# Stimson ANILCA Access Easement, Colville National Forest, Pend Oreille County, WA

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A99-8726

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** April 8, 1999
- **Citation:** 64 FR 17144

## Text

DEPARTMENT OF AGRICULTURE

Forest Service

Stimson ANILCA Access Easement, Colville National Forest, Pend
Oreille County, WA

ACTION: Notice of intent to prepare environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: The Forest Service, USDA, will prepare an environmental impact
statement (EIS) on a site-specific proposal to grant an easement and
authorize construction and reconstruction of specific roads across
National Forest System (NFS) lands as requested by Stimson Lumber
Company to access their lands. This request seeks legal access to
approximately 2,480 acres in five separate sections of non-Federal land
located within the Forest Boundary on the Sullivan Lake Ranger
District. The proposed action is located approximately six miles south
of Ione, Washington, within the LeClerc Creek watershed. The Proposed
Action will be in compliance with the 1988 Colville National Forest
Land and Resource Management Plan (Forest Plan) as amended, which
provides the overall guidance for management of this area. The Colville
National Forest invites written comments and suggestions on the scope
of the analysis. The agency gives notice of the full environmental
analysis and decision making process so that interested and affected
people may be able to participate and contribute in the final decision.

[[Page 17145]]

DATES: Comments concerning the scope of this proposal should be
received in writing by May 15, 1999.

ADDRESSES: Send written comments and suggestions to Fred C. Gonzalez,
District Ranger, 12641 Sullivan Lake Road, Metaline Falls, Washington
99153.

FOR FURTHER INFORMATION CONTACT: Questions about this EIS should be
directed to Tim Bertram, Interdisciplinary Team Leader, 12641 Sullivan
Lake Road, Metaline Falls, Washington 99153 (phone: 509-446-7500).

SUPPLEMENTARY INFORMATION: The Proposed Action is to grant an easement
to Stimson Lumber Company authorizing the construction, reconstruction,
and use of seven segments of road, totaling approximately 2.69 miles,
to access their property. Sections of land to be accessed are
surrounded by NFS lands and no legal road access to the sections
currently exists. Stimson Lumber Company seeks access pursuant to the
Alaska National Interest Lands Conservation Act, (ANILCA). The ANILCA
directs the Forest Service to grant access to inholdings of non-Federal
land within the National Forest boundary for the reasonable use and
enjoyment of those lands by the landowner. Stimson has stated that it
intends to manage the lands to be accessed for long-term timber
production utilizing conventional ground based logging systems. The
applicant intends to build roads on the easement sufficient to support
the intended use of the land.
The proposed Action may result in an amendment to the Forest Plan
to provide additional standards and guidelines for the LeClerc Grizzley
Bear Management Unit. The standards and guidelines would be based upon
recommendations provided in the Interagency Grizzly Bear committee Task
Force Report (as revised July 29, 1998).
This analysis will evaluate a range of alternatives for granting
access for Stimson's inholdings. The access involves approximately 2.69
miles of road on 22 acres of NFS lands.
Analysis of effects will include both the project area on NFS lands
as well as affects on non-federal Stimson lands accessed by the roads.
Analysis areas will differ based on resource being assessed (watershed
boundaries, grizzly bear management units, etc.).
The Draft EIS will be tiered to the Colville National Forest Land
and Resource Management Plan. The Land and Resource Management Plan's
Management Area direction for this project area is approximately 3
percent Old Growth Dependent Species Habitat (Management Area 1), 30
percent Wood/Forage Emphasis (Management Area 7), and 67 percent Winter
Range (Management Area 8).
Preliminary issues include: (1) Under ANILCA and its implementing
regulations, what would constitute reasonable access to Stimson land;
(2) What would be the effects of granting access to Stimson land on
natural resources including proposed, threatened, and endangered
species habitat; and (3) Where is access mutually needed by both
Stimson and the Forest Service to meet both economic concerns and
natural resource objectives?
A range of alternatives will be considered, including a no-action
alternative. Initial scoping began in May 1992 with notice and mailings
to interested parties. An Interdisciplinary team was assigned on May
28, 1992 to identify and clarify issues, to explore and develop
alternatives based on key issues, and to review and analyze potential
environmental effects. An Environmental Assessment (EA), called the
Stimson Cost-Share EA, was issued to the public for comment from July
16, 1997 to August 15, 1997. A Decision Notice/Finding of No
Significant Impact was issued on March 6, 1998. The decision document
was appealed and reversed by the Appeal Deciding Officer on June 15,
1998. comments from the EA comment period and the appeals have been
incorporated in the preparation of this Notice and the Proposed Action.
The Environmental Protection Agency (EPA) will publish a Notice of
Availability of the draft EIS in the Federal Register. The draft EIS is
expected to be available by June, 1999. The comment period on the draft
EIS will be 45 days from the date the EPA notice appears in the Federal
Register. It is important that those interested in the management of
the Colville National forest participate at that time.
The Forest Service believes it is important to give reviewers
notice at this early stage of several court rulings related to public
participation in the environmental review process.
First, reviewers of the draft EIS must structure their
participation in the environmental review of the proposal so that it is
meaningful and alerts an agency to the reviewer's position and
contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S.
519,553 (1978). Also, environmental objections that could be raised at
the draft EIS stage but that are not raised until after completion of
the final EIS may be waived or dismissed by the courts. City of Angoon
v. Hodel, 803 f. 2d 1016, 1022 (9th Cir., 1986) and Wisconsin
Heritages. Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D. Wis. 1980).
Because of these court rulings, it is very important that those
interested in this Proposed Action participate by the close of the 45
day comment period so that substantive comments and objections are made
available to the Forest Service at a time when it can meaningfully
consider them and respond to them in the final EIS.
To assist the Forest Service in identifying and considering issues
and concerns on the proposed action, comments on the draft EIS should
be as specific as possible. It is also helpful if comments refer to
specific pages or chapters of the draft EIS. Comments may also address
the adequacy of the draft EIS or the merits of the alternatives
formulated and discussed in the Statement. Reviewers may wish to refer
to the Council on Environmental Quality Regulations for implementing
the procedural provisions of the National Environmental Policy Act at
40 CFR 1503.3 in addressing these points.
The final EIS is scheduled to be available by September 1999. In
the final EIS, the Forest Service is required to respond to substantive
comments received during the comment period for the draft EIS. The Lead
Agency is the USDA Forest Service. The responsible official is Colville
National Forest Supervisor, Robert L. Vaught, 765 South Main, Colville,
WA 99114. The responsible official will decide which, if any, of the
alternatives will be implemented. The decision and the rationale for
the decision will be documented in the record of Decision, which will
be subject to Forest Service Appeal Regulations (36 CFR Part 215).

Dated: March 30, 1999.
Robert L. Vaught,
Forest Supervisor.
[FR Doc. 99-8726 Filed 4-7-99; 8:45 am]
BILLING CODE 3410-11-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A99-8726. Public record. Not legal advice.
