DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. CP99-621-000]

Texas Eastern Transmission Corporation; Notice of Intent To
Prepare an Environmental Assessment for the Proposed Ironwood Lateral
and Request for Comments on Environmental Issues

November 2, 1999.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Ironwood Lateral involving
construction and operation of facilities by Texas Eastern Transmission
Corporation (Texas Eastern) in Lebanon County, Pennsylvania.\1\ These
facilities would consist of about 3.6 miles of 16-inch-diameter
pipeline, one meter station and dual 12-inch hot taps. This EA will be
used by the Commission in its decision-making process to determine
whether the project is in the public convenience and necessity.
---------------------------------------------------------------------------

\1\ Texas Eastern's application was filed with the Commission
under Section 7 of the Natural Gas Act and Part 157 of the
Commission's regulations.
---------------------------------------------------------------------------

If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The pipeline company would seek to negotiate a mutually acceptable
agreement. However, if the project is approved by the Commission, that
approval conveys with it the right of eminent domain. Therefore, if
easement negotiations fail to produce an agreement, the pipeline
company could initiate condemnation proceedings in accordance with
state law. A fact sheet addressing a number of typically asked
questions, including the use of eminent domain, is attached to this
notice as appendix 1.\2\
---------------------------------------------------------------------------

\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, 888
First Street, N.E., Washington, D.C. 20426, or call (202) 208-1371.
Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------

Summary of the Proposed Project

Texas Eastern wants to expand the capacity of its facilities in
Pennsylvania to transport an additional 12,000 million British thermal
units per day of natural gas to an electric cogenerating facility.
Texas Eastern seeks authority to construct and operate:
Approximately 3.6 miles of 16-inch-diameter pipeline in
Lebanon County, Pennsylvania;
One meter station in Lebanon County, Pennsylvania, and
Dual 12-inch hot taps in Lebanon County, Pennsylvania.
The location of the project facilities is shown is appendix 2.

Land Requirements for Construction

Construction of the proposed facilities would require about 37.2
acres of land. Following construction, about 0.3 acre would be
maintained as a new aboveground facility site. The remaining 36.9 acres
of land would be restored and allowed to revert to its former use.

The EA Process

The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are considered during the preparation of the EA. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils
Water resources, fisheries, and wetlands
Land use
Cultural resources
Vegetation and wildlife
Endangered and threatened species
Public safety
Air quality and noise
Hazardous waste
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section beginning on page 4.

Curently Identified Environmental Issues

We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Texas Eastern. This
preliminary list of issues may be changed based on your comments and
our analysis.
The project would cross one perennial waterbody,
Tulpehocken Creek. This creek was designated as part of the
Pennsylvania Scenic Rivers Program in December 1992.
A total of 23.2 acres of agricultural land would be
impacted.
The proposed project would cross the Union Canal which is
eligible for listing in the National Register of Historic Places.
Also, we have made a preliminary decision to not address the
impacts of the nonjurisdictional facilities. We will briefly describe
their location and status in the EA.

Public Participation

You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You

[[Page 60811]]

should focus on the potential environmental effects of the proposal,
alternatives to the proposal (including alternative routes), and
measures to avoid or lessen environmental impact. The more specific
your comments, the more useful they will be. Please carefully follow
these instructions to ensure that your comments are received in time
and properly recorded:
Send two copies of your letter to: David P. Boergers,
Secretary, Federal Energy Regulatory Commission, 888 First St., N.E.,
Room 1A, Washington, DC 20426;
Label one copy of the comments for the attention of the
Environmental Review and Compliance Branch. PR-11.2;
Reference Docket No. CP99-621-000; and
Mail your comments so that they will be received in
Washington, DC on or before November 29, 1999.

Becoming an Intervenor

In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor''. Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervernor must provide 14 copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214) (see appendix 3). Only intervenors have the
right to seek rehearing of the Commission's decision.
The date for filing timely motions to intervene in this proceeding
has passed. Therefore, parties now seeking to file late interventions
must show good cause, as required by section 385.214(b)(3), why this
time limitation should be waived. Environmental issues have been viewed
as good cause for late intervention.
You do not need intervenor status to have your environmental
comments considered. Additional information about the proposed project
is available from Mr. Paul McKee of the Commission's Office of External
Affairs at (202) 208-1088 or on the FERC website (www.ferc.fed.us)
using the ``RIMS'' link to information in this docket number. Click on
the ``RIMS'' link, select ``Docket #'' from the RIMS Menu, and follow
the instructions. For assistance with access to RIMS, the RIMS helpline
can be reached at (202) 208-2222.
Similarly, the ``CIPS'' link on the FERC Internet website provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings. From the FERC Internet website,
click on the ``CIPS'' link, select ``Docket #'' from the CIPS menu, and
follow the instructions. For assistance with access to CIPS, the CIPS
helpline can be reached at (202) 208-2474.
David P. Boergers,