# Five Rivers Landscape Management Project; Siuslaw National Forest, Lincoln and Lane Counties, Oregon

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A99-4646

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** February 25, 1999
- **Citation:** 64 FR 9308

## Text

DEPARTMENT OF AGRICULTURE

Forest Service

Five Rivers Landscape Management Project; Siuslaw National
Forest, Lincoln and Lane Counties, Oregon

AGENCY: Forest Service, USDA.

ACTION: Notice of intent to prepare and consider an environmental
impact statement.

-----------------------------------------------------------------------

SUMMARY: The USDA Forest Service will prepare an environmental impact
statement (EIS) for a proposed action in the Five Rivers Watershed,
designed to:
Increase late-successional habitat in late-successional
and riparian reserves;
Restore the health of watersheds and associated aquatic
ecosystems;
Maintain the function and diversity of matrix (non-
reserved) lands, while providing timber and other products and
amenities; and
Learn from various strategies for achieving late-
successional conditions and aquatic conservation because no single
strategy is known to work best.
The Five Rivers watershed is about 34 air miles southwest of
Corvallis and 40 air miles northwest of Eugene, Oregon. Proposed
activities include thinning plantations through commercial sales and
service contracts, planting hardwoods and shade-tolerant conifers in
suitable sites, decommissioning and closing roads, placing large woods
in streams, planting conifers in riparian areas, maintaining and
creating early-seral habitat, maintaining diverse dispersed
recreational opportunities, and maintaining opportunities to harvest
greenery and mushrooms. These proposed activities are linked by their
interacting effects--through the networks of streams, roads, and
forested stands--on this large project area. Efficiencies in planning
are also expected.
The Five Rivers planning area comprises about 37,000 acres; of this
total, 4,932 acres (13%) are private land. Of the 32,038 acres of
National Forest land, about 15,530 acres (48%) have been previously
harvested and regenerated. About 11,781 acres (37%) remain in mature
condition, and about 5,000 acres (15%) are in hardwood or mixed conifer
and hardwood. The project area has an average road density of 3.1 miles
per square mile, and an average stream density of 7.9 miles per square
mile. The project area does not include any inventoried roadless or
designated wilderness areas.
The Forest Service proposal complies with the 1990 Siuslaw National
Forest Land and Resource Management Plan, as amended by the 1994
Northwest Forest Plan, which provides guidance for managing this area.
The Lobster/Five Rivers watershed analysis (1997) identified many
opportunities to restore terrestrial and aquatic ecosystems in the Five
Rivers watershed, which the proposed action is designed to address.
Some proposed project activities are expected to begin in fiscal year
(FY) 2000, but when activities actually begin in a function of many
factors--such as availability of funding, market conditions, contract
size, and award date. For example, a timber sale planned for 2004 could
take 4 or 5 years to complete, for a variety of reasons--for example,
because of poor market conditions. Planned post-sale activities to be
funded by timber receipts could thus be delayed as well. We expect the
work to begin in FY2000 and continue through FY2015.
The Siuslaw National Forest invites written comments on this
proposal. Site-specific comments are encouraged because they are the
most useful for improving project design. The proposed actions are
described in detail below to provide our current thinking in a way to
help people understand the proposal. Considerable flexibility exists
for developing strategies, depending on the issues raised.

DATES: Comments about the scope of the proposal should be received in
writing by March 19, 1999.

ADDRESSES: Send written comments to Doris Tai, District Ranger,
Waldport Ranger District, Siuslaw National Forest, P.O. Box 400,
Waldport, Oregon 97394.

FOR FURTHER INFORMATION CONTACT:
Paul Thomas, EIS Team Leader, Waldport Ranger District, Siuslaw
National Forest, Phone 541-563-3211. Maps, referenced below, showing
proposed actions for the Five River Watershed Restoration Project, can
be viewed at the Waldport District Office or on the Siuslaw National
Forest Web site at www.fs.fed.us/r6/siuslaw/projects.htm.

SUPPLEMENTARY INFORMATION: The land managed by the Siuslaw National
Forest is public land. In the project area, the Record of Decision for
the Northwest Forest Plan (NWFP 1994) designates three land allocations
that must be managed under specific guidelines intended to: move tree
plantations in the late-successional reserves toward old-growth
conditions; improve habitat for riparian-dependent species, including
anadromous fish, in late-successional and riparian reserves; and
harvest wood products from the remaining area (matrix) to benefit local
economies. The Plan also provides a

[[Page 9309]]

process for evaluating management actions and identifying steps to
modify activities to improve results (adaptive management).
The Assessment Report: Federal Lands in and Adjacent to Oregon
Coast Province (1995, chapters C-F), the Late-Successional Reserve
Assessment: Oregon Coast Province, Southern Portion (1997, chapter 3),
and the Lobster/Five Rivers Watershed Analysis (1997, chapter 5)
describe the current terrestrial, aquatic, and social conditions in the
Five Rivers watershed. The Lobster/Five Rivers Watershed Analysis
(chapter 6) identifies many opportunities for restoring terrestrial and
aquatic ecosystems in the planning area. In reviewing these documents,
I identified the following needs and proposed actions to meet the
current objectives:
A need for increased late-successional habitat in late-successional
and riparian reserves. Late-successional reserves were designed to
protect and enhance conditions of late-successional and old-growth
forest ecosystems, which are required habitat for many species (NWFP
1994). Riparian reserve objectives include protecting and enhancing
habitat for terrestrial plants and animals, as well as providing
connectivity corridors between late-successional reserves. The
watershed analysis showed that the amount of mature and late-
successional forest, including large patches, has decreased over the
last 100 years, and edge habitat, fragmentation, numbers of hardwoods,
and early-seral habitat have increased. Natural stands have more
diversity in tree species and structure, as well more coarse woody
debris and snags, than do these plantations. To accelerate developing
mature and late-successional habitat characteristics, I propose to thin
about 3,250 acres of predominately Douglas-fir-from both late-
successional and riparian reserves--through commercial timber sales
(map 1); to support these sales, about 16 miles of existing road would
be temporarily reopened, and about 1.5 miles of new temporary road
would be built. After stand development and coarse wood debris
restoration objectives are met, about 32.1 million board feet would be
available to harvest for manufacturing wood products. About 2,000 acres
would be thinned through service contracts. A mixture of shade-tolerant
conifers and hardwoods would be planted on 800 acres in existing
plantations to add diversity to their future composition and structure.
A need to restore the health of watersheds and associated aquatic
ecosystems. The Aquatic Conservation Strategy in the Northwest Forest
Plan is intended to restore and maintain the health of watersheds and
the aquatic ecosystems they contain. The watershed analysis showed
several streams with one or more aquatic habitat components--such as
stream temperatures, channel complexity, and stream substrate
characteristics--as at risk of or not functioning properly. To
facilitate restoring hydrologic processes and conditions, I propose to
decommission about 37 miles of road and close about 86 miles of road in
the watershed (map 2). To mitigate for the loss of access to a private
parcel, I will issue a special-use permit to build, use, and maintain a
road across National Forest land (map 2). I am also proposing to
evaluate alternative routes for Roads 32 and 3505 in the Upper Five
Rivers subwatershed. To facilitate restoring hydrologic processes, I
propose to place large conifers and root wads along 36 miles of stream
(map 1). To provide for a future supply of conifers and facilitate
shade development, 200 acres of alder- or meadow-dominated riparian
areas will be planted with conifers and various hardwoods (map 1).
A need to maintain the function and diversity in matrix lands while
providing timber and other products and amenities. Producing timber and
other products is an important objective for the matrix lands, but the
standards and guides of the Northwest Forest Plan are also designed to
provide important ecological functions, such as the carryover of some
species from one stand to the next and maintaining structural
components such as logs, snags, and large green trees. The matrix is
also managed to add ecological diversity by providing early-
successional habitat. The watershed analysis showed that the habitat
components in the matrix lands were similar in composition and
structure to lands in late-successional reserves. To ensure that future
management activities are able to meet management objectives, I propose
to thin about 650 acres in plantations on matrix lands through
commercial timber sales (map 1). To support these sales, about 3 miles
of existing road would be temporarily reopened, and about 0.5 miles of
new temporary road would be built. About 6.5 million board feet would
be sold and harvested for manufacturing wood products. To maintain a
diversity or seral classes, about 40 acres of existing meadows and
plantations in matrix land will be maintained in early-seral condition
(map 1).
A need to learn from a variety of strategies for achieving late-
successional conditions and aquatic conservation because no single
strategy is known to work best. The Northwest Forest Plan identified
the standards and guides for management activities. Adaptive management
is a process of action-based planning, monitoring, researching,
evaluating, and adjusting to improve future actions and to determine if
the standards and guides are effective in achieving the goals of the
Northwest Forest Plan. The high density of roads in the Siuslaw
continues to fuel the debate over their long-term management, primarily
related to the values associated with using and maintaining them versus
their adverse effects on the terrestrial and aquatic environment.
Debate also surrounds the question of whether the plantations will ever
achieve old-growth conditions, with or without thinning and under-
planting. I propose a management study to compare effects of different
road-management strategies and their effects on resources. Four
strategies have been proposed so far: no road access, no intervention;
continued road access, continuous management; 10-year road closures,
intermittent management; and 20-year road closures, intermittent
management. Strategies with long road closures will require thinning to
wider spacing and different stream-restoration strategies than
strategies that keep roads open. The strategies would be distributed
across the landscape in a way that makes comparing the results most
valid. Details of the management study, reflecting public input, will
be described in the draft EIS.
This analysis will consider a range of alternatives that will
address the purpose and needs for the proposed project. The no-action
alternative will be part of this range so that effects associated with
not implementing any of the proposed activities can be evaluated.
Preliminary issues considered significant include the effects on
habitat of species associated with late-successional and old-growth
forests, effects on aquatic habitats and hydro-logic processes, and
changes in vehicle access to the watershed.
The Forest Service will be seeking additional information,
comments, and assistance from Federal, State, and local agencies;
tribes; and other individuals or organizations who may be interested or
affected by the proposed project. Field trips and public scoping
meetings are not scheduled at this time, pending comments form the
public. Comments from other agencies are being sought and will be used
in preparing the draft EIS. The scoping process will:
Identify potential issues;
Identify key issues to analyzed in depth;

[[Page 9310]]

Eliminate non-key issues or those that have been covered
by relevant previous environmental analyses;
Identify alternatives to the proposed action;
Identify opportunities for cooperative restoration
projects on private land; and
Identify potential environmental effects (that is, direct,
indirect, and cumulative effects) of the proposed action and
alternatives.
The draft EIS is expected to be filed with the Environmental
Protection Agency (EPA) and to available for public review by June
1999. The comment period on the draft EIS will be 45 days after the EPA
publishes the notice of availability in the Federal Register. The final
EIS is scheduled to be available in September 1999.
To assist the Forest Service in identifying and considering issues
on the proposed project, comments on the draft EIS should be as
specific as possible. Referring to specific pages or chapters of the
draft statement is also helpful. Comments may address both the adequacy
of the draft EIS and the merits of the alternative formulated and
discussed in the statement. (Reviewers may wish to refer to the Council
on Environmental Quality Regulations for implementing the procedural
provisions of the National Environmental Policy Act at 40 CFR 1503.3 in
addressing these points.)
At this early stage, I believe that giving reviewers notice of
several court rulings related to public participation in reviewing
environmental processes is important. First, reviewers of draft
environmental impact statements must structure their participation in
the environmental review of the proposal so that it is meaningful and
alerts the agency to the reviewer's position and contentions (Vermont
Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 533; 1978). Also,
environmental objections that could be raised at the draft
environmental impact statement stage but that are not raised until the
final environmental impact statement is completed may be waived or
dismissed by the courts (City of Angoon v. Hodel, 803 F. 2d 1016, 1022
(9th Cir. 1986) and Wisconsin Heritages, Inc. v. Harris, 490 F. Supp.
1334, 1338 (E.D. Wis. 1980). Because of those court rulings,
participation by those interested in this proposed project by the close
of the 45-day comment period is essential, so that substantive comments
and objections are made available to the Forest Service when it can
consider and respond to them in developing issues and alternatives in
the final EIS.
After the 45-day public comment period, the comments received will
be reviewed and considered in preparing the final EIS. The forest
supervisor of the Siuslaw National Forest is the responsible official
for this EIS. After considering public comments and responses,
environmental consequences discussed in the final EIS, and applicable
laws, regulations and policies; as the responsible official, I will
reach a decision on this proposal. This decision and the evidence
supporting it will be documented in a record of decision, which is
subject to Forest Service appeal regulations (36 CFR Part 215).

Dated: February 9, 1999.
James R. Furnish,
Forest Supervisor.
[FR Doc. 99-4646 Filed 2-24-99; 8:45 am]
BILLING CODE 3410-11-M

---