SUMMARY: Today's action revises, clarifies and strengthens the
Environmental Protection Agency's (EPA's) National Pollutant Discharge
Elimination System (NPDES) Program and Water Quality Standards (WQS)
Regulation under the Clean Water Act (CWA). Today's proposed rule is
intended to achieve two objectives. The first objective is to achieve
reasonable further progress toward attaining water quality standards in
impaired waterbodies prior to EPA approval or establishment of a Total
Maximum Daily Load (TMDL). To achieve this objective, EPA is proposing
explicit language describing the Agency's discretionary authority to
object to, and reissue, if necessary, State-issued expired and
administratively-continued permits authorizing discharges into impaired
waterbodies in the absence of an EPA approved or established TMDL. EPA
would exercise this authority to ensure that those permits are
consistent with water quality standards. Also to achieve this
objective, EPA is proposing to require that selected dischargers offset
any increase in mass loadings of a pollutant(s) causing the
nonattainment of water quality standards in an amount that would result
in reasonable further progress toward attainment of water quality
standards.
The second objective is to achieve reasonable assurance that an
established TMDL will be implemented. To achieve this objective, EPA is
proposing explicit language describing EPA's discretionary authority to
object to, and reissue, if necessary, State-issued expired and
administratively-continued permits authorizing discharges into impaired
waterbodies with established and approved TMDLs. EPA would exercise
this authority to ensure that those permits are consistent with
applicable wasteload allocations in a TMDL. Also to achieve this
objective, EPA is proposing explicit language describing the authority
of both EPA and States with approved NPDES programs, to designate
certain currently unregulated sources as sources that would require an
NPDES permit.

DATES: Comments on this proposal must be received, postmarked or
delivered by hand on or before October 22, 1999.

ADDRESSES: Send written comments on the proposed rule to W-99-04,
NPDES/WQS, Comment Clerk, Water Docket, Environmental Protection
Agency, 401 M Street, SW, Washington, DC 20460. Comments can also be
submitted electronically to OW-D[email protected] (see ``DOCKET'' section
below). A copy of the supporting documents cited in this proposal is
available for review at EPA's Water Docket; 401 M Street, SW, Mail
code: EB57, Washington, DC 20460.

FOR FURTHER INFORMATION CONTACT: Kim Kramer, Office of Wastewater
Management, 401 M St., SW, Washington, DC 20640, Mail Code 4203, e-
mail: Kramer.K[email protected], telephone: (202) 260-9541 for information
regarding the NPDES provisions, or Susan Gilbertson, Office of Science
and Technology, 401 M St., SW, Washington, DC 20460, Mail Code 4305, e-
mail: Gilbertson.S[email protected], telephone: (202) 260-7301 for information
regarding the water quality standards provisions.

SUPPLEMENTARY INFORMATION:

A. Table of Contents of This Preamble

I. Purposes and Objectives of Today's Proposed Rules
II. Proposed Requirements for New and Significantly Expanding
Dischargers Located on Impaired Waters
A. Who Would Be Subject to This Proposal?
1. Which Sources Discharge New Pollutant Loads to a Waterbody?
2. Would Dischargers Who are Currently Discharging but Move
Their Outfall(s) to Another Waterbody Be Subject to This Proposal?
3. Will The Proposed Changes to the Definitions of a New
Discharger and an Existing Source Affect Their Application Elsewhere
in the Regulations?
4. Would Any Existing Dischargers Be Subject to This Proposal?
5. How is EPA Proposing to Define A ``Significant Expansion'' of
an Existing Discharger?
B. What are the Proposed Changes to the Federal Antidegradation
Policy?
1. What is the Current Federal Antidegradation Policy?
2. What Were the Recommendations of the TMDL Federal Advisory
Committee?
3. What Revisions is EPA Proposing Today?
i. Why is EPA Proposing to Require Dischargers Subject to This
Proposal to Achieve Reasonable Further Progress Toward Attaining
Water Quality Standards?
a. How Does This Relate to the TMDL FACA Committee's
Recommendations?
b. Has This Approach Been Used in Other Statutes?
ii. How is EPA Proposing to Define Reasonable Further Progress?
a. Has Reasonable Further Progress Been Defined Under Other
Statutes?
iii. What Offsets Would Affected Dischargers Need to Obtain to
Ensure Reasonable Further Progress?
a. Could Offsets be Obtained From Existing Nonpoint Sources?
b. Could the Director Vary the Amount of the Offset?
iv. Would the Reasonable Further Progress Requirements Apply to
Affected Dischargers Proposing to Discharge to All Waters of the
U.S.?
v. Why is EPA Proposing to Subject Only New Dischargers and
Existing Dischargers Undergoing a Significant Expansion to These
Requirements?
vi. Would All New Dischargers and Existing Dischargers
Undergoing a Significant Expansion Be Subject to These Proposed
Requirements?
a. How Would This Proposal Facilitate the Establishment of
Trading Markets?
C. How Would EPA Ensure any Needed Changes to the
Antidegradation Policies in State, Territorial and Tribal Water
Quality Standards?
D. How Would These Changes Be Implemented Through NPDES Permits?
1. Must the New or Significantly Expanding Discharger Obtain an
Offset of the Same Pollutant(s) the New or Significantly Expanding
Discharger Would Be Required to Offset?
2. From What Geographic Area Would the Pollutant Load Reductions
Need to Be Obtained?
3. Could the Pollutant Load Reductions Come From a Source With
Existing Requirements to Reduce its Loads?
4. When Would the Pollutant Load Reductions Need to Be Obtained?
5. How Long Would the Pollutant Load Reductions Need to Be
Maintained?
6. What Would Be Required When the Source of the Offset is an
Existing Point Source?
7. What Would Be Required When the Source of the Offset is an
Existing Nonpoint Source?
8. How Would Offsets Be Obtained From Sources Seeking Coverage
Under a General Permit?
i. What Options is the Agency Considering?
ii. What If a Notice of Intent Form is Not Required?
iii. Who and Under What Circumstances Would Need to Submit a
Supplemental Certification?
iv. How Would Offsets Be Determined for Dischargers Regulated
Solely by BMPs?
E. Additional Proposed Modifications to Related NPDES Provisions
1. How is EPA Proposing to Modify the Water Quality-Based
Permitting Regulations?

[[Page 46059]]

2. How is EPA Proposing to Modify the Regulations Pertaining to
the Statement of Basis and Permit Fact Sheet?
III. Proposed Authority to Designate Additional Sources of
Pollutants to the NPDES Program
A. How Would Animal Feeding Operations and Aquatic Animal
Production Facilities Be Affected by Today's Proposal?
1. How Do These Sources Become Subject to the NPDES Program?
i. Under What Circumstances Are CAFOs Designated on a Case-By-
Case Basis?
ii. Under What Circumstances are CAAPFs Designated on a Case-by-
Case Basis?
2. Why is EPA Proposing Changes to the CAFO and CAAPFs
Jurisdictional Regulations?
i. How Do Animal Feeding Operations Impact Water Quality?
ii. How Do Aquatic Animal Production Facilities Impact Water
Quality?
3. What Changes is EPA Proposing to Make to the CAFO and CAAPFs
Jurisdictional Regulations?
i. When Would EPA Designate These Sources?
ii. How Will This Proposal Affect States?
iii. Who Would Issue Permits to These Sources Once Designated?
4. How Would EPA Revise Regulatory Text?
B. How Would Silvicultural Activities Be Affected by Today's
Proposal?
1. Which Sources Are Currently Excluded From the Definition of a
``Point Source?'
2. Are All Discharges From Silvicultural Activities Currently
Excluded From the NPDES Program?
3. Which Silvicultural Discharges Would Be Designated Under
Today's Proposal as Sources Subject to the NPDES Program?
4. Why is EPA Proposing to Remove the Regulatory Exclusion for
These Silvicultural Discharges?
5. When Would Silviculture Sources Be Required to Obtain an
NPDES Permit?
6. How Would States Be Affected by This Proposal?
IV. Proposed EPA Authority to Reissue State-Issued Expired and
Administratively-Continued NPDES Permits
A. Can EPA Object to State-Issued Expired and Administratively-
Continued Permits?
B. How Would EPA Review and Object to a State-Issued Expired and
Administratively-Continued Permit?
C. When Would EPA Withdraw its Objection?
D. When Could EPA Invoke This Authority?
E. Will EPA Work With the States Before Invoking This Authority?
F. What If a Permit Has Expired but the Permittee Has Not
Submitted a Timely and Complete Application for Renewal to the
State?
G. What Authority Supports Today's Proposed Changes?
H. Conclusion
V. Regulatory Assessment Requirements
A. Regulatory Flexibility Act, as amended by the Small Business
Regulatory Enforcement Fairness Act of 1996
B. Executive Order 12866
C. Unfunded Mandates Reform Act
D. Paperwork Reduction Act
E. Executive Orders on Federalism
F. Executive Order 13084: Consultation and Coordination With
Indian Tribal Governments
G. Executive Order 13045: Protection of Children From
Environmental Health Risks and Safety Risks
H. National Technology Transfer and Advancement Act
I. Executive Order 12898: Environmental Justice

B. Potentially Regulated Entities

Entities discharging pollutants to certain waters of the U.S. could
be regulated by this rulemaking if they are subject to National
Pollutant Discharge Elimination System (NPDES) program. Potentially
regulated entities include:

------------------------------------------------------------------------
Examples of potentially
Category regulated entities
------------------------------------------------------------------------
State, Territorial or authorized Tribal States, territories and
Governments. authorized Tribes issuing
NPDES permits
Federal Government..................... EPA
Industry............................... Industries, including municipal
construction sites,
discharging pollutants to
waters of the U.S.
Municipalities......................... Owners and operators of
publically-owned treatment
works, municipal separate
storm sewer systems, and
municipal construction and
industrial activities
discharging pollutants to
waters of the U.S.
------------------------------------------------------------------------

This table is not intended to be exhaustive, but rather provide a
guide for readers to identify entities that EPA believes could
potentially be affected by this action. Other types of entities not
listed in this table could also be regulated. To determine whether your
facility may be regulated by this proposed action, you should carefully
examine the applicability criteria in 40 CFR 122.4, 122.23, 122.24,
122.26, 123.44 and 131.12 of today's proposed rulemaking. If you have
any questions regarding the applicability of this action to a
particular entity, consult one of the persons listed in the FOR FURTHER
INFORMATION CONTACT section.

C. Docket

The record for this notice has been established under docket number
W-99-04 and includes supporting documentation. EPA requests that
commenters submit any references cited in their comments. EPA also
requests that commenters submitting written comments include an
original and 3 copies of their written comments and enclosures.
Commenters that want receipt of their comments acknowledged should
include a self-addressed, stamped envelope. No facsimiles (faxes) will
be accepted.
Electronic comments are encouraged and may be submitted to the
Water Docket (see ADDRESSES section above). Electronic comments must be
submitted as an ASCII file or a WordPerfect file. Electronic comments
must be identified by the docket number, (W-99-04). Comments and data
will also be accepted on disks in WP8 format or ASCII file format. No
confidential business information (CBI) should be sent via e-mail.
For access to docket materials, call EPA's Water Docket at (202)
260-3027 between 9:00 a.m. and 3:30 p.m. for an appointment. An
electronic version of this proposal will be available via the Internet
at: http://www.epa.gov.

I. Purposes and Objectives of Today's Proposed Rules

Today's proposed rule is intended to clarify and strengthen EPA's
NPDES and WQS regulations governing discharges into waterbodies that
are not attaining water quality standards. Today, EPA is separately
proposing revisions to its Total Maximum Daily Load regulations so that
TMDLs can more effectively contribute to improving the nation's water
quality. Today's proposal complements that effort by ensuring that two
objectives are met. The first objective applies in impaired waterbodies
prior to the establishment of a TMDL. The purpose of this objective is
to achieve reasonable further progress toward attaining water quality
standards. The second objective applies in impaired waterbodies after
the establishment of a TMDL. The purpose of this objective is to ensure
more effective implementation of TMDLs.
To meet the reasonable further progress objective, EPA is adding a
new antidegradation requirement and revising the NPDES permitting
regulations to implement that requirement. Today's proposal would
require all large new dischargers and existing dischargers undergoing a
significant expansion proposing to discharge the pollutant(s) of
concern into an impaired waterbody, to offset that new or increased
discharge. This requirement is in addition to otherwise applicable
requirements of the CWA and will ensure that there will be reasonable
further progress toward attaining water quality standards despite the
addition of the new load from those dischargers. Today's

[[Page 46060]]

proposal also establishes a number of requirements, under the NPDES
program, to ensure compliance with the antidegradation offset
requirement. Those requirements include boundaries on when and where
pollutant load reductions would need to be obtained. Therefore, today's
proposal will result in reasonable further progress toward attainment
of water quality standards. In some cases, such progress may even
result in the attainment of water quality standards so that a TMDL is
no longer required.
The Agency notes that this requirement is in addition to existing
requirements found at 40 CFR 122.44(d)(1)(vii) and 122.4(i). Section
122.44(d) requires dischargers, where necessary, to receive limits that
derive from and comply with water quality standards. Section 122.4(i)
requires that no permit be issued to a new source or a new discharger
if the discharge will cause or contribute to a violation of water
quality standards.
Today, EPA is also proposing to explicitly describe a Regional
Administrator's authority to trigger existing provisions for reviewing
and objecting to State-issued NPDES permits. Under the proposal, the
Regional Administrator will have the discretion, under certain
circumstances, to trigger these review and objection procedures when a
State fails to reissue an expired, State-issued permit that has been
administratively continued for more than 90 days. This proposal is
designed to address lengthy administrative continuance of permits that
authorize discharges into impaired waterbodies and which contain limits
that are insufficient to protect applicable water quality standards. By
not reissuing these permits, there is a delay in the implementation of
needed water quality-based effluent limitations. This provision will
serve both purposes of today's proposal. Prior to the establishment of
a TMDL, the provision can be used to ensure that more stringent
effluent limitations which derive from and comply with water quality
standards are implemented. Subsequent to the establishment of a TMDL,
this provision will enable the Regional Administrator to ensure that
existing dischargers receive permit limits consistent with wasteload
allocations in a TMDL.
EPA is today proposing additional revisions to the permitting
regulations to ensure that TMDLs are implemented. These revisions
include changes to the NPDES jurisdictional regulations regarding
designation of point sources for regulation under the NPDES permitting
program. EPA is proposing explicit language describing its authority,
in States with approved NPDES programs, to designate animal feeding
operations (AFOs) and aquatic animal production facilities (AAPFs) as
sources subject to NPDES requirements on a case-by-case basis. EPA is
also proposing to eliminate the current regulatory exclusion for
certain discharges from silvicultural activities. These discharges may
also become subject to NPDES requirements on a case-by-case basis. EPA
is constraining its discretion to exercise the authority to subject
these sources to the NPDES program to those circumstances when EPA
establishes a TMDL for a waterbody and determines that designation is
necessary to ensure that the wasteload allocations and load allocations
under the TMDL are achieved. The proposed rule does not place any
constraint on the discretion of State program Directors, in NPDES
delegated States, to designate silvicultural activities as point
sources. EPA recommends however, that States use this authority only on
a limited basis, in circumstances similar to those in which EPA intends
to use it (i.e., when there is no other means of providing reasonable
assurance that a load allocation or wasteload allocation in a TMDL will
be met).
Each of today's proposed revisions is designed to achieve the water
quality goals of the Clean Water Act. EPA believes that today's
proposal will ensure that those goals are met more quickly and that one
of the most important tools for achieving those goals, a TMDL, will be
implemented more effectively.

II. Proposed Requirements for New and Significantly Expanding
Dischargers Located on Impaired Waters

A. Who Would Be Subject to This Proposal?

EPA is today proposing to establish new requirements for
dischargers proposing to add new pollutant loads to an impaired
waterbody in the absence of a TMDL. These new requirements are located
in 40 CFR 122.4(j) and 131.12(a)(1)(ii). Section 122.4(j) applies to
all new dischargers and existing dischargers undergoing a significant
expansion proposing to add new pollutant loads to a waterbody. Section
131.12(a)(1)(ii) applies to large new and significantly expanding
dischargers proposing to add new pollutant loads to an impaired
waterbody for which EPA has not approved or established a TMDL. EPA is
also proposing to modify the definitions of a new discharger and an
existing source under 40 CFR 122.2 and 122.29.
EPA intends these new requirements to apply only to those
dischargers who are proposing to add new loads of pollutants to a
waterbody. Because the current definition of a new discharger can be
read to include some dischargers who are not adding new loads to a
waterbody, EPA is proposing to modify the existing definitions of both
a new discharger and an existing source. The definition of a new
discharger is currently found at 40 CFR 122.2 and the definition of an
existing source is currently found at 40 CFR 122.29. EPA is also
proposing to define the term ``significant expansion.'' All of these
definitions will be moved to 40 CFR 122.2.
A new discharger, as currently defined in 40 CFR 122.2, means any
building, structure, facility, or installation from which there is a
discharge of pollutants which commenced after August 13, 1979; which is
not a new source; and has never received a finally effective NPDES
permit. An existing source, as defined in 40 CFR 122.29, is any source
which is not a new source or a new discharger. The plain reading of the
current definition of a new discharger would subject certain sources to
today's proposed sections (122.4(j) and 131.12(a)(1)(ii), including the
proposed offset requirements explained below). Under the current
definition, these sources would be subject to today's proposal even
though they would not propose to discharge new pollutant loads to a
waterbody. Such sources include sources that have been and currently
are discharging pollutants that are not now subject to the NPDES
program but may in the future become subject to the NPDES program.
These sources would be subject to the requirements of the NPDES program
once designated.
Designation of sources can be made on a case-by-case basis
involving an individual source. For example, an individual medium-sized
animal feeding operation (AFO) may be designated as a medium-sized
concentrated animal feeding operation (CAFO).1 Designation
can also be made

[[Page 46061]]

by category. For example, sources that will become subject to the NPDES
program under the Storm Water Phase II rule will be designated on a
categorical basis.2 Although these sources have been
discharging before and at the time of designation, they would fall
within the current definition of a new discharger. As a result, unless
EPA amends the definitions of a new discharger and an existing source
for this purpose, these sources would be subject to the proposed
requirements of 40 CFR122.4(j) and 131.12(a)(1)(ii). As mentioned
above, EPA intends these sections to apply only to sources proposing to
discharge new pollutant loads to a waterbody.
---------------------------------------------------------------------------

\1\ An example of a source that may be designated as a point
source on an individual basis and which at the time of designation,
would fall within the current definition of a new discharger, is a
medium-sized animal feeding operation (AFO) designated as a medium-
sized concentrated animal feeding operation (CAFO). This would be
the case where that AFO started discharging pollutants after August
13, 1979. This source is not a new source (there is no applicable
NSPS yet) and this source has never received a finally effective
NPDES permit. As an AFO, the source is not subject to the NPDES
permit program because AFOs are exempt from permit requirements
under 40 CFR 122.3(e). However, if that source is designated as a
CAFO (under 40 CFR 122.23) at any time in the future, it would fall
within the current definition of a new discharger.
\2\ An example of a source which may become subject to the NPDES
program as a result of a categorical designation of point sources
and which would fall within the current definition of a new
discharger is any Storm Water Phase II source that currently is and
has been discharging pollutants at any point after August 13, 1979.
These sources are not new sources (there is no applicable NSPS) and
these sources have never received a finally effective NPDES permit.
---------------------------------------------------------------------------

1. Which Sources Discharge New Pollutant Loads to a Waterbody?
Sources that are proposing to discharge new pollutant loads to a
waterbody are dischargers that have not yet begun discharging but are
proposing to discharge. Also discharging new pollutant loads are those
dischargers that have been discharging to one waterbody and, for
example, propose to move their outfall to another location not within
the ``same body of water.'' Existing dischargers that expand or
increase their loads, discharge new pollutant loads to a waterbody as
well.
For proposed 40 CFR122.4(j) and 131.12(a)(1)(ii) to apply only to
dischargers that propose to discharge new pollutant loads to a
waterbody, EPA is proposing to modify the definition of a new
discharger. In addition, EPA is proposing to delete the current
definition of an existing source at 40 CFR 122.29 and replace it with a
new term, ``existing discharger,'' which will be defined in 40 CFR
122.2. EPA believes that consolidating these definitions into one
section provides greater clarity. The proposed modifications would
result in dischargers that fall into two classes, those that are
currently discharging to the same body of water (or existing
dischargers) and those that are not now discharging but wish to
discharge in the future (or new dischargers). For purposes of 40 CFR
122.4(j) and 131.12(a)(1)(ii), however, although dischargers would be
classified as either ``new dischargers'' or ``existing dischargers,'' a
new discharger may also be a new source and an existing discharger may
also be a new source.3
---------------------------------------------------------------------------

\3\ The definition of a new source remains unchanged. A new
source is a source which began construction after the promulgation
of applicable new source performance standards (NSPS). Under this
unchanged definition of a new source, existing dischargers and new
dischargers (under this proposal) can be new sources subject to
NSPS. For example, if a discharger is a new discharger under this
proposal and that discharger began construction after the
promulgation of applicable NSPS, then that discharger would also be
a new source (subject to NSPS). Likewise, if a discharger is an
existing discharger under this proposal and that discharger began
construction after the promulgation of applicable NSPS, then that
discharger would also be a new source (subject to NSPS). If there
are no applicable NSPS for either discharger, then neither would be
a new source.
---------------------------------------------------------------------------

2. Would Dischargers Who Are Currently Discharging but Move Their
Outfall(s) to Another Waterbody Be Subject to This Proposal?
Some dischargers move their outfalls from one waterbody to another
waterbody. In order to protect impaired waterbodies, EPA believes it is
appropriate to subject these dischargers to the new requirements
reflected in today's proposal. This is consistent with the Agency's
intent to subject sources introducing new pollutant loads to a
waterbody to today's new requirements. An outfall would not be subject
to today's new requirements if it was moved within the ``same body of
water'' as the existing outfall location. In determining whether the
outfall is moved within the ``same body of water'' as its original
location, the permitting authority should consider whether: (1) The
background concentration of the pollutant in the receiving water
(excluding any amount of the pollutant in the facility's discharge) is
similar at and between both outfall points; (2) there is a direct
hydrological connection between outfall points; and (3) water quality
characteristics (e.g., temperature, Ph, hardness) are similar at and
between both outfall points. Dischargers who move an outfall(s) within
the same body of water would remain existing dischargers.
The proposed modifications to the definitions of a new discharger
and an existing source will capture these sources as sources that would
be subject to proposed 40 CFR 122.4(j) and 131.12(a)(1)(ii).
3. Will the Proposed Changes to the Definitions of a New Discharger
and an Existing Source Affect Their Application Elsewhere in the
Regulations?
In modifying the definition of a new discharger, deleting the
definition of an existing source and proposing a definition for a new
term, an existing discharger, EPA does not intend to affect any other
existing regulations or effluent guidelines, including EPA's permit
decisionmaking regulations. Under 40 CFR 124.16 and 124.60 of EPA's
permit decisionmaking procedures, a ``new discharger,'' whose permit is
the subject of a pending administrative appeal, is without a permit
until the appeal process has concluded and the Agency's action has
become final. On the other hand, an existing facility, whose permit is
the subject of a pending administrative appeal, is not without a permit
until the appeal process has concluded. The uncontested terms of an
existing facility's permit take effect pending the conclusion of an
administrative appeal. Although today's proposal would change the
definitions of a new discharger and an existing source, EPA does not
intend to change the application of 40 CFR 124.16 or 124.60 at this
time. Accordingly, a discharger who, under the existing definitions, is
a ``new discharger'' and who, under the definitions in today's
proposal, would be an ``existing discharger,'' would be treated as a
``new discharger'' for purposes of 40 CFR 124.16 and 124.60. That is, a
discharger who would become an ``existing discharger'' by virtue of the
changes in today's proposal, would still be without a permit pending
the conclusion of an administrative appeal of the discharger's permit.
EPA believes that this interpretation of 40 CFR 124.16 and 124.60 makes
sense because dischargers who become ``existing dischargers'' by virtue
of the changed definitions proposed today would not have been operating
under an existing permit (this class of dischargers are those that are
discharging and not subject to NPDES regulation (discharging legally
without a permit) but are designated as sources subject to NPDES
regulation at some point in the future). EPA has long required that
those who wish to contest permit terms do so on their own time. 43 FR
37,087 (Aug. 21, 1978). This principle is especially compelling when
the Agency has never acted to approve the discharge on any set of terms
or conditions.
EPA believes that an amendment to 40 CFR part 124 would clarify how
EPA intends the stay provisions in 40 CFR 124.16 and 124.60 to apply to
``existing dischargers''; however, EPA has not included revised
language in today's proposal because the Agency has,

[[Page 46062]]

elsewhere, proposed changes to 40 CFR 124.16 and 124.60 which have not
yet been finalized. 61 FR 65,268 (Dec. 11, 1996)(Amendment to
Streamline the National Pollutant Discharge Elimination System Program
Regulations: Round 2). EPA proposes to amend 40 CFR 124.16 and 124.60
in a way that more clearly reflects its understanding of their
applicability to ``existing dischargers'' and which will conform to the
revisions made to these provisions in the Round 2 NPDES Streamlining
Rule once the contours of those revisions have become final. EPA
solicits comment on whether or not a new discharger that would become
an existing discharger under the definitions in today's proposal should
be treated as an existing discharger for purposes of 40 CFR 124.16 and
124.60.
EPA also invites comment on whether the modifications to these
definitions will have an effect on their application elsewhere in the
NPDES regulations. EPA may amend the respective sections so that these
definitional changes do not affect those sections.
4. Would Any Existing Dischargers Be Subject to This Proposal?
EPA has consistently believed that the mere fact that an existing
discharger currently discharges does not give them the privilege to
discharge any amount of additional loads without consequence.
Therefore, EPA is also proposing to subject existing dischargers
undergoing a significant expansion to proposed 40 CFR 122.4(j) and
131.12(a)(1)(ii). The term ``significant expansion'' will be newly
defined in 40 CFR 122.2.
5. How Is EPA Proposing To Define What Constitutes a ``Significant
Expansion'' of an Existing Discharger?
EPA is proposing to define the term ``significant expansion'' to
mean a twenty percent or greater increase in loadings above the
discharger's current permit limit. Twenty percent is consistent with
EPA's ``Guidance Manual for the Use of Production-Based Pretreatment
Standards and the Combined Wastestream Formula,'' September 19, 1985.
There, the Agency stated that an industrial user (IU) is required to
notify the Control Authority immediately where the IU's average
production and flow rate data have ``significantly'' changed. The
guidance further explains that as a general rule, the average rate is
considered to have changed significantly if the change is greater than
twenty percent. Where there is a significant change in these rates, it
is suggested that the Control Authority reevaluate the limits in the
IU's permit. In the preamble to the revision to the General
Pretreatment Regulations for Existing and New sources, FR 40562, 40565,
October 17, 1988, EPA confirmed the use of twenty percent as the level
at which an average rate is considered to have changed significantly.
The Agency stated that ``for purposes of today's rule, any increase or
decrease in production (or flow) rates will generally be deemed
significant if the change is equal to or greater than twenty percent of
the long term average production (or flow) rate at the facility.''
Therefore, in order to maintain consistency with its current guidance,
EPA is proposing a twenty percent increase in loadings above the
discharger's current permit limit as the threshold level which defines
a significant expansion.
The Agency believes however, that using an increase in ``loadings''
rather than ``production or flow rates'' is more appropriate. Today's
proposal is applicable to dischargers proposing to discharge new
pollutant loads into a waterbody and there may be cases where an
increase in production rates may not result in a corresponding increase
in pollutant loads. EPA invites comment on the appropriateness of a
twenty percent increase in loadings above the discharger's current
permit limit as the threshold level which defines a significant
expansion.
EPA is also considering the use of a fifty rather than a twenty
percent increase in loadings above the discharger's current permit
limit as the threshold level to define a ``significant expansion.'' A
threshold level of fifty percent is consistent with other Agency
guidance. On December 18, 1984, EPA put out guidance on the
``Calculation of Production-Based Effluent Limits'' (Memorandum from J.
William Jordan to Regional Branch Chiefs). The purpose of the guidance
was to clarify the procedure for calculating production-based effluent
limitations and to provide guidance on the use of alternate
limitations.
Effluent limitations guidelines are often derived from production
rates and are set at levels which include some variations in
production. However, certain facilities may have large random or cyclic
fluctuations in production rates where it would be appropriate to have
alternative effluent limitations which are applicable at some increased
production rate. The guidance mentioned above suggests that if
production rates are expected to change ``significantly'' during the
life of the permit, the permit should include alternate limits. The
guidance identifies that it is generally agreed that a ten to twenty
percent fluctuation in production is within the range of normal
variability and thus, would not need alternate limits. Further, it
states that changes in production rates which are substantially higher,
``such as fifty percent,'' would warrant the consideration of alternate
limits. EPA seeks comment on whether a fifty percent increase in
loadings above the discharger's current permit limits should be used to
define a significant expansion.
Other statutes and regulations also establish thresholds over which
a source cannot change without incurring different requirements. The
Resource Conservation and Recovery Act (RCRA) permit regulations hold
that ``reconstruction'' occurs when capital investment in the changes
to the facility exceed fifty percent of the capital cost of a
comparable entirely new hazardous waste management facility. 40 CFR
270.72(b). An interim status facility (a facility that is in existence
on the effective date of statutory or regulatory amendments that render
the facility subject to the requirement to have a RCRA permit), is
treated as having been issued a permit and may make changes short of
reconstruction, but cannot make changes amounting to reconstruction
until the facility receives a permit.
Under the Clean Air Act, new source review applies to new major
sources and modifications to existing major sources. 42 U.S.C. 7411. A
modification of an existing major source triggers review if it is a
physical or operational change that increases emissions by a
``significant'' amount. By regulation, EPA has defined ``significant''
based on the pollutant emitted. 40 CFR 51.165.
EPA invites comment on whether a threshold level other than twenty
or fifty percent should trigger the applicability of 40 CFR 122.4(j)
and 131.12(a)(1)(ii). One option would be to allow the permitting
authority to determine what constitutes a significant expansion on a
case-by-case basis, without establishing a specific threshold level.
The Agency notes that where an existing discharger undergoes a
``significant expansion,'' only the expanded portion of the discharge
(the new loadings) would be subject to the offset requirements under 40
CFR 131.12(a)(1)(ii). For existing dischargers with a current permitted
load, the definition of a significant expansion and the amount for
which offsets are required would be based on the increase in the
permitted load.
Based on an initial analysis of potentially affected sources, EPA
believes that the cost to dischargers of using a threshold of twenty
percent to

[[Page 46063]]

define a significant expansion would not be significantly greater than
the cost of using a threshold of 50 percent. EPA requests comment on
this initial conclusion and any supporting data commenters can provide.
EPA also invites comment on how to measure a significant expansion
and to calculate the corresponding offset requirements for those
dischargers who increase the loadings of a pollutant for which the
waterbody is impaired but for which there is no current permitted load
(there is no effluent limit for that particular pollutant in the
discharger's permit). It is EPA's intent that the offset requirements
apply to new pollutant loads and in the case of an existing discharger,
``significant'' new pollutant loads.

B. What Are the Proposed Changes to the Federal Antidegradation Policy?

EPA is proposing to amend 40 CFR 131.12(a) to require a new
discharger, or an existing discharger undergoing a significant
expansion, proposing to discharge to a waterbody not attaining water
quality standards, the pollutant(s) causing the nonattainment, to
achieve reasonable further progress toward attaining water quality
standards. This requirement, in addition to otherwise applicable
requirements of the CWA, would apply where there is no EPA approved or
established Total Maximum Daily Load (TMDL). When EPA has approved or
established a TMDL, a new discharger proposing to discharge the
pollutant(s) for which the TMDL was established, may discharge only in
accordance with that TMDL or a revised, approved TMDL. It would apply
only to new dischargers and existing dischargers undergoing a
significant expansion that are not a small business or entity as
defined in 5 U.S.C. 601(6). Therefore, a new discharger or existing
discharger undergoing a significant expansion which is not a small
business or entity, would need to comply with a permit limit that
derives from and complies with water quality standards and this new
requirement for reasonable further progress. With this proposed change,
EPA intends to ensure reasonable further progress toward restoring
water quality standards in impaired waters prior to the completion of
TMDLs. EPA emphasizes that this is an interim approach to attaining
water quality standards; these requirements apply only until the TMDL
is approved or established by EPA, and the TMDL is implemented with
respect to the discharger subject to these requirements.
1. What Is the Current Federal Antidegradation Policy?
Section 303(c) of the CWA establishes the basis for federal water
quality standards. EPA regulations implementing section 303(c) are
published at 40 CFR part 131. Under these rules, the minimum elements
that must be included in a State's water quality standards include: use
designations for all waterbodies in the State, water quality criteria
sufficient to protect those use designations, and an antidegradation
policy. See 40 CFR 131.6. States may also include in their standards,
policies generally affecting the standards' application and
implementation. See 40 CFR 131.13. These policies are subject to EPA
review and approval.
The current federal antidegradation policy performs an essential
function in protecting and maintaining water quality. Designated uses
establish the water quality goals for the waterbody, water quality
criteria define the minimum conditions necessary to achieve those goals
and the antidegradation policy specifies the framework to be used in
making decisions regarding changes in water quality. The intent of an
antidegradation policy is to ensure that in all cases, at a minimum:
(1) Water quality necessary to support existing uses is maintained
(Tier 1); (2) that where water quality is better than the minimum level
necessary to support protection and propagation of fish, shellfish and
wildlife, and recreation in and on the water (``fishable/swimmable''),
that water quality is also maintained and protected unless, through a
public process, some lowering of water quality is deemed to be
necessary to allow important economic or social development to occur
(Tier 2); and (3) where waterbodies are of exceptional recreational or
ecological significance, water quality is maintained and protected
(Tier 3). Antidegradation plays a critical role in allowing States and
Tribes to maintain and protect the finite public resource of clean
water and ensure that decisions to allow reductions in water quality
are made in a public manner and serve the public good. States and
authorized Tribes are required to adopt antidegradation policies at
least as stringent as the federal antidegradation policy.
Section 131.12(a) of the antidegradation policy, contained in the
federal water quality standards regulation, requires that existing uses
and the water quality necessary to protect them be maintained and
protected. This provision, in effect, establishes the floor of water
quality for all waters of the U.S., and that all waters of the U.S. are
subject to Tier 1 protection. In general, waters that are subject only
to Tier 1 antidegradation policies are those waterbodies that do not
exceed the CWA section 101(a) goals. These waters either do not have
any remaining assimilative capacity to receive additional loads of
pollutants without causing the loss of the existing use or the water
quality already is degraded below that necessary to maintain an
existing use. ``Existing uses'' are defined at 40 CFR 131.3(c) as those
uses actually attained in the waterbody on or after November 28, 1975,
whether or not they are included in the water quality standards.
Antidegradation policies are generally implemented for Tier 1 by
reviewing and determining whether a discharge would impair an existing
use. Tier 1 currently requires that water quality necessary to protect
existing uses shall be maintained and protected. In addition, the State
or Tribe should ensure that all existing uses are designated in
accordance with 40 CFR 131.10(i).
2. What Were the Recommendations of the TMDL Federal Advisory
Committee?
The Federal Advisory Committee on the Total Maximum Daily Load
Program recommended a number of ways to improve the effectiveness and
efficiency of EPA, State, Territorial and Tribal programs under section
303(d) of the CWA. These recommendations address many of the TMDL
program's complex technical and policy issues, and include
recommendations on several new policy and program directions. In
particular, the Committee recognized that there could be a considerable
time lag between the initial listing of a waterbody on a section 303(d)
list of impaired or threatened waters and the actual completion,
approval and implementation of the TMDL. Some on the Committee noted
that water quality should not be allowed to further degrade during that
time period. The Committee recommended that EPA actively encourage and
support stakeholders stabilizing and enhancing water quality before a
TMDL is in place (Committee Report at page 17). The Committee noted
that the most successful stakeholder efforts would lead to the full
restoration of water quality and attainment of water quality standards
and ultimately the water's removal from the section 303(d) list before
a TMDL is developed. The Committee recommended an optional
stabilization plan that would identify mechanisms that might allow for

[[Page 46064]]

exceptions from point source discharge restrictions upon demonstration
that the optional stabilization plan results in parameter specific net
progress in water quality through means other than those restrictions.
EPA believes that further degradation of already impaired
waterbodies must be prevented and also recognizes the need for progress
toward attaining water quality standards in this interim period.
Therefore, EPA believes that by creating a new requirement under the
federal antidegradation policy as reflected in today's proposal, not
only will further degradation of water quality be prevented, but
reasonable further progress towards restoring water quality standards
will be achieved.
3. What Revisions Is EPA Proposing Today?
i. Why Is EPA Proposing to Require Dischargers Subject to This
Proposal to Achieve Reasonable Further Progress Toward Attaining Water
Quality Standards?
Water quality standards serve as the foundation for the water-
quality based approach to pollution control and are a fundamental
component of watershed protection. Under the Clean Water Act, States,
Territories and authorized Tribes adopt water quality standards to
protect public health or welfare, enhance the quality of the nation's
water and serve the purposes of the Act. A primary objective of the Act
is to ``restore and maintain the chemical, physical and biological
integrity of the Nation's waters.'' CWA section 101(a). To date, EPA's
implementing regulations at 40 CFR 131 have addressed the mandate for
restoring the nation's waters through the specification of designated
uses. Designated uses are defined as those uses specified for each
waterbody or segment, whether or not those uses are being attained.
Designated uses focus on the attainable condition of the waterbody, in
contrast to existing uses which focus on the past or present condition
of the waterbody. It is through the designation of uses that the
environmental goals for specific waterbodies are established. States,
Territories and authorized Tribes have the flexibility to establish
goals for waters that require improvements in water quality, thus
establishing a requirement for restoration. Today's proposal
supplements the restoration provisions of the current regulations. By
establishing the requirement for reasonable further progress as a
component of the federal antidegradation policy, EPA believes the
objectives of the Act will be advanced.
Prior to today's proposal, Tier 1 of the federal antidegradation
policy has been aimed at protecting and maintaining existing uses of
waterbodies. EPA believes extending the protection of existing uses to
include a provision aimed at promoting reasonable further progress
toward restoring water quality in impaired waterbodies is both
consistent with the goals of the Act, and is a logical means for
meeting those goals.
The Agency's policy choice is supported by the Act's legislative
history. The Senate Report states:

In those waterbodies which are not pristine, it should be the
national policy to take those steps which will result in change
toward the pristine state in which the physical, chemical and
biological integrity of the waterbody can be said to exist. Striving
toward, and maintaining the pristine state is an objective which
minimizes the burden to man in maintaining a healthy environment,
and which will provide for a stable biosphere that is essential to
the well-being of human society. S. Rep. No. 92-414, 92d Cong. 1st.
Sess. at 76-77 (1971).

Establishing a requirement for reasonable further progress will result
in improvements in water quality and progress toward attaining water
quality standards, pending the establishment, approval and
implementation of the TMDL.
Today, EPA is proposing to require large new and significantly
expanding dischargers proposing to discharge to nonattained waterbodies
to achieve reasonable further progress toward attaining water quality
standards before discharging additional loadings of the pollutant
causing the nonattainment. In effect, certain dischargers will be
required to show net progress toward improving water quality as a
condition of being authorized to discharge to a nonattained waterbody.
EPA believes this proposal is consistent with the recommendations of
the Federal Advisory Committee on the Total Maximum Daily Load Program,
and the approach chosen by the Agency when faced with the need to
address a similar problem under the Clean Air Act.
a. How Does This Relate to the TMDL Federal Advisory Committee's
Recommendations?
As noted above, the Committee recommended that EPA actively
encourage and support stakeholders stabilizing and enhancing water
quality before a TMDL is in place. While EPA is not adopting all of the
Committee's recommendations, the Agency believes that progress toward
the section 101(a) goals of the Act should occur before allowing some
new and significantly expanding dischargers to add new loads of the
pollutant causing the nonattainment to an impaired waterbody.
b. Has This Approach Been Used in Other Statutes?
Just as the Clean Water Act establishes the goal to ``* * * restore
and maintain the chemical, physical and biological integrity of the
Nation's waters,'' the Clean Air Act declares its purpose is ``to
protect and enhance the quality of the Nation's air resources so as to
promote the public health and welfare and the productive capacity of
its population.'' CAA section101(b)(1). Given these similar goals, the
actions and reasoning of the Agency and Congress in dealing with areas
which are not meeting air quality standards can serve to guide EPA's
policy choices when dealing with waterbodies which are not attaining
water quality standards.
In 1970, the Clean Air Act required generally, that State programs
had to ensure that new sources did not interfere with the attainment of
national ambient air quality standards (NAAQS). In 1976, EPA issued an
interpretive ruling on the preconstruction review requirements for
major new stationary sources proposing to locate in an area that
exceeded a NAAQS. Given a standard and an area not in attainment with a
standard, the Agency believed that it was reasonable to allow a new
addition of the pollutant causing the nonattainment only if the new
source ensured that reasonable progress was made toward meeting that
standard. 41 FR 55524. Congress agreed that EPA's requirement was
reasonable. As a result, Congress clarified in the Clean Air Act
Amendments of 1977 that, in general, a new permit to construct and
operate a new major stationary source or a major modification to an
existing source proposing to emit the pollutant of concern in a
nonattainment area may only be issued if reasonable further progress
toward attainment of the NAAQS was made and the source met the most
stringent emissions limits. CAA section 173.
Given the similar statutory goals and the similar circumstances,
EPA again believes it would be reasonable to require new and
significantly expanding existing dischargers proposing to discharge
additional loads of the pollutant(s) causing the nonattainment of water
quality standards to ensure that progress is made toward attainment of
the standards in the future. EPA believes that establishing a similar
requirement for reasonable further progress as a component of the
federal antidegradation policy is the best way to meet the goals of the
Clean Water Act

[[Page 46065]]

when faced with new and significantly expanding existing dischargers
wishing to locate on impaired waterbodies.
EPA invites comments on this proposed change to Tier 1 of the
federal antidegradation policy. EPA also invites comment on whether
some other approach could serve as an appropriate means to ensure
reasonable further progress toward restoring water quality standards in
the interim period between listing of waterbodies under CWA section
303(d), and the establishment, approval and implementation of the TMDL.
ii. How is EPA Proposing to Define Reasonable Further Progress?
As stated above, EPA is proposing to require reasonable further
progress as a means of achieving the objectives of the Clean Water Act.
EPA is also today proposing a definition of reasonable further progress
for some new and existing dischargers. EPA believes reasonable further
progress is best achieved by offsetting any new loading of the
pollutant of concern to an impaired waterbody by reducing loads of the
same pollutant from existing sources located on the same waterbody. EPA
further believes that an offset of at least one and a half to one is
generally appropriate as means of ensuring reasonable further progress.
Offsets are not only the most feasible means to achieve reasonable
further progress for new and significantly expanding dischargers, they
are a logical means to actually achieve such progress. Further, they
are a means the Agency has chosen in similar circumstances.
EPA is thus proposing that, in general, pollutant load reductions
must be one and a half times the new loads of the pollutant to the
waterbody (see discussion below). Under such a requirement, reasonable
further progress toward meeting the applicable water quality standard
would be achieved because the total load of the pollutant to the
waterbody is reduced. An added benefit of requiring offsets as the
means for achieving reasonable further progress is that the requirement
creates an incentive for pollution prevention. A discharger subject to
the requirement can reduce the burden of finding sufficient offsets by
reducing the amount of pollutant(s) the discharger is proposing to add
to the impaired waterbody.
EPA also believes that this proposed requirement will serve as a
catalyst for the establishment of a trading market between large new
dischargers and existing dischargers undergoing a significant
expansion, and existing point source dischargers or nonpoint sources.
(See discussion below). EPA believes that the establishment of a
trading market will give dischargers more options to achieve any future
permit limits required by TMDLs more efficiently.
a. Has Reasonable Further Progress Been Defined Under Other
Statutes?
In 1977, Congress amended the Clean Air Act and adopted the general
requirements for a new permit to construct and operate a new major
stationary source or a major modification to an existing source
proposing to emit the pollutant of concern in a nonattainment area.
Such permits may be issued if, by the time the source begins operating,
sufficient offsetting emissions reductions have been attained such that
the total emissions in the area will be sufficiently less than the
emissions from existing sources prior to the application for a new
permit so as to represent reasonable further progress. CAA section 173.
The term ``reasonable further progress'' was defined as ``such annual
incremental reductions in emissions of the relevant air pollutant as
are required by this part or may be reasonably required by the
Administrator for the purpose of ensuring attainment of the applicable
national ambient air quality standards by the applicable date.'' CAA
section 171(1). Congress adopted this new provision ``to allow
reasonable economic growth to continue in an area while making
reasonable further progress to assure attainment of the standards by a
fixed date. * * *'' 95 Cong. House Report 294 at *211.
EPA believes that the Agency's experiences under the Clean Air Act
serve as a useful guide for its policy choices with respect to
treatment of new loads of pollutants to impaired waterbodies under the
Clean Water Act. EPA's proposals today are, therefore, similarly
designed to allow continued growth in areas which are not meeting water
quality standards while ensuring that progress toward meeting water
quality standards is not halted or reversed.
iii. What Offsets Would Affected Dischargers Need to Obtain to
Ensure Reasonable Further Progress?
EPA is proposing to require that large new and significantly
expanding dischargers obtain and maintain offsets, i.e., pollutant load
reductions, in general, in the amount of one and a half to one. In
other words, these dischargers would need to obtain and maintain an
offset of least of one and a half times the amount of the new or
additional pollutant loadings they are proposing to discharge. The
specific requirements for an individual discharger would be dependent
upon the type of pollutant for which the waterbody is impaired (which
is also the pollutant the discharger is proposing to discharge), the
source from which the discharger is proposing to obtain and maintain
the offsetting load reductions, and the large new or significantly
expanding discharger itself. In addition, EPA is proposing specific
permitting requirements to implement this offset requirement. (See
discussion below).
In considering the amount by which a proposed discharge should be
offset, EPA considered the burdens associated with achieving the
necessary pollutant load reductions. Based upon the Agency's analysis
of the costs, discussed below in section VI. A, EPA believes that in
most cases an offset in the amount of one and a half times the proposed
discharge is both reasonable and achievable.
a. Could Offsets Be Obtained From Existing Nonpoint Sources?
EPA believes further that this proposed requirement will result in
load reductions from sources that EPA and States authorized to
administer the NPDES program can not regulate under the NPDES program.
Under today's proposal, large new or significantly expanding
dischargers would need to obtain and maintain pollutant load reductions
to compensate for their proposed increases in pollutant loads. These
reductions would need to be obtained from existing point source
discharger(s) or nonpoint sources located on the same waterbody as the
discharge from the new discharger or existing discharger undergoing a
significant expansion. EPA believes the ability to obtain offsets from
nonpoint sources, in addition to point source dischargers, is a crucial
element in ensuring reasonable further progress toward restoring water
quality pending the completion of a TMDL. Nonpoint sources, in some
areas, are significant contributors of pollutants to waters of the
United States, and high pollutant levels persist in many waterbodies.
Furthermore, in many cases it is more cost effective to obtain
significant reductions from non-point sources than to impose more
stringent limitations on point sources.
b. Could the Director Vary the Amount of the Offset?
Today's proposal generally requires that the amount of the proposed
discharge be offset by pollutant load reductions of one and a half
times the increase in mass loadings. The amount of the offset however,
could be varied, at the discretion of the Director. The Director may
determine that an offset greater than one and a half times the proposed
discharge is necessary in order

[[Page 46066]]

to ensure reasonable further progress toward restoring water quality
standards. The Director may also determine that an offset less than one
and a half times, but at least more than, the amount of the proposed
discharge will ensure reasonable further progress. Each of these cases
is discussed below.
EPA recognizes the potential for a significant amount of
uncertainty in both obtaining and maintaining the pollutant load
reductions, depending on the source of the reductions. For example, if
the discharger enters into an agreement with an existing point source,
the discharger would be presumed to have an offset requirement of one
and a half times the amount of the proposed discharge. However, when
entering into an agreement with a nonpoint source, it may be somewhat
more difficult to determine exactly how much reduction will be achieved
and whether the reductions would be maintained over time, due to the
uncertainties regarding the effects of management practices designed to
reduce loads from nonpoint sources. In addition, since nonpoint sources
are not subject to an NPDES permit, the permitting authority may have
less ability to ensure that offsets are implemented and maintained. EPA
notes however that many States have additional authorities beyond those
specified in the CWA, to implement load reductions from nonpoint
sources.
The location of the offsetting source(s) within the impaired
waterbody may also impact the potential for achieving reasonable
further progress in attaining water quality standards. If the source(s)
of the offsetting pollutant load reductions are located at the margins
of the impaired waterbody, the overall impact of the pollutant load
reductions in terms of attaining water quality standards is more
difficult to determine. In such cases, the Director may require that a
greater amount of reductions must be realized and require an offset
greater than one and a half to one. Specifically, the final offset may
be determined by factors such as how great a pollutant load reduction
the offsetting source(s) would actually be able to realize; the
likelihood that the offsetting source(s) will be able to maintain the
offset; and the location of the offsetting source(s) within the
impaired waterbody.
EPA believes allowing the Director the discretion to require an
offset greater than one and a half times the amount the discharger is
proposing to discharge is appropriate in order to compensate for
uncertainties associated with obtaining load reductions from offsetting
sources. EPA also believes this discretion is appropriate to account
for other factors which may include the type of pollutant and the
degree of impairment of the waterbody.
EPA also recognizes that situations may exist where offsets of one
and a half times the proposed discharge are difficult to obtain, such
that an offset of less than one and a half to one (but greater than one
to one) may satisfy the requirement for reasonable further progress.
For example, there may only be a few other sources of the pollutant
causing the impairment, the other sources may discharge a very limited
amount of the pollutant, or it may be very costly to control the
discharge. While EPA believes these situations are limited in number,
allowing the Director the discretion to require an offset less than one
and a half times the proposed discharge but at least more than the
amount of the proposed discharge will still ensure reasonable further
progress toward restoring water quality standards in the interim.
To assure appropriate implementation of the offset provisions by
authorized State permitting authorities, EPA would implement its
oversight role though the permit objection provisions of CWA section
402(d) (The Agency proposes changes to the permit objection regulations
elsewhere in today's notice. Those changes involve EPA's authority to
object to expired and administratively-continued permits). Under CWA
section 402(d), EPA may object to the issuance of an NPDES permit by an
authorized State if the permit would be outside the guidelines and
requirements of the Act. If the issuance of a State NPDES permit to a
source required to obtain an offset would not result in reasonable
further progress toward attainment of water quality standards, EPA
could object to such a permit.
EPA envisions two instances when an objection might be warranted:
specifically, when the State Director would propose to issue a permit
with an offset less than 1.5 and, as discussed further on in today's
notice, when the State Director would waive the offset provision
concluding that the offset would result in further degradation of water
quality. The 1.5 offset criterion is not absolute and the Director has
discretion to require a lesser offset. The exercise of that discretion,
however, would still need to ensure reasonable further progress toward
attainment of water quality standards. If a lesser offset would not
ensure reasonable further progress, today's proposal would maintain the
Agency's authority to object to the issuance of the permit.
Today's notice does not propose changes to the regulatory text
describing the Regional Administrator's grounds for permit objections
because the Agency believes the existing regulations would provide the
bases for such objections. If the Agency were to object to a State
permit for failure to ensure reasonable further progress, the objection
would be based on 40 CFR 123.44(c)(1), (3), (4), (7) and/or (8).
Subsection (c)(1) refers to a permit that fails to apply or ensure
compliance with any applicable requirement of 40 CFR part 123. Though
the 1.5 offset criterion would not be a requirement, today's proposal
would require offsets that ensure reasonable further progress. If an
offset less than 1.5 would not ensure reasonable further progress, the
permit would fail to apply a requirement of 40 CFR part 123 (section
123.25 specifies the NPDES permitting requirements in 40 CFR part 122
that apply to State NPDES programs, including 40 CFR 122.4). Subsection
(c)(3) refers to a permit issued using procedures that fail to comply
with procedures required by the CWA, implementing regulations, or by
the Memorandum of Agreement. If a State did not adequately explain why
an offset less than 1.5 would ensure reasonable further progress, the
issuance of such a permit would not comply with applicable procedural
requirements. Subsection (c)(4) refers to a permit that misinterprets
the CWA or any guidelines or regulations or misapplies them to the
facts. Issuance of a State permit that would not ensure reasonable
further progress would misinterpret the CWA or misapply applicable
requirements. Subsection (c)(7) restates the statutory standard that
the issuance of the proposed permit could not be outside the
requirements of the CWA or implementing regulations. Finally,
subsection (c)(8) refers to the effluent limits of a permit that fails
to satisfy the requirements of 40 CFR 122.44(d) (section 122.44(d)
requires that effluent limits achieve water quality standards). The
issuance of any permit to a source required to obtain an offset would
not satisfy the requirements of 40 CFR 122.44(d) if the permit would
not ensure reasonable further progress toward attainment of water
quality standards.
While the Agency believes that changes to regulatory text are
unnecessary, EPA invites comment on whether to include an explicit
basis for objection in any final rule. The purpose of any explicit
regulatory text would be to clarify that the Agency could object to the
issuance of a State permit to a source required to obtain an offset if
the issuance would not ensure reasonable further progress toward
attainment of water quality standards.
EPA also recognizes there may be limited circumstances where
requiring

[[Page 46067]]

offsets will result in further degradation of water quality, and loss
of an existing use. Therefore, EPA is proposing that the Director also
have the discretion to not require an offset, if it is determined that
any offset would result in further degradation of water quality. Such
degradation may occur, for example, when the sole NPDES discharger,
with a low volume but high concentration of a pollutant such as
phosphorus, discharges to an ephemeral or low flow waterbody which is
currently not attaining the water quality criteria for phosphorus and
where the only other sources of phosphorus are from irrigation return
flows. If the sole discharger negotiates a reduction of irrigation
return flows to offset its phosphorus loads, it may result in increased
ambient phosphorus concentrations due to the loss of volume in the
waterbody, and further degradation of water quality. In circumstances
such as these, although limited and infrequent, EPA believes the
Director should have the discretion to waive the requirement for any
offset in order to prevent further degradation of water quality and the
loss of an existing use. For the reasons described earlier, the Agency
also proposes to retain authority to object to the issuance of a State
permit for a source required to obtain an offset if the State Director
inappropriately waived the offset requirement concluding that the
offset would result in further degradation of water quality.
Finally, the new provision at 40 CFR 131.12(a) proposes that
reasonable further progress for large new dischargers and existing
dischargers undergoing a significant expansion means, at a minimum, an
offset greater than the amount of the proposed discharge. The proposed
regulation, therefore, provides the permitting authority with the
discretion to require additional measures to attain reasonable further
progress. The permitting authority may choose to exercise this
discretion depending upon, for example, the severity of the impairment
of the waterbody, the type of pollutant, or the distance of the offsets
from the new discharge. Such additional measures could include
pollution prevention plans or conservation easements which could ensure
continued reasonable further progress. EPA invites comment on what
measures, in addition to the offset requirement, permitting authorities
should consider requiring of large new dischargers and existing
dischargers undergoing a significant expansion.
EPA believes an offset requirement of one and half times the amount
of the increased loading the discharger is proposing to discharge (with
exceptions) is appropriate and invites comment on whether a different
amount would be better suited to ensuring reasonable further progress
toward restoring water quality standards prior to the approval or
establishment by EPA of TMDLs. EPA invites comment on whether there may
be reasons, other than uncertainty, why the Director may find it
necessary to adjust the offset requirements in amounts greater than one
and half times the proposed discharge. EPA also invites comments on
whether the Director should have the discretion to allow an offset less
than one and half times the proposed discharge, but at least greater
than the amount of the proposed discharge and if so, for what reasons.
One option would be to require an offset at least equal to the amount
of the proposed discharge, but allow the Director the discretion to
determine how much progress beyond a one to one offset is necessary to
ensure reasonable further progress. Finally, EPA invites comment on
whether the Director should have the discretion to waive the
requirement for an offset if any offset would result in further
degradation of water quality. If not, for what reasons and also, if the
concurrence of EPA should be required before the Director makes such a
determination.
iv. Would the Reasonable Further Progress Requirements Apply to
Affected Dischargers Proposing to Discharge to All Waters of the U.S.?
EPA is establishing a new provision at 40 CFR 131.12(a)(1)(ii) that
requires a new discharger or existing discharger undergoing a
significant expansion discharging into a waterbody that does not meet
water quality standards, and for which EPA has not yet approved or
established a TMDL, the pollutant(s) causing the non-attainment to
achieve reasonable further progress toward attaining water quality
standards. Thus, this provision applies to a new discharger or existing
discharger undergoing a significant expansion discharging into any
waterbody of the United States that does not attain water quality
standards (as defined in 40 CFR 131). Where a waterbody receives a
thermal discharge from one or more point sources, impaired means that
the waterbody does not have or maintain a balanced indigenous
population of shellfish, fish, and wildlife. Exceedance of a narrative
criterion in a waterbody means that the waterbody does not attain water
quality standards.
v. Why is EPA Proposing to Subject Only New Dischargers and
Existing Dischargers Undergoing a Significant Expansion to These
Requirements?
EPA is proposing today to establish the offset requirement
discussed above only for large new and significantly expanding
dischargers of the pollutant of concern into an impaired waterbody. EPA
believes that this new requirement is appropriate for these dischargers
because it will enable discharges to occur in impaired waterbodies
while ensuring that progress toward attaining water quality standards
is achieved in those waterbodies. EPA believes that subjecting large
new and significantly expanded dischargers to more stringent water
quality standards is supported by the same logic which led Congress to
establish more stringent technology based requirements for new sources
under other provisions of the CWA.
Given that this offset provision would be a requirement only until
a TMDL is approved or established by EPA for a waterbody not attaining
water quality standards, it makes sense as a practical matter to apply
this requirement only to large sources which are adding new loads of
the pollutant of concern to the waterbody. Existing dischargers are
likely to be in a poorer position to bargain for offsets because they
may not have a realistic option to locate on a different waterbody.
Furthermore, it might be very disruptive to existing dischargers if
they were required to offset their discharge before a TMDL is
established only to possibly receive different permit limits and
conditions once wasteload allocations and a margin of safety are
established in a TMDL. EPA seeks to avoid these disruptions if
possible. Finally, new dischargers will be undertaking construction and
will be in a better position to modify their design so as to minimize
pollution, and thus minimize the amount of their offset.
EPA also believes that subjecting for new and significantly
expanding dischargers to these new requirements is consistent with the
CWA more generally. In its technology-based provisions, the Act
provides a higher standard (best available demonstrated technology
under new source performance standards) for new sources than for
existing sources (best available technology economically available).
Although in this regulation, EPA is addressing new dischargers and
significantly expanding dischargers rather than ``new sources,'' EPA
believes Congress' rationale for its treatment of new sources applies
equally to new dischargers and significantly expanding dischargers.
Congress chose to place more stringent technology based requirements on
new sources both to

[[Page 46068]]

prevent new water quality impairments and because imposing stricter
standards on new sources would be the most efficient means of solving
existing water quality problems. Here, the Agency is proposing to
regulate more stringently two types of dischargers which are adding new
loads of a pollutant of concern to ensure reasonable further progress
toward attaining of water quality standards.
First, consistent with other provisions in EPA regulations, EPA is
proposing to treat new dischargers more stringently than existing
dischargers. An example of such treatment is the extent to which
variances to water quality standards are available to new dischargers
when compared to existing dischargers. See 63 FR 36761. Compliance
schedules have also not been available to new dischargers to the same
extent that they are available for existing dischargers. 40 CFR 122.47.
EPA is proposing to further develop this differential treatment of new
dischargers by creating new provisions at 40 CFR 122.4(j) and
131.12(a)(1)(ii). These provisions together will subject new and
significantly expanding dischargers proposing to discharge into
impaired waterbodies to the new requirements outlined but not existing
dischargers under the same or similar circumstances.
Second, EPA also believes that it is appropriate to extend these
requirements to significant expansions of existing discharges due to
the similar impacts which occur as a result of significant new
pollutant loads. EPA believes this is consistent with the general
approach of the CWA to prevent new water quality pollution problems.
Although these sources are existing sources, their ``significant
expansions'' will have the same or similar effect with respect to
creating new water quality impairments as the truly new source.
Undertaking a significant expansion may provide certain opportunities
for a discharger to achieve efficiencies in solving water pollution
problems, similar to the opportunities available to new sources. EPA's
proposed definition of ``significant expansion'' is discussed above
(see Section A5).
EPA invites comments on whether the requirement for offsets should
apply to both new and significantly expanding dischargers, and reasons
why the requirement should apply to one class of discharger versus
another.
vi. Would All New Dischargers and Existing Dischargers Undergoing a
Significant Expansion Be Subject to These Proposed Requirements?
EPA is proposing today to subject only those new and significantly
expanded dischargers not meeting the definition of a small entity under
the Regulatory Flexibility Act (see 5 U.S.C. 601(6)) to the offset
requirements of this rule. The Regulatory Flexibility Act (``RFA'')
states that the term ``small business'' has the same meaning as the
term ``small business concern'' under section 3 of the Small Business
Act (SBA). This meaning holds unless an agency, after consultation with
the Office of Advocacy of the Small Business Administration and after
opportunity for public comment, establishes one or more definitions of
such term which are appropriate to the activities of the agency and
publishes such definition(s) in the Federal Register. 5 U.S.C. 601(3).
EPA has not proposed to establish a different definition of the term
for this proposed rule.
The SBA defines ``small-business concern'' as one which is
independently owned and operated and which is not dominant in its field
of operation. 15 U.S.C. 632. Pursuant to the SBA, the Small Business
Administration has specified additional detailed definitions or
standards by which a business concern may be determined to be a small
business concern. Also under the RFA, the term ``small organization''
means any not-for-profit enterprise which is independently owned and
operated and is not dominant in its field. This meaning holds unless an
agency establishes, after opportunity for public comment, one or more
definitions of such term which are appropriate to the activities of the
agency and publishes such definition(s) in the Federal Register. 5
U.S.C. 601(4). The term ``small governmental jurisdiction'' means
governments of cities, counties, towns, townships, villages, school
districts, or special districts, with a population of less than fifty
thousand. This meaning also holds unless an agency establishes, after
opportunity for public comment, one or more definitions of such term
which are appropriate to the activities of the agency and which are
based on such factors as location in rural or sparsely populated areas
or limited revenues due to the population of such jurisdiction, and
publishes such definition(s) in the Federal Register. 5 U.S.C. 601(5).
Again, EPA has not proposed alternative definitions for purposes of
this rule. Finally, the term ``small entity'' has the same meaning as
the terms ``small business'', ``small organization'' and ``small
governmental jurisdiction'' defined in the RFA. 5 U.S.C. 601(6).
EPA is proposing to limit the scope of this new provision because
it is a new requirement which is needed only in the interim before
TMDLs are approved or established by EPA. Also, such narrowed coverage
is more likely to ensure development of a successful market for
pollutant trading.
In today's proposal, EPA is requiring large (i.e., not meeting the
definition of a small entity under the Regulatory Flexibility Act (see
5 U.S.C. 601(6)) new and significantly expanding dischargers to offset
any increase in mass loadings. EPA believes this is an important step
toward achieving the CWA goal to ``* * * restore and maintain the
chemical, physical and biological integrity of the Nation's waters.''
Section 101(a). In exercising its discretion to impose this new
requirement on large dischargers, EPA notes that all dischargers will
continue to need permit limits that derive from and comply with water
quality standards (see 40 CFR 122.44(d)). In evaluating the significant
number of the nation's waters on State section 303(d) lists, and the
amount of time necessary for States to establish and implement TMDLs,
EPA concluded that in the interim period before a TMDL is approved or
established by EPA, it is necessary to establish a new requirement in
an effort to ensure reasonable further progress toward attaining water
quality standards, consistent with the goals of the Act. The
requirement is thus, both incremental and interim, and at this time EPA
is choosing to impose it only on those dischargers the Agency believes
are in the best position to achieve offsets.
a. How Would This Proposal Facilitate the Establishment of Trading
Markets?
In developing these revisions to the federal antidegradation
policy, EPA considered the most likely approach by which to establish a
trading mechanism between new and existing dischargers undergoing a
significant expansion, and existing sources of pollutants. In effect,
EPA is seeking to establish a market for pollutant trading, in the
hopes of creating more effective and efficient mechanisms for restoring
water quality. EPA believes that requiring offsets from facilities
which are not small entities, as defined by the Regulatory Flexibility
Act, will focus the initiation of such a market on those entities which
have the greatest likelihood of securing offsets. Large dischargers are
more likely to have access to data and information, both environmental
and economic, that can be used in identifying, analyzing and allocating
offsets. Large dischargers are also more likely to have the resources
to devote to negotiating offsets with other entities.

[[Page 46069]]

EPA recognizes that establishing the framework for such a market in
pollutant trading presents many challenges. Nonetheless, EPA believes
that creating the offset requirement would provide a valuable mechanism
for ensuring reasonable progress toward attaining water quality
standards. EPA believes the expenditure of resources to establish a
market in pollutant trading will be compensated for by such factors as
reduced overall costs in meeting water quality standards, the ability
to locate a new enterprise or expand an existing enterprise, and
increased flexibility in designing pollution control systems. Such a
market, once established, would also provide other, more efficient
opportunities for improving water quality, as States and Tribes
implement watershed protection programs. EPA has developed draft
guidance on how to conduct watershed-based trading which addresses the
benefits and types of trades and how trading can be implemented to
attain and maintain water quality standards. Draft Framework for
Watershed-based Trading, EPA 800-R-96-001, May, 1996.
Trading in pollutant discharges is not a retreat from the CWA
goals. It can be a more efficient, market driven approach to meeting
these goals. EPA supports only trades that meet CWA requirements.
Through trading, EPA seeks to encourage innovative approaches and the
flexibility to implement load reductions in ways that maximize water
quality improvements and minimize costs. In allowing offsets as the
means to ensure reasonable further progress toward attaining the water
quality standard, EPA is seeking to generate environmental benefits in
the most cost-effective manner.
EPA invites comments on whether the requirement for offsets as a
means of ensuring reasonable further progress should be limited to
entities which are not small entities as defined by the Regulatory
Flexibility Act. EPA also invites comments on extending this
requirement to other entities which may be small entities under SBREFA.

C. How Would EPA Ensure Any Needed Changes to the Antidegradation
Policies in State, Territorial and Tribal Water Quality Standards?

With this notice of proposed rulemaking, EPA is initiating
development of Federal water quality standards pursuant to section
303(c)(4)(B) of the CWA. EPA intends to promulgate, as the EPA
Administrator determines necessary, Federal water quality standards for
any State, Territory or Tribe which does not adopt or already have in
place water quality standards which include provisions consistent with
40 CFR 131.12(a)(1)(ii) as ultimately promulgated. EPA believes such a
Federal promulgation could be necessary to ensure consistent,
nationwide application of any final provisions of 40 CFR
131.12(a)(1)(ii) in the period before the establishment of TMDLs for
waterbodies that do not meet water quality standards. EPA is today
providing notice of the Agency's intent for the Administrator to make a
determination whether a Federal promulgation is necessary for any
State, Tribe or Territory. EPA will delay this determination to allow
States, Territories and Tribes the opportunity to adopt their own water
quality standards. Any State, Territory or Tribe which expeditiously
acts to adopt standards consistent with the Agency's final promulgation
of this section would not be included in the proposed Federal water
quality standards. Further, EPA would initiate withdrawal of any
Federal promulgation for a State, Territory or Tribe that adopts
standards consistent with 40 CFR 131.12(a)(1)(ii).
EPA acknowledges that many States, Territories and Tribes may face
difficulties in completing adoption of water quality standards in the
time frame envisioned by the Agency. Nonetheless, EPA believes it is
important to have this mechanism firmly established in State,
Territorial or Tribal water quality standards in order to ensure
reasonable further progress toward restoring designated uses in the
period of time prior to the completion of TMDLs. This requirement would
only apply prior to the establishment and implementation of the TMDL
for a waterbody not meeting water quality standards.

D. How Would These Changes Be Implemented Through NPDES Permits?

New dischargers or existing dischargers undergoing a significant
expansion are required, under 40 CFR 122.4(i), to have permit limits or
conditions that ensure that they will not cause or contribute to a
violation of water quality standards. A new discharger or an existing
discharger undergoing a significant expansion required to offset their
proposed discharge pursuant to 40 CFR 131.12(a)(1)(ii), would also be
subject to additional requirements relating to the mechanics of
obtaining and maintaining an offset. EPA believes that these
additional, new requirements are necessary to ensure that the offsets
will in fact be realized. Each of these requirements are specified in a
new section 40 CFR122.4(j)(2), and explained in detail below.
1. Must the New or Significantly Expanding Discharger Obtain an Offset
of the Same Pollutant(s) the New or Significantly Expanding Discharger
Would Be Required To Offset?
Proposed 40 CFR 122.4(j)(2)(i) would require the discharger seeking
an offset to obtain the pollutant load reductions from one or more
sources of the pollutant(s) for which the waterbody is impaired. This
pollutant(s) must also be the same pollutant(s) the new or existing
discharger undergoing a significant expansion would be required to
offset. For example, the waterbody may be impaired by both copper and
lead. If a new discharger wishes to discharge copper (and not lead),
the discharger must obtain the requisite amount of pollutant load
reductions from a source(s) that is currently discharging copper into
the waterbody.
EPA recognizes that there may be circumstances where reasonable
further progress toward attaining water quality standards could best be
served by allowing the Director the discretion to offset a new or
expanded discharge of one pollutant with a load reduction of a
different pollutant for which the waterbody is also impaired. EPA,
however, is concerned with the technical difficulties of implementing
such an option and therefore, is not proposing it. EPA requests comment
on the possibility of allowing such discretion and on how the technical
difficulty of determining an appropriate offset for a different
pollutant could be resolved.
2. From What Geographic Area Would the Pollutant Load Reductions Need
To Be Obtained?
Proposed 40 CFR 122.4(j)(2)(ii) would require the discharger to
obtain the pollutant load reductions from one or more sources located
on the same waterbody as the discharge from the new discharger or
existing discharger undergoing a significant expansion. To determine if
a source(s) is located on the same waterbody, for purposes of obtaining
an offset under 40 CFR 131.12(a)(1)(ii), there would need to be a
direct hydrological connection between two sources. For example, there
must be a direct hydrologic connection between the outfall of the
existing point source where the reductions are realized and the outfall
of the proposed discharge.
States should be able to assist in the determination of whether a
source is located on the same waterbody. States often identify their
waters and assign waterbody identification numbers to specific
hydrologic units, often called

[[Page 46070]]

segments. States are also required to identify all waterbodies not
attaining water quality standards for the purposes of establishing a
TMDL. For the purposes of section 303(d) listing, a waterbody pollutant
combination will have a unique identifier so that the status of each
listed waterbody can be tracked over time. States often delineate these
segments based on hydrologic features, such as the presence of a dam,
the confluence of two rivers, or gradations of salinity in an estuary.
If a source is located on a waterbody with the same identification
number, this would be a good indication that it is located on the same
waterbody for purposes of obtaining an offset. EPA invites comment on
other conditions that would identify whether a source is located on the
same waterbody. EPA believes this requirement is reasonable, as is 40
CFR 122.4(j)(2)(i), because it ensures that the results from the offset
will be effective in benefitting waterbodies not attaining water
quality standards for a particular pollutant(s).
EPA intends the offset to result in reasonable further progress
toward attaining water quality standards. The most appropriate
hydrologic unit, and therefore geographic area within the same
waterbody, depends on site-specific hydrologic conditions such as water
chemistry, ecological parameters, and the location, number and types of
sources already discharging to that waterbody. An offset can be
obtained from a source located downstream from the new or significantly
expanding discharger provided that source is discharging to the same
body of water. An offset would not be appropriate if obtained outside
of the impaired waterbody in which the new or significantly expanded
discharger is located. EPA would also like comment on whether sources
providing pollutant load reductions for offsets, should be located only
upstream of the new or significantly expanding source.
EPA recognizes that air deposition contributes to some of the water
quality problems that exist today. EPA is considering whether to allow
an offset from an air pollution source emitting the same pollutant the
new or significantly expanded discharger is proposing to discharge. EPA
would consider this only where the air pollution source directly
affects the waterbody in the vicinity of the new or significantly
expanded discharge. EPA invites comment on how some of the additional
requirements related to obtaining an offset would be met if EPA allowed
dischargers to obtain offsets from an air pollution source(s). In
particular, EPA invites comment on whether the requirement in 40 CFR
122.4(j)(2)(v) (discussed below) to modify an offsetting source's NPDES
permit to reflect the required reductions should be expanded to require
permit modifications when offsets are obtained from permitted air
pollution sources. 40 CFR 122.4(j)(2)(v) would require the permit
regulating the source from which the offset is obtained to be modified
to reflect the pollutant load reductions.
3. Could the Pollutant Load Reductions Come From a Source With Existing
Requirements To Reduce its Loads?
Proposed 40 CFR 122.4(j)(2)(iii) would require that the pollutant
load reductions be the result of pollutant control measures implemented
by, or secured and assured by, the new discharger or existing
discharger undergoing a significant expansion. To satisfy this
requirement, the discharger must obtain the reductions from one or more
sources discharging the pollutant(s) of concern to the same waterbody.
If the discharger wishes to obtain the reductions from another source
in the same waterbody, the pollutant control measures must be the
result of an entirely new agreement and/or requirement for the
offsetting source. In other words, if the offsetting source, for any
reason other than to satisfy the proposed discharger's offset
requirements, was already required to construct or install the
pollutant control measures, the proposed discharger could not receive
credit for the resulting reductions. EPA believes this requirement is
reasonable because the load reductions would be a new requirement on
the offsetting source intended to result in reasonable further progress
toward attaining water quality standards where such progress was not
otherwise required.
4. When Would the Pollutant Load Reductions Need To Be Obtained?
Proposed 40 CFR 122.4(j)(2)(iv) would require the discharger to
achieve the pollutant load reductions on or before the date the new or
significantly expanding discharger begins to discharge. For reductions
to be achieved on or before the discharger begins to discharge, the
pollutant control measures would have to be in place. The discharger
would also need to satisfy any requirements that the Director
determined were necessary to demonstrate that the pollutant control
measures were in place and the requisite amount of pollutant load
reductions are and will continue to be realized. Such requirements
might include sampling, either at the discharge point or instream, and
reporting the results of those samples both before and after the
pollutant control measures were put in place. The results would need to
show that the requisite amount of pollutant load reductions are and
will continue to be realized. EPA invites comment on other ways the
discharger may make this demonstration.
EPA is also proposing to give the Director the discretion to not
require that the pollutant load reductions be obtained on or before the
date the discharge commences. The Director would have this discretion
in circumstances where the Director determines that a different time
frame for obtaining and maintaining the offset would best serve the
goal of reasonable further progress toward attaining water quality
standards. One example of such circumstances is where it is not
possible for the new or significantly expanding discharger to
demonstrate that the pollutant load reductions are being realized on or
before the date the discharge commences. An example of such a case is
where the source of the offset involves a reforestation effort. In this
instance, it will take time to produce reduction results because of the
time required for trees and/or shrubs for example, to grow.
In exchange for not requiring that the offsets be achieved on or
before the date the discharge commences, the Director must require that
the discharger obtain pollutant load reductions by an amount of at
least twice the amount of the new or expanded discharge. The Agency
believes this requirement is reasonable because in exchange for the
degree of uncertainty involved in whether the pollutant load reductions
will in fact be realized, the discharger will be able to discharge
prior to obtaining the reductions. In addition, it ensures that the
Director's discretion will be exercised in a way that best serves the
goal of reasonable further progress toward attaining water quality
standards.
Also, to provide assurances that the offsets will be achieved there
would need to be an enforceable and defined schedule with milestones
identified and sufficiently laid out in the proposed discharger's
permit. The use of this discretion would not be permitted in instances
where the TMDL is scheduled to be established before the offset is
fully realized. EPA invites comment on this aspect of the proposal
including whether the Agency should provide for these exceptions to the
requirement that the pollutant load reductions be achieved on or before
the date the discharge commences.

[[Page 46071]]

5. How Long Would the Pollutant Load Reductions Need To Be Maintained?
Reductions would also need to be maintained until the TMDL for the
waterbody is approved or established by EPA or until the new or
significantly expanding discharger ceases to discharge. Where a TMDL
has been approved or established by EPA, the new or significantly
expanding discharger would need to maintain the reductions until its
permit contained effluent limits or conditions consistent with its WLA
in the TMDL. To maintain the reductions, regular monitoring reports
would need to be submitted to ensure their continued achievement.
Depending on the source(s) from which the discharger is obtaining the
reductions (see discussion below under sections D6 and D7), the reports
might be submitted by either the discharger or the offsetting
source(s). The permitting authority would determine the appropriate
number of samples and how often monitoring reports would need to be
submitted. The Agency emphasizes that it is not sufficient for the TMDL
to be approved or established by EPA; the new or significantly
expanding discharger would also need to have limits or conditions in
its NPDES permit that reflect its WLA in the TMDL. At that point, the
discharger's WLA under the TMDL would supercede the offset
requirements.
Also, if the discharger stops discharging prior to the time a TMDL
for the waterbody is approved or established, the discharger would no
longer be required to maintain the reductions. For example, if a new
construction operation is expected to last eight months and the TMDL
will not be established for six years, the new discharger (construction
operation) need only maintain the reductions for the time in which the
discharge from the operation is ongoing (eight months).
EPA believes this requirement is reasonable because the offset is a
condition of being permitted to discharge. Therefore, it should be in
place on or before the discharger starts to discharge, unless this
requirement is modified by the Director under 40 CFR
122.4(j)(2)(iv)(B), and remain in place until the discharger either
stops discharging or until the TMDL is established and implemented with
respect to that discharger. Again, EPA intends that this requirement be
an interim measure and notes that the TMDL process is the appropriate
means of determining WLA/LAs that are necessary to attain and maintain
water quality standards. EPA does, however, invite comment on requiring
the offset to be maintained indefinitely (before and after the TMDL is
established). Requiring the offset to be maintained both before and
after the TMDL would prevent reintroducing pollutants to a waterbody
where they have already been removed, although this issue should be
addressed in the development of the TMDL itself.
6. What Would Be Required When the Source of the Offset Is an Existing
Point Source?
Proposed 40 CFR 122.4(j)(2)(v) would require that where a
discharger obtains pollutant load reductions from an existing point
source(s), as defined in the CWA, that existing point source(s)'s NPDES
permit would need to be modified to reflect the reductions. The
permitting authority would also need to consider the need for any
additional monitoring and reporting requirements to ensure that the
reductions are being maintained. This modification would need to take
place on or before the date the new permit is issued to the proposed
discharger. EPA believes this requirement is reasonable because
requiring that the permit for the existing point source(s) be modified
to reflect the reductions creates a level of accountability. This
accountability stems from the reductions being contained as permit
limits in an enforceable permit. If the existing point source(s)'s
discharge monitoring reports do not show that the reductions are being
realized, the point source(s) would not be in compliance with its
permit and thus, would be subject to an enforcement action.
The Agency again, notes that because the existing point source(s)'s
permit would be modified to reflect the reductions, the offset
requirement would be accounted for as a result of that modification.
Therefore, it would not be necessary to incorporate the offset
requirements in the new or significantly expanding discharger's permit.
The Agency recognizes that there may be additional costs and delays
associated with modifying the offsetting source's permit to reflect the
reductions and therefore, requests comment on suggestions for a
streamlined approach to accounting for the offset requirements. In
particular, the Agency invites comment on incorporating the offset
requirement in the new or significantly expanding discharger's permit
rather than the modifying the existing point source(s)'s permit.
Today's proposal would require the existing, offsetting point
source(s)'s permit to be modified to reflect the pollutant load
reductions on or before the date a permit is issued to the new or
significantly expanding discharger. EPA notes that there may be a time
period during which the existing offsetting point source(s)'s permit
has been modified but the proposed discharger has not yet begun
discharging. EPA expects that this time period, if any, would be short-
term. However, if there is a significant delay before the new or
significantly expanding discharger starts to discharge, one option
would be to place alternate effluent limits in the existing
discharger's permit. One limit would be applicable before the proposed
discharger starts to discharge and the other limit would be applicable
after the proposed discharger starts to discharge. EPA invites comment
on the idea of placing alternate effluent limits in the permit for the
offsetting source.
EPA also recognizes that the source from which the offset is
obtained may be discharging at levels less than their current permit
limits. In these cases, the baseline used to calculate the appropriate
reductions would be the offsetting source's actual and current loads
not their current permit limit. It is EPA's intent that the offsets
result in corresponding reductions in actual loads despite the
existence of a higher permit limit. The offsetting source's permit
would then need to be modified to reflect the corresponding reductions
in actual loads. This does not necessarily mean that the permit limits
would be adjusted to match the new actual load. Sources often target a
discharge level below the permitted amount in order to ensure
continuous compliance. In fact, EPA believes that well operated sources
should do this. It is likely that a source which was discharging below
its original permit limits would continue to target a discharge level
below any new permit limits designed to implement an offset. The exact
permit limits necessary to implement the offset would be determined on
a case-by-case basis by the permitting authority.
7. What Would Be Required When the Source of the Offset Is an Existing
Nonpoint Source?
Proposed 40 CFR 122.4(j)(2)(vii) would require that where a
discharger obtains pollutant load reductions from an existing nonpoint
source(s), the discharger's NPDES permit would need to contain any
conditions necessary to ensure that the load reductions from the
nonpoint source will be realized. These include such things as the
offset requirements themselves and any accompanying monitoring and
reporting requirements to ensure continued achievement of the pollutant
load

[[Page 46072]]

reductions (from the nonpoint source(s)). The Director may also wish to
establish alternate effluent limits in the permit for the new
discharger that would become effective if and when the pollutant load
reductions are not maintained. EPA invites comment on whether to
require the permitting authority to include alternate effluent limits
in the new or significantly expanded discharger's permit.
EPA believes the requirement in proposed 40 CFR 122.4(j)(2)(vi) is
reasonable for the same reasons stated above for 40 CFR 122.4(j)(2)(v).
Requiring the offset and accompanying monitoring and reporting
requirements to be placed in the proposed discharger's permit creates a
level of accountability as a result of being contained in an
enforceable permit. If the discharger's monitoring reports do not show
that the reductions are being realized or if the discharger is not in
compliance with an alternate permit limit, the discharger would not be
in compliance with its permit and would be subject to an enforcement
action. Assuming there is an enforceable contract between the new or
significantly expanding discharger and the nonpoint source (the
agreement under which the pollutant load reductions will be achieved
and maintained), in the event that there is a lack of reported
reductions which is at the fault of the nonpoint source, the discharger
should have an enforceable remedy against the nonpoint source (e.g.,
under contract law). Contract law may allow the new or significantly
expanding discharger to recover costs or other remedies they negotiated
in their agreement (any remedies the new or significantly expanding
discharger may have against the nonpoint source would be a product of
State contract law, outside of the NPDES permitting context).
8. How Would Offsets Be Obtained From Sources Seeking Coverage Under a
General Permit?
Determining whether and in what amount an offset would be required
from dischargers seeking coverage under a general permit would
necessarily differ from the same determinations for dischargers
applying for individual permits. Several issues arise with respect to
dischargers seeking coverage under a general permit when the discharge
would be to a waterbody not attaining water quality standards. The
first issue is whether and how the discharger would know if the
receiving water is one that does not meet water quality standards. Most
discharges seeking coverage under a general permit are required to
submit a notice of intent (NOI) form to claim authorization to
discharge. However, there is typically no information requested on the
NOI, other than identifying the latitude and longitude of the facility
that would help to identify the water quality status of the receiving
water. The second issue is whether the discharger and/or permitting
authority would know if the discharger's proposed effluent would
contain the pollutant(s) causing the impairment. The third issue is if
the pollutant(s) of concern is detected, how would the permitting
authority obtain the information indicating the amount of that
pollutant(s) the discharger is proposing to discharge. An NOI form
typically does not request information on the pollutant(s) expected in
the discharge. Absent any explicit information requirement for NOI
forms, it is unlikely that the discharger or permitting authority could
determine whether a discharger would be required to obtain an offset
under proposed 40 CFR 131.12(a)(1)(ii). EPA invites comment on how to
fill this information need.
i. What Options Is the Agency Considering?
One option that the Agency is considering to fill this information
need would be to amend the general permit regulations at 40 CFR
122.28(b)(2)(ii) and 40 CFR 122.28(b)(2)(v) to require the general
permit applicant to provide this additional information. Section
122.28(b)(2)(ii) discusses the contents of an NOI. For purposes of
notifying the permitting authority about the localized attainment of
water quality standards and to determine whether a proposed discharger
would be required to obtain an offset, EPA is considering whether the
following language should be included in the general permit provision:

``New dischargers or existing dischargers undergoing a
significant expansion (as defined in 40 CFR 122.2) but not those
that are small entities (as defined in 5 U.S.C. 601(6)) (see
discussion under proposed 40 CFR 131.12) must determine whether the
receiving water meets water quality standards. Operators that are
discharging or proposing to discharge to a waterbody that does not
meet water quality standards and for which a TMDL has not been
established and approved must certify that the discharge does not
add the pollutant(s) for which the waterbody is impaired.
Dischargers that do add the pollutant(s) for which the waterbody is
impaired and for which a TMDL has not been established or approved
must apply for an individual permit and are subject to the
requirements in 40 CFR 122.4(j).''

EPA notes that the Director already has authority to require a general
permit applicant to apply for and obtain an individual permit under 40
CFR 122.28(b)(3)(i).
To determine whether the receiving water is impaired, the applicant
could contact the appropriate State agency or check the State's 303(d)
list of waters not attaining water quality standards. The State may
have several ways for the public to access the information in the
303(d) list, including access via the World Wide Web.
The supplemental certification could request the applicant to
provide information on the expected contents and amount of pollutant(s)
in its proposed discharge. This type of information would assist the
applicant and the permitting authority in identifying whether the
pollutant of concern is in the proposed discharge and if it is, to
determine what, if any, offset is required. The contents of this
supplemental certification could be similar to the contents of Item V
on Form 2D but focused on the pollutant(s) for which the waterbody is
impaired. Some new applicants for EPA-issued individual permits use
NPDES application Form 2D. EPA Form 3510-2D (9/86). The permit
application regulations at 40 CFR 122.21(k)(5) (as reflected at Item V
on Form 2D) require each applicant to estimate and report data on the
pollutants that the applicant expects to discharge (per outfall).
Sampling and analysis are not required for purposes of the application
requirement. If data from such analyses are available, however, then
that data should be reported. Section 122.21(k)(5) and Parts A-C of the
application require the applicant to provide an estimate of the maximum
daily and average daily value for certain identified pollutant(s). This
estimate is based on the applicant's determination of whether a
pollutant will be present in their discharge. The applicant could base
this determination on knowledge of the proposed facility's raw
materials, maintenance chemicals, intermediate and final products,
byproducts, and any analyses, if available, of their effluent or of any
similar effluent.
Other sources upon which to base the estimate could include
available in-house or contractor's engineering reports and any other
studies performed on the proposed facility. Also, if an effluent
guideline applies to the facility or similar facilities, then the
development document to the effluent guideline may provide additional
information. If there is an applicable effluent guideline and the
pollutant(s) of concern is not addressed in the guideline, however,
this would not be conclusive evidence that the pollutant(s) of concern
is not present. If

[[Page 46073]]

the applicable effluent guideline does address the pollutant(s) of
concern, that recognition should be considered as a rebuttable
presumption that the pollutant(s) of concern will, in fact, be present
in the discharge.
EPA is also considering another option to fill this information
need. This option would require these dischargers to submit a
supplemental certification that they have already obtained and are
continuing to maintain the requisite offset requirements. However, EPA
has concerns about how this would work. In particular, EPA is concerned
with how this permit applicant would determine the amount of the
pollutant(s) of concern in its proposed discharge and in turn,
determine the amount of required offset. When determining the proper
offset required in an individual permit, the Director would have
discretion to consider a number of variables. For example, if the
applicant decides to obtain offsets from a nonpoint source, maintenance
of the offset could remain highly uncertain. To compensate, the
Director could appropriately require the applicant to obtain and
maintain a greater offset (see discussion above in section
(B)(3)(iii)(b)). Given discretionary considerations such as these,
offset determinations may be difficult to implement for general
permittees. EPA requests comments on how such compensation could be
implemented, where necessary, for general permit applicants under this
option.
EPA is considering a third option for general permittee offsets.
This option would allow the general permits themselves to contain
alternative sets of requirements depending on whether the discharge
would be to a waterbody meeting water quality standards or a waterbody
not meeting water quality standards. For permitted discharges to
waterbodies not meeting water quality standards, requirements would be
more stringent and/or prescriptive than those required for discharges
to waterbodies that do meet water quality standards. Some general
permits currently provide such differing requirements. For purposes of
satisfying an offset requirement, an option might be to establish the
more stringent and/or prescriptive requirements for discharges into
impaired waterbodies in lieu of an individualized offset. The
reductions needed to ensure reasonable further progress toward meeting
water quality standards would be ``built in'' to the general permit. As
with the second option discussed above, the permitting authority would
not be able to tailor the offset requirements to the specific
circumstances and discharge of the individual new or significantly
expanding discharger. However, this option could allow the permitting
authority to establish conditions in the general permit necessary to
ensure that collectively, new and significantly expanding dischargers
obtained offsets sufficient to achieve reasonable further progress
toward attaining water quality standards. EPA invites comments on
whether to allow more stringent and/or prescriptive requirements for
discharges into impaired waterbodies in the general permit in lieu of
requiring an individual permit.
General permitting also creates complications regarding the
requirements in 40 CFR 122.4(j)(2). In particular, the Agency
anticipates it would be difficult to implement the specific
requirements applicable when offsets are obtained from an existing
nonpoint source(s). In these cases, an individual permit would need to
include conditions necessary, including the offset requirements and any
accompanying monitoring and reporting requirements, to ensure continued
achievement of the reductions. EPA invites comment on how this
requirement should be addressed in general permits.
EPA requests comment on these three options as well as other
possible approaches for satisfying the offset requirements for new or
significantly expanding dischargers applying for a general permit and
proposing to discharge into impaired waterbodies. In particular, EPA
requests information on the burdens these options impose on regulated
entities and State permitting authorities. EPA also requests comment on
the water quality benefits of the three options and on whether the
definition of a significant expansion should be different for general
permittees than for individual permittees.
ii. What If a Notice of Intent Form Is Not Required?
General permitting presents additional implementation problems when
an NOI form is not required. One option would be to amend 40 CFR
122.28(b)(2)(v), which authorizes the Director to allow certain
dischargers to be covered under a general permit without submitting an
NOI. This section also identifies some sources for which the Director
does not have this discretion. EPA is considering including new
dischargers and existing dischargers undergoing a significant expansion
(but not those that are '`small entities'' as defined in 5 U.S.C.
601(6)), in the list of sources for which the Director would not have
the discretion to waive the submission of an NOI. EPA invites comment
on how this additional concern might be addressed.
iii. Who and Under What Circumstances Would Need To Submit a
Supplemental Certification?
EPA recognizes that the language suggested above for an amendment
to 40 CFR 122.28(b)(2)(ii) would require only new dischargers and
existing dischargers undergoing a significant expansion that are not
small entities as defined in 5 U.S.C. 601(6) to provide an additional
certification for discharges to a waterbody not attaining water quality
standards. Not requiring all new dischargers and existing dischargers
undergoing a significant expansion to make this certification is
consistent with the proposed requirements at 40 CFR 131.12(a)(1)(ii)
because the offset requirement would only apply to those dischargers
who are not considered ``small entities'' (as defined in 5 U.S.C.
601(6)). Dischargers who do not fall within the definition of a small
entity would be able to seek coverage under a general permit.
iv. How Would Offsets Be Determined for Dischargers Regulated
Solely by BMPs?
Once it is determined that an offset is required, the amount of
offset required must be determined as well. This issue is particularly
important for applicants seeking coverage under a general permit. This
issue involves how to determine the appropriate offset requirements (or
offset equivalents) for dischargers regulated solely by best management
practices (BMPs). For example, would it be appropriate to require more
stringent BMPs, or additional ``offsetting'' BMPs from other sources in
lieu of a pound-for-pound offset? EPA invites comment on how to address
this issue as well.

E. Additional Proposed Modifications to Related NPDES Provisions

1. How Is EPA Proposing To Modify the Water Quality-Based Permitting
Regulations?
EPA is today proposing to include the phrase ``State
antidegradation provisions'' in its water quality-based permitting
regulations at 40 CFR 122.44(d)(1). Section 122.44 contains the
requirements for establishing limitations, standards and other permit
conditions in NPDES permits necessary to ensure that NPDES permits are
protective of water quality standards. Including this phrase is
clarifying only and not intended to create a substantive change.
Including this phrase in these provisions gives added notice and
clarification to EPA's longstanding policy which is well understood by
the

[[Page 46074]]

States and the public, including regulated entities, that
antidegradation policies and implementation procedures are required
elements of State water quality standards.
2. How Is EPA Proposing To Modify the Regulations Pertaining to the
Statement of Basis and Permit Fact Sheet?
EPA is also proposing to change both 40 CFR 124.56 and 124.7. EPA
believes this is necessary in light of the proposed changes to 40 CFR
122.4(j) and 131.12. Section 124.56 lists specific items which must be
placed in the fact sheet required by 40 CFR 124.8 of the NPDES
regulations. EPA believes it is necessary to include, in the fact
sheet, an explanation of how and why any decision was made by the
Director with respect to any offsets requir

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A99-21415. Public record. Not legal advice.