection Type

curb and gutter

Planter Type

trees in bulb-outs

Landscape Type

trees at 30' o.c. avg.

Walkway Type

5' sidewalk

Curb Type

square

Intersection
Curb Radius

10' max.

2. 52' Neighborhood Main Street
Application
Design Speed

20 mph

Pedestrian Crossing Time

5.5 seconds

Overall Widths
Right-of-Way (ROW) Width

52'

Pavement Width

22'

Lanes
Traffic Lanes

2 @ 11'

Parking Lanes

2 @ 7', marked

Edges
Drainage Collection Type

curb and gutter

Planter Type

trees in bulb-outs

Landscape Type

trees at 30' o.c. avg.

Walkway Type

8' sidewalk

Curb Type

Square

Intersection
Curb Radius

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

10' max.

2-5

General Standards: Street Standards

October 2011

Residential Street Types

4. 40' Residential Street

3. 52' Residential Street

3. 52' Residential Street
Application
Design Speed

20 mph

Pedestrian Crossing Time

5 seconds

Overall Widths
Right-of-Way (ROW) Width

52'

Pavement Width

20'

Lanes
Traffic Lanes

2 @ 1'

Parking Lanes

8' min. pervious surface

Edges
Drainage Collection Type

gutter pan

Planter Type

trees in cont. planter

Landscape Type

trees at 50' o.c. avg.

Walkway Type

5' min. sidewalk

Curb Type

none

Intersection
Curb Radius

10' max.

4. 40' Residential Green Street
Application
Design Speed

20 mph

Pedestrian Crossing Time

4 seconds

Overall Widths
Right-of-Way (ROW) Width

40'

Pavement Width

20'

Lanes
Traffic Lanes

varies

Parking Lanes

8' min. pervious surface

Edges
Drainage Collection Type

varies

Planter Type

trees in cont. planter

Landscape Type

trees at 50' o.c. avg.

Walkway Type

5' mn. sidewalk

Curb Type

none

Intersection
Curb Radius

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

10' max.

2-6

General Standards: Street Standards

October 2011

Special Street Types

5. Rural Residential Drive

6. 120' Recreational Camping Drive

5. Rural Residential Drive
Application
Design Speed

20 mph

Pedestrian Crossing Time

9 seconds

Overall Widths
Right-of-Way (ROW) Width

varies

Pavement Width

12' min.

Lanes
Traffic Lanes

1 @ 12' min. shared

Parking Lanes

none

Edges
Drainage Collection Type

swale

Planter Type

none

Landscape Type

none

Walkway Type

none

Curb Type

none

Intersection
Curb Radius

n/a

6. 120' Recreational Camping Drive
Application
Design Speed

20 mph

Pedestrian Crossing Time

9 seconds

Overall Widths
Right-of-Way (ROW) Width

66'

Pavement Width

22'

Lanes
Traffic Lanes

2 @ 10'

Parking Lanes

2 @ 14', marked

Edges
Drainage Collection Type

swale

Planter Type

none

Landscape Type

none

Walkway Type

none

Curb Type

none

Intersection
Curb Radius

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

none

2-7

General Standards: Street Standards

October 2011

Special Street Types

7. 16' Scenic Drive

8. 24' Scenic Drive

7. 16' Scenic Drive
Application
Design Speed

15 mph

Pedestrian Crossing Time

4 seconds

Overall Widths
Right-of-Way (ROW) Width

52'

Pavement Width

16'

Lanes
Traffic Lanes

1 @ 10', shared

Parking Lanes

none

Edges
Drainage Collection Type

swale

Planter Type

none

Landscape Type

none

Walkway Type

5' painted sidewalk

Curb Type

none

Intersection
Curb Radius

none

8. 24' Scenic Drive
Application
Design Speed

15 mph

Pedestrian Crossing Time

6 seconds

Overall Widths
Right-of-Way (ROW) Width

66'

Pavement Width

24'

Lanes
Traffic Lanes

1 @ 12', shared

Parking Lanes

none

Edges
Drainage Collection Type

swale

Planter Type

none

Landscape Type

trees at 30' o.c. avg.

Walkway Type

5' painted sidewalk

Curb Type

none

Intersection
Curb Radius

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

none

2-8

General Standards: Street Standards

October 2011

Roundabout

9. Single Lane Roundabout

9. Single Lane Roundabout
Application
Design Speed

Slow

Overall Widths
Right-of-Way (ROW) Width

180' inscribed diameter typ.
80' width typ.

Curb Face to Face Width

115' typ.

Lanes
Traffic Lanes (within circle)

20'

Entry Lane/Radius

16' / 45° R

Exit Lane/Radius

18'/ 65° R

Central Island

75' diameter typ.

Apron (mountable)

10'

Miscellaneous

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Splitter Island

varies

Planting Strip

varies

Pedestrian Crossing

10' typ.

Sidewalks

5' min.

2-9

General Standards: Water Resources

October 2011

Water Resources
This section provides goals, policies, and standards for domestic water, wastewater,
and rainwater capture. This section also provides best practice practices (BMPs) for
stormwater management, and stormwater management plans for each of the Rancheria
parcels.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-10

General Standards: Water Resources

October 2011

Existing Conditions and Potential

Domestic Water Existing Conditions

Water Resource Site Development Goal and Strategies

Water Resource Management Standards

The Trinidad Rancheria’s main parcel and the Westhaven parcel
are currently provided domestic water by the City of Trinidad. As
a policy, the City charges high rates for users who are outside of
the city limits, such as the Rancheria. Consequently, the Rancheria
incurs relatively high water costs when compared to similar local
users. The Archer Road parcel is connected to McKinleyville’s
domestic water system; this connection appears to be functioning
properly and in good repair.

Goal:

Water Supply Standards

Remove dependency on City of Trinidad water supplies through
a variety of alternative water resources and ultimately become a
water provider to the City.

All new construction on the main Rancheria parcel should install
rainwater harvesting systems and storage in order to utilize
rainwater for non-potable domestic and irrigation uses.

Strategies:

All new construction on the main Rancheria parcel should reuse
gray water on site for irrigation purposes at a minimum, during
summer months.

The casino, located on the main parcel, has a water storage tank
on site with a capacity of approximately 150,000 gallons. This tank
serves as fire storage and domestic surplus to offset peak demand
within the casino.
Wastewater Existing Conditions
The main parcel currently has a membrane bioreactor (MBR)
wastewater treatment system that treats approximately 60-70%
of the parcel’s wastewater. Recycled water from this plant has
been reused for toilet flushing within the casino since 1999. The
remaining 30-40% of the parcel’s wastewater flow goes to two
community leach fields. The Westhaven parcel has two community
leach fields, one of which requires effluent to be pumped to it. On
the Archer Road parcel, there is one community leach field and an
undetermined number of separate individual septic systems. Many
of these various septic systems are in need of repair or replacement
and are leaking; at the tanks and/or the leach field. This has led
to current contamination issues caused by wastewater flowing
directly into streams. Although not independently verified, it was
reported that the leakage has also caused instability of the bluffs on
the main parcel.
Water Resource Inventory
Humboldt County receives a great deal of rainfall every year, with
the highest concentration occurring along the coast. The City of
Trinidad in particular receives an average of about 38 inches per
year. This rainfall represents an untapped resource that if captured
can begin to decrease the Rancheria’s dependence on City water
and increase the sustainability of the site itself. The region presents
a favorable application for rainwater capture because rain falls year
round, allowing for a reduction in storage volume as compared to
the typical climates farther south in California.

• Explore the suitability of the aquifer to support wells for the
Rancheria by drilling test wells and analyzing the production
capability of the aquifer.
• Utilize rainwater for non-potable domestic and irrigation
uses with the installation of rainwater harvesting systems and
storage.
• Reuse gray water on site for irrigation purposes during summer
months.

Wastewater Management Standards
All new construction on the main Rancheria parcel should send
wastewater to the wastewater treatment plant serving the
casino. Package Treatment Plants should be utilized to handle
additional treatment as needed.
All existing rural residential lots should be connected to the
centralized wastewater treatment plant.
The Westhaven Parcel should implement a Septic Tank Effluent
Pumping (STEP) system and build a connection to the Main
Parcel in order to send wastewater to the wastewater treatment
plant.

Goal:
Rectify wastewater flows to remove pollution to bluffs and streams
and consolidate flows on main parcel to centralized wastewater
treatment system.

All septic systems on Archer Road should be in fully functioning
condition. New land allotments shall be provided new leach
fields prior to new development.

Strategies:
• New construction on the main parcel should send wastewater to
the wastewater treatment plant serving the casino. Expand with
package treatment plants as necessary.
• Connect existing rural residential lots to the centralized
wastewater treatment plant that are not already connected.
• Utilize septic tank effluent pumping (STEP) system on the
Westhaven parcel and build connection to main parcel to send
wastewater to wastewater treatment plant.
• Repair and maintain septic systems on Archer Road parcel and
build new leach fields for new assignments.

7.00

6.00

5.00

4.00

MonthlyR
TotalMon
3.00

2.00

1.00

0.00
Jan

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2-11

General Standards: Water Resources

October 2011

Rainwater Capture Scenario

Rainwater Capture Scenario

WATER BALANCE CALCULATIONS
Trinidad Rancheria - California

By retrofitting the existing casino and tribal offices to capture
rainwater from their respective roofs and installing water storage
cisterns, the Rancheria can significantly offset City water imports.
Using the existing casino roof for catchment, a rainwater collection
system with a 170,000 gallon cistern for storage would be adequate
to meet the entirety of the casino’s water demands. Treatment,
including filtration and disinfection, would be necessary to achieve
potable water quality. Similarly, a 20,000 gallon cistern installed
at the tribal offices to store water collected from the roofs would
be adequate to serve all of the interior water demands. At an
estimated cost of $240,000, and, based on water bills from the
summer of 2010, the payback period for the Rancheria would be
about 29 years.

Calculations by Amy Kam
1-Apr-11

Based on:
1) Average long-term monthly rainfall totals provided by local National Weather Service stations for the 2010 water year.
2) Evapotranspiration (ETo) data provided by local California Irrigation Management and Information Systems (CIMIS) Reference Eto Zones (2010).
3) Rainwater harvested from:
68,935 sf of roof with collection efficiency of
85%
4) Building footprints estimated from aerial photos.
Casino
Tribal Offices
TOTAL

55,000 sf
26,100 sf
81,100 sf

Monthly Rainfall Totals (in):

Feb
5.51

Mar
5.55

Apr
2.91

May
1.62

Jun
0.65

Jul
0.16

Aug
0.38

Sep
0.86

Oct
2.36

Nov
5.78

Dec
6.35

Total
38.10

Mar
62,822

Apr
60,795

May
62,822

Jun
60,795

Jul
62,822

Aug
62,822

Sep
60,795

Oct
62,822

Nov
60,795

Dec
62,822

Total
739,674

TOTAL DOMESTIC DEMAND

In addition to this large-scale rainwater capture scenario,
individual residences can collect rainwater for use in irrigation.
Single-home rainwater capture system vary in complexity
from systems that include cisterns and use rainwater inside the
home to systems as simple as a rain barrel connected to the roof
downspouts. Either way, the utilization of a resource as plentiful
as rainwater will reduce the dependence on Trinidad’s municipal
water supply.

Jan
Feb
62,822
56,742
D
Days
(8/22 - 9/29)
Casino
Tribal Offices (north & south)
TOTAL

Total:

39
8,830 cf
1,736 cf
10,566 cf

66,048 gal
12,985 gal
79,034 gal

1,694 gpd
333 gpd
2,027 gpd

Domestic water use based on September 2010 City of Trinidad
Water Department customer bills.

RAINWATER CAPTURED
Casino
Rainwater Capture (cf):
(gal):
Rainwater in Cistern- Beginning of Month (gal):
Rainwater Used for Domestic Demand (gal):
Deficit (gal)
Rainwater Used for Irrigation (gal):
Controlled Releases (gal):
Rainwater in Cistern- End of Month (gal):

Casino Cistern Water Balance

Jan
5.97

Tribal Offices Cistern Water Balance

180,000

90,000

160,000

80,000

140,000

70,000

120,000

60,000

100,000

50,000

Jun
2,532
18,942
164,708
50,806
-31,865
0
0
132,843

Jul
0
0
132,843
52,500
-52,500
0
0
80,343

Aug
1,480
11,074
80,343
52,500
-41,426
0
0
38,917

Sep
3,350
25,061
38,917
50,806
-25,745
0
0
13,171

Oct
9,194
68,772
13,171
52,500

Nov
22,518
168,434
29,444
50,806

Dec
24,739
185,044
147,071
52,500

0
33,993
170,000

May
6,311
47,208
170,000
52,500
-5,292
0
0
164,708

0
0
29,444

0
0
147,071

0
109,616
170,000

Mar
10,261
76,749
20,000
10,322

Apr
5,380
40,241
20,000
9,989

May
2,995
22,402
20,000
10,322

Nov
10,686
79,930
20,000
9,989

Dec
11,740
87,812
20,000
10,322

0
12,081
20,000

Aug
703
5,255
8,678
10,322
-5,067
0
0
3,612

Oct
4,363
32,636
5,516
10,322

0
30,253
20,000

Jul
0
0
19,000
10,322
-10,322
0
0
8,678

Sep
1,590
11,893
3,612
9,989

0
66,427
20,000

Jun
1,202
8,989
20,000
9,989
-1,000
0
0
19,000

0
0
5,516

0
7,830
20,000

0
69,941
20,000

0
77,490
20,000

Jan
23,258
173,971
147,071
52,500

Feb
21,466
160,566
170,000
47,419

Mar
21,622
161,732
170,000
52,500

Apr
11,337
84,800
170,000
50,806

0
98,542
170,000

0
113,147
170,000

0
109,232
170,000

Jan
11,037
82,557
20,000
10,322

Feb
10,187
76,196
20,000
9,323

0
72,235
20,000

0
66,873
20,000

Total
147,808
1,105,603
-618,145
156,829
0
464,529
---

Tribal Offices
Rainwater Capture (cf):
(gal):
Rainwater in Cistern- Beginning of Month (gal):
Rainwater Used for Domestic Demand (gal):
Deficit (gal)
Rainwater Used for Irrigation (gal):
Controlled Releases (gal):
Rainwater in Cistern- End of Month (gal):

Total
70,142
524,659
-121,529
16,388
0
403,130
---

GALLONS

GALLONS

Water_Balance.xls

40,000

80,000

CISTERN LIFE CYCLE ANALYSIS
Trinidad Rancheria - California

Calculations by Amy Kam; Michael Amodeo
1-Apr-11

CASINO & OFFICES

REQUIRED
CISTERN
STORAGE

40,000

Based on:

REQUIRED
CISTERN
STORAGE

20,000

10,000

20,000

0

0

Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Rainwater Capture (gal)

Rainwater Capture (gal)

Rainwater Used for Domestic
Demand (gal):

Rainwater Used for Domestic
Demand (gal):

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Minimum
Required Storage (gal)

4/1/2011

39-Day Water Use

Cost ($)
$576.06

Annual Water Use

$5,391.33

Cistern Cost (170,000 gal)
Cistern Cost (20,000 gal)
Treatment Cost
Total Cost

$170,000.00
$20,000.00
$50,000.00
$240,000.00

Rate of Inflation

3.0%

Years to Recover Cistern Cost

29

30,000

60,000

Minimum
Required Storage (gal)

1) Cistern / storage tanks assumed to cost:
2) Water use charges computed using 2010 rates for 8/22 to 9/29:
Use (ccf)
Casino
8,830
Offices
1,736
0
Landscaping
TOTAL

$1.00 /gal
Use (gal)
66,048
12,985
0

Cost ($)
$375.72
$147.91
$52.43
$576.06

Cost ($/gal)
$0.006
$0.011

2-12

General Standards: Water Resources

October 2011

Stormwater
Existing Conditions
The Rancheria experiences significant non-point source (NPS) pollution, as detailed in the
Trinidad Rancheria Environmental Plan, August 2008. Sediments and other pollutants
such as oils, heavy metals, and toxic chemicals are picked up by stormwater flowing across
roads and parking areas. In many cases, this water flows directly into streams that lead
into the ocean, detrimentally impacting the water ecology. The main Rancheria parcel is
within the watershed of McConnahas Mill Creek, and the McKinleyville parcel is within
the watershed of Duke Creek. The Rancheria has no official requirements for stormwater
management, but tribal interest in sustainable stormwater management has lead to recent
projects to manage stormwater through decentralized treatment.
Low Impact Development (LID) Elements and Methods
3HUPHDEOH
3DYHPHQW

&XUE&XWV
)ORZWKURXJK
3DUNLQJ/DQH3ODQWHU

,QÀOWUDWLRQ3ODQWHU
2YHUÁRZ&RQQHFWLRQ

,QÀOWUDWLRQ3ODQWHU
ZLWK&XUE&XWV

LID stormwater features can also be easily incorporated into the street
sections. The figures on the following pages illustrate the use of planters
within the street section to treat stormwater both qualitatively and
quantitatively. Permeable paving in the parking areas can also decrease the
runoff leaving the site while replenishing the groundwater table.

Rainwater is often considered a waste product and nuisance; therefore, traditional
strategies have targeted removing runoff from a site as quickly as possible. Within
developed areas, impervious surfaces such as streets, sidewalks, driveways, parking lots,
and buildings prevent stormwater from infiltrating into the ground, so the rate and total
volume of runoff is increased over natural conditions. These flows are collected into
storm drain infrastructure that often cannot handle peak flows; converting what would
otherwise be dispersed, minor flooding into concentrated pockets of intense major
flooding when they overflow.
Although it is possible to address storm drain deficiencies through traditional methods,
an alternative approach involves treating rainwater as a resource, facilitating a return to
sustainable, more natural conditions. Low Impact Designs (LID) attempt to mimic the
natural hydrologic process by allowing rainfall to slowly infiltrate into plants and soils
near where it falls, rather than immediately routing it into storm drains. This process of
slowing and absorbing not only reduces the burden on storm drains and downstream
discharge points (thereby addressing both existing and future capacity constraints), but
improves the quality of runoff by filtering out many of the pollutants it picks up when
flowing across paved surfaces. This can help reduce the concentration of pollutants within
the Rancheria’s creeks, and also improve the quality of water discharged to the Pacific
Ocean. Localized infiltration could also increase percolation into and recharge of the
aquifer that underlies the Rancheria and could potentially serve as a significant water
source. The magnitude of this particular benefit would have to be confirmed through
groundwater studies, though. Appropriate LID techniques and mitigation measures
designed to increase control of stormwater at the source, and which are suitable for
implementation in the Rancheria parcels, are presented in the following sections.
Site Development Goal and Strategies
Goal:
Improve quality and decrease quantity of stormwater flow off site and into creeks and
ocean.
Strategies:
• Infiltrate stormwater close to where it falls to reduce the need for pipes and
infrastructure.
• Decentralize off-site flows to reduce erosion to bluffs and creek banks.
• Collect rainwater from rooftops to use as alternative water source.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-13

General Standards: Water Resources

$

October 2011

$

5XQQHO7KURXJK
3DUNLQJ$UHD

Swale

*UDYHO(QHUJ\
'LVVLSDWRU
6ZDOH:LGHQV
DW3ODQWHG$UHDV
B

B
'UDLQ,QOHWV

Swale

:LGHQVDW
3ODQWHG$UHD

6WRUP'UDLQ

2YHUÁRZWR
/DQGVFDSH

5DLQ*DUGHQ

$$

BB

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-14

General Standards: Water Resources

October 2011

Stormwater Management Types

Stormwater Management Types

Stormwater Management Types (continued)

Vegetated Swale

Community Swale

Vegetated swales are shallow drainage ways that employ
landscaping to stabilize the soil while providing water quality
treatment via biofiltration. They are designed to remove silt
and sediment associated pollutants before discharging to storm
sewers and to reduce volume if soils allow for infiltration. The
treatment area can be planted in a variety of grasses, sedges
and rushes, while the side slopes can be planted with shrubs
and groundcover. Check dams are added to aid infiltration.

Community swales are similar in size to a natural swale, but
more linear in design to conform to the adjacent development
zones (i.e. walkways, roadways, and buildings).

Pervious Paving

Urban Channel

Pervious paving systems allow water to pass freely through
the interstitial space ingrained throughout the paving matrix,
thereby transforming traditionally impervious surfaces. Several
examples are pervious concrete and asphalt, interlocking
pavers, and reinforced gravel and grass paving.

Urban channels are narrow vegetated or stone lined
conveyances framed by vertical stone or concrete banks
abutting cultivated landscapes or hardscapes.

Rain Gardens

Level Spreader

Rain gardens are flat-bottomed landscaped depressions that can
be built to any size or shape. Also known as 'bioretention cells',
they are designed to allow water to settle and infiltrate into
the soil. They reduce the peak discharge rate from a site via
detention. Water quality improvements are achieved through
particle settling, nutrient uptake, and filtration as water soaks
into the ground.

Level spreaders are structures that are designed to uniformly
distribute concentrated flow over a large area to mimic natural
sheet flow. Concentrated flow enters the spreader through a
pipe, ditch or swale; the flow is retarded, energy is dissipated;
the flow is distributed throughout a long linear shallow trench
or behind a low berm; water then flows over the berm/ditch
uniformly (in theory) along the entire length.

Flow Through Planters

Cisterns

Flow-through planters are landscape features that also provide
stormwater runoff control and treatment. Flow-through
planters are sealed on all sides and fitted with an underdrain.
They only absorb as much water as soil and plants in the
planter can accommodate. Once the planter is at capacity,
water is then discharged through the underdrain. They are
ideal for receiving roof runoff from downspouts and can be
incorporated into foundation walls.

Cisterns function similar to rain barrels by collected
stormwater and storing it for reuse, but on a much larger scale.
Cisterns can be stored above ground, buried below ground,
or located inside of buildings. They typically store rainwater
for reuse in irrigation, mechanical uses, toilet flushing, and fire
prevention.

Naturalized Channel
A natural channel is a meandering, vegetated watercourse with
natural banks. It is buffered from development zones by large
uncultivated landscape.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-15

General Standards: Water Resources

October 2011

Main Rancheria Parcel

Detention for
Highway Runoff
Level Spreader or
Rain Garden

Swales

Stormwater Feature

Planters

Permeable Paving

Level Spreader
Retrofit Opportunity #1
Swale with Cascading Checkdams

Exis
tin
gP
ere
nn
ial

5HWURÀW2SSRUWXQLW\
5DLQ*DUGHQ

am
re
St

Retrofit Opportunity #3
Green Parking Lot

5DLQ*DUGHQ

Rain Garden
Rain Garden

Main Rancheria Parcel
The main parcel includes a large amount of impervious surfaces, due to the buildings,
roads, and parking areas. Utilizing a network of linked LID strategies will filter the
pollutants from the driving surfaces and reduce the stormwater volumes and flows and
associated to McConnahas Mill Creek. The illustrations on this page show a stormwater
master plan based on the proposed development of the site. Planters in and among
the parking areas can serve as rain gardens and infiltration planters to reduce off-site
stormwater flows. Overflows will travel through pipes to other infiltration areas. A
network of swales would also pick up runoff from around the site and convey it towards
rain gardens. Lastly, all flows leaving the site at the tops of the hills will pass through level
spreaders to decentralize the flow and reduce the risk of erosion.
Further study may be needed where stormwater tools are used in areas with high soil
instability.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-16

General Standards: Water Resources

October 2011

Stormwater Management Precedents

Existing drainage along Cher-Ae Lane

A cascading flow-through planter could be implemented
along Cher-Ae Lane

Existing drainage in Casino parking lot

Flow-through planters

The introduction of a swale with weirs or check dams along Cher-Ae Lane can slow stormwater down and remove sediments that are
currently entering the storm drain inlet at Scenic Drive.

The existing casino parking lot offers excess pavement that can be broken up with the introduction of planters that can treat stormwater
through infiltration and pollutant removal.

Existing drainage in Casino parking lot

Westhaven Drive Parcel: Existing

Flow-through planters

Construction of a rain garden surrounding the existing drain inlet in Ma-We-More Lane would address ponding experienced along the curb
line and reduce sediments entering the drain inlet.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Rain garden design for Westhaven Drive

Sedimentation at the end of Teh-Pah Lane suggests that a rain garden could improve the stormwater collection and treatment of the road
while also providing a site amenity.

2-17

General Standards: Water Resources

October 2011

Archer Road Parcel

/HYHO6SUHDGHU
5HWURÀW2SSRUWXQLW\
5DLQ*DUGHQDW'UDLQ,QOHW
/HYHO6SUHDGHU
3LSHG2YHUÁRZ
IURP5DLQ*DUGHQ
5DLQ*DUGHQ

Swale

5DLQ*DUGHQ

ale

Sw

Caption
Archer Road Parcel
A stormwater management plan has been created for the Archer Road parcel similar to the
main parcel (above). Roadside swales will collect runoff from roads and convey it to rain
gardens and the downhill sides of the roads. These rain gardens will have piped overflows
that transmit stormwater from large events to level spreaders above the steep hillsides.
The level spreaders will decentralize flows as stormwater enters the creeks separating the
communities. Further study may be need where stormwater tools are used in areas with
high soil instability.

Existing drainage

Rain garden precedent

The existing drain inlet at the cul de sac of Twe-Goh Court could be improved with a rain garden that would treat the runoff from the street
before allowing overflows off site.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-18

General Standards: Water Resources

October 2011

Stormwater Management Precedents

Flow-through planters along a street

Flow-through planters along a street

Flow-through planter in a parking lot

Rain garden

1.

2.

3.

4.

Infiltration Planters

Flow Through Planters

Green Parking Lot Rain Garden

Detention Area

Infiltration planters reduce stormwater volumes flowing into the
storm drain systems by infiltrating water into the groundwater table.

Flow through planters remove pollutants from street runoff and
reduce peak flows to storm drain systems by slowing down flows.

Planters incorporated into parking lots can remove toxins
accumulated from oils on paving surfaces.

Rain gardens and other planted detention areas provide stormwater
management for both quality and quantity. These can be
incorporated in sites with large vegetated areas, such as at the edges
of parking lots.

Permeable pavers in parking lot

Flow-through planter along a street

Cascading flow-through planter along roadway

Cascading flow-through planter along roadway

5.

6.

7.

8.

Permeable Pavement

Permeable pavement is an aesthetic solution to stormwater that
reduces runoff by infiltrating water into the ground or through
subsurface storage.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Rain Garden

Swales and rain gardens can be incorporated as plantings within
street sections to manage stormwater volumes and quality.

Integrated Development Standards

Swale with Weirs

Various types of weirs or check dams can be applied along steep
roads to slow down stormwater for treatment.

Swale with Weirs

Various types of weirs or check dams can be applied along steep
roads to slow down stormwater for treatment.

2-19

October 2011

Lighting Standards
Adapted from the International Dark-Sky Association’s Simple Guidelines for Lighting
Regulations for Small Communities, Urban Neighborhoods, and Subdivisions
The purpose of the regulation is to:
• Permit reasonable uses of outdoor lighting for nighttime safety, utility, security, and
enjoyment while preserving the ambiance of the night;
• Curtail and reverse any degradation of the nighttime visual environment and the night
sky;
• Minimize glare and obtrusive light by limiting outdoor lighting that is misdirected,
excessive, or unnecessary;
• Conserve energy and resources to the greatest extent possible;
• Help protect the natural environment from the damaging effects of night lighting.
All outdoor lighting fixtures (luminaires) shall be installed in conformance with these
Regulations and with the provisions of the Building Code, the Electrical Code, and the
Sign Code, as applicable and under permit and inspection, if such is required.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-20

General Standards: Lighting Standards

October 2011

Maximum Lamp Wattage and Required Luminaire or Lamp Shielding:
All lighting installations shall be designed and installed to be fully shielded (full cutoff),
except as in exceptions below, and shall have a maximum lamp wattage of 250 watts HID
(or lumen equivalent) for commercial lighting, 100 watts incandescent, and 26 watts
compact fluorescent for residential lighting (or approximately 1,600 lumens). In rural
residential areas, light should be shielded such that the lamp itself or the lamp image is not
directly visible from the street.
Lighting that is exempt from these regulations:
1.

Lighting in swimming pools and other water features governed by Article 680 of the
National Electrical Code.

2.

Exit signs and other illumination required by building codes.

3.

Lighting for stairs and ramps, as required by the building code.

4.

Signs are regulated by the sign code, but all sign lighting is recommended to be fully
shielded.

5.

Holiday and temporary lighting (less than thirty days use in any one year).

6.

Football, baseball, and softball field lighting; only with permit from the authority
recognizing that steps have been taken to minimize glare and light trespass, and
utilize sensible curfews.

7.

Low voltage landscape lighting, but such lighting should be shielded in such a way as
to eliminate glare and light trespass.

Additional requirements:
1.

Lighting attached to single-family home structures should not exceed the height of the
eave.

2.

Residential pole height restrictions can be considered to control light trespass on
adjacent properties and/or to nearby structures.

General Guidelines:
1.

The general belief that more light means better safety and security is just a myth. All
that is needed is the right amount, in the right place, at the right time. More light just
means wasted light and energy.

2.

Use the lowest wattage of lamp as possible. For cost saving purposes, consider
compact fluorescent lamps rather than incandescent, as they use much less energy
and have a much longer lifetime.

3.

Specify and use fixtures that carry approval of the International Dark Sky
Association.

4.

Whenever possible, turn off the lights.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Example of the type of light fixtures that would be appropriate for the Rancheria.
Image courtesy of Phillips Lumec

2-21

October 2011

Tree Protection Standards
Every effort should be made to protect Heritage Trees on Rancheria lands. Removal of
Heritage Trees should occur only as emergency removal when trees pose an immediate
danger to life, limb, or property due to an accident or a storm or other act of nature.
Removal of Heritage Trees is subject to a Tree Removal Permit.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-22

General Standards: Tree Protection Standards

October 2011

Tree Protection Standards

Protection of Trees During Construction

5.

The objective of this section is to reduce the negative impacts of construction on trees.
The tree protection regulations are intended to guide a construction project to insure that
appropriate practices will be implemented in the field to eliminate or mitigate undesirable
consequences that may result from construction activities. Typical negative impacts that
occur during construction may include:

Protective Tree Fencing for Heritage Trees. Fenced enclosures shall be erected
around trees to be protected to establish the Tree Protection Zone (TPZ) in which no
soil disturbance is permitted and activities are restricted.
1.

· Mechanical injury to roots, trunk or branches
· Compaction of soil, which degrades the functioning roots, inhibits the development of
new ones and restricts drainage
· Changes in existing grade which can cut or suffocate roots
· Alteration of the water table - either raising or lowering

Size and type of fence. All trees to be preserved shall be protected with 6 foot
high, minimum 12 gauge chain link fence. Fences are to be mounted on 2-inch
diameter galvanized iron posts, driven into the ground to a depth of at least
2-feet at no more than 10-foot spacing (See detail, Appendix III). This detail shall
appear on grading, demolition and building permit plans.

2.

Duration. Tree fencing shall be erected before any demolition, grading or
construction begins and remain in place until the Town Arborist approves the
removal.

3.

"Warning" Sign. A warning sign shall be prominently displayed on each fence.
The signs are available at the Rancheria.

· Sterile soil conditions associated with stripping off topsoil

Tree Protection Zone (TPZ)

Tree Protection and Preservation Plan

Each Heritage Tree to be protected, shall have a designated TPZ identifying the area
sufficiently large enough to protect the tree and roots from disturbance. The TPZ area
can be determined by the formula: one foot per inch of diameter. For example a 20”
diameter tree shall have a 20’ radius from the perimeter of the trunk or a 20 foot TPZ. Any
deviation in determining the TPZ will require approval by Rancheria Staff.

Prior to commencement of a development project, a Tree Protection and Preservation
Plan shall be prepared. The Tree Protection and Preservation Plan will be prepared by a
certified arborist to identify trees to be removed, assess impacts to trees to be preserved,
recommend mitigations to reduce impacts to a less than significant level, and identify
construction guidelines to be followed through all phases of a construction project.

Activities prohibited within the TPZ include:
1.

Pre-construction Requirements
The following six steps shall be incorporated within the Tree Protection and Preservation
Plan prior to grading, demolition or building permit issuance:
1.

Site Plan. On the Tree Protection and Preservation Plan for the project, plot accurate
trunk locations and the dripline of all trees over 8" in diameter, including Heritage
Trees. For Heritage Trees the plans shall accurately show the species, trunk diameter,
dripline and clearly indicate the Tree Protection Zone (TPZ) to be enclosed with the
specified tree fencing as a bold dashed line.

2.

Tree Disclosure Statement, A statement signed by the applicant, on a form provided
by the Rancheria, acknowledging the existence of Heritage Trees on the property.

3.

Verification of Tree Protection. The Project Arborist shall verify, in writing, that all
pre-construction requirements have been met. Written verification must be submitted
to and approved by the Rancheria prior to demolition, grading or building permit
issuance.

4.

Pre-Construction Meeting. The demolition, grading and general contractors are
required to meet with the Project Arborist and Rancheria Staff at the site prior
to beginning demolition, grading or new construction to review tree protection
measures and to establish haul routes, staging areas, etc.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Storage or parking vehicles, building materials, refuse, excavated spoils or dumping
of poisonous materials, including but not limited to, paint, petroleum products,
concrete, stucco mix or dirty water.

2.

The use of tree trunks as a winch support, anchorage, as a temporary power pole, sign
posts or other similar function.

3.

Cutting of tree roots by utility trenching, foundation digging, placement of curbs and
trenches and other miscellaneous excavation.

4.

Soil disturbance, soil compaction or grade changes.

5.

Drainage changes.

Activities permitted or required within the TPZ include:
1.

Mulching - During construction, it is recommended that wood chips or similar
material be spread within the TPZ to a 4-to 6-inch depth, leaving the trunk clear of
mulch.

2.

Root Buffer - When areas within the TPZ cannot be fenced, a Root Buffer is required
and shall cover the root zone.

3.

Irrigation, aeration, fertilizing or other beneficial practices that have been specifically
approved for use by the Project Arborist within the TPZ.

Erosion Control
If a tree is adjacent to or in the immediate proximity to a grade slope of 8% (23 degrees) or
more, then approved erosion control or silt barriers shall be installed outside the TPZ to
prevent siltation and/or erosion within the TPZ.
Tunneling and Directional Drilling
If trenching or pipe installation has been approved within the TPZ, then the trench shall
be either cut by hand, air spade, or by mechanically boring the tunnel under the roots with
a horizontal directional drill and hydraulic or pneumatic air excavation technology. In all
cases, install the utility pipe, immediately backfill with soil and soak within the same day.
Tree Pruning and Surgery
The most compelling reason to prune is to develop a strong, safe framework and tree
structure and to reduce hazards. If the Project Arborist recommends that trees be pruned,
the standard pruning shall consist of “crown cleaning” as defined by the International
Society of Arboriculture's Pruning Guidelines.
Maximum Pruning
Maximum pruning should only occur if approved by Rancheria Staff. No more than
one fourth (25 percent) of the functioning leaf, branch and stem area may be removed
within one calendar year of any Heritage Tree, or removal of foliage so as to cause the
unbalancing of the tree. Trees should not be topped.
Tree Workers
Pruning shall not be attempted by construction or contractor personnel, but shall
be performed by a qualified tree care specialist or certified tree worker, according to
specifications contained within these procedures.
Tree Removal Procedure
When Heritage Trees are removed, the following tree removal practices apply:
1.

A permit is required to remove any Heritage Tree.

2.

Any tree to be removed that may impact a Heritage Tree shall be done under the
supervision of a certified arborist.

3.

The removal of trees that extend into the branches or roots of Heritage Trees shall
not be attempted by demolition or construction personnel, grading or other heavy
equipment. A certified arborist or certified tree worker shall remove, or oversee the
removal of the tree in a manner that causes no damage above or below ground to trees
that remain.

2-23

General Standards: Tree Protection Standards

October 2011

Tree Protection Standards

Tree Injury Mitigation

Inspection Schedule

A mitigation program is required if the approved development will cause drought stress,
dust accumulation or soil compaction to trees that are to be saved. To help reduce impact
injury, one or more of the following mitigation measures shall be implemented and
supervised by the Project Arborist.

The Project Arborist retained by the applicant shall conduct the following required
inspections of construction sites containing protected Heritage Trees. Inspections shall
verify that the type of tree protection is consistent with the standards outlined within
these Guidelines. For each required inspection, a monthly inspection report of any change
in tree conditions and actions taken shall be provided to the Rancheria.

Irrigation Program. Irrigate to wet the soil within the TPZ during the dry season as
specified by the Project Arborist.
Dust Control Program. During periods of extended drought, or grading, spray trunk,
limbs and foliage to remove accumulated construction dust.
Soil Compaction Damage. Compaction of the soil is the largest killer of trees on
construction sites due to suffocation of roots. If compaction to the upper 12-inch soil
within the TPZ has occurred, then one or more of the following mitigation measures shall
be implemented as recommended by the Project Arborist or Rancheria Staff.
1.

2.

Type I Mitigation. If an approved paving, hardscape or other compromising material
encroaches within the TPZ, an aeration system shall be designed by a certified
arborist and used within this area.
Type 11 Mitigation. If inadvertent compaction of the soil has occurred within the
TPZ, the soil shall be loosened by a method approved by the Town Arborist, such as
Vertical Mulching or Soil Fracturing.

Required Inspections
A. Pre-Construction Meeting. Prior to commencement of construction, the applicant or
contractor shall conduct a pre-construction meeting to discuss tree protection with the job
site superintendent, grading equipment operators, Project Arborist, and Rancheria Staff.
B. Inspection of Protective Tree Fencing. Rancheria staff shall be in receipt of a written
statement from the applicant or Project Arborist verifying that he has conducted a field
inspection of the trees and that the protective tree fencing is in place prior to issuance of a
demolition, grading, or building permit.
C. Inspection of Rough Grading. The Project Arborist shall perform an inspection
during the course of rough grading adjacent to the TPZ to ensure trees will not be injured
by compaction, cut or fill, drainage and trenching, and if required, inspect aeration
systems, tree wells, drains and special paving. The contractor shall provide the Project
Arborist at least 48 hours advance notice of such activity.
D. Monthly Inspections. The Project Arborist shall perform monthly inspections
to monitor changing conditions and tree health and submit a written report to the
Rancheria.

Damage to Trees
Reporting. Any damage or injury to trees shall be reported within 24 hours to the Project
Arborist and Rancheria Staff so that mitigation can take place. All mechanical or chemical
injury to branches, trunk or to roots over 2-inches in diameter shall be reported.

E. Special Activities within the Tree Protection Zone. Work in this area (TPZ) requires
the direct onsite supervision of the Project Arborist.

Appraised Value. If a tree is damaged, a Certified Arborist determines the Tree Appraisal
value by adjusting a tree’s basic value by its condition, location, and species using the most
recent edition of the Guide for Plant Appraisal, published by the Council of Tree and
Landscape Appraisers. The formula used should also be noted.
Mitigation
1. Root injury. If trenches are cut and tree roots 2-inches or larger are encountered they
must be cleanly cut back to a sound wood lateral root under the supervision of the Project
Arborist. The end of the root shall be sealed and kept moist. All exposed root areas within
the TPZ shall be backfilled or covered within one hour. Exposed roots may be kept from
drying out by temporarily covering the roots and draping layered burlap or carpeting over
the upper 3-feet of trench walls. The materials must be kept wet until backfilled to reduce
evaporation from the trench walls.
2. Bark or trunk wounding. Current bark tracing and treatment methods shall be
performed by a qualified tree care specialist within two days.
3. Scaffold branch or leaf canopy injury. Remove broken or torn branches back to an
appropriate branch capable of resuming terminal growth within five days. If leaves are
heat scorched from equipment exhaust pipes, consult the Project Arborist within 24
hours.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-24

October 2011

Architectural Standards and Guidelines
These Architectural Standards and Guidelines intend to promote design and character
that is in keeping with the desires and intentions of the Rancheria community. They
include standards and guidelines for building types, walls and roofs, exterior elements,
and materials and colors.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-25

General Standards: Architectural Standards and Guidelines

October 2011

Page Title

Character
This section of the document provides guidance in selecting the appropriate character for
buildings in the Rancheria's commercial and institutional buildings.

Massing and Scale
• Building forms should be small-scaled, simple volumes. Volumes may be a simple
rectilinear massing or a combination of gable ends and hipped roof forms in two- or
three-story massings.
• Larger buildings should be broken down into smaller forms. Overly complicated facades
should be avoided.
• Buildings of a width greater than 125' should be broken into multiple facades to appear
as individual buildings.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-26

General Standards: Architectural Standards and Guidelines

October 2011

Roofs and Walls

Roofs
Guidlelines
• Roofs should be simple forms, either flat with a parapet, or a low
pitch ranging from 3:12 to 5:12.
• Flat roofs should be concealed with parapet walls. Buildings
should use cornice profiles to articulate parapets as distinct
exterior walls that make a visual transition to the sky.
• Flat roofs may be accessible and used as balconies or terraces.
• Pitched roofs may be gable or shed forms.
• Roof forms can utilize and/or build upon the asymmetrical gable
form found in traditional tribal village homes.

Traditional tribal house

Simple gable-fronted form with wrapped porch

Traditional roof form reinterpreted as skylight

Deep overhanging eaves
with wood brackets

Materials and Color
• Wood shingles, metal and asphalt shingles are allowed.
• Roofs are generally either natural wood or an earthtone color.

Roof and wall forms of traditional tribal house applied to
contemporary structure

Deep overhanging eaves
with exposed rafters

Stucco parapet with cornice

Walls
Guidelines
• Primary walls are usually composed of horizontal wood siding,
or vertical boards with or without battens.
• Stucco may be used infrequently.
• Facades are typically finished in one material.
• Facades should be embellished with decorative elements such as
window moldings.
Materials and Color

Rustic board and batten siding

Stucco two-story commercial block

Board and batten commercial building

Painted horizontal wood siding

• Wood siding may be wood or cementitious.
• Stucco is typically 3 coat, smooth finish.
• Walls are generally either natural wood finish, an earthtone or
light color found in nature.

Natural wood board and batten siding

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

2-27

General Standards: Architectural Standards and Guidelines

October 2011

Openings

Windows
Guidelines
• Individual windows should be vertically proportioned.
• Individual windows should be multi-paned, and divided by true
or simulated muntins. Muntins should have a profile with a
minimum ¾" width and minimum ½˝ depth.
• For wider openings, individual vertically-proportioned windows
should be ganged together. Windows may be ganged together
when a mullion with a minimum 4˝ width and a minimum 1˝
depth is used.
• Ornamental windows that are square or round may be used
occasionally.
• Windows are typically casements or double hung with clear glass
panes; sliding windows should be avoided.
• Windows on buildings with horizontal siding should be framed
with a 3½˝ minimum wood or fiber cement trim and a 2"
minimum apron. Window trim caps may be a basic trim board
or a more formal cap with or without brackets.
• All windows must have a sill. The sill should not be integrated
into a ˝picture frame˝ surround and should have a depth of ¾”
minimum from the plane of the wall.

Individual and ganged verticallyproportioned double-hung windows

Traditional tribal house door form used as ornamental opening

Materials and Colors

Ganged casement windows with verticallyproportioned muntins

Ganged windows with wood
trim

Ornamental window

Individual and ganged
windows on commercial
block

Traditional circular entry
form echoed in modern door

Double door entry to
commercial space

Deep-recessed double door
entry to commercial space

Rustic wood door paired
with window-paneled door

Paneled wood door with side
lites

Wood door with screen

• Windows should be wood with or with out aluminum cladding
or aluminum.
• Windows should be painted the same color across a facade.
• Window trim may be a different color that accents the window.

Vertically proportioned full-height windows
on store front

Doors
Guidelines
• Doors should have simple, rectilinear panels and windows. Top
transom windows are allowed.
• Doors may have square or arched tops.
• Doors on buildings with horizontal siding should be framed
with a 3½˝ minimum wood or fiber cement trim and a 2"
minimum apron. Window trim caps may be a basic trim board
or a more formal cap with or without brackets.
Materials and Colors
• Doors may be made from any combination of the following
materials: wood, fiberglass, glass, aluminum.
• Doors should be painted the same color across a facade.
• Door trim may be a different color that accents the window.
Traditional circular entry form echoed in contemporary double door
entry

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Wood screen doors with transom above

2-28

General Standards: Architectural Standards and Guidelines

October 2011

Attached Elements

Storefronts and Awnings
Guidelines
• Storefronts can be found with recessed entry, angled corner
entry or flush entry.
• Storefronts have large expanses of clear glass with tall windows
that often have transom windows to allow light to penetrate deep
into the store; glass shall not be tinted, mirrored or colored.
• Storefronts are recessed minimum of 6" and a maximum of 1'
from the facade.
• Storefronts typically have a 1’ - 2' tall continuous base, finished
with wood panels, brick, tile, or fiber cement.
• Corner storefront entry doors are located on an angled 45°
wall on the corner of the building. A bay window is typically
set above the door and can have a 6" minimum width vertical
support at the corner of building form.
• Entry doors should be accessed from the primary street address.
Handicapped access ramps shall not extend into the sidewalk.
• Awnings and canopies may extend over the sidewalk and may
be used to provide shelter to passing pedestrians, to emphasize
ground floor uses such as cafes and restaurants, and/or to add
interest to the facade.
• Awnings and canopies shall have a minimum of 8 feet clear from
the sidewalk to the underside of the awning or canopy.

Deep overhanging open rafters enclose public space in front of rustic
commercial building

Natural wood porch over commercial
frontage

Canvas awning with lettering

Semi-enclosed sitting area engages sidewalk

Recessed entry, large display windows, and
transom window across entire storefront

Large window expanses engage public
pedestrian space

Natural wood porch with attached pergola

Deep porch allows space for outdoor
furniture

Single bay, gable end porch

Porch engaged under overall roof form

Materials and Colors
• Storefront frames are made of wood, aluminum or other metal.
• Storefronts are often painted to match the trim color of the
building.
Stoops and Porches
Guidelines
• Stoops and porches provide a transition between the inside
(private) and outside (public) parts of a building.
• See additional standards for Stoops and Porches on page 2-2.
Materials and Colors
• Porches and Stoops are often made with a combination of wood,
stone, concrete and stucco.
• Porches and Stoops are often painted to match the trim color of
the building.

Attached, full front porch

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Entry stoop

2-29

General Standards: Architectural Standards and Guidelines

October 2011

Attached Elements

Balconies and Bay Windows
Guidelines
• Balconies are used as accents along facades and are generally
made from wood, heavy timber, or metal.
• Wood and heavy timber balconies have decorative wood
brackets and simple posts or decorative columns/rails. They
are often covered by roofs with exposed rafter tails. Balconies
generally have a minimum 3’ depth.
• Metal balconies are made from wrought or cast iron and may
have metal rails and decorative, supporting metal brackets or
metal rails with a concrete or stone base and brackets. They are
typically uncovered but may have an awning. Metal balconies
have a minimum 12" depth.
• Bay windows may be square, chamfered or round. Bays come in
a variety of heights and depths.
• Bays may or may not have supporting brackets and should not
project above the cornice.

Large natural wood balcony set on simple
posts

Metal balcony with metal brackets

Balcony incorporated in dormer window

Chamfered bay

Square bay with wood brackets

Chamfered bay

Materials and Colors
• Balconies are used as accents along facades and are generally
made from wood, heavy timber, or metal.
• Balconies and Bay Windows are often painted to match the trim
color of the building.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Bracketed wood balcony, with
exposed-rafter roof overhang

Integrated Development Standards

Wood balcony with chamfered
bay over porch with brackets
and posts

2-30

October 2011

Review Procedures
This section identifies the review procedures applicable for these standards. These include
Standard Procedures that set forth review procedures and post-decision actions (including
appeals) applicable to all types of applications, and Application-Specific Procedures, that
are specific to particular types of applications.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

Review Procedures

October 2011

Pre-Application Conferences

form established by the Rancheria.

Pre-application conferences provide an opportunity for applicants to meet with Rancheria
Staff to discuss potential future development applications, and learn more about review
standards and procedures. Pre-application conferences are optional but strongly
encouraged.

Conduct of Meeting. At the meeting, the applicant shall explain the development
proposal and application, inform attendees about the application review process, respond
to questions and concerns neighbors raise about the application, and propose ways to
resolve conflicts and concerns.

Neighborhood Meeting/Community Meetings

Written Summary of Neighborhood Meeting. The applicant shall prepare a written
summary of the meeting that includes a list of meeting attendees, a summary of
attendee comments, discussed issues related to the development proposal, and any other
information the applicant deems appropriate. The meeting summary shall be included
with the application materials and be made available to the public for inspection.

The purpose of the pre-application neighborhood/community meeting is to educate
owners and occupants of nearby lands about a proposed development application that
is going to be reviewed under these standards and to provide the Rancheria Staff and
residents with an opportunity to voice and hear comments and concerns about the
development proposal and resolve conflicts and outstanding issues.
Neighborhood meetings are encouraged as opportunities for informal communication
between applicants and the owners and occupants of nearby lands, and other residents
who may be affected by development proposals.

Response to Summary. Any person attending the neighborhood meeting may submit
a written response to the applicant’s meeting summary to the Rancheria within 30 days
after the application is determined complete. The response may state their understanding
of attendee comments, discuss issues related to the development proposal, and include
any other information they deem appropriate. All written responses to the applicant’s
summary of the neighborhood meeting shall be transmitted to the applicant, included
with the application materials, and made available for public inspection.

Determining if Applications are Complete
Completeness Review. On receiving an application, the Rancheria shall, within a
reasonable period of time, determine whether the application is complete or incomplete. A
complete application is one that:
1.

Contains all information and materials established by the Rancheria as required for
submittal of the particular type of application;

2.

Is in the form established by the Rancheria as required for submittal of the particular
type of application;

3.

Includes information in sufficient detail to evaluate the application to determine
whether it complies with the appropriate review standards and the goals of the
Rancheria Comprehensive Plan.

Incomplete Applications
On determining that the application is incomplete, the Rancheria shall notify the
applicant of any submittal deficiencies. The applicant may correct the deficiencies and
resubmit the application for completeness determination. If the applicant fails to resubmit
an application within 30 calendar days after being first notified of submittal deficiencies,
the application shall be considered withdrawn.

Applicability
A neighborhood meeting is required before submittal of a Major Land Development
Plan, and is encouraged, but not required, before submittal of any other development
application reviewed under these standards.
Procedure
If a neighborhood meeting is held by the applicant, it shall comply with the following
procedures:

Submitting, Accepting, and Withdrawing Applications
Development applications reviewed under this Code shall be submitted by:
1.

The Rancheria administration; or

2.

The owner, contract purchaser, or any other person having a recognized property
interest in the land on which development is proposed; or

3.

A person authorized to submit the application on behalf of the Rancheria, the
owner, contract purchaser, or other person having a recognized property interest in
the land, as evidenced by a letter or document signed by an authorized Rancheria
representative, such owner, contract purchaser, or other person.

Time and Place. The meeting shall be held at a place that is convenient and accessible
to neighbors residing in close proximity to the land subject to the application. It may be
scheduled after 5:00 P.M. on a weekday.
4.
Notification
Mailed Notice. The applicant shall mail notice of the meeting a minimum of ten days in
advance of the meeting to the Rancheria and to the following:

If there are multiple owners, contract purchasers, or other persons authorized to
submit the application, all such persons shall sign the application or a letter or
document consenting to the application.

Application Content
1.

All owners of the land subject to the application; and

2.

All owners of land within 500 feet of the land subject to the application (including
owners of land located outside Rancheria lands).

The notice shall state the time and place of the meeting and general nature of the
development proposal. Notice shall be deemed mailed by its deposit in the United
States mail, properly addressed, and postage paid. A copy of the mailed notice shall be
maintained in the office of the Rancheria for public inspection during normal business
hours.
Posted Notice. The applicant shall post notice of the neighborhood meeting on the land
subject to the application for at least ten days before the date fixed for the meeting, in a

The Rancheria is authorized to and shall establish the requirements for the content and
form for development applications reviewed under these standards. The Rancheria may
amend and update these standards as determined necessary to ensure effective and
efficient review of projects. The applicant bears the burden of ensuring that an application
contains sufficient information to demonstrate compliance with applicable standards.

The Rancheria shall not process an application for further review until it is determined to
be complete. Notwithstanding the other provisions of this subsection, after an application
is determined to be incomplete three times, the applicant may request, and the Rancheria
shall undertake, processing and review of the application even though it is not determined
to be a complete application.
Application Complete. On determining that the application is complete, or on receiving
the applicant’s request that the application be processed, the Rancheria shall accept
the application for review in accordance with the procedures and standards of these
standards.
Revising Applications
An applicant may revise an application after receiving initial staff review comments
on the application, or on requesting and receiving permission from the Rancheria to
do so. Revisions shall be limited to changes that directly respond to specific requests or
suggestions made by Rancheria. Any other revisions to the application may be submitted
at any time during the review procedure, but the revised application shall be submitted
and reviewed as if it were a new application. All revised applications shall be submitted to
the Rancheria.
Withdrawing Applications
An applicant may withdraw a development application at any time by submitting a letter
of withdrawal to the Rancheria.

Submittal and Review Schedule. The Rancheria is authorized to and shall establish
specific rules for the submittal and review schedule (including time frames for review)
for the various types of development applications. The Rancheria may amend and update
these provisions as is determined necessary to ensure effective and efficient review under
this Code.
Application Submittal. Applications shall be submitted to the Rancheria in the form
established by the Rancheria.

Opticos Design, Inc.
©2011 Opticos Design, Inc.

Integrated Development Standards

3-2

Review Procedures

October 2011

Staff Review and Action
When an application is determined complete, it shall be distributed by the Rancheria to
all appropriate staff and review agencies for review and comment, and the preparation
of a staff report. In preparing the staff report staff shall review the application, relevant
support material, and any comments or recommendations from other staff and review
agencies to which the application was referred. If deficiencies in complying with applicable
standards of these standards are identified, the Rancheria, may notify the applicant
of such deficiencies and provide the applicant a reasonable opportunity to discuss the
deficiencies and revise the application to address them.
Staff Report and Recommendation. Upon completion of staff review on an application,
the Rancheria shall prepare a written staff report. The staff report shall conclude whether
the application complies with all applicable review standards and recommend one of the
decisions authorized for the particular type of application. The staff report may identify
and recommend conditions of approval addressing how compliance deficiencies might be
corrected and adverse effects of the development application might be mitigated.
Distribution and Availability of Application and Staff Report. Within a reasonable
time period before the meeting or public hearing at which the application is scheduled for
review by the Tribal Council, the Rancheria shall:
1.

Schedule and ensure notice of any required public hearing on the application
(if appropriate);

2.

Transmit the application, related materials, and the staff report to the Tribal Council;

3.

Transmit a copy of the staff report to the applicant; and

4.

Make the application, related materials, and the staff report available for examination
by the community in the Rancheria office during normal business hours, and make
copies of such materials available at a reasonable cost.

Public Hearings

The notice shall state the time and place of the meeting and general nature of the
development proposal. Notice shall be deemed mailed by its deposit in the United
States mail, properly addressed, and postage paid. A copy of the mailed notice shall be
maintained in the office of the Rancheria for public inspection during normal business
hours.
Posted Notice. The applicant shall post notice of the public hearing on the land subject
to the application, in a form established by the Rancheria. The notice shall include the
application or application number, and the name, address, and telephone number of the
applicant or the applicant’s agent; the date, time, and place of the public hearing; the land
involved by street address or legal description and nearest cross street, and area size; the
nature, scope, and purpose of the application or proposal; and that the application, and all
relevant information about the application may be obtained at the Rancheria office during
normal business hours, and include the office's street address and a contact phone number.

If the development application is subject to a public hearing by the Tribal Council, the
public hearing shall be held in accordance with the following procedures.

Time. Any review body conducting the hearing shall act in accord with any time
limits established in this Code or the body’s own by-laws. Action shall be taken as
promptly as possible in consideration of the interests of the applicant, the residents of
the Rancheria, and shall include a recommendation or decision of approval, approval
with conditions, or disapproval (whichever is appropriate).

2.

Form of Decisions. The form of all decisions shall include at least the following
elements:
A statement of findings or other factors considered, whichever is appropriate, and
a statement of the basis upon which such facts were applied with respect to the
relevant review standards.

c.

A statement of a recommendation or decision of approval, approval with
conditions or disapproval (whichever is appropriate).

Rights of All Persons. Any person may appear at a public hearing and submit testimony,
either individually or as a representative of a person or an organization. Each person
who appears at a public hearing shall be identified, state an address, and if appearing on
behalf of a person or organization, state the name and mailing address of the person or
organization being represented. If the person states they represent an organization, the
Tribal Council may request written evidence of that person’s authority to speak on behalf
of the organization in regard to the matter under consideration.

Mailed Notice. The applicant shall mail notice of the meeting to the Rancheria and to the
following:

Recording. A record of the hearing shall be kept as follows.

©2011 Opticos Design, Inc.

1.

b.

Continuance of Public Hearing. The Tribal Council may, on its own motion or at the
request of any person, continue the public hearing to a fixed date, time, and place. An
applicant shall have the right to request and be granted one continuance. Any subsequent
continuances requested by any party shall be granted at the discretion of the Tribal
Council only upon good cause shown.

Integrated Development Standards

General Procedures and Findings Following Public Hearings

Burden of Proof or Persuasion. The burden of demonstrating that an application
complies with applicable review and approval standards of these standards is on the
applicant. The burden is not on the Rancheria or other parties to show that the standards
have not been met by the applicant.

Timing. The public hearing(s) on the application shall be scheduled so there is sufficient
time for a staff report to be prepared and for the public notification requirements to be
satisfied. Public notification of a public hearing on a development application shall be
provided at least 10 calendar days prior to the public hearing, and should be both mailed
and posted.

Opticos Design, Inc.

Close of Hearings. Upon the completion of all testimony or public comment, the hearing
shall be closed. No further direct or informal testimony, comments or evidence shall be
provided or considered on the matter. The applicant may be asked questions or allowed to
comment on proposed conditions.

A summary of the information presented before the body.

Offers of Testimony. In the event any testimony is excluded as irrelevant, immaterial, or
unduly repetitious, the person submitting such testimony shall have an opportunity at that
hearing to offer such testimony to be entered into the record. Such offer shall be made at
the public hearing.

All owners of land within 500 feet of the land subject to the application (including
owners of land located outside Rancheria lands).

A copy of the public hearing record may be obtained by any person upon applying to
the Rancheria and paying the cost for duplication of the record.

a.

Application to be Scheduled for Meeting. When a development application is subject to a
public hearing with the Tribal Council, the Rancheria shall ensure that the public hearing
on the application is scheduled for a regularly scheduled meeting or a meeting specially
called for that purpose.

2.

3.

Conduct of Public Hearings

Public Hearing Scheduling and Notice

All owners of the land subject to the application; and

All records of public hearings conducted by the Tribal Council shall be a public
record.

Public Hearing Procedures

Exclusion of Testimony. The Tribal Council may exclude testimony that it finds to be
irrelevant, immaterial, or unduly repetitious.

1.

2.

1.

The Rancheria shall record the public hearing. The written or taped record of oral
proceedings (including testimony and statements of personal opinions), the hearing
minutes, all applications, exhibits and papers submitted in any proceeding before the
review board, the staff report, and the recommendation or decision shall constitute
the record.

Approved Development Plans
Approval of any development application in accordance with these standards authorizes
only the particular use, plan, or other specific activity approved, and not any other
development requiring separate application.
Expiration of Permitted Development Plans
An applicant shall have two years from final approval to receive a Building Permit or, if no
Building Permit is required, to obtain a Certificate of Compliance. Upon written request
by the applicant submitted to the Rancheria no later than one month prior to expiration
of the approval, the Tribal Council may grant up to, but not exceeding, five, one-year
extensions, for good cause. Development permits not renewed shall expire.
Material Misrepresentation. A development permit is subject to revocation by the Tribal
Council upon its determination, after notice and public hearing, that there was a material
misrepresentation by the applicant or substantial noncompliance with the terms and
conditions of the original or amended development permit or approval.
Limitation on Subsequent Similar Applications
If a development application requiring a public hearing is denied, no application proposing
the same or similar development on all or part of the same land shall be submitted
within one year after the date of denial unless the Tribal Council waives this time limit.
In considering such a waiver the Tribal Council shall consider that the applicant has
demonstrated that:

3-3

Review Procedures

October 2011

1.

There is a substantial change in circumstances relevant to the issues or facts
considered during review of the prior application that might reasonably affect the
Tribal Council's application of the relevant review standards; or

2.

New or additional information is available that was not available at the time of review
of the prior application and that might reasonably affect the decision-making body's
application of the relevant review standards to the development proposed in the new
application; or

3.

The new application proposed to be submitted is materially different from the prior
application; or

4.

The final decision on the prior application was based on a material mistake of fact.

PROCEDURE FOR MAJOR LAND DEVELOPMENT PLANS

PROCEDURE FOR MINOR LAND DEVELOPMENT PLANS

Pre-Application Conference

Pre-Application Conference

Neighborhood Meeting
Land Development Plans

Neighborhood Meeting

The Land Development Plan provisions of this section are intended to ensure that the
layout and general site design of proposed development is compatible with surrounding
uses and complies with all applicable development standards and, in some cases, other
applicable City or County standards. The purpose of this section is to establish the
procedure and standards for review of a Land Development Plan.

Application Submittal and
Acceptance
Application Submittal and
Acceptance

Applicability
Approval of a Land Development Plan in accordance with this section is required before
issuance of a Building Permit. Development Plans are Major or Minor as characterized
below.

Staff Review and Action

Staff Review and Action

Major Development Plans include:
1.

Nonresidential development of 5,000 square feet of gross floor area or more on an
undeveloped site;

2.

The addition of 5,000 square feet or 30 percent or more of the original building of a
nonresidential development which results in a building larger than 5,000 square feet;
or

3.

Public Hearing Scheduling and
Notice
Appeal to Tribal Council

Residential, multi-family development or other housing developments of four
dwelling units or more.

Tribal Council Review and Decision

Minor Development Plans include:
1.

Nonresidential development of less than 5,000 square feet of gross floor area on an
undeveloped site;

1.

Pre-Application Conference. Optional.

1.

Pre-Application Conference. Optional.

2.

Additions to nonresidential

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/tribal%3Acher-ae_heights%3A9072f3c83f7e23ce. Public record. Not legal advice.
