DEPARTMENT OF ENERGY

Western Area Power Administration
[DOE/EIS-0297]

Record of Decision for the Interconnection of the Griffith Power
Plant With the Western Area Power Administration's Parker-Davis and
Pacific Northwest-Pacific Southwest Intertie Transmission Systems

AGENCY: Western Area Power Administration, DOE.

ACTION: Record of decision.

-----------------------------------------------------------------------

SUMMARY: Griffith Energy Limited Liability Corporation (Griffith)
applied for transmission service from the Western Area Power
Administration (Western) for the Griffith Energy Project (Project).
Based on the application, Western proposed to enter into an
interconnection and construction agreement with Griffith to provide
interconnections with Western's Pacific Northwest-Pacific Southwest
Intertie and Parker-Davis transmission systems. Western has decided to
enter into interconnection and construction agreements with Griffith to
provide the interconnections with Western's Pacific Northwest-Pacific
Southwest Intertie and Parker-Davis transmission systems, and to
construct and operate transmission system additions to provide the
interconnection with its transmission system. The interconnection to
Western's transmission system will be provided via two new 230-kilovolt
(kV) transmission lines, a new 230-/345-kV substation, and the
upgrading of the existing Davis-Prescott 230-kV transmission line.
Western's decision for its action took into consideration the
environmental ramifications of the Project. The environmental
ramifications of the Project were addressed in Western's Griffith
Energy Project Draft and Final Environmental Impact Statements (DOE/
EIS-0297). This Record of Decision (ROD) has been prepared in
accordance with Council on Environmental Quality regulations for
implementing the National Environmental Policy Act (NEPA) (40 CFR parts
1500-1508) and Department of Energy (DOE) Procedures for Implementing
NEPA (10 CFR part 1021), and DOE's Floodplain/Wetland Review
Requirements (10 CFR 1022). Western will reconsider this decision if
Griffith does not obtain a Prevention of Significant Deterioration
(PSD) air permit from the Arizona Department of Environmental Quality
(ADEQ). Full implementation of this decision is contingent upon the
Project obtaining all other required permits and approvals.

FOR FURTHER INFORMATION CONTACT: Mr. John Holt, Environmental Manager,
Desert Southwest Customer Service Region, Western Area Power
Administration, P.O. Box 6457, Phoenix, AZ 85005, telephone (602) 352-
2592, email [email protected]. Copies of the Environmental Impact
Statements (EIS) are available from Mr. Holt.

SUPPLEMENTARY INFORMATION: Western is the lead agency for the EIS and
the U.S. Department of the Interior, Bureau of Land Management, Kingman
Field Office (BLM) is a cooperating agency. Western decided to enter
into interconnection and construction agreements with Griffith, and to
construct and operate transmission system additions to provide the
interconnection with its transmission system. The transmission system
additions include:

1. A new 8-mile 230-kV transmission line from the Griffith Power
Plant to Western's existing McConnico Substation along route
segments A and D as defined in the EIS;
2. A new 230-/345-kV substation, named Peacock Substation, at
the intersection of the existing Davis-Prescott and Mead-Phoenix
transmission lines in the northeast corner of Section 36, Township
22 North, Range 14 West;
3. A new 30.2-mile 230-kV transmission line from the Griffith
Power Plant to the new substation along route segments A, B and C as
defined in the EIS (segments A and B will utilize a right-of-way
previously acquired by Citizen's Utilities for its Kingman-Havasu
project);
4. The installation of new electrical equipment and structures
within the boundaries of Western's existing McConnico and Mead
substations; and
5. The tensioning of existing conductors and/or installation of
new conductors on the existing Davis-Prescott 230-kV transmission
line between Western's Davis Substation and the new Peacock
Substation (segment Z as defined in the EIS), including the
installation of new structures between some longer spans to support
the conductor.

The transmission lines will be constructed along Western's
preferred alternative as described in the EIS. In addition, Western
decided to utilize single-pole steel structures for the portions of the
new transmission lines that cross State- and privately-owned lands.
Across BLM-administered public lands, Western will utilize the
structure type stipulated by BLM in its rights-of-way grant.
Western based its decision on the information contained in the
Griffith Energy Project EIS (DOE/EIS-0297; Draft EIS issued October
1998 and Final issued March 1999), subsequent comments received during
the Final EIS waiting period, and consultations with the BLM.

Alternatives Considered

Western considered the transmission alternatives addressed in the
EIS and the environmental ramifications of the Griffith Power Plant in
reaching its decision. Transmission alternatives included system,
routing, and structure alternatives, and the no action alternative.
Transmission line routing alternatives considered in the EIS were
limited by the proximity of the Project to an established utility
corridor, and the presence of other Western facilities in the area.
Western did not select a routing alternative directly north of the
power plant (segments A and E as defined in the EIS) because of its
proximity to Walnut Creek Estates. Another routing alternative for
segment D was suggested, but it was not technically feasible. Steel
lattice, H-frame, and single-pole structure alternatives were
considered for the transmission lines. The environmental impacts for
each structure type will be similar. Due to cost and engineering
considerations, Western selected the single-pole structure for the new
lines and the H-frame structures for installation between the longer
spans on the existing line. Single pole structures will not be feasible
for the Davis-Peacock upgrade due to the horizontal configuration of
the existing line. System alternatives were also addressed, but
dismissed from full analysis.
The no action alternative is the environmentally preferred
alternative. It was not selected because it will not satisfy Western's
need to provide access to its transmission system when requested by an
eligible organization. Western implemented an Open Access Transmission
Tariff to meet the intent of the Federal Energy Regulatory Commission
(FERC) Order for Open Transmission Access (FERC Order Nos. 888 and 888-
A). The no action

[[Page 29024]]

alternative also will not provide enhancements to the transmission
system in northwestern Arizona, or extend the life of the existing
Davis-Prescott transmission line.
Western believes that the selection of the no action alternative
would not necessarily preclude development of the Griffith Power Plant,
as Griffith could pursue other options or appeal a Western denial.
Existing transmission constraints in the Kingman area have been well
documented. If Griffith decides not to develop the Project under the no
action alternative, it is believed that Citizen's Utilities would
reinitiate its Kingman-Havasu transmission line project and pursue
development of its own power plant to meet future electrical loads in
the Kingman area. With development of the Project, Citizen's Utilities
is not expected to construct a new 230-kV transmission line north of
the Griffith Power Plant.
In addition to the transmission system additions, the Project has
other components that include the power plant, a brine disposal pond,
gas pipelines, a power plant access road, an equipment off-loading
area, a temporary haul route, water wells, and a water pipeline.
Western does not have any jurisdiction over these components of the
project. The BLM has jurisdiction over the eastern gas pipeline and
will be issuing a separate ROD for the pipeline and the transmission
lines that cross BLM-administered public lands. Western did consider
the environmental ramifications of the entire Project in its decision
making. Western has determined that the development of the gas
pipelines, access road, temporary equipment off-loading, and haul road
will not have significant environmental impacts based on the mitigation
measures included in the EIS. The significance of the environmental
impacts of the other Project components are discussed below.
Additional comments were received during the Final EIS waiting
period that expressed concerns about water use and depletion, water use
alternatives, Mohave County's authorization of the water supply for the
Project, and cumulative impacts. Western's decision considered water
resource impacts based on an average annual consumption rate of 3,300
gallons per minute over a 40-year life of the project. The water
balance analysis in the Final EIS addressed water consumption rather
than water supply. The water consumption analysis is a more accurate
representation of the Project's impacts on the Sacramento water basin.
Considering the water balance analysis and the highest possible
estimates used to address cumulative water withdrawal impacts, Western
believes the Final EIS more than adequately represents potential
cumulative water consumption impacts. Western determined that the water
consumption impacts will be adverse, but not significant.
Western's decision also considered action taken by the Arizona
Corporation Commission which issued a Certificate for Environmental
Compatibility with conditions related to water use. The conditions will
help the State monitor the Project's impact on groundwater resources.
The power plant design incorporates equipment to recycle waste water
and minimize water use. The EIS addressed alternatives to reduce water
consumption by the power plant, but these alternatives were not
economically feasible and were dismissed from full analysis. Two
additional methods were suggested to reduce water depletion during the
Final EIS waiting period that are consistent with the alternatives
dismissed. Two more methods were suggested, but were outside the scope
defined for the EIS during scoping.
Western's decision also took into consideration the potential
impacts of the brine disposal pond. In response to comments received on
the Draft EIS, Western worked with Griffith to add monitoring and
reporting of any waterfowl use and problems with the brine disposal
pond. With monitoring and reporting, Western will be able to address
any impacts to waterfowl with State and Federal wildlife agencies. In
addition, Western based its decision on Griffith's need to obtain an
aquifer protection permit from ADEQ for the brine disposal pond. The
permit will adequately address concerns expressed about the pond to
Western during the Final EIS waiting period.
Western's decision also considered the Project's impacts on
regional haze. Based on a review of the additional analysis on the
Project's impacts on Grand Canyon visibility, Western concurs with the
results that the Project will not have an adverse impact on Grand
Canyon or Hualapai Tribe visibility. This ROD will be reconsidered if
the ADEQ denies Griffith a PSD permit for the project.

Mitigation Measures

All practicable means to avoid or minimize environmental harm from
Western's selected alternative have been adopted. The generic and
selective mitigation measures adopted are given in Table 2.1-4 of the
Final EIS. Specific mitigation that applies to the construction of the
new transmission lines, and the upgrading of the existing transmission
line is identified in the EIS. This mitigation includes:

1. A desert tortoise mitigation plan which will include
preconstruction surveys and compensation for unmitigated impacts;
2. Hualapai tribal participation in the intensive cultural
resource surveys for the new transmission lines and the upgrade of
the existing Davis-Peacock line;
3. In locations identified during cultural resource inventory as
having the potential to contain sensitive cultural resources to the
Hualapai Tribe, Hualapai representatives will be invited to monitor
right-of-way blading and construction;
4. New conductors and groundwires will be nonspecular and when
existing conductors are replaced, nonspecular conductors will be
used to reduce visual impacts;
5. New transmission line structures will be dulled to reduce
visual impacts;
6. Transmission line structures would be designed for the
appropriate seismic zone;
7. Third-party construction monitoring in areas identified by
the BLM;
8. Reseeding and plant salvaging per a BLM approved Reclamation
Operation Maintenance Plan;
9. Preconstruction surveys for peregrine falcon and other raptor
nesting activity;
10. Avoidance of construction during any discovered mountain
plover breeding season; and
11. Coordination with interested property owners on structure
siting to reduce land use and visual impacts.

The decision also is based on the implementation of specific
mitigation measures identified in the EIS for the other components of
the Project including:

1. Western's review and approval of dust control procedures for
the construction of the Griffith Power Plant as required by the ADEQ
air permit;
2. Power plant lighting compliance with Mohave County
illumination ordinances and use of partially- or fully-shielded
fixtures during darkness;
3. Painting plant with colors similar to the surrounding
landscape; and
4. Monitoring and reporting of waterfowl use and impacts at the
brine disposal pond.

A Mitigation Action Plan will be developed in accordance with 10
CFR 1021.331 that addresses mitigation commitments described above. The
Mitigation Action Plan will explain how the mitigation will be planned
and implemented and will be available upon request.

Dated: May 12, 1999.
Michael S. Hacskaylo,
Administrator.
[FR Doc. 99-13668 Filed 5-27-99; 8:45 am]