# Otter Lake Timber Sale(s), Tongass National Forest; Hoonah Ranger District, Alaska

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A99-18068

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** July 15, 1999
- **Citation:** 64 FR 38178

## Text

DEPARTMENT OF AGRICULTURE

Forest Service

Otter Lake Timber Sale(s), Tongass National Forest; Hoonah Ranger
District, Alaska

AGENCY: Forest Service, USDA.

ACTION: Notice of Intent to Prepare an Environmental Impact Statement.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture, Forest Service will prepare an
environmental impact statement (EIS) to disclose the environmental
effects of proposed actions within the Otter Lake Project Area. The
proposed action provides for: (1) Harvest of seven units covering 588
acres, from a unit pool of 14 units totalling 849 acres and containing
19.4 million board feet, and regeneration of new stands of trees; (2)
construction of 3.2 miles of specified road and 0.5 miles of temporary
road, as well as reconstruction of 2.5 miles of specified road; and (3)
the use of the existing log transfer facility at Eight Fathom Bight
(terminus of Forest Development Road 8580). This level of development
would result in the harvest of an estimated 12.4 million board feet of
sawlog and utility timber volume over a three year period following the
approval of this document and award of contract(s). The proposed action
is one alternative to achieve the purpose and need for this project. A
map of the unit and road pool, and the proposed action, is available
from the address provided.

DATES: Comments concerning the scope of the analysis should be received
in writing by August 23, 1999.

LEAD AGENCY: USDA Forest Service, Tongass National Forest.

ADDRESSES: Send written comments to Otter Lake Planning Team, USDA
Forest Service, 204 Siginaka Way, Sitka, Alaska 99835.

COOPERATING AGENCIES: U.S. Army Corps of Engineers, U.S. Environmental
Protection Agency will be invited to participate as Cooperating
Agencies.

FOR FURTHER INFORMATION CONTACT: Michael E. Fox, USDA Forest Service,
204 Siginaka Way, Sitka, Alaska 99835, (907) 747-4328, e-mail at mfox/
[email protected] or FAX at (907) 747-4281.

SUPPLEMENTARY INFORMATION:

Background

This environmental impact statement (EIS) will tier to the Tongass
Land and Resource Management Plan Environmental Impact Statement and
Modified 1997 Tongass Land and Resource Management Plan (April 1999
Record of Decision). The Tongass Land and Resource Management Plan
(TLRMP) provides the overall guidance (Goals, Objectives, Standards,
Guidelines, and Management Area direction) to achieve the desired
condition for the area in which the project is proposed.
The EIS will be prepared by a contractor working under the
supervision of the Forest Service. Work to be done by the contractor
includes the field investigations, development of resource reports,
preparation of a draft EIS, and the preparation of the final EIS. The
Forest Service will prepare the Record of Decision. The Forest Service
will provide oversight and review at all steps of the process.
The Otter Lake Project Area is located about 60 air miles north of
Sitka, Alaska and 12 air miles west of Hoonah, Alaska. The project area
(7,580 acres) is located on north Chichagof Island, just north of Neka
Bay, and north and west of Port Frederick. The project area encompasses
part or all of R 59 E, T 43 S, Sec. 31, 32, 33, 34, 35, & 36; R 59 E, T
44 S, Sec. 1 through 18, 20, & 21, and R 60 E, T 45 S, Sec. 6 (Eight
Fathom Bight Log Transfer Facility (LTF) site). The LTF is
approximately 6.5 road miles south of the project area. The Otter Lake
Project Area lies within Value Comparison Unit (VCU) 2010. The project
area is administered by the Hoonah Ranger District, Tongass National
Forest.

Purpose and Need for the Proposed Action

The purpose and need for the project is to implement the direction,
goals, and objectives in the modified 1997 Tongass Land and Resource
Management Plan (TLMPR), dated May 23, 1997 and the Record of Decision,
dated April 13, 1999. The project is planned to move timber stands to a
managed condition resulting in a healthier, faster growing stand, to
increase growth and yield from the managed stands, to reduce volume
loss associated with disease and decay and to recover timber volume
that might otherwise be lost for human use.
The project is planned to contribute an estimated 12 million board
feet of sawlog and utility timber in support of the Tongass National
Forest timber program, in order to meet the direction, in the Tongass
Timber Reform Act, section 101, to ``seek to provide a supply of timber
from the Tongass National Forest which (1) meets the annual market
demand for timber from such forest and (2) meet market demand from such
forest for each planning cycle'' to the extent consistent with multiple
use and sustained yield from

[[Page 38179]]

all renewable forest resources. This environmental impact statement may
result in one or more timber sales under the sale program.

Decisions To Be Made

Fred S. Salinas, Assistant Forest Supervisor, Tongass National
Forest, is the Responsible Official and will decide whether or not to
authorize timber harvest within the Otter Lake Project Area. He will
decide: (1) If the design of the timber sale offerings are consistent
with meeting resource protection standards and guidelines in the
Modified 1997 Tongass Land and Resource Management Plan; (2) how much
timber volume to make available and what the logical sale offerings
are; (3) the location and design of the arterial and collector road
system needed to develop the project area, and the post-sale
transportation options; (4) the location and design of timber harvest
units (including silvicultural prescriptions and logging systems), and
log transfer and camp facilities; (5) mitigation and monitoring
measures for sound resource management; and (6) subsistence
determinations required by Secton 810 of the Alaska National Interest
Lands Conservation Act (ANILCA).

Management Objectives

The project area is in Value Comparison Unit (VCU) 2010, and is
located totally within the Timber Production Land Use Designation
(LUD). An Old-growth Habitat Reserve is located immedately adjacent to
the south and east of the project boundary. The existing Eight Fathom
Bight Log Transfer Facility (LTF), located approximately five air miles
to the south, lies within a Scenic Viewshed LUD.
Management direction that the proposed action is designed to
address include: Desired Condition--Suitable timber lands are managed
for the production of sawtimber and other products on an even-flow,
long-term sustained yield basis. A road system provides access for
timber management activities, recreation, hunting and fishing, and
other administration uses; some roads may be closed seasonally or
permanently to address resource concerns. Management activities will
generally dominate the landscape. Tree stands are healthy and in a
balanced mix of age classes from young stands to trees of harvestable
age, often in 40- to 100-acres stands. Recreation opportunities
associated with roaded settings are available. A variety of wildlife
habitats, predominately in the early to middle successional stages, are
present.
Goals--Manage the timber resource for production of saw timber and
other wood products from suitable timber lands made available for
timber harvest, on an even-flow, long-term sustained yield basis, and
in an economically efficient manner. Provide a diversity of
opportunities for resource uses that contribute to the local and
regional economies of Southeast Alaska.
Objectives--Seek to provide a timber supply sufficient to meet the
annual market demand for Tongass National Forest timber, and the market
demand for the planning cycle. Support a wide range of natural resource
employment opportunities within Southeast Alaska's communities.

Tentative Issues

Scoping has not yet been done for this project; however, issues
identified for the Supplement to the Environmental Impact Statement,
1981-86 & 1986-90 Operating Periods (SEIS) and the Eight Fathom Timber
Sale(s) Project for the same general area are considered to still be
applicable. The issues as expressed below have been modified to reflect
the reduced project area.
Issue 1--Project Effects on Recreation and Tourism: This issue
focuses on how timber harvest and road building would affect
recreational opportunities and the visual character of the landscape.
This includes potential disruptions to fish and wildlife resources that
drive recreation/tourism businesses, extent of additional access for
recreational users via logging roads, and if there would be impacts on
areas of concern such as Neka Bay.
Issue 2--Subsistence Impacts: This issue focuses on whether or not
proposed activities will significantly restrict subsistence use through
effects on wildlife, fish, and plant resources for customary and
traditional uses. Concerns include whether harvest activities would
displace subsistence users, whether additional use from logging
personnel, increased traffic from logging, and increased future
recreation use on new logging roads would displace or reduce abundance
of subsistence resources, including deer.
Issue 3--Potential Economic Impacts: The issue focuses on the
capability of the project area to provide a long-term sustained yield
of timber and other resources, and whether this associated level of
outputs is sufficient to meet the needs of dependent local communities.
These concerns include whether timber production and productivity can
be maximized to achieve positive economic return, whether the short-
term timber obligations will be balanced with long-term maintenance of
other natural resources, whether the economic analysis would consider
the economics of resources other than timber, and whether the road
system for the project would remain in place to facilitate future
harvest and minerals activities.
Issue 4--Protection of Fish and Wildlife Resources: This issue
focuses on the effects of timber harvest and associated road
construction on water quality, fish, and wildlife, including protection
of fish and wildlife habitat during harvest activities, whether
biodiversity and population viability will be affected, whether
sediments from roads and logging will affect salmon production
downstream, and extent of effects on deer, marten, and bear habitats.
Issue 5--Cultural and Historical Resource Protection: This issue
focuses on the protection of heritage resources, and concerns a project
design to avoid damage to cultural or historical resources, and
coordination with the State's Scenic Byway Program to address proposed
projects within areas designated for corridors of scenic, historic,
cultural, recreational, or archaeological significance.
Issue 6--Protection of Caves and Karst Features: This issue focuses
on the potential presence of karst features in the project locale.
Issue 7--Alternatives to Clearcutting: The issue is focused on
public concerns that silvicultural systems other than even-aged
management be considered in the alternatives, and implementation of a
reforestation program to speed recovery after harvest and to reduce the
duration of scenic effects, and the presence of clearcuts in high
public use, highly visible areas.

Proposed Action

The proposed action is the harvesting of seven units of a 14-unit
pool totalling 849 acres with 19.4 million board feet. The total area
harvested, including road right-of-way, is 595 acres yielding an
estimated 12.4 million board feet. Logging systems include three
helicopter units totalling 240 acres for 5.6 million board feet, as
well as four units with a ground-based logging system (skyline or
shovel) with 326 acres yielding 6.2 million board feet. All units are
planned as clearcuts. The proposed road system consists of 3.2 miles of
new specified road construction, 0.5 miles of temporary road
construction, and 2.5 miles of reconstruction of existing specified
road. Road construction right-of-way area is 22 acres, yielding 0.6
million board feet. Nineteen percent of the 3,170

[[Page 38180]]

acres of timber suitable and available for harvest would be harvested
under this scenario. All units and roads will conform to the standards
and guidelines in the TLMPR, including stream buffers, retention of
green trees within units, marten habitat requirements, and the
avoidance of extreme hazard soils and over-steepened slopes.

Permits

To proceed with the timber harvest as proposed, various permits
must be obtained from other agencies. Federal agencies and their
responsibilities are as follows: U.S. Army Corps of Engineers has the
responsibility for approval of discharge of dredged or fill material
into the waters of the United States (section 404 of the Clean Water
Act), and approval of construction of structures or work in navigable
waters of the United States (section of the Rivers and Harbors Act of
1899); the Environmental Protection Agency has responsibility for the
National Pollution Discharge System review (section 402 of the Clean
Water Act); the U.S. Coast Guard has responsibility for Coast Guard
Bridge Permits (General Bridge Act of 1946) required for all structures
constructed within the tidal influence zone. Other agencies which will
participate are as follows: State of Alaska, Department of Natural
Resources has responsibility for authorization for occupancy and use of
tidelands and submerged lands; State of Alaska, Department of
Environmental Conservation has responsibility for the Solid Waste
Disposal Permit (section 402 of the Clean Water Act, 18 AAC 60.230) and
the Certificate of Reasonable Assurance (section 401 of the Clean Water
Act). Both the Environmental Protection Agency and the U.S. Army Corps
of Engineers will be invited to participate as cooperating agencies in
the preparation of the environmental impact statement.

Process Steps

Preparation of the environmental impact statement will include the
following steps: (1) Public notification and scoping (comments due in
approximately 45 days, beginning with the publication of this Notice in
the Federal Register; (2) identification of significant issues related
to the proposed action to be analyzed in depth; (3) development of a
reasonable range of alternatives to the proposed action which meet the
stated purpose and need for the proposed action and address significant
issues; and (4) identification of the potential environmental effects
of the alternatives.
Scoping announcements will be published during the week of July 12,
1999 in the Juneau Empire and Daily Sitka Sentinel, and copies of the
announcement will be mailed to interested persons. This announcement
will describe the timing and location of public involvement meetings.
Scoping meetings will be held in Hoonah in August 1999. Comments
received from public scoping will be analyzed to determine significant
issues within the scope of this project. Alternatives to the proposed
action will be developed to address significant issues. One of these
will be the ``No Action'' alternative in which there will be no
project-related activities such as timber harvest or road construction.
Other alternatives may consider various levels and locations of
activities in response to issues and other resource objectives. The
direct and indirect effects of each alternative will be analyzed and
documented. Mitigating measures will be identified and their
effectiveness evaluated.

Public Participation Encouraged

In addition to commenting on the proposed action and the Draft
Environmental Impact Statement when it is released, agencies and other
interested persons or groups are invited to contact Forest Service
Officials at any time during the planning process.
The Draft EIS is expected to be filed with the Environmental
Protection Agency (EPA) in September 2000. The comment period for the
Draft Environmental Impact Statement will be 45 days from the date the
EPA publishes the notice of availability in the Federal Register.
The Forest Service believes, at this early stage, it is important
to give reviewers notice of several court rulings related to public
participation in the environmental review process. First, reviewers of
draft environmental impact statements must structure their
participation in the environmental review of the proposal so that it is
meaningful and alerts an agency to the reviewer's position and
contentions; Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,
553 (1978). Also, environmental objections that could be raised at the
Draft Environmental Impact Statement stage but that are not raised
until after completion of the Final Environmental Statement may be
waived or dismissed by the courts; City of Angoon v. Hodel, 803 F.2d
1016, 1022 (9th Circuit, 1986) and Wisconsin Heritages, Inc. v. Harris,
490 F. Supp. 1334 (E.D. Wis 1980). Because of these court rulings, it
is important that those interested in this proposed action participate
by the close of the 45 day comment period so that substantive comments
and objections are made to the Forest Service at a time when it can
meaningfully consider and respond to them in the Final Environmental
Impact Statement.
To assist the Forest Service in identifying and considering issues
and concerns on the proposed action, comments on the Draft
Environmental Impact Statement should be as specific as possible. It is
also helpful if comments refer to specific pages or chapters of the
Draft Environmental Statement. Comments may also address the adequacy
of the Draft Environmental Statement or the merits of the alternatives
formulated and discussed in the document. Reviewers may wish to refer
to the Council on Environmental Quality Regulations for implementing
the procedural provisions of the National Environmental Policy Act, 40
CFR 1503.3, in addressing these points.
The Final Environmental Impact Statement and Record of Decision is
expected to be released in June 2001. The Assistant Forest Supervisor,
Sitka Assistant Forest Supervisor's Office, Tongass National Forest,
will, as the responsible official for the environmental impact
statement, make a decision regarding this proposal considering the
comments, responses, environmental consequences disclosed in the final
environmental impact statement, and applicable laws, regulations, and
policies. The decision and supporting reasons will be documented in the
record of decision.
Fred S. Salinas,
Assistant Forest Supervisor.
[FR Doc. 99-18068 Filed 7-14-99; 8:45 am]
BILLING CODE 3410-11-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A99-18068. Public record. Not legal advice.
