# Acquisition Regulation

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A99-7

## Record

- **Collection:** Federal Register
- **Document type:** Proposed Rule
- **Published:** January 8, 1999
- **Citation:** 64 FR 1344

## Text

SUMMARY: The Department of Health and Human Services is republishing
its acquisition regulation (HHSAR), Title 48 Code of Federal
Regulations, Chapter 3, to streamline and simplify it in accordance
with the tenets of the National Performance Review. In doing so, the
Department believes it has eliminated some procedural guidance which is
too encumbering for a simplified system while attempting to empower the
appropriate levels of management and contracting personnel with the
authorities required for them to successfully accomplish their mission
with the least amount of resistance and oversight.

DATES: Comments must be received by March 9, 1999.

ADDRESSES: Comments should be sent to Mr. E. S. Lanham, Office of
Acquisition Management, 200 Independence Avenue, Southwest--Room 517 D,
Washington, D.C. 20201.

FOR FURTHER INFORMATION CONTACT: E. S. Lanham, Office of Acquisition
Management, telephone (202) 690-7590.

SUPPLEMENTARY INFORMATION: The Department emphasizes that it is not
making significant amendments to the existing HHSAR. The amendments
being made to the HHSAR concern internal procedural matters which are
administrative in nature, and will not have a major effect on the
general public, or to contractors or offerors of the Department. The
majority of the amendments eliminate procedural guidance no longer
deemed necessary, or change contracting review and approval authorities
to situate them at levels more appropriate to simplification,
streamlining, and empowerment. The Department has also updated HHSAR to
bring it in line with the latest amendments made to the Federal
Acquisition Regulation (FAR).
The Department of Health and Human Services certifies this document
will not have a significant economic effect on a substantial number of
small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et
seq.); therefore, no regulatory flexibility statement has been
prepared. Since this rule conveys existing acquisition policies or
procedures and does not promulgate any new policies or procedures which
would impact the public, it has been determined that this rule will not
have a significant economic effect on a substantial number of small
entities, and, thus, a regulatory flexibility analysis was not
performed.
Furthermore, this document does not contain new information
collection requirements needing approval by the Office of Management
and Budget under the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et
seq.). Existing approvals cited in 48 CFR section 301.106 remain in
effect. The provisions of this regulation are issued under 5 U.S.C.
301; 40 U.S.C. 486 (c).

List of Subjects in 48 CFR Chapter 3

Government procurement.

Under the authority of 5 U.S.C. 301; 40 U.S.C. 486(c), the
Department of Health and Human Services revises 48 CFR Chapter 3 as set
forth below.

Dated: November 24, 1998.
John J. Callahan,
Assistant Secretary for Management and Budget.

CHAPTER 3--HEALTH AND HUMAN SERVICES

Table of Contents

Subchapter A--General

Part

301--HHS Acquisition Regulation System
302--Definitions of Words and Terms
303--Improper Business Practices and Personal Conflicts of Interest
304--Administrative Matters

Subchapter B--Competition and Acquisition Planning

305--Publicizing Contract Actions
306--Competition Requirements
307--Acquisition Planning
309--Contractor Qualifications

Subchapter C--Contracting Methods and Contract Types

313--Simplified Acquisition Procedures
314--Sealed Bidding
315--Contracting by Negotiation
316--Types of Contracts
317--Special Contracting Methods

Subchapter D--Socioeconomic Programs

319--Small Business Programs
323--Environment, Conservation, Occupational Safety, and Drug-Free
Workplace
324--Protection of Privacy and Freedom of Information
325--Foreign Acquisition

Subchapter E--General Contracting Requirements

328--Bonds and Insurance
330--Cost Accounting Standards Administration
332--Contract Financing
333--Protests, Disputes, and Appeals

Subchapter F--Special Categories of Contracting

334--Major System Acquisition
335--Research and Development Contracting

Subchapter G--Contract Management

342--Contract Administration

Subchapter H--Clauses and Forms

352--Solicitation Provisions and Contract Clauses
353--Forms

Subchapter T--HHS Supplementations

370--Special Programs Affecting Acquisition

SUBCHAPTER A--GENERAL

PART 301--HHS ACQUISITION REGULATION SYSTEM

Subpart 301.1--Purpose, Authority, Issuance

Sec.
301.101 Purpose.
301.103 Authority.
301.106 OMB approval under the Paperwork Reduction Act.

Subpart 301.2--Administration

301.270 Executive Committee for Acquisition.

Subpart 301.4--Deviations from the FAR

301.403 Individual deviations.
301.404 Class deviations.
301.470 Procedure.

Subpart 301.6--Career Development, Contracting Authority, and
Responsibilities

301.602 Contracting officers.
301.602-3 Ratification of unauthorized commitments.
301.603 Selection, appointment, and termination of appointment.
301.603-1 General.
301.603-2 Selection.
301.603-3 Appointment.
301.603-4 Termination.
301.603-70 Delegation of contracting officer responsibilities.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 301.1--Purpose, Authority, Issuance

301.101 Purpose.

(a) The Department of Health and Human Services Acquisition
Regulation (HHSAR) is issued to establish uniform acquisition policies
and procedures for the Department of Health and Human Services (HHS)
which conform to the Federal Acquisition Regulation (FAR) System.
(b) The HHSAR implements and supplements the FAR. (Implementing
material expands upon or indicates the manner of compliance with
related FAR material. Supplementing material is new material which has
no counterpart in the FAR.)

[[Page 1345]]

(c) The HHSAR contains all formal departmental policies and
procedures that govern the acquisition process or otherwise control
contracting relationships between the Department's contracting offices
and contractors.

301.103 Authority.

(b) The HHSAR is prescribed by the Assistant Secretary for
Management and Budget under the authority of 5 U.S.C. 301 and Section
205 (c) of the Federal Property and Administrative Services Act of
1949, as amended (40 U.S.C. 486(c)), as delegated by the Secretary.
(c) The HHSAR is issued in the Code of Federal Regulations (CFR) as
Chapter 3 of Title 48, Department of Health and Human Services
Acquisition Regulation. It may be referenced as ``48 CFR Chapter 3.''

301.106 OMB approval under the Paperwork Reduction Act.

The following OMB control numbers apply to the information
collection and record keeping requirements contained in this
regulation:

------------------------------------------------------------------------
OMB control
HHSAR segment No.
------------------------------------------------------------------------
315.4...................................................... 0990-0139
324.70..................................................... 0990-0136
342.7101................................................... 0990-0131
352.224-70................................................. 0990-0136
352.233-70................................................. 0990-0133
352.270-1.................................................. 0990-0129
352.270-2.................................................. 0990-0129
352.270-3.................................................. 0990-0129
352.270-5.................................................. 0990-0130
370.1...................................................... 0990-0129
370.2...................................................... 0990-0129
------------------------------------------------------------------------

The OMB control number ``OMB No. 0990-0115'' is to be included in
the upper right corner of the first page of all solicitations, purchase
orders, and contracts issued by departmental contracting activities.
The number represents approval of the HHS acquisition process and
covers record keeping and reporting requirements which are unique to
individual acquisitions (e.g., requirements contained in
specifications, statements of work, etc.).

Subpart 301.2--Administration

301.270 Executive Committee for Acquisition.

(a) The Deputy Assistant Secretary for Grants and Acquisition
Management has established the Executive Committee for Acquisition
(ECA) to assist and facilitate the planning and development of
departmental acquisition policies and procedures and to assist in
responding to other agencies and organizations concerning policies and
procedures impacting the Federal acquisition process.
(b) The ECA consists of members and alternates from the Office of
Acquisition Management, Administration for Children and Families,
Health Care Financing Administration, Program Support Center, Centers
for Disease Control and Prevention, Food and Drug Administration,
Health Resources and Services Administration, Indian Health Service,
National Institutes of Health, and Substance Abuse and Mental Health
Services Administration. The ECA is chaired by the Director, Office of
Acquisition Management. All meetings will be held at the call of the
Chairman, and all activities will be carried out under to direction of
the Chairman.
(c) The ECA, to facilitate the planning, development, and
coordination of governmentwide and departmentwide acquisition policies
and procedures, is to:
(1) Advise and assist the Chairman concerning major acquisition
policy matters;
(2) Review and appraise, at appropriate intervals, the overall
effectiveness of existing policies and procedures; and
(3) Review and appraise the impact of new major acquisition
policies, procedures, regulations, and development on current
acquisition policies and procedures.
(d) The Chairman will periodically issue a list of current members
and alternates specifying the name, title, organization, address, and
telephone number of each. The member organizations are responsible for
apprising the Chairman whenever a new member or alternate is to be
appointed to the ECA.

Subpart 301.4--Deviations from the FAR

301.403 Individual deviations.

Requests for individual deviations to either the FAR or HHSAR shall
be prepared in accordance with 301.470 and forwarded through
administrative channels to the Director, Office of Acquisition
Management for review and approval.

301.404 Class deviations.

Requests for class deviations to either the FAR or HHSAR shall be
prepared in accordance with 301.470 and forwarded through
administrative channels to the Deputy Assistant Secretary for Grants
and Acquisition Management for review and approval.

301.470 Procedure.

(a) When a contracting office determines that a deviation is
needed, it shall prepare a deviation request in memorandum form and
forward it through administrative channels to the official designated
in 301.403 or 301.404. In an exigency situation, the contracting office
may request a deviation verbally, through normal acquisition channels,
but is required to confirm the request in writing as soon as possible.
(b) A deviation request shall clearly and precisely set forth the:
(1) Nature of the needed deviation;
(2) Identification of the FAR or HHSAR citation from which the
deviation is needed;
(3) Circumstances under which the deviation would be used;
(4) Intended effect of the deviation;
(5) Time-frame; and
(6) Reasons which will contribute to complete understanding and
support of the requested deviation. A copy of pertinent background
papers such as a form or contractor's request should accompany the
deviation request.

Subpart 301.6--Career Development, Contracting Authority, and
Responsibilities

301.602 Contracting officers.

301.602-3 Ratification of unauthorized commitments.

(b) Policy. (1) The Government is not bound by agreements or
contractual commitments made to prospective contractors by persons to
whom contracting authority has not been delegated. However, execution
of otherwise proper contracts made by individuals without contracting
authority, or by contracting officers in excess of the limits of their
delegated authority, may be later ratified. The ratification must be in
the form of a written document clearly stating that ratification of a
previously unauthorized act is intended and must be signed by the head
of the contracting activity (HCA).
(2) The HCA is the official authorized to ratify an unauthorized
commitment (but see (b)(3) of this section).
(3) Ratification authority for actions up to $25,000 may be
redelegated by the HCA to the chief of the contracting office (CCO). No
other redelegations are authorized.
(c) Limitations. (5) The concurrence of legal counsel concerning
the payment issue is optional.
(e) Procedures. (1) The individual who made the unauthorized
contractual commitment shall furnish the reviewing contracting officer
all records and documents concerning the commitment and a complete
written statement of facts, including, but not limited to: a

[[Page 1346]]

statement as to why the contracting office was not used, a statement as
to why the proposed contractor was selected, a list of other sources
considered, a description of work to be performed or products to be
furnished, the estimated or agreed contract price, a citation of the
appropriation available, and a statement whether the contractor has
commenced performance.
(2) The contracting officer will review the submitted material, and
prepare the ratification document if he/she determines that the
commitment may be ratifiable. The contracting officer shall forward the
ratification document and the submitted material to the HCA or CCO with
any comments or information which should be considered in evaluation of
the request for ratification. If legal review is desirable, the HCA or
CCO will coordinate the request for ratification with the Office of
General Counsel, Business and Administrative Law Division.
(3) If ratification is authorized by the HCA or CCO, the file will
be returned, along with the ratification document, to the contracting
officer for issuance of a purchase order or contract, as appropriate.

301.603 Selection, appointment, and termination of appointment.

301.603-1 General.

(a) The appointment and termination of appointment of contracting
officers shall be made by the head of the contracting activity (HCA).
This authority is not delegable.
(b) The contracting officer appointment document for personnel in
the GS-1101, 1102, and 1105 series, as well as personnel in any other
series who will obligate the Government to the expenditure of funds in
excess of the micro-purchase threshold, shall be the Standard Form
(SF)--1402, Certificate of Appointment. The HCA may determine an
alternative appointment document for appointments below that threshold.
Changes to appointments shall be made by issuing a new appointment
document. Each appointment document shall be prepared and maintained in
accordance with FAR 1.603-1 and shall state the limits of the
individual's authority.
(c) An individual must be certified under the HHS Acquisition
Certification Program as a prerequisite to being appointed as a
contracting officer with authority to obligate funds in excess of the
micro-purchase threshold (see 301.603-3(a)). The HCA will determine and
require appropriate training for individuals appointed as contracting
officers at lower dollar levels. An individual shall be appointed as a
contracting officer only in instances where a valid organizational need
can be demonstrated. Factors to be considered in assessing the need for
an appointment of a contracting officer include volume of actions,
complexity of work, and structure of the organization.

301.603-2 Selection.

Nominations for appointment of contracting officers shall be
submitted to the HCA through appropriate organizational channels for
review. The nomination package, which is usually initiated by the
prospective contracting officer's immediate supervisor, shall normally
include the nominee's current personal qualifications statement or job
history, including the information required by FAR 1.603-2, a copy of
his/her most recent performance appraisal, and a copy of the
certificate issued under the HHS Acquisition Certification Program
indicating the nominee's current certification level, if applicable.
The HCA will determine the documentation required, consistent with FAR
1.603-2, when the resulting appointment and authority will not exceed
the micro-purchase threshold.

301.603-3 Appointment.

(a) Contracting officer appointments shall be made at levels
commensurate with nominees' certification levels as follows:
(1) Level I--Purchasing Agent--Required for all personnel in the
GS-1102 and 1105 series having signature authority for simplified
acquisitions, including orders from GSA sources over the micro-purchase
threshold.
(2) Level II--Acquisition Official--Required for all personnel in
the GS-1102 series. Sufficient for delegation of contracting officer
authority up to $500,000.
(3) Level III--Senior Acquisition Official--Required for all
personnel in the GS-1102 series for delegation of contracting officer
authority above $500,000.
(4) Level IV--Acquisition Manager--Required for delegation of
preaward review and approval authority as specified in Subpart 304.71.
(b) If it is essential to appoint an individual who does not fully
meet the certification requirements of this section for the contracting
officer authority sought, an interim appointment may be granted by the
HCA. Interim appointments may not exceed one (1) year in total, and
shall not be granted unless the individual can meet the certification
requirements within one year from the date of appointment. If the
certification requirements are not met by that date, the appointment
will automatically terminate and cannot be renewed.

301.603-4 Termination.

Termination of contracting officer appointments shall be
accomplished in accordance with FAR 1.603-4.

301.603-70 Delegation of contracting officer responsibilities.

(a) Contracting officer responsibilities which do not involve the
obligation (or deobligation) of funds or result in establishing or
modifying contractual provisions may be delegated by the contracting
officer by means of a written memorandum which clearly delineates the
delegation and its limits.
(b) Contracting officers may designate individuals as ordering
officials to make purchases or place orders under blanket purchase
agreements, indefinite delivery contracts, or other pre-established
mechanisms. Ordering officials, including those under NIH's DELPRO, are
not contracting officers.
(c) Project officers are required to complete the training
specified in 307.170, while ordering officials and others should
receive sufficient instruction from the contracting officer to ensure
the appropriate exercise of the responsibilities and knowledge of their
limitations.

PART 302--DEFINITIONS OF WORDS AND TERMS

Subpart 302.1--Definitions

Sec.
302.101 Definitions.

Subpart 302.2--Definitions Clause

302.201 Contract clause.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 302.1--Definitions

302.101 Definitions.

Chief of the contracting office (CCO) is a mid-level management
official in charge of a contracting office who controls and oversees
the daily contracting operation of an Operating Division (OPDIV) or
major component of an OPDIV. The CCO is subordinate to the head of the
contracting activity, and is located at a management level above other
contracting personnel, usually as a branch chief or division director.
Head of the agency or agency head, unless otherwise specified,
means the head of the Operating Division (OPDIV) for ACF, HCFA, PSC,
CDCP, FDA, HRSA, IHS, NIH, and SAMHSA, or the Assistant Secretary for
Management and Budget (ASMB) for the Office of the Secretary (OS).

[[Page 1347]]

Head of the contracting activity (HCA) is defined in terms of
certain organizational positions within the Office of Grants and
Acquisition Management (OGAM), Administration for Children and Families
(ACF), Health Care Financing Administration (HCFA), Program Support
Center (PSC), Centers for Disease Control and Prevention (CDCP), Food
and Drug Administration (FDA), Health Resources and Services
Administration (HRSA), Indian Health Service (IHS), National Institutes
of Health (NIH), and Substance Abuse and Metal Health Services
Administration (SAMHSA), as follows:

OGAM-OS--Director, Office of Acquisition Management
ACF--Director, Division of Acquisition Management
HCFA--Director, Office of Acquisition and Grants
PSC--Director, Division of Acquisition Management
CDCP--Director, Procurement and Grants Office
FDA--Director, Office of Facilities, Acquisition, and Central Services
HRSA--Director, Division of Grants and Procurement Management
IHS--Director, Division of Contracts and Grants Policy
NIH--Director, Office of Contracts and Grants Management
SAMHSA--Director, Division of Contracts Management

In addition, the Deputy Assistant Secretary for Grants and
Acquisition Management (DASGAM) is designated as an HCA. Each HCA is
responsible for conducting an effective and efficient acquisition
program. Adequate controls shall be established to assure compliance
with applicable laws, regulations, procedures, and the dictates of good
management practices. Periodic reviews shall be conducted and evaluated
by qualified personnel, preferably assigned to positions other than in
the contracting office being reviewed, to determine the extent of
adherence to prescribed policies and regulations, and to detect a need
for guidance and/or training. The HCA shall be certified, or be
certifiable, at Level IV of the HHS Acquisition Certification Program.
Individuals appointed as HCA's who do not meet the Level IV
requirements shall have one year from the date of appointment to obtain
Level IV certification. The heads of contracting activities may
redelegate their HCA authorities to the extent that redelegation is not
prohibited by the terms of their respective delegations of authority,
by law, by the Federal Acquisition Regulation, by the HHS Acquisition
Regulation, or by other regulations. However, HCA and other contracting
approvals and authorities shall not be redelegated below the levels
specified in the HHS Acquisition Regulation or, in the absence of
coverage in the HHS Acquisition Regulation, the Federal Acquisition
Regulation. To ensure proper control of redelegated acquisition
authorities, HCA's shall maintain a file containing successive
delegations of HCA authority through and including the contracting
officer level. Personnel delegated responsibility for acquisition
functions must possess a level of experience, training, and ability
commensurate with the complexity and magnitude of the acquisition
actions involved.

Subpart 302.2--Definitions Clause

302.201 Contract clause.

The FAR clause, Definitions, at 52.202-1 shall be used as
prescribed in FAR 2.201, except as follows:
(a) Paragraph (a) at 352.202-1 shall be used in place of paragraph
(a) of the FAR clause.
(b) Paragraph (h), or its alternate, at 352.202-1 shall be added to
the end of the FAR clause. Use paragraph (h) when a fixed-priced
contract is anticipated; use the alternate to paragraph (h) when a
cost-reimbursement contract is anticipated.

PART 303--IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF
INTEREST

Subpart 303.1--Safeguards

Sec.
303.101 Standards of conduct.
303.101-3 Agency regulations.

Subpart 303.2--Contract Gratuities to Government Personnel

303.203 Reporting suspected violations of the Gratuities clause.

Subpart 303.3--Reports of Suspected Antitrust Violations

303.303 Reporting suspected antitrust violations.

Subpart 303.4--Contingent Fees

303.405 Misrepresentations or violations of the Covenant Against
Contingent Fees.

Subpart 303.6--Contracts With Government Employees or Organizations
Owned or Controlled by Them

303.602 Exceptions.

Subpart 303.7--Voiding and Rescinding Contracts

303.704 Policy.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 303.1--Safeguards

301.101 Standards of conduct.

303.101-3 Agency regulations.

The Department of Health and Human Services' Standards of Conduct
are prescribed in Part 73 of Title 45.

Subpart 303.2--Contractor Gratuities to Government Personnel

303.203 Reporting suspected violations of the Gratuities clause.

Departmental personnel shall report suspected violations of the
Gratuities clause in accordance with Subpart M, Reporting Violations,
of 45 CFR Part 73. Refer to Subpart B, Gifts from Outside Sources, (5
CFR 2635.201) for an explanation regarding what is prohibited and what
is permitted.

Subpart 303.3--Reports of Suspected Antitrust Violations

303.303 Reporting suspected antitrust violations.

A copy of each report of suspected antitrust violations submitted
to the Attorney General by the HCA shall also be submitted to the
Director, Office of Acquisition Management.

Subpart 303.4--Contingent Fees

303.405 Misrepresentations or violations of the Covenant Against
Contingent Fees.

(c) Reports shall be made promptly to the contracting officer.
(d)(4) Suspected fraudulent or criminal matters to be reported to
the Department of Justice shall be prepared in letter format and
forwarded through acquisition channels to the head of the contracting
activity for signature. The letter must contain all pertinent facts and
background information considered by the contracting officer and chief
of the contracting office that led to the decision that fraudulent or
criminal matters may be present. A copy of the signed letter shall be
sent to the Director, Office of Acquisition Management.

Subpart 303.6--Contracts With Government Employees or Organizations
Owned or Controlled by Them

303.602 Exceptions.

Approval of an exception to the policy stated in FAR 3.601 shall be
made by the HCA (not delegable).

Subpart 303.7--Voiding and Rescinding Contracts

303.704 Policy.

For purposes of implementing FAR Subpart 3.7, the authorities
granted to

[[Page 1348]]

the ``agency head or designee'' shall be exercised by the HCA (not
delegable).

PART 304--ADMINISTRATIVE MATTERS

Subpart 304.6--Contract Reporting

Sec.
304.602 Federal Procurement Data System.

Subpart 304.8--Government Contract Files

304.804-70 Contract closeout audits.

Subpart 304.70--Acquisition Instrument Identification Numbering System

304.7000 Scope of subpart.
304.7001 Numbering acquisitions.

Subpart 304.71--Review and Approval of Proposed Contract Awards

304.7100 Policy.
304.7101 Procedures.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 304.6--Contracting Reporting

304.602 Federal Procurement Data System (FPDS).

The Departmental Contracts Information System (DCIS) represents the
Department's implementation of the FPDS. All departmental contracting
activities are required to participate in the DCIS and follow the
procedures stated in the Enhanced Departmental Contracts Information
System Manual and amendments to it. The HCA (not delegable) shall
ensure that all required contract information is collected, submitted,
and received into the DCIS on or before the 15th of each month for all
appropriate contract and contract modifications award of the prior
month.

Subpart 304.8--Government Contract Files

304.804-70 Contract closeout audits.

(a) Contracting officers shall rely, to the maximum extent
possible, on non-Federal single audits to close physically completed
cost-reimbursement contracts with colleges and universities, hospitals,
non-profit firms, and State and local governments. In addition, where
appropriate, a sample of these contractors may be selected for audit,
in accordance with the decision-making process set forth in the
following paragraph (b).
(b) Contracting officers shall request contract closeout audits on
physically completed, cost-reimbursement, for-profit contracts as
follows:
(1) Decisions on: the need for and allocation of contract audit
resources and services; the selection of contracts or contractors to be
audited; the identification of the audit agency to perform the audit;
and the type or scope of closeout audit to be conducted, shall be made
by the Office of Inspector General (OIG) and Office of Grants and
Acquisition Management, in consultation with the Department's Contract
Audit Users Work Group. These decisions shall be based upon the needs
of the customer, risk analysis, return on investment, and the
availability of audit resources. When an audit is warranted prior to
closing a contract, the contracting officer shall submit the audit
request to the OIG's Office of Audit via the appropriate OPDIV
representative on the Contract Audit Users Work Group.
(2) Except where a contracting officer suspects misrepresentation
or fraud, contract closeout field audits shall not be requested if the
cost of performance is likely to exceed the potential cost recovery.
Contracts that are not selected for a field audit may be closed on the
basis of a desk review, subject to any later on-site audit findings.
The release executed by the contractor shall contain the following
statement:

The Contractor agrees, pursuant to the clause in this contract
entitled ``Allowable Cost'' or ``Allowable Cost and Fixed Fee'' (as
appropriate), that the amount of any sustained audit exceptions
resulting from any audit made after final payment shall be refunded
to the Government.''

Subpart 304.70--Acquisition Instrument Identification Numbering
System

304.7000 Scope of subpart.

This subpart prescribes policy and procedures for assigning
identifying numbers to contracts and related instruments, including
solicitation documents, purchase orders, and delivery orders. The HCA
(not delegable) is responsible for establishing the numbering system
within the OPDIV.

304.7001 Numbering acquisitions.

(a) Acquisitions which require numbering. The following
acquisitions shall be numbered in accordance with the system prescribed
in paragraph (b) of this section:
(1) Contracts, including letter contracts and task orders under
basis ordering agreements, which involve the payment of $2,500 or more
for the acquisition of personal property or nonpersonal services. (The
number assigned to a letter contract shall be assigned to the
superseding definitized contract).
(2) Contracts which involve the payment of $2,000 or more for
construction (including renovation or alteration).
(3) Contracts which involve more than one payment regardless of
amount.
(4) Requests for proposals and invitations for bids.
(5) Purchase and delivery orders.
(6) Requests for quotations.
(7) Basic ordering agreements.
(b) Numbering system for contracts. All contracts which require
numbering shall be assigned a number consisting of the following:
(1) The three digit identification code assigned to the contracting
office by the Office of Financial Operations, Program Support Center.
(2) A two digit fiscal year designation; and
(3) A four digit serial number. For example, the initial contract
executed by the Office of Acquisition Management, OS, for fiscal year
1996 would be numbered 100-96-0001. While it is required that a
different series of four digit serial numbers be used for each fiscal
year, serial numbers assigned need not be sequential.
(c) Numbering system for other acquisitions. The HCA is responsible
for developing a numbering system for the acquisitions other than
contracts listed in HHSAR 304.7001 (a)(4) through (a)(7), and any other
types of acquisitions that may be used.
(d) Assignment of identification codes. Each contracting office of
the Department shall be assigned a three digit identification code by
the Office of Financial Operations. Requests for the assignment of
codes for newly established contracting offices shall be submitted by
the headquarters acquisition staff office of the contracting activity
to the Office of Financial Operations must be notified. A listing of
the contracting office identification codes currently in use is
contained in the Enhanced Departmental Contracts Information System
Manual.

Subpart 304.71--Review and Approval of Proposed Contract Awards

304.7100 Policy.

This subpart requires each HCA (not delegable) to establish review
and approval procedures for proposed contracts actions to ensure that:
(a) Contract awards are in conformance with law, established
policies and procedures, and sound business practices;
(b) Contractual documents properly reflect the mutual understanding
of the parties; and
(c) The contracting officer is informed of deficiencies and items
of questionable acceptability, and corrective action is taken.

304.7101 Procedures.

(a) All contractual documents, regardless of dollar value, are to
be

[[Page 1349]]

reviewed by the contracting officer prior to award.
(b) The HCA is responsible for establishing review and approval
procedures and designating acquisition officials to serve as reviewers.
Each HCA is responsible for determining the criterion (criteria) to be
used in determining which contracts are to be reviewed, and that a
sampling of proposed contracts not included in the ``to be reviewed''
group are reviewed and approved.
(c) Officials assigned responsibility for review and approval of
contract actions must possess qualifications in the field of
acquisition commensurate with the level of review performed, and, at a
minimum, possess those acquisition skills expected of a contracting
officer. However, if any official is to serve as the contracting
officer and sign the contractual document, the review and approval
function shall be performed by an appropriate official at least one
level above.

PART 305--PUBLICIZING CONTRACT ACTIONS

Subpart 305.2--Synopsis of Proposed Contract Actions

Sec.
305.202 Exceptions.

Subpart 305.3--Synopsis of Contract Awards

305.303 Announcement of contract awards.

Subpart 305.5--Paid Advertisements

305.502 Authority.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 305.2--Synopsis of Proposed Contract Actions

305.202 Exceptions.

(b) When a contracting office believes that it has a situation
where advance notice is not appropriate or reasonable, it shall prepare
a memorandum citing all pertinent facts and details and send it,
through normal acquisition channels, to the Deputy Assistant Secretary
for Grants and Acquisition Management (DASGAM) requesting relief from
synopsizing. The DASGAM shall review the request and decide whether an
exception to synopsizing is appropriate or reasonable. If it is, the
DASGAM shall take the necessary coordinating actions required by FAR
5.202(b). Whatever the decision is on the request, the DASGAM shall
promptly notify the contracting office when a determination has been
made.

Subpart 305.3--Synopses of Contract Awards

305.303 Announcement of contract awards.

(a) Public announcement. Any contract, contract modification, or
delivery order in the amount of $3 million or more shall be reported by
the contracting officer to the Office of the Deputy Assistant Secretary
for Legislation (Congressional Liaison), Room 406G, Hubert H. Humphrey
Building. Notification shall be accomplished by providing a copy of the
contract or award document face page to the referenced office prior to
the day of award, or in sufficient time to allow for an announcement to
be made by 5:00 p.m. Washington, DC time on the day of award.

Subpart 305.5--Paid Advertisements

305.502 Authority.

The contracting officer is authorized to publish advertisements,
notices, and contract proposals in newspapers and periodicals in
accordance with the requirements and conditions referenced in FAR
Subpart 5.5.

PART 306--COMPETITION REQUIREMENTS

Subpart 306.2--Full and Open Competition After Exclusion of Sources

Sec.
306.202 Establishing or maintaining alternative sources.

Subpart 306.3--Other Than Full and Open Competition

306.302 Circumstances permitting other than full and open
competition.
306.302-1 Only one responsible source and no other supplies or
services will satisfy agency requirements.
306.302-7 Public interest.
306.303 Justification.
306.303-1 Requirements
306.303-2 Content.
306.304 Approval of the justification.

Subpart 306.5--Competition Advocates

306.501 Requirement.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 306.2--Full and Open Competition After Exclusion of Sources

306.202 Establishing or maintaining alternative sources.

(a) The reference to the agency head in FAR 6.202(a) shall mean the
appropriate competition advocate cited in 306.501.
(b)(1) The required determination and findings (D&F) shall be
prepared by the contracting officer based on the data provided by
program personnel, and shall be signed by the appropriate competition
advocate. The D&F signatory is not delegable.

Subpart 306.3--Other Than Full and Open Competition

306.302 Circumstances permitting other than full and open competition.

306.302-1 Only one responsible source and no other supplies or
services will satisfy agency requirements.

(a)(2)(ii) Follow-on contracts for the continuation of major
research and development studies on long-term social and health
programs, major research studies, or clinical trials may be deemed to
be available only from the original source when it is likely that award
to any other source would result in unacceptable delays in fulfilling
the Department's or OPDIV's requirements.
(b) Application. (4) When the head of the program office has
determined that a specific item of technical equipment or parts must be
obtained to meet the activity's program responsibility to test and
evacuate certain kinds and types of products, and only one source is
available. (This criterion is limited to testing and evaluation
purposes only and may not be used for initial outfitting or repetitive
acquisitions. Project officers should support the use of this criterion
with citations from their agency's legislation and the technical
rationale for the item of equipment required.)

306.302-7 Public interest.

(a) Authority. (2) Agency head, in this instance, means the
Secretary.
(b) Limitations. An ``approval package'' must be prepared by the
contracting officer and staffed through departmental acquisition
channels to the Secretary. The package shall include a determination
and findings for the Secretary to sign that contains all pertinent
information to support justification for exercising the exemption to
competition, and a letter for the Secretary to sign notifying Congress
of the determination to award a contract under the authority of 41
U.S.C. 253(c)(7).

306.303 Justifications.

306.303-1 Requirements.

(b) Preliminary arrangements or agreements with the proposed
contractor shall have no effect on the rationale used to support an
acquisition for other than full and open competition.
(f) When a program office desires to obtain certain goods or
services by contract without full and open competition, it shall, at
the time of

[[Page 1350]]

forwarding the requisition or request for contract, furnish the
contracting office a justification explaining why full and open
competition is not feasible. All justifications shall be initially
reviewed by the contracting officer.
(1) Justifications in excess of the simplified acquisition
threshold shall be in the form of a separate, self-contained document,
prepared in accordance with FAR 6.303 and 306.303, and called a
``JOFOC'' (Justification for Other Than Full and Open Competition).
Justifications at or below the simplified acquisition threshold may be
in the form of a paragraph or paragraphs contained in the requisition
or request for contract.
(2) Justifications, whether over or under the simplified
acquisition threshold, shall fully describe what is to be acquired,
offer reasons which go beyond inconvenience, and explain why it is not
feasible to obtain competition. The justifications shall be supported
by verifiable facts rather than mere opinions. Documentation in the
justification should be sufficient to permit an individual with
technical competence in the area to follow the rationale.

306.303-2 Content.

(a)(1) The program office and name, address, and telephone number
of the project officer shall also be included.
(2) This item shall include project identification such as the
authorizing program legislation, to include citations or other internal
program identification data such as title, contract number, etc.
(3) The description may be in the form of a statement of work,
purchase description, or specification. A statement is to be included
to explain whether the acquisition is an entity in itself, whether it
is one in a series, or part of a related group of acquisitions.
(c) Each JOFOC shall conclude with at least signature lines for the
project officer, project officer's immediate supervisor, contracting
officer, and approving official.

306.304 Approval of the Justification.

(a)(2) The competition advocates are listed in 306.501. This
authority is not delegable.
(3) The competition advocate shall exercise this approval
authority, except where the individual designated as the competition
advocate does not meet the requirements of FAR 6.304(a)(3)(ii). This
authority is not delegable.
(4) The senior procurement executive of the Department is the
Assistant Secretary for Management and Budget.
(c) A class justification shall be processed the same as an
individual justification.

Subpart 306.5--Competition Advocates

306.501 Requirement.

The Department's competition advocate is the Deputy Assistant
Secretary for Grants and Acquisition Management. The competition
advocates for the Department's primary contracting officers are as
follows:

ACF--Director, Office of Management Services
HCFA--Associate Administrator for Operations and Resource Management
OS--Deputy Assistant Secretary for Grants and Acquisition Management
PSC--Director, Administrative Services Center
AHCPR--Executive Officer
CDCP--Director, Office of Program Support
FDA--Associate Commissioner for Management
HRSA--Associate Administrator for Operations and Management
IHS--Associate Director, Office of Administration and Management
NIH--(R&D)--Associate Director for Extramural Affairs (Other than
R&D)--Associate Director for Intramural Affairs
SAMHSA--Associate Administrator for Management

PART 307--ACQUISITION PLANNING

Subpart 307.1--Acquisition Plans

Sec.
307.104 General procedures.
307.105 Contents of written acquisition plans.
307.170 Program training requirements.
307.170-1 Policy exceptions.
307.170-2 Training course prerequisites.

Subpart 307.3--Contractor Versus Government Performance

307.302 General.
307.303 Determining availability of private commercial sources.
307.304 Procedures.
307.307 Appeals.

Subpart 307.70--Considerations in Selecting an Award Instrument

307.7000 Scope of subpart.
307.7001 Distinction between acquisition and assistance.
307.7002 Procedures.

Subpart 307.71--Requests for Contract

307.7100 Scope of subpart.
307.7101 General.
307.7102 Procedures.
307.7103 Responsibilities.
307.7104 Transmittal.
307.7105 Format and content.
307.7106 Statement of work.
307.7107 Review.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 307.1--Acquisition Planning

307.104 General procedures.

(c) If use of other than full and open competition is anticipated,
see 307.104(h).
(d) Each contracting activity shall prepare an Annual Acquisition
Plan (AAP). The AAP is a macro plan, containing a list of anticipated
contract actions over the simplified acquisition threshold and their
associated funding, as well as the aggregate planned dollars for
simplified acquisitions by quarter, developed for each fiscal year. The
AAP shall conform to reasonable budget expectations and shall be
reviewed at least quarterly and modified as appropriate. The chief of
the contracting office (CCO) shall obtain this information from the
program planning/budget office of the contracting activity and use the
AAP to provide necessary reports and monitor the workload of the
contracting office. For contract actions, the plan shall contain, at a
minimum:
(1) A brief description (descriptive title, perhaps one or two
sentences if necessary);
(2) Estimated award amount;
(3) Requested award date;
(4) Name and phone number of contact person (usually the project
officer);
(5) Other information required for OPDIV needs.
(e) Once the AAP is obtained, the contracting officer/contract
specialist shall initiate discussions with the assigned project officer
for each planned negotiated acquisition over $100,000 except for:
(1) Acquisitions made under interagency agreements, and
(2) Contract modifications which exercise options, make changes
authorized by the Changes clause, or add funds to an incrementally
funded contract. (The HCA may prescribe procedures for contract actions
not covered by this subpart.)
(f) The purpose of the discussions between the contracting and
project officers is to develop an individual acquisition planning
schedule and to address the things that will need to be covered in the
request for contract (RFC), including clearances, acquisition strategy,
sources, etc. The project officer must either have a statement of work
(SOW) ready at this time or must discuss in more detail the nature of
the services/supplies that will be required.
(g) Standard lead-times for processing various types of
acquisitions and deadlines for submission of acceptable RFCs (that is,
RFCs which include all

[[Page 1351]]

required elements such as clearances, funding documents, and an
acceptable SOW) for award in a given fiscal year shall be established
by the HCA or designee not lower that the CCO.
(h) The outcome of the discussions referenced in 307.104 (f)
between the project officer and the contracting officer/contracting
specialist will be an agreement concerning the dates of significant
transaction-specific acquisition milestones, including the date of
submission of the RFC to the contracting officer. This milestone
schedule document will be prepared with those dates and will be signed
by the project officer and the contracting officer. The milestones
cannot be revised except by mutual agreement of these same individuals.
If the planning schedule indicates the need to obtain approval of a
Justification for Other than Full and Open Competition, the CCO must
sign the milestone agreement. This document shall be retained in the
contract file. All other considerations that will affect the
acquisition (technical, business, management) shall be addressed in the
RFC (see 307.71).
(A) RFCs submitted after the established deadline in paragraph (g)
of this section or the agreed-upon milestone for RFC submission in
paragraph (h) of this section will be accepted for processing on a
case-by-case basis.

307.105 Contents of written acquisition plans.

The written acquisition plan required by FAR 7.105 is contained in
the request for contract, as specified in Subpart 307.71, and is the
final product of the planning process.

307.170 Program training requirements.

(a) All program personnel selected to serve as project officer for
an HHS contract shall have successfully completed either the
Department's appropriate ``Basic Project Officer'' course, or an
equivalent course (see paragraph (c) of this section).
(b) At least fifty percent of the HHS program personnel performing
the function of technical proposal evaluator on a technical evaluation
team or panel for any competitively solicited HHS contract shall have
successfully completed the appropriate ``Basic Project Officer''
course, or an equivalent course (see paragraph (c) of this section).
This requirement applies to the initial technical proposal evaluation
and any subsequent technical evaluations that may be required.
(c) Determination of course equivalency shall be made by the HCA
(not delegable) of the cognizant contracting activity. The contracting
officer is responsible for ensuring that the project officer and
technical proposal evaluators have successfully completed the required
training discussed in 307.170-2.

307.170-1 Policy exceptions.

In the event there is an urgent requirement for a specific
individual to serve as a project officer and that individual has not
successfully completed the prerequisite training course, the HCA (not
delegable) may waive the training requirement and authorize the
individual to perform the project duties, provided that:
(a) The individual first meets with the cognizant contracting
officer to review the ``DHHS Project Officers' Contracting Handbook,''
and to discuss the important aspects of the contracting--program office
relationship as appropriate to the circumstances; and
(b) The individual attends the next scheduled and appropriate
``Basic Project Officer'' course.

307.170-2 Training course prerequisites.

(a) Project officers. (1) Newly appointed project officers, and
project officers with less than three years experience and no previous
related training, are required to take the appropriate ``Basic Project
Officer'' course. (The grade level for project officers attending the
course should be GS-7 and above.) All project officers are encouraged
to take the appropriate ``Writing Statements of Work'' course.
(2) Project officers with more than three years experience, and
project officers with less than three years experience who have
successfully completed the appropriate basic course, are qualified (and
encouraged) to take the ``Advanced Project Officer'' course.
(3) Additional information on prerequisites for attendance of these
courses may be found in the ``DHHS Acquisition Training and
Certification Handbook.''
(b) Technical proposal evaluators. Technical proposal evaluators,
regardless of experience, are required to take the appropriate ``Basic
Project Officer'' course. Upon successful completion of the basic
course, it is recommended that they take the appropriate ``Advanced
Project Officer'' course.

Subpart 307.3--Contractor Versus Government Performance

307.302 General.

(a) GAM Chapter 18-10, Commercial-Industrial Activities of the
Department of Health and Human Services Providing Products or Services
for Government Use, assigns responsibilities for making method-of-
performance decisions (contract vs. in-house performance) to various
management levels within the Department depending on the dollar amount
of capital investment or annual operating costs. It also requires that
each operating division (OPDIV) and staff division (STAFFDIV) designate
a ``Commercial-Industrial Control Officer'' (CICO) to be responsible
for ensuring compliance with the requirements of the Chapter.
(d) Besides contracts with annual operating costs under $100,000,
contracts with annual operating costs under an authorized acquisition
set-aside for small business concerns and contracts made pursuant to
section 8(a) of the Small Business Act are exempted from the
requirements of FAR Subpart 7.3, GAM Chapter 18-10, and OMB Circular
No. A-76.

307.303 Determining availability of private commercial sources.

In accordance with the provisions of GAM Chapter 18-10, OPDIVs and
STAFFDIVs must prepare and maintain a complete inventory of all
individual commercial or industrial activities, including those
conducted under contracts in excess of $100,000 annually. They must
also conduct periodic reviews of each activity and contract in the
inventory to determine if the existing performance, in-house or by
contract, continues to be in accordance with the policy guidelines of
GAM Chapter 18-10.

307.304 Procedures.

Contracting officers shall ensure that no acquisition action
involving a commercial-industrial activity is initiated unless it is in
compliance with the requirements of GAM Chapter 18-10. The contracting
officer must check each request for contract expected to result in a
contract in excess of $100,000 to ensure that it contains a statement
as to whether the proposed contract is or is not subject to review
under GAM Chapter 18-10 requirements. If the contracting officer has
any questions regarding the determination of applicability or
nonapplicability, or if the required statement is missing, the program
office submitting the request for contract should be contacted and the
situation rectified. If the issue cannot be resolved with the program
office, the contracting office shall refer the matter to the CICO for a
final determination. The HCA is responsible for ensuring that
contracting activities are in full compliance with FAR Subpart 7.3.

[[Page 1352]]

307.307 Appeals.

The review and appeals procedure discussed in FAR 7.307 are
addressed in GAM Chapter 18-10.

Subpart 307.70--Considerations in Selecting an Award Instrument

307.7000 Scope of subpart.

This subpart provides guidance on the appropriate selection of
award instruments consistent with the Federal Grant and Cooperative
Agreement Act of 1977 (41 U.S.C. 501). This subpart explains the use of
the contract as the award instrument for acquisition relationships, and
the grant or cooperative agreement as the instrument for assistance
relationships. This subpart provides guidance for determining whether
to use the acquisition or assistance process to fulfill program needs.
Detailed guidance on assistance instruments may be found in Chapter 1-
02 of the Grants Administration Manual.

307.7001 Distinction between acquisition and assistance.

(a) The Federal Grant and Cooperative Agreement Act of 1977
requires the use of contracts to acquire property or services for the
direct benefit or use of the Government and grants or cooperative
agreements to transfer money, property, services, or anything of value
to recipients to accomplish a public purpose of support or stimulation
authorized by Federal statute.
(b) A contract is to be used as the legal instrument to reflect a
relationship between the Federal Government and a recipient whenever:
(1) The principal purpose of the instrument is the acquisition, by
purchase, lease, or barter, of property or services for the direct
benefit or use of the Federal Government; or
(2) The Department determines in a specific instance that the use
of a type of contract is appropriate. That is, it is determined in a
certain situation that specific needs can be satisfied best by using
the acquisition process. However, this authority does not permit
circumventing the criteria for use of acquisition or assistance
instruments. Use of this authority is restricted to extraordinary
circumstances and only with the prior approval of the Deputy Assistant
Secretary for Grants and Acquisition Management (DASGAM).
(c) A grant or cooperative agreement is to be used as the legal
instrument to reflect a relationship between the Federal Government and
a recipient whenever the principal purpose of the relationship is the
transfer of money, property, services, or anything of value to the
recipient to accomplish a public purpose of support or stimulation
authorized by Federal statute.
(1) A grant is the legal instrument to be used when no substantial
involvement is anticipated between the Department and the recipient
during performance of the contemplated activity.
(2) A cooperative agreement is the legal instrument to be used when
substantial involvement is anticipated between the Department and the
recipient during performance of the contemplated activity.
(d) As a general rule, contracts are to be used for the following
purposes:
(1) Evaluation (including research of an evaluative nature) of the
performance of Government programs or projects or grantee activity
initiated by the funding agency for its direct benefit or use.
(2) Technical assistance rendered to the Government, or on behalf
of the Government, to any third party, including those receiving grants
or cooperative agreements.
(3) Surveys, studies, and research which provide specific
information desired by the Government for its direct activities, or for
dissemination to the public.
(4) Consulting services or professional services of all kinds if
provided to the Government or, on behalf of the Government, to any
third party.
(5) Training projects where the Government selects the individuals
or specific groups whose members are to be trained or specifies the
content of the curriculum (not applicable to fellowship awards.)
(6) Planning for Government use.
(7) Production of publications or audiovisual materials required
primarily for the conduct of the direct operations of the Government.
(8) Design or development of items for Government use or pursuant
to agency definition or specifications.
(9) Conferences conducted on behalf of the Government.
(10) Generation of management information or other data for
Government use.

307.7002 Procedures.

(a) OPDIV program officials should use existing budget and program
planning procedures to propose new activities and major changes in
ongoing programs. It is the responsibility of these program officials
to meet with the HCA and the principal grants management official, or
their designees, to distinguish the relationships and determine whether
award is to be made through the acquisition process or assistance
process. This determination should be made prior to the time when the
annual acquisition plan is reviewed and approved so that the plan will
reflect all known proposed contract actions. The cognizant contracting
officer will confirm the appropriateness of the use of the contract
instrument when reviewing the request for contract.
(b) Shifts from one award instrument to another must be fully
documented in the appropriate files to show a fundamental change in
program purpose that unequivocally justifies the rationale for the
shift.
(c) OPDIVs must ensure that the choice of instrument is determined
in accordance with the Federal Grant and Cooperative Agreement Act of
1977 and applicable departmental policies. If, however, there are major
individual transactions or programs which contain elements of both
acquisition and assistance in such a way that they cannot be
characterized as having a principal purpose of one or the other,
guidance should be obtained from the DASGAM, through normal channels,
before proceeding with a determination.
(d) Any public notice, program announcement, solicitation, or
request for applications or proposals must indicate whether the
intended relationship will be one of acquisition or assistance and
specify the award instrument to be used.

Subpart 307.71--Requests for Contract

307.7100 Scope of subpart.

This subpart prescribes the format and contents of the request for
contract (RFC) and provides procedures for its preparation and
submission.

307.7101 General.

The program office's preparation of the RFC and submission to the
contracting office completes the presolicitation phase of the
acquisition planning process and commences the solicitation phase. The
RFC is the formal document which initiates the preparation of the
request for proposals (RFP) by the contracting office and sets the
acquisition process in motion. It is the result of the planning by the
project officer and contracting officer and contains much of the
pertinent information necessary for the development of a sound,
comprehensive RFP.

307.7102 Procedures.

The program office should submit the RFC to the contracting office
no later than the date agreed to by the contracting officer and the
project officer in the milestone schedule (see

[[Page 1353]]

307.104(h)), unless a revised due date has been established by mutual
agreement.

307.7103 Responsibilities.

(a) It is the responsibility of the project officer to prepare the
RFC so that it complies with the requirements of this subpart and any
OPDIV guidance issued in accordance with this subpart.
(b) Prior to the submission of the RFC to the contracting office,
the head of the program office sponsoring the project shall review the
RFC to ensure that all required information is provided in the
prescribed format, and a technical review of the statement of work has
been made. The level and extent of the technical review is to be
commensurate with the estimated cost, importance, and complexity of the
proposed acquisition, and must be thorough enough to ensure that vague
and ambiguous language is eliminated, the statement of work is
structured by phases or tasks, if appropriate, and methods are
available for assessing the contractor's technical, cost, and delivery
performance.

307.7104 Transmittal.

The RFC must be conveyed to the contracting office by use of a
covering memorandum or other form of transmittal. The transmittal
document must be signed by the head of the sponsoring program office
and include both a statement attesting to the conclusiveness of the
review described in 307.7103(b) and a list identifying all attachments
to the RFC.

307.7105 Format and content.

The Department does not prescribe a standard format for the RFC. A
format similar to what is in this section is recommended. However, any
document or group of documents will be acceptable as an RFC as long as
all of the required information (paragraph (a) of this section), and as
much of the optional information (paragraph (b) of this section) as is
relevant, is included.
(a) The RFC must include:
(1) Purpose of the contract. A brief, general description of the
requirement, including the citation of the legislation which authorizes
the program or project, and a statement as to the intended purpose/use
of the proposed contract.
(2) Period of performance. The number of months (or other time
period) required for total performance and, if applicable, for each
phase of work indicated in the statement of work, as well as the
proposed starting date.
(3) Estimated cost and funds citation. An estimate of the total
cost of the proposed contract and, if applicable, the estimate for each
phase indicated in the statement of work. The project officer must
provide a cost breakdown of all contributing cost factors, an estimate
of the technical staff hours, direct material, subcontracting, travel,
etc., and may consult with contracting and cost advisory personnel in
developing this information. This section must include the
certification of funds availability for the proposed acquisition, along
with the appropriation and accounting information citations. When funds
for the proposed acquisition are not currently available for obligation
but are anticipated, a statement of intent to commit funds from the
financial management officer shall be included in lieu of the
certification of funds availability. (Contracts cannot be awarded
unless funds are available, but see FAR 32.703-2).
(4) Specification, purchase description, or statement or work. A
description of the work to be performed that may be in the form of a
specification, purchase description, or statement of work. Guidance
concerning the statement of work and its contents is contained in
307.7106. Specifications and purchase descriptions are not used to a
great extent in this Department. Use of the specification is primarily
limited to supply or service contracts where the material end item or
service to be delivered is well defined by the Government.
(5) Schedule of deliverables/reporting requirements. A description
of what is to be delivered, including, if applicable, technical and
financial progress reports and any final report, and the required date
of delivery for each deliverable. Reporting requirements should be
tailored to the instant acquisition and should not be unnecessarily
extensive or detailed. All delivery and reporting requirements shall
include the quantities, the place of delivery, and time of delivery.
(6) Sources for solicitation. A list of known potential sources by
name and mailing address. The project officer is encouraged to use
trade and professional journals and publications to identify new
prospective sources to supplement the list of known sources. Efforts to
identify set-aside possibilities, i.e., small disadvantaged, and women-
owned small businesses must be explained.
(7) Project officer and alternate. The project officer's name,
title, organization, mailing address, and telephone number, along with
the same data for the project officer's alternate, and a statement that
these individuals have completed the Department's project officer
training course (see 307.170)
(b) The RFC must include, if applicable to the acquisition:
(1) Background and need. The background, history, and necessity for
the proposed contract. This section is to include prior, present, and
planned efforts by the program office in the same or related areas, and
a description of efforts by other departmental activities and Federal
agencies in the same or related program areas, if known. In addition,
specific project information, such as the relevance or contribution to
overall program objectives, reasons for the need, priority, and project
overlap are to be provided.
(2) Reference materials. A list, by title and description, of study
reports, plans, drawings, and other data to be made available to
prospective offerors for use in preparation of proposals and/or the
contractor for use in performance of the contract. The project officer
must indicate whether this material is currently available or when it
will be available.
(3) Technical evaluation criteria and instructions. Technical
evaluation criteria, which have been developed based on the
requirements of the specific project, and any instructions and
information which will assist in the preparation of prospective
offerors' technical proposals. Evaluation factors may include
understanding of the problem, technical approach, experience,
personnel, facilities, etc. Criteria areas discussed in the statement
of work and the relative order of importance or weights assigned to
each of these areas for technical evaluation purposes must be
identified.
(4) Special program clearances or approvals. Any required clearance
or approval. The following special program clearances or approvals
should be reviewed for applicability to each acquisition. The ones
which are applicable should be addressed during the planning
discussions between the project officer and contracting officer/
contract specialist (see 307.104(f)) and immediate action should be
initiated by the project officer to obtain the necessary clearances or
approvals. Comprehensive checklists of these and any OPDIV special
approvals, clearances, and requirements shall be provided for reference
purposes to program offices by the servicing contracting activity. If
the approval or clearance has been requested and is being processed at
the time of RFC submission, a footnote to this effect, including all
pertinent details, must be included in this section.

[[Page 1354]]

(i) Commercial activities. (OMB Circular No. A-76). A request for
contract (RFC) must contain a statement as to whether the proposed
solicitation is or is not to be used as part of an OMB Circular No. A-
76 cost comparison. (See General Administrative Manual (GAM) Chapter
18-10; FAR Subpart 7.3, Subpart 307.3; OMB Circular No. A-76.)
(ii) Printing. The acquisition of printing and high volume
duplicating by contract is prohibited unless it is authorized by the
Joint Committee on Printing of the U.S. Congress. Procedures to be
followed are contained in the ``Government Printing and Binding
Regulations'' and the HHS Printing Management Manual and FAR Subpart
8.8.
(iii) Paperwork Reduction Act. Under the Paperwork Reduction Act of
1995, a Federal agency shall not collect information or sponsor the
collection of information from ten or more persons (other than Federal
employees acting within the scope of their employment) unless, in
advance, the agency has submitted a request for Office of Management
and Budget (OMB) review, to the OMB, and the OMB has approved the
proposed collection of information. Procedures for the approval may be
obtained by contacting the OPDIV reports clearance officer. (See Title
5 CFR Part 1320).
(iv) Publications. All projects that will result in contracts which
include more than one publication require review and approval by the
Office of the Assistant Secretary for Public Affairs (OASPA). Form HHS-
524, Request for Communications Contract Clearance, should be forwarded
to OASPA through the OPDIV public affairs officer. Publications are
defined in Chapter 5-00-15 of the Public Affairs Management Manual.
(v) Public affairs services. Projects for the acquisition of public
affairs services in excess of $5,000 require review and approval by the
Office of the Assistant Secretary for Public Affairs (OASPA). Form HHS-
524, Request for Communications Contract Clearance, should be forwarded
to OASPA through the OPDIV public affairs officer. Public affairs
services are defined in Chapter 8-00-20 of the Public Affairs
Management Manual.
(vi) Audiovisual. Any proposed acquisition of an audiovisual
production requires the submission of a Standard Form 282, Mandatory
Title Check, to the National Audiovisual Center (NAC). When the results
of this title check have been reviewed by the project office and if a
determination is made that existing materials are not adequate to
fulfill the requirements, a statement to that effect shall be prepared
by the project office. Audiovisuals are defined in Chapter 6-00-15 of
the Public Affairs Management Manual. For acquisitions in excess of
$5,000, a copy of that statement and Form HHS-524A, Audiovisual
Clearance Request, shall be submitted through the OPDIV public affairs
officer to the Office of the Assistant Secretary for Public Affairs
(OASPA) for review and approval. An approval copy of the Form HHS-524A
will be returned to the OPDIV for transmission to the contract
negotiator.
(vii) Privacy Act (Pub. L. 93-579). Whenever the Department
contracts for the design, development, operation, or maintenance of a
system of records on individuals on behalf of the Department to
accomplish a departmental function, the Privacy Act is applicable. The
program official, after consultation with the activity's Privacy Act
Coordinator and the Office of General Counsel, as necessary, shall
include a statement in the request for contract as to the applicability
of the Act. Whenever an acquisition is subject to the Act, the program
official prepares a ``system notice'' and has it published in the
Federal Register. (See HHS Privacy Act regulation, 45 CFR 5b; FAR
Subpart 24.1 and Subpart 324.1.)
(viii) Foreign research. All foreign research contract projects to
be conducted in a foreign country and financed by HHS funds (U.S.
dollars) must have clearance by the Department of State with respect to
consistency with foreign policy objectives. This clearance should be
obtained prior to negotiation. Procedures for obtaining this clearance
are set forth in the HHS General Administration Manual, Chapter 20-60.
(5) Identification and disposition of data. Identification of the
data expected to be generated by the acquisition and an indication of
whether the data are to be delivered to the Department or to be
retained by the contractor. The project officer must also include
information relative to the use, maintenance, disclosure, and
disposition of data. The project officer must include a statement as to
whether or not another acquisition, based upon the data generated by
the proposed acquisition, is anticipated.
(6) Government property. If known, the type of Government property,
individual items, and quantities of Government property to be furnished
to, or allowed to be acquired by, the resultant contractor. The project
officer must specify when the Government property is to be made
available. Refer to HHS Publication (OS) 686, ``Contractor's Guide for
Control of Government Property (1990).''
(7) Special terms and conditions. Any suggested special terms and
conditions not already covered in the statement of work or the
applicable contract general provisions.
(8) Justification for other than full and open competition. If the
proposed acquisition is to be awarded using other than full and open
competition, a justification prepared in accordance with FAR Subpart
6.3 and Subpart 306.3.

307.7106 Statement of work.

(a) General. A statement of work (SOW) differs from a
specifications and purchase description primarily in that it describes
work or services to be performed in reaching an end result rather than
a detailed, well defined description or specification of the end
product. The SOW may enumerate or describe the methods (statistical,
clinical, laboratory, etc.) that will be used. However, it is
preferable for the offeror to propose the method of performing the
work. The SOW should specify the desired results, functions, or end
items without telling the offeror what has to be done to accomplish
those results unless the method of performance is critical or required
for the successful performance of the contract. The SOW should be clear
and concise and must completely define the responsibilities of the
Government and the contractor. The SOW should be worded so as to make
more than one interpretation virtually impossible because it has to be
read and interpreted by persons of varied backgrounds, such as
attorneys, contracting personnel, cost estimators, accountants,
scientists, educators, functional specialists, etc. The SOW must
clearly define the obligations of both the contractor and the
Government so as to protect the interests of both. Ambiguous statements
of work can create unsatisfactory performance, delays, and disputes,
and can result in higher costs.
(b) Term (level of effort) vs. completion work statement. Careful
distinctions must be drawn between term (level of effort) SOWs, which
essentially require the furnishing of technical effort and a report
thereof, and completion type work statements, which require development
of tangible items designed to meet specific performance
characteristics. (See FAR 16.306(d) for distinction).
(1) Term (or level of effort). A term or level of effort type SOW
is appropriate to research where one seeks to discover the feasibility
of later development, or to gather general information. A term or level
of effort type SOW may only specify that some number of labor-hours

[[Page 1355]]

be expended on a particular course of research, or that a certain
number of tests be run, without reference to any intended conclusion.
(2) Completion. A completion type SOW is appropriate to development
work where the feasibility of producing an end item is already known. A
completion type SOW may describe what is to be achieved through the
contracted effort, such as development of new methods, new end items,
or other tangible results.
(c) Phasing. Individual research, development, or demonstration
projects frequently lie well beyond the present state of the art and
entail procedures and techniques of great complexity and difficulty.
Under these circumstances, a contractor, no matter how carefully
selected, may be unable to deliver the desired result. Moreover, the
job evaluating the contractor's progress is often difficult. Such a
contract is frequently phased and often divided into stages of
accomplishment, each of which must be completed and approved before the
contractor may proceed to the next. Phasing makes it necessary to
develop methods and controls, including reporting requirements for each
phase of the contract and criteria for evaluation of the report
submitted, that will provide, at the earliest possible time,
appropriate data for making decisions relative to future phases. A
phased contract may include stages of accomplishment such as research,
development, and demonstration. Within each phase, there may be a
number of tasks which should be included in the SOW. When phases of
work can be identified, the SOW will provide for phasing and the
request for proposals will require the submission of proposed costs by
phases. The resultant contract will reflect costs by phases, require
the contractor to identify incurred costs by phases, establish delivery
schedules by phase, and require the written acceptance of each phase.
The provisions of the Limitation of Cost clause shall apply to the
estimated cost of each phase. Contractors shall not be allowed to incur
costs for phases which are dependent upon successful completion of
earlier phases until written acceptance of the prior work is obtained
from the contracting officer.
(d) Elements of the SOW. The elements of the SOW will vary with the
objective, complexity, size, and nature of the acquisition. In general,
it should cover the following matters as appropriate.
(1) A general description of the required objectives and desired
results. Initially, a broad, nontechnical statement of the nature of
the work to be performed. This should summarize the actions to be
performed by the contractor and the results that the Government
expects.
(2) Background information helpful to a clear understanding of the
requirements and how they evolved. Include a brief historical summary
as appropriate and the relationship to overall program objectives.
(3) A detailed description of the technical requirements. A
comprehensive description of the work to be performed to provide
whatever details are necessary for prospective offerors to submit
meaningful proposals.
(4) Subordinate tasks or types of work. A listing of the various
tasks or types of work (it may be desirable in some cases to indicate
that this is not all-inclusive). The degree of task breakout is
directly dependent on the size and complexity of the work to be
performed and the logical groupings. A single cohesive task should not
be broken out merely to conform to a format. Indicate whether the tasks
are sequential or concurrent for offeror planning purposes.
(5) Reference material. All reference material to be used in the
conduct of the project that tells how the work is to be carried out
must be identified. Applicability should be explained, and a statement
made as to where the material can be obtained.
(6) Level of effort. When a level of effort is required, the number
and type of personnel required should be stated. If known, the type and
degree of expertise should be specified.
(7) Special requirements. (as applicable). An unusual or special
contractual requirement, which would impact on contract performance,
should be included as a separate section.
(8) Deliverables reporting requirements. All deliverables and/or
reports must be clearly and completely described.

307.7101 Review.

Upon receipt of the RFC, the contracting officer shall review its
contents to ensure that all pertinent information has been provided by
the program office and that it includes an acceptable SOW. If pertinent
information is missing or the SOW is inadequate, the contracting
officer shall obtain or clarify the information as soon as possible so
that the acquisition schedule can be met. If the program office delays
furnishing the information or clarification, the contracting officer
should notify the head of the sponsoring program office, in writing, of
the possible slippage in the acquisition schedule and the need for an
expeditious remedy. The contracting officer should also notify the
chief of the contracting office. A program office's or project
officer's continued failure to adhere to agreed on milestones should
also be reported to the head of the contracting activity.

PART 309--CONTRACTOR QUALIFICATIONS

Subpart 309.4--Debarment, Suspension, and Ineligibility

Sec.
309.403 Definitions.
309.404 List of parties excluded from Federal procurement and
nonprocurement programs.
309.405 Effect of listing.
309.406 Debarment.
309.406-3 Procedures.
309.407 Suspension.
309.407-3 Procedures.
309.470 Reporting of suspected causes of debarment, suspension, or
the taking of evasive actions.
309.470-1 Situations where reports are required.
309.470-2 Contents of reports.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 309.4--Debarment, Suspension, and Ineligibility

309.403 Definitions.

Acquiring agency's head or designee, as used in the FAR, shall
mean, unless otherwise stated in this subpart, the head of the
contracting activity. Acting in the capacity of the acquiring agency's
head, the head of the contracting activity may make the required
justifications or determinations, and take the necessary actions,
specified in FAR 9.405, 9.406 and 9.407 for his or her respective
activity, but only after obtaining the approval of the debarring or
suspending official, as the case may be.
Debarring official means the Assistant Secretary for Management and
Budget, or his/her designee.
Initiating official means either the contracting officer, the head
of the contracting activity, the Deputy Assistant Secretary for Grants
and Acquisition Management, or the Inspector General.
Suspending official means the Assistant Secretary for Management
and Budget, or his/her designee.

309.304 List of parties excluded from Federal procurement and
nonprocurement programs.

(c) The Office of Grants and Acquisition Management (OGAM) shall
perform the actions required by FAR 9.404(c).
(4) OGAM shall maintain all documentation submitted by the

[[Page 1356]]

initiating official recommending the debarment or suspension action and
all correspondence and other pertinent documentation generated during
the OGAM review.

309.405 Effect of listing.

(a) The head of the contracting activity (HCA) (not delegable) may,
with the concurrence of the debarring or suspending official, make the
determinations referenced in FAR 9.405(a), regarding contracts for
their respective activities.
(1) If a contracting officer considers it necessary to award a
contract, or consent to a subcontract with a debarred or suspended
contractor, the contracting officer shall prepare a determination,
including all pertinent documentation, and submit it through
acquisition channels to the head of the contracting activity. The
documentation must include the date by which approval is required and a
compelling reason for the proposed action. Some examples of
circumstances that may constitute a compelling reason for the award to,
or consent to a subcontract with, a debarred or suspended contractor
include:
(i) The property or services to be acquired are available only from
the listed contractor;
(ii) The urgency of the requirement dictates that the Department
deal with the listed contractor; or
(iii) There are other compelling reasons which require business
dealings with the listed contractor.
(2) If the HCA decides to approve the requested action, he/she
shall request the concurrence of the debarring or suspending official
and, if given, shall inform the contracting officer in writing of the
decision within the required time period.

309.406 Debarment.

309.406-3 Procedures.

(a) Investigation and referral. Whenever an apparent cause for
debarment becomes known to an initiating official, that person shall
prepare a report incorporating the information required by 309.470-2,
if known, and forward it through appropriate channels with a written
recommendation, to the debarring official. Contracting officers shall
forward their reports in accordance with 309.470-1. The debarring
official shall initiate an investigation through such means as he/she
deems appropriate.
(b) Decisionmaking process. The debarring official shall review the
results of the investigation, if any, and make a written determination
whether or not debarment procedures are to be commenced. A copy of the
determination shall be promptly sent through appropriate channels to
the initiating official, and the contracting officer, if necessary. If
the debarring official determines to commence debarment procedures, he/
she shall, after consultation with the Office of the General Counsel,
notify the contractor in accordance with FAR 9.406-3(c). If the
proposed action is not based on a conviction or judgement and the
contractor's submission in response to the notice raises a genuine
dispute over facts material to the proposed debarment, the debarring
official shall arrange for fact-finding hearings and take the necessary
action specified in FAR 406-3(b)(2). The debarring official shall also
ensure that written findings of facts are prepared, and shall base the
debarment decisions on the facts as found, after considering
information and argument submitted by the contractor and any other
information in the administrative record. The Office of the General
Counsel shall represent the Department at any fact-finding hearing and
may present witnesses for HHS and question any witnesses presented by
the contractor.

309.407 Suspension.

309.407-3 Procedures.

(a) Investigation and referral. Whenever an apparent cause for
suspension becomes known to an initiating official, that person shall
prepare a report incorporating the information required by 309.470-2,
if known, and forward it through appropriate channels, with a written
recommendation, to the suspending official. Contracting officers shall
forward their reports in accordance with 309.470-1. The suspending
official shall initiate an investigation through such means as he/she
deems appropriate.
(b) Decisionmaking process. The suspending official shall review
the results of the investigation, if any, and make a written
determination whether or not suspension should be imposed. A copy of
this determination shall be promptly sent through appropriate channels
to the initiating official and the contracting officer, if necessary.
If the suspending official determines to impose suspension, he/she
shall, after consultation with the Office of the General Counsel,
notify the contractor in accordance with FAR 9.407-3(c). If the action
is not based on an indictment, and, subject to the provisions of FAR
9.407-3(b)(2), the contractor's submission in response to the notice
raises a genuine dispute over facts material to the suspension, the
suspending official shall, after suspension has been imposed, arrange
for fact-finding hearings and take the necessary actions specified in
FAR 9.407-3(b)(2).

309.470 Reporting of suspected causes for debarment or suspension, or
the taking of evasive actions.

309.470-1 Situations where reports are required.

A report incorporating the information required by 309.470-2 shall
be forwarded, in duplicate, by the contracting officer through
acquisition channels to OGAM when:
(a) A contractor has committed, or is suspected of having
committed, any of the acts described in FAR 9.406-2 or FAR 9.407-2; or
(b) A contractor is suspected of attempting to evade the
prohibitions of debarment or suspension imposed under this regulation,
or any other comparable regulation, by changes of address, multiple
addresses, formation of new companies, or by other devices.

309.470-2 Contents of reports.

Each report prepared under 309.470-1 shall be coordinated with the
Office of the General Counsel and shall include the following
information, where available:
(a) Name and address of contractor.
(b) Name of the principal officers, partners, owners, or managers.
(c) All known affiliates, subsidiaries, or parent firms, and the
nature of the affiliation.
(d) Description of the contract or contracts concerned, including
the contract number, and office identifying numbers or symbols, the
amount of each contract, the amount paid the contractor and the amount
still due, and the percentage of work completed and to be completed.
(e) The status of vouchers.
(f) Whether contract funds have been assigned pursuant to the
Assignment of Claims Act, as amended, (31 U.S.C. 3727, 41 U.S.C. 15),
and, if so assigned, the name and address of the assignee and a copy of
the assignment.
(g) Whether any other contracts are outstanding with the contractor
or any affiliates, and, if so, the amount of the contracts, whether
these funds have been assigned pursuant to the Assignment of Claims
Act, as amended, (31 U.S.C. 3727, 41 U.S.C. 15), and the amounts paid
or due on the contracts.
(h) A complete summary of all available pertinent evidence.
(i) A recommendation as to the continuation of current contracts.

[[Page 1357]]

(j) An estimate of damages, if any, sustained by the Government as
a result of the action of the contractor, including an explanation of
the method used in making the estimate.
(k) The comments and recommendations of the contracting officer and
statements regarding whether the contractor should be suspended or
debarred, whether any limitations should be applied to the action, and
the period of any proposed debarment.
(l) As an enclosure, a copy of the contract(s) or pertinent
excerpts therefrom, appropriate exhibits, testimony or statements of
witnesses, copies of assignments, and other relevant documentation or a
written summary of any information for which documentation is not
available.

PART 313--SIMPLIFIED ACQUISITION PROCEDURES

Subpart 313.3--Simplified Acquisition Methods

Sec.
313.303 Blanket purchase agreements (BPAs).
313.303-5 Purchases under BPAs.
313.305 Imprest funds and third party drafts.
313.305-1 General.
313.306 SF 44, Purchase Order--Invoice--Voucher.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 313.3--Simplified Acquisition Methods.

313.303 Blanket Purchase Agreements (BPAs).

313.303-5 Purchase under BPAs.

(e)(5) Delivery documents, invoices, etc., signed by the Government
employee receiving the item or service will be forwarded to the fiscal
office or other paying office as designated by the OPDIV. Payment will
be made on the basis of the signed document, invoice, etc. Contracting
offices will ensure that established procedures allowing for
availability of funds are in effect prior to placement of orders.

313.305 Imprest funds and third party drafts.

313.305-1 General.

Requests to establish imprest funds shall be made to the
responsible fiscal office. At larger activities where the cashier may
not be conveniently located near the purchasing office, a Class C
Cashier may be installed in the purchasing office. Documentation of
cash purchases shall be in accordance with instructions contained in
the HHS Voucher Audit Manual Part 1, Chapter 1-10.

313.306 SF 44, Purchase Order--Invoice--Voucher.

(d) Since the Standard Form (SF) 44 is an accountable form, a
record shall be maintained of serial numbers of the form, to whom
issued, and date issued. SF 44's shall be kept under adequate lock and
key to prevent unauthorized use. A reservation of funds shall be
established to cover total anticipated expenditures prior to use of the
SF 44.

PART 314--SEALED BIDDING

Subpart 314.2--Solicitation of Bids

Sec.
314.202 General rules for solicitation of bids.
314.202-7 Facsimile bids.
314.213 Annual submission of representations and certifications.

Subpart 314.4--Opening of Bids and Award of Contract

314.404 Rejection of bids.
314.404-1 Cancellation of invitations after opening.
314.407 Mistakes in bids.
314.407-3 Other mistakes disclosed before award.
314.407-4 Mistakes after award.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

Subpart 314.2--Solicitation of Bids

314.202 General rules for solicitation of bids.

314.202-7 Facsimile bids.

If the head of the contracting activity (HCA) (not delegable) has
determined that the contracting activity will allow use of facsimile
bids and proposals, the HCA shall prescribe internal procedures, in
accordance with the FAR, to ensure uniform processing and control.

314.213 Annual submission of representations and certifications.

Each HCA (not delegable) shall determine whether the contracting
activity will allow use of the annual submission of representations and
certifications by bidders.

Subpart 314.4--Opening of Bids and Award of Contract

314.404 Rejection of bids.

314.404-1 Cancellation of invitations after opening.

(c) The chief of the contracting office (CCO) (not delegable) shall
make the determination required by FAR 14.404-1(c).

314.407 Mistakes in bids.

314.407-3 Other mistakes disclosed before award.

(e) Authority has been delegated to the Departmental Protest
Control Officer, Office of Acquisition Management, Office of Grants and
Acquisition Management to make administrative determinations in
connection with mistakes in bid alleged after opening and before award.
This authority may not be redelegated.
(f) Each proposed determination shall have the concurrence of the
Chief, Business Law Branch, Business and Administrative Law Division,
Office of General Counsel.
(i) Doubtful cases shall not be submitted by the contracting
officer directly to the Comptroller General, but shall be submitted to
the Departmental Protest Control Officer.

314.407-4 Mistakes after award.

(c) Authority has been delegated to the Departmental Protest
Control Officer to make administrative determinations in connection
with mistakes in bid alleged after award. This authority may not be
redelegated.
(d) Each proposed determination shall have the concurrence of the
Chief, Business Law Branch, Business and Administrative Law Division,
Office of General Counsel.

PART 315--CONTRACTING BY NEGOTIATION

Subpart 315.2--Solicitation and Receipt of Proposals and Information

Sec.
315.204 Contract format.
315.204-5 Part IV--Representations and instructions.
315.208 Submission, modification, revision, and withdrawal of
proposals.
315.209 Solicitation provisions and contract clauses.

Subpart 315.3--Source Selection

315.305 Proposal evaluation.
315.306 Exchanges with offerors after receipt of proposals.
315.307 Final proposal revisions.
315.370 Finalization of details with the selected source.
315.371 Contract preparation and award.
315.372 Preparation of negotiation memorandum.

Subpart 315.4--Contract Pricing

315.404 Proposal analysis.
315.404-2 Information to support proposal analysis.
315.404-4 Profit.

Subpart 315.6--Unsolicited Proposals

315.605 Content of unsolicited proposals.
315.606 Agency procedures.
315.606-1 Receipt and initial review.
315.609 Limited use of data.

Authority: 5 U.S.C. 301; 40 U.S.C. 486(c).

[[Page 1358]]

Subpart 315.2--Solicitation and Receipt of Proposals and
Information

315.204 Contract format.

315.204-5 Part IV--Representations and instructions.

(a) Section K, Representations, certifications, and other
statements of offerors.
(1) This section shall begin with the following and continue with
the applicable representations and certifications:

To Be Completed by the Offeror: (The Representations and
Certifications must be executed by an individual authorized to bind
the offeror.) The offeror makes the following Representations and
Certifications as part of its proposal (check or complete all
appropriate boxes or blanks on the following pages).

(Name of Offeror)------------------------------------------------------

(RFP No.)--------------------------------------------------------------

(Signature of Authorized Individual)-----------------------------------

----------------------------------------------------------------------

(Date)-----------------------------------------------------------------

(Typed Name of Authorized Individual)----------------------------------

----------------------------------------------------------------------

Note: The penalty for making false statements in offers is
prescribed in 18 U.S.C. 1001.

(c) Section M, Evaluation factors for award.
(1) General. (i) The evaluation criteria must be developed by the
project officer and submitted to the contracting officer in the request
for contract (RFC) for inclusion in the request for proposal (RFP).
Development of these criteria and the assignment of the relative
importance or weight to each criterion require the exercise of
judgement on a case-by-case basis because they must be tailored to the
requirements of the individual acquisition. Since the criteria will
serve as a standard against which all proposals will be evaluated, it
is imperative that they be chosen carefully to emphasize those factors
considered to be critical in the selection of a contractor.
(ii) The finalized evaluation criteria and indications of their
relative importance or weight, as included in the RFP, cannot be
changed except by a formal amendment to the RFP issued by the
contracting officer. No factors other than those set forth in the RFP
shall be used in the evaluation of proposals.
(2) Review of evaluation criteria.
(i) The evaluation criteria should be reviewed by the contracting
officer in terms of the work statement. This review is not intended to
dictate technical requirements to the program office or project
officer, but rather to ensure that the evaluation criteria are clear,
concise, and fair so that all potential offerors are fully aware of the
bases for proposal evaluation and are given an equal opportunity to
compete.
(ii) The project officer and the contracting officer should then
review the evaluation criteria together to ascertain the following:
(A) The criteria are described in sufficient detail to provide the
offerors (and evaluators) with a total understanding of the factors to
be involved in the evaluation process;
(B) The criteria address the key programmatic concerns which the
offerors must be aware of in preparing proposals;
(C) The criteria are specifically applicable to the instant
acquisition and are not merely restatements of criteria from previous
acquisitions which are not relevant to this acquisition; and
(D) The criteria are selected to represent only the significant
areas of importance which must be emphasized rather than a multitude of
factors. (All criteria tend to lose importance if too many are
included. Using too many criteria will prove as detrimental as using
too few.)
(3) Examples of topics that form a basis for evaluation criteria.
Typical examples of topics that form a basis for the development of
evaluation criteria are listed in the following paragraphs. These
examples are intended to assist in the development of actual evaluation
criteria for a specific acquisition and should only be used if they are
applicable to that acquisition. They are not to be construed as actual
examples of evaluation criteria to be included in the RFP.
(i) Understanding of the problem and statement of work;
(ii) Method of accomplishing the objectives and intent of the
statement of work;
(iii) Soundness of the scientific or technical approach for
executing the requirements of the statement of work (to include, when
applicable, preliminary layouts, sketches, diagrams, other graphic
representations, calculations, curves, and other data necessary for
presentation, substantiation, justification, or understanding of the
approach);
(iv) Special technical factors, such as experience or pertinent
novel ideas in the specific branch of science or technology involved;
(v) Feasibility and/or practicality of successfully accomplishing
the requirements (to include a statement and discussion of anticipated
major difficulties and problem areas and recommended approaches for
their resolution);
(vi) Availability of required special research, test, and other
equipment or facilities;
(vii) Managerial capability (ability to achieve delivery or
performance requirements as demonstrated by the proposed use of
management and other personnel resources, and to successfully manage
the project, including subcontractor and/or consultant efforts, if
applicable, as evidenced by the management plan and demonstrated by
previous experience);
(viii) Availability, qualifications, experience, education, and
competence of professional, technical, and other personnel, to include
proposed subcontractors and consultants (as evidenced by resumes,
endorsements, and explanations of previous efforts); and
(ix) Soundness of the proposed staff time or labor hours, propriety
of personnel classifications (professional, technical, others),
necessity for type and quantity of material and facilities proposed,
validity of proposed subcontracting, and necessity of proposed travel.
(4) Relative importance or weight.
(i) A statement or indication of the relative importance or weight
must be assigned to each evaluation criterion (significant factor) to
inform prospective offerors (and evaluators) of the specific
significance of each criterion in comparison to the other criteria.
Similarly, if a criterion (factor) is subdivided into parts, each of
the parts (subfactors) must be assigned a statement or indication of
the relative importance or weight.
(ii) Cost or price is not generally included as one of the
evaluation criteria and is not assigned an indication of relative
importance or weight. However, a statement must be included in the RFP
to reflect the relationship of cost or price in comparison to the other
criteria. (See FAR 15.304(e)). The contracting officer and project
officer should work together in arriving at the final determination
regarding the relationship.

315.208 Submission, modification, revision, and withdrawal of
proposals.

(b) When the head of the contracting activity (HCA) for a health
agency determines that certain classes of biomedical or behavioral
research and development acquisitions should be subject to conditions
other than those specified in FAR 52.215-1(c)(3), the HCA may authorize
the use of the provision at 352.215-70 in addition to the provision at
FAR 52.215-1.
(2) When the provision at 352.215-70 is included in the
solicitation and a

[[Page 1359]]

proposal is received after the exact time specified for receipt, the
contracting officer, with the assistance of cost and technical
personnel, shall make a written determination as to whether the
proposal meets the requirements of the provision at 352.215-70 and,
therefore, can be considered.

315.209 Solicitation provisions and contract clauses.

(a) Paragraph (e) of the provision at 352.215-1 shall be used in
place of that specified at FAR 52.215-1(e).
(g) If the head of the contracting activity (HCA)(not delegable)
has determined that the contracting activity will allow the use of the
annual submission of representations and certifications by offerors,
the provisions of FAR 14.213 shall be followed.

Subpart 315.3--Source Selection

315.305 Proposal evaluation.

(a) (1) Cost or price evaluation. The contracting officer shall
evaluate business proposals adhering to the requirements for cost or
price analysis included in FAR 15.404. The contracting officer must
determine the extent of analysis in each case depending on the amount
of the proposal, the technical complexity and related cost or price,
and cost realism. The contracting officer should request the project
officer to analyze items such as the number of labor hours proposed for
various labor categories; the mix of labor hours and categories of
labor in relation to the technical requirements of the project; the
kinds and quantities of material, equipment, and supplies; types,
numbers and hours/days of proposed consultants; logic of proposed
subcontracting; analysis of the travel proposed including number of
trips, locations, purpose, and travelers; and kinds and quantities of
data processing. The project officer shall provide his/her opinion as
to whether these elements are necessary and reasonable for efficient
contract performance. Exceptions to proposed elements shall be
supported by adequate rationale to allow for effective negotiations or
award if discussions are not conducted. The contracting officer should
also request the assistance of a cost/price analyst when considered
necessary. In all cases, the negotiation memorandum must include the
rationale used in determining that the price or cost is fair and
reasonable.
(3) Technical evaluation.
(i) Technical evaluation plan.
(A) A technical evaluation plan may be required by the contracting
officer, at his/her discretion, when an acquisition is sufficiently
complex as to warrant a formal plan.
(B) The technical evaluation plan should include at least the
following:
(1) A list of recommended technical evaluation panel members, their
organizations, a list of their major consulting clients (if
applicable), their qualifications, and curricula vitae (if applicable);
(2) A justification for using non-Government technical evaluation
panel members. (Justification is not required if non-Government
evaluators will be used in accordance with standard contracting
activity procedures or policies);
(3) A statement that there is no apparent or actual conflict of
interest regarding any recommended panel member;
(4) A copy of each rating sheet, approved by the contracting
officer, to be used to assure consistency with the evaluation criteria;
and
(5) A brief description of the general evaluation approach.
(C) The technical evaluation plan must be signed by an official
within the program office in a position at least one level above the
project officer, or in accordance with contracting activity procedures.
(D) The technical evaluation plan should be submitted to the
contracting officer for review and approval before the solicitation is
issued. The contracting officer shall make sure that the principal
factors relating to the evaluation are reflected in the evaluation
criteria when conducting the review of the plan.
(ii) Technical evaluation panel.
(A) General. (1) A technical evaluation panel is required for all
acquisitions applicable to this subpart which are expected to exceed
$500,000 and in which technical evaluation is considered a key element
in the determination of making an award . The contracting officer has
the discretion to require a technical evaluation panel for acquisitions
not exceeding $500,000 based on the complexity of the acquisition.
(2) The technical evaluation process requires careful consideration
regarding the size, composition, expertise, and function of the
technical evaluation panel. The efforts of the panel can result in the
success or failure of the acquisition.
(B) Role of the project officer. (1) The project officer is the
contracting officer's technical representative for the acquisition
action. The project officer may be a voting member of the technical
evaluation panel, and may also serve as the chairperson of the panel,
unless he/she is prohibited by law or contracting activity procedures
to do so.
(2) The project officer is responsible for recommending panel
members who are knowledgeable in the technical aspects of the
acquisition and who are competent to identify strengths and weaknesses
of the various proposals. The program training requirements specified
in 307.170 must be adhered to when selecting prospective panel members
(government employees).
(3) The project officer shall ensure that persons possessing
expertise and experience in addressing issues relative to sex, race,
national origin, and handicapped discrimination be included as panel
members in acquisitions which address those issues. The intent is to
balance the composition of the panel so that qualified and concerned
individuals may provide insight to other panel members regarding ideas
and approaches to be taken in the evaluation of proposals.
(4) The project officer is to submit the recommended list of panel
members to an official within the program office in a position at least
one level above the project officer, or in accordance with contracting
activity procedures. This official will review the recommendations and
select the chairperson.
(5) The project officer shall arrange for adequate and secure
working space for the panel.
(C) Role of the contracting officer. (1) The term ``contracting
officer,'' as used in this subpart, may be the contracting officer or
his/her designated representative within the contracting office.
(2) The contracting officer shall not serve as a member of the
technical evaluation panel but should be available to:
(i) Address the initial meeting of the technical evaluation panel;
(ii) Provide assistance to the evaluators as required; and
(iii) Ensure that the scores adequately reflect the written
technical report comments.
(D) Conflict of interest. (1) If a panel member has an actual or
apparent conflict of interest related to a proposal under evaluation,
he/she shall be removed from the panel and replaced with another
evaluator. If a suitable replacement is not available, the panel shall
perform the review without a replacement.
(2) For the purposes of this subpart, conflicts of interest are
defined in the Standards of Ethical Conduct for Employees of the
Executive Branch (5 CFR 2635), Supplemental Standards of Ethical
Conduct for Employees of the

[[Page 1360]]

Department of Health and Human Services (5 CFR Part 5501), and the
Procurement Integrity Act. For outside evaluators serving on the
technical evaluation panel, see paragraph (F), (315.305(a)(3)(ii)(F)).
(E) Continuity of evaluation process. (1) The technical evaluation
panel is responsible for evaluating the original proposals, making
recommendations to the chairperson regarding weaknesses and
deficiencies of proposals, and, if required by the contracting officer,
assisting the contracting officer during communications and
discussions, and reviewing supplemental, revised and/or final proposal
revisions. To the extent possible, the same evaluators should be
available throughout the entire evaluation and selection process to
ensure continuity and consistency in the treatment of proposals. The
following are examples of circumstances when it would not be necessary
for the technical evaluation panel to evaluate revised proposals
submitted during the acquisition:
(i) The answers to questions do not have a substantial impact on
the proposal;
(ii) Final proposal revisions are not materially different from the
original proposals; or
(iii) The rankings of the offerors are not affected because the
revisions to the proposals are relatively minor.
(2) The chairperson, with the concurrence of the contracting
officer, may decide not to have the panel evaluate the revised
proposals. Whenever this decision is made, it must be fully documented
by the chairperson and approved by the contracting officer.
(3) When technical evaluation panel meetings are considered
necessary by the contracting officer, the attendance of evaluators is
mandatory. When the chairperson determines that an evaluator's failure
to attend the meetings is prejudicial to the evaluation, the
chairperson shall remove and/or replace the individual after discussing
the situation with the contracting officer and obtaining his/her
concurrence and the approval of the official responsible for appointing
the panel members.
(4) Whenever continuity of the evaluation process is not possible,
and either new evaluators are selected or a reduced panel is decided
upon, each proposal which is being reviewed at any stage of the
acquisition shall be reviewed at that stage by all members of the
revised panel unless it is impractical to do so because of the receipt
of an unusually large number of proposals.
(F) Use of outside evaluators. (1) The National Institutes of
Health (NIH) and the Substance Abuse and Mental Health Services
Administration (SAMHSA) are required to have a peer review of research
and development contracts in accordance with Public Law (Pub. L.) 93-
352 as amended by Pub. L. 94-63; 42 U.S.C. 289 1-4. This legislation
requires peer review of projects and proposals, and not more than one-
fourth of the members of a peer review group may be officers or
employees of the United States. NIH and SAMHSA are therefore exempt
from the provisions of 315.305(a)(3)(ii) to the extent that 42 U.S.C.
289 1-4 applies. Conflicts of interest are addressed in the Scientific
Peer Review of Research Grant Applications and Research and Development
Contract Projects (42 CFR Part 52 h).
(2) In general, decisions to disclose proposals outside the
Government for evaluation purposes shall be made by the official
responsible for appointing panel members for the acquisition, after
consultation with the contracting officer and in accordance with
operating division procedures. The decision to disclose either a
solicited or unsolicited proposal outside the Government for the
purpose of obtaining an evaluation shall take into consideration the
avoidance of organizational conflicts of interest and any competitive
relationship between the submitter of the proposal and the prospective
evaluator(s).
(3) When it is determined to disclose a solicited proposal outside
the Government for evaluation purposes, the following or similar
conditions shall be included in the written agreement with evaluator(s)
prior to disclosure:

Conditions for Evaluating Proposals

The evaluator agrees to use the data (trade secrets, business
data, and technical data) contained in the proposal only for
evaluation purposes.
The requirement does not apply to data obtained from another
source without restriction.
Any notice or legend placed on the proposal by either the
Department or the submitter of the proposal shall be applied to any
reproduction or abstract provided to the evaluator or made by the
evaluator. Upon completion of the evaluation, the evaluator shall
return the Government furnished copy of the proposal or abstract,
and all copies thereof, to the Departmental office which initially
furnished the proposal for evaluation.
Unless authorized by the Department's initiating office, the
evaluator shall not contact the submitter of the proposal concerning
any aspects of its contents.
The evaluator will be obligated to obtain commitments from its
employees and subcontractors, if any, to effect the purposes of
these conditions.

(iii) Receipt of proposals.
(A) After the closing date set by the solicitation for the receipt
of proposals, the contracting officer will use a transmittal memorandum
to forward the technical proposals to the project officer or
chairperson for evaluation. The business proposals will be retained by
the contracting officer for evaluation.
(B) The transmittal memorandum shall include at least the
following:
(1) A list of the names of the organizations submitting proposals;
(2) A reference to the need to preserve the integrity of the source
selection process;
(3) A statement that only the contracting officer is to conduct
discussions.
(4) A requirement for a technical evaluation report in accordance
with 315.305(a)(3)(vi); and
(5) The establishment of a date for receipt of the technical
evaluation report.
(iv) Convening the technical evaluation panel.
(A) Normally, the technical evaluation panel will convene to
evaluate the proposals. However, there may be situations when the
contracting officer determines that it is not feasible for the panel to
convene. Whenever this decision is made, care must be taken to assure
that the technical review is closely monitored to produce acceptable
results.
(B) When a panel is convened, the chairperson is responsible for
the control of the technical proposals provided to him/her by the
contracting officer for use during the evaluation process. The
chairperson will generally distribute the technical proposals prior to
the initial panel meeting and will establish procedures for securing
the proposals whenever they are not being evaluated to insure their
confidentiality. After the evaluation is complete, all proposals must
be returned to the contracting officer by the chairperson.
(C) The contracting officer shall address the initial meeting of
the panel and state the basic rules for conducting the evaluation. The
contracting officer shall provide written guidance to the panel if he/
she is unable to attend the initial panel meeting. The guidance should
include:
(1) Explanation of conflicts of interest;
(2) The necessity to read and understand the solicitation,
especially the statement of work and evaluation criteria, prior to
reading the proposals;
(3) The need for evaluators to restrict the review to only the
solicitation and the contents of the technical proposals;
(4) The need for each evaluator to review all the proposals;

[[Page 1361]]

(5) The need to watch for ambiguities, inconsistencies, errors, and
deficiencies which should be surfaced during the evaluation process;
(6) An explanation of the evaluation process and what will be
expected of the evaluators throughout the process;
(7) The need for the evaluators to be aware of the requirement to
have complete written documentation of the individual strengths and
weaknesses which affect the scoring of the proposals; and
(8) An instruction directing the evaluators that, until the award
is made, information concerning the acquisition must not be disclosed
to any person not directly involved in the evaluation process.
(v) Rating and ranking of proposals. The evaluators will
individually read each proposal, describe tentative strengths and
weaknesses, and develop preliminary scores in relation to each
evaluation criterion set forth in the solicitation. After this has been
accomplished, the evaluators shall discuss in detail the individual
strengths and weakness described by each evaluator and, if possible,
arrive at a common understanding of the major strengths and weaknesses
and the potential for correcting each offeror's weakness(es). Each
evaluator will score each proposal, and then the technical evaluation
panel will collectively rank the proposals. Generally, ranking will be
determined by adding the numerical scores assigned to the evaluation
criteria and finding the average for each offeror. The evaluators
should then identify whether each proposal is acceptable or
unacceptable. Predetermined cutoff scores shall not be employed.
(vi) Technical evaluation report. A technical evaluation report
shall be prepared and furnished to the contracting officer by the
chairperson and maintained as a permanent record in the contract file.
The report must reflect the ranking of the proposals and identify each
proposal as acceptable or unacceptable. The report must also include a
narrative evaluation specifying the strengths and weaknesses of each
proposal, a copy of each rating sheet, and any reservations,
qualifications, or areas to be addressed that might bear upon the
selection of sources for negotiation and award. Concrete technical
reasons supporting a determination of unacceptability with regard to
any proposal must be included. The report should also include specific
points and questions which are to be raised in discussions or
negotiations.

315.306 Exchanges with offerors after receipt of proposals.

(c) Competitive range. (1) Some of the factors which the
contracting officer should consider in determining the competitive
range are:
(i) The relative importance of cost or price as compared to
technical factors;
(ii) The susceptibility of significantly reducing a proposal with
an unreasonable high price or cost without undermining the technical
merit if the offeror otherwise has a reasonable chance to receive an
award; and
(iii) The likelihood of reducing cost or price of a proposal which
exceeds the Government's requirements.
(2) The contracting officer shall conduct a thorough review of the
technical evaluation report to be assured that:
(i) All determinations of unacceptability are supported by concrete
and comprehensive statements that are factual and convincing and are
consistent with the evaluation criteria set forth in the solicitation.
Every statement should be reviewed carefully to eliminate any doubts as
to the unacceptability of a proposal;
(ii) All recommendations to exclude proposals from the competitive
range are supported by persuasive rationale and sufficient facts to
substantiate a judgment that meaningful discussions are not possible or
there is no reasonable chance of the proposal being selected for award;
(iii) Those cases where only one organization is found to be
technically acceptable are fully scrutinized; and
(iv) Unacceptable proposals contain ``information'' deficiencies
which are so material as to preclude any possibility of upgrading the
proposal to a competitive level except through major revisions and
additions which would be tantamount to the submission of another
proposal.
(d) Exchanges with offerors after establishment of the competitive
range. The contracting officer and project officer should discuss the
uncertainties and/or deficiencies that are included in the technical
evaluatio

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A99-7. Public record. Not legal advice.
