# Environmental Impact Statements and Regulations; Availability of EPA Comments

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A99-7490

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** March 26, 1999
- **Citation:** 64 FR 14719

## Text

ENVIRONMENTAL PROTECTION AGENCY

(ER-FRL-6241-2)

Environmental Impact Statements and Regulations; Availability of
EPA Comments

Availability of EPA comments prepared March 01, 1999 Through March
05, 1999 pursuant to the Environmental Review Process (ERP), under
Section 309 of the Clean Air Act and Section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities at (202)
564-7167. An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 10, 1998 (63
FR 17856).

Draft EISs

ERP No. D-AFS-J65297-MT

Rating EC2, Bull Lake Estates Road Access Project, Implementation,
Easement Grant Permit, Kootenai National Forest, Three Rivers Rangers
District, Lincoln County, MT.
Summary: EPA expressed environmental concerns about potential
adverse social, water quality, fisheries, and wildlife impacts of the
development of the Bull Lake Estates subdivision. The Final EIS should
discuss the environmental impacts of the management actions and
mitigation measures.

ERP No. D-AFS-L65312-WA

Rating EO2, Olympic Cross Cascade Pipeline Project, Construct and
Operate a Common Carrier Petroleum Pipeline, Mt. Baker-Snoqualmie and
Wenatchee National Forests, City of Pasco, Snohomish, King, Kittitas,
Adams, Grant and Franklin Counties, WA.
Summary: EPA expressed environmental objections because the draft
EIS does not adequately discuss the need for the project in terms of a
public interest, a range of alternatives needed to meet the purpose and
need for the project, and environmental risks posed by the proposed
alternative.

ERP No. D-AFS-L65316-ID

Rating EC2, Coeur d'Alene River Ranger District Noxious Weed
Control

[[Page 14720]]

Project, Treating 76 Specific Sites across District, Kootenai and
Shoshone Counties, ID.
Summary: EPA expressed environmental concerns with the proposed
methodologies for the controlling noxious weeds. The Final EIS should
address operational objectives or performance standards, additional
strategies to prevent the spread of noxious weeds, funding for the
control of weed expansion and adaptive management that addresses
treatment other than chemical ones.

ERP No. D-BLM-K65217-AZ

Rating EO2, Ray Land Exchange/Plan Amendment, Implementation,
Exchange of Federal Lands for Public Lands, Pinal, Gila and Mohave
Counties, AZ.
Summary: EPA expressed strong objections to the proposed project
because of its potential for significant environmental degradation. EPA
recommended that BLM consider preparing a revised DEIS with
substantially more information regarding other alternatives, the
affected environment, and environmental consequences, including
indirect and cumulative impacts, with respect to site geology and
geochemistry, hydrology and hydrogeology, existing and potential future
water and air quality, riparian and aquatic resources, facilities
design, minerals and land management, environmental justice, and
mitigation measures.

ERP No. D-DOA-G36150-AR

Rating EC2, Departee Creek Watershed Plan Flood Prevention,
Implementation, COE Section 404 Permit, Independence and Jackson
Counties, AR.
Summary: EPA expressed environmental concerns regarding wetland
impacts, alternative, mitigation, and environmental justice. Additional
information concerning these issues was requested.

ERP No. DS-AFS-L67036-OR

Rating EC2, Nicore Mining Project, Implementation, New Information
on Six New Alternatives, Plan-of-Operations, Mining of Four Sites, Road
Construction, Reconstruction, Hauling and Stockpiling of Ore, Rough and
Ready Creek Watershed, Illinois Valley Ranger District, Siskiyou
National Forest, Medford District.
Summary: EPA expressed environmental concerns with mining in the
Rough and Ready watershed because of potential impacts to water quality
and the unique ecological values of the area. The Final EIS should
disclose complete monitoring plan and mitigation plans.

Final EISs

ERP No. F-BLM-L65272-ID

Challis Land and Resource Management Plan, Implementation, Upper
Columbus--Salmon Clearwater Districts, Salmon River, Lemhi and Custer
Counties, ID.
Summary: Review of the Final EIS has been completed and the project
found to be satisfactory.

ERP No. F-GSA-C60004-NY

Governors Island Disposition of Surplus Federal Real Property,
Implementation, Upper New York Bay, NY.
Summary: EPA's review of the Final EIS have been adequately
addressed. In light of the covenants that will be set forth in the
transfer deed, EPA have concluded that the proposed project would not
result in significant adverse environmental impacts; therefore, EPA has
no objections to the implementation of the proposed project.

ERP No. F-IBR-K28018-CA

Central Valley Project, Municipal and Industrial Water Supply
Contracts under Public Law 101-514 (Section 206), Sacramento County
Water Agency and San Juan Water District, City of Folsom, Sacramento
County, CA.
Summary: EPA continues to be concerned with the probability of
additional diversions from the American river. EPA urge selection of
diversion point on the American River below the courthouse of the
American River.

ERP No. F-STA-G50007-00

Programmatic EIS--International Bridge Crossing Project,
Construction and Operation, Along the United States--Mexico Border from
EL Paso to Brownsville, TX, Presidential Permit, NM and TX.
Summary: EPA finds that the Final Programmatic EIS to be adequate
and has no objections to preferred alternative.

ERP No. FS-UMC-K24018-CA

Sewage Effluent Compliance Project, Updated and Additional
Information, Implementation, Lower Santa Margarita Basin, Marine Corps
Base Camp Pendleton, San Diego County, CA.
Summary: EPA indicated that the FSEIS adequately addressed EPA
environmental objections. EPA request that a Record of Decision (ROD)
not be made until the Navy fully evaluates a final percolation pond
study. EPA also asked the Navy to provide a detailed monitoring and
reporting program and contingency measures, for their selected
alternative, to ensure that no adverse impacts would occur to the
nearby salt marsh. EPA also commented on concerns regarding long term
health of riparian habitat and asked the Navy to acknowledge its
intent, in the ROD, to seek funding for tertiary treatment facilities.

Other

ERP No. LD-UAF-K11096-NV

Rating EO2, Nellis Air Force Range (NAFR), Renewal of the Land
Withdrawal to Provide a Safe and Secure Location to Test Equipment and
Train Military Personnel, Clark, Lincoln and Nye Counties, NV.
Summary: EPA expressed objections due to the excessively long
proposed periods between public reviews of the land withdrawal (i.e.,
indefinitely or 25 years) of the roughly 3 million acre area. EPA
requested additional information regarding impacts to ground and
surface water, hazardous materials and waste, safety, and biological
resources.

Dated: March 23, 1999.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 99-7490 Filed 3-25-99; 8:45 am]
BILLING CODE 6560-50-U

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A99-7490. Public record. Not legal advice.
