## Text

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Project No. 201]

Petersburg Municipal Power and Light; Notice of Scoping Meetings
and Project Facilities Tour Pursuant to the National Environmental
Policy Act of 1969 for an Applicant Prepared Environmental Assessment

November 3, 1999.
The Commission's regulations allow applicants the option of
preparing their own Environmental Assessment (EA) for hydropower
projects, and filing the EA with their application as part of an
alternative licensing procedure.\1\ On September 8, 1999, the
Commission approved the use of an alternative licensing procedure in
the preparation of a new license application for Petersburg Municipal
Power and Light's (Petersburg), Blind Slough Project, No. 201.
---------------------------------------------------------------------------

\1\ 81 FERC para. 61,103 (1997)
---------------------------------------------------------------------------

The alternative procedures include provisions for the distribution
of an initial information package, and for the cooperative scoping of
environmental issues and needed studies. During the week of November 1,
1999, Petersburg will distribute a Scoping Document (SD1) and initial
information package.\2\ Two public meetings will be held to discuss
these documents.
---------------------------------------------------------------------------

\2\ Copies of these documents can be obtained by calling Nan
Nalder at 206-281-7079 or e-mail [email protected]
---------------------------------------------------------------------------

Combined Scoping and Initial Information Meetings

Petersburg will hold public scoping meetings on December 13, 1999,
pursuant to the National Environmental Policy Act (NEPA) of 1969. At
the scoping meetings, Petersburg will: (1) Summarize the material
presented in the initial information package and the environmental
issues tentatively identified in the scoping document for analysis in
the EA; (2) outline any resources they believe would not require a
detailed analysis; (3) identify reasonable alternatives to be addressed
in the EA; (4) solicit from the meeting participants all available
information, especially quantitative data, on the resources at issue;
and (5) encourage statements from experts and the public on issues that
should be analyzed in the EA.
Although Petersburg's intent is to prepare an EA, there is the
possibility that an Environmental Impact Statement (EIS) will be
required. Nevertheless, this

[[Page 61109]]

meeting will satisfy the NEPA scoping requirements, irrespective of
whether an EA or EIS is issued by the Commission.
The times and locations of the scoping meetings are:

Agency Scoping Meeting
December 13, 1999, 9:00 am to 11:30 pm, Alaska division of
Governmental Coordination, 240 Main Street, 3rd Floor conference Room,
Juneau, AK 99811
Public Scoping Meeting
December 13, 1999, 7:00 pm to 8:30 pm, City Council Chambers, 12
South Nordic, Petersburg, AK 00883

All interested individuals, organizations, and agencies are invited
and encouraged to attend any or all of the meetings to assist in
identifying and clarifying the scope of environmental issues that
should be analyzed in the EA.

Project Tour

A visit to the project facilities (powerhouse, tailrace area, lower
penstock) is tentatively scheduled for December 14, 1999, weather
permitting. Access to the project dam requires air transport which will
very likely be unavailable due to low visibility, but can be arranged
for a later date. Those interested in visiting the project on December
14, should contact Dennis Lewis of Petersburg at 907-772-4203.

Scoping Meeting Procedures

The meetings will be conducted according to the procedures used at
Commission scoping meetings. Because this meeting will be a NEPA
scoping meeting under the APEA process, the Commission does not intend
to conduct a NEPA scoping meeting after Petersburg's application and EA
are filed with the Commission. Instead, Commission staff will attend
the meetings on December 13, 1999.
Both scoping meetings will be recorded by a court reporter, and the
transcripts will become part of the formal record for this project.
Those who choose not to speak during the scoping meetings may instead
submit written comments on the project. Written comments should be
mailed or e-mailed to: Nan A. Nalder, Relicensing Manager, Acres
International, 3254-11th Avenue West, Seattle, WA 98119,
[email protected].

Commenting Deadline

All correspondence should be postmarked no later than February 15,
2000. Comments should show the following caption on the first page:
Scoping Comments, Blind Slough Hydroelectric Project, Project No. 201.
For further information please contact Vince Yearick of the
Commission at (202) 219-3073.
David P. Boergers,
Secretary.
[FR Doc. 99-29273 Filed 11-8-99; 8:45 am]
BILLING CODE 6717-01-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A99-29273. Public record. Not legal advice.