# Petition for Waiver of Compliance

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A99-28465

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** November 1, 1999
- **Citation:** 64 FR 58898

## Text

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

Petition for Waiver of Compliance

In accordance with Part 211 of Title 49 Code of Federal Regulations
(CFR), notice is hereby given that the Federal Railroad Administration
(FRA) received a request for a waiver of compliance from certain
requirements of its safety regulations. The individual petition is
described below including, the party seeking relief, the regulatory
provisions involved, the nature of the relief being requested, and the
petitioner's arguments in favor of relief.

CSX Transportation

[Docket Number FRA-1999-6252]

CSX Transportation (CSXT) seeks a waiver of compliance from certain
provisions of the Railroad Locomotive Safety Standards, 49 CFR Part
229. Specifically, CSXT requests relief from the requirements of 49 CFR
229.27(a)(2) Annual Tests and 49 CFR 229.29(a) Biennial Tests, as
solely applicable to all present and future installations of the New
York Air Brake Corporation (NYAB) Computer Controlled Brake (CCB)
Systems on CSXT locomotives. Part 229.27(a)(2) requires that, ``Brake
cylinder relay valve portions, main reservoir safety valves, brake pipe
vent valve portions, feed and reducing valve portions in the air brake
system (including related dirt collectors and filters) shall be
cleaned, repaired, and tested'' at intervals that do not exceed 368
calendar days. Part 229.29(a) requires in part that ``* * * all valves,
valve portions, MU locomotive brake cylinders and electric-pneumatic
master controllers in the air brake system (including related dirt
collectors and filters) shall be cleaned, repaired , and tested at
intervals that do not exceed 736 calendar days.'' CSXT requests these
provisions be temporarily waived to accommodate the implementation of a
Test Plan to prove the new technology incorporated in this brake system
is more reliable and safer in the Rail Transportation Industry, with
the intent of moving to a component repair as required, performance-
based COT&S criterion.

[[Page 58899]]

The time interval for the requirements of Part 229.29(a) was
extended to 1,104 calendar days in 1985 for 26L Brake equipment, based
on proven service reliability with the evolution of improved
components. The time interval for CCB equipment was extended to 1,840
calendar days in 1996, per FRA Test Waiver, H-95-3.
CSXT states that the CCB equipment used on their locomotives
provides reliable operation based upon the availability of diagnostics,
which continuously monitors the function of all critical components.
When the CCB diagnostics detects operational characteristics outside
allowed limits, the system automatically takes appropriate action to
assure safety. Because failures are detected and fault action is
automatically initiated, CSXT believes that COT&S intervals can be
increased without any impact on safety.
CSXT bases their Test Plan on the following: (1) The reduction of
mechanical devices through the use of micro-processor logic; (2) the
replacement of ``O'' ring technology with ``poppet'' technology; (3)
the immediate detection of faults or improper operation through the
vigilance of a microcomputer; (4) the control of faults to a known safe
condition; (5) emergency brake initiation and brake cylinder pressure
development is accomplished mechanically as well as electronically
under any condition; and (6) the performance of CCB equipment during
current FRA Waiver H-95-3.
The Test Plan is designed to determine the feasibility of a
``performance-based'' COT&S. The initial duration of the test shall be
six years from the in-service date of the locomotives listed in the
control group. At the end of the six years, an evaluation and review
will be made to assess whether an extension of an additional year for
the test will be granted. Data collection for this test shall be
accomplished within the present structure of the CSXT Mechanical
Operations group, with assistance of NYAB Field Service Engineering.
The test plan has specific requirements to tag and record detailed
information on all faulty brake components removed from locomotives
equipped with the CCB system and covered by this waiver. Data analysis
for confirmation of failures will be determined by CSXT, NYAB Field
Service Engineering and/or NYAB Service Department. A ``criticality
rating'' will be assigned to each component failure and all information
will be compiled for an evaluation of performance.
The periodic (92-day) test, per Sec. 229.23, will be performed on
all locomotives in the test group and replacement of all filtering
devices and dirt collectors will be done annually. CSXT, NYAB, and FRA
will perform an annual test of the CCB system, per NYAB Test ABT-2771,
on select locomotives from the control group. The results of the tests
and the information gathered throughout the year will be used to
determine if the test plan can be extended for another year.
Interested parties are invited to participate in these proceedings
by submitting written views, data, or comments. FRA does not anticipate
scheduling a public hearing in connection with these proceedings since
the facts do not appear to warrant a hearing. If any interested party
desires an opportunity for oral comment, they should notify FRA in
writing, before the end of the comment period and specify the basis for
their request.
All communications concerning these proceedings should identify the
appropriate docket number (e.g., Waiver Petition Docket Number FRA-
1999-6252) and must be submitted to the Docket Management Facility,
Room PL-401, (Plaza Level) 400 Seventh Street, SW, Washington, DC
20590-0001. Communications received within 45 days of the date of this
notice will be considered by FRA before final action is taken. Comments
received after that date will be considered as far as practicable. All
written communications concerning these proceedings are available for
examination during regular business hours (9 a.m.-5 p.m.) at the above
facility. All documents in the public docket are also available for
inspection and copying on the Internet at the docket facility's web
site at http://dms.dot.gov.

Issued in Washington, DC. on October 25, 1999.
Grady C. Cothen, Jr.,
Deputy Associate Administrator for Safety Standards and Program
Development.
[FR Doc. 99-28465 Filed 10-29-99; 8:45 am]
BILLING CODE 4910-06-P

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A99-28465. Public record. Not legal advice.
