Ms. Lisa Felice
Michigan Public Service Commission
7109 W. Saginaw Hwy.
P. O. Box 30221
Lansing, MI 48909

RE:

Via E-filing

MPSC Case No. U-20763

Dear Ms. Felice:
The following are attached for paperless electronic filing:
•

Supplemental Authority Submitted by Bay Mills Indian Community Regarding
Enbridge Energy, Limited Partnership’s Request for Declaratory Relief

•

Proof of Service

Sincerely,

Christopher M. Bzdok
Chris@envlaw.com

xc:

Parties to Case No. U-20763

STATE OF MICHIGAN
BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

IN RE ENBRIDGE ENERGY
In the matter of the application for the authority to
replace and relocate the segment of Line 5 crossing the
Straits of Mackinac into a tunnel beneath the Straits of
Mackinac, if approval is required Pursuant to 1929 PA
16; MCL 483.1 et seq. and Rule 447 of the Michigan
Public Service Commission’s Rules of Practice and
Procedure, R 792.10447, or the Grant of other
Appropriate Relief

Case No. U-20763

SUPPLEMENTAL AUTHORITY SUBMITTED
BY BAY MILLS INDIAN COMMUNITY
REGARDING ENBRIDGE ENERGY, LIMITED PARTNERSHIP’S REQEST FOR
DECLARATORY RELIEF
Bay Mills Indian Community (“Bay Mills”) respectfully submits this supplemental
authority to bring to the Commission’s attention recent motions and briefs filed by the Michigan
Attorney General in Nessel, v. Enbridge Energy, Ltd., et al, No. 19-474-CE (Ingham County Cir.
Ct. Michigan) (the “Ingham County Litigation”). In its comments previously submitted regarding
the pending request for declaratory relief by Enbridge Energy, Limited Partnership (“Enbridge”),
Bay Mills argued that Enbridge’s request for a declaratory ruling should be denied in light of the
pending request in the Ingham County Litigation for an injunction requiring Enbridge to cease
operation of Line 5 in the Straits. Bay Mills also argued that the request for a declaratory ruling
should be denied because the environmental impacts of the proposed project must be evaluated by
the Commission, particularly in light of concerns about Enbridge’s record with respect to safety
and transparency about safety issues.

On June 22, 2020, in the Ingham County Litigation, the Attorney General filed a Motion
For Preliminary Injunction (attached as Exhibit A), a Motion For Temporary Restraining Order
Pending Hearing on Motion For Preliminary Injunction (attached as Exhibit B), and briefs in
support of each motion (attached as Exhibits C and D). In these filings, the Attorney General seeks
a temporary restraining order and preliminary injunction requiring Enbridge to cease operation of
Line 5. In the brief in support of the motion for a preliminary injunction, the Attorney General
states:
•

“On Thursday, June 18, 2020, representatives of the Defendant Enbridge entities
(Enbridge) informed the State of Michigan that Enbridge had discovered new evidence of
substantial damage to the Line 5 dual pipelines infrastructure.”

•

“On Friday, June 19, 2020, the Governor requested that Enbridge immediately provide the
State of Michigan with all information in its possession related to this issue, with digital
information provided within 24 hours and all remaining information provided no later than
Monday June 22, 2020.”

•

“Despite initially stating that it would provide the requested information Enbridge has
failed to provide an adequate response, providing two short engineering reports on
Monday, June 22, but none of the underlying data that went into the reports, no video, and
only the small number of photographs included in the reports.”

•

“[T]he response failed to explain how the damage occurred and what measures will be
taken to prevent a recurrence.”

Brief in Support of Plaintiff’s Motion For Preliminary Injunction, attached as Exhibit D, pp. 1-2.
The Attorney General’s filings on June 22, and the allegations contained therein, relate to
Bay Mills’ arguments that the Commission must evaluate the environmental impacts of Line 5.
The allegations also heighten Bay Mills’ concerns about Enbridge’s record with respect to safety
and transparency.

2

Respectfully submitted,
Digitally signed by
Christopher M. Bzdok
Date: 2020.06.25
11:53:01 -04'00'
__________________________________

Counsel for Bay Mills Indian Community
Christopher M. Bzdok (P53094)
OLSON, BZDOK & HOWARD, P.C.
420 E. Front St.
Traverse City, MI 49686
chris@envlaw.com
Debbie Chizewer*
EARTHJUSTICE
311 S. Wacker Drive, Suite 1400
Chicago, IL 60606
dchizewer@earthjustice.org
Christopher R. Clark*
EARTHJUSTICE
311 S. Wacker Drive, Suite 1400
Chicago, IL 60606
cclark@earthjustice.org
David Gover*
Senior Staff Attorney
NATIVE AMERICAN RIGHTS FUND
Boulder, CO
dgover@narf.org
Matt Campbell*
Staff Attorney
NATIVE AMERICAN RIGHTS FUND
Boulder, CO
mcampbell@narf.org
*Pro Hac Vice motions filed

3

BAY MILLS INDIAN COMMUNITY
Attn: Legal Department
12140 West Lakeshore Drive
Brimley, MI 49715
Kathryn Tierney (P-24837)
candyt@bmic.net
Whitney Gravelle (P-83217)
wgravelle@baymills.org

4

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit A
Page 1 of 3

STATE OF MICHIGAN
CIRCUIT COURT FOR THE 30TH JUDICIAL CIRCUIT
INGHAM COUNTY
DANA NESSEL, ATTORNEY GENERAL OF
THE STATE OF MICHIGAN, ON BEHALF
OF THE PEOPLE OF THE STATE OF
MICHIGAN,
Plaintiff,

No. 19-474-CE
HON. JAMES S. JAMO

v
ENBRIDGE ENERGY, LIMITED
PARTNERSHIP; ENBRIDGE ENERGY
COMPANY, INC.; and ENBRIDGE ENERGY
PARTNERS, L.P.,
Defendants.
S. Peter Manning (P45719)
Robert P. Reichel (P31878)
Daniel P. Bock (P71246)
Charles A. Cavanagh (P79171)
Assistant Attorneys General
Attorneys for Plaintiff
Environment, Natural Resources, and
Agriculture Division
P.O. Box 30755
Lansing, MI 48909
(517) 335-7664

Peter H. Ellsworth (P23657)
Jeffery V. Stuckey (P34648)
Ryan M. Shannon (P74535)
Dickinson Wright PLLC
Attorneys for Defendants
215 South Washington Square
Suite 200
Lansing, MI 48933
(517) 371-1730

David H. Coburn (pro hac vice)
William T. Hassler (pro hac vice)
Alice Loughran (pro hac vice)
Joshua Runyan (pro hac vice)
Steptoe & Johnson LLP
Attorneys for Defendants
1330 Connecticut Avenue, N.W.
Washington, DC 20036
(202) 429-3000

Phillip J. DeRosier (P55595)
Attorney for Defendants
500 Woodward Avenue
Suite 4000
Detroit, MI 48226
(313) 223-3866

PLAINTIFF’S EX PARTE MOTION FOR
TEMPORARY RESTRAINING ORDER PENDING
HEARING ON MOTION FOR PRELIMINARY INJUNCTION

/

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit A
Page 2 of 3

The Plaintiff, Dana Nessel, Attorney General of the State of Michigan, on
behalf of the people of the State of Michigan, brings this ex parte motion for a
temporary restraining order pursuant to MCR 3.310(B).
The purpose of this motion is to preserve the status quo until the Court can
hear and decide the Plaintiff’s contemporaneously filed motion for preliminary
injunction. A temporary restraining order preserving the last peaceable,
uncontested status quo is necessary to prevent two irreparable injuries. First, the
grave risk of irreparable injury to the Great Lakes if Defendants continue operation
of the west leg of the Line 5 dual pipelines, or resume operation of the east leg of the
pipelines, before the Court can consider Plaintiff’s motion for a preliminary
injunction.
Second, the State of Michigan will suffer an irreparable injury if Defendants
continue operation of the west leg of the pipelines, or resume operation of the east
leg of the pipelines, without first providing legally required information to the State
for its review and determination that it is safe to resume pipeline operations.
Consistent with MCR 3.310(B)(2), undersigned counsel for the Plaintiff
certifies that he attempted to contact Defendants’ counsel Philip DeRosier, who has
been Plaintiff’s primary point of contact in this matter, via telephone at
approximately 3:40 p.m., and via email at approximately 3:50 p.m. on June 22,
2020, to provide notice of this motion.
For these reasons, as set forth more fully in the brief in support of this
motion, the Plaintiff respectfully requests that the Court enter a temporary

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit A
Page 3 of 3

restraining order enjoining operation of the Line 5 dual pipelines in the Straits of
Mackinac until the Court can rule on Plaintiff’s motion for preliminary injunction.
Respectfully submitted,
Dana Nessel
Attorney General
/s/Daniel P. Bock
S. Peter Manning (P45719)
Robert P. Reichel (P31878)
Daniel P. Bock (P71246)
Charles A. Cavanagh (P79171)
Assistant Attorneys General
Attorneys for Plaintiff
Environment, Natural Resources,
and Agriculture Division
P.O. Box 30755
Lansing, MI 48909
(517) 335-7664

Dated: June 22, 2020

LF: Enbridge Straits (AG v)/AG #2019-0253664-B-L/Motion for TRO 2020-06-22

2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit B
Page 1 of 3

STATE OF MICHIGAN
CIRCUIT COURT FOR THE 30TH JUDICIAL CIRCUIT
INGHAM COUNTY
DANA NESSEL, ATTORNEY GENERAL OF
THE STATE OF MICHIGAN, ON BEHALF
OF THE PEOPLE OF THE STATE OF
MICHIGAN,
Plaintiff,

No. 19-474-CE
HON. JAMES S. JAMO

v
ENBRIDGE ENERGY, LIMITED
PARTNERSHIP; ENBRIDGE ENERGY
COMPANY, INC.; and ENBRIDGE ENERGY
PARTNERS, L.P.,
Defendants.
S. Peter Manning (P45719)
Robert P. Reichel (P31878)
Daniel P. Bock (P71246)
Charles A. Cavanagh (P79171)
Assistant Attorneys General
Attorneys for Plaintiff
Environment, Natural Resources, and
Agriculture Division
P.O. Box 30755
Lansing, MI 48909
(517) 335-7664

Peter H. Ellsworth (P23657)
Jeffery V. Stuckey (P34648)
Ryan M. Shannon (P74535)
Dickinson Wright PLLC
Attorneys for Defendants
215 South Washington Square
Suite 200
Lansing, MI 48933
(517) 371-1730

David H. Coburn (pro hac vice)
William T. Hassler (pro hac vice)
Alice Loughran (pro hac vice)
Joshua Runyan (pro hac vice)
Steptoe & Johnson LLP
Attorneys for Defendants
1330 Connecticut Avenue, N.W.
Washington, DC 20036
(202) 429-3000

Phillip J. DeRosier (P55595)
Attorney for Defendants
500 Woodward Avenue
Suite 4000
Detroit, MI 48226
(313) 223-3866

PLAINTIFF’S MOTION FOR PRELIMINARY INJUNCTION

/

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit B
Page 2 of 3

The Plaintiff, Dana Nessel, Attorney General of the State of Michigan, on
behalf of the people of the State of Michigan, brings this motion for a preliminary
injunction pursuant to MCR 3.310(A).
For the reasons set forth in the brief in support of this motion, the Attorney
General respectfully requests that the Court:
A.

Enter a preliminary injunction requiring the Defendants to perform

the following actions:
1.

Immediately provide the State of Michigan any and all

information in their possession related to the nature, extent, and cause(s) of newlydiscovered damage to the Line 5 dual pipelines and their supporting infrastructure
in the Straits of Mackinac first reported to the State on June 18, 2020, including
without limitation all inspection reports, photographs, unedited video recordings,
engineering evaluations, and the basis for Enbridge’s conclusion, if any, that it was
or is reasonably prudent to re-start either pipeline;
2.

Preserve the status quo by ceasing operation of both legs of the

dual pipelines until the State of Michigan can conduct a full review of the
information with the assistance of independent experts, and Enbridge affirmatively
establishes that it is reasonably prudent to resume their operation; and
B.

Grant the Attorney General other relief as the Court finds appropriate

and just.
Respectfully submitted,
Dana Nessel
Attorney General

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit B
Page 3 of 3

/s/Daniel P. Bock
S. Peter Manning (P45719)
Robert P. Reichel (P31878)
Daniel P. Bock (P71246)
Charles A. Cavanagh (P79171)
Assistant Attorneys General
Attorneys for Plaintiff
Environment, Natural Resources,
and Agriculture Division
P.O. Box 30755
Lansing, MI 48909
(517) 335-7664

Dated: June 22, 2020

LF: Enbridge Straits (AG v)/AG #2019-0253664-B-L/POS 2020-06-22

2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 1 of 9

STATE OF MICHIGAN
CIRCUIT COURT FOR THE 30TH JUDICIAL CIRCUIT
INGHAM COUNTY
DANA NESSEL, ATTORNEY GENERAL OF
THE STATE OF MICHIGAN, ON BEHALF
OF THE PEOPLE OF THE STATE OF
MICHIGAN,
Plaintiff,

No. 19-474-CE
HON. JAMES S. JAMO

v
ENBRIDGE ENERGY, LIMITED
PARTNERSHIP; ENBRIDGE ENERGY
COMPANY, INC.; and ENBRIDGE ENERGY
PARTNERS, L.P.,
Defendants.
S. Peter Manning (P45719)
Robert P. Reichel (P31878)
Daniel P. Bock (P71246)
Charles A. Cavanagh (P79171)
Assistant Attorneys General
Attorneys for Plaintiff
Environment, Natural Resources, and
Agriculture Division
P.O. Box 30755
Lansing, MI 48909
(517) 335-7664

Peter H. Ellsworth (P23657)
Jeffery V. Stuckey (P34648)
Ryan M. Shannon (P74535)
Dickinson Wright PLLC
Attorneys for Defendants
215 South Washington Square
Suite 200
Lansing, MI 48933
(517) 371-1730

David H. Coburn (pro hac vice)
William T. Hassler (pro hac vice)
Alice Loughran (pro hac vice)
Joshua Runyan (pro hac vice)
Steptoe & Johnson LLP
Attorneys for Defendants
1330 Connecticut Avenue, N.W.
Washington, DC 20036
(202) 429-3000

Phillip J. DeRosier (P55595)
Attorney for Defendants
500 Woodward Avenue
Suite 4000
Detroit, MI 48226
(313) 223-3866

BRIEF IN SUPPORT OF PLAINTIFF’S EX PARTE MOTION
FOR TEMPORARY RESTRAINING ORDER PENDING
HEARING ON MOTION FOR PRELIMINARY INJUNCTION

/

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 2 of 9

The facts and law that support this motion are set forth in Plaintiff’s
contemporaneously filed motion for preliminary injunction and brief in support and
are incorporated herein by reference. In this situation, a preliminary injunction
alone is not sufficient. Given Enbridge’s clear willingness to reactivate the Line 5
dual pipelines on state owned bottomlands without consulting state government
officials consistent with its contractual agreements with the state, even
immediately after informing the Governor that the pipelines had been shut down, a
temporary restraining order is necessary to ensure that the pipelines remain
inactive until the Court can hear and decide Plaintiff’s motion for preliminary
injunction.
As set forth in the Plaintiff’s brief in support of its motion for preliminary
injunction, the last actual, peaceable, uncontested status quo was that the Line 5
dual pipelines were shut down pending an investigation into the newly discovered
damage to the pipelines and their infrastructure. (6/22/20 Brief in Support of
Motion for Preliminary Injunction, pp 12–13.)
Enbridge’s actions of informing the Governor via a letter from its CEO that
the pipelines were shut down pending investigation, only to almost immediately
resume operation of one leg of the pipelines, demonstrate that its statements to
government regulators are, at best, inconsistent with its actions. At worst, they are
misleading.
As set forth in the attached affidavit of Daniel Eichinger, the people of the
State of Michigan will suffer immediate and irreparable injury, loss, or damage

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 3 of 9

from the delay required to effect the usual notice provisions required by the
Michigan Court Rules. (Ex A, ¶¶ 5–11.) Specifically, Enbridge has already
reactivated one leg of the Line 5 pipelines, in apparent contradiction of its formal
letter to the Governor issued earlier the same day. (Ex A, ¶ 6; Exs B and C to
Plaintiff’s 6/22/20 Brief in Support of Motion for Preliminary Injunction.) This
decision to reactivate the west leg was made without first providing the information
Enbridge was legally required to provide to the State, and without any
understanding of the cause of the newly discovered damage to the pipelines and
supporting infrastructure. (Id.)
The fact that the west leg is operating without the assurance of a full
investigation, and without any involvement by State regulators, in and of itself
constitutes an immediate and irreparable injury to the people of the State of
Michigan. (Ex A, ¶¶ 7–8.) The people of the State have an interest in ensuring that
privately owned infrastructure that threatens the Great Lakes is operated in a
reasonably prudent and legal manner, complete with appropriate government
oversight. By shirking its legal obligations to share information with the State,
Enbridge has irreparably harmed the people by denying their ability to oversee
Enbridge’s operations on public trust bottomlands and protect the Great Lakes.
Additionally, given Enbridge’s cavalier attitude toward the risk its pipelines
pose to the Great Lakes, and its indifferent response to its legal obligations and the
reasonable requests of State government officials, there is no reason to believe that
Enbridge will consult State officials before it reactivates the east leg of the

2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 4 of 9

pipelines. After all, that is exactly what it did with the west leg as recently as
Saturday, June 20, 2020. (Ex A, ¶¶ 6–10.) This would constitute a second
immediate and irreparable injury that cannot be avoided absent the issuance of a
temporary restraining order.
Finally, there is a far graver risk of irreparable harm: the risk of a release of
oil from the Line 5 pipelines into the waters of the Straits of Mackinac. (Ex A, ¶ 11;
6/22/20 Brief in Support of Motion for Preliminary Injunction, pp 11–12, 13, and
14.)
CONCLUSION AND RELIEF REQUESTED
For the reasons set forth above, the Attorney General respectfully requests
that this Court enter a temporary restraining order enjoining the operation of the
Line 5 dual pipelines in the Straits of Mackinac until such time as the Court can
rule on the Plaintiff’s motion for preliminary injunction.
Respectfully submitted,
Dana Nessel
Attorney General
/s/Daniel P. Bock
S. Peter Manning (P45719)
Robert P. Reichel (P31878)
Daniel P. Bock (P71246)
Charles A. Cavanagh (P79171)
Assistant Attorneys General
Attorneys for Plaintiff
Environment, Natural Resources,
and Agriculture Division
P.O. Box 30755
Lansing, MI 48909
(517) 335-7664

Dated: June 22, 2020

LF: Enbridge Straits (AG v)/AG #2019-0253664-B-L/Brief in Support of Motion for TRO 2020-06-22

3

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 5 of 9

EXHIBIT A

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 6 of 9

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 7 of 9

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 8 of 9

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit C
Page 9 of 9

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 1 of 64

STATE OF MICHIGAN
CIRCUIT COURT FOR THE 30TH JUDICIAL CIRCUIT
INGHAM COUNTY
DANA NESSEL, ATTORNEY GENERAL OF
THE STATE OF MICHIGAN, ON BEHALF
OF THE PEOPLE OF THE STATE OF
MICHIGAN,
Plaintiff,

No. 19-474-CE
HON. JAMES S. JAMO

v
ENBRIDGE ENERGY, LIMITED
PARTNERSHIP; ENBRIDGE ENERGY
COMPANY, INC.; and ENBRIDGE ENERGY
PARTNERS, L.P.,
Defendants.
S. Peter Manning (P45719)
Robert P. Reichel (P31878)
Daniel P. Bock (P71246)
Charles A. Cavanagh (P79171)
Assistant Attorneys General
Attorneys for Plaintiff
Environment, Natural Resources, and
Agriculture Division
P.O. Box 30755
Lansing, MI 48909
(517) 335-7664

Peter H. Ellsworth (P23657)
Jeffery V. Stuckey (P34648)
Ryan M. Shannon (P74535)
Dickinson Wright PLLC
Attorneys for Defendants
215 South Washington Square
Suite 200
Lansing, MI 48933
(517) 371-1730

David H. Coburn (pro hac vice)
William T. Hassler (pro hac vice)
Alice Loughran (pro hac vice)
Joshua Runyan (pro hac vice)
Steptoe & Johnson LLP
Attorneys for Defendants
1330 Connecticut Avenue, N.W.
Washington, DC 20036
(202) 429-3000

Phillip J. DeRosier (P55595)
Attorney for Defendants
500 Woodward Avenue
Suite 4000
Detroit, MI 48226
(313) 223-3866

BRIEF IN SUPPORT OF PLAINTIFF’S
MOTION FOR PRELIMINARY INJUNCTION

/

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 2 of 64

INTRODUCTION
On Thursday, June 18, 2020, representatives of the Defendant Enbridge
entities (Enbridge) informed the State of Michigan that Enbridge had discovered
new evidence of substantial damage to the Line 5 dual pipelines infrastructure.
According to Enbridge, this includes damage to the coating of both pipelines, as well
as jarring loose one of the anchor supports affixed to the east leg of the dual
pipelines. Enbridge initially shut down operation of both pipelines.
Enbridge stated that it does not presently know what caused this damage to
the Line 5 dual pipelines. But it is clear that the pipelines were impacted by a
physical force powerful enough to dislodge a solid steel anchor support and damage
the protective coating of the pipelines themselves. The fact that, according to
Enbridge, this impact occurred approximately 220 feet below the surface of the
Straits of Mackinac necessarily limits the universe of potential causes.
As set forth more fully below, Enbridge’s response to this alarming
occurrence has been woefully inadequate. On Friday, June 19, 2020, the Governor
requested that Enbridge immediately provide the State of Michigan with all
information in its possession related to this issue, with digital information provided
within 24 hours and all remaining information provided no later than Monday,
June 22, 2020. Despite initially stating that it would provide the requested
information Enbridge has failed to provide an adequate response, providing two
short engineering reports on Monday, June 22, but none of the underlying data or
information that went into the reports, no video, and only the small number of

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 3 of 64

photographs included in the reports. In addition, the response failed to explain how
the damage occurred and what measures will be taken to prevent a recurrence.
Enbridge unilaterally reactivated the West leg of the dual pipelines on Saturday,
June 20, 2020 without consulting the State, and prior to providing any of the
information that the Governor requested. Later, on June 20, 2020, the Governor
requested that Enbridge leave the dual pipelines shut down until an investigation
into the cause of this incident and the overall risk to the Great Lakes could be
completed. Enbridge has nevertheless continued operating the West leg and
appears to be preparing to re-activate the East leg.
This newly discovered damage to the Line 5 dual pipelines is merely the
latest in a troubling pattern of events in which the pipelines have been damaged,
often without explanation, and without immediate detection or prevention by
Enbridge. For example, in 2017, Enbridge belatedly disclosed several areas of
damaged pipeline coating where bare metal was exposed, 1 despite having identified
some of this damage as early as 2014. 2 In April 2018, the pipelines were struck by
an anchor, but Enbridge did not detect the anchor strike and damage to the
coatings on both pipelines until notified by a third party. Again, in May 2020,
Enbridge belatedly discovered additional damage to pipeline coating, but

1 https://www.freep.com/story/news/local/michigan/2017/11/14/enbridge-discloses-

dozens-more-gaps-straits-mackinac-pipelines-protective-coating/863490001/

2 https://www.mlive.com/news/2017/10/enbridge_line_5_damage_2014_de.html

2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 4 of 64

apparently does not know when and how it occurred. 3
Enbridge’s inadequate response to the latest incident reflects the
continuation of a pattern of conduct in which Enbridge puts profits above the health
and safety of the Great Lakes and ignores its due care obligation under the 1953
Easement.
It is apparent that this pattern will continue unless the Court compels
Enbridge to manage the pipelines responsibly as long as they are allowed to remain
in operation. To that end, a preliminary injunction is necessary to compel Enbridge
to provide the State of Michigan with any and all information it possesses related to
this newly discovered damage to the pipelines, to allow the State to review this
information with the assistance of outside experts, and to preserve the status quo
by shutting down both of the Line 5 dual pipelines until this review is complete, the
cause investigated, and mitigation measures are in place.
STATEMENT OF FACTS
The Court is no doubt familiar with the Line 5 dual pipelines and their
history, as well as the grave harm that would be caused by a release from the
pipelines. This brief will, therefore, focus only on the immediately relevant facts.
On Thursday, June 18, 2020, Enbridge representatives contacted the
Directors of the Michigan Department of Natural Resources (DNR) and the
Michigan Department of Environment, Great Lakes, and Energy (EGLE) via

3 https://www.detroitnews.com/story/news/local/michigan/2020/05/26/enbridge-says-

four-bare-spots-line-5-repaired/5262976002/
3

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 5 of 64

telephone conference and informed them that Enbridge had discovered evidence of
damage to the Line 5 dual pipelines infrastructure. (Ex A, p 1.) Specifically, on
June 18, Enbridge had discovered significant damage to an anchor support attached
to the east leg of the dual pipelines. (Id.)
This damaged anchor support is located approximately 150 feet from a
portion of the pipeline where, on or about May 26, 2020, Enbridge discovered
damage to the pipeline coating. (Ex A, p 1.) Enbridge informed the State that it
had shut down both legs of the pipelines and was in the process of gathering
information via divers and the use of a remotely operated vehicle (ROV). (Id.)
In a letter dated June 19, 2020, the Governor requested that Enbridge
provide the DNR and EGLE Directors with all information in its possession related
to this incident, including, but not limited to, engineering reports, photographs,
video, and any other demonstrative evidence of the damage. (Id., pp 1–2.) The
Governor requested that immediately available digital information be provided
within 24 hours, and that the remaining information be provided no later than
Monday, June 22, 2020, and supplemented as necessary thereafter. (Id., p 2.)
The next day, on June 20, 2020, Enbridge’s CEO Al Monaco responded with a
letter stating that the anchor support had “shifted position,” that this was “an issue
affecting that anchor support assembly and not the pipeline itself,” 4 and that, “As a
preliminary precaution, we immediately shut down both the east and west legs of

4 Mr. Monaco’s letter did not mention that, as previously noted, this damaged

anchor support was located a mere150 feet from recently discovered damage to the
coating of the pipeline itself. (Ex A, p 1.)
4

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 6 of 64

Line 5” and promptly notified the State of Michigan and federal regulators. (Ex B,
p 1.) Mr. Monaco further stated that, “Our current efforts to assess the fitness for
service of the dual pipelines includes deployment of divers to inspect the area
around the damaged support assembly and the use of a remotely operated vehicle
(ROV) to inspect the entire pipeline, both the east and west legs.” (Id.)
At approximately 1:59 p.m. that same day, shortly after Mr. Monaco’s letter
was received electronically by the Governor, Enbridge informed the DNR and EGLE
Directors that it would reactivate the west leg of the dual pipelines at
approximately 2:00 p.m. (Ex C, p 1.) The west leg of the pipelines was reactivated
without consulting the State of Michigan or providing any of the information that
Enbridge had agreed to provide. Indeed, it was reactivated less than 48 hours after
Enbridge informed the State that it was shut down. (Id.) This reactivation
appears to have occurred with no understanding of the cause of the damage to the
pipeline infrastructure, no understanding of how the source of the damage escaped
Enbridge’s detection and prevention measures, and no determination by any party
other than Enbridge itself as to whether it was prudent to resume operations.
The Governor responded with another letter that same day, June 20, 2020.
(Ex C.) In this letter, the Governor stated:
Given the gravity of this matter, I was taken aback to learn the
company has unilaterally resumed operation of the west leg without
even opportunity for discussion. At this moment, Enbridge is pumping
crude through the Great Lakes on state-owned bottomlands without
any explanation for the cause of this damage to the pipeline structure
and no assurance that Enbridge has taken sufficient steps to mitigate
future harm. This disregard for the safety and well-being of our Great

5

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 7 of 64

Lakes, and Enbridge’s due care obligations under the 1953 Easement,
is unacceptable.
(Id., p 1.)
The Governor then requested that Enbridge immediately shut down the dual
pipelines until the matter could be investigated and preventative measures put in
place. (Id.) The Governor requested that this involve a full report prepared by
Enbridge and reviewed by the State or a third party selected by the State. (Id., p 2.)
To date, Enbridge has failed or refused to fully respond to the Governor’s
request for information. As noted above, Enbridge did not provide any information
within the 24 hour timeline requested by the Governor, and to date has provided
only the two short engineering reports, see Exhibits D and E, 5 without providing
any of the underlying data or any video footage, and only the small handful of
photographs included in the reports. Additionally, the west leg of the dual pipelines
remains active despite there being no apparent indication of precisely what caused
the damage to the pipelines, how it evaded Enbridge’s detection and prevention
measures, or what steps need to be taken to prevent future harm from recurring.

5 Exhibits D and E were provided to the State by Enbridge and were stamped

“privileged and confidential.” The basis for Enbridge’s assertion of confidentiality is
unclear at this time. However, due to time constraints and out of an abundance of
caution, Exhibits D and E will be filed separately once the State determines
whether it is necessary to file them under seal.
6

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 8 of 64

ARGUMENT
I.

Enbridge is legally required to produce any and all information it
possesses related to the newly discovered damage to the Line 5 dual
pipelines. Additionally, the Court has the authority to compel
Enbridge to produce this information, and to enjoin the operation of
the pipelines until an independent review confirms that it is safe to
resume operation.
The relief sought in this motion is available under four legal bases.

Enbridge’s conduct constitutes violations of both the 1953 Easement that
authorized the placement of the Line 5 dual pipelines in the Straits of Mackinac as
well as a subsequent contract between Enbridge and the State of Michigan
commonly referred to as the “Second Agreement.” (Exs F and G.) The Court has
the power to grant injunctive relief to compel compliance with these agreements.
Additionally, injunctive relief is available under count II, public nuisance, and count
III, Michigan Environmental Protection Act, of the complaint.
A.

The 1953 Easement requires Enbridge to produce the
information that it has thus far withheld, and provides a legal
basis for the Court to compel Enbridge to produce that
information and to enjoin operation of the dual pipelines until
Enbridge affirmatively establishes that it is reasonably
prudent to resume operations.

The 1953 Easement itself contains provisions that require Enbridge to
provide the information requested in this motion. 6 First, the Easement requires
that Enbridge, “in its exercise of rights under this easement, including its

6 While this lawsuit challenges the validity of the 1953 Easement, a contract is

presumed to be valid and binding until a court declares otherwise. Therefore, until
this matter is resolved and so long as Enbridge continues to operate the dual
pipelines, Enbridge is bound by the Easement’s terms.
7

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 9 of 64

designing, constructing, testing, operating, maintaining . . . said pipelines, shall
follow the usual necessary, and proper procedures for the type of operation involved,
and at all times shall exercise the due care of a reasonably prudent person for the
safety and welfare of all persons and of all public and private property.” (Ex F, pp
3–4 ¶ A.)
Second, the Easement provides that the Grantor can inspect, at all
reasonable times, the pipelines, appurtenances, and fixtures authorized by the
Easement. (Id., p 12 ¶ O.)
Here, Enbridge has thus far withheld information in its possession related to
the pipelines, appurtenances, and fixtures, including the damaged anchor support.
While Exhibits D and E constitute short compilations and analyses of information
performed by Enbridge or its agents, they do not satisfy the Governor’s request for
all information Enbridge possesses. The purpose of this request is, among other
things, to allow the State to conduct a full independent review of all of the available
facts, rather than short summary reports prepared by Enbridge itself.
Enbridge’s inadequate response to the Governor’s request violates the “due
care” obligation that requires Enbridge to exercise the care of a reasonably prudent
person. The Court has the power to grant injunctive relief to compel compliance
with the terms of the Easement, including that Enbridge uphold its due care
obligations by taking the reasonably prudent steps of sharing information related to
damage to the pipelines’ infrastructure. Additionally, the Court has the power to
determine that a reasonably prudent person would cease operations of the dual

8

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 10 of 64

pipelines until that information can be reviewed, and until Enbridge affirmatively
establishes that it is reasonably prudent to resume normal operations.
B.

The “Second Agreement” between the State of Michigan and
Enbridge requires Enbridge to produce the information that it
has thus far withheld and provides a legal basis for the Court
to compel Enbridge to produce that information.

On October 2, 2018, the State of Michigan, DNR, and EGLE entered into a
contract with Enbridge commonly referred to as the Second Agreement. (Ex E.)
The Second Agreement specifically provided that:
Enbridge will work cooperatively with the State to: (a) make available
to the State’s representative data and other materials generated under
this Second Agreement, including but not limited to geologic,
engineering, or other technical information concerning Line 5 located
in the State of Michigan and Enbridge’s implementation of the
measures described herein; (b) all requested information in Enbridge’s
possession concerning the operation, integrity management, leak
detection, and emergency preparedness for Enbridge’s Line 5 pipeline
located in the State of Michigan.
(Ex E, p 4 ¶ I.A.2.)
The Attorney General has the ability to enforce this contractual provision
against Enbridge, on behalf of the people of the State of Michigan, in this lawsuit.
While two of the signatories to the Second Agreement, DNR and EGLE, are not
parties to this lawsuit, the State of Michigan itself is a signatory, and the Attorney
General brings this action on behalf of the people of the State of Michigan.
Additionally, the Second Agreement was expressly entered into for the
benefit of the people of the State of Michigan. 7 Therefore, even if they were not a
7 See, e.g., the following passage: “WHEREAS, the State and Enbridge recognize

that the Straits Crossing and the St. Clair River Crossing (collectively ‘Crossings’)
9

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 11 of 64

signatory, the people of the State of Michigan would collectively be an intended
third party beneficiary of the Second Agreement, and may enforce its provisions in
court. MCL 600.1405; Schmalfeldt v North Pointe Ins Co, 469 Mich 422, 427–428
(2003), internal citations omitted.
Here, the State of Michigan has requested precisely the sort of information
that Enbridge is obligated to provide, and Enbridge’s partial response is simply
inadequate. The information requested by the Governor is crucial to determining
whether, as the complaint alleges, Line 5 presents an imminent threat of pollution,
impairment, or destruction of natural resources or the public trust in those natural
resources, and whether Line 5 presents an imminent threat of a public nuisance.
The Court may, therefore, enter an injunction requiring that Enbridge immediately
produce all information in its possession related to this newly discovered damage to
the pipelines and their infrastructure.
C.

The common law doctrine of public nuisance provides an
independent basis for the Court to preserve the status quo and
prevent irreparable harm to the Great Lakes by enjoining the
operation of the pipelines until an independent review
confirms that it is safe.

Count II of the complaint in this matter alleges that Enbridge’s operation of
the Line 5 dual pipelines in the Straits of Mackinac creates a public nuisance
because it constitutes a continuing, unreasonable risk of catastrophic harm to

are located in the Great Lakes and connecting waters that include and are in
proximity to unique ecological and natural resources that are of vital significance to
the State and its residents, to tribal governments and their members, to public water
supplies, and to the regional economy.” (Ex F, p 2, emphasis added.)
10

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 12 of 64

public rights. (6/27/19 Complaint, Count II pp 25–26.) The fact that there is
evidence of some new damage to the pipelines, discovered barely two years after the
April 1, 2018 anchor strike, highlights the gravity of this risk.
The Court has the power to grant injunctive relief to abate a public nuisance.
MCL 600.2940(1). Here, where there is evidence of damage to the Line 5 pipelines,
but where Enbridge refuses or otherwise fails to share all of its information related
to that damage, this creates an unreasonable risk that constitutes a public nuisance
which this Court should abate.
D.

The Michigan Environmental Protection Act provides an
independent basis for the Court to preserve the status quo and
prevent irreparable harm to the Great Lakes by enjoining the
operation of the pipelines until an independent review
confirms that it is safe.

Count III of the complaint in this matter alleges a violation of Part 17,
Michigan Environmental Protection Act (MEPA), of the Natural Resources and
Environmental Protection Act, MCL 324.1701 et seq. (6/27/19 Complaint, Count III,
pp 26–27.)
MEPA specifically provides that the Attorney General may seek, and the
Court may award, equitable relief to prevent the pollution, impairment, or
destruction or natural resources or the public trust in those natural resources.
MCL 324.1701(1). Injunctive relief is equitable in nature. Dep’t of Envt’l Quality v
Gomez, 318 Mich App 1, 31–34 (2016).
As alleged in the complaint in this matter, a release of oil from Line 5 would
undoubtedly pollute, impair, or destroy the natural resources of the State of
11

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 13 of 64

Michigan and the public trust in those resources. Here, where there is evidence of
damage to the Line 5 pipelines, but where Enbridge refuses or otherwise fails to
share all of its information related to that damage, injunctive relief under MEPA is
necessary and appropriate.
II.

A preliminary injunction is necessary to preserve the status quo and
to prevent irreparable harm to the Great Lakes.
The purpose of a preliminary injunction is to preserve the status quo, so that

upon hearing the rights of the parties may be determined without injury to either.
Psychological Services of Bloomfield, Inc. v Blue Cross Blue Shield of Michigan, 144
Mich App 182, 185 (1985), citing Gates v Detroit M&R Co, 151 Mich 548, 551 (1908).
The status quo that must be preserved is the “last actual, peaceable, nonconstested
status” which preceded the pending controversy. Id., citing Steggles v National
Discount Corp, 326 Mich 44, 51 (1949).
A.

Standard of Review

Michigan courts apply a four-factor test in determining whether to issue a
preliminary injunction. The Supreme Court has held:
Whether a preliminary injunction should issue is determined by a fourfactor analysis: harm to the public interest if an injunction issues;
whether harm to the applicant in the absence of a stay outweighs harm
to the opposing party if a stay is granted; the strength of the
applicant’s demonstration that the applicant is likely to prevail on the
merits; and demonstration that the applicant will suffer irreparable
injury if a preliminary injunction is not granted.
Michigan State Employees Ass’n v Dep’t of Mental Health, 421 Mich 152, 157–158
(1984).

12

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 14 of 64

Whether to issue a preliminary injunction rests in the discretion of the trial
court. State v McQueen, 493 Mich 135, 146 (2013).
Here, the four factors set forth by the Supreme Court militate in favor of
issuing a preliminary injunction to prevent irreparable harm to the Great Lakes by
preserving the status quo by ceasing the recently resumed operation of the west leg
and preventing the reactivation of the east leg of the Line 5 dual pipelines until an
independent review has confirmed that it is safe.
B.

A preliminary injunction is necessary and appropriate to
ensure that the Line 5 dual pipelines remain inactive until an
independent review is complete, the cause investigated, and
mitigation measures are in place .

Here, the last actual, peaceable, noncontested status was that the Line 5 dual
pipelines were shut down pending an investigation. (Exs A and B.) That was the
status that existed before Enbridge unilaterally reactivated the west leg of the
pipelines almost immediately after informing the Governor that both legs had been
shut down pending an investigation. A preliminary injunction restoring and
preserving that status quo is necessary given the gravity of the harm that will be
suffered if Enbridge’s rush to resume pipeline operations without a full
investigation and impartial review proves misguided.
1.

A preliminary injunction serves the public interest.

It is beyond dispute that the public interest is best served by taking
appropriate measures to prevent a release from Line 5 into the waters of the Straits
of Mackinac. Given the facts set forth above, the public clearly has a strong interest
13

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 15 of 64

in an order compelling Enbridge to provide all information related to this issue to
the State, for the State to review that information with the assistance of outside
experts, and for the pipelines to remain shut down until that review confirms that it
is reasonably prudent to resume operations.
2.

Any harm caused to Enbridge by a preliminary
injunction is heavily outweighed by the risk of harm to
the public if a preliminary injunction is not entered.

Enbridge will not be harmed at all by being compelled to share its
information with the State. Indeed, Enbridge agreed to do so in the Second
Agreement, and appeared to agree to do so again in the June 20, 2020 letter from its
CEO. Additionally, Enbridge will not be harmed by having its information reviewed
by the State, nor by outside experts chosen by the State.
The only potential harm to Enbridge would be the financial impact of a
temporary shutdown of the Line 5 pipelines. But that harm is dwarfed by the
potential harm to the public if there is a release of oil from the pipelines. Therefore,
a preliminary injunction requiring Enbridge to provide all information it possesses
to the State for a full review and requiring that the pipelines be shut down until
this review is complete is appropriate.
3.

The Attorney General is likely to succeed on the merits of
this action.

The Court is familiar with the merits of this lawsuit, so in the interest of
economy they will not be repeated here. This new information only serves to
increase the Attorney General’s likelihood of success on the merits. Enbridge’s
14

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 16 of 64

primary defense to counts II and III of the complaint, public nuisance and MEPA,
hinge on the notion that this exact occurrence—large force impact to the Line 5 dual
pipelines infrastructure—is statistically unlikely.
Specifically, Enbridge has argued that count II, public nuisance, should be
dismissed because it is “impermissibly speculative,” and that count III, MEPA,
should be dismissed because the Attorney General is unable to demonstrate that a
release from the pipelines is likely to occur. (Defendants’ 9/16/19 Brief in Support of
Motion for Summary Disposition, pp 36–43.)
This alarming new occurrence proves that Enbridge’s arguments based on
likelihood are divorced from reality. As the Court is aware, a massive anchor strike
damaged the pipelines infrastructure on April 1, 2018. Now, approximately two
years later (though no one is currently able to say when with any precision), there is
evidence of another large force impact. This directly undercuts Enbridge’s
arguments on these counts and demonstrates that the merits of the Attorney
General’s claims are well founded.
Moreover, the Attorney General is likely to succeed on the merits of the
specific relief requested in this motion. As set forth above, the due care obligations
of the 1953 Easement, the information sharing requirements of the Second
Agreement, the common law of public nuisance and MEPA all provide legal support
for the interim relief requested here: (a) restoring the last uncontested status quo
by ordering Enbridge to cease operation of the west leg of the Straits Pipelines and
by maintain the current shutdown of the east leg pending disclosure of and

15

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 17 of 64

independent review of the requested information; and (b) ordering Enbridge to
immediately and fully disclose the requested information regarding the nature,
extent and causes of the most recent damage to the pipeline infrastructure.
4.

There is a grave risk of irreparable harm that can only be
prevented by the entry of a preliminary injunction.

The gravity of the threat to the Great Lakes cannot be overstated. It is
beyond dispute that a release from the Line 5 dual pipelines would constitute
irreparable harm. It is also clear that, absent an injunction, Enbridge will not
honor its legal duty to share all of its information with the State. Given Enbridge’s
troubling history, combined with its indifferent and inadequate response to this
alarming incident, a preliminary injunction is necessary to ensure that the
available information is vetted by the State or by experts of the State’s choosing.
CONCLUSION AND RELIEF REQUESTED
Despite Enbridge’s protestations that anchor strikes or similar large force
impacts to the Line 5 dual pipelines are highly unlikely, the Court now has before it
evidence of a second substantial strike to the pipelines in approximately two years.
At present, no one is able to say whether this second impact was caused by an
anchor strike or some other source, which itself is troubling. Enbridge’s prevention
and detection measures have failed to prevent or detect the source of this damage,
and that failure has created a risk of irreparable harm to the Great Lakes.
Enbridge’s response has been to largely shrug off its information-sharing
responsibilities, providing only limited summary reports rather than the full suite
16

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 18 of 64

of information in its possession, and promptly resume operation of the west leg of
the pipelines almost immediately after telling the Governor that the pipelines had
been shut down pending an investigation.
A preliminary injunction is necessary to ensure that Enbridge is not the only
party with access to the facts, and that an independent review verifies Enbridge’s
conclusions. Further, a preliminary injunction is necessary to ensure that Enbridge
cannot resume pipeline operations until an independent review confirms that it is
reasonably prudent to do so.
Respectfully submitted,
Dana Nessel
Attorney General
/s/Daniel P. Bock
S. Peter Manning (P45719)
Robert P. Reichel (P31878)
Daniel P. Bock (P71246)
Charles A. Cavanagh (P79171)
Assistant Attorneys General
Attorneys for Plaintiff
Environment, Natural Resources,
and Agriculture Division
P.O. Box 30755
Lansing, MI 48909
(517) 335-7664
Dated: June 22, 2020
LF: Enbridge Straits (AG v)/AG #2019-0253664-B-L/Brief in Support of Motion for Preliminary Injunction 2020-06-22

17

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 19 of 64

EXHIBIT A

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 20 of 64

June 19, 2020

Al Monaco
CEO, Enbridge, Inc.
200, Fifth Avenue Place
425 – 1st Street S.W.
Calgary, Alberta
Canada T2P 3L8
Dear Mr. Monaco,
Yesterday evening your company informed the State of Michigan that an anchor support on
one of the Line 5 dual pipelines running along the bottomlands of the Straits of Mackinac
had incurred significant damage. This support lies approximately 150 feet from a section of
the pipeline where damage to the pipeline coating was discovered on or around May 26,
2020. At this point, as I understand it, the cause for this damage to the pipeline support is
unknown, although it appears the anchor support was subject to considerable force. After
discovering the damaged anchor support, Enbridge shut down the Line 5 pipeline and is
gathering more information through divers, the use of a remotely operated vehicle (ROV),
and other means. The pipeline remains shut down as Enbridge continues to gather more
information.
The information I have received about this incident leaves many unanswered questions as
to the cause of this damage, the catastrophe that may have been narrowly avoided, and the
threats that may remain as a result of the damaged infrastructure. As you know, under the
1953 easement Enbridge holds an ongoing duty of “due care” to the State of Michigan in the
“operating” and “maintaining” of the dual pipelines. There can be no question this duty
obligates Enbridge to proceed with the utmost caution and care at this moment.
As a first step toward fulfilling that duty, I ask that Enbridge provide Director Liesl Clark,
Department of Environment, Great Lakes, and Energy, and Director Dan Eichinger,
Department of Natural Resources, all information available to Enbridge about this
incident. This includes, but is not limited to, all engineering reports, photographs, video,

GEORGE W. ROMNEY BUILDING • 111 SOUTH CAPITOL AVENUE • LANSING, MICHIGAN 48909
www.michigan.gov
PRINTED IN-HOUSE

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 21 of 64

and other demonstrative evidence of the damage. Please provide this information no later
Monday, June 22, 2020 and supplement that disclosure with all further information about
the incident as it becomes available. Information in digital form and available immediately
should be provided within 24 hours to Director Eichinger (EichingerD@michigan.gov) and
Director Clark (ClarkL20@michigan.gov). In addition, I ask that Enbridge provide
affirmative evidence, including appropriate diagnostic testing, that establishes the integrity
of the dual pipelines in the Straits of Mackinac.
As Governor of the State of Michigan – the Great Lakes State – I carry an immense burden
to protect this priceless treasure that defines the contours of our state and our way of life. I
anticipate and expect your full cooperation.
Sincerely,

Gretchen Whitmer
Governor
cc:

Liesl Clark, Director, Department of Environment, Great Lakes, and Energy, State
of Michigan
Dan Eichinger, Director, Department of Natural Resources, State of Michigan
Alan K. Mayberry, Associate Administrator for Pipeline Safety, Pipeline and
Hazardous Materials Safety Administration, U.S. Department of Transportation

2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 22 of 64

EXHIBIT B

Al Monaco
President & CEO

tel
fax

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page
403 266 7901
Enbridge
Inc. 23 of 64
403-231-3939

200, 425 – 1st Street SW
Calgary, Alberta T2P 3L8
Canada

June 20, 2020

Governor Gretchen Whitmer
George W. Romney Building
111 South Capitol Avenue
Lansing, Michigan USA 48909
Dear Governor Whitmer,
Thank you for your letter of June 19, 2020, which I received yesterday evening.
As you know from our earlier discussions with your staff and regulatory agencies, on
June 18, 2020 Enbridge observed as part of our seasonal maintenance work on Line 5
a screw anchor assembly on the east leg that had shifted from its original
position. This is an issue affecting that anchor support assembly and not the pipeline
itself.
As a preliminary precaution, we immediately shut down both the east and west legs of
Line 5 and promptly notified the State of Michigan and our federal regulator, the
Pipeline and Hazardous Materials Safety Administration (PHMSA), as well as the U.S.
Environmental Protection Administration (EPA).
During the morning of June 19, 2020, we briefed your administration and staff on what
is currently known about the damage to the support assembly and related background,
and responded to questions asked by the officials. We also fully briefed PHMSA on
June 19, 2020. We are committed to keep the State of Michigan and PHMSA informed
of new information as it develops.
Our current efforts to assess the fitness for service of the dual pipelines includes
deployment of divers to inspect the area around the damaged support assembly and
the use of a remotely operated vehicle (ROV) to inspect the entire pipeline, both the
east and west legs. We have and will continue to discharge our duty of due care under
the 1953 easement that you referenced in your letter.
As part of our assessment process, we are committed to sharing what we learn about
this incident with PHMSA and the State of Michigan. Mr. Michael Koby, our Vice
President of U.S. Operations, will provide the information you requested to Director
Liesl Clark and Director Dan Eichinger.

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
2
PagePage
24 of 64

Finally, we share your commitment to keeping the Great Lakes safe. Mr. Koby and our
team will give this matter their highest priority.
Sincerely,

Al Monaco

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 25 of 64

EXHIBIT C

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 26 of 64

June 20, 2020

Al Monaco
CEO, Enbridge, Inc.
200, Fifth Avenue Place
425 – 1st Street S.W.
Calgary, Alberta
Canada T2P 3L8
Dear Mr. Monaco,
I received your letter earlier today responding to my correspondence yesterday evening
about the damage to the anchor support on the east leg of the Line 5 dual pipelines that run
through the Straits of Mackinac. Thank you for your commitment to provide the
information I requested; I trust we will receive all digital information today.
My understanding is that at 1:59 pm this afternoon, shortly after your letter arrived,
Enbridge notified Directors Eichinger and Clark of the following by email:
As we have verified that the west leg is not affected, we will resume normal
operations on that line today at approximately 2:00 PM Eastern Time. However, the
east leg will remain shut down.
Given the gravity of this matter, I was taken aback to learn the company has unilaterally
resumed operation of the west leg without even opportunity for discussion. At this moment,
Enbridge is pumping crude through the Great Lakes on state-owned bottomlands without
any explanation for the cause of this damage to the pipeline structure and no assurance
that Enbridge has taken sufficient steps to mitigate future harm. This disregard for the
safety and well-being of our Great Lakes, and Enbridge’s due care obligations under the
1953 Easement, is unacceptable.
I ask that Enbridge immediately shut down the dual pipelines that run through the Straits
of Mackinac until this incident is investigated, assessed, and preventive measures are put

GEORGE W. ROMNEY BUILDING • 111 SOUTH CAPITOL AVENUE • LANSING, MICHIGAN 48909
www.michigan.gov
PRINTED IN-HOUSE

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 27 of 64

in place. In addition to responding to my prior information request, I ask that Enbridge
provide a full report as to the cause of this damage and what measures Enbridge will put in
place to prevent this harm from happening again. Once the state, or a third-party selected
by the state, has reviewed this information, we can discuss when normal operations may
resume.
Sincerely,

Gretchen Whitmer
Governor
cc:

Liesl Clark, Director, Department of Environment, Great Lakes, and Energy, State
of Michigan
Dan Eichinger, Director, Department of Natural Resources, State of Michigan
Alan K. Mayberry, Associate Administrator for Pipeline Safety, Pipeline and
Hazardous Materials Safety Administration, U.S. Department of Transportation

2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 28 of 64

EXHIBIT D
(withheld pending
confidentiality review)

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 29 of 64

EXHIBIT E
(withheld pending
confidentiality review)

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 30 of 64

EXHIBIT G

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 31 of 64

SECOND AGREEMENT BETWEEN THE STATE OF MICHIGAN, MICHIGAN
DEPARTMENT OF ENVIRONMENTAL QUALITY, AND MICHIGAN DEPARTMENT
OF NATURAL RESOURCES AND ENBRIDGE ENERGY, LIMITED PARTNERSHIP,
ENBRIDGE ENERGY COMPANY, INC., AND ENBRIDGE ENERGY PARTNERS, L.P.
This Second Agreement is entered between the State of Michigan, the Michigan
Department of Environmental Quality, and the Michigan Department of Natural Resources
(collectively referred to herein as “the State”), AND Enbridge Energy, Limited Partnership,
Enbridge Energy Company, Inc., formerly known as Lakehead Pipe Line Company, Inc., and
Enbridge Energy Partners, L.P. (collectively referred to herein as “Enbridge”) concerning those
segments of Enbridge’s Line 5 pipeline (“Line 5”) that are located within the State of Michigan.
This Second Agreement results from, and is intended to fulfill, the parties’ obligations under
Paragraph I.H. of the first Agreement between the State and Enbridge, entered November 27,
2017 (“First Agreement”), in which the parties agreed to pursue a further agreement to address
Line 5’s crossing of the Straits of Mackinac (“Straits”).
WHEREAS, the segments of Line 5 located within Michigan extend 547 miles, from the
border of Wisconsin near Ironwood, Michigan to Marysville, Michigan, where it crosses the St.
Clair River to the border with Sarnia, Ontario (“St. Clair River Crossing”);
WHEREAS, the segments of Line 5 located within Michigan must be operated and
maintained in compliance with all applicable laws that are intended to protect the public health,
safety, and welfare and prevent pollution, impairment, or destruction of the natural resources of
the State of Michigan, including the unique resources of the Great Lakes;
WHEREAS, the continued operation of Line 5 through the State of Michigan serves
important public needs by providing substantial volumes of propane to meet the needs of
Michigan citizens, supporting businesses in Michigan, and transporting essential hydrocarbon
products, including Michigan-produced oil to Michigan and regional refineries and
manufacturers;
WHEREAS, the State issued an “Easement” to Lakehead Pipeline Company, Inc.
(“Lakehead”), subsequently renamed Enbridge Energy Company, Inc., on April 23, 1953
pursuant to Act No. 10, PA 1953 “for the purpose of erecting, laying, maintaining and operating”
an approximate 4-mile segment of Line 5 across the Straits upon determining that such crossing
would “be of benefit to all of the people of the State of Michigan and in furtherance of the public
welfare”;
WHEREAS, in accordance with the Easement, Enbridge constructed two parallel
pipelines, each 4.09-miles long (referred to herein as the “Dual Pipelines”) across the Straits in

1

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 32 of 64

1953 (referred to as the “Straits Crossing”), and since that time continues to operate and maintain
such pipelines consistent with the terms of the Easement as part of Line 5 to transport light crude
oil, synthetic crude oil, and natural gas liquids;
WHEREAS, on September 3, 2015, Enbridge and the State entered an agreement under
which Enbridge affirmed that it does not and will not transport heavy crude oil through the Dual
Pipelines;
WHEREAS, the State and Enbridge recognize that the Straits Crossing and the St. Clair
River Crossing (collectively “Crossings”) are located in the Great Lakes and connecting waters
that include and are in proximity to unique ecological and natural resources that are of vital
significance to the State and its residents, to tribal governments and their members, to public
water supplies, and to the regional economy, and the Crossings are also present in important
infrastructure corridors;
WHEREAS, the State and Enbridge recognize that other important ecological and natural
resources are located near other segments of Line 5 that cross or approach other waters of the
State that are also of vital significance to the State and its residents, to tribal governments and
their members, to public water supplies, and to the regional economy;
WHEREAS, in the First Agreement, the State and Enbridge established additional
measures with respect to certain matters related to Enbridge’s stewardship of Line 5 within
Michigan and the transparency of its operation;
WHEREAS, in accordance with Paragraph I.A. of the First Agreement, Enbridge has
enhanced its coordination with the State concerning the operation and maintenance of Line 5
located in the State of Michigan;
WHEREAS, in accordance with Paragraph I.B. of the First Agreement, Enbridge timely
requested pre-application consultations and applied for all US and Canadian authorizations and
approvals necessary to replace Line 5’s crossing of the St. Clair River by the use of a horizontal
directional drill method;
WHEREAS, under the circumstances specified in Paragraph I.C. and Appendix 1 to the
First Agreement, Enbridge has discontinued Line 5 operations in the Straits during sustained
adverse weather conditions;
WHEREAS, Enbridge has completed its evaluation of underwater technologies to
enhance leak detection and technologies to assess coating condition of the Dual Pipelines and has

2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 33 of 64

submitted the results of such evaluations to the State, in accordance with Paragraph I.D. of the
First Agreement;
WHEREAS, Enbridge has submitted to the State an evaluation of measures to mitigate
potential vessel anchor strike, in accordance with Paragraph I.E. of the First Agreement;
WHEREAS, Enbridge has submitted to the State an evaluation of alternatives to replace
the Dual Pipelines, in accordance with Paragraph I.F. of the First Agreement;
WHEREAS, Enbridge has worked in coordination with the State to identify and evaluate
water crossings by Line 5 and to assess measures to minimize the likelihood and/or
consequences of a release at each water crossing location, in accordance with Paragraph I.G. of
the First Agreement;
WHEREAS, the evaluations carried out pursuant to the First Agreement have identified
near-term measures to enhance the safety of Line 5, and a longer-term measure – the replacement
of the Dual Pipelines – that can essentially eliminate the risk of adverse impacts that may result
from a potential release from Line 5 at the Straits;
WHEREAS Enbridge has recently implemented and committed to continue additional
measures to enhance the safety of Line 5; and
WHEREAS, the State acknowledges that the stipulations specified in this Second
Agreement are intended to further protect ecological and natural resources held in public trust by
the State of Michigan, and that the terms of this Second Agreement will both protect the
ecological and natural resources held in public trust by the State and provide clarity as to State’s
expectations concerning the safety, integrity, and operation of Line 5.
NOW, THEREFORE, the parties agree as set forth below.
I.

STIPULATIONS

Enbridge and the State agree to the following measures, which are designed, among other
things, to increase coordination between the State and Enbridge concerning the operation and
maintenance of Enbridge’s Line 5 pipeline located in the State of Michigan, including further
enhancing the safety of its operation and reducing the risk of adverse impacts that may result
from a potential release from Line 5 at the Straits in the interest of the citizens of Michigan.
A.
Continued Coordination Between the State and Enbridge: In order to continue
coordination with the State concerning the operation and maintenance of Line 5 located in the

3

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 34 of 64

State of Michigan, and to facilitate the implementation of the measures described at Paragraphs
B-K below, the parties agree as follows:
1.

The State will further provide designated representatives to participate in
the stewardship and transparency consultations and communications to be
carried out under this Second Agreement.

2.

Enbridge will work cooperatively with the State to: (a) make available to
the State’s representative data and other materials generated under this
Second Agreement, including but not limited to geologic, engineering, or
other technological information concerning Line 5 located in the State of
Michigan and Enbridge’s implementation of the measures described
herein; and (b) all requested information in Enbridge’s possession
concerning the operation, integrity management, leak detection, and
emergency preparedness for Enbridge’s Line 5 pipeline located in the
State of Michigan. The State recognizes, and to the extent provided by
applicable law will accommodate, Enbridge’s interest in protecting from
disclosure critical energy infrastructure and other confidential information
protected from disclosure by law.

3.

Enbridge and representatives designated by the State agree to meet semiannually to discuss any changes to engineering parameters, risks, new
technologies, and innovations pertaining to the operation and maintenance
of Line 5 located within the State of Michigan. One such semi-annual
meeting shall include subject matter experts from Enbridge and the State
to review matters relating to pipeline integrity, emergency response and
preparedness for Line 5 located within the State of Michigan.

B.
Replacement of Line 5 St. Clair River Crossing: Consistent with Paragraph I.B.
of the First Agreement, Enbridge timely met its obligations under the First Agreement by filing
applications seeking all state, US federal and Canadian authorizations and approvals necessary
for the replacement of the St. Clair River Crossing by use of a horizontal directional drill
(“HDD”) method. No later than 180 days after obtaining all state, US federal, and Canadian
authorizations and approvals necessary to replace Line 5’s crossing of the St. Clair River by the
use of a HDD method, Enbridge will initiate the work identified in the applications necessary to
replace that segment of Line 5.
C.
Discontinuation of Line 5 Operations in the Straits During Sustained Adverse
Weather Conditions: Until such time that the Dual Pipelines are replaced, Enbridge has and will
continue to temporarily shut-down the operation of the Dual Pipelines while “Sustained Adverse

4

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 35 of 64

Weather Conditions,” as that term is defined in Appendix 1 to this Second Agreement, remain in
effect in the Straits, using the procedure set forth in Appendix 1. Additionally, should median
wave heights in the Straits over a continuous 60-minute period exceed 6.5 feet in height based
upon “Near-real time Data” or in its absence, “Modeled Data,” as those terms are defined in
Appendix 1, Enbridge shall ensure that at least one Enbridge employee is available and capable
of traveling to the Line 5 North Straits valve station in less than 15 minutes. Enbridge will notify
the State when the Line 5 Dual Pipelines have been shut down due to “Sustained Adverse
Weather Conditions” and again when the Line 5 Dual Pipelines are restarted. Further, the State
is planning to install radar technology that will provide additional near real-time data regarding
wave height at the Straits. The State and Enbridge agree that when those data become available,
they will be shared with Enbridge and applied to the procedures set forth in Appendix 1and this
Paragraph. Any modification to Appendix 1 to account for the use of radar technology data shall
not require a written Amendment to this Second Agreement under Section II below.
D.
Underwater Technologies to Enhance Leak Detection and Technologies to Assess
Coating Condition of the Dual Pipelines: Based upon the evaluation performed pursuant to
Paragraph I.D. of the First Agreement, Enbridge will conduct a Close Interval Survey (“CIS”) of
the Dual Pipelines every two years, so long as the Dual Pipelines remain in operation. Enbridge
plans to conduct a CIS on the Dual Pipelines in 2018, and shall complete the next CIS within two
calendar years from the date on which that CIS is conducted by Enbridge, and then every two
calendar years thereafter.
E.
Implementation of Measures to Mitigate Potential Vessel Anchor Strike: The
United States Coast Guard (“Coast Guard”) has proposed the establishment of a Regulated
Navigation Area pursuant to 33 CFR 165 in the Straits of Mackinac that would prohibit vessels
from anchoring or loitering within that Area without Coast Guard authorization. 83 Federal
Register 37780 (August 2, 2018). In order to assist the Coast Guard in monitoring compliance
with that regulation, Enbridge agrees to provide one-time funding of up to $200,000 to be used
for the acquisition and installation of video cameras at the Straits.
F.
Replacement of Dual Pipelines in a Straits Tunnel: Pursuant to Paragraph I.F. of
the First Agreement, Enbridge prepared and submitted to the State the report entitled Alternatives
for replacing Enbridge’s dual Line 5 pipelines crossing the Straits of Mackinac (June 15, 2018)
(“Alternatives Analysis”). That Alternatives Analysis concluded that construction of a tunnel
beneath the lakebed of the Straits connecting the upper and lower peninsulas of Michigan, and
the placement in the tunnel of a new oil pipeline, is a feasible alternative for replacing the Dual
Pipelines, and that alternative would essentially eliminate the risk of adverse impacts that may
result from a potential oil spill in the Straits (hereinafter “Straits Tunnel”). The State and
Enbridge agree to promptly pursue further agreements discussed under Paragraph I.G below for

5

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 36 of 64

the design, construction, operation, management, and maintenance of the Straits Tunnel in which
a replacement for the Dual Pipelines could be located (“Line 5 Straits Replacement Segment”).
G.
Further Agreements for a Straits Tunnel: The State has proposed that, together
with housing the Line 5 Straits Replacement Segment, the Straits Tunnel could accommodate
multiple utilities, including but not necessarily limited to: electric transmission lines, and
facilities for transmitting data and telecommunications (collectively “Utilities”). The State and
Enbridge agree to initiate discussions, as soon as practicable, to negotiate a public-private
partnership agreement with the Mackinac Bridge Authority (“Authority”) with respect to the
Straits Tunnel for the purpose of locating the Line 5 Straits Replacement Segment and, to the
extent practicable, Utilities in that Tunnel (hereinafter “Tunnel Project Agreement”). The
Tunnel Project Agreement shall include provisions under which the Authority will provide
property necessary for the construction of the Straits Tunnel, in return for which Enbridge
would: (a) fund the design and construction of the Straits Tunnel; (b) construct the Straits
Tunnel; and (c) construct the Line 5 Straits Replacement Segment to be located within the
Tunnel. Such agreement shall also provide that the Authority shall: (a) obtain or support
Enbridge in obtaining the necessary permits, authorizations, or approvals necessary for the
construction and operation of the Tunnel and the Line 5 Straits Replacement Segment; and (b)
upon completion of the construction of the Straits Tunnel, the Authority shall assume ownership
of the Straits Tunnel. Simultaneous with the execution of such agreement, the Authority would
execute a lease or other agreements to: (a) authorize Enbridge’s use of the Straits Tunnel for the
purpose of locating the Line 5 Straits Replacement Segment for as long as the Line 5 Straits
Replacement Segment shall be in operation by Enbridge; (b) provide that Enbridge will operate
and maintain the Straits Tunnel during the term of the lease on terms to be agreed; and (c)
specify the conditions under which Utilities may gain access to the Straits Tunnel. Provided that
the agreements discussed in this Paragraph I.G. are executed by the Authority and Enbridge, the
State and Enbridge would simultaneously enter into an agreement expressly confirming
Enbridge’s rights to operate the Dual Pipelines under the terms of the Easement during the
construction of the Straits Tunnel and Line 5 Replacement Straits Segment, subject to
compliance with the terms of the agreements described in Paragraph I.G. and applicable laws.
Any failure to reach the further agreements contemplated by this Paragraph I.G. shall not alter
any existing rights Enbridge has under the Easement.
H.
Permanent Deactivation of the Dual Pipelines: Enbridge agrees that following
completion of the Straits Tunnel and after the Line 5 Straits Replacement Segment is constructed
and placed into service by Enbridge within the Straits Tunnel, Enbridge will permanently
deactivate the Dual Pipelines. Consistent with Paragraphs E, H, and Q of the Easement, the
procedures, methods, and materials for replacement, relocation, and deactivation of the Dual
Pipelines are subject to the written approval of the State, which the State agrees shall not be
unreasonably withheld. At a minimum, any portion of the Dual Pipelines that remains in place

6

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 37 of 64

after deactivation shall be thoroughly cleaned of any product or residue thereof and the ends
shall be permanently capped to the satisfaction of the State, which shall not be unreasonably
withheld. The State and Enbridge agree that decisions regarding the method of deactivation,
including potential removal of the Dual Pipelines should take into account short- and long-term
effects of the deactivation method options and associated sediment and water quality disturbance
on natural resources, particularly fishery resources, in proximity to the Straits. The options
include: (a) abandoning in place the entire length of each of the Dual Pipelines; or (b) removing
from the Straits the submerged portions of each of the Dual Pipelines that were not fully buried
in a ditch and placed under cover near the shoreline of the Straits at the time of initial
construction.
I.
Line 5 Water Crossings Other Than the Straits: Pursuant to Paragraph I.C. of the
First Agreement, Enbridge prepared and submitted to the State the Report entitled Enhancing
Safety and Reducing Potential Impacts at Line 5 Water Crossings (June 30, 2018) (“Water
Crossing Report). As described in the Water Crossing Report, Enbridge and representatives of
the State jointly identified and prioritized a total of 74 Line 5 water crossings in Michigan other
than the Straits and organized them into 11 area groupings, detailed in Tables 1 and 2 in
Appendix A to the Report. The Water Crossing Report assessed available mitigation measures
to: (a) minimize the likelihood of potential releases (leak prevention); and (b) reduce the
consequences of potential releases if they were to occur. Based on that assessment, the Report
identified a series of specific Action Items to address both of those objectives and proposed time
frames for their implementation (Report, pp 18- 24). They include measures related to:
(a) Enbridge’s Mainline Integrity program; (b) Enbridge’s Geohazard Management Program; (c)
Pipeline Damage Prevention; (d) Emergency Response; and (e) Environmental Management. As
reflected in the Water Crossing Report, the Action Items include, among other things, measures
that are intended to increase by an order of magnitude Enbridge’s leak prevention safety targets
for certain water crossings.
In addition to completing all of the Action Items identified in the Report, the parties have
agreed upon two projects at water crossings on which preparatory work shall immediately begin.
These specific mitigation measures to be implemented in the near term at certain locations as are
specified in Appendix 2 of this Second Agreement.
Enbridge shall implement the Action Items as described in the Report, and as
supplemented in this Second Agreement and the Summary contained in Appendix 2 to this
Second Agreement, provided that the State and Enbridge may mutually agree in writing to
modify Action Items, as well as any tangible follow-up actions, tasks, or mitigation measures
associated with the Action Items, as necessary to accommodate site conditions and industry best
practices. Any such modifications do not require a written Amendment to this Second
Agreement under Section II below. To the extent they differ: (i) the terms of any modification

7

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 38 of 64

to the Action Items takes precedence over this Second Agreement; (ii) the terms of this Second
Agreement takes precedence over those of Appendix 2; and (iii) those terms of Appendix 2 take
precedence over those of the Report.
J.
Financial Assurance: The State commissioned the final Independent Risk
Analysis for the Straits Pipelines (Meadows, et al., September 15, 2018) (hereinafter
“Independent Risk Analysis”) to assess a worst-case discharge from the Dual Pipelines,
including the cost of responding to that worst-case discharge. Enbridge strongly disagrees with
the methods and conclusions of the Independent Risk Analysis report, and nothing in this Second
Agreement shall be construed to constitute Enbridge’s acceptance of those methods and
conclusions. Enbridge nonetheless agrees that, so long as it continues to operate the Dual
Pipelines, the Enbridge entity or entities that own and operate Line 5, or the parent companies of
such Enbridge entity(ies), will maintain in force financial assurance mechanisms that meet or
exceed the $1,878,000,000 estimate of Enbridge’s potential total quantifiable response liability
for a worst-case discharge from the Dual Pipelines that is identified in the Independent Risk
Analysis. To demonstrate compliance with this requirement, on an annual basis Enbridge will
file with the State updated financial assurance information in a format similar to that provided in
Appendix 3. Enbridge further agrees that, upon the request by the State, it will on an annual
basis, make available to the State for inspection and review information regarding the amount,
availability, and changes to liability insurance that it maintains. The State agrees that Enbridge’s
compliance with the requirements under this Paragraph I.J. satisfies its financial assurance
obligations specified under Paragraph J of the Easement.
K.
Continuation of Additional Measures to Enhance the Safety of Line 5 in
Michigan: Enbridge has in recent years undertaken a variety of additional measures to enhance
the safety of Line 5 in Michigan and to improve its emergency preparedness and response
capabilities. Such measures, as listed in Appendix 4 to this Agreement, include but are not
limited to: (i) the purchase and placement of additional emergency response equipment; (ii) the
positioning of permanent personnel in proximity to the Straits; and (iii) improvements to
personnel response times to manually close valves in proximity to the Straits. Enbridge agrees
that it will continue to implement the measures listed in Appendix 4 so long as it continues to
operate the portions of Line 5 to which they apply.
II.

AMENDMENT

The State or Enbridge may propose in writing that this Second Agreement be amended.
The State and Enbridge agree to consult in good faith in an effort to reach agreement on any
proposed amendment. Except as provided in Paragraph I.G., any amendment agreed to by the
State and Enbridge shall be effective on the date that any written amendment is executed by the
State and Enbridge.

8

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 39 of 64

III.

DISPUTE RESOLUTION

The State and Enbridge agree that, should any dispute arise under this Second
Agreement, the State and Enbridge shall in good faith attempt to resolve the dispute through
informal negotiations. If the parties are unable to informally resolve such a dispute, either party
may initiate proceedings in a court of competent jurisdiction to resolve the dispute.
IV.

TERM AND TERMINATION

The terms of this Second Agreement shall remain in effect until the commitments in
Paragraphs I.B., I.E. - I.I. above are fulfilled, except that the obligations in Paragraphs I.A., I.C.,
I.D., I.J., and I.K. shall continue, subject to the terms set forth in those Paragraphs, unless and
until the Second Agreement terminates automatically. This Second Agreement shall terminate
automatically upon the voluntary discontinuation of service by Enbridge of Line 5 through the
State of Michigan.
V.

COMPLIANCE WITH APPLICABLE LAW

The State and Enbridge acknowledge and agree that Enbridge’s operation of Line 5
remains subject to the requirements of all applicable state and federal law, the Easement, the
September 3, 2015 Agreement with the State that prohibits Enbridge from transporting heavy
crude oil on Line 5 within the State of Michigan, and the terms of any easement granted by the
State for Line 5 and agree that nothing in this Second Agreement is intended to relieve Enbridge
of its obligation to comply with or waive any rights that Enbridge and the State may have under
such laws or to supersede or displace applicable state law, regulation or requirement, or any
federal law, regulation, or requirement that is applicable to the operation or maintenance of Line
5, including but not limited to the Pipeline Safety Act (including its preemption provisions); the
Protecting Our Infrastructure of Pipelines and Enhancing Safety Act of 2016 (Public Law 114183); any regulation or order issued by PHMSA or any other federal agency; or the Consent
Decree entered into between Enbridge and the United States in United States v. Enbridge
Energy, Limited Partnership, et al., No. 1:16-cv-914, ECF No. 14 (E.D. Mich., entered May 23,
2017), which specifies certain investigation, integrity management, leak detection, valve
placement, and emergency response measures to prevent discharges of oil or hazardous
substances into or upon the waters of the United States or adjoining shorelines.
VI.

ENTIRE AGREEMENT

This Second Agreement constitutes the whole of the Agreement between the parties
concerning those portions of Enbridge’s Line 5 located in the State of Michigan. This Second
Agreement supersedes in its entirety the First Agreement.

9

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 40 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 41 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 42 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 43 of 64

Appendix 1
Enbridge Line 5 – Sustained Adverse Weather Conditions Procedure
This Appendix is designed to facilitate an effective emergency response to a potential release
incident by specifying procedures for a systematic approach by Enbridge to temporarily shut
down Line 5 in the Straits of Mackinac during Sustained Adverse Weather Conditions. Enbridge
shall maintain a record of its use of the procedure and make it available to the State. If an
alternate source of near-real time wave height data such as the radar system planned by the State
becomes available following the execution of this agreement, Enbridge and the State will work
cooperatively to revise this Appendix to account for the alternative data source.
Definitions:
Sustained Adverse Weather Conditions: Conditions in which median wave heights in the Straits
of Mackinac over a continuous 60-minute period are greater than 8 feet based on “Near-real
Time Data,” or in its absence “Modeled Data.”
Near-real Time Data: The wave height data derived from Buoy 45175 (Mackinac Straits West)
of the Great Lakes Research Center of Michigan Technological University’s Upper-Great Lakes
Observing System (UGLOS) and/or alternate data sources such as radar data, as mutually agreed
by the State and Enbridge through a modification of this Appendix.
Modeled Data: Modeled wave height data based on real-time data inputs that is available on the
NOAA Great Lakes Coastal Forecasting System (GLCFS) Nowcast model at a representative
point in the Straits.
Forecasted Data: Data available on the NOAA Great Lakes Coastal Forecasting System Forecast
model at a representative point in the Straits.

Enbridge Line 5 Procedures – Sustained Adverse Weather Conditions
Step #
1

2

3

Action
Enbridge or Enbridge Consultant (collectively “Enbridge Monitor”) will
continuously monitor Near-real Time Data, or in its absence Modeled Data, to
identify Sustained Adverse Weather Conditions at the Straits.
When Sustained Adverse Weather Conditions are forecasted based on
Forecasted Data, the Enbridge Monitor will inform the Control Center
Operations Shift Supervisor, at which point the Control Center Operations will
prepare for the potential that an unplanned shut down of Line 5 at the Straits
may be required.
When Near-real Time Data, or in its absence Modeled Data, indicate that
Sustained Adverse Weather Conditions are occurring at the Straits, the Enbridge
Monitor will immediately contact the Control Center Operations Shift
Supervisor.

App. 1 - 12

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 44 of 64

Step #
4

5

6

7

8
9

Action
The Control Center Operations Shift Supervisor will promptly call the Enbridge
Great Lakes On-Call Manager to advise them that Sustained Adverse Weather
Conditions exist at the Straits.
The Enbridge Great Lakes On-Call Manager will request, no later than 15
minutes after being notified in Step 4 above, that the Control Center Operations
shutdown Line 5. If real time conditions in the Straits determined by the
Enbridge Great Lakes On-Call Manager indicate Sustained Adverse Weather
Conditions do not exist, the Great Lakes On-Call Manager will advise the
Control Center Operations Shift Supervisor that Line 5 should not be shutdown.
In that event, the Enbridge Monitor will continue to monitor conditions as per
Step 1 for changes that indicate that Sustained Adverse Weather conditions may
be present and the other Steps in this Appendix shall be followed should the
Enbridge Monitor determine that such conditions are present.
Unless advised otherwise by the Enbridge Great Lakes On-Call Manager as per
Step 5 above, Control Center Operations will perform a controlled emergency
shut down of Line 5 and isolate the segment across the Straits.
While shut down, the Enbridge Monitor will continuously monitor Near-real
Time Data, or in its absence Modeled Data, to identify the continuance of
Sustained Adverse Weather Conditions at the Straits.
When Near-real Time Data, or in its absence Modeled Data, indicates the
Sustained Adverse Weather Conditions no longer exist at the Straits, the
Enbridge Great Lakes On Call Manager and Control Center Operations Admin
On Call will authorize the restart of Line 5.
Control Center Operations will safely restart Line 5.

Communications Protocol:
Enbridge shall immediately notify the State of Michigan as follows: (i) when median wave
heights in the Straits over a continuous 60-minute period exceed 6.5 feet in height based upon
“Near-real time Data” or in its absence, “Modeled Data,” as those terms are defined in Appendix
1, and Enbridge has acted to ensure that at least one Enbridge employee is available and capable
of traveling to the Line 5 North Straits valve station in less than 15 minutes; (ii) when Line 5 has
been temporarily shut down in the Straits of Mackinac due to Sustained Adverse Weather
Conditions, as per Step 6 above; and (iii) when Line 5 has been safely restarted in the Straits of
Mackinac, as per Step 9 above. Any notification required under this provision shall be made by
email to a specified email address provided to Enbridge by the State of Michigan.

App. 1 - 13

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 45 of 64

Appendix 2
Action Items for Water Crossings Other than the Straits

A. Additional Near-Term Items
1. Mitigate potential geohazard at the following water crossings:
a.
Point Aux Chenes (3)-restore depth of cover and stabilize bank to
prevent further erosion:
i.
Work with State Technical Team to select method, design
and schedule within 3 months from the effective date of
this Agreement.
ii.
Apply for all necessary permits within 6 months from the
effective date of this Agreement.
iii.
Complete construction of mitigation measures within 12
months after receipt of permits.
b.
Tributary to Paint River – Address exposed section of pipeline:
i.
Work with State Technical Team to select method, design
and schedule within 3 months of the effective date of this
Agreement.
ii.
Apply for all necessary permits within 6 months from the
effective date of this Agreement.
iii.
Complete construction of mitigation measures within 12
months after receipt of permits.
2.
Accelerated field work to evaluate crossings with potential need for
geohazard remediation. Additional information to be gathered for the
following crossings within 6 months from the effective date of this
Agreement:
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.

Whitefish River - MP 1358
Rapid River – MP 1356
Tributary to Southwest Branch Fishdam River – MP 1373
Elm Creek – MP 1691
East Branch Black River – MP 1442
East Mile Creek – MP 1436
Paquin Creek – MP 1448
Pointe Aux Chenes River (1) – MP 1466
West Branch Paquin Creek – MP 1447
West Mile Creek – MP 1436
Red Creek – MP 1563

App. 2 - 1

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 46 of 64

Based on evaluations, remedial measures, if needed, may include: depth of cover
restoration; bank and bed armoring; or pipeline lowering or replacement. These
remedial measures will be implemented as follows:
i.

ii.
iii.

Work with State Technical Team for method selection,
design and schedule within 6 months from the effective
date of this Agreement.
Apply for all necessary permits within 12 months from the
effective date of this Agreement.
Complete construction of remedial measures within 12
months after receipt of permits.

B. Action Items in Report
Preventive and Mitigative Measures

Time to
Complete
(months)

Number
of
locations

Leak Prevention Measures
1.

Increase Safety Targets Within Grouping Areas

6

All

2.

Engineering Assessment

12

4

3.

Baseline Geohazard Assessment

18

17

4.

Depth of Cover/Bathymetric Survey

18

31

5.

Perform Detailed Scour Study

18

7

6.

Replacement/Lowering

TBD

TBD

7.

Outreach to local government officials involved in
construction activities near waterbodies

6

All

App. 2 - 2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 47 of 64

Consequence Mitigation Measures
8.
9.
10.
11.
12.
13.

Review Emergency Response Training and Exercise
Communication Plan
Establish Additional Emergency Response Tactical
Control Points
Collaborative Review of Emergency Response Tactical
Control Points
Update Environmental Sensitivity Maps with State
Sensitivity Data
Review Emergency Response Aquatic Invasive Species
Inspection Procedure
Conduct Baseline Environmental Studies - Rare Wetland
Communities

6

All

12

10

9

All

12

All

12

All

18

20

Biology Mitigation Studies
14.

Fisheries

18

12

15.

Freshwater Mussels

18

31

16.

Biological Integrity

18

11

App. 2 - 3

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 48 of 64

Appendix 3
Enbridge Financial Assurance Verification Form for Calendar Year [Insert]

Enbridge Inc. (EI)

Cash

Credit Facility (available liquidity
as at [date]) Note 1
Other Resources Available in 30-60
Days (explain)
Total Short-Term
Insurance

Enbridge Energy
Partners, L.P. ( EEP)

$
(as per EI’s consolidated Q_ 20__ balance sheet– cash
& cash equivalents
$

$

$
(as per EI’s consolidated Q_ 20__ balance sheet –
accounts receivable and other)
$

$

Total

Timing of Access
(business days - estimate)

$

1 day

$

1-3 days

$

30-60 days

$

General Liability Insurance, includes Time Element Reporting Pollution (sudden and
accidental) coverage currently US$[Insert] Note 2

Note 3

Surety Bonds
Parent/Affiliate Guarantees (from
Parent Co. to Authorization Holder)
Other Financial Resources (explain)
Total Other
Notes:
1. Enbridge utilizes the commercial paper markets in both Canada and the US as a cost effective source of short term liquidity. The commercial paper programs
are fully backstopped by the Credit Facilities and the availability of such is reflected net of any commercial paper outstanding.
2. The reflected insurance amount represents the limit for coverage that is maintained by EI for the specified calendar year, and for which EEP is named as an
insured under that policy, thereby enabling EEP to obtain insurance recoveries for events covered under the policy. The insurance amount is reviewed and renewed
on an annual basis and is subject to insurance market conditions and experience that may impact the breadth and limit of coverage available.
3. The insurance coverage maintained by EI provides any Enbridge entity covered under that policy, such as EEP, with eventual recovery of monies which that
Enbridge entity has paid because of its legal liability for direct third- party bodily injury and property damage caused by the release and that financial recovery can
extend over a period of months and years.

App. 3 - 1

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 49 of 64

Appendix 4
Enhanced Safety and Emergency Response Capabilities
Enbridge has, in recent years, undertaken a variety of additional measures to enhance the safety of
Line 5 and to improve its emergency preparedness and response capability at the Straits of
Mackinac, in the Great Lakes, and throughout Michigan. Enbridge agrees that it will continue
these measures so long as it continues to operate the portions of Line 5 to which they apply. These
measures include, but are not limited to:
Equipment:
a. Enbridge recently strengthened its already robust emergency response capabilities for the
Great Lakes by adding more than $7 million of emergency response equipment to be staged
at the Straits of Mackinac. This equipment can be deployed in the Straits and throughout
the Great Lakes as necessary. The new equipment includes, but is not limited to:
• 10,000 feet of Sea Sentry Boom - heavy duty open water containment boom which
is fit for service in the presence of ice and rough waters. This boom can withstand
wave action to eight feet.
• 1,000 feet of Fire Boom, necessary for an in situ burning response.
• Lamor Ice Skimmers (the first deployment in North America)
• Nofi Current Busters
b. The company holds annual boom deployment exercises in the Great Lakes.
c. Valve Closure Gang boxes, which includes the necessary equipment to execute a manual
valve closure, have been located at North Straits valve site and pre-located at each pump
station along Line 5.
Personnel:
d. Enbridge established a Pipeline Maintenance (PLM) Crew at St. Ignace adding five
employees in addition to the Enbridge employee permanently based in the Straits of
Mackinac area. This crew augments crews already stationed along Line 5 in Ironwood,
Escanaba, Indian River, and Bay City.
e. Enbridge recently agreed to purchase a building in St. Ignace that will house its local
operations employees. The new facility is less than 10 minutes from the North Straits
valve site.
f. Enbridge has implemented Incident Command System (ICS) role specific training for its
Regional team and Operations Leadership individuals.
Response time:
g. The company improved personnel response time for manual closing of valves at the North
Straits valve site to under an hour, and with a target time of no more than 45 minutes – no
matter what time of day or weather condition. Manual closing of the valves would be
necessary only if all other redundant systems on Line 5 at the Straits would fail. The
redundant systems include:
1) Dedicated 24/7 remote operational control of the pipelines from the Enbridge
Control Center. All valves can be remotely opened and closed by the Control
Center.

App. 4 - 1

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 50 of 64

•

If there is a power failure at the North Straits site resulting in communications
loss with the Control Center, an automatic back-up generator on-site will restore
power and allow communications with the Control Center.
2) The pipelines at the Straits are equipped with automatic shut-off valves which will
close within three minutes should a threshold pressure loss occur in the pipelines.
These closures would be independent of and could not be overridden by any
Control Center action. In the unlikely event that communications with the Control
Center is lost due to a power outage and the backup generator fails, and the
automatic valves fail to operate properly, valves can be closed manually.

App. 4 - 2

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 51 of 64

EXHIBIT F

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 52 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 53 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 54 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 55 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 56 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 57 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 58 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 59 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 60 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 61 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 62 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 63 of 64

U-20763 | June 25, 2020
Supplemental Authority Submited by BMIC
Exhibit D
Page 64 of 64

STATE OF MICHIGAN
BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION
In the matter of the Application for the
Authority to Replace and Relocate the
Segment of Line 5 Crossing the Straits of
Mackinac into a Tunnel Beneath the Straits of
Mackinac, if Approval is Required Pursuant to
1929 PA 16; MCL 483.1 et seq. and Rule 447
of the Michigan Public Service Commission’s
Rules of Practice and Procedure, R 792.10447,
or the Grant of other Appropriate Relief

U-20763

PROOF OF SERVICE
On the date below, an electronic copy of Supplemental Authority Submitted by Bay
Mills Indian Community Regarding Enbridge Energy, Limited Partnership’s Request for
Declaratory Relief was served on the following:
Name/Party

E-mail Address

Counsel for Enbridge Energy, Limited
Partnership.
Michael S. Ashton
Shaina Reed

mashton@fraserlawfirm.com
sreed@fraserlawfirm.com

Counsel for MPSC Staff
Spencer A. Sattler
Benjamin J. Holwerda
Nicholas Q. Taylor

sattlers@michigan.gov
holwerdab@michigan.gov
taylorn10@michigan.gov

Counsel for Michigan Environmental Council
(MEC), and National Wildlife Federation
Christopher M. Bzdok
Lydia Barbash-Riley

chris@envlaw.com
lydia@envlaw.com

Counsel for Grand Traverse Band of Ottawa
and Chippewa Indians (GTB)
Bill Rastetter
Christopher M. Bzdok
Lydia Barbash-Riley

bill@envlaw.com
chris@envlaw.com
lydia@envlaw.com

Counsel for Environment Law & Policy
Center
Margrethe Kearney

mkearney@elpc.org

1

For Love Of Water (FLOW)
James Olson

jim@flowforwater.org

Counsel for Bay Mills Indian Community
(BMIC)
Christopher M. Bzdok
Whitney Gravelle
Kathryn Tierney
Debbie Chizewer
Christopher Clark
David Gover
Matt Campbell

chris@envlaw.com
wgravelle@baymills.org
candyt@bmic.net
dchizewer@earthjustice.org
cclark@earthjustice.org
dgover@narf.org
mcampbell@narf.org

Counsel for Tip of the Mitt Watershed
Council
Christopher M. Bzdok
Lydia Barbash-Riley
Abigail Hawley

chris@envlaw.com
lydia@envlaw.com
abbie@envlaw.com

The statements above are true to the best of my knowledge, information and belief.
OLSON, BZDOK & HOWARD, P.C.
Counsel for BMIC
Date:

Digitally signed by Karla
Gerds
Date: 2020.06.25 12:04:17
-04'00'

June 25, 2020

By: ________________________________________
Karla Gerds, Legal Assistant
420 E. Front St.
Traverse City, MI 49686
Phone: 231/946-0044
Email: karla@envlaw.com