# ​TRIBAL HAZARD MITIGATION PLAN​

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/tribal%3Abear_river%3Aa6764c45ccb7e17a

## Record

- **Collection:** Tribal code
- **Document type:** Tribal code

## Text

3​
​

​TRIBAL HAZARD MITIGATION PLAN​

4​
​

​2026 UPDATE​

AF

5​
​

T​

2​
​

​BEAR RIVER BAND OF THE ROHNERVILLE​
​RANCHERIA​

1​
​

​PREPARED FOR PUBLIC REVIEW​

6​
​

​Prepared by the Office of Emergency Services​

7​
​

​Bear River Band of the Rohnerville Rancheria • 266 Keisner Road, Loleta, CA 95551​

​​ ​Original Plan Adopted February 18, 2021 (Resolution No. 21-11) • FEMA Region IX Approved March 30,​
8
9​
​
​2022​

R

​This update prepared pursuant to 44 CFR § 201.7 and the Disaster Mitigation Act of 2000​

​D

1​0​
​11​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​1​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​PLAN OVERVIEW​

​12​

​Detail​

​Tribal Jurisdiction​

​ ear River Band of the Rohnerville Rancheria (BRB), a federally recognized​
B
​sovereign Tribal nation​

​Plan Type​

​Tribal Hazard Mitigation Plan — Five-Year Update (44 CFR § 201.7)​

​Prior Plan​

​ dopted February 18, 2021 (Resolution No. 21-11); revised October 2021 and​
A
​January 2022; FEMA approved March 30, 2022​

​Planning Period​

​2026–2031​

​Point of Contact​

​Amanda Gonzales, Office of Emergency Services Manager​

​Plan Support​

​Nicholas Anderson, Office of Emergency Services Logistics Coordinator​

​Address​

​266 Keisner Road, Loleta, CA 95551​

​Guiding Philosophy​

​“Healing the land heals the people.”​

​Community Pillars​

​Quality of Life • Self-Sufficiency • Sustainability • Cultural Awareness​

​Disaster History​
​Plan Status​

​2026 Tribal THIRA; 2025 SPR; BRB Emergency Operations Plan (July 2025)​
​ EMA-4692-DR (December 20, 2022 M6.4 earthquake); December​
F
​earthquake trilogy 2021, 2022, 2024​
​ onsolidated working draft for public review; placeholders marked in red​
C
​pending completion​

​D

R

​13​

AF

​Companion Documents​

T​

​Item​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​2​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​TABLE OF CONTENTS​

​14​

​15​​PLAN OVERVIEW​
​16​​TABLE OF CONTENTS​
​17​​EXECUTIVE SUMMARY​
​18​​PART ONE: INTRODUCTION​

​ .1 Purpose and Background​
1
​20​
​1.2 Regulatory Basis​
​21​
​1.3 FEMA Mitigation Grant Programs​
​22​
​1.4 Tribal Mitigation Vision and Mission​
​23​
​Mitigation Vision​
​24​
​Mitigation Mission​
​25​
​1.5 The Four Community Pillars​
​26​
​1.6 Plan Goals​
​27​
​1.7 Plan Organization​
​28​​PART TWO: PLANNING PROCESS​
​29​
​2.1 Description of the Planning Process​
​30​
​2.2 Public Participation​
​31​
​Hazards Experienced by the Community​
​32​
​Critical Facilities and Infrastructure Priorities​
​33​
​What We Heard: Locations, Suggestions, and Readiness​
​34​
​2.3 Stakeholder and Intergovernmental Coordination​
​35​
​2.4 Integration with THIRA, SPR, and Other Tribal Planning​
​36​
​2.5 Review and Incorporation of Existing Plans, Studies, and Reports​
​37​
​2.6 Government-to-Government Relationship​
​38​​PART THREE: COMMUNITY AND LAND PROFILE​
​39​
​3.1 Overview​
​40​
​3.2 History and Connection to Land​
​41​
​The 1860 Coordinated Massacres and Aftermath​
​42​
​The Indian Boarding School Era​
​43​
​The 1958 Termination and the Tillie Hardwick Lawsuit​
​44​
​The Salmon Ceremony — Cultural Restoration and Ecological Stewardship​
​45​
​3.3 Governance​
​46​
​3.4 Tribal Lands​
​47​
​3.5 Population and Vulnerable Populations​
​48​
​3.6 Critical Facilities​
​49​
​3.7 Transportation and Access​
​50​
​3.8 Water Systems and Fire Protection Infrastructure​
​51​
​3.8.1 Tish Non Water System and February 2026 Hydrant Flow Test​
​52​
​3.8.2 Resort Reclaimed Water System​
​53​
​3.9 Public Safety Services​

​D

R

AF

T​

​19​

​​
2
​3​
​4​
​5​
​5​
​5​
​5​
​6​
​6​
​6​
​6​
​6​
​6​
​8​
​8​
​9​
​9​
​10​
​10​
​12​
​12​
​12​
​13​
​15​
​15​
​17​
​17​
​17​
​17​
​18​
​18​
​18​
​20​
​20​
​21​
​24​
​24​
​25​
​25​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​3​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​ .9.1 Law Enforcement​
3
​55​
​3.9.2 Fire Protection​
​56​
​3.10 Emergency Operations and Alerting​
​57​
​3.11 Cultural Resources​
​58​​PART FOUR: RISK ASSESSMENT​
​59​
​4.1 Methodology​
​60​
​4.2 Climate Change as a Force Multiplier​
​61​
​4.3 Hazard Summary and Priority Rankings​
​62​
​4.4 Earthquake​
​63​
​Hazard Profile — Type, Location, Extent​
​64​
​Previous Occurrences — The December Trilogy​
​65​
​Probability, Impacts, and Vulnerability​
​66​
​4.5 Pandemic / Public Health Emergency​
​67​
​4.6 Fire and Wildfire​
​68​
​Hazard Profile​
​69​
​Regional Wildfire History​
​70​
​Fire Flow Baseline​
​71​
​4.7 Flooding (Localized and Riverine)​
​72​
​Hazard Profile​
​73​
​4.8 Severe Weather and Climate Change​
​74​
​4.9 Drought and Water Shortage​
​75​
​4.10 Tsunami and Coastal Hazards​
​76​
​4.11 Transportation and Access Hazards​
​77​
​4.12 Cyberattack​
​78​
​4.13 Other Hazards​
​79​
​4.14 Tribal Capability Assessment​
​80​
​4.15 Overall Vulnerability Summary and Loss Estimation​
​81​​PART FIVE: MITIGATION STRATEGY AND ACTION PLAN​
​82​
​5.1 Strategy Framework​
​83​
​5.2 Regulatory Framework​
​84​
​5.3 Status of 2021 THMP Mitigation Actions​
​85​
​5.4 Prioritization Criteria​
​86​
​5.5 Goals and Objectives​
​87​
​5.6 Mitigation Actions — Detail Sheets​
​88​
​Action 5.6.1 — Tribal Fire Program — Phase 1 (Priority 1)​
​89​
​Action 5.6.2 — Bear River Police Department Reinstatement​
​90​
​Action 5.6.3 — Emergency Resilience Campus — Singley Hill Corridor​
​91​
​Action 5.6.4 — Singley Hill Corridor and Secondary Egress Program​
​92​
​Action 5.6.5 — Recreation Center Generator and 30-Day Fuel Capability​
​93​
​Action 5.6.6 — Resort Seismic Assessment (Active HMGP Project)​
​94​
​HMGP - 4692 - Seismic Retrofit and Slope Stabilization Project​

​ 5​
2
​25​
​25​
​26​
​27​
​27​
​27​
​28​
​29​
​29​
​30​
​31​
​34​
​34​
​34​
​34​
​35​
​37​
​37​
​38​
​39​
​39​
​42​
​43​
​43​
​43​
​44​
​45​
​45​
​45​
​45​
​46​
​47​
​47​
​47​
​47​
​48​
​48​
​49​
​49​
​49​

​D

R

AF

T​

​54​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​4​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​ ction 5.6.7 — Mattole Beach Emergency Protocol​
A
​49​
​96​
​Action 5.6.8 — FEMA-4692-DR Public Assistance Contract Execution​
​50​
​97​
​5.7 Mitigation Actions 9 through 26​
​50​
​98​
​5.8 Master Priority Summary — All 26 Actions​
​53​
​99​
​5.9 Funding Strategy​
​54​
100​​PART SIX: PLAN MAINTENANCE​
​
​55​
101​ ​6.1 Monitoring​
​
​55​
102​ ​6.2 Evaluation​
​
​55​
103​ ​6.3 Updating​
​
​55​
104​ ​6.4 Continued Public Participation​
​
​55​
105​ ​6.5 Integration into Other Planning Mechanisms​
​
​55​
106​ ​6.6 Project Closeout​
​
​55​
107​ ​6.7 Assurances​
​
​56​
108​​APPENDIX A: PLANNING PROCESS DOCUMENTATION​
​
​57​
109​​APPENDIX B: COMMUNITY HAZARD MITIGATION SURVEY​
​
​59​
110​​APPENDIX C: TRIBAL STAKEHOLDER OUTREACH DOCUMENTATION​
​
​60​
111​​APPENDIX D: MITIGATION ACTION COMPLETION REPORT (MACR) TEMPLATE​
​
​61​
112​​APPENDIX E: TRIBAL COUNCIL ADOPTION RESOLUTION​
​
​62​
113​​APPENDIX F: ENERGY EMERGENCY PLAN​
​
​63​
114​​APPENDIX G: PET AND SERVICE ANIMAL EMERGENCY PLAN​
​
​64​
115​​APPENDIX H: SEVERE WEATHER EMPLOYEE TRAINING MODULE​
​
​65​
116​​APPENDIX I: PRE-STORM CULVERT AND DRAINAGE INSPECTION PROTOCOL​
​
​66​
117​​APPENDIX J: FLOODING ENGINEERING DOCUMENTATION​
​
​67​
118​​PRE-SUBMISSION CHECKLIST (INTERNAL — REMOVE BEFORE PUBLIC RELEASE AND​
​
119​​FEMA SUBMISSION)​
​
​68​

​D

R

AF

T​

​95​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​5​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​EXECUTIVE SUMMARY​

120​
​

​21​​The Bear River Band of the Rohnerville Rancheria (BRB or the Tribe) is a federally recognized​
1
122​​sovereign Tribal nation located in Humboldt County, California. This Tribal Hazard Mitigation​
​
123​​Plan (THMP) is the Tribe's five-year update to its original plan, adopted February 18, 2021 and​
​
124​​approved by FEMA Region IX on March 30, 2022. The plan is prepared pursuant to 44 CFR §​
​
125​​201.7 and the Disaster Mitigation Act of 2000, and its approval maintains the Tribe's eligibility for​
​
126​​FEMA hazard mitigation assistance, including the Hazard Mitigation Grant Program (HMGP)​
​
127​​and Building Resilient Infrastructure and Communities (BRIC).​
​

T​

​28​​This plan is organized around four community pillars articulated by the Tribe: Quality of Life,​
1
129​​Self-Sufficiency, Sustainability, and Cultural Awareness, anchored by the guiding philosophy that​
​
130​​healing the land heals the people. These pillars are not decorative framing — they are the​
​
131​​substantive organizing logic of the plan. Mitigation priorities reflect Tribal values and institutional​
​
132​​goals, including workforce development and cultural healing, and not simply hazard frequency​
​
133​​or severity.​
​

AF

​34​​The period since the 2021 plan has been eventful. On December 20, 2022, a magnitude 6.4​
1
135​​earthquake struck offshore of Ferndale, causing documented damage across ten Tribal facilities​
​
136​​and resulting in a Presidential Major Disaster Declaration (FEMA-4692-DR) — the Tribe's first​
​
137​​direct declaration. December earthquakes in 2021, 2022, and 2024 form a three-event trilogy​
​
138​​that has elevated seismic risk to the Tribe's highest hazard priority. In February 2026 the Tribe​
​
139​​conducted its first-ever hydrant flow test of all 16 hydrants on the Tish Non water system per​
​
140​​NFPA 291. Whitchurch Engineering documented six localized flooding sites in March 2024​
​
141​​(Project BRB2401), identifying systemic infrastructure maintenance governance failure as the​
​
142​​root cause, and the Bureau of Reclamation has funded infrastructure improvements under​
​
143​​Agreement R25AP00342.​
​

R

​44​​This update identifies ten hazards, presents tribal-specific vulnerability data as primary (with​
1
145​​regional data as supplemental context, per FEMA's 2022 review guidance), documents the​
​
146​​status of all 15 mitigation actions from the 2021 plan, and establishes 26 mitigation actions for​
​
147​​the 2026–2031 cycle. The highest priorities include establishment of a Tribal Fire Program​
​
148​​(Priority 1 — framed as workforce development, cultural revitalization, and land healing),​
​
149​​reinstatement of the Bear River Police Department, development of an Emergency Resilience​
​
150​​Campus on the Singley Hill corridor adjacent to the Rancheria, secondary egress via Bowie​
​
151​​Road to Echo Lane, and execution of the approved but unspent FEMA Public Assistance​
​
152​​contract under FEMA-4692-DR.​
​

​D

​53​​This plan is a public document. Operationally sensitive details are maintained in the BRB​
1
154​​Emergency Operations Plan and are not reproduced here. Members of the Tribal community​
​
155​​and the public are invited to review this draft and provide comment to the Office of Emergency​
​
156​​Services before the plan is finalized for Tribal Council adoption and FEMA Region IX​
​
157​​submission.​
​
158​
​

159​ ​Released for Public Comment on: 8/4/2026​
​
160​ ​Closed for Review on: 9/14/2026​
​
161​
​
162​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​6​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​PART ONE: INTRODUCTION​

163​
​

164​​1.1 Purpose and Background​
​
​65​​The purpose of this Tribal Hazard Mitigation Plan is to identify the natural and human-caused​
1
166​​hazards that threaten the Bear River Band of the Rohnerville Rancheria, assess the Tribe's​
​
167​​vulnerability to those hazards, and establish a prioritized strategy of mitigation actions that​
​
168​​reduce long-term risk to life, property, the Tribal economy, and cultural resources. Hazard​
​
169​​mitigation is sustained action taken to reduce or eliminate long-term risk — it is distinct from​
​
170​​preparedness, response, and recovery, though it strengthens all three.​
​

177​​1.2 Regulatory Basis​
​

T​

​71​​This plan is an update to the Tribe's original THMP, adopted by Tribal Council on February 18,​
1
172​​2021 under Resolution No. 21-11 and approved by FEMA Region IX on March 30, 2022​
​
173​​following revisions in October 2021 and January 2022. As a plan update, this document​
​
174​​addresses the additional requirements of 44 CFR § 201.7(d)(3): changes in development,​
​
175​​progress on prior mitigation actions, and changes in priorities are documented throughout,​
​
176​​principally in Part Five.​
​

​•​
​•​
​•​

​•​
•​ ​
​•​

​ isaster Mitigation Act of 2000 (DMA 2000), amending the Robert T. Stafford Disaster​
D
​Relief and Emergency Assistance Act​
​44 CFR § 201.7 — Tribal Mitigation Plans, establishing the criteria for FEMA approval of​
​tribal plans​
​Sandy Recovery Improvement Act of 2013 (SRIA), which established federally​
​recognized tribes' authority to request Presidential disaster declarations directly,​
​affirming the government-to-government relationship​
​Robert T. Stafford Act §§ 203, 404, and 406 — pre-disaster mitigation, Hazard Mitigation​
​Grant Program, and Public Assistance mitigation​
​2 CFR Parts 200 and 3002 — uniform administrative requirements for federal awards​
​Executive Order 13175 — Consultation and Coordination with Indian Tribal​
​Governments​

R

​79​
1
180​
​
181​
​
182​
​
183​
​
184​
​
185​
​
186​
​
187​
​
188​
​
189​
​
190​
​

AF

178​​This plan is prepared under the following federal authorities:​
​

​D

​91​​As a federally recognized sovereign nation, BRB engages with FEMA on a​
1
192​​government-to-government basis. This plan is submitted directly to FEMA Region IX and does​
​
193​​not require state review.​
​
194​​1.3 FEMA Mitigation Grant Programs​
​
​95​​An approved THMP maintains the Tribe's eligibility for FEMA Hazard Mitigation Assistance,​
1
196​​including the Hazard Mitigation Grant Program (HMGP), Building Resilient Infrastructure and​
​
197​​Communities (BRIC), and Flood Mitigation Assistance (FMA), as well as mitigation opportunities​
​
198​​within Public Assistance (PA Categories C–G). The Tribe has a Presidential Major Disaster​
​
199​​Declaration (FEMA-4692-DR) establishing direct HMGP eligibility, an active HMGP-funded​
​
200​​seismic assessment project, and an approved PA contract pending execution. BRB is actively​
​
201​​pursuing both HMGP and BRIC funding opportunities as of the date of this plan update.​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​7​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

202​​1.4 Tribal Mitigation Vision and Mission​
​
203​​Mitigation Vision​
​
​04​​To create a vibrant Tribal community that promotes safety through preventative planning,​
2
205​​training, and the implementation of strategies designed to avoid or mitigate potential risks to​
​
206​​Tribal citizens, Rancheria visitors, and Tribal assets — including those on the main Rancheria,​
​
207​​discontiguous Tribal lands, and ancestral territories where Tribal members gather.​
​
208​​Mitigation Mission​
​

213​​1.5 The Four Community Pillars​
​

T​

​09​​To protect the Tribal community and its resources through the establishment of an integrated​
2
210​​mitigation program that helps BRB prevent and reduce the incidence of injury and damage from​
​
211​​hazards, assert Tribal authority over public safety on Tribal trust lands, and build long-term​
​
212​​community resilience consistent with Tribal sovereignty and self-determination.​
​

​Pillar​

​Meaning in This Plan​

​Quality of Life​

​ rotecting the health, safety, housing, and daily well-being of Tribal citizens,​
P
​elders, children, and employees​

​Self-Sufficiency​

​ uilding Tribal capability to respond to and recover from emergencies without​
B
​dependence on outside agencies whose response is delayed or uncertain​

​Sustainability​

I​nvesting in infrastructure, energy, and water systems that endure across​
​generations and changing climate conditions​
​ rotecting ceremonial sites, cultural practices, language, and the Tribe's​
P
​relationship with ancestral lands — recognizing that cultural restoration is itself​
​mitigation​

R

​Cultural Awareness​

217​
​

AF

​14​​Every mitigation action in this plan advances one or more of four community pillars established​
2
215​​by the Tribe. Together with the guiding philosophy that healing the land heals the people, these​
​
216​​pillars are the organizing logic of the plan:​
​

​D

218​​1.6 Plan Goals​
​

​19​​Goal 1:​​Preserve human life at BRB Rancheria and protect​​the health, safety, and well-being of​
2
220​​Tribal citizens, Tribal employees, and visitors to BRB Rancheria and Tribal lands.​
​
​21​​Goal 2:​​Protect and safeguard BRB property, including​​buildings, water, electrical and other​
2
222​​utilities, equipment, land, cultural resources, and environmental resources.​
​
​23​​Goal 3:​​Preserve and protect Tribal government and​​economic enterprises from interruption and​
2
224​​implement mitigation strategies that reduce the likelihood of long-term disruptions.​
​
225​​1.7 Plan Organization​
​
226​​Table 1-1: Plan Organization​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​8​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​Title​

​Description​

​Part One​

​Introduction​

​ urpose, regulatory basis, grant programs, vision, mission,​
P
​and goals​

​Part Two​

​Planning Process​

​ lan update process, committee membership, public​
P
​participation, and agency coordination​

​Part Three​

​Community and Land Profile​

​ ribal history, lands, facilities, population, infrastructure, and​
T
​public services​

​Part Four​

​Risk Assessment​

​ azard identification, profiling, vulnerability assessment, and​
H
​loss estimation​

​Part Five​

​ itigation Strategy and​
M
​Action Plan​

​ oals, objectives, and 26 mitigation actions with responsible​
G
​parties and timelines​

​Part Six​

​Plan Maintenance​

​Monitoring, evaluation, and update procedures​

227​
​

T​

​Part​

228​​Supporting documentation is provided in the following appendices:​
​

AF

•​ ​
​•​
​•​
​•​
​•​
​•​
​•​
​•​
​•​

​ ppendix A: Planning Process Documentation — meeting notes, sign-in sheets, and​
A
​planning timeline​
​Appendix B: Community Hazard Mitigation Survey — instrument and results​
​Appendix C: Tribal Stakeholder Outreach Documentation​
​Appendix D: Mitigation Action Completion Report (MACR) Template​
​Appendix E: Tribal Council Adoption Resolution​
​Appendix F: Energy Emergency Plan​
​Appendix G: Pet and Service Animal Emergency Plan​
​Appendix H: Severe Weather Employee Training Module​
​Appendix I: Pre-Storm Culvert and Drainage Inspection Protocol​
​Appendix J: Flooding Engineering Documentation​

R

​•​

​D

​29​
2
230​
​
231​
​
232​
​
233​
​
234​
​
235​
​
236​
​
237​
​
238​
​
239​
​
240​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​9​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​PART TWO: PLANNING PROCESS​

241​
​

242​​2.1 Description of the Planning Process​
​
​43​​To update this THMP, the Bear River Band of the Rohnerville Rancheria reconvened its Hazard​
2
244​​Mitigation Planning Committee and initiated a structured, phased planning process led by​
​
245​​Amanda Gonzales, Office of Emergency Services Manager, with support from Nicholas​
​
246​​Anderson, Office of Emergency Services Logistics Coordinator.​
​

252​​Table 2-1: Hazard Mitigation Planning Committee​
​

​Role​

​Office of Emergency Services​

​Plan Lead / Coordinator​

​Tribal Administration​

​Committee Member​

​Information Technology​
​Grants Management​

AF

​Department​

​Human Resources​

253​
​

T​

​47​​The planning process was designed to meet the requirements of 44 CFR § 201.7(b) and (c),​
2
248​​which require that the process: (1) include an opportunity for neighboring communities, local​
​
249​​and regional agencies, businesses, and other organizations to be involved; (2) include the​
​
250​​public; and (3) be conducted in a manner consistent with the government-to-government​
​
251​​relationship between the Tribe and federal agencies.​
​

​Committee Member​
​Committee Member​
​Committee Member​

​Facilities and Maintenance​

​Committee Member​

​Finance​

​Committee Member​

257​
​

​D

258​
​

R

​54​​Meeting notes and sign-in sheets are maintained on file at the BRB Office of Emergency​
2
255​​Services ; the planning process, partner engagement, and schedule are documented in​
​
256​​Appendix A.​
​

259​
​
260​
​
261​
​
262​
​
263​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​10​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

264​​2.2 Public Participation​
​
​65​​As​ ​part​ ​of​ ​the​ ​public​ ​participation​ ​process​ ​for​ ​this​ ​plan​ ​update,​ ​the​ ​Office​ ​of​ ​Emergency​ ​Services​
2
266​​distributed​​a​​community​​hazard​​survey​​to​​Tribal​​citizens,​​Tribal​​government​​employees,​​and​​residents​​of​
​
267​​the​ ​planning​ ​area.​ ​Respondents​ ​rated​ ​their​ ​level​ ​of​ ​concern​ ​for​ ​eight​ ​hazards​ ​on​ ​a​ ​five-point​ ​scale,​
​
268​​identified​ ​hazards​ ​that​ ​have​ ​personally​ ​affected​ ​their​ ​households,​ ​ranked​ ​the​ ​community​ ​facilities​ ​and​
​
269​​infrastructure​ ​they​ ​considered​ ​most​ ​critical​ ​to​ ​protect,​ ​and​ ​assessed​ ​household​​preparedness,​​warning​
​
270​​system​ ​effectiveness,​ ​and​ ​evacuation​ ​readiness.​ ​Respondents​ ​were​ ​also​ ​invited​ ​to​ ​identify​ ​specific​
​
271​​hazardous​ ​locations​ ​and​ ​to​ ​suggest​ ​mitigation​ ​actions​ ​in​ ​their​ ​own​ ​words.​ ​The​ ​survey​ ​instrument​ ​and​
​
272​​complete response tabulation are provided in Appendix B.​
​

T​

​73​​Survey​​participation​​spanned​​enrolled​​Tribal​​members​​living​​on​​trust​​land,​​Tribal​​government​​employees,​
2
274​​and​​non-member​​residents​​of​​the​​planning​​area,​​with​​tenure​​in​​the​​planning​​area​​ranging​​from​​under​​five​
​
275​​years​ ​to​ ​more​ ​than​ ​twenty.​ ​Results​ ​were​​used​​to​​validate​​the​​hazard​​rankings​​developed​​by​​the​​THMP​
​
276​​Planning Team and directly informed the prioritization of mitigation actions in Part Five​​.​
​
277​​Community Hazard Concerns​
​

​Average Concern​
​Rating (1–5)​

R

​Hazard​

AF

​78​​Earthquake​ ​registered​ ​the​ ​highest​ ​community​ ​concern​ ​of​ ​any​ ​hazard,​ ​consistent​ ​with​ ​the​​Tribe's​​direct​
2
279​​experience​​of​​the​​December​​earthquake​​sequence​​of​​2021,​​2022,​​and​​2024​​and​​the​​damages​​sustained​
​
280​​across​​ten​​Tribal​​facilities​​under​​FEMA-4692-DR.​​Power​​outage​​ranked​​second​​—​​a​​notable​​result,​​as​​it​
​
281​​confirms​ ​that​​the​​community​​experiences​​energy​​disruption​​as​​a​​hazard​​in​​its​​own​​right​​rather​​than​​only​
​
282​​as​ ​a​ ​secondary​ ​effect,​ ​and​ ​it​ ​directly​ ​supports​ ​the​ ​priority​ ​placed​ ​on​ ​the​ ​Energy​ ​Emergency​ ​Plan​
​
283​​(Appendix​​F)​​and​​backup​​power​​actions​​in​​Part​​Five.​​Severe​​weather​​and​​landslide/erosion​​ranked​​third​
​
284​​at​​equivalent​​levels;​​elevated​​concern​​for​​landslide​​and​​erosion​​aligns​​with​​the​​slope​​and​​bank​​instability​
​
285​​documented​ ​in​ ​the​ ​Whitchurch​ ​Engineering​ ​assessment​ ​(BRB2401).​ ​Concern​ ​for​ ​drought​​and​​extreme​
​
286​​heat was comparatively low, consistent with the Rancheria's coastal climate.​
​

​Typical Response​
​Range​

​Rank​

​3.7​

​Very / Extremely​

​1​

​Power Outage​

​3.2​

​Moderately / Very​

​2​

​ evere Weather (Thunderstorms,​
S
​High Winds, Hail)​

​3.0​

​Moderately​

​3 (tie)​

​Landslide / Erosion​

​3.0​

​Moderately​

​3 (tie)​

​Wildfire​

​2.8​

​Moderately​

​5​

​Flooding​

​2.4​

​Slightly / Moderately​

​6​

​Drought / Water Shortage​

​1.8​

​Slightly​

​7 (tie)​

​Extreme Heat​

​1.8​

​Slightly​

​7 (tie)​

​D

​Earthquake​

​87​ ​Table 2-2. Community hazard concern ratings. Averages reflect all responses received for each​
2
288​
​
​hazard; not every respondent rated every hazard.​
289​​Hazards Experienced by the Community​
​
​90​​Respondents​​were​​asked​​which​​hazards​​had​​personally​​affected​​their​​household​​or​​property​​in​​the​​past,​
2
291​​including​ ​loss​ ​of​ ​utilities,​ ​property​ ​damage,​ ​or​ ​evacuation.​ ​Earthquakes​ ​accounted​ ​for​ ​nearly​​half​​of​​all​
​
292​​reported​​impacts​​—​​every​​hazard​​experience​​profile​​but​​one​​included​​it​​—​​reinforcing​​its​​position​​as​​the​
​
​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​11​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​93​​Tribe's​​defining​​hazard.​​Reported​​impacts​​from​​severe​​weather,​​flooding,​​and​​drought/water​​issues​​were​
2
294​​distributed​ ​evenly​ ​behind​ ​it.​ ​No​ ​respondent​ ​reported​ ​a​ ​past​ ​wildfire​ ​impact,​ ​consistent​ ​with​ ​wildfire's​
​
295​​moderate​​concern​​rating;​​wildfire​​nonetheless​​remains​​fully​​profiled​​in​​Part​​Four​​given​​regional​​fire​​history​
​
296​​and the fuels conditions documented in the risk assessment.​
​

​Hazard​

​Reported Past Impacts​
​45%​

​Severe Weather (Wind / Storms)​

​18%​

​Flooding​

​18%​

​Drought / Water Issues​

​18%​

T​

​Earthquake​

​Wildfire​

​0%​

​97​ T
2
​ able 2-3. Hazards reported by respondents as having personally affected their household or​
298​ ​property, as a share of all reported impacts; respondents could select more than one hazard.​
​
299​​Critical Facilities and Infrastructure Priorities​
​

​Facility / Infrastructure​

​Rank​

​Water / Wastewater Treatment Plants​

​22%​

​1​

​Power Lines / Power Distribution​

​19%​

​2​

​Major Roadways / Bridges​

​15%​

​3 (tie)​

​Daycare / Youth Development Center​

​15%​

​3 (tie)​

​Tribal Administrative Offices​

​7%​

​5 (tie)​

​Social Services Offices​

​7%​

​5 (tie)​

​Essential Businesses​

​7%​

​5 (tie)​

​Cultural / Historical Sites​

​4%​

​8 (tie)​

​Gaming Offices​

​4%​

​8 (tie)​

R

​Share of Selections​

​D

AF

​00​​Asked​ ​which​ ​community​ ​buildings​ ​and​ ​infrastructure​ ​are​ ​most​ ​critical​ ​to​ ​protect​​during​​a​​hazard​​event,​
3
301​​respondents​​converged​​strongly​​on​​lifeline​​systems:​​water​​and​​wastewater​​treatment,​​power​​distribution,​
​
302​​and​​major​​roadways​​and​​bridges​​together​​accounted​​for​​over​​half​​of​​all​​selections,​​with​​water/wastewater​
​
303​​treatment​ ​appearing​ ​in​ ​every​ ​respondent's​ ​priorities.​ ​The​ ​Daycare/Youth​ ​Development​ ​Center​ ​ranked​
​
304​​alongside​ ​roadways​ ​—​ ​a​ ​clear​ ​community​ ​statement​ ​that​ ​protection​​of​​children​​and​​youth​​facilities​​is​​a​
​
305​​first-order​​priority.​​These​​results​​reinforce​​the​​infrastructure​​focus​​of​​the​​mitigation​​strategy​​and​​align​​with​
​
306​​the lifeline vulnerabilities identified in the FY 2025 Stakeholder Preparedness Review.​
​

​07​​Table 2-4. Community facilities and infrastructure identified as most critical to protect, as a share​
3
308​
​
​of all selections.​
309​
​
310​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​12​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

311​​What We Heard: Locations, Suggestions, and Readiness​
​
​12​​The​ ​open-ended​ ​responses​ ​provided​ ​some​ ​of​ ​the​ ​most​ ​actionable​ ​input​ ​in​ ​the​ ​survey.​ ​Respondents​
3
313​​identified​ ​specific​ ​hazardous​ ​locations:​ ​mature​ ​bull​ ​pine​ ​trees​ ​along​ ​Singley​ ​Hill​ ​Road​ ​across​ ​from​​the​
​
314​​casino​ ​that​ ​shed​ ​large​ ​limbs​ ​in​ ​high​ ​winds;​ ​U.S.​ ​Highway​ ​101​ ​at​ ​Beatrice​ ​Hill;​ ​Fernbridge​ ​as​ ​a​
​
315​​flood-vulnerable​​crossing;​​and​​the​​single-access,​​one-way-in/one-way-out​​configuration​​of​​portions​​of​​the​
​
316​​Rancheria.​​The​​access​​concern​​directly​​corroborates​​the​​secondary​​egress​​route​​action​​in​​Part​​Five,​​and​
​
317​​the tree hazard reports support the vegetation management actions in the mitigation strategy.​
​

T​

​18​​Respondent​ ​suggestions​ ​for​ ​mitigation​ ​actions​ ​included​ ​tree-topping​ ​on​ ​Tribal​ ​home​ ​sites​ ​(with​ ​one​
3
319​​respondent​ ​specifically​ ​proposing​ ​pursuit​ ​of​ ​Stafford​ ​Act​ ​Section​ ​404​ ​Hazard​​Mitigation​​Grant​​Program​
​
320​​funding);​ ​backup​ ​power,​ ​water,​ ​and​ ​connectivity​ ​for​ ​critical​ ​functions;​ ​department-level​ ​and​ ​household​
​
321​​emergency​ ​plans​ ​and​ ​kits;​ ​designated​ ​protective​ ​location​ ​zones​ ​for​ ​use​ ​during​ ​disasters;​ ​sheltering​
​
322​​capacity​ ​with​ ​food,​ ​power,​ ​heat,​ ​and​ ​water​ ​for​ ​displaced​ ​persons;​ ​and​ ​an​ ​annual​ ​full-scale​ ​community​
​
323​​exercise​ ​paired​​with​​field​​medical​​training​​and​​certification,​​reflecting​​the​​extended​​emergency​​response​
​
324​​times​​characteristic​​of​​rural​​communities.​​Each​​of​​these​​suggestions​​was​​reviewed​​by​​the​​Planning​​Team​
​
325​​and is reflected in, or informed the prioritization of, the mitigation actions in Part Five.​
​

​D

R

AF

​26​​On​ ​community​ ​readiness:​ ​most​ ​respondents​ ​rated​ ​the​ ​Tribe's​ ​warning​ ​systems​​(RAVE​​alerts,​​text,​​and​
3
327​​email)​​as​​effective​​or​​very​​effective​​in​​reaching​​them​​during​​emergencies,​​with​​one​​respondent​​reporting​
​
328​​the​​systems​​do​​not​​reach​​them​​effectively​​—​​a​​result​​that​​supports​​continued​​enrollment​​outreach​​under​
​
329​​the​ ​severe​ ​weather​ ​training​ ​program​ ​(Appendix​ ​H).​ ​Household​ ​preparedness​ ​self-ratings​ ​averaged​​the​
​
330​​midpoint​ ​of​ ​the​ ​scale,​ ​indicating​ ​meaningful​ ​room​ ​for​ ​improvement​ ​in​ ​household-level​ ​readiness.​
​
331​​Estimated​​household​​evacuation​​times​​divided​​evenly​​between​​under​​thirty​​minutes​​and​​thirty​​minutes​​to​
​
332​​one​ ​hour.​ ​Text​ ​alerts​ ​and​ ​email​ ​were​ ​the​ ​most​ ​common​​channels​​for​​receiving​​emergency​​information,​
​
333​​followed​ ​by​ ​word​ ​of​ ​mouth​ ​and​ ​social​ ​media.​ ​Every​ ​respondent​ ​expressed​ ​willingness​ ​or​ ​conditional​
​
334​​willingness​ ​to​ ​participate​ ​in​ ​future​ ​preparedness​ ​and​ ​mitigation​ ​training​ ​—​ ​a​ ​strong​ ​mandate​ ​for​ ​the​
​
335​​training and exercise actions in Part Five.​
​

​36​​Figure 2-1: Average community concern rating by hazard, 2026 Community Hazard Mitigation Survey​
3
337​​(five-point scale; see Appendix B for survey instrument and full results).​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​13​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

338​​2.3 Stakeholder and Intergovernmental Coordination​
​
​39​​Stakeholder coordination for this update ran through the integrated 2025–2026 Tribal​
3
340​​emergency planning sequence. Development of the BRB Emergency Operations Plan (July​
​
341​​2025) directly engaged regional emergency management entities—including the Humboldt​
​
342​​County Office of Emergency Services, Loleta Fire Department, CAL FIRE / Fortuna Emergency​
​
343​​Command Center, and adjacent Tribal nations. Collaborative input from these regional​
​
344​​stakeholders is integrated across this THMP, alongside capability assessments from the 2025​
​
345​​SPR and 2026 THIRA. In addition, each government and agency listed below was notified of​
​
346​​this draft’s availability and invited to comment during the public review period (August 4 –​
​
347​​September 4, 2026).​
​

​•​
​•​
​•​
​•​
​•​
​•​
​•​

​ eighboring Tribal Nations​​— Wiyot Tribe, Blue Lake​​Rancheria, Cher-Ae Heights​
N
​Indian Community of the Trinidad Rancheria, Yurok Tribe, Hoopa Valley Tribe, and Karuk​
​Tribe; regional intertribal cooperation concerning shared hazards and mutual assistance.​
​Humboldt County Office of Emergency Services​​— coordination​​for the operational​
​area, alerting systems, and mass care strategy; active EOP planning contributor.​
​Loleta Fire Department​​— structural fire protection​​and current JHA; subject of​
​formalization and sovereignty documentation under Action 5.6.19.​
​CAL FIRE / Fortuna Emergency Command Center​​— regional​​emergency dispatch​
​and command services; participant in the Tribal EOP cycle.​
​Bureau of Indian Affairs​​— standing coordination regarding​​federal trust duties and​
​wildland fire protection on trust lands (Federal Responsibility Area).​
​Whitchurch Engineering, Inc.​​— flooding infrastructure​​engineering and site-specific​
​assessments under Project BRB2401.​
​Bureau of Reclamation​​— active infrastructure partnership​​established via Agreement​
​No. R25AP00342.​
​U.S. Army Corps of Engineers​​— study and technical​​assistance project focused on​
​the Mattole Beach area and the Salmon Ceremony; produced the mapping series used​
​throughout this plan; two-day site visit May 6–7, 2026.​

AF

​•​

R

​50​
3
351​
​
352​
​
353​
​
354​
​
355​
​
356​
​
357​
​
358​
​
359​
​
360​
​
361​
​
362​
​
363​
​
364​
​
365​
​
366​
​
367​
​

T​

​48​​The Tribe maintains coordination relationships with the following governments and partner​
3
349​​agencies:​
​

368​​2.4 Integration with THIRA, SPR, and Other Tribal Planning​
​

​D

​69​​This THMP is one of three integrated documents in the Tribe's federal emergency planning​
3
370​​framework. The 2026 Tribal Threat and Hazard Identification and Risk Assessment (THIRA)​
​
371​​establishes capability targets across standardized scenarios; the 2025 Stakeholder​
​
372​​Preparedness Review (SPR) measures current capability against those targets and identifies​
​
373​​gaps; and this THMP establishes the mitigation actions that close them. Capability gaps​
​
374​​identified in the SPR are cited directly in the mitigation action sheets in Part Five. The plan is​
​
375​​also integrated with the BRB Emergency Operations Plan (July 2025), which contains​
​
376​​operational detail intentionally excluded from this public document.​
​
377​​2.5 Review and Incorporation of Existing Plans, Studies, and Reports​
​
378​​The following documents were reviewed and incorporated into this update:​
​
​79​
3
380​
​
381​
​

​•​

​ RB Tribal Hazard Mitigation Plan (2021, FEMA approved 2022) and FEMA Region IX​
B
​Plan Review Tool (March 30, 2022) — all Opportunities for Improvement from FEMA's​
​review are addressed in this update​
​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​14​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​82​
3
383​
​
384​
​
385​
​
386​
​
387​
​
388​
​
389​
​
390​
​

•​ ​
​•​
​•​
•​ ​
​•​
​•​
​•​

​ 026 BRB THIRA and 2025 BRB SPR executive summaries​
2
​BRB Emergency Operations Plan (July 2025)​
​Whitchurch Engineering Scoping Letter, Project No. BRB2401 (March 7, 2024) —​
​six-site flooding assessment​
​Bureau of Reclamation Agreement No. R25AP00342​
​FEMA-4692-DR Public Assistance damage documentation (ten facilities)​
​BRB Hydrant Flow Test Report (February 2026, NFPA 291)​
​County of Humboldt Hazard Mitigation Plan and CAL FIRE Fire Hazard Severity Zone​
​mapping (as supplemental regional context)​

T​

391​​2.6 Government-to-Government Relationship​
​
​92​​Consistent with the Sandy Recovery Improvement Act of 2013 and Executive Order 13175,​
3
393​​BRB engages FEMA directly as a sovereign government. The Tribe's December 2022​
​
394​​Presidential Major Disaster Declaration (FEMA-4692-DR) was received directly, and this plan​
​
395​​will be submitted directly to FEMA Region IX for review and approval. This plan asserts and​
​
396​​documents Tribal jurisdictional authority over public safety on Tribal trust lands.​
​

399​
​
400​
​
401​
​
402​
​
403​
​
404​
​
405​
​
406​
​
407​
​
408​
​

​D

409​
​

R

398​
​

AF

397​
​

410​
​

411​
​

412​
​
413​
​
414​
​
415​
​
416​
​
417​
​
418​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​15​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​PART THREE: COMMUNITY AND LAND PROFILE​

419​
​
420​
​

AF

​22​​This section provides a​
4
423​​comprehensive profile of​
​
424​​the Bear River Band of​
​
425​​the Rohnerville​
​
426​​Rancheria, including its​
​
427​​history, governance,​
​
428​​demographics, land​
​
429​​holdings, critical​
​
430​​facilities, infrastructure,​
​
431​​and public services.​
​
432​​This information forms​
​
433​​the foundation for the​
​
434​​risk assessment in Part​
​
435​​Four and for the​
​
436​​mitigation actions in Part​
​
437​​Five.​
​

T​

421​​3.1 Overview​
​

​D

R

​38​​Understanding the​
4
439​​community profile in the​
​
440​​context of BRB's history​
​
441​​is essential to​
​
442​​understanding why​
​
443​​current vulnerabilities​
​
444​​exist. The Tribe's history​
​
445​​of dispossession,​
​
446​​termination, and​
​
447​​restoration is not​
​
448​​background information​
​
449​​— it is direct causal​
​
450​​context for the​
​
451​​infrastructure gaps,​
​
452​​dispersed population,​
​
453​​and institutional capacity​
​
454​​constraints that define​
​
455​​BRB's current hazard​
​
456​​vulnerability.​
​
​57​
4
458​
​
459​
​
460​
​
461​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​16​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

462​​3.2 History and Connection to Land​
​

T​

​63​​The Bear River Band of the Rohnerville Rancheria is a federation of Wiyot and Eel River, Bear​
4
464​​River, and Mattole peoples whose ancestors have inhabited what is now Humboldt County since​
​
465​​time immemorial. These peoples maintained — and continue to maintain — deep cultural,​
​
466​​spiritual, and ecological relationships with the rivers, forests, coastline, and lands of the region.​
​
467​​The Mattole River watershed, the Humboldt coast, and the territory surrounding the Eel River​
​
468​​are not simply geographic references in this plan; they are ancestral homelands central to Tribal​
​
469​​identity, ceremony, and the well-being of Tribal members today. The Tribe's present​
​
470​​demographic profile, geographic dispersal, and hazard vulnerabilities are direct consequences​
​
471​​of documented historical policies of violence, displacement, and cultural suppression. This​
​
472​​history is not background context. It is the foundation of this plan.​
​
473​​The 1860 Coordinated Massacres and Aftermath​
​

AF

​74​​Following the 1849 Gold Rush, settlers flooded the Humboldt Bay, Eel River, and Bear River​
4
475​​basins, seizing hunting grounds and converting indigenous lands into private ranches. On​
​
476​​February 26, 1860, a secret committee of settlers launched coordinated, simultaneous attacks​
​
477​​on Native villages at Table Bluff, Eel River, Bear River, and the Mattole Valley. The Indian Island​
​
478​​(Duluwat Island) massacre killed an estimated 80 to 250 Wiyot people — primarily women,​
​
479​​children, and elders — during a traditional World Renewal Ceremony. Survivors were marched​
​
480​​to Fort Humboldt, where nearly half died from starvation and disease. Approximately 450​
​
481​​survivors were forcibly marched to the Klamath River Reservation; when that reservation was​
​
482​​destroyed in the 1861–1862 floods, returning refugees were hunted and forcibly relocated to​
​
483​​Hoopa Valley, Smith River, and Round Valley. The Wiyot population, estimated at 1,500 to 2,000​
​
484​​in 1850, numbered only 100 by the 1900 U.S. Census.​
​
485​​The Indian Boarding School Era​
​

​D

R

​86​​From the late 1800s through the 1970s, the U.S. government institutionalized regional children​
4
487​​at facilities including the Hoopa Valley Boarding School, the Round Valley Indian School, the​
​
488​​Sherman Institute in Riverside, and the Chemawa Indian School in Salem, Oregon — hundreds​
​
489​​of miles from their families. The boarding school era directly caused the loss of fluent Wiyot and​
​
490​​Mattole language speakers and disrupted intergenerational cultural transmission. The forced​
​
491​​separation of children from their families created patterns of dispersal and institutional​
​
492​​involvement that continue to affect the Tribal community today, including the contemporary​
​
493​​foster care vulnerability addressed in this plan. The Bear River Band dedicates substantial​
​
494​​resources to cultural revitalization, Tribal language programs, and mental health initiatives to​
​
495​​address these intergenerational impacts, including through the BIA Living Languages Grant​
​
496​​Program.​
​
497​​The 1958 Termination and the Tillie Hardwick Lawsuit​
​
​98​​In the 1950s, the U.S. government enacted the Termination Era policy, aiming to forcibly​
4
499​​assimilate Native Americans by dissolving their tribal status. Under the California Rancheria Act​
​
500​​of 1958, the government terminated 41 California Rancherias including the Rohnerville​
​
501​​Rancheria. Tribal communal lands were converted into private parcels subject to state taxation,​
​
502​​causing many impoverished families to lose their properties. Tribal members were stripped of​
​
503​​their legal recognition as Indians and rendered ineligible for federal health, education, and​
​
504​​housing services. Critically, the BIA terminated the Tribe without fulfilling mandatory promises to​
​
505​​upgrade infrastructure, water systems, and roads — a failure that contributed to the​
​
506​​infrastructure deficiencies that persist on the Rancheria today.​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​17​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​07​​In 1979, Tillie Hardwick led a class-action lawsuit against the United States on behalf of 17​
5
508​​terminated rancherias, arguing that the BIA had unlawfully terminated the tribes without meeting​
​
509​​its infrastructure obligations. On July 19, 1983, the court approved a judgment restoring federal​
​
510​​recognition to the Bear River Band, restoring Tribal sovereignty, re-establishing individual Tribal​
​
511​​member rights to federal services, and enabling the rebuilding of the Tribal land base. The initial​
​
512​​60 acres of what is referred to as “the Old Rancheria” in Rohnerville - Fortuna CA, were​
​
513​​acquired in 1991 and taken into trust in 1994. An additional 113 acres were acquired in 2007​
​
514​​through the Fearrien Property transfer. Subsequent acquisitions have expanded the main​
​
515​​Rancheria to approximately 263 acres as of 2026, in Loleta CA.​
​
516​​The Salmon Ceremony — Cultural Restoration and Ecological Stewardship​
​

T​

​17​​The Bear River and Mattole peoples traditionally performed a Salmon Return Ceremony at the​
5
518​​mouth of the Mattole River — a sacred practice marking the return of salmon and maintaining​
​
519​​the spiritual and ecological relationship between the people and the watershed. The ceremony​
​
520​​was last fully performed around 1902–1903, before forced displacement made physical access​
​
521​​to the Mattole River estuary impossible, and its formal cultural framework dissolved in 1958​
​
522​​when termination destroyed the structural support needed to coordinate intergenerational​
​
523​​gatherings.​
​

532​​3.3 Governance​
​

AF

​24​​The ceremony remained dormant for over a century. Beginning approximately 2020, the Bear​
5
525​​River Band partnered with local conservationists from the Lost Coast League and the Mattole​
​
526​​Salmon Group to revitalize the ceremony, with community members welcoming Bear River​
​
527​​members back to the Mattole Beach area. The revived Salmon Ceremony is one of the most​
​
528​​significant cultural restoration efforts in modern BRB history. When this plan documents tsunami​
​
529​​and coastal risk at Mattole Beach, it is documenting risk to an irreplaceable cultural practice that​
​
530​​took 120 years to restore — which is why Mattole Beach protective actions carry weight in this​
​
531​​plan disproportionate to event frequency.​
​

​D

R

​33​​BRB is governed by an elected Tribal Council. Tribal government departments include​
5
534​​Administration, Education, Office of Emergency Services, Public Works and Facilities, Housing,​
​
535​​Social Services, Renewable Energy Department, Environmental and Natural Resources, Grants​
​
536​​Management, Finance, Human Resources, Information Technology, and cultural and language​
​
537​​programs. The Tribe's principal economic enterprise is the Bear River Casino Resort, whose​
​
538​​revenue funds Tribal government services — a structural fact reflected in the fuel rationing​
​
539​​hierarchy and continuity priorities in this plan.​
​
540​
​
541​
​
542​
​
​43​
5
544​
​
545​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​18​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

546​​3.4 Tribal Lands​
​

567​
​
568​
​
569​
​
570​
​
571​
​
572​
​
573​
​
574​
​
575​
​

​D

576​
​

R

566​
​

AF

T​

​47​​The Tribal planning area consists of the main Rancheria of approximately 263 acres near​
5
548​​Loleta, together with discontiguous Tribal lands including parcels in the Singley Hill corridor​
​
549​​adjacent to the Rancheria, the Petrolia area parcel, and ancestral gathering areas including​
​
550​​Mattole Beach where Tribal members regularly gather for ceremony which approximately 1.5​
​
551​​hours drive over​
​
552​​narrow, often​
​
553​​single lane roads.​
​
554​​Lands are held in a​
​
555​​combination of​
​
556​​federal trust and​
​
557​​Tribal fee status,​
​
558​​with active efforts​
​
559​​to move additional​
​
560​​fee parcels into​
​
561​​trust. All figures in​
​
562​​this plan label the​
​
563​​planning area as​
​
564​​the Rancheria​
​
565​​Boundary.​
​

577​
​
578​
​
579​
​
580​
​
581​
​
582​
​
583​
​
584​
​
​85​
5
586​
​

​ PLACEHOLDER: Insert current parcel inventory table with acreage and trust/fee​
▶
​status for each parcel — Request sent to ENR 7/27/26​
​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​19​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

587​​3.5 Population and Vulnerable Populations​
​
​88​​The Rancheria is home to a small, close-knit community on California's North Coast (Census​
5
589​​geography: Rohnerville (Rancheria) Trust Lands, CA; GEOID 2500000US3220). The Tribal​
​
590​​government sustains housing, social services, child care, health programs, and emergency​
​
591​​services, and operates one of the region's largest private employers.​
​

T​

​92​​The Tribal community extends well beyond the Rancheria boundary. On-Rancheria residential​
5
593​​population is concentrated in Tish Non Village, Basayo Village, and Bear Paws Lane, in​
​
594​​neighborhoods that include multigenerational households, elders, and young children, with​
​
595​​additional daily population at the Tribal Day Care, across the government campus, and among​
​
596​​the workforce and visitors at the Bear River Casino Resort. Tribal citizens also live dispersed​
​
597​​throughout Humboldt County — including Arcata, McKinleyville, and coastal tsunami hazard​
​
598​​zones — and across the continental United States. This dispersal is not a neutral demographic​
​
599​​fact: it is a direct legacy of the dispossession, termination, and displacement policies​
​
600​​documented in Section 3.2, and the Tribe accordingly treats reaching and protecting its​
​
601​​dispersed citizens as a matter of sovereignty and justice, not merely logistics.​
​

AF

​02​​Populations requiring specific planning consideration include: elders, including residents of elder​
6
603​​housing; households with access and functional needs (AFN); children in foster care​
​
604​​placements — a contemporary echo of the boarding school era, addressed in this plan through​
​
605​​a foster care emergency protocol; limited English proficiency (LEP) employees and community​
​
606​​members, a consideration reflected in the Tribe's alert and warning and workplace emergency​
​
607​​communication practices; residents of Bear Paws Lane (seven remaining units in an area facing​
​
608​​access constraints, with conversion and displacement planning underway); and day care and​
​
609​​youth program enrollees.​
​

​D

R

​10​​The community meets federal definitions of a disadvantaged population. The Rancheria and​
6
611​​surrounding area are identified as disadvantaged under the federal Climate and Economic​
​
612​​Justice Screening Tool, and the community experiences elevated social vulnerability across the​
​
613​​indicators most relevant to disaster outcomes: income constraints, housing concentration,​
​
614​​limited egress, and dependence on a small number of critical facilities. These conditions are not​
​
615​​incidental — they are the direct legacy of the policies documented in Section 3.2, which stripped​
​
616​​the Tribe of its land base and economic foundation for over a century. Mitigation investment on​
​
617​​the Rancheria therefore carries disproportionate protective value: a single hardened facility,​
​
618​​secured egress route, or resilient utility connection protects a far greater share of this​
​
619​​community than the same investment would elsewhere. This is the practical meaning of the​
​
620​​Tribe's guiding principle that healing the land heals the people.​
​
​21​​Specific population figures, facility occupancies, and functional and access needs registries are​
6
622​​maintained by the responsible Tribal departments and in the BRB Emergency Operations Plan​
​
623​​(July 2025), consistent with this plan's practice of retaining operationally sensitive detail outside​
​
624​​the public document.​
​
625​
​
626​
​
​27​
6
628​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​20​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

629​​3.6 Critical Facilities​
​
630​​Table 3-1: Critical Tribal Facilities​
​
​Hazard Notes​

​ ribal Administration​
T
​Office/Tish Non Community​
​Center​

​ ontinuity of government,​
C
​Community services; gathering​

​ R-4692-DR documented damage;​
D
​sprinklered​

​Recreation Center​

​ esignated emergency shelter​
D
​(County MOU); animal​
​sheltering ballfields​

​ R-4692-DR damage; generator and​
D
​30-day fuel identified as Priority action;​
​no-stake astroturf restriction during​
​Emergency use on Field​

​ ear River Casino Resort​
B
​(incl. hotel tower)​

​ rimary economic enterprise;​
P
​large assembly, non​
​congregate shelter -​
​warming/cooling/clean air​

​ ulti-story; no ladder apparatus in​
M
​first-due area; reclaimed water fire system​
​uncharacterized; active HMGP seismic​
​assessment​

​The Venue / The Epicenter​

​Large-assembly event venues​

​ ssembly occupancy; fire response gaps​
A
​apply​

​ ater Treatment Facility /​
W
​Tish Non water system​

​Potable water​

​ R-4692-DR damage; single tank; ~45​
D
​min sustained fire flow​

​ astewater Treatment Plant​
W
​(upgraded)​

​ astewater; reclaimed water​
W
​source​

​ yberattack (SCADA) exposure identified​
C
​in THIRA​

​Pump and Play fuel station​

​Tribal fuel supply​

​ riority resupply agreement identified as​
P
​mitigation action​

​Elders Village / Apartments​

​ lder and vulnerable resident​
E
​housing​

​Served by hydrant H-10 (retest pending)​

​Basayo Village​

​Residential​

​Population figure pending​

​ outh Development Center /​
Y
​Day Care​

​Children's services​

​ eunification planning with school​
R
​districts​

​ lectronic notification sign -​
E
​Deployable​

​Public alerting​

​ ompleted​​"Pandemic Mitigation Action​
C
​#2 - FY21 THMP​​”​

R

AF

T​

​Function​

​ PLACEHOLDER: Update total insured replacement value of Tribal assets with current figures. Request​
▶
​sent to TA 7/26/26​

​D

631​
​

​Facility​

​32​
6
633​
​
634​
​
635​
​
636​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​21​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

637​
​
638​​3.7 Transportation and Access​
​

668​
​

​D

669​
​

R

AF

T​

​39​​The main Rancheria is served by a single primary ingress/egress route via the Singley Hill​
6
640​​corridor connecting to US-101. This single-access condition is among the Tribe's most​
​
641​​consequential structural​
​
642​​vulnerabilities: any event​
​
643​​that blocks the route —​
​
644​​collision, slide, flooding,​
​
645​​wildfire, or seismic damage​
​
646​​— isolates the entire​
​
647​​community. The Singley Hill /​
​
648​​US-101 corridor is a​
​
649​​documented fatality corridor,​
​
650​​with five or more fatalities​
​
651​​per year in recent years. A​
​
652​​secondary egress route from​
​
653​​Bowie Road to Echo Lane​
​
654​​has been identified and is​
​
655​​developed as Mitigation​
​
656​​Action 5.6.22; preliminary​
​
657​​review indicates CEQA and​
​
658​​Clean Water Act Section 404​
​
659​​requirements given the​
​
660​​sloped, vegetated, and​
​
661​​seasonally wet terrain, with a​
​
662​​drainage culvert passing​
​
663​​beneath the highway. Bear​
​
664​​Paws Lane presents its own​
​
665​​access constraints for its​
​
666​​seven remaining residential​
​
667​​units​
​

670​
​
671​
​
672​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​22​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

673​
​
674​​3.8 Water Systems and Fire Protection Infrastructure​
​
675​​3.8.1 Tish Non Water System and February 2026 Hydrant Flow Test​
​

T​

​76​​In February 2026, the Tribe conducted its first-ever hydrant flow test of the Tish Non water​
6
677​​system. Testing was conducted on 16 hydrants per NFPA 291 standards using a calibrated​
​
678​​hydrant diffuser and single-hydrant methodology (one hydrant flowing, one capped with pitot​
​
679​​gauge). All 16 hydrants were confirmed operational following corrections made during the​
​
680​​testing process. Two hydrants — H-10 (Apartments area) and H-15 (265 Kiesner Road Parking​
​
681​​Lot) — required maintenance corrections and are pending flow-rate confirmation retesting; both​
​
682​​are confirmed flowing water.​
​
683​​Table 3-2: Hydrant Flow Test Summary — Tish Non Side (February 2026)​
​
​Location​

​Test Flow (GPM)​

​Fire Flow @ 20 PSI​

​Status​

​H-1​

​Top of Carroll​

​1,179​

​1,236​

​OK​

​H-2​

​65 Carroll Rd​

​1,468​

​2,619​

​OK​

​H-3​

​258 Carroll Rd​

​1,264​

​1,426​

​OK​

​H-4​

​323 Carroll Rd​

​1,382​

​2,843​

​OK​

​H-5​

​235 Bernard Rd​

​1,444​

​4,337​

​OK​

​H-6​

​325 Bernard Rd​

​1,444​

​3,443​

​OK​

​H-7​

​Bernard/Bowie Rd​

​1,444​

​2,662​

​OK​

​H-8​

​189 Bowie Rd​

​1,444​

​1,970​

​OK — threads tightened​

​H-9​

​End of Bowie​

​1,291​

​1,677​

​OK​

​H-10​

​Apartments​

​—​

​—​

​OK pending GPM​

​Bernard/Keisner Rd​

​1,222​

​2,342​

​OK​

​260 Kiesner Rd​

​1,179​

​1,733​

​OK​

​263 Kiesner Rd​

​1,236​

​1,677​

​OK​

​265 Kiesner Rd Roadway​

​1,236​

​7,107​

​OK​

​H-15​

​265 Kiesner Rd Parking Lot​

​—​

​—​

​OK pending GPM​

​H-16​

​120 Bowie Rd (ENR)​

​1,318​

​1,846​

​OK​

​H-12​
​H-13​

​D

​H-14​

R

​H-11​

AF

​Hydrant​

​84​
6
685​
​
686​
​

​ ource: BRB Office of Emergency Services Hydrant Test Report, February 2026. Prepared by​
S
​Amanda Gonzales, OES Manager. Testing conducted per NFPA 291. Flow values represent​
​single-hydrant test conditions.​

​87​​Water system tank capacity testing conducted concurrent with hydrant testing indicated​
6
688​​approximately 45 minutes of sustained flow time before significant tank depletion, with the tank​
​
689​​level dropping from approximately ⅓ capacity during the test period. No backup water source​
​
690​​has been identified for the Tish Non water system. Most major Tribal facilities, including the​
​
691​​Community Center and residential buildings, are equipped with fire sprinkler systems, which​
​
692​​reduce required suppression flow demand under normal conditions. Simultaneous multi-hydrant​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​23​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​93​​demand — which a major fire event would require — remains untested and could reveal​
6
694​​pressure drop across the system.​
​
695​​3.8.2 Resort Reclaimed Water System​
​
​96​​The Bear River Casino Resort and associated Resort enterprises are served by a separate​
6
697​​reclaimed water system drawing from the upgraded WWTP. The specifications, storage​
​
698​​capacity, and fire flow characteristics of the Resort water system have not been formally​
​
699​​assessed as of the date of this plan. This is the Tribe's primary economic asset and operates on​
​
700​​a fire suppression water system that has not been characterized is itself a finding of this plan,​
​
701​​addressed as Mitigation Action 5.6.11.​
​

​ PLACEHOLDER: Obtain WWTP reclaimed water system specifications (storage​
▶
​capacity, pump ratings, distribution pressure, Resort-side hydrant locations) from​
​Public Works and Resort Facilities Management. Insert WWTP upgraded treatment​
​capacity in GPD.​

706​​3.9 Public Safety Services​
​
707​​3.9.1 Law Enforcement​
​

T​

​02​
7
703​
​
704​
​
705​
​

​13​
7
714​
​

AF

​08​​The Bear River Police Department is not currently active. Reinstatement of the department is a​
7
709​​Priority mitigation action (5.6.2), supported by the 2025 SPR which documents​
​
710​​law-enforcement-dependent capabilities at approximately 20 percent of target. Law enforcement​
​
711​​response currently depends on the Humboldt County Sheriff, with response times and​
​
712​​jurisdictional complexity on trust lands documented in Part Four.​
​

​ PLACEHOLDER: Confirm whether PD dissolution occurred by Council action or​
▶
​administratively — Tribal Administration/Council​

715​​3.9.2 Fire Protection​
​

R

​16​​Structural fire protection is provided by the Loleta Fire Department, a volunteer department that​
7
717​​holds jurisdictional fire authority (JHA) for the Rancheria area without formal documented​
​
718​​agreement with the Tribe. Dispatch is provided through the Fortuna Emergency Command​
​
719​​Center, managed by CAL FIRE. Formalizing the JHA relationship, pursuing supplemental​
​
720​​coverage for large-assembly venues, and — centrally — establishing a Tribal Fire Program​
​
721​​(Action 5.6.1, Priority 1) address these gaps.​
​

​D

722​​3.10 Emergency Operations and Alerting​
​
​23​​The Tribe does not currently have a dedicated Emergency Operations Center; EOC functions​
7
724​​have operated on an ad hoc, multi-use basis from shared facilities, a model documented in this​
​
725​​update as unsustainable. The Emergency Resilience Campus (Action 5.6.3), planned for Tribal​
​
726​​land adjacent to the Rancheria on the Singley Hill corridor, is the foundational response to this​
​
727​​gap, with near-term secure connex-box supply storage (Action 5.6.3a) as a 90-day interim​
​
728​​measure. Public alerting is provided through RAVE Mobile enrollment and the electronic​
​
729​​notification sign at the Tish Non Village entrance (completed 2021 action). Alerting reach, LEP​
​
730​​notification capability, and enrollment rates are addressed in Part Five.​
​
731​​3.11 Cultural Resources​
​
​32​​Cultural resources requiring protection in this plan include the Mattole Beach ceremonial​
7
733​​gathering area and the revived Salmon Ceremony; Tribal language programs; cultural and​
​
​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​24​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​34​​ceremonial materials and regalia; and ancestral and archaeological sites within Tribal lands and​
7
735​​ancestral territory. Protection of cultural practice is treated in this plan as a mitigation outcome in​
​
736​​its own right under the Cultural Awareness pillar.​
​

​D

R

AF

T​

737​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​25​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​PART FOUR: RISK ASSESSMENT​

738​
​

739​​4.1 Methodology​
​
​40​​This risk assessment identifies the hazards that can affect the Tribal planning area; describes​
7
741​​the type, location, and extent of each hazard; documents previous occurrences and the​
​
742​​probability of future events, including the effects of long-term changes in weather patterns; and​
​
743​​assesses impacts and vulnerability. Consistent with FEMA Region IX's 2022 review guidance,​
​
744​​tribal-specific data is presented as primary throughout this Part, with Humboldt County regional​
​
745​​data as supplemental context.​
​

T​

746​​4.2 Climate Change as a Force Multiplier​
​

AF

​47​​Climate change is addressed in this plan not as a standalone hazard but as a force multiplier​
7
748​​that increases the probability, intensity, or consequence of nearly every profiled hazard: more​
​
749​​intense atmospheric river events driving flooding and severe weather; extended drought cycles​
​
750​​stressing the well-dependent water supply and salmon habitat; elevated wildfire conditions; sea​
​
751​​level rise and king tide interaction affecting coastal and low-lying areas; and increased​
​
752​​frequency of utility Public Safety Power Shutoff (PSPS) events.​
​
753​​PSPS Risk Designation and Utility Outage History​
​

R

​54​​The Rancheria is not located within a CPUC High Fire-Threat District Tier 2 (Elevated) or Tier 3​
7
755​​(Extreme) area; local weather conditions at the Rancheria do not independently trigger Public​
​
756​​Safety Power Shutoff events. The Tribe's PSPS exposure is instead transmission-driven:​
​
757​​electricity reaches Humboldt County via transmission corridors along Highways 299 and 36 that​
​
758​​traverse high fire-threat terrain, and de-energization of those lines can interrupt power​
​
759​​countywide regardless of coastal conditions. This occurred twice in October 2019 (October 8–10​
​
760​​and October 26–29), when countywide PSPS events left the Rancheria and approximately​
​
761​​30,000 Humboldt County customers without power. In 2020, PG&E completed reconfiguration of​
​
762​​the Humboldt Bay Generating Station to operate in "island mode," energizing portions of the​
​
763​​county — including the Fortuna district serving the Rancheria — independently of the wider grid​
​
764​​during transmission-level events. No PSPS de-energization has affected the Rancheria since​
​
765​​the October 2019 events.​
​

​D

​66​​Source: CPUC High Fire-Threat District Map, adopted January 19, 2018, pursuant to D.17-12-024​
7
767​​(revised March 2021); verified July 2026. The Rancheria is not located within an HFTD Tier 2 (Elevated)​
​
768​​or Tier 3 (Extreme) fire-threat area.​
​
​69​​PG&E outage records for the Eel River 1102 distribution circuit serving the Rancheria (January​
7
770​​2022 – June 2026) document 11 sustained unplanned outages totaling approximately 4,109​
​
771​​minutes (68.5 hours), none attributable to PSPS:​
​
​Date​

​Cause​

​Duration (min)​

​Customers Affected​

​1/3/2022​

​Third party​

​1,128​

​1,619​

​6/4/2022​

​Vegetation (transmission)​

​32​

​1,623​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​26​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​ nvironmental — M6.4 earthquake​
E
​(FEMA-4692-DR)​

​2,002​

​1,455​

​1/4/2023​

​Vegetation​

​146​

​1,530​

​3/27/2023​

​Vegetation​

​109​

​1,623​

​3/24/2024​

​Third party​

​30​

​1,631​

​12/5/2024​

​Environmental/external​

​222​

​1,591​

​12/13/2024​

​Equipment failure​

​20​

​1,577​

​1/4/2025​

​Vegetation​

​8/5/2025​

​Equipment failure​

​6/25/2026​

​Animal​

T​

​12/2/2022​

​199​

​1,635​

​70​

​1,624​

​151​

​1,627​

AF

​72​​The December 20, 2022 transmission-level outage began at 2:34 a.m., coinciding with the M6.4​
7
773​​Ferndale earthquake mainshock, and lasted approximately 33 hours — the longest interruption​
​
774​​in the record and a direct illustration of the earthquake–energy infrastructure cascade​
​
775​​addressed in the Energy Emergency Plan (Appendix F). Vegetation contact is the leading​
​
776​​recurring cause (4 of 11 events), consistent with the mitigation emphasis on vegetation​
​
777​​management and utility coordination.​
​
778​​Current Drought Status (U.S. Drought Monitor, July 2026)​
​

R

​79​​As of July 2026, the Rancheria lies within the D0 (Abnormally Dry) classification on the U.S.​
7
780​​Drought Monitor. Approximately 34.9 percent of Humboldt County's population (46,935 people)​
​
781​​is within a designated drought area, with D1 (Moderate Drought) conditions present in the​
​
782​​county's northern coastal zone. January–June 2026 ranked as the 15th driest year-to-date​
​
783​​period in 132 years of record, 14.07 inches below normal precipitation — underscoring that​
​
784​​near-normal individual months (June 2026 ranked 49th wettest) can mask significant cumulative​
​
785​​deficit.​
​

​D

​86​​Source: U.S. Drought Monitor (National Drought Mitigation Center, USDA, and NOAA), Humboldt County​
7
787​​conditions via drought.gov; precipitation rankings from NOAA National Centers for Environmental​
​
788​​Information. Data as of July 2026​​.​
​
789​​4.3 Hazard Summary and Priority Rankings​
​
790​​Table 4-1: BRB Hazard Priority Rankings — 2026 Update​
​
​Priority​

​Hazard​

​Probability​

​Impact​

​Declared​

​Change from 2021​

​1​

​Earthquake​

​High​

​ igh —​
H
​documented DR​

​ es —​
Y
​ levated: three-event​
E
​FEMA-4692-​ ​December trilogy; direct​
​DR​
​declaration​

​2​

​ andemic /​
P
​Public Health​

​Moderate​

​ igh — full​
H
​closure​

​ ederal/Stat​
F
​e COVID​

​ ustained: COVID-19​
S
​impacts fully documented​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​27​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​Hazard​

​Probability​

​Impact​

​Declared​

​Change from 2021​

​3​

​Fire / Wildfire​

​High​

​ igh —​
H
​compounding​
​gaps​

​No​

​ levated: significant new​
E
​vulnerabilities identified​

​4​

​ looding​
F
​(Localized)​

​Moderate-High​

​ oderate —​
M
​active failure​

​ o (BOR​
N
​active)​

​ levated: Whitchurch​
E
​engineering; six sites​
​documented​

​5​

​ limate Change /​
C
​Severe Weather​

​ igh​
H
​(increasing)​

​Moderate-High​

​No​

​ ustained: atmospheric​
S
​river impacts​
​documented​

​6​

​ rought / Water​
D
​Shortage​

​Moderate​

​Moderate​

​No​

​ ustained: no current​
S
​impacts; well-only​
​dependency​

​7​

​Tsunami​

​ ow-Moderate​
L
​(Mattole​
​Beach)​

​High if occurs​

​No​

​ ew: Mattole Beach;​
N
​December 2024 tsunami​
​alert​

​8​

​ ransportation /​
T
​Access​

​High — daily​

​ igh — 5+​
H
​fatalities/year​

​No​

​ ew: documented fatality​
N
​corridor; single access​
​route​

​9​

​Cyberattack​

​Moderate​

​ igh — $3.65M​
H
​exposure​

​No​

​ ew: THIRA​
N
​ransomware scenario;​
​WWTP at risk​

​10​

​Other Hazards​

​Low​

​Low-Moderate​

​No​

​Sustained​

793​
​
794​
​

​D

​95​
7
796​
​
797​
​

AF

792​
​

R

791​
​

T​

​Priority​

798​
​
799​
​
​00​
8
801​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​28​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

802​​4.4 Earthquake​
​
803​​Hazard Profile — Type, Location, Extent​
​
​04​​The Rancheria lies within one of the most seismically active regions in the continental United​
8
805​​States, near the Mendocino Triple Junction where the Cascadia Subduction Zone, San Andreas​
​
806​​system, and Mendocino Fault meet. The planning area is subject to strong ground shaking,​
​
807​​liquefaction in susceptible soils, landslide triggering, and — for a Cascadia event — near-field​
​
808​​tsunami affecting coastal areas where Tribal members live and gather. Extent is characterized​
​
809​​using moment magnitude and the Modified Mercalli Intensity (MMI) scale; the December 20,​
​
810​​2022 event produced strong to very strong shaking (MMI VII range) in the Rancheria area.​
​

T​

811​​Table 4-2: Modified Mercalli Intensity Scale (abridged)​
​
​Shaking​

​Typical Effects​

​IV​

​Light​

​Felt indoors by many; windows and dishes rattle​

​V​

​Moderate​

​Felt by nearly all; some dishes and windows broken​

​VI​

​Strong​

​Felt by all; some heavy furniture moved; slight damage​

​VII​

​Very strong​

​Considerable damage in poorly built structures; slight-to-moderate in well-built​

​VIII​

​Severe​

​IX+​

​Violent+​

AF

​MMI​

​Considerable damage in ordinary buildings; partial collapse​
​Significant damage even in well-designed structures​

812​
​

813​​Previous Occurrences — The December Trilogy​
​

R

​14​​The Tribe has experienced three significant December earthquakes in four years: December​
8
815​​2021, December 20, 2022, and December 2024. The December 20, 2022 magnitude 6.4​
​
816​​earthquake offshore of Ferndale caused documented damage across ten Tribal facilities —​
​
817​​including the Tish Non Community Center, Recreation Center (the designated emergency​
​
818​​shelter), Water Treatment Facility, and Resort facilities — and resulted in the Tribe's direct​
​
819​​Presidential Major Disaster Declaration, FEMA-4692-DR. The December 2024 event​
​
820​​additionally generated a tsunami alert affecting coastal areas where Tribal members live and​
​
821​​gather.​
​

​D

822​​Table 4-3: FEMA-4692-DR Public Assistance Project Worksheets — Confirmed Facility Damages​
​

​PW​

​Facility​

​FEMA Project No.​ F​ EMA-Approved Damage​
​Estimate ($)​

​1​

​Parking Lot / RTW​

​714344​

​12,590.14​

​2​

​Water Treatment Facility​

​714343​

​13,287.42​

​3​

​Social Services Building​

​714426​

​31,660.86​

​4​

​Recreation Center (REC)​

​714425​

​11,572.37​

​5​

​Tobacco Traders​

​714434​

​15,000.00​

​6​

​Pump & Play​

​714433​

​20,343.03​

​7​

​Family Engagement Center (FEC)​

​714430​

​17,269.21​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​29​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​8​

​Gaming Office​

​714432​

​60,815.56​

​9​

​Tish Non Community Center​

​714429​

​70,703.19​

​10​

​Bear River Casino Resort​

​714342​

​323,842.95​

S​ ubtotal — Facility Damages (PW​
​1–10)​
​11​

​ ategory Z — Direct Administrative​
C
​Costs​

​577,084.73​
​826161​

​Total — FEMA-Approved Estimates​

​40,668.10​
​617,752.83​

827​
​
828​
​

​D

R

AF

​29​
8
830​​The December 20, 2022 M6.4​
​
831​​earthquake resulted in the Tribe’s​
​
832​​first Presidential disaster​
​
833​​declaration, FEMA-4692-DR.​
​
834​​Confirmed damages were​
​
835​​documented across ten Tribal​
​
836​​facilities through the FEMA Public​
​
837​​Assistance program, with​
​
838​​FEMA-approved estimates totaling​
​
839​​$577,084.73 in facility damages​
​
840​​and $617,752.83 including direct​
​
841​​administrative costs (Table 4-3).​
​
842​​Damages ranged from parking and​
​
843​​site infrastructure to the Water​
​
844​​Treatment Facility, Tish Non​
​
845​​Community Center, and the Bear​
​
846​​River Casino Resort — the facility​
​
847​​whose revenues sustain Tribal​
​
848​​government operations —​
​
849​​demonstrating that even moderate​
​
850​​structural damage distributed​
​
851​​across the government campus​
​
852​​carries compounding operational​
​
853​​and economic consequences for​
​
854​​the Tribe.​
​

T​

​23​​Source: FEMA-4692-DR Public Assistance grant files, Bear River Band OES / Grants Administration. Amounts reflect​
8
824​​FEMA-approved damage estimates; project period of performance extends through March 8, 2027. An additional completed​
​
825​​Project Worksheet (Basayo Apartments, $3,888.00) has been closed out. Cost-share detail is maintained in the Tribe’s Public​
​
826​​Assistance grant records.​
​

855​
​
856​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​30​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

857​
​
858​
​

​ robability, Impacts, and​
P
​Vulnerability​

​61​
8
862​
​
863​
​
864​
​
865​
​
866​
​
867​
​
868​
​
869​
​
870​
​
871​
​
872​
​
873​
​
874​
​
875​
​
876​
​
877​
​
878​
​
879​
​
880​
​
881​
​
882​
​

​ robability of damaging seismic​
P
​events is high; a full-margin​
​Cascadia Subduction Zone​
​rupture is the region's​
​catastrophic planning scenario.​
​Tribal vulnerability includes​
​unreinforced and pre-code​
​structures identified for​
​assessment under the active​
​HMGP-funded seismic​
​assessment project, the​
​multi-story Resort hotel tower​
​(assessment in progress), water​
​system components, and the​
​compounding effect of​
​single-route access if the Singley​
​Hill corridor is damaged. The​
​2026 THIRA earthquake​
​scenario establishes capability​
​targets that current capabilities​
​do not fully meet, per the 2025​
​SPR.​

885​
​
886​
​
887​
​

​D

888​
​

AF

884​
​

R

883​
​

T​

​59​
8
860​
​

889​
​
890​
​

​91​​ACTIVE VULNERABILITY: The approved $200,000 in FEMA Public Assistance funding​
8
892​​for facilities damaged in DR-4692-DR remains unspent pending contract execution as​
​
893​​of the date of this plan. Several facilities with documented earthquake damage have​
​
894​​not been fully repaired, including the designated emergency shelter (Recreation​
​
895​​Center). Contract execution is identified as Action 5.6.8 in Part Five.​
​
​96​
8
897​
​
898​
​
899​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​31​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

900​​4.5 Pandemic / Public Health Emergency​
​
​01​​The COVID-19 pandemic caused full closure of Tribal government and enterprise operations,​
9
902​​documented revenue interruption to the enterprise that funds Tribal government services, and​
​
903​​sustained public health protective operations. The Tribe developed a Pandemic Response Plan​
​
904​​(completed 2021 mitigation action) which is carried forward for maintenance and update as​
​
905​​Action 5.6.23. Probability of future pandemic or public health emergency is moderate; impact​
​
906​​severity is high, given the Tribe's dependence on a single large-assembly enterprise for​
​
907​​government revenue.​
​

​ PLACEHOLDER: Insert COVID-19 closure dates, duration, and federal assistance​
▶
​amounts (Finance / Resort).​

910​​4.6 Fire and Wildfire​
​

T​

​08​
9
909​
​

911​​Hazard Profile — Type, Location, and Extent​
​

AF

​12​​Under CAL FIRE's updated 2026 Fire Hazard Severity Zone (FHSZ) maps, lands immediately​
9
913​​surrounding and adjoining the Rancheria are classified as Moderate. The Rancheria itself​
​
914​​carries no FHSZ designation — not because hazard is absent, but because trust lands are​
​
915​​Federal Responsibility Area, outside the State and Local Responsibility Areas that CAL FIRE's​
​
916​​FHSZ program maps. Because fuels, topography, and weather are continuous across the trust​
​
917​​land boundary, the Tribe treats the surrounding Moderate classification as the effective fire​
​
918​​hazard baseline for planning purposes. The mapping gap is itself a planning consideration:​
​
919​​hazard designations that drive building standards, defensible space enforcement, and mitigation​
​
920​​funding eligibility do not automatically extend to trust lands — reinforcing the importance of​
​
921​​Tribally led wildfire mitigation, including the Tribal Fire Program (Action 5.6.1).​
​

​D

R

​22​​The fire environment surrounding the Rancheria is mixed: grassy hillsides and brush, on and​
9
923​​adjacent to Tribal land, transitioning to continuous timber to the east and south — the terrain​
​
924​​carrying the Moderate classification that surrounds the Rancheria on three sides. Mature bull​
​
925​​pines along the Singley Hill corridor, identified by survey respondents as an existing hazard,​
​
926​​stand within reach of structures and the Tribe's single access road. Critically, the Rancheria lies​
​
927​​directly adjacent to U.S. Highway 101, one of the most heavily trafficked corridors on the North​
​
928​​Coast. Roadside ignition — vehicle fires, dragging chains and equipment, hot catalytic​
​
929​​converters over dry grass, and discarded smoking materials — is a well-documented wildfire​
​
930​​cause along major highways, and the 101 corridor places a continuous ignition source at the​
​
931​​base of the grassy slopes below Tribal homes and facilities. Extent is best expressed by fire​
​
932​​behavior potential: a wind-driven grass or brush fire starting at the highway shoulder or in the​
​
933​​Singley Hill corridor could reach structures and sever the sole egress route within the first​
​
934​​burning period, well inside the Loleta Fire Department's documented 20-plus-minute response​
​
935​​time. The Rancheria's exposure is therefore characterized less by acreage at risk than by the​
​
936​​coincidence of fuels, slope, a continuous roadside ignition source, and the single-access​
​
937​​configuration at the same location.​
​
​38​​While no wildfires have directly impacted the Rancheria since the last plan cycle, the Tribe has​
9
939​​identified a set of compounding structural fire protection vulnerabilities that collectively represent​
​
940​​a significant life safety concern, particularly given recent facility expansions and increased​
​
941​​occupancy.​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​32​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

942​​COMPOUNDING VULNERABILITY:​
​
​43​​The following fire protection gaps exist simultaneously at BRB Rancheria: (1) 20+ minute​
9
944​​documented response times; (2) no ladder apparatus for the multi-story Resort hotel; (3)​
​
945​​approximately 45 minutes of sustained fire flow before tank depletion; (4) Resort water system​
​
946​​fire flow uncharacterized; (5) JHA held by a volunteer department without formal agreement; (6)​
​
947​​no Tribal fire program; (7) single ingress/egress route. A major fire event at The Venue or Resort​
​
948​​during a large event would activate all of these vulnerabilities simultaneously.​
​

AF

​D

R

​50​​According to CAL​
9
951​​FIRE data, 634​
​
952​​wildfires burned in​
​
953​​Humboldt County​
​
954​​between 1910 and​
​
955​​2017, averaging​
​
956​​approximately two​
​
957​​fires per year with a​
​
958​​historical range of 0​
​
959​​to 17 fires annually.​
​
960​​Approximately 63​
​
961​​percent of wildfires in​
​
962​​Humboldt County​
​
963​​are caused by​
​
964​​human activity, with​
​
965​​electrical equipment​
​
966​​including power lines​
​
967​​and transformers a​
​
968​​frequent ignition​
​
969​​source. The 2020​
​
970​​August Complex fire​
​
971​​burned over​
​
972​​1,000,000 acres​
​
973​​including portions of​
​
974​​Humboldt County;​
​
975​​while the main​
​
976​​Rancheria was not​
​
977​​directly threatened,​
​
978​​smoke impacts and​
​
979​​the potential for​
​
980​​power infrastructure​
​
981​​ignition were​
​
982​​significant concerns.​
​

T​

949​​Previous Occurrences and Regional Wildfire History​
​

​83​​The 2020 fire season​
9
984​​also directly​
​
985​​engaged Tribal​
​
986​​resources: beginning​
​
987​​September 11, 2020, the Tribe operated an evacuation shelter at the Bear River Recreation​
​
988​​Center for regional fire evacuees, without regard to tribal affiliation (see Section 4.14).​
​
​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​33​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

989​​Probability​
​

999​​Impacts and Vulnerability​
​

T​

​90​​Probability of a wildfire directly affecting the Rancheria is moderate and rising. Humboldt​
9
991​​County's human-caused ignition share — approximately 63 percent — must be read against the​
​
992​​Rancheria's setting: a continuously trafficked federal highway at its doorstep, overhead electrical​
​
993​​infrastructure serving the Rancheria and Resort, and seasonal grass cure on adjacent slopes​
​
994​​each summer and fall. The absence of a wildfire on Rancheria lands during the planning period​
​
995​​reflects favorable coastal conditions, not the absence of exposure — the ignition sources are​
​
996​​permanent; only the receptive fuel conditions vary by season and year. Climate projections​
​
997​​increase probability over the planning period through extended dry seasons and deepening fuel​
​
998​​moisture stress, conditions that reach even the coastal zone in drought years (Section 4.9).​
​

1009​​Fire Flow Baseline​
​

AF

​000​​Impacts of a wildfire event would extend well beyond structure loss. Smoke is the demonstrated​
1
1001​​impact pathway: the 2020 fire season brought sustained hazardous air quality to the region,​
​
1002​​affecting elders, children, and residents with respiratory conditions. A fire in the Singley Hill or​
​
1003​​Highway 101 corridor would simultaneously threaten homes, compromise the only egress route,​
​
1004​​and endanger the Resort — the enterprise funding Tribal government operations — while​
​
1005​​cultural sites and gathering places on and near Tribal land are irreplaceable in a way structure​
​
1006​​valuation cannot capture. Vulnerability concentrates in the same singularities identified in​
​
1007​​Section 4.15: one road out, one water tank, approximately 45 minutes of fire flow, and no Tribal​
​
1008​​fire program — precisely the gaps Actions 5.6.1, 5.6.4, and 5.6.22 address.​
​

R

​010​​The February 2026 hydrant flow test (Section 3.8.1) established the fire suppression baseline:​
1
1011​​approximately 45 minutes of sustained flow before significant tank depletion, no identified​
​
1012​​backup water source for the Tish Non system, and an uncharacterized Resort reclaimed water​
​
1013​​system. Sprinkler coverage in major facilities reduces demand for single-structure fires; a major​
​
1014​​or multi-structure event would exceed the documented capacity, particularly if Loleta FD​
​
1015​​response is delayed beyond its documented 20-minute time.​
​

​D

​016​​The Tribal Fire Program (Action 5.6.1) is this plan's Priority 1 mitigation action. Its priority​
1
1017​​reflects not only suppression capability but the pillars themselves: workforce development for​
​
1018​​Tribal members, cultural fire practice and land stewardship, and assertion of Tribal authority​
​
1019​​over public safety on trust lands. Healing the land heals the people — and returning fire to its​
​
1020​​proper cultural and ecological role on Tribal land is central to that healing.​
​
1021​
​
1022​
​
1023​
​
1024​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​34​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

1025​​4.7 Flooding (Localized and Riverine)​
​
1026​​Hazard Profile​
​
​027​​Flood risk at BRB has two distinct components. Regional riverine flooding is associated with the​
1
1028​​Eel River system and atmospheric river events, with king tide interaction affecting low-lying​
​
1029​​areas. Localized flooding on the Rancheria itself is now engineering-documented: Whitchurch​
​
1030​​Engineering, Inc. (Jeffrey Laikam, PE, RCE #68586) conducted initial flooding inspections under​
​
1031​​Project No. BRB2401, documented in a scoping letter dated March 7, 2024, identifying six​
​
1032​​distinct flooding sites on Tribal lands.​
​

T​

​033​​Critically, the Whitchurch assessment identified systemic infrastructure maintenance​
1
1034​​governance failure — the absence of an assigned owner and inspection cycle for culverts and​
​
1035​​drainage infrastructure — as a root cause common to the six sites. This plan corrects that​
​
1036​​governance gap directly: the Pre-Storm Culvert and Drainage Inspection Protocol (Appendix I)​
​
1037​​assigns annual September inspection responsibility to Public Works and Facilities, with OES​
​
1038​​receiving the annual report and holding escalation authority for deferred maintenance.​
​
1039​​Table 4-3: Whitchurch Engineering BRB2401 — Documented Flooding Sites (March 2024)​
​
​Condition Documented​

​Site 1​

​ ravel access road floods where a headwall (with a​
G
​likely buried culvert, inlet inaccessible) receives runoff​
​from a degraded uphill stone-lined swale. The poorly​
​infiltrating hillside adds runoff; uphill soils become​
​saturated or under standing water​

​ OR R25AP00342 - Under​
B
​Design. Construction FY 26.​
​$200,000 change order requiring​
​funding​

​Site 2​

​ he gaming office, southeast of the casino, predates the​
T
​uphill parking lot to the northeast; runoff from the lot's​
​asphalt now sheets across the lawn and ponds against​
​the building's foundation and siding.​

​ OR R25AP00342 - Under​
B
​Design. Construction FY 26.​
​$200,000 change order requiring​
​funding​

​Site 3​

​ ownhome runoff between Highway 101 and Bowie​
T
​Road drains via curb cuts and three swales to a rear​
​retention area. Two swales are overgrown and likely​
​unlined; grading to the swale inlets is poorly sloped and​
​doesn't drain positively.​

​ OR R25AP00342 - Under​
B
​Design. Construction FY 26.​
​$200,000 change order requiring​
​funding​

​ bermed wetland east of the parcel pushes outflow​
A
​toward the buildings; the existing French drain diverts it​
​but runs constantly, and soils behind it stay saturated.​
​Downspouts add significant non-infiltrating water.​

​ OR R25AP00342 - Under​
B
​Design. Construction FY 26.​
​$200,000 change order requiring​
​funding​

​Site 5​

​ he residence at 352 Brenard Way sits downhill of its​
T
​driveway and hillside, flooding the garage; the existing​
​drain line hasn't prevented saturation around the​
​building, which is flat-graded to the foundation.​

​ OR R25AP00342 - Under​
B
​Design. Construction FY 26.​
​$200,000 change order requiring​
​funding​

​Site 6​

​ he alley's drainage system between the east and west​
T
​ends of Carroll Road has broadly failed: the swale is​
​overgrown and soil-filled, all culverts are silted in, and​
​south-side building drain pipes are silted, possibly​
​broken, undersized and not installed per plans.​

​ OR R25AP00342 - Under​
B
​Design. Construction FY 26.​
​$200,000 change order requiring​
​funding​

R

​D

​Site 4​

​Status​

AF

​Site​

1040​
​
1041​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​35​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​D

R

AF

T​

​042​​Previous occurrences include recurring seasonal flooding at the six documented sites, culvert​
1
1043​​overflow events, and flooding of the gaming office (a former Tribal residential structure). The​
​
1044​​probability of continued localized flooding is moderate-to-high until infrastructure improvements​
​
1045​​and the inspection governance protocol are fully implemented; atmospheric river intensification​
​
1046​​increases both probability and consequence over the planning period. Infrastructure​
​
1047​​improvements at the documented sites are funded under Bureau of Reclamation Agreement No.​
​
1048​​R25AP00342 and are in design development (see Part 5, Mitigation Action #11).​
​

1049​
​
​050​
1
​Access and functional needs (AFN) households are present in the localized flood-affected​
1051​
​
​area, including subgrade residential structures. Flooding at these sites is a life-safety issue,​
1052​
​
​not only a property issue.​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​36​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

1053​
​
1054​​4.8 Severe Weather and Climate Change​
​

1062​​4.9 Drought and Water Shortage​
​

T​

​055​​Atmospheric river storms deliver some of the highest rainfall totals in California to the region,​
1
1056​​producing high wind, sustained heavy rain, flooding, slides, and extended power outages,​
​
1057​​including PG&E Public Safety Power Shutoff events. Severe weather is a high-probability​
​
1058​​annual occurrence with moderate-to-high impact, and climate change is increasing both​
​
1059​​frequency and intensity. Mitigation is addressed through the Energy Emergency Plan (Appendix​
​
1060​​F), generator and fuel actions (5.6.5, 5.6.15), the severe weather training module (Appendix H),​
​
1061​​and the culvert inspection protocol (Appendix I).​
​

1070​
​
1071​
​
1072​
​
1073​
​
​074​
1
1075​
​
1076​
​

​D

1077​
​

R

1069​
​

AF

​063​​Drought classification follows the U.S. Drought Monitor scale from None through D0​
1
1064​​(Abnormally Dry), D1 (Moderate), D2 (Severe), D3 (Extreme), and D4 (Exceptional Drought).​
​
1065​​The Tribal water supply is entirely groundwater-well dependent with no identified backup source,​
​
1066​​making extended drought a direct water security threat even absent current impacts. Drought​
​
1067​​also directly threatens Mattole River salmon habitat — and with it the cultural practice the​
​
1068​​Salmon Ceremony restored. A Drought Contingency Plan is carried forward as Action 5.6.21.​
​

​078​
1
1079​
​
1080​
​
1081​
​
1082​
​
1083​
​
1084​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​37​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

1085​​4.10 Tsunami and Coastal Hazards​
​

​D

R

AF

T​

​086​​The Mattole Beach ceremonial gathering area is directly exposed to both distant-source and​
1
1087​​near-field tsunami. A near-field Cascadia event could provide only minutes of natural warning​
​
1088​​(strong ground​
​
1089​​shaking) before​
​
1090​​wave arrival,​
​
1091​​with no​
​
1092​​engineered​
​
1093​​warning​
​
1094​​infrastructure at​
​
1095​​the beach. The​
​
1096​​December 2024​
​
1097​​earthquake​
​
1098​​generated a​
​
1099​​tsunami alert​
​
1100​​affecting the​
​
1101​​coastal zone.​
​
1102​​Tribal members​
​
1103​​also reside in​
​
1104​​mapped coastal​
​
1105​​tsunami zones​
​
1106​​off-Rancheria.​
​
1107​​Because the​
​
1108​​revived Salmon​
​
1109​​Ceremony​
​
1110​​gathers the​
​
1111​​community at​
​
1112​​the shoreline,​
​
1113​​this hazard​
​
1114​​directly​
​
1115​​threatens both​
​
1116​​lives and an​
​
1117​​irreplaceable​
​
1118​​cultural practice;​
​
1119​​the Mattole​
​
1120​​Beach​
​
1121​​Emergency​
​
1122​​Protocol is​
​
1123​​Action 5.6.7,​
​
1124​​with the​
​
1125​​ceremonial site​
​
1126​​evacuation and​
​
1127​​warning plan as​
​
1128​​Action 5.6.20.​
​
1129​​The biannual​
​
1130​​frequency of​
​
1131​​gatherings​
​
1132​​places Mattole Beach actions below daily-exposure actions in priority order, while their cultural​
​
1133​​stakes keep them within the plan's core priorities.​
​
1134​
​
​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​38​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

1135​
​
1136​​4.11 Transportation and Access Hazards​
​

1165​
​
1166​
​

​D

1167​
​

R

AF

T​

​137​​The Singley Hill / US-101 corridor is a documented fatality corridor with five or more fatalities​
1
1138​​per year, and it is the​
​
1139​​Rancheria's only​
​
1140​​ingress/egress route.​
​
1141​​Daily probability of​
​
1142​​disruptive incidents is​
​
1143​​high. A single event —​
​
1144​​major collision, slide,​
​
1145​​flood, fire, or seismic​
​
1146​​damage — can​
​
1147​​simultaneously isolate​
​
1148​​the community and​
​
1149​​block emergency​
​
1150​​response in both​
​
1151​​directions. This​
​
1152​​hazard interacts with​
​
1153​​nearly every other​
​
1154​​hazard in this Part.​
​
1155​​Mitigation actions:​
​
1156​​Singley Hill corridor​
​
1157​​and secondary egress​
​
1158​​development (5.6.4),​
​
1159​​Bowie Road to Echo​
​
1160​​Lane secondary​
​
1161​​egress (5.6.22), and​
​
1162​​US-101 interchange​
​
1163​​safety improvements​
​
1164​​(5.6.4 component).​
​

1168​
​
1169​
​
1170​
​
1171​
​
1172​
​
1173​
​
1174​
​
1175​
​
1176​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​39​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

1177​​4.12 Cyberattack​
​
​178​​The 2026 THIRA ransomware scenario documents an estimated $3.65 million exposure across​
1
1179​​Tribal government and enterprise systems. Specific vulnerabilities include the casino gaming​
​
1180​​network, Tribal administrative IT, dependence on RAVE Mobile for public alerting, and industrial​
​
1181​​control (SCADA) systems at the upgraded Wastewater Treatment Plant. A successful attack on​
​
1182​​the WWTP would convert a cyber incident into a public health and environmental incident.​
​
1183​​Formalization of the Cybersecurity Incident Response Plan is Action 5.6.16. Operational​
​
1184​​security detail is maintained in the EOP and excluded from this public document.​
​
1185​​4.13 Other Hazards​
​

AF

1192​​4.14 Tribal Capability Assessment​
​

T​

​186​​Additional hazards profiled at lower priority include: landslide and slope erosion (Bear Creek​
1
1187​​bank erosion documented under the Whitchurch scope; slope hazards adjacent to the​
​
1188​​Rancheria); hazardous materials incidents along the US-101 corridor; civil unrest or active​
​
1189​​threat associated with large-assembly enterprise operations (Action 5.6.26 maintains annual​
​
1190​​exercises); and energy shortage / extended utility outage (addressed by Appendix F and the​
​
1191​​microgrid pathway, Action 5.6.24).​
​

​193​​Pursuant to 44 CFR § 201.7(c)(3), this section evaluates the Tribe's pre- and post-disaster​
1
1194​​hazard management capabilities. Existing capabilities include: the Office of Emergency Services​
​
1195​​with dedicated Manager and Logistics Coordinator; the Emergency Operations Plan (July 2025);​
​
1196​​the THIRA/SPR assessment cycle; a Grants Management office administering federal awards​
​
1197​​under 2 CFR 200; the Recreation Center shelter MOU with Humboldt County; RAVE Mobile​
​
1198​​alerting; completed Pandemic Response Plan; Great ShakeOut participation two consecutive​
​
1199​​years; the Renewable Energy Coordinator position; and demonstrated direct federal disaster​
​
1200​​management under FEMA-4692-DR.​
​

​D

R

​201​​Demonstrated sheltering capability. The Tribe’s sheltering capability is proven, not theoretical.​
1
1202​​On September 11, 2020, during California’s historic wildfire season, the Tribe opened the Bear​
​
1203​​River Recreation Center as an evacuation shelter for community members displaced by regional​
​
1204​​fires, without regard to tribal affiliation. The operation provided four separated areas for larger​
​
1205​​families and socially distanced individual accommodations for up to 45 people, with adjacent​
​
1206​​outdoor space for tent camping and vehicle parking. The Tribe supplied hot and cold meals,​
​
1207​​cots, bedding, water, restrooms, showers, and COVID-19 protective measures — a congregate​
​
1208​​sheltering operation run under active pandemic protocols, demonstrating the capability to​
​
1209​​manage compounding hazards simultaneously. (Source: Bear River Band press release,​
​
1210​​September 11, 2020, via Lost Coast Outpost.)​
​
​211​​Capability gaps documented in the 2025 SPR and addressed by this plan include:​
1
1212​​law-enforcement-dependent capabilities at approximately 20 percent of target (no active PD); no​
​
1213​​Tribal fire program and no formalized JHA; no dedicated EOC; supply storage vulnerability​
​
1214​​(shared warehouse with theft and pest exposure); animal sheltering capability at 20 animals​
​
1215​​against a THIRA target of 50–200; foster care roster access protocol unresolved with Social​
​
1216​​Services; and the unexecuted PA contract. Tribal development regulation on trust lands includes​
​
1217​​CBC seismic standards for new construction (contractually required since January 1, 2022, with​
​
1218​​The Venue constructed to current code), with a BRIC code plus-up application extending​
​
1219​​land-use and code capabilities.​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​40​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

1220​​4.15 Overall Vulnerability Summary and Loss Estimation​
​
​221​​Across all hazards, the Tribe's defining vulnerability pattern is concentration and singularity: a​
1
1222​​single access road, a single water tank, a single revenue enterprise, a single shared shelter​
​
1223​​facility, and singular cultural sites. Mitigation strategy in Part Five is accordingly organized​
​
1224​​around redundancy, Tribal self-sufficiency, and governance clarity. Structure-level loss​
​
1225​​estimation is anchored by documented DR-4692-DR damages and insured replacement values.​
​
​226​
1
1227​
​
1228​
​

​ PLACEHOLDER: Insert updated total insured asset value and per-hazard loss​
▶
​estimation table once Finance provides current replacement values. Request sent to​
​TA Office 7/27/26​

​D

R

AF

T​

1229​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​41​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​PART FIVE: MITIGATION STRATEGY AND ACTION PLAN​

1230​
​

1231​​5.1 Strategy Framework​
​
​232​​The mitigation strategy is built on the four community pillars — Quality of Life, Self-Sufficiency,​
1
1233​​Sustainability, and Cultural Awareness — and the guiding philosophy that healing the land heals​
​
1234​​the people. The mitigation actions in this plan are conceived not as isolated projects, but as​
​
1235​​components of a unified vision for a Tribal community that is prepared, self-determined, and​
​
1236​​whole. Prioritization reflects Tribal values and institutional goals — workforce development and​
​
1237​​cultural healing are legitimate priority drivers — in addition to hazard probability and severity.​
​

T​

1238​​5.2 Regulatory Framework​
​

​Application in This Plan​

​44 CFR § 201.7​

​Tribal plan criteria; update requirements at § 201.7(d)(3)​

​DMA 2000 / Stafford Act § 203​

​Pre-disaster mitigation authority​

​Stafford Act § 404 (HMGP)​

​ ost-declaration mitigation funding; active seismic assessment​
P
​project​

AF

​Authority​

​Stafford Act § 406 (PA C–G)​

​ itigation within Public Assistance repairs; DR-4692-DR contract​
M
​(Action 5.6.8)​

​ andy Recovery Improvement Act​
S
​2013​

​ irect tribal declaration authority; government-to-government​
D
​submission​

​2 CFR Parts 200 / 3002​

​Federal award administration standards; assurances in Part Six​

​Executive Order 13175​

R

1239​
​

​Tribal consultation and coordination​

1240​​5.3 Status of 2021 THMP Mitigation Actions​
​

​D

​241​​44 CFR § 201.7(d)(3) requires the updated plan to document the status of actions from the​
1
1242​​previous plan, describe progress in mitigation efforts, and reflect changes in priorities. The​
​
1243​​following table summarizes each of the 15 actions from the 2021 THMP and its disposition in​
​
1244​​this update.​
​
1245​​Table 5-1: Status of 2021 THMP Mitigation Actions​
​
​#​

​2021 Action​

​Status​

​Disposition in This Plan​

​1​

​ evelop Pandemic​
D
​Response Plan​

​Completed​

​Plan on file; carried forward for update as Action 5.6.23​

​2​

I​nstall electronic emergency​ ​Completed​
​notification sign at Tish Non​
​Village entrance​

​ ocumented as completed; RAVE integration under​
D
​Action 5.6.9; see 5.6.18​

​3​

​ ew buildings meet CBC​
N
​seismic standards​

​ ngoing contractual requirement; The Venue built to​
O
​current code; BRIC code plus-up; carried forward under​
​Actions 5.6.1 / 5.6.6​

​In Progress​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​42​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​2021 Action​

​Status​

​Disposition in This Plan​

​4​

​ eview/retrofit critical​
R
​buildings for earthquake​
​safety​

​In Progress​

​ R-4692-DR documented damages; BRIC and PA​
D
​addressing; carried forward as Actions 5.6.6 and 5.6.8​

​5​

​ arthquake preparedness​
E
​in employee training​

​Ongoing​

​ reat ShakeOut participation two consecutive years;​
G
​carried forward as Action 5.6.17​

​6​

​ ire/wildfire preparedness​
F
​in employee training​

​Ongoing​

​ R completed; cultural fire being pursued; JHA​
P
​complications noted; carried forward as Actions 5.6.1​
​and 5.6.19​

​7​

​ esort/Community Center​
R
​as evacuation/command​
​center​

​In Progress​

​ ulti-use model not sustainable; independent EOC​
M
​identified as priority; carried forward as Action 5.6.3​
​(Emergency Resilience Campus)​

​8​

​ oluntary safety personnel​
V
​evaluated/trained​

​Partial​

​ raining occurred; volunteer availability gap (family/work​
T
​obligations) documented; carried forward as Action​
​5.6.17​

​9​

​ unding applied for​
F
​microgrid/electrical​
​resilience​

​In Progress​

​ enewable Energy Coordinator established; carried​
R
​forward as Action 5.6.24​

​10​

​ unding applied for Drought​ ​In Progress​
F
​Contingency Plan​

​Funding being pursued; carried forward as Action 5.6.21​

​11​

​ re-Flood Hazard​
P
​Reduction Plan developed​

​ ot​
N
​Developed​

​ OR R25AP00342 addresses primary vulnerability;​
B
​carried forward as Action 5.6.12​

​12​

​ evere weather​
S
​preparedness in employee​
​training​

​ ot​
N
​Developed​

​ arried forward as Action 5.6.17; training module​
C
​drafted (Appendix H)​

​13​

​ isaster supply kits​
D
​purchased​

​Partial​

​ urchased multiple times; storage vulnerability (shared​
P
​warehouse, theft/pest risk); carried forward as Action​
​5.6.3a (dedicated secure storage)​

​14​

​ unding applied for Energy​
F
​Emergency Plan​

​ ot​
N
​Developed​

​ o application submitted; carried forward as Actions​
N
​5.6.3 and 5.6.5; Energy Emergency Plan drafted​
​(Appendix F)​

​15​

​ et and Service Animal​
P
​Emergency Plan developed​

​ ot​
N
​Developed​

​ ed Cross now requires animal shelter accounting; SPR​
R
​shows 10% capability; carried forward as Action 5.6.13;​
​plan drafted (Appendix G)​

​D

R

AF

T​

​#​

1246​
​
​247​
1
1248​
​

​ er FEMA 2022 review note (Element C-4): responsible parties are identified for every action in this​
P
​update, including the two 2021 actions previously lacking assignment.​

1249​​5.4 Prioritization Criteria​
​
​250​​Actions are prioritized using three weighted criteria: (1) life safety and hazard consequence​
1
1251​​reduction; (2) advancement of the four community pillars, including workforce development,​
​
1252​​sovereignty, and cultural healing; and (3) implementation feasibility, including funding availability​
​
1253​​and shovel-readiness. Consistent with FEMA guidance, timelines are expressed in general​
​
1254​​terms (anticipated start year and duration) rather than fixed dates.​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​43​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

1255​​5.5 Goals and Objectives​
​
​256​​The three plan goals (Section 1.6) are implemented through objectives spanning: life safety and​
1
1257​​alerting; fire protection and Tribal fire capability; law enforcement reinstatement; emergency​
​
1258​​facility and supply infrastructure; access and egress redundancy; water security and fire flow;​
​
1259​​energy resilience; flood infrastructure and maintenance governance; cultural site protection;​
​
1260​​vulnerable population protocols (AFN, foster care, LEP, animals); cyber resilience; and​
​
1261​​continuity of government and enterprise.​
​
1262​​5.6 Mitigation Actions — Detail Sheets​
​
1263​​Action 5.6.1 — Tribal Fire Program — Phase 1 (Priority 1)​
​

​Field​

AF

T​

​264​​Establish a Bear River Band Tribal Fire Program. Phase 1 encompasses program design, initial​
1
1265​​workforce recruitment and training of Tribal members, equipment planning, cultural fire practice​
​
1266​​integration, and formalization of relationships with surrounding departments. This action is​
​
1267​​Priority 1 not because fire is the most frequent hazard, but because the program simultaneously​
​
1268​​closes the plan's most dangerous compounding vulnerability set (Section 4.6), creates career​
​
1269​​pathways for Tribal members, restores cultural fire to Tribal land stewardship, and asserts Tribal​
​
1270​​authority over public safety on trust lands. Workforce development and cultural healing are the​
​
1271​​point, not side effects: healing the land heals the people.​
​
​Detail​

​Priority​

​1 — Highest priority action in this plan​

​Hazards Addressed​
​Pillars​

​Fire/wildfire; severe weather; earthquake (response); all-hazards capability​
​All four — Self-Sufficiency and Cultural Awareness lead​

​Lead​

​Office of Emergency Services / Tribal Administration​

​Loleta FD; CAL FIRE; Fortuna Fire; BIA; neighboring tribal fire programs​

R

​Partners​
​Timeline​

​ nticipated start within one year of plan approval; Phase 1 duration approx. 2​
A
​years​

​Est. Cost / Funding​

​ hase 1 planning and initial capability — HMGP/BRIC planning and​
P
​capacity-building eligible; BIA​

​D

1272​
​

1273​​Action 5.6.2 — Bear River Police Department Reinstatement​
​
​274​​Reinstate the Bear River Police Department. The 2025 SPR documents​
1
1275​​law-enforcement-dependent capabilities at approximately 20 percent of target. Reinstatement​
​
1276​​restores Tribal jurisdiction over public safety on trust lands, reduces dependence on county​
​
1277​​response times, and supports every response-phase capability in the THIRA.​
​
​Field​

​Detail​

​Priority​

​1​

​Hazards Addressed​

​All-hazards response; civil unrest/active threat; access control​

​Pillars​

​Self-Sufficiency; Quality of Life​

​Lead​

​Tribal Administration / Tribal Council​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​44​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​Field​

​Detail​

​Partners​

​Humboldt County Sheriff; BIA Office of Justice Services​

​Timeline​

​Anticipated start within planning cycle; duration 2–3 years​

​Est. Cost / Funding​

​BIA; DOJ tribal justice programs; Tribal funds​

1278​
​
1279​​Action 5.6.3 — Emergency Resilience Campus — Singley Hill Corridor​
​

​Detail​

​Priority​

AF

​Field​

T​

​280​​Develop a dedicated Emergency Resilience Campus on Tribal land adjacent to the Rancheria​
1
1281​​on the Singley Hill corridor, providing: a dedicated Emergency Operations Center (correcting the​
​
1282​​ad hoc multi-use model documented as unsustainable), secure emergency supply storage,​
​
1283​​staging and logistics space, training facilities for the Tribal Fire Program and volunteers, and​
​
1284​​backup power. The campus is this plan's foundational response to the​
​
1285​​concentration-and-singularity vulnerability pattern identified in Section 4.15. The need is not​
​
1286​​hypothetical: the Tribe’s only proven mass care facility, the Bear River Recreation Center,​
​
1287​​sustained damage in the December 2022 earthquake (FEMA-4692-DR PW #714425) —​
​
1288​​purpose-built, seismically resilient capacity on the Singley Hill corridor closes that exposure.​
​

​1 — Foundational infrastructure gap​

​Hazards Addressed​
​Pillars​

​All hazards — EOC, sheltering support, supply logistics, training​
​Self-Sufficiency; Sustainability; Quality of Life; Cultural Awareness​

​Lead​

​Office of Emergency Services / Tribal Administration​

​Partners​

​Grants Management; Public Works and Facilities; Tribal Council​
​Phased; site planning start within 1–2 years; multi-year build-out​

R

​Timeline​
​Est. Cost / Funding​

​HMGP; BRIC; BIA; EDA; Tribal capital​

1289​​Action 5.6.4 — Singley Hill Corridor and Secondary Egress Program​
​

​D

​290​​Address the single-access vulnerability and the documented US-101/Singley Hill fatality corridor​
1
1291​​(five or more fatalities per year) through interchange safety improvements, corridor advocacy​
​
1292​​with Caltrans, and development of secondary egress capability. Companion detail on the Bowie​
​
1293​​Road to Echo Lane route is in Action 5.6.22.​
​
​Field​

​Detail​

​Priority​

​1​

​Hazards Addressed​

​Transportation/access; all hazards (evacuation and response access)​

​Pillars​

​Quality of Life; Self-Sufficiency​

​Lead​

​Public Works and Facilities / OES​

​Partners​

​Caltrans; Humboldt County; BIA Roads​

​Timeline​

​Corridor safety advocacy immediate; egress engineering multi-year​

​Est. Cost / Funding​

​HMGP; BRIC; BIA Roads; Caltrans safety programs​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​45​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

1294​​Action 5.6.5 — Recreation Center Generator and 30-Day Fuel Capability​
​
​295​​Equip the Recreation Center — the designated County-MOU emergency shelter — with​
1
1296​​permanent standby generation and fuel capability supporting extended operations. The 2026​
​
1297​​THIRA establishes a 7-day outage capability threshold; this action builds toward the 30-day​
​
1298​​scenario addressed in the Energy Emergency Plan (Appendix F).​
​
​Detail​

​Priority​

​1​

​Hazards Addressed​

​Severe weather/PSPS; earthquake; all hazards (sheltering)​

​Pillars​

​Self-Sufficiency; Quality of Life​

​Lead​

​Office of Emergency Services / Office of Energy Services​

​Partners​

​Humboldt County (shelter MOU); PG&E​

​Timeline​

​Start within 1 year; approx. 1–2 years​

​Est. Cost / Funding​

​HMGP 5% initiative / BRIC; generator grant​

T​

​Field​

AF

1299​​Action 5.6.6 — Resort Seismic Assessment (Active HMGP Project)​
​

​300​​Complete the active HMGP-funded seismic assessment of Resort and critical Tribal structures,​
1
1301​​producing prioritized retrofit recommendations that will feed the next round of BRIC/HMGP​
​
1302​​construction applications.​
​
​Field​

​Detail​

​Priority​

​1 — In progress​

​Hazards Addressed​

​Lead​

​Self-Sufficiency; Sustainability​

R

​Pillars​

​Earthquake​

​Grants Management / Facilities​
​FEMA HMGP; engineering consultant​

​Timeline​

​Active; per HMGP period of performance​

​Est. Cost / Funding​

​HMGP (active award)​

​D

​Partners​

1303​​HMGP - 4692 - Seismic Retrofit and Slope Stabilization Project​
​
1304​​Action 5.6.7 — Mattole Beach Emergency Protocol​
​
​305​​Establish an emergency protocol for Tribal gatherings at Mattole Beach, including pre-gathering​
1
1306​​hazard briefing, natural-warning evacuation trigger (ground shaking = immediate move to high​
​
1307​​ground), designated evacuation routes and assembly point, and communications procedures for​
​
1308​​a location with limited coverage. The THIRA tsunami scenario informs capability targets.​
​
1309​​Frequency of gatherings is biannual, which places this below daily-exposure actions in​
​
1310​​sequence — but the ceremony's cultural stakes, documented in Section 3.2, make its protection​
​
1311​​a core commitment of this plan. Companion action 5.6.20 develops the full ceremonial site​
​
1312​​evacuation and warning plan. A U.S. Army Corps of Engineers study and technical assistance​
​
1313​​project focused on the Mattole Beach area and the Salmon Ceremony is underway, engaging​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​46​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​314​​the Mattole Restoration Council and Mattole Salmon Group on watershed restoration relevant to​
1
1315​​the site.​
​
​Detail​

​Priority​

​2​

​Hazards Addressed​

​Tsunami; coastal hazards; earthquake (near-field)​

​Pillars​

​Cultural Awareness; Quality of Life​

​Lead​

​Office of Emergency Services / Cultural Programs​

​Partners​

​ umboldt County OES; NOAA/NWS; U.S. Army Corps of Engineers (Mattole​
H
​Beach study and technical assistance project); Mattole Restoration Council;​
​Mattole Salmon Group; Lost Coast League​

​Timeline​

​Protocol within 1 year; drills at gatherings thereafter​

​Est. Cost / Funding​

​Minimal — planning; HMGP/BRIC planning eligible​

T​

​Field​

1316​
​

AF

1317​​Action 5.6.8 — FEMA-4692-DR Public Assistance Contract Execution​
​

​318​​Execute the approved but unexecuted Public Assistance contract under FEMA-4692-DR and​
1
1319​​complete repairs to earthquake-damaged facilities, including the designated emergency shelter.​
​
1320​​Approved federal funding left unspent while damaged facilities remain unrepaired is both a risk​
​
1321​​and a compliance exposure; this action closes it.​
​
​Field​

​Detail​

​Priority​

​1 — Administrative urgency​

​Hazards Addressed​

​Lead​

​Self-Sufficiency​

R

​Pillars​

​Earthquake (repair of documented damage)​

​Grants Management / Tribal Administration​
​FEMA Region IX PA​

​Timeline​

​Immediate​

​Est. Cost / Funding​

​ pproved PA funding — FEMA share $476,092.04 across 11 Project​
A
​Worksheets (Section 4.4) — unobligated​

​D

​Partners​

1322​
​

1323​​5.7 Mitigation Actions 9 through 26​
​
​324​​The following actions complete the 26-action portfolio. Each is developed with lead​
1
1325​​responsibility, pillar alignment, and funding pathway; full implementation detail follows the same​
​
1326​​structure as Actions 1–8.​
​
1327​​Table 5-2: Mitigation Actions 9–26 — Summary Detail​
​
​#​

​Action​

​Pillar(s)​

​Priority​

​Lead​

​Scope​

​9​

​ AVE Mobile Enrollment​
R
​Drive​

​ uality of​
Q
​Life​

​2​

​OES​

​ ommunity-wide alerting enrollment​
C
​campaign; integration with electronic​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​47​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​#​

​Action​

​Pillar(s)​

​Priority​

​Lead​

​Scope​
​ ign; annual enrollment events​
s
​including live enrollment during training​
​(Appendix H).​

​ oster Care Emergency​
F
​Protocol​

​ uality of​
Q
​Life​

​2​

​ ocial​
S
​Service​
​s / OES​

​ stablish emergency accountability​
E
​and reunification protocol for Tribal​
​children in foster placements — a​
​direct answer to the​
​boarding-school-era legacy​
​documented in Section 3.2.​

​11​

​ esort Water System Fire​
R
​Flow Assessment​

​ elf-Sufficien​ ​2​
S
​cy​

​ ublic​
P
​Works /​
​Resort​
​Facilitie​
​s​

​ haracterize the reclaimed water​
C
​system serving the Resort: storage,​
​pumps, pressure, hydrants; establish​
​fire flow baseline and backup storage​
​need.​

​12​

​ tormwater Infrastructure​
S
​and Maintenance​
​Governance​

​Sustainability​ ​1​

​ ublic​
P
​Works​
​and​
​Facilitie​
​s​

I​mplement BOR R25AP00342​
​improvements at Whitchurch sites;​
​adopt Appendix I inspection protocol;​
​BRIC code plus-up land-use​
​provisions; Bear Paws Lane conversion​
​protocol.​

​13​

​ et and Service Animal​
P
​Emergency Plan​
​Implementation​

​14​

​ EP Emergency​
L
​Notification Capability​

​15​

​ ump and Play Priority​
P
​Fuel Resupply Agreement​

​ elf-Sufficien​ ​2​
S
​cy​

​ ES /​
O
​ ormal priority resupply agreement​
F
​Enterpri​ ​with fuel distributor; implements the​
​se​
​fuel rationing hierarchy (Appendix F) —​
​gaming within Priority 1 because​
​gaming revenue funds all government​
​services.​

​16​

​ ybersecurity Incident​
C
​Response Plan​
​Formalization​

​ elf-Sufficien​ ​3​
S
​cy​

I​nforma​
​tion​
​Technol​
​ogy​

​ ormalize incident response for​
F
​government, gaming, and WWTP​
​SCADA environments; THIRA $3.65M​
​scenario is the planning basis; detail​
​retained in EOP.​

​17​

​ omprehensive​
C
​All-Hazards Training​
​Program​

​ uality of​
Q
​Life​

​ ES /​
O
​HR​

​ nified annual training consolidating​
U
​2021 Actions 5, 6, 8, and 12:​
​earthquake (Great ShakeOut), fire,​
​severe weather (Appendix H),​
​volunteer development — with the​
​documented volunteer availability gap​
​addressed through paid-time and​
​incentive design.​

AF

T​

​10​

​3​

​OES​

I​mplement Appendix G: ballfield​
​sheltering with weighted no-stake​
​fencing, 50-animal initial capacity,​
​county Animal Control coordination,​
​reunification.​

​ uality of​
Q
​Life​

​2​

​ ES /​
O
​HR​

​ ultilingual alerting and materials for​
M
​LEP employees and community​
​members; Title VI obligation noted.​

​D

R

​ uality of​
Q
​Life​

​2​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​48​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​Action​

​Pillar(s)​

​Priority​

​Lead​

​Scope​

​18​

​ lectronic Notification Sign​
E
​— Sustainment​

​ uality of​
Q
​Life​

​3​

​OES​

​ ompleted 2021 action; sustain,​
C
​maintain, and integrate with RAVE​
​alerting.​

​19​

J​ HA Review,​
​Formalization, and​
​Sovereignty​
​Documentation​

​ elf-Sufficien​ ​1​
S
​cy / Cultural​
​Awareness​

​ ribal​
T
​Adminis​
​tration /​
​OES​

​ ormalize the Loleta FD JHA in written​
F
​agreement; document Tribal​
​jurisdictional authority on trust lands;​
​pursue supplemental coverage​
​agreement with Fortuna Fire for the​
​hotel tower and large-assembly​
​venues.​

​20​

​ attole Beach Ceremonial​
M
​Site Evacuation and​
​Warning Plan​

​ ultural​
C
​Awareness /​
​Quality of​
​Life​

​ ES /​
O
​Cultural​
​Progra​
​ms​

​ ull evacuation route survey, assembly​
F
​point designation, signage/warning​
​approach appropriate to the site, and​
​drill integration with gatherings.​

​21​

​Drought Contingency Plan​

​Sustainability​ ​2​

​ ublic​
P
​Works /​
​ENR​

​ evelop plan addressing​
D
​well-dependent supply, conservation​
​triggers keyed to Drought Monitor​
​stages, and salmon habitat​
​coordination.​

​22​

​ owie Road to Echo Lane​
B
​Secondary Egress​

​ uality of​
Q
​Life​

​2​

​ ublic​
P
​Works​
​and​
​Facilitie​
​s​

​ ngineer and permit the identified​
E
​secondary egress route. Terrain is​
​sloped, vegetated, and seasonally wet​
​with a culvert passing beneath the​
​highway; CEQA and CWA §404​
​compliance anticipated — a cost and​
​schedule factor, not a bar. Animal​
​underpass co-benefit identified.​

​23​

​ andemic Response Plan​
P
​— Maintenance and​
​Update​

​ uality of​
Q
​Life​

​3​

​OES​

​ pdate the completed plan with​
U
​COVID-19 lessons learned; annual​
​review cycle.​

​24​

​Tribal Microgrid — Phase 1​ ​Sustainability​ ​3​

​D

R

AF

​2​

T​

​#​

​ enew​ L
R
​ ong-term (5+ year) energy​
​able​
​sovereignty pathway; Phase 1​
​Energy​ ​feasibility and funding development.​
​Coordin​
​ator​

​25​

​ etrolia Parcel Hazard​
P
​Assessment​

​Sustainability​ ​3​

​ ES /​
O
​ENR​

​26​

​ ctive Threat / Civil Unrest​
A
​Plan — Annual Exercise​

​ uality of​
Q
​Life​

​ ES /​
O
​ aintain and exercise annually for​
M
​Enterpri​ ​large-assembly enterprise operations;​
​se​
​operational detail in EOP.​
​Security​

​3​

​ aseline hazard assessment of the​
B
​discontiguous Petrolia parcel.​

1328​
​
1329​​5.8 Master Priority Summary — All 26 Actions​
​
1330​​Table 5-3: Master Mitigation Action Priority Summary​
​

​BRB Tribal Hazard Mitigation Plan — 2026 Update — Page​​49​​of​​65​
​https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit​

​#​

​Action​

​Priority​

​Lead​

​Funding Pathway​

​5.6.1​

​Tribal Fire Program — Phase 1​

​1​

​OES / Admin​

​ MGP/BRIC planning;​
H
​BIA​

​5.6.2​

​Bear River PD Reinstatement​

​1​

​Admin / Council​

​BIA; DOJ​

​5.6.3​

​ mergency Resilience Campus —​
E
​Singley Hill​

​1​

​OES / Admin​

​HMGP; BRIC; EDA​

​5.6.3a​

​Near-Term Connex Supply Storage​

​1 (90-day)​ ​OES​

​5.6.4​

​ ingley Hill Corridor / Secondary​
S
​Egress Program​

​1​

​Public Works / OES​ H
​ MGP; BIA Roads;​
​Caltrans​

​5.6.5​

​ ecreation Center Generator +​
R
​30-Day Fuel​

​1​

​OES / Facilities​

​HMGP/BRIC​

​5.6.6​

​Resort Seismic Assessment​

​1 (active)​

​Grants / Facilities​

​HMGP (awarded)​

​5.6.7​

​Mattole Beach Emergency Protocol​

​2​

​OES / Cultural​

​Planning funds​

​5.6.8​

​DR-4692 PA Contract Execution​

​1 (admin)​

​Grants / Admin​

​PA (approved)​

​5.6.9​

​RAVE Mobile Enrollment Drive​

​2​

​OES​

​Tribal; THSGP​

​5.6.10​

​Foster Care Emergency Protocol​

​2​

​ ocial Services /​
S
​OES​

​Planning funds​

​5.6.11​

​ esort Water System Fire Flow​
R
​Assessment​

​2​

​ ublic Works /​
P
​Resort​

​BRIC; Tribal​

​5.6.12​

​ tormwater Infrastructure +​
S
​Maintenance Governance​

​1​

​Public Works​

​ OR R25AP00342;​
B
​BRIC​

​5.6.13​

​ nimal Emergency Plan​
A
​Implementation​

​3​

​OES​

​Tribal; Red Cross coord.​

​5.6.14​

​LEP Notification Capability​

R

​2​

​OES / HR​

​Tribal​

​ ump and Play Priority Fuel​
P
​Resupply​

​2​

​OES / Enterpris

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---