# Federal Plan Requirements for Other Solid Waste Incineration Units Constructed on or Before December 9, 2004

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3AE6-21285

## Record

- **Collection:** Federal Register
- **Document type:** Proposed Rule
- **Published:** December 18, 2006
- **Citation:** 71 FR 75816

## Text

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 62
[EPA-HQ-OAR-2006-0364; FRL-8254-9]
RIN 2060-AN43
Federal Plan Requirements for Other Solid Waste Incineration Units Constructed on or Before December 9, 2004

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Proposed rule.

SUMMARY:

On December 16, 2005, the EPA promulgated emission guidelines (EG) for existing “other” solid waste incineration (OSWI) units. Sections 111 and 129 of the Clean Air Act (CAA) require States with existing OSWI units subject to the EG to submit plans to the EPA that implement and enforce the emission guidelines. Indian Tribes may submit, but are not required to submit, Tribal plans to implement and enforce the EG in Indian country. State plans are due from States with OSWI units subject to the EG on December 16, 2006. If a State or Tribe with existing OSWI units does not submit an approvable plan, sections 111(d) and 129 of the CAA require the EPA to develop, implement, and enforce a Federal plan for OSWI units located in that State or Tribal area within 2 years after promulgation of the EG (December 16, 2007). This action proposes a Federal plan to implement EG for OSWI units located in States and Indian country without effective State or Tribal plans. On the effective date of an approved State or Tribal plan, the Federal plan would no longer apply to OSWI units covered by the State or Tribal plan.

DATES:

Comments must be received on or before February 16, 2007.

Public Hearing.
If anyone contacts EPA by January 8, 2007 requesting to speak at a public hearing, EPA will hold a public hearing on January 22, 2007. If you are interested in attending the public hearing, contact Ms. Dorothy Apple at (919) 541-4487 to verify that a hearing will be held.

ADDRESSES:

Submit your comments, identified by Docket ID No. EPA-HQ-OAR-2006-0364, by one of the following methods:

Web site: http://www.regulations.gov.
Follow the on-line instructions for submitting comments.

E-mail:
Send your comments via electronic mail to
a-and-r-docket@epa.gov.
Attention: Docket ID No. EPA-HQ-OAR-2006-0364.

Mail:
Send your comments to: EPA Docket Center (EPA/DC), Environmental Protection Agency, Mailcode: 6102T, 1200 Pennsylvania Ave., NW., Washington, DC 20460, Attention Docket ID No. EPA-HQ-OAR-2006-0364. Please include a total of two copies. The EPA requests a separate copy also be sent to the contact person identified below (see
FOR FURTHER INFORMATION CONTACT
).

Hand Delivery:
EPA Docket Center (EPA/DC), EPA West Building, Room B108, 1301 Constitution Ave., NW., Washington, DC, 20460, Attention Docket ID No. EPA-HQ-OAR-2006-0364. Such deliveries are accepted only during the normal hours of operation (8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays), and special arrangements should be made for deliveries of boxed information.

Instructions:
Direct your comments to Docket ID No. EPA-HQ-OAR-2006-0364. EPA's policy is that all comments received will be included in the public docket without change and may be made available online at
http://www.regulations.gov,
including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through
http://www.regulations.gov
or e-mail. The
http://www.regulations.gov
Web site is an “anonymous access” system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through
http://www.regulations.gov,
your e-mail address will be automatically captured and included as part of the comment that is placed in the public docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses.

Public Hearing:
If a public hearing is held, it will be held at EPA's Campus located at 109 T.W. Alexander Drive in Research Triangle Park, NC, or an alternate site nearby.

Docket:
All documents in the docket are listed in the
http://www.regulations.gov
index. Although listed in the index, some information is not publicly available, i.e., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy. Publicly available docket materials are available either electronically at
http://www.regulations.gov
or in hard copy at the EPA Docket Center (EPA/DC), EPA West Building, Room B102, 1301 Constitution Ave., NW., Washington, DC. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566-1744, and the telephone number for the EPA Docket Center is (202) 566-1742.

Note:

The EPA Docket Center suffered damage due to flooding during the last week of June 2006. The Docket Center is continuing to operate. However, during the cleanup, there will be temporary changes to Docket Center telephone numbers, addresses, and hours of operation for people who wish to make hand deliveries or visit the Public Reading Room to view documents. Consult EPA's
Federal Register
notice at 71 FR 38147 (July 5, 2006) or the EPA Web site at
http://www.epa.gov/epahome/dockets.htm
for current information on docket operations, locations, and telephone numbers. The Docket Center's mailing address for U.S. mail and the procedure for submitting comments to
www.regulations.gov
are not affected by the flooding and will remain the same.

FOR FURTHER INFORMATION CONTACT:

For information concerning specific aspects of this proposal, contact Ms. Martha Smith, Natural Resources and Commerce Group, Sector Policies and Programs Division (E143-03), U.S. EPA, Research Triangle Park, North Carolina 27711; telephone number: (919) 541-2421; e-mail address:
smith.martha@epa.gov.
For technical information, contact Ms. Mary Johnson, Energy Strategies Group, Sector Policies Program Division (D243-01), U.S. EPA, Research Triangle Park, NC 27711; telephone number: (919) 541-5025; e-mail address:
johnson.mary@epa.gov.

SUPPLEMENTARY INFORMATION:

Organization of This Document.
The following outline is provided to aid in locating information in this preamble.

I. General Information

A. Does this action apply to me?

B. What should I consider as I prepare my comments for EPA?

II. Background Information

A. What is the regulatory development background for this proposed rule?

B. What associated regulatory activity preceded this proposed rule?

C. What impact does the EPA's granting of a request for reconsideration have on this Federal plan?

III. Affected Facilities

A. What is an OSWI unit?

B. Does the Federal plan apply to me?

C. How do I determine if my OSWI unit is covered by an approved and effective State or Tribal plan?

IV. Elements of the OSWI Federal Plan

A. Legal Authority and Enforcement Mechanism

B. Inventory of Affected OSWI Units

C. Inventory of Emissions

D. Emission Limitations

E. Compliance Schedules

F. Waste Management Plan Requirements

G. Testing, Monitoring, Recordkeeping, and Reporting

H. Operator Training and Qualification Requirements

I. Record of Public Hearings

J. Progress Reports

V. Summary of OSWI Federal Plan

A. Might the proposed rules apply to me?

B. What emission limitations would apply?

C. What operating limits would apply?

D. What would be the requirements for OSWI air curtain incinerators?

E. What other requirements would apply?

F. What is the proposed compliance schedule?

G. How did EPA determine the compliance schedule?

VI. OSWI That Have or Will Shut Down

A. Units That Plan To Close Rather Than Comply

B. Inoperable Units

C. OSWI Units That Have Shut Down

VII. Implementation of the Federal Plan and Delegation

A. Background of Authority

B. Delegation of the Federal Plan and Retained Authorities

C. Mechanisms for Transferring Authority

D. Implementing Authority

E. OSWI Federal Plan and Indian Country

VIII. Title V Operating Permits

IX. Statutory and Executive Order Reviews

A. Executive Order 12866: Regulatory Planning and Review

B. Paperwork Reduction Act

C. Regulatory Flexibility Act

D. Unfunded Mandates Reform Act

E. Executive Order 13132: Federalism

F. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

G. Executive Order 13045: Protection of Children From Environmental Health and Safety Risks

H. Executive Order 13211: Actions That Significantly Affect Energy Supply, Distribution or Use

I. National Technology Transfer Advancement Act

I. General Information

A. Does this action apply to me?

Categories and entities potentially regulated by the proposed rules are very small municipal waste combustion (VSMWC) units and institutional waste incineration (IWI) units. The OSWI Federal plan would affect the following categories of sources:

Category
NAICS* code
Examples of potentially regulated entities

Any State, local, or Tribal Government using a VSMWC unit as defined in the regulations
562213, 92411
Solid waste combustion units burning municipal waste collected from the general public and from residential, commercial, institutional, and industrial sources.

Institutions using an IWI unit as defined in the regulations
922, 6111, 623, 7121
Correctional institutions, primary and secondary schools, camps and national parks.

Any Federal Government Agency using an OSWI unit as defined in the regulations
928
Department of Defense (labs, military bases, munitions facilities).

Any college or university using an OSWI unit as defined in the regulations
6113, 6112
Universities, colleges and community colleges.

Any church or convent using an OSWI unit as defined in the regulations
8131
Churches and convents.

Any civic or religious organization using an OSWI unit as defined in the regulations
8134
Civic associations and fraternal associations.

* North American Industry Classification System.

This table is not intended to be exhaustive, but rather provides a guide for readers regarding entities likely to be regulated by the proposed rules. To determine whether your facility would be regulated by the proposed rules, you should examine the applicability criteria in CAA sections 62.15460 through 62.15500 of the proposed Federal plan. If you have any questions regarding the applicability of the proposed rules to a particular entity, contact either of the persons listed in the preceding
FOR FURTHER INFORMATION CONTACT
section.

B. What should I consider as I prepare my comments for EPA?

1.
Submitting CBI.
Do not submit information that you consider to be CBI electronically through
www.regulations.gov
or e-mail. Send or deliver information identified as CBI to only the following address: Mr. Roberto Morales, c/o OAQPS Document Control Officer (Mail Drop C404-02), U.S. EPA, Research Triangle Park, NC 27711, Attention Docket ID No. EPA-HQ-OAR-2006-0364. Clearly mark the part or all of the information that you claim to be CBI. For CBI information in a disk or CD ROM that you mail to EPA, mark the outside of the disk or CD ROM as CBI and then identify electronically within the disk or CD ROM the specific information that is claimed as CBI. In addition to one complete version of the comment that includes information claimed as CBI, a copy of the comment that does not contain the information claimed as CBI must be submitted for inclusion in the public docket. Information marked as CBI will not be disclosed except in accordance with procedures set forth in 40 CFR part 2.

If you have any questions about CBI or the procedures for claiming CBI, please consult either of the persons identified in the
FOR FURTHER INFORMATION CONTACT
section.

2.
Tips for Preparing Your Comments.
When submitting comments, remember to:

a. Identify the rulemaking by docket number and other identifying information (subject heading,
Federal Register
date and page number).

b. Follow directions. The EPA may ask you to respond to specific questions or organize comments by referencing a Code of Federal Regulations (CFR) part or section number.

c. Explain why you agree or disagree; suggest alternatives and substitute language for your requested changes.

d. Describe any assumptions and provide any technical information and/or data that you used.

e. If you estimate potential costs or burdens, explain how you arrived at your estimate in sufficient detail to allow for it to be reproduced.

f. Provide specific examples to illustrate your concerns, and suggest alternatives.

g. Explain your views as clearly as possible, avoiding the use of profanity or personal threats.

h. Make sure to submit your comments by the comment period deadline identified.

Docket.
The docket number for the proposed Federal plan (40 CFR part 620, subpart KKK) is Docket ID No. EPA-HQ-OAR-2005-0364.

Worldwide Web (WWW).
In addition to being available in the docket, an electronic copy of the proposed rules is available on the WWW through the Technology Transfer Network Website (TTN Web). Following signature, EPA will post a copy of the proposed rules on the TTN's policy and guidance page for newly proposed or promulgated rules at
http://www.epa.gov/ttn/oarpg
. The TTN provides information and technology exchange in various areas of air pollution control.

II. Background Information

A. What is the regulatory development background for this proposed rule?

Section 129 of the CAA requires EPA to develop emission guidelines for, among other things, unspecified “other categories of solid waste incineration units”, herein referenced as OSWI units. The EPA proposed emission guidelines for OSWI units on December 9, 2004, and promulgated them on December 16, 2005 (70 FR 74870), to be codified at 40 CFR part 60, subpart FFFF. In writing Section 129 of the CAA, Congress looked first to the States as the preferred implementers of emission guidelines for existing OSWI units. To make these emission guidelines enforceable, States with existing OSWI units must have submitted to EPA within one year following promulgation of the emission guidelines (by December 16, 2006) State plans that implement and enforce the emission guidelines. For States or Tribes that do not have an EPA-approved and effective plan, EPA must develop and implement a Federal plan within two years following promulgation of the emission guidelines (by December 16, 2007). The EPA sees the Federal plan as an interim measure to ensure that congressionally mandated emission standards are implemented until States assume their role as the preferred implementers of the emissions guidelines. Thus, the EPA encourages States to either use the Federal plan as a template to reduce the effort needed to develop their own plans or to simply take delegation to directly implement and enforce the guidelines. States without any existing OSWI units are required to submit to the Administrator a letter of negative declaration certifying that there are no OSWI units in the State. No plan is required for States that do not have any OSWI units.

As discussed in section VII.E of this preamble, Indian Tribes may, but are not required to, submit Tribal plans to cover OSWI units in Indian country. A Tribe may submit to the Administrator a letter of negative declaration certifying that no OSWI units are located in the Tribal area. No plan is required for Tribes that do not have any OSWI units. OSWI units located in States or Tribal areas that mistakenly submit a letter of negative declaration would be subject to the Federal plan until a State or Tribal plan becomes approved and effective covering those OSWI units.

This action proposes a Federal plan for OSWI units that are not covered by an approved State or Tribal plan as of December 16, 2006. Sections 111 and 129 of the CAA and 40 CFR 60.27(c) and (d) require EPA to develop, implement, and enforce a Federal plan to cover existing OSWI units located in States that do not have an approved plan within two years after promulgation of the emission guidelines (by December 16, 2007, for OSWI units). The EPA is proposing this Federal plan now so that a promulgated Federal plan will be in place at the earliest possible date, thus ensuring timely implementation and enforcement of the OSWI emission guidelines. In addition, EPA's timing allows a State or Tribe the opportunity to take delegation of the Federal plan in lieu of writing a State plan.

B. What associated regulatory activity preceded this proposed rule?

Regulations have been developed for each of the listed categories of solid waste incineration unit except for the “other categories of solid waste incineration units.” This notice proposes regulations for these “other” (or OSWI) units. Several previous notices have been published regarding OSWI regulatory development (58 FR 31358, June 2, 1993; 58 FR 58498, November 2, 1993; 65 FR 67367, November 9, 2000). In the November 9, 2000 notice, EPA revised the OSWI regulatory schedule to promulgate regulations by November 2005. This was subsequently incorporated into a consent decree, requiring that EPA propose regulations for the OSWI source category by November 30, 2004, and promulgate by November 30, 2005. We proposed regulations on December 9, 2004. On December 16, 2005, we promulgated EG for OSWI constructed on or before December 9, 2004 (70 FR 74870), which are to be implemented via today's proposed rulemaking.

C. What impact does the EPA's granting of a request for reconsideration have on this Federal plan?

On February 14, 2006, subsequent to EPA's promulgation of the final rule establishing the New Source Performance Standards (NSPS) and the Emission Guidelines (EG) for OSWI units, the Sierra Club filed a petition for reconsideration, pursuant to section 307(d)(7)(B) of the CAA.
1

On June 28, 2006 (71 FR 36726-36730), EPA granted reconsideration of one issue raised by the Sierra Club. In granting reconsideration on this issue, EPA agreed to undertake further notice and comment proceedings related to whether sewage sludge incinerators should be regulated under CAA section 129.
2

EPA's granting reconsideration on an issue does not stay, vacate or otherwise influence the effective date of the OSWI regulations. Specifically, CAA section 307(d)(7)(B) provides that “reconsideration shall not postpone the effectiveness of the rule,” except that “the effectiveness of the rule may be stayed during such reconsideration * * * by the Administrator or the court for a period not to exceed three months.” In this case, neither EPA nor the court stayed the effectiveness of the final OSWI regulations in connection with the reconsideration petition. Because the existing OSWI regulations remain in effect, EPA's obligation under CAA section 129(b)(3) to promulgate a Federal Plan (to implement those regulations for existing units that are not covered by an approved and effective State plan) remains unchanged.
3

Therefore, EPA is complying with its statutory obligations by issuing today's proposed Federal Plan for OSWI units.

1
The Sierra Club also filed a petition for review in the D.C. Circuit, challenging the final OSWI rule.
Sierra Club
v.
EPA
, No. 06-1066 (D.C. Cir.). That case is being held in abeyance while EPA undertakes its reconsideration proceeding.

2
EPA will respond to other issues raised in the petition for reconsideration no later than when it takes final action on the sewage sludge issue, which EPA expects to be no later than January 2007.

3
Similarly, the obligations of States and sources are unaffected by EPA's reconsidering one issue.

If, after reconsidering any issues raised in the petition for reconsideration, EPA revises the OSWI rules, EPA plans to make corresponding changes to the final Federal Plan. Thus, by this notice, we are informing the public that EPA is reconsidering this same issue (
e.g.
, involving sewage sludge incinerators) as it pertains to the OSWI Federal Plan as well, and if the Federal Plan is finalized after EPA final action on reconsideration, it too will reflect EPA's final decision on the issue.

III. Affected Facilities

A. What is an OSWI unit?

The term OSWI unit means either a very small municipal waste combustion unit or an institutional waste incineration unit, as defined in proposed 40 CFR part 62, subpart KKK. Seventeen types of combustion units, which are listed in CAA section 62.15845 of proposed subpart KKK are conditionally exempt from specific provisions of the proposed Federal plan.

B. Does the Federal plan apply to me?

The proposed Federal plan will apply to you if you are the owner or operator of an OSWI unit, including any OSWI air curtain incinerator (ACI), not covered by an approved and effective State or Tribal plan as of the date of promulgation of the Federal plan. The Federal plan proposed herein would cover your OSWI unit until EPA should approve a State or Tribal plan that would cover your OSWI unit and that plan should become effective.

If you began the construction of your OSWI unit on or before December 9, 2004, it is considered an existing OSWI unit and could be subject to the Federal plan. If you began the construction of your OSWI unit after December 9, 2004, it is considered a new OSWI unit and is subject to the new source performance standards (NSPS). If you began reconstruction or modification of your OSWI unit prior to June 16, 2006, it is considered an existing OSWI unit and could be subject to the Federal plan. Likewise, if you began reconstruction or modification of your OSWI unit on or after June 16, 2006, it is considered a new OSWI unit and is subject to the NSPS.

Your existing OSWI unit would be subject to this Federal plan if on the effective date of the Federal plan, EPA has not approved a State or Tribal Plan that covers your unit, or the EPA-approved State or Tribal plan has not become effective. The specific applicability of this plan is described in CAA sections 62.15460 through 62.15500 of proposed subpart KKK.

Once an approved State or Tribal plan is in effect, the Federal plan will no longer apply to an OSWI unit covered by such plan. An approved State or Tribal plan is a plan developed by a State or Tribe that EPA has reviewed and approved based on the requirements in 40 CFR part 60, subpart B to implement and enforce 40 CFR part 60, subpart DDDD. The State or Tribal plan is effective on the date specified in the notice published in the
Federal Register
announcing EPA's approval of the plan.

The EPA's promulgation of an OSWI Federal plan will not preclude States or Tribes from submitting a plan. If a State or Tribe submits a plan after promulgation of the OSWI Federal plan final rule, EPA will review and approve or disapprove the State or Tribal plan. If EPA approves a plan, then the Federal plan would no longer apply to OSWI units covered by the State or Tribal plan as of the effective date of the State or Tribal plan. If an OSWI unit were overlooked by a State or Tribe and the State or Tribe submitted a negative declaration letter, or if an individual OSWI unit were not covered by an approved and effective State or Tribal plan, the OSWI unit would be subject to this Federal plan.

C. How do I determine if my OSWI unit is covered by an approved and effective State or Tribal plan?

Part 62 of Title 40 of the Code of Federal Regulations identifies the approval and promulgation of sections 111(d) and section 129 State or Tribal plans for designated facilities in each State or area of Indian Country. However, 40 CFR part 62 is updated once per year. Thus, if 40 CFR part 62 does not indicate that your State or Tribal area has an approved and effective plan, you should contact your State environmental agency's air director or your EPA Regional Office to determine if approval occurred since publication of the most recent version of 40 CFR part 62.

EPA Regional Contacts for OSWI

Region
Contact
Phone/fax
States and protectors

I
EPA New England, Director, Air Compliance Program, 1 Congress Street, Suite 1100 (SEA), Boston, MA 02114-2023
617-918-1650, 617-918-1505 (fax)
CT, ME, MA, NH, RI, VT.

II
U.S. EPA Region 2, Air Compliance Branch, 290 Broadway, New York, NY 10007
212-637-4080, 212-637-3998 (fax)
NJ, NY, Puerto Rico, Virgin Islands.

III
U.S. EPA Region 3, Chief, Air Enforcement Branch (3AP12), 1650 Arch Street, Philadelphia, PA 19103-2029
215-814-3438, 215-814-2134 (fax)
DE, DC, MD, PA, VA, WV.

IV
U.S. EPA Region 4, Air and Radiation Technology Branch, Atlanta Federal Center, 61 Forsyth Street, Atlanta, GA 30303-3104
404-562-9105, 404-562-9095 (fax)
AL, FL, GA, KY, MS, NC, SC, TN.

V
U.S. EPA Region 5, Air Enforcement and Compliance Assurance Branch (AR-18J), 77 West Jackson Boulevard, Chicago, IL 60604-3590
312-353-2088, 312-353-2018 (fax)
IL, IN, MN, OH, WI.

VI
U.S. EPA Region 6, Chief, Toxics Enforcement Section (6EN-AT), 1445 Ross Avenue, Dallas, TX 75202-2733
214-665-7224, 214-665-7446 (fax)
AR, LA, NM, OK, TX.

VII
U.S. EPA Region 7, Air Permitting and Compliance Branch (ARTD/APCO-2119F), 901 N. 5th Street, Kansas City, KS 66101
913-551-7020, 913-551-7844 (fax)
IA, KS, MO, NE.

VIII
U.S. EPA Region 8, Air and Radiation Program Air Technical Assistance Unit (Mail Code 8P—AR), 999 18th Street, Suite 200, Denver, CO 80202
303-312-6526, 303-312-6064 (fax)
CO, MT, ND, SD, UT, WY.

IX
U.S. EPA Region 9, Air Division, 75 Hawthorne Street, San Francisco, CA 94105
415-947-4200, 415-744-1076 (fax)
AZ, CA, HI, NV, American Samoa, Guam.

X
U.S. EPA Region 10, Office of Air Quality, 1200 Sixth Avenue, Seattle, WA 98101
206-553-1602, 206-553-0110 (fax)
AK, ID, OR, WA.

IV. Elements of the OSWI Federal Plan

Because EPA is proposing a Federal plan to cover OSWI units located in States and areas of Indian Country where plans are not in effect, EPA has elected to include in this proposal the same elements as are required for State plans: (1) Identification of legal authority and mechanisms for implementation, (2) inventory of OSWI units, (3) emissions inventory, (4) emission limitations, (5) compliance schedules, (6) waste management plan, (7) testing, monitoring, inspection, reporting, and recordkeeping, (8) operator training and qualification, (9) public hearing, and (10) progress reporting. See 40 CFR part 60 subparts B and C and sections 111 and 129 of the CAA. Each plan element is described below as it relates to this proposed OSWI Federal plan. The table below lists each element and identifies where it is located or codified.

Elements of the OSWI Federal Plan

Legal authority and enforcement mechanism
Sections 129(b)(3) 111(d), 301(a), and 301(d)(4) of the CAA.

Inventory of Affected MWC Units
Docket EPA-HQ-OAR-2003-0156.

Inventory of Emissions
Docket EPA-HQ-OAR-2003-0156.

Emission Limits
40 CFR 62.15575-62.15605.

Compliance Schedules
40 CFR 62.15505-62.15515.

Operator Training and Qualification
40 CFR 62.15535-62.15570.

Waste Management Plan
40 CFR 62.15520-62.15530.

Record of Public Hearings
Docket EPA-HQ-OAR-2003-0156.

Testing, Monitoring, Recordkeeping, and Reporting
40 CFR 62.15610, 40 CFR 15665-62.15710, 40 CFR 62.15715-62.15780.

Progress Reports
Section IV.J. of this preamble.

A. Legal Authority and Enforcement Mechanism

1. EPA's Legal Authority in States

Section 301(a) of the CAA provides EPA with broad authority to write regulations that carry out the functions of the CAA. Sections 111(d) and 129(b)(3) of the CAA direct EPA to develop a Federal plan for States that do not submit approvable State plans. Sections 111 and 129 of the CAA provide EPA with the authority to implement and enforce the Federal plan in cases where the State fails to submit a satisfactory State plan. CAA Section 129(b)(3) requires EPA to develop, implement, and enforce a Federal plan within 2 years after the date the relevant emission guidelines are promulgated (by December 16, 2007). Compliance with the emission guidelines cannot be later than 5 years after the relevant emission guidelines are promulgated (by December 16, 2010 for OSWI units).

2. EPA's Legal Authority in Indian Country

Section 301 of the CAA provides EPA with the authority to administer Federal programs in Indian country. See CAA sections 301 (a) and (d). Section 301(d)(4) of the CAA authorizes the Administrator to directly administer provisions of the CAA where Tribal implementation of those provisions is not appropriate or administratively not feasible. See section VII.E of this preamble for a more detailed discussion of EPA's authority to administer the OSWI Federal plan in Indian country.

The EPA is proposing this Federal regulation under the legal authority of the CAA to implement the emission guidelines in those States and areas of Indian country not covered by an approved plan. As discussed in section VII of this document, implementation and enforcement of the Federal plan may be delegated to eligible Tribal, State, or local agencies when requested by a State, eligible Tribal, or local agency, and when EPA determines that such delegation is appropriate.

B. Inventory of Affected OSWI Units

The proposed Federal plan includes an inventory of OSWI units affected by the emission guidelines. (See 40 CFR part 60.25(a).) Docket No. EPA-HQ-OAR-2003-0156 contains an inventory of the OSWI units that may potentially be covered by this proposed Federal plan in the absence of State or Tribal plans. This inventory contains 248 OSWI units in 26 States. It is based on information collected from State and Federal databases, information collection request survey responses, and stakeholder meetings during the development of the OSWI emission guidelines. The EPA recognizes that this list may not be complete. Therefore, sources potentially subject to this Federal plan may include, but are not limited to, the OSWI units listed in the inventory memorandum in Docket No. EPA-HQ-OAR-2003-0156. Any OSWI unit that meets the applicability criteria in the Federal plan rule is subject to the Federal plan, regardless of whether it is listed in the inventory. States, Tribes, or individuals are invited to identify additional sources for inclusion to the list during the comment period for this proposal.

C. Inventory of Emissions

The proposed Federal plan includes an emissions estimate for OSWI units subject to the emission guidelines. (See 40 CFR 60.25(a).) The pollutants to be inventoried are dioxins/furans, cadmium (Cd), lead (Pb), mercury (Hg), particulate matter (PM), hydrogen chloride (HCl), oxides of nitrogen (NO
X
), carbon monoxide (CO), and sulfur dioxide (SO
2
). For this proposal, EPA has estimated the emissions from each known OSWI unit that potentially may be covered by the Federal plan for the nine pollutants regulated by the Federal plan.

The emissions inventory is based on available information about the OSWI units, emission factors, and typical emission rates developed for calculating nationwide air impacts of the OSWI emission guidelines and the Federal plan. Refer to the inventory memorandum in Docket No. EPA-HQ-OAR-2003-0156 for the complete emissions inventory and details on the emissions calculations.

D. Emission Limitations

The proposed Federal plan includes emission limitations. (See 40 CFR 60.24(a).) Section 129(b)(2) of the CAA requires these emission limitations to be “at least as protective as” those in the emission guidelines. The emission limitations in this proposed OSWI Federal plan are the same as those contained in the EG. Section V of this preamble discusses the emission limitations and operating limits. The EG promulgated December 16, 2005, had a technical error which is being corrected through a technical amendment. Due to the uncertainty of the publication date for the amendment, the technical error will not appear in the proposal of this Federal plan. The correct opacity measurement averaging time appears in

this proposal. This possible discrepancy between the EG and Federal Plan is in Table 2 of the rule in the EG and Table 1 of the rule in the Federal Plan.

E. Compliance Schedules

Typically, State or Federal plans include increments of progress for units that need more than one year from State plan approval to comply, or in the case of the Federal plan, more than one year after promulgation of the final Federal plan. (See 40 CFR part 60.24(e)(1).) The purpose of increments of progress is to ensure that each affected unit needing more time to comply is making progress toward meeting the emission limits.

Section 129(f) of the CAA specifies the dates by which affected facilities must comply with EG. Existing units must be in compliance with the guidelines as expeditiously as practicable after approval of a State plan, but no later than three years after the effective date of State plan approval or five years after promulgation of the guidelines, whichever is earlier. To proceed in an expeditious manner, we are proposing to implement the EG within that same time frame.

For the EG, we are incorporating the full compliance time allowed by CAA section and to include final compliance as the sole increment of progress. The OSWI units are small and are located at small municipalities and institutions that do not always have full-time environmental staff. They will need time to investigate the regulatory, technical, cost, financing, and economic implications of control techniques and alternative waste disposal options available to their facility. The EPA wants to allow sufficient time for owners and operators of OSWI units to investigate, plan, and carry out activities for compliance or, as expected in most cases, a closure of their waste combustion units and an orderly transition to the use of alternative waste disposal methods. Our compliance schedule was developed to allow small sources maximum flexibility in accomplishing final compliance by a date 3 years after publication of a final rule for the Federal plan.

F. Waste Management Plan Requirements

A waste management plan is a written plan that identifies both the feasibility and the methods used to reduce or separate certain components of solid waste from the waste stream to reduce or eliminate toxic emissions from incinerated waste. The waste management plan must be submitted no later than the date sixty days after the initial performance test. This date is 240 days after the final compliance date.

G. Testing, Monitoring, Recordkeeping, and Reporting

The proposed Federal plan includes testing, monitoring, recordkeeping, and reporting requirements. (See 40 CFR part 60.25).) Testing, monitoring, recordkeeping, and reporting requirements are consistent with 40 CFR part 60 subpart FFFF, and assure initial and ongoing compliance.

H. Operator Training and Qualification Requirements

The owner or operator must qualify operators or their supervisors (at least one per facility) by ensuring that they complete an operator training course and annual review or refresher course. CAA sections 62.15535 through 62.15570 of the proposed subpart KKK contain the operator training and qualification requirements.

I. Record of Public Hearings

The proposed Federal plan provides opportunity for public participation in adopting the plan. (See 40 CFR part 60.23(c).) If requested to do so, EPA will hold a public hearing in Research Triangle Park, NC. A record of the public hearing, if any, will appear in Docket No. EPA-HQ-OAR-2006-0364. If a public hearing is requested and held, EPA will ask clarifying questions during the oral presentation but will not respond to the presentations or comments. Written statements and supporting information submitted during the public comment period will be considered with equivalent weight as any oral statement and supporting information subsequently presented at a public hearing, if held.

J. Progress Reports

Under the Federal plan, the EPA Regional Offices will prepare annual progress reports to show progress of OSWI units in the Region toward implementation of the emission guidelines. (See 40 CFR 60.25(e).) States or Tribes that have been delegated the authority to implement and enforce this Federal plan would also be required to submit annual progress reports to the appropriate EPA Regional Office.

Each progress report must include the following items: (1) Status of enforcement actions; (2) status of increments of progress; (3) identification of sources that have shut down or started operation; (4) emission inventory data for sources that were not in operation at the time of plan development, but that began operation during the reporting period; (5) additional data as necessary to update previously submitted source and emission information; and (6) copies of technical reports on any performance testing and monitoring.

V. Summary of OSWI Federal Plan

A. Might the proposed rules apply to me?

The proposed OSWI Federal rules could apply to you if you own or operate either of the following at a location not subject to an approved State or Tribal plan:

(1) An incineration unit with a capacity less than 35 tpd burning municipal solid waste (MSW) (as defined in CAA sections 129 and 62.15850 of 40 CFR part 62 subpart KKK); or

(2) An incineration unit located at an institutional facility burning institutional waste (as defined in CAA section 62.15850 of 40 CFR part 62 subpart KKK) generated at that facility.

Requirements for air curtain incineration units that would otherwise be VSMWC or IWI units, but for the fact that they burn certain materials, are discussed later in this preamble. If your incineration unit is currently meeting emission limitations and other requirements of another CAA section 129 regulation (i.e., small or large municipal waste combustion (MWC) units; hospital, medical, infectious waste incineration (HMIWI) units; or commercial and industrial solid waste incineration (CISWI) units), the proposed OSWI rules would not apply to you. Likewise, if an institutional combustion unit is covered under the CAA section 112 national emission standards for hazardous air pollutants (NESHAP) for industrial, commercial, and institutional boilers and process heaters (boilers NESHAP), it would not be subject to the proposed OSWI rules. Certain types of combustion units listed in CAA section 62.15485 of 40 CFR part 62 subpart KKK also would be excluded from the final OSWI rules.

If you began construction of your incineration unit on or before December 9, 2004, it is considered an existing unit and would be subject to the proposed Federal plan. If you began construction of your incineration unit after December 9, 2004, it is considered a new unit and is subject to the NSPS (40 CFR part 60, subpart EEEE). If you began reconstruction or modification of your incineration unit prior to June 16, 2006, it would be considered an existing unit and subject to the Federal plan. Likewise, if you begin reconstruction or modification of your incineration unit on or after June 16, 2006, it is

considered a new unit and is subject to the NSPS.

B. What emission limitations would apply?

As the owner or operator of an existing OSWI unit, you would be required to meet the proposed emission limitations as specified in the table below. See CAA section V.F of this preamble for a discussion of the compliance schedule.

Emission Limits for Existing OSWI Units

For these pollutants

You must meet
these emission

limits
a

And determine
compliance using

these methods
b

c

Cd
18 micrograms per dry standard cubic meter (μg/dscm)
EPA Method 29.

CO
40.0 parts per million dry volume (ppmdv)
EPA Methods 10, 10A or 10B.

Dioxins/Furans (total mass basis)
33 nanograms per dry standard cubic meter (ng/dscm)
EPA Method 23.

HCl
15.0 ppmdv
EPA Method 26A.

Pb
226 μg/dscm
EPA Method 29.

Hg
74 μg/dscm
EPA Method 29.

Opacity
10%
EPA Method 9.

NO
X

103 ppmdv

EPA Methods 7, 7A, 7C, 7D, or 7E.
d

PM
0.013 grains per dry standard cubic foot (gr/dscf)
EPA Method 5 or 29.

SO
2

3.1 ppmdv

EPA Method 6 or 6C .
e

a
All emission limits (except opacity) are measured at 7 percent oxygen, dry basis at standard conditions.

b
These methods are in 40 CFR part 60, appendix A.

c
Compliance with the CO emission limit is determined on a 12-hour rolling average basis using continuous emission monitoring system data. Compliance for the other pollutants' emission limits is determined by stack testing.

d
ASME PTC 19-10-1981—Part 10 is an acceptable alternative to only Methods 7 and 7C.

e
ASME PTC 19-10-1981—Part 10 is an acceptable alternative to only Method 6.

C. What operating limits would apply?

If you use a wet scrubber to comply with the emission limits, you would be required to establish the maximum and minimum site-specific operating limits indicated in Table 1 of this preamble. You would then be required to operate the OSWI unit so that the charge rate does not exceed the established maximum charge rate. You would be required to operate the wet scrubber so that the pressure drop or amperage, scrubber liquor flow rate, and scrubber liquor pH do not fall below the minimum established operating limits.

Table 1.—Operating Limits for Existing OSWI Units Using Wet Scrubbers

For these operating parameters
You must establish these operating limits

And monitor continuously
using these recording times

Charge rate
Maximum charge rate
Every hour.

Pressure drop across the wet scrubber, or amperage to the wet scrubber
Minimum pressure drop or amperage
Every 15 minutes.

Scrubber liquor flow rate
Minimum flow rate
Every 15 minutes.

Scrubber liquor pH
Minimum pH
Every 15 minutes.

Note:

Compliance is determined on a 3-hour rolling average basis, except charge rate for batch incinerators, which is determined on a 24-hour basis.

If you use an air pollution control device other than a wet scrubber to comply with the emission limits, you would be required to petition the EPA for approval of other site-specific operating limits to be established during the initial performance test and continuously monitored thereafter. The information you must include in your petition is described in 40 CFR 62.15595 of proposed subpart KKK.

D. What would be the requirements for OSWI air curtain incinerators?

The final OSWI rules establish opacity limitations for air curtain incineration units that would otherwise meet the definitions of IWI or VSMWC units, but burn only:

• 100 percent wood wastes;

• 100 percent clean lumber;

• 100 percent yard waste; or

• 100 percent mixture of only wood waste, clean lumber, and/or yard waste.

The opacity limit is 10 percent. However, 35 percent opacity is allowed during startup periods that are within the first 30 minutes of operation. Air curtain incinerators burning only these materials must meet the opacity limits and certain monitoring, recordkeeping, and reporting requirements, and must apply for and obtain a title V operating permit.

Air curtain incinerators burning other institutional waste or municipal waste must meet the requirements of the final OSWI rules including all emission limits in table 1 of this preamble and the associated testing, permitting, monitoring, recordkeeping, and reporting requirements.

E. What other requirements would apply?

As the owner or operator of an OSWI unit, you would be required to meet the following additional requirements.

Waste Management Plan:

• Submit a written plan that identifies both the feasibility and the methods used to reduce or separate certain components of solid waste from the waste stream to reduce or eliminate toxic emissions from incinerated waste.

Operator Training and Qualification Requirements:

• Qualify operators or their supervisors (at least one per facility) by ensuring that they complete an operator training course and annual review or refresher course.

Testing Requirements:

• Conduct initial performance tests for Cd, CO, dioxins/furans, HCl, Pb, Hg, NO
X
, opacity, PM, and SO
2
and

establish operating limits (i.e., maximum or minimum values for operating parameters).

• Conduct annual performance tests for all nine pollutants and opacity. (An owner or operator may conduct less frequent testing if the facility demonstrates that it is in compliance with the emission limits for three consecutive performance tests).

Monitoring Requirements:

• Continuously monitor CO emissions.

• If using a wet scrubber to comply with the emission limits, continuously monitor the following operating parameters: charge rate, pressure drop across the wet scrubber (or amperage), and scrubber liquid flow rate and pH.

• If using something other than a wet scrubber to comply with the emission limits, monitor other operating parameters, as approved by the EPA.

Recordkeeping and Reporting Requirements:

• Maintain for 5 years records of the initial performance tests and all subsequent performance tests, operating parameters, any maintenance, the siting analysis (for new units only), and operator training and qualification. Each record must be kept on site for at least 2 years. The records may be kept off site for the remaining 3 years.

• Submit the results of the initial performance tests and all subsequent performance tests and values for the operating parameters.

• Submit annual compliance reports and semiannual reports of any deviations from the emission limits, operating limits, or other requirements.

• Apply for and obtain a title V operating permit.

F. What is the proposed compliance schedule?

Each incineration unit will be required to reach final compliance by the date 3 years after publication of the final rule in the
Federal Register
. In addition, the owner or operator will need to comply with the operator training and qualification requirements and inspection requirements by the date 1 year after publication of the final rule in the
Federal Register
, regardless of when the OSWI unit reaches final compliance.

To achieve final compliance, the owner or operator of each OSWI unit must incorporate all process changes or complete retrofit construction in accordance with the final control plan. The owner or operator must connect the air pollution control equipment or process changes such that when the OSWI unit is brought on line all necessary process changes or air pollution control equipment will operate as designed.

G. How did EPA determine the compliance schedule?

Section 129(f) of the CAA specifies the dates by which affected facilities must comply with the EG. Existing units must be in compliance with the guidelines as expeditiously as practicable after approval of a State plan, but no later than three years after the effective date of State plan approval or five years after promulgation of the guidelines, whichever is earlier.

EPA chose to include the full compliance time allowed by CAA section 129 in the EG and proposes to do the same in the proposed Federal plan for OSWI units. The OSWI units are small and are located at small municipalities and institutions that do not always have full-time environmental staff. They will need time to investigate the regulatory, technical, cost, financing, and economic implications of control techniques and alternative waste disposal options available to their facility. The EPA wants to allow sufficient time for owners and operators of OSWI units to investigate, plan, and carry out activities for compliance or, as expected in most cases, a closure of their waste combustion units and an orderly transition to the use of alternative waste disposal methods.

VI. OSWI That Have or Will Shut Down

A. Units That Plan To Close Rather Than Comply

If you plan to permanently close your currently operating incineration unit, you must do so by the date three years after publication of the final rule for this Federal plan in the
Federal Register
. If you close your OSWI unit after the date one year after publication of the final rule in the
Federal Register
, but before the date three years after publication of the final rule in the
Federal Register
, then you must comply with the operator training and qualification requirements by the date one year after publication of the final rule in the
Federal Register.
In addition, while still in operation, you are subject to the same requirements for title V operating permits that apply to units that will not shut down.

B. Inoperable Units

In cases where an OSWI unit has already shut down, has been rendered inoperable, and does not intend to restart, the OSWI unit may be left off the source inventory in a State, Tribal, or this Federal plan. An OSWI unit that has been rendered inoperable would not be covered by the Federal plan. The OSWI owner or operator may do the following to render an OSWI unit inoperable: (1) Weld the waste charge door shut, (2) remove stack (and by-pass stack, if applicable), (3) remove combustion air blowers, or (4) remove burners or fuel supply appurtenances.

C. OSWI Units That Have Shut Down

OSWI units that are known to have already shut down (but are not known to be inoperable) are included in the source inventory for the proposed Federal plan and will be identified in any State or Tribal plan submitted to EPA.

1. Restarting Before the Final Compliance Date

If the owner or operator of an inactive incineration unit plans to restart before the final compliance date, the owner or operator must meet any requirements for operator training or obtaining title V operating permits that apply to units planning to meet the final compliance date.

2. Restarting After the Final Compliance Date

Before restarting, such OSWI units would have to complete the operator training and qualification requirements and inspection requirements (if applicable) and complete retrofit or process modifications. Performance testing to demonstrate compliance would be required within 30 days after restarting. An incineration unit that operates out of compliance after the final compliance date would be in violation of the Federal plan and subject to enforcement action.

VII. Implementation of the Federal Plan and Delegation

A. Background of Authority

Under sections 111(d) and 129(b) of the CAA, EPA is required to adopt emission guidelines that are applicable to existing solid waste incineration sources. These emission guidelines are enforceable once EPA approves a State or Tribal plan or adopts a Federal plan that implements and enforces them, and the State, Tribal, or Federal plan has become effective. As discussed above, the Federal plan regulates OSWI units in a State or Tribal area that does not have an EPA-approved plan currently in effect.

Congress has determined that the primary responsibility for air pollution prevention and control rests with State and local agencies. See section 101(a)(3) of the CAA. Consistent with that overall determination, Congress established sections 111 and 129 of the CAA with the intent that the States and local

agencies take the primary responsibility for ensuring that the emission limitations and other requirements in the emission guidelines are achieved. Also, in section 111(d) of the CAA, Congress explicitly required that EPA establish procedures that are similar to those under section 110(c) for State Implementation Plans. Although Congress required EPA to propose and promulgate a Federal plan for States that fail to submit approvable State plans on time, States and Tribes may submit approvable plans after promulgation of the OSWI Federal plan. The EPA strongly encourages States that are unable to submit approvable plans to request delegation of the Federal plan so that they can have primary responsibility for implementing the emission guidelines, consistent with the intent of Congress.

Approved and effective State plans or delegation of the Federal plan is EPA's preferred outcome since EPA believes that State and local agencies not only have the responsibility to carry out the emission guidelines, but also have the practical knowledge and enforcement resources critical to achieving the highest rate of compliance. For these reasons, EPA will do all that it can to expedite delegation of the Federal plan to State and local agencies, whenever possible.

EPA also believes that Indian Tribes should be the primary parties responsible for regulating air quality within Indian country, if they desire to do so. See EPA's Indian Policy (“Policy for Administration of Environmental Programs on Indian Reservations,” signed by William D. Ruckelshaus, Administrator of EPA, dated November 4, 1984), reaffirmed in a 2001 memorandum (“EPA Indian Policy,” signed by Christine Todd Whitman, Administrator of EPA, dated July 11, 2001).

B. Delegation of the Federal Plan and Retained Authorities

If a State or Indian Tribe intends to take delegation of the Federal plan, the State or Indian Tribe must submit to the appropriate EPA Regional Office a written request for delegation of authority. The State or Indian Tribe must explain how it meets the criteria for delegation.
See generally
“Good Practices Manual for Delegation of NSPS and NESHAP” (EPA, February 1983). In order to obtain delegation, an Indian Tribe must also establish its eligibility to be treated in the same manner as a State. The letter requesting delegation of authority to implement the Federal plan must demonstrate that the State or Tribe has adequate resources, as well as the legal and enforcement authority to administer and enforce the program. A memorandum of agreement between the State or Tribe and EPA would set forth the terms and conditions of the delegation, the effective date of the agreement, and would also serve as the mechanism to transfer authority. Upon signature of the agreement, the appropriate EPA Regional Office would publish an approval notice in the
Federal Register
; thereby incorporating the delegation of authority into the appropriate subpart of 40 CFR part 62.

If authority is not delegated to a State or Indian Tribe, EPA will implement the Federal plan. Also, if a State or Tribe fails to properly implement a delegated portion of the Federal plan, EPA will assume direct implementation and enforcement of that portion. The EPA will continue to hold enforcement authority along with the State or Tribe even when a State or Tribe has received delegation of the Federal plan. In all cases where the Federal plan is delegated, EPA will retain and will not transfer authority to a State or Tribe to approve the following items:

The following authorities are withheld by the EPA Administrator and not transferred to the State or Tribe:

(1) Approval of alternatives to the emission limitations in Table 1 of the proposed rule and operating limits established under 40 CFR 62.15585 and Table 2 of the proposed rule.

(2) Approval of petitions for specific operating limits in 40 CFR 62.15595 the proposed rule.

(3) Approval of major alternatives to test methods.

(4) Approval of major alternatives to monitoring.

(5) Approval of major alternatives to recordkeeping and reporting.

(6) The status report requirements in 40 CFR 62.15570(c)(2) the proposed rule.

C. Mechanisms for Transferring Authority

There are two mechanisms for transferring implementation authority to State or Tribal agencies: (1) EPA approval of a State or Tribal plan after the Federal plan is in effect; and (2) if a State or Tribe does not submit or obtain approval of its own plan, EPA delegation to a State or Tribe of the authority to implement certain portions of this Federal plan to the extent appropriate and if allowed by State or Tribal law. Both of these options are described in more detail below.

1. Federal Plan Becomes Effective Prior to Approval of a State or Tribal Plan

After OSWI units in a State or Tribal area become subject to the Federal plan, the State or Tribal agency may still adopt and submit a plan to EPA. If EPA determines that the State or Tribal plan is as protective as the emission guidelines, EPA will approve the State or Tribal plan. If EPA determines that the plan is not as protective as the emission guidelines, EPA will disapprove the plan and the OSWI units covered in the State or Tribal plan would remain subject to the Federal plan until a State or Tribal plan covering those OSWI units is approved and effective.

Upon the effective date of an approved State or Tribal plan, the Federal plan would no longer apply to OSWI units covered by such a plan, and the State or Tribal agency would implement and enforce the State or Tribal plan in lieu of the Federal plan. When an EPA Regional Office approves a State or Tribal plan, it will amend the appropriate subpart of 40 CFR part 62 to indicate such approval.

2. State or Tribe Takes Delegation of the Federal Plan

EPA, in its discretion, may delegate to State or eligible Tribal agencies the authority to implement this Federal plan. As discussed above, EPA believes that it is advantageous and the best use of resources for State or Tribal agencies to agree to undertake, on EPA's behalf, the administrative and substantive roles in implementing the Federal plan to the extent appropriate and where authorized by State or Tribal law. If a State requests delegation, EPA will generally delegate the entire Federal plan to the State agency. These functions include administration and oversight of compliance reporting and recordkeeping requirements, OSWI inspections, and preparation of draft notices of violation, but will not include any retained authorities.

EPA also believes that it is the best use of resources for Tribal agencies to undertake a role in the implementation of the Federal plan. The Tribal Authority Rule issued on February 12, 1998 (63 FR 7254), provides Tribes the opportunity to develop and implement Clean Air Act programs. However, due to resource constraints and other factors unique to Tribal governments, it leaves to the discretion of the Tribe whether to develop these programs and which elements of the program they will adopt. Consistent with the approach of the Tribal Authority Rule, EPA may choose to delegate a partial Federal plan (i.e., to

delegate authority for some functions needed to carry out the plan) in appropriate circumstances and where consistent with Tribal law.

Both States and Tribal agencies, that have taken delegation, as well as EPA, will have responsibility for bringing enforcement actions against sources violating Federal plan provisions. However, EPA recognizes that Tribes have limited criminal enforcement authority, and EPA will address in the delegation agreement with the Tribe how criminal enforcement issues are referred to EPA.

D. Implementing Authority

The EPA delegated authority within the Agency to the EPA Regional Administrators to implement the OSWI Federal plan. All reports required by this Federal plan should be submitted to the appropriate Regional Office Administrator.

E. OSWI Federal Plan and Indian Country

The term “Indian country,” as used in this preamble, means (1) all land within the limits of any Indian reservation under the jurisdiction of the United States government, notwithstanding the issuance of any patent, and including rights-of-way running through the reservation; (2) all dependent Indian communities within the borders of the United States whether within the original or subsequently acquired territory thereof, and whether within or without the limits of a State; and (3) all Indian allotments, the Indian titles to which have not been extinguished, including rights-of-way running through the same.

The OSWI Federal plan would apply throughout Indian country to ensure that there is not a regulatory gap for existing OSWI units in Indian country. However, eligible Indian tribes now have the authority under the CAA to develop Tribal plans in the same manner that States develop State plans. On February 12, 1998, EPA promulgated regulations that outline provisions of the CAA for which it is appropriate to treat Tribes in the same manner as States. See 63 FR 7254 (Final Rule for Indian Tribes: Air Quality Planning and Management, (Tribal Authority Rule)) (codified at 40 CFR part 49). As of March 16, 1998, the effective date of the Tribal Authority Rule, EPA has had authority under the CAA to approve Tribal programs such as Tribal plans to implement and enforce the OSWI emission guidelines.

1. Tribal Implementation

Section 301(d) of the CAA authorizes the Administrator to treat an Indian tribe as a State under certain circumstances. The Tribal Authority Rule, which implements section 301(d) of the CAA, identifies provisions of the CAA for which it is appropriate to treat a Tribe as a State. (See 40 CFR part 49.3 and 49.4.) Under the Tribal Authority Rule, a Tribe may be treated as a State for purposes of this Federal plan. If a Tribe meets the criteria below, EPA can delegate to an Indian tribe authority to implement the Federal plan in the same way it can delegate authority to a State:

(1) The applicant is an Indian tribe recognized by the Secretary of the Interior;

(2) The Indian tribe has a governing body carrying out substantial governmental duties and functions;

(3) The functions to be exercised by the Indian tribe pertain to the management and protection of air resources within the exterior boundaries of the reservation or other areas within the tribe's jurisdiction; and

(4) The Indian tribe is reasonably expected to be capable, in the EPA Regional Administrator's judgment, of carrying out the functions to be exercised in a manner consistent with the terms and purposes of the CAA and all applicable regulations. (See 40 CFR part 49.6).

2. EPA Implementation

The CAA also provides EPA with the authority to administer Federal programs in Indian country. This authority is based in part on the general purpose of the CAA, which is national in scope. Section 301(a) of the CAA provides EPA broad authority to issue regulations that are necessary to carry out the functions of the CAA. Congress intended for EPA to have the authority to operate a Federal program when Tribes choose not to develop a program, do not adopt an approvable program, or fail to adequately implement an air program authorized under section 301(d) of the CAA.

Section 301(d)(4) of the CAA authorizes the Administrator to directly administer provisions of the CAA to achieve the appropriate purpose where Tribal implementation is not appropriate or administratively not feasible. The EPA's interpretation of its authority to directly implement Clean Air Act programs in Indian country is discussed in more detail in the Tribal Authority Rule. See 63 FR at 7262-7263. As mentioned previously, Tribes may, but are not required to, submit a OSWI plan under section 111(d) of the CAA.

3. Applicability in Indian Country

The Federal plan would apply throughout Indian country except where an EPA-approved plan already covers an area of Indian country. This approach is consistent with EPA's implementation of the Federal Operating Permits program in Indian country (see 64 FR 8247 (February 19, 1999).)

VIII. Title V Operating Permits

All existing OSWI units and air curtain incinerators to be regulated by the proposed OSWI Federal plan will have to apply for and obtain a title V operating permit. These title V operating permits assure compliance with all applicable Federal requirements for regulated incineration units, including all applicable CAA section 129 requirements. (See 40 CFR 70.6(a)(1), 40 CFR 70.2, 40 CFR 71.6(a)(1), and 40 CFR 71.2.)

The permit application deadline for a CAA section 129 source applying for a title V operating permit depends on when the source first becomes subject to the relevant title V permits program. If your existing incineration unit is not subject to an earlier permit application deadline, a complete title V permit application must be submitted by the earlier of the following dates:

(1) 12 months after the effective date of any applicable EPA-approved CAA section 111(d)/129 plan (i.e., an approved State or Tribal plan that implements the OSWI emission guidelines);

(2) 12 months after the effective date of any applicable Federal plan; or

(3) December 16, 2008.

For any existing incineration unit not subject to an earlier permit application deadline, the application deadline of 36 months after the promulgation of 40 CFR part 60, subpart FFFF, applies regardless of whether or when any applicable Federal plan is effective, or whether or when any applicable CAA section 111(d)/129 plan is approved by EPA and becomes effective. (See CAA sections 129(e), 503(c), 503(d), and 502(a) and 40 CFR parts70.5(a)(1)(i) and 40 CFR 71.5(a)(1)(i).)

If your incineration unit is subject to title V as a result of some triggering requirement(s) other than those mentioned above (for example, a unit may be a major source or part of a major source), then you may be required to apply for a title V operating permit for that unit prior to the deadlines specified above. If more than one requirement triggers a source's obligation to apply for a title V operating permit, the 12-month timeframe for filing a title V permit application is triggered by the

requirement which first causes the source to be subject to title V. (See CAA section 503(c) and 40 CFR parts 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)

For additional background information on the interface between CAA section 129 and title V, including EPA's interpretation of CAA section 129(e), as well as information on submitting title V permit applications, updating existing title V permit applications and reopening existing title V permits, see the final Federal Plan for Commercial and Industrial Solid Waste Incinerators, October 3, 2003 (68 FR 57518, 57532), as well as the “Summary of Public Comments and Responses” document in EPA's OSWI emission guidelines docket (EPA-HQ-OAR-2003-0156).

Title V and Delegation of a Federal plan

We have previously stated our position that issuance of a Title V permit is not equivalent to the approval of a State plan or delegation of a Federal plan. Legally, delegation of a standard or requirement results in a delegated State or Tribe standing in for EPA as a matter of Federal law. This means that obligations a source may have to the EPA under a Federally promulgated standard become obligations to a State (except for functions that the EPA retains for itself) upon delegation.
4

Although a State or Tribe may have the authority under State or Tribal law to incorporate section 111/129 requirements into its title V permits, and implement and enforce these requirements in these permits without first taking delegation of the section 111/129 Federal plan, the State or Tribe is not standing in for EPA as a matter of Federal law in this situation. Where a State or Tribe does not take delegation of a section 111/129 Federal plan, obligations that a source has to EPA under the Federal plan continue after a title V permit is issued to the source. As a result, the EPA continues to maintain that an approved part 70 operating permits program cannot be used as a mechanism to transfer the authority to implement and enforce the Federal plan from the EPA to a State or Tribe.

4
If the Administrator chooses to retain certain authorities under a standard, those authorities cannot be delegated, e.g., alternative methods of demonstrating compliance.

As mentioned above, a State or Tribe may have the authority under State or Tribal law to incorporate section 111/129 requirements into its title V permits, and implement and enforce these requirements in that context without first taking delegation of the section 111/129 Federal plan.
5

Some States or Tribes, however, may not be able to implement and enforce a section 111/129 standard in a title V permit until the section 111/129 standard has been delegated. In these situations, a State or Tribe should not issue a part 70 permit to a source subject to a Federal plan before taking delegation of the section 111/129 Federal plan.

5
The EPA interprets the phrase “assure compliance” in section 502(b)(5)(A) to mean that permitting authorities will implement and enforce each applicable standard, regulation, or requirement which must be included in the title V permits the permitting authorities issue.
See
definition of “applicable requirement” in 40 CFR 70.2.
See also
40 CFR 70.4(b)(3)(i) and 70.6(a)(1).

If a State or Tribe can provide an Attorney General's (AG's) opinion delineating its authority to incorporate section 111/129 requirements into its Title V permits, and then implement and enforce these requirements through its Title V permits without first taking delegation of the requirements, then a State or Tribe does not need to take delegation of the section 111/129 requirements for purposes of title V permitting.
6

In practical terms, without approval of a State or Tribal plan, delegation of a Federal plan, or an adequate AG's opinion, States and Tribes with approved part 70 permitting programs open themselves up to potential questions regarding their authority to issue permits containing section 111/129 requirements, and to assure compliance with these requirements. Such questions could lead to the issuance of a notice of deficiency for a State's or Tribe's part 70 program. As a result, prior to a State or Tribal permitting authority drafting a part 70 permit for a source subject to a section 111/129 Federal plan, the State or Tribe, EPA Regional Office, and source in question are advised to ensure that delegation of the relevant Federal plan has taken place or that the permitting authority has provided to the EPA Regional Office an adequate AG's opinion.

6
It is important to note that an AG's opinion submitted at the time of initial title V program approval is sufficient if it demonstrates that a State or Tribe has adequate authority to incorporate CAA section 111/129 requirements into its title V permits, and to implement and enforce these requirements through its title V permits without delegation.

In addition, if a permitting authority chooses to rely on an AG's opinion and not take delegation of a Federal plan, a section 111/129 source subject to the Federal plan in that State must simultaneously submit to both EPA and the State or Tribe all reports required by the standard to be submitted to the EPA. Given that these reports are necessary to implement and enforce the section 111/129 requirements when they have been included in title V permits, the permitting authority needs to receive these reports at the same time as the EPA.

In the situation where a permitting authority chooses to rely on an AG's opinion and not take delegation of a Federal plan, EPA Regional Offices will be responsible for implementing and enforcing section 111/129 requirements outside of any title V permits. Moreover, in this situation, EPA Regional Offices will continue to be responsible for developing progress reports, and conducting any other administrative functions required under this Federal plan or any other section 111/129 Federal plan. See the section IV.J. of this preamble titled “Progress Reports”.

It is important to note that the EPA is not using its authority under 40 CFR part 70.4(i)(3) to request that all States and Tribes which do not take delegation of this Federal plan submit supplemental AG's opinions at this time. However, the EPA Regional Offices shall request, and permitting authorities shall provide, such opinions when the EPA questions a State's or Tribe's authority to incorporate section 111/129 requirements into a title V permit, and implement and enforce these requirements in that context without delegation.

IX. Statutory and Executive Order Reviews

A. Executive Order 12866: Regulatory Planning and Review

This action is not a “significant regulatory action” under terms of Executive Order (EO) 12866 (58 FR 51735, October 4, 1993) and is therefore not subject to review under the EO.

B. Paperwork Reduction Act

This action does not impose any new information collection burden. However, the information collection requirements in the proposed rules have been previously submitted for approval to OMB under the Paperwork Reduction Act, 44 U.S.C. 3501,
et seq.
and has been assigned OMB control number 2060-0562 for the proposed rule and the emission guideline (ICR No. 2164.02 for 40 CFR part 60 subpart FFFF). A copy of the OMB approved Information Collection Request (ICR) may be obtained from Susan Auby by mail at the Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Avenue, NW., Washington, DC 20460, or by calling (202) 566-1672.

This ICR reflects the burden estimate for the emission guidelines which were promulgated in the
Federal Register
on December 16, 2005. The burden estimate includes the burden associated with State or Tribal plans as well as the burden associated with the proposed Federal plan. Consequently, the burden estimates described below overstate the information collection burden associated with the Federal plan. However, upon approval by EPA, a State or Tribal plan becomes Federally enforceable. Therefore, it is important to estimate the full burden associated with the State or Tribal plans and the Federal plan. As State or Tribal plans are approved, the Federal plan burden will decrease, but the overall burden of the State or Tribal plans and the Federal plan will remain the same.

The proposed rules contain monitoring, reporting, and recordkeeping requirements. Information specified in the emission guidelines would be used by States or EPA to identify existing units subject to the State or Federal plans that implement the emission guidelines, and to ensure that these units comply with their emission limits and other requirements. Records and reports would be necessary to enable EPA or States to identify waste incineration units that may not be in compliance with the requirements. Based on reported information, EPA would decide which units and what records or processes should be inspected.

These recordkeeping and reporting requirements are specifically authorized by CAA section 114 (42 U.S.C. 7414). All information submitted to EPA for which a claim of confidentiality is made will be safeguarded according to EPA policies in 40 CFR part 2, subpart B, Confidentiality of Business Information.

The estimated average annual burden for the first 3 years after promulgation of the emission guidelines for industry and the implementing agency is outlined below.

Affected entity

Average
annual hours

Labor costs
Capital costs
O&M costs
Total annual costs

Industry
3,803
$174,703
$0
$0
$174,703

Implementing agency
383
17,611
0
0
17,611

EPA expects the emission guidelines to affect a maximum of 248 OSWI units over the first 3 years. There are no capital, start-up, or operation and maintenance costs for existing units during the first 3 years, because compliance with the emission guidelines is not required until 5 years after promulgation of the emission guidelines (or 3 years after the effective date of approval of a State or Federal plan to implement the guidelines). Costs in the first 3 years include time to review the guidelines and the State or Federal plan. The implementing agency will not incur any capital or start-up costs.

Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information.

An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for our regulations are listed in 40 CFR part 9.

C. Regulatory Flexibility Act

The Regulatory Flexibility Act (RFA) generally requires an agency to prepare a regulatory flexibility analysis of any rule subject to notice and comment rulemaking requirements under the Administrative Procedures Act or any other statute unless the agency certifies that the proposed rules will not have a significant economic impact on a substantial number of small entities. Small entities include small businesses, small government organizations, and small government jurisdictions.

For purposes of assessing the impacts of the proposed rules on small entities, small entity is defined as follows:

1. A small business that is an ultimate parent entity in the regulated industry that has a gross annual revenue less than $6.5 million (this varies by industry category, ranging up to $10.5 million for North American Industrial Classification System (NAICS) code 562213 (VSMWC)), based on Small Business Administration's size standards;

2. a small governmental jurisdiction that is a government of a city, county, town, school district or special district with a population of less than 50,000; or

3. a small organization that is any not-for-profit enterprise that is independently owned and operated and is not dominant in its field.

After considering the economic impacts of the proposed rules on small entities, I certify that this action will not have a significant economic impact on a substantial number of small entities. The economic impacts on small entities will not be significant because the cost of the proposed rules is expected to range from negligible to actual cost savings. EPA expects that the majority of these entities may realize a cost savings under the likely response to the proposed rules.

Alternative waste disposal methods, such as land filling, are available for OSWI units. During development of the underlying EG, our analysis using model plants and a supplemental analysis using site-specific data both supported the idea that the annual cost to landfill waste will typically be less than the annual cost of using an OSWI unit for waste disposal. Thus, the likely response to the proposed Federal implementation plan will be for small entities that own and operate OSWI units to close the units and use an alternative waste disposal method. More detailed information about these analyses is available in the docket for the underlying EG (see Revised Economic Analysis for Other Solid Waste Incineration (OSWI) Units, November 2005; and Impacts of Other Solid Waste Incinerator Rule on Affected Small Entities, November 2005 in Docket ID No. EPA-HQ-OAR-2003-0156).

The Small Business Administration's Office of Advocacy (SBA) expressed concerns that EPA's certification that the proposed emission guidelines would not have a significant economic impact on a substantial number of small entities is not based on an adequate analysis of IWI units operated by small entities. In response to SBA's public comment, we conducted further detailed analyses (as

summarized in this preamble and available in the docket) and sent small entity outreach surveys requesting information regarding the use of solid waste incinerators at schools to eight entities (identified by SBA) associated with schools. All responses from the small entity outreach survey, with one exception, indicate that incinerators are not being used by the respondents. The one exception regards an institution that owns/operates pathological waste incinerators, which are excluded from regulation under the standards and guidelines.

Although the underlying EG rules will not have a significant economic impact on a substantial number of small entities, EPA nonetheless has tried to reduce the impact of the rules on small entities. The final EG rules provide various exclusions for some sources that may find it unreasonably costly to comply with the rules or utilize alternative disposal options. These exclusions should provide relief for many small entities for which a reasonable disposal alternative is unavailable. In addition, to ensure that affected sources were aware of the proposed rules, EPA sent fact sheets to 361 existing OSWI units in our inventory and an additional 125 fact sheets to trade organizations and interest groups that represented potential OSWI unit owners/operators. The fact sheets explained the proposed regulations, the anticipated costs and impacts to their facilities, and how they could submit comments. None of the facilities or interest groups submitted comments on the proposed OSWI rules or on the cost or other impacts EPA anticipated due to the rulemaking and, in fact, about one-third of the 361 facilities informed us that they no longer own or operate an incineration unit. We continue to be interested in the potential impacts of the proposed rule on small entities and welcome comments on issues related to such impacts.

D. Unfunded Mandates Reform Act

Title II of the Unfunded Mandates Reform Act (UMRA) of 1995, Public Law 104-4, establishes requirements for Federal agencies to assess the effects of their regulatory actions on State, local, and Tribal governments and the private sector. Under section 202 of the UMRA, EPA generally must prepare a written statement, including a cost-benefit analysis, for proposed and final rules with “Federal mandates” that may result in expenditures by State, local, and Tribal governments, in the aggregate, or by the private sector, of $100 million or more in any 1 year. Before promulgating an EPA rule for which a written statement is needed, section 205 of the UMRA generally requires EPA to identify and consider a reasonable number of regulatory alternatives and adopt the least costly, most cost-effective, or least burdensome alternative that achieves the objectives of the proposed rules. The provisions of section 205 do not apply when they are inconsistent with applicable law. Moreover, section 205 allows EPA to adopt an alternative other than the least costly, most cost-effective, or least burdensome alternative if EPA publishes with the final rule an explanation why that alternative was not adopted.

Before EPA establishes any regulatory requirements that may significantly or uniquely affect small governments, including Tribal governments, EPA must develop a small government agency plan under section 203 of the UMRA. The plan must provide for notifying potentially affected small governments, enabling officials of affected small governments to have meaningful and timely input in the development of EPA's regulatory proposals with significant Federal intergovernmental mandates, and informing, educating, and advising small governments on compliance with the regulatory requirements.

The EPA has determined that the proposed rules do not contain a Federal mandate that may result in expenditures of $100 million or more for State, local, and Tribal governments, in the aggregate, or the private sector in any 1 year. In the preamble promulgating the emissions guidelines, we presented our expectation that most OSWI units would close and utilize an economical alternative waste disposal method rather than complying with the final rules, rendering the cost impacts negligible. Thus, the final EG, and by extension the proposed Federal plan, are not subject to the requirements of section 202 and 205 of the UMRA. In addition, EPA has determined that the proposed rules contain no regulatory requirements that might significantly or uniquely affect small governments because the burden is small and the regulations do not unfairly apply to small governments. Therefore, the proposed rules are not subject to the requirements of section 203 of the UMRA.

E. Executive Order 13132: Federalism

Executive Order 13132 (64 FR 43255, August 10, 1999), requires EPA to develop an accountable process to ensure “meaningful and timely input by State and local officials in the development of regulatory policies that have federalism implications.” “Policies that have federalism implications” is defined in the Executive Order to include regulations that have “substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.”

Under section 6 of Executive Order 13132, EPA may not issue a regulation that imposes substantial direct compliance costs, and that is not required by statute, unless the Federal government provides the funds necessary to pay the direct compliance costs incurred by State and local governments, or EPA consults with State and local officials early in the process of developing the proposed regulation. Also, EPA may not issue a regulation that has federalism implications and that preempts State law, unless EPA consults with State and local officials early in the process of developing the proposed regulation.

The proposed rules do not have federalism implications. They will not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132. The proposed rules will not impose substantial direct compliance costs on State or local governments, and will not preempt State law. Thus, Executive Order 13132 does not apply to the proposed rules.

F. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

Executive Order 13175, (65 FR 67249, November 9, 2000), requires EPA to develop an accountable process to ensure “meaningful and timely input by Tribal officials in the development of regulatory policies that have Tribal implications.” The proposed rule does not have Tribal implications, as specified in Executive Order 13175. Thus, Executive Order 13175 does not apply to the proposed rules.

G. Executive Order 13045: Protection of Children From Environmental Health and Safety Risks

Executive Order 13045 (62 FR 19885, April 23, 1997), applies to any rule that: (1) Is determined to be “economically significant” as defined under Executive Order 12866, and (2) concerns an environmental health or safety risk that EPA has reason to believe may have a disproportionate effect on children. If the regulatory action meets both criteria,

EPA must evaluate the environmental health or safety effects of the planned rule on children, and explain why the planned regulation is preferable to other potentially effective and reasonably feasible alternatives EPA considered.

The EPA interprets Executive Order 13045 as applying only to those regulatory actions that are based on health or safety risks, such that the analysis required under section 5-501 of the Executive Order has the potential to influence the regulation. The proposed rules are not subject to Executive Order 13045 because they are based on technology performance and not on health and safety risks. Also, the proposed rules are not “economically significant.”

H. Executive Order 13211: Actions That Significantly Affect Energy Supply, Distribution or Use

This rule is not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR28355; May 22, 2001) because it is not a significant regulatory action under Executive Order 12866.

I. National Technology Transfer Advancement Act

Section 12(d) of the National Technology Transfer and Advancement Act (NTTAA) of 1995 (Pub. L. 104-113; 15 U.S.C. 272 note) directs EPA to use voluntary consensus standards in their regulatory and procurement activities unless to do so would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., materials specifications, test methods, sampling procedures, business practices) developed or adopted by one or more voluntary consensus bodies. The NTTAA directs EPA to provide Congress, through annual reports to OMB, with explanations when an agency does not use available and applicable voluntary consensus standards.

The proposed rules involve technical standards. The EPA proposes to use EPA Methods 1, 2, 3A, 3B, 4, 5, 6 or 6C, 7 or 7A, 7C, 7D, or 7E, 9, 10, 10A or 10B, 23, 26A, and 29 of 40 CFR part 60, appendix A.

Consistent with the NTTAA, EPA conducted searches to identify voluntary consensus standards in addition to these EPA methods. No applicable voluntary consensus standards were identified for EPA Methods 7D, 9, and 10A. The search and review results have been documented and are placed in the docket for the OSWI emission guidelines.

One voluntary consensus standard was identified as an acceptable alternative to EPA test methods for the purposes of the proposed rules. The voluntary consensus standard ASME PTC 19-10-1981-Part 10, “Flue and Exhaust Gas Analyses,” is cited in the emission guidelines and the proposed rules for its manual methods for measuring the nitrogen oxide, oxygen, and sulfur dioxide content of exhaust gas. These parts of ASME PTC 19-10-1981-Part 10 are acceptable alternatives to Methods 3B, 6, 7, and 7C.

The search for emissions measurement procedures identified 29 voluntary consensus standards applicable to the proposed rules. The EPA determined these 29 standards identified for measuring emissions of Cd, CO, dioxins/furans, HCl, Hg, Pb, PM, NO
X,
and SO
2
subject to the emission limits were impractical alternatives to EPA test methods for the purposes of the proposed rules. Therefore, EPA does not intend to adopt the standards for this purpose. (See Docket ID No. EPA-HQ-OAR-2003-0156 for further information on the methods.)

Four of the 29 voluntary consensus standards identified in this search were not available at the time the review was conducted because they are under development by a voluntary consensus body: ASME/BSR MFC 13M, “Flow Measurement by Velocity Traverse,” for EPA Method 2 (and possibly 1); ASME/BSR MFC 12M, “Flow in Closed Conduits Using Multiport Averaging Pitot Primary Flowmeters,” for EPA Method 2; ISO/DIS 12039, “Stationary Source Emissions-Determination of Carbon Monoxide, Carbon Dioxide, and Oxygen-Automated Methods” for EPA Method 3A; and ASTM Z6590Z, “Manual Method for Both Speciated and Elemental Mercury” for EPA Method 29 (portion for Hg only).

Tables 2 and 4 of subpart FFFF of 40 CFR part 60 list the EPA testing methods from the underlying EG that would be included in the proposed rules. Under 40 CFR part 60.8(b) and 60.13(i) of subpart A (General Provisions), a source may apply to EPA for permission to use alternative test methods or alternative monitoring requirements in place of any of the EPA testing methods, performance specifications, or procedures.

List of Subjects in 40 CFR Part 62

Environmental protection, Administrative practice and procedure, Air pollution control, Incorporation by reference, Intergovernmental relations, Reporting and recordkeeping requirements.

Dated: December 8, 2006.
Stephen L. Johnson,
Administrator.

40 CFR part 62 is proposed to be amended as follows:

PART 62—[AMENDED]

1. The authority citation for part 62 continues to read as follows:

Authority:

42 U.S.C. 7401
et seq.

2. Section 62.13 is amended by revising paragraph (e) to read as follows:

§ 62.13
Federal plans.

(e) The substantive requirements of the other solid waste incineration units Federal plan are contained in subpart KKK of this part. These requirements include emission limits, compliance schedules, testing, monitoring, and reporting and recordkeeping requirements.

3. Part 62 is amended by adding a new subpart KKK to read as follows:

Subpart KKK—Federal Plan Requirements for Other Solid Waste Incineration Units That Commenced Construction on or Before December 9, 2004

Sec.

Introduction

62.15450
What is the purpose of this subpart?
62.15455
What are the principal components of this subpart?
Applicability

62.15460
Am I subject to this subpart?
62.15470
Can my OSWI unit be covered by both a State plan and this subpart?
62.15475
How do I determine if my OSWI unit is covered by an approved and effective State or Tribal plan?
62.15480
If my OSWI unit is not listed in the Federal plan inventory, am I exempt from this subpart?
62.15485
Can my combustion unit be exempt from this subpart?
62.15495
When must I submit any records required pursuant to an exemption allowed under § 62.15485?
62.15500
Are air curtain incinerators regulated under this subpart?
Compliance Schedule and Increments of Progress

62.15505
When must I comply with this subpart if I plan to continue operation of my OSWI unit?
62.15510
What must I do if I plan to permanently close my OSWI unit and not restart it?
62.15515
What must I do if I close my OSWI unit and then restart it?
Waste Management Plan

62.15520
What is a waste management plan?
62.15525

When must I submit my waste management plan?

62.15530
What should I include in my waste management plan?
Operator Training and Qualification

62.15535
What are the operator training and qualification requirements?
62.15545
When must the operator training course be completed?
62.15550
How do I obtain my operator qualification?
62.15555
How do I maintain my operator qualification?
62.15560
How do I renew my lapsed operator qualification?
62.15565
What site-specific documentation is required?
62.15570
What if all the qualified operators are temporarily not accessible?
Emission Limitations and Operating Limits

62.15575
What emission limitations must I meet and by when?
62.15585
What operating limits must I meet and by when?
62.15595
What if I do not use a wet scrubber to comply with the emission limitations?
62.15605
What happens during periods of startup, shutdown, and malfunction?
Performance Testing

62.15610
How do I conduct the initial and annual performance test?
62.15615
How are the performance test data used?
Initial Compliance Requirements

62.15620
How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
62.15630
By what date must I conduct the initial performance test?
Continuous Compliance Requirements

62.15635
How do I demonstrate continuous compliance with the emission limitations and the operating limits?
62.15645
By what date must I conduct the annual performance test?
62.15650
May I conduct performance testing less often?
62.15660
May I conduct a repeat performance test to establish new operating limits?
Monitoring

62.15665
What continuous emission monitoring systems must I install?
62.15675
How do I make sure my continuous emission monitoring systems are operating correctly?
62.15685
What is my schedule for evaluating continuous emission monitoring systems?
62.15690
What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable?
62.15700
How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
62.15705
What operating parameter monitoring equipment must I install, and what operating parameters must I monitor?
62.15710
Is there a minimum amount of operating parameter monitoring data I must obtain?
Recordkeeping and Reporting

62.15715
What records must I keep?
62.15725
Where and in what format must I keep my records?
62.15730
What reports must I submit?
62.15740
What information must I submit following my initial performance test?
62.15745
When must I submit my annual report?
62.15750
What information must I include in my annual report?
62.15755
What else must I report if I have a deviation from the operating limits or the emission limitations?
62.15760
What must I include in the deviation report?
62.15765
What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
62.15770
Are there any other notifications or reports that I must submit?
62.15775
In what form can I submit my reports?
62.15780
Can reporting dates be changed?
Air Curtain Incinerators That Burn 100 Percent Wood Waste, Clean Lumber and/or Yard Waste

62.15785
What is an air curtain incinerator?
62.15790
When must I comply if my air curtain incinerator burns only wood waste, clean lumber, and yard waste?
62.15795
What must I do if I close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and then restart it?
62.15800
What must I do if I plan to permanently close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not restart it?
62.15805
What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber and yard waste?
62.15810
How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber and yard waste?
62.15815
What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
62.15820
Am I required to apply for and obtain a title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and yard waste?
Title V Operating Permits

62.15825
Am I required to apply for and obtain a title V operating permit for my existing unit?
62.15830
When must I submit a title V permit application for my existing unit?
Temporary-Use Incinerators and Air Curtain Incinerators Used In Disaster Recovery

62.15835
What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?
Delegation of Authority

62.15840
What authorities are withheld by the EPA?
Equations

62.15845
What equations must I use?
Definitions

62.15850
What definitions must I know?
Tables to Subpart KKK of Part 62

Table 1 of Subpart KKK of Part 62—Emission Limitations

Table 2 of Subpart KKK of Part 62—Operating Limits for Incinerators and Wet Scrubbers

Table 3 of Subpart KKK of Part 62—Requirements for Continuous Emission Monitoring Systems (CEMS)

Table 4 of Subpart KKK of Part 62—Summary of Reporting Requirements

Subpart KKK—Federal Plan Requirements for Other Solid Waste Incineration Units That Commenced Construction on or Before December 9, 2004

Introduction

§ 62.15450
What is the purpose of this subpart?

(a) This subpart establishes emission requirements and compliance schedules for the control of emissions from other solid waste incineration (OSWI) units that are not covered by an EPA approved and currently effective State or Tribal plan. The pollutants addressed by these emission requirements are listed in Table 1 of this subpart. These emission requirements are developed in accordance with sections 111 and 129 of the Clean Air Act and subpart B of 40 CFR part 60.

(b) In this subpart, “you” means the owner or operator of an OSWI unit or air curtain incinerator subject to this subpart.

§ 62.15455
What are the principal components of this subpart?
This subpart contains the twelve major components listed in paragraphs (a) through (l) of this section.

(a) Compliance schedule.

(b) Waste management plan.

(c) Operator training and qualification.

(d) Emission limitations and operating limits.

(e) Performance testing.

(f) Initial compliance requirements.

(g) Continuous compliance requirements.

(h) Monitoring.

(i) Recordkeeping and reporting.

(j) Definitions.

(k) Equations

(l) Tables.

Applicability

§ 62.15460
Am I subject to this subpart?
(a) You are subject to this subpart if you own or operate an OSWI unit as defined in § 62.15850, or an air curtain incinerator subject to this subpart as defined in § 62.15785. OSWI units are very small municipal waste combustion units and institutional waste incineration units as defined in § 62.15850. Units subject to this subpart meet the criteria described in paragraphs (a)(1) through (a)(3) of this section.

(1) Construction of your incineration unit commenced on or before November December 9, 2004.

(2) Your incineration unit is not exempt under § 62.15485.

(3) Your incineration unit is not regulated by an EPA approved and currently effective State or Tribal plan, or your incineration unit is located in any State whose approved State or Tribal plan is subsequently vacated in whole or in part.

(b) If the owner or operator of an incineration unit subject to this subpart makes changes that meet the definition of modification or reconstruction on or after June 16, 2006, that unit becomes subject to subpart EEEE of 40 CFR part 60 (New Source Performance Standards for Other Solid Waste Incineration Units) and this subpart no longer applies to that unit.

(c) If you make physical or operational changes to your existing incineration unit primarily to comply with this subpart, then such changes do not qualify as modifications or reconstructions under subpart EEEE of 40 CFR part 60.

§ 62.15470
Can my OSWI unit be covered by both a State plan and this subpart?
(a) If your OSWI unit is located in a State that does not have an EPA-approved State plan or your State's plan has not become effective, this subpart applies to your OSWI unit until the EPA approves a State plan that covers your OSWI unit and that State plan becomes effective. However, a State may enforce the requirements of a State regulation while your OSWI unit is still subject to this subpart.

(b) After the EPA approves a State plan covering your OSWI unit, and after that State plan becomes effective, you will no longer be subject to this subpart and will only be subject to the approved and effective State plan.

§ 62.15475
How do I determine if my OSWI unit is covered by an approved and effective State or Tribal plan?
This part (40 CFR part 62) contains a list of State and Tribal areas with approved Clean Air Act section 111(d) and section 129 plans along with the effective dates for such plans. The list is published annually. If this part does not indicate that your State or Tribal area has an approved and effective plan, you should contact your State environmental agency's air director or your EPA Regional Office to determine if the EPA has approved a State plan covering your unit since publication of the most recent version of this subpart.

§ 62.15480
If my OSWI unit is not listed in the Federal plan inventory, am I exempt from this subpart?
Not necessarily. Sources subject to this subpart are not limited to the inventory of sources listed in Docket No. EPA-HQ-OAR-2006-0364 for the Federal plan. If your incineration unit meets the applicability criteria in § 62.15460, this subpart applies to you whether or not your unit is listed in the Federal plan inventory in the docket.

§ 62.15485
Can my combustion unit be exempt from this subpart?
This subpart exempts the types of units described in paragraphs (a) through (q) of this section from complying with the requirements of this subpart except for the requirements specified in this section.

(a)
Cement kilns.
The unit is excluded if it is regulated under subpart LLL of part 63 of this chapter (National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry).

(b)
Co-fired combustors.
The unit, that would otherwise be considered a very small municipal waste combustion unit, is excluded if the owner/operator of the unit meets the following five requirements:

(1) Has a Federally enforceable permit limiting the combustion of municipal solid waste to 30 percent of the total fuel input by weight.

(2) Notifies the Administrator that the unit qualifies for the exclusion.

(3) Provides the Administrator with a copy of the Federally enforceable permit.

(4) Records the weights, each calendar quarter, of municipal solid waste and of all other fuels combusted.

(5) Keeps each report for 5 years. These records must be kept on site for at least 2 years, but may be kept off site for the remaining 3 years.

(c)
Cogeneration facilities.
The unit is excluded if it meets the three requirements specified in paragraphs (c)(1) through (3) of this section.

(1) The unit qualifies as a cogeneration facility under section 3(18)(B) of the Federal Power Act (16 U.S.C. 796(18)(B)).

(2) The unit burns homogeneous waste (not including refuse-derived fuel) to produce electricity and steam or other forms of energy used for industrial, commercial, heating, or cooling purposes.

(3) The owner/operator of the unit notifies the Administrator that the unit meets all of these criteria.

(d)
Commercial and industrial solid waste incineration units.
The unit is excluded if it is regulated under subparts CCCC or DDDD of part 60 or subpart III of part 62 and is required to meet the emission limitations established in those subparts.

(e)
Hazardous waste combustion units.
The unit is excluded if it meets either of the two criteria specified in paragraph (e)(1) or (2) of this section.

(1) The owner/operator of the unit is required to get a permit for the unit under section 3005 of the Solid Waste Disposal Act.

(2) The unit is regulated under 40 CFR part 63, subpart EEE (National Emission Standards for Hazardous Air Pollutants from Hazardous Waste Combustors).

(f)
Hospital/medical/infectious waste incinerators.
The unit is excluded if it is regulated under subparts Ce or Ec of part 60 (New Source Performance Standards and Emission Guidelines for Hospital/Medical/Infectious Waste Incinerators) or subpart HHH of part 62 (Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed on or before June 20, 1996).

(g)
Incinerators and air curtain incinerators in isolated areas of Alaska.
The incineration unit is excluded if it is used at a solid waste disposal site in Alaska that is classified as a Class II or Class III municipal solid waste landfill, as defined in § 62.15850.

(h)
Rural institutional waste incinerators.
The incineration unit is excluded if it is an institutional waste incinerator, as defined in § 62.15850, and the application for exclusion described in paragraphs (h)(1) and (2) of this section has been approved by the Administrator.

(1) Prior to 1 year before the final compliance date, an application and supporting documentation demonstrating that the institutional waste incineration unit meets the two requirements specified in paragraphs (h)(1)(i) and (ii) of this section must be submitted to the Administrator for approval.

(i) The unit is located more than 50 miles from the boundary of the nearest Metropolitan Statistical Area,

(ii) Alternative disposal options are not available or are economically infeasible,

(2) The application described in paragraph (h)(1) of this section must be revised and resubmitted to the Administrator for approval every 5 years following the initial approval of the exclusion for your unit.

(3) If you re-applied for an exclusion pursuant to paragraph (h)(2) of this section and were denied exclusion by the Administrator, you have 3 years from the expiration date of the current exclusion to comply with the emission limits and all other applicable requirements of this subpart.

(i)
Institutional boilers and process heaters.
The unit is excluded if it is regulated under 40 CFR part 63, subpart DDDDD (National Emission Standards for Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers and Process Heaters).

(j)
Laboratory Analysis Units.
The unit is excluded if it burns samples of materials only for the purpose of chemical or physical analysis.

(k)
Materials recovery units.
The unit is excluded if it combusts waste for the primary purpose of recovering metals. Examples include primary and secondary smelters.

(l)
Pathological waste incineration units.
An institutional waste incineration unit or very small municipal waste combustion unit is excluded from this subpart if it burns 90 percent or more by weight (on a calendar quarter basis and excluding the weight of auxiliary fuel and combustion air) of pathological waste, low-level radioactive waste, and/or chemotherapeutic waste as defined in § 62.15850 and the owner/operator of the unit meets the criteria specified in paragraphs (l)(1) and (2) of this section.

(1) Notify the Administrator that the unit meets these criteria.

(2) Keeps records on a calendar quarter basis of the weight of pathological waste, low-level radioactive waste, and/or chemotherapeutic waste burned, and the weight of all other fuels and wastes burned in the unit.

(m)
Small or large municipal waste combustion units.
The unit is excluded if it is regulated under 40 CFR part 60, subparts AAAA, BBBB, Ea, Eb, or Cb, and is required to meet the emission limitations established in those subparts. Also excluded are units regulated under 40 CFR part 62, subparts FFF or JJJ.

(n)
Small power production facilities.
The unit is excluded if it meets the three requirements specified in paragraphs (n)(1) through (3) of this section.

(1) The unit qualifies as a small power-production facility under section 3(17)(C) of the Federal Power Act (16 U.S.C. 796(17)(C)).

(2) The unit burns homogeneous waste (not including refuse-derived fuel) to produce electricity.

(3) The owner/operator of the unit notifies the Administrator that the unit meets all of these criteria.

(o)
Temporary-use incinerators and air curtain incinerators used in disaster recovery.
The incineration unit is excluded if it is used on a temporary basis to combust debris from a disaster or emergency such as a tornado, hurricane, flood, ice storm, high winds, or act of bioterrorism and you comply with the requirements in § 62.15835.

(p)
Units that combust contraband or prohibited goods.
The incineration unit is excluded if the unit is owned or operated by a government agency such as police, customs, agricultural inspection, or a similar agency to destroy only illegal or prohibited goods such as illegal drugs, or agricultural food products that can not be transported into the country or across state lines to prevent biocontamination. The exclusion does not apply to items either confiscated or incinerated by private, industrial, or commercial entities.

(q)
Incinerators used for national security.
Your incineration unit is excluded if it meets the requirements specified in either (q)(1) or (2) of this section.

(1) The incineration unit is used solely during military training field exercises to destroy national security materials integral to the field exercises.

(2) The incineration unit is used solely to incinerate national security materials, its use is necessary to safeguard national security, you follow the exclusion request requirements in paragraphs (q)(2)(i) and (ii) of this section, and the Administrator has approved your request for exclusion.

(i) The request for exclusion and supporting documentation must demonstrate both that the incineration unit is used solely to destroy national security materials and that a reliable alternative to incineration that ensures acceptable destruction of national security materials is unavailable, on either a permanent or temporary basis.

(ii) The request for exclusion must be submitted to the Administrator prior to 1 year before the final compliance date.

§ 62.15495
When must I submit any records required pursuant to an exemption allowed under § 62.15485?
Owners or operators of sources that qualify for the exemptions in § 62.15485(b) and (l) must submit any records required to support their claims of exemption to the EPA Administrator (or delegated enforcement authority) upon request. Upon request by any person under the regulation at part 2 of this chapter (or a comparable law or regulation governing a delegated enforcement authority), the EPA Administrator (or delegated enforcement authority) must request the records in § 62.15485(b) and (l) from an owner or operator and make such records available to the requestor to the extent required by part 2 of this chapter (or a comparable law governing a delegated enforcement authority). Any records required under § 62.15485(b) and (l) must be maintained by the source for a period of at least 5 years. Notifications of exemption claims required under § 62.15485(b) and (l) of this section must be maintained by the EPA or delegated enforcement authority for a period of at least five years. Any information obtained from an owner or operator of a source accompanied by a claim of confidentiality will be treated in accordance with the regulations in part 2 of this chapter (or a comparable law governing a delegated enforcement authority).

§ 62.15500
Are air curtain incinerators regulated under this subpart?
(a) Air curtain incinerators that burn less than 35 tons per day of municipal solid waste or air curtain incinerators located at institutional facilities burning any amount of institutional waste generated at that facility are subject to all requirements of this subpart, including the emission limitations specified in Table 1 of this subpart.

(b) Air curtain incinerators that burn only less than 35 tons per day of the materials listed in paragraphs (b)(1) through (4) of this section collected from the general public and from residential, commercial, institutional, and industrial sources; or, air curtain incinerators located at institutional facilities that burn only the materials listed in paragraphs (b)(1) through (4) of this section generated at that facility, are required to meet only the requirements in §§ 62.15785 through 62.15830 and are exempt from all other requirements of this subpart.

(1) 100 percent wood waste.

(2) 100 percent clean lumber.

(3) 100 percent yard waste.

(4) 100 percent mixture of only wood waste, clean lumber, and/or yard waste.

Compliance Schedule and Increments of Progress

§ 62.15505
When must I comply with this subpart if I plan to continue operation of my OSWI unit?

If you plan to continue operation and come into compliance with the requirements of this subpart by [A DATE WILL BE INSERTED WHICH WILL BE THREE YEARS AFTER DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
], then you must complete the requirements of paragraphs (a) through (f) of this section.

(a) You must comply with the operator training and qualification requirements and inspection requirements (if applicable) of this subpart by [A DATE WILL BE INSERTED WHICH WILL BE ONE YEAR AFTER DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
].

(b) You must submit a waste management plan no later than 60 days following the initial performance test as specified in Table 4 of this subpart.

(c) You must achieve final compliance by [A DATE WILL BE INSERTED WHICH WILL BE THREE YEARS AFTER THE DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
]. To achieve final compliance, you must incorporate all process changes and complete retrofit construction of control devices, so that, if the affected CISWI unit is brought online, all necessary process changes and air pollution control devices would operate as designed.

(d) You must conduct the initial performance test no later than [A DATE WILL BE INSERTED WHICH WILL BE THREE YEARS PLUS 180 DAYS AFTER THE DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
].

(e) You must submit an initial test report including the results of the initial performance test no later than 60 days following the initial performance test.

(f) You must submit a notification to the Administrator stating whether final compliance has been achieved, postmarked within 10 business days after [A DATE WILL BE INSERTED WHICH WILL BE THREE YEARS PLUS 10 DAYS AFTER THE DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
].

§ 62.15510
What must I do if I plan to permanently close my OSWI unit and not restart it?

You must close the unit before the final compliance date on [A DATE WILL BE INSERTED WHICH WILL BE THREE YEARS AFTER DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
].

(1) You must comply with the operator training and qualification requirements and inspection requirements (if applicable) of this subpart by [A DATE WILL BE INSERTED WHICH WILL BE ONE YEAR AFTER DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
].

(2) While still in operation, your OSWI unit is subject to the same requirement to apply for and obtain a title V operating permit that applies to an OSWI unit that will not be permanently closing. See §§ 62.15825 and 62.15830.

§ 62.15515
What must I do if I close my OSWI unit and then restart it?

(a) If you close your OSWI unit but will reopen it prior to [A DATE WILL BE INSERTED WHICH WILL BE THREE YEARS AFTER DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
], you must meet all the requirements of § 62.15505.

(b) If you close your OSWI unit and restart the unit after [A DATE WILL BE INSERTED WHICH WILL BE THREE YEARS AFTER THE DATE THE FINAL RULE IS PUBLISHED IN THE
Federal Register
] and resume operation, you must meet all of the requirements of § 62.15505(a), (b), (c), and (e) at the time you restart your OSWI unit. You must conduct the initial performance test within 30 days of restarting your OSWI unit. Upon restarting your OSWI unit, you must have incorporated all process changes and completed retrofit construction of control devices so that when the affected OSWI unit is brought online, all necessary process changes and air pollution control devices operate as designed.

Waste Management Plan

§ 62.15520
What is a waste management plan?
A waste management plan is a written plan that identifies both the feasibility and the methods used to reduce or separate certain components of solid waste from the waste stream in order to reduce or eliminate toxic emissions from incinerated waste.

§ 62.15525
When must I submit my waste management plan?
You must submit a waste management plan no later than 60 days following the initial performance test as specified in Table 4 of this subpart

§ 62.15530
What should I include in my waste management plan?
A waste management plan must include consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials. The plan must identify any additional waste management measures, and the source must implement those measures considered practical and feasible, based on the effectiveness of waste management measures already in place, the costs of additional measures, the emissions reductions expected to be achieved, and any other environmental or energy impacts they might have.

Operator Training and Qualification

§ 62.15535
What are the operator training and qualification requirements?
(a) No OSWI unit can be operated unless a fully trained and qualified OSWI unit operator is accessible, either at the facility or can be at the facility within 1 hour. The trained and qualified OSWI unit operator may operate the OSWI unit directly or be the direct supervisor of one or more other plant personnel who operate the unit. If all qualified OSWI unit operators are temporarily not accessible, you must follow the procedures in § 62.15570.

(b) Operator training and qualification must be obtained through a State-approved program or by completing the requirements included in paragraph (c) of this section.

(c) Training must

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3AE6-21285. Public record. Not legal advice.
