# South Spruce Ecosystem Rehabilitation Project, Dixie National Forest, Iron and Kane Counties, Utah

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A98-8863

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** April 6, 1998
- **Citation:** 63 FR 16756

## Text

DEPARTMENT OF AGRICULTURE

Forest Service

South Spruce Ecosystem Rehabilitation Project, Dixie National
Forest, Iron and Kane Counties, Utah

AGENCY: Forest Service, USDA.

ACTION: Notice of intent to prepare an environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the Forest Service, USDA, will
prepare an environmental impact statement (EIS) for the Forest Service
to implement several proposals within the South Spruce Ecosystem
Recovery Project area, on the Cedar City Ranger District, Dixie
National Forest. These proposals include: (1) commercial timber harvest
by salvage, release, and improvement cuttings, and associated road
construction; (2) burning and mechanical regeneration treatments of
aspen forests; and, (3) travel management. Multiple decisions may be
issued upon completion of the analysis; however, the cumulative effects
of all the proposed actions will be disclosed in the EIS. The purpose
of these proposals is to initiate actions that would improve forest
health and diversity, accelerate reforestation, meet woody debris
objectives, and reduce road densities within the project area. The
project area is located approximately 15 miles east of Cedar City,
Utah. The project would be implemented in accordance with direction in
the Land and Resource Management Plan (LRMP) for the Dixie National
Forest, 1986.
In addition to the management activities proposed to be
implemented, a site specific amendment to the LRMP is being proposed.
This amendment is necessary in order to ensure that the commercial
timber harvest proposed action complies with the LRMP. The amendment is
described below under Supplementary Information.
The agency gives notice that the environmental analysis process is
underway. During the analysis process, an issue surfaced that warranted
disclosure of effects under an EIS. This issue is the high degree of
interest associated with the potential to alter the undeveloped
character of a portion of the project area due to vegetative management
treatments.
Interested and potentially affected persons, along with local,
state, and other federal agencies, are invited to participate in, and
contribute to, the environmental analysis. The Dixie National Forest
invites written input regarding issues specific to the proposed action.

DATES: Written comments to be considered in the preparation of the
Draft Environmental impact Statement (DEIS) should be submitted by May
11, 1998, which is at least 30 days following the publication of this
notice in the Federal Register. The DEIS is expected to be available
for review by June, 1998. The Record of Decision and Final
Environmental Impact Statement are expected to be available by
November, 1998.

ADDRESSES: Submit written comments to: District Ranger, Cedar City
Ranger District, 82 North 100 East, P.O. Box 627, Cedar City, Utah
84721-0627; FAX: (801) 865-3791; E-mail: Brunswick__Nancy/
[email protected].

FOR FURTHER INFORMATION CONTACT:
Direct questions about the proposed action and EIS to Phillip G.
Eisenhauer, Project Environmental Coordinator, by mail at 82 North 100
East, P.O. Box 627, Cedar City, Utah 84721-0627; or by phone at (801)
865-3700; FAX: (801) 865-3791; E-mail: Brunswick__Nancy/
[email protected].

SUPPLEMENTARY INFORMATION: The proposed projects are located in a
52,991 acre analysis area in the upper drainages of the Parowan,
Mammoth, Panguitch, Asay and Coal Creek watersheds. Approximately
37,577 acres of the project area are forested and 15,414 acres are non-
forested. The proposed commercial conifer treatment areas currently are
or will likely be infested with spruce beetle (Dendrocto-nus
rufipennis). Spruce beetle populations are at epidemic levels and have
killed millions of spruce trees, on approximately 19,000 acres within
the project area. In some sites, where spruce was the dominant
overstory, few live trees remain. Because spruce beetle populations
have been expanding since the early 1990's it is likely the remaining
9,000 acres of spruce forest will become infested.
The purpose of the project is to harvest with salvage cuttings
approximately 718 acres of dead, dying, and high risk Engelmann spruce
trees to recover wood products that would otherwise be lost, while
still meeting desired resource objectives for standing dead and down
tree material. Minor amounts of subalpine fir trees (less than 15% of
the total removed) would also be removed with improvement cuttings to
release healthy aspen, spruce or subalpine fir regeneration, improve
residual stand vigor, or that will likely be damaged or killed during
the removal of the spruce trees.
Approximately 2,412 acres of spruce forests that are at moderate to
high risk to spruce beetle infestation that are located immediately
adjacent to infested areas are proposed for harvest with the same
commercial salvage and improvement cuttings. These currently uninfested
areas will not be harvested until they become infested by epidemic
levels of spruce beetles.
On approximately 289 acres adjacent to sites previously harvested
by strip clearcutting the purpose of commercial timber harvest is to
release or stimulate aspen regeneration and create a more natural
forest pattern.
Rehabilitation of areas heavily impacted by bark beetle mortality
through the completion of natural and artificial regeneration
activities would occur as needed. An estimated 1,625 acres would be
planted with spruce seedlings. Reforestation is essential to providing
for the most rapid progression toward the desired future condition for
forest cover in the project area.
Regeneration treatment of aspen forests is also included in this
proposal. Treatments would include both burning and mechanical
(commercial and non-commercial harvest) with or without burning. About
9,171 acres of forest are dominated by aspen in the project area. Most
are being converted to conifers by natural succession and the lack of
fire in the ecosystem. Most vegetation management treatments would lead
to an increase in the abundance of aspen, which is the desired goal for
resource values identified in the project area (ie: wildlife habitat
improvement,

[[Page 16757]]

vegetation diversity, and scenic variety and color in the landscape).
Approximately 463 acres would be regenerated.
Travel management is proposed for portions of the project area. The
purpose of this activity is to restore and rehabilitate ecological
values in areas where excessive numbers of open roads exist. Moving
these portions of the project area toward or below the LRMP guideline
of two miles of open road per square mile will reduce the adverse
environmental impacts associated with excessive numbers of open roads.
A reduction in open road density will reduce long-term maintenance
costs while promoting safe, efficient public travel on the open road
system.
Vegetation management treatments involving commercial harvest,
aspen regeneration, and travel management would occur on National
Forest system lands located within portions of Sections 28-33 of
Township(T) 35 South(S), Range(R) 8 West(W); Sections 3-17, 20-24, 26-
35 of T.36 S., R.8 W.; Sections 3-10, 15-21, 30-32 of T.37 S., R.8 W.;
Sections 1, 2, 11-14, 23-26, 35-36 of T.37 S., R. 8\1/2\ W.; Sections
1-6, 8-15, 24-25 and 36 T.36 S., R.9 W.; Sections 10-16, 22-27, 35-36
of T.37 S., R.9 W., Salt Lake City (SLC) Meridian, Iron County, UT;
and, Sections 1-2 of T.38 S., R.9 W.; and Sections 5-6 of T.38 S., R.8
W., SLC Meridian, Kane County, UT.
The transportation system required to access commercial harvest
areas is largely in place. However, to access all currently infested
stands, approximately 2.6 miles of temporary and specified road
construction would be required. An additional one half mile of
temporary road is proposed to access aspen regeneration areas with
commercial sawtimber and non-commercial fuelwood opportunities. No road
construction is proposed to occur in areas classified categories one,
two or three under Chief Dombeck's interim road policy (36 CFR part
212). A haul route is proposed through Cedar Breaks National Monument
along existing roads to facilitate removal of a portion of the trees
removed under the commercial harvest proposal.
All newly constructed temporary roads would be obliterated upon
completion of the project, and any new permanent or systems road would
be physically closed with earth and rock barriers or gates.
In addition to the vegetation management treatments, and related
activities, a site-specific amendment to the Dixie National Forest LRMP
is being proposed for this project. This amendment is necessary in
order to ensure that the commercial harvest proposed action is in
compliance with the LRMP. Because of the level of spruce beetle caused
mortality along state highways and areas designated semi-primitive
recreation management in the LRMP (2A and 2B), commercial harvests in
these areas may require that site specific amendments be made regarding
scenic resource management.
The proposed actions would implement management direction,
contribute to meeting the goals and objectives identified in the DNF-
LRMP, and move the project area toward the desired condition. This
project EIS would be tiered to the Dixie National Forest LRMP EIS
(1986), which provides goals, objectives, standards and guidelines for
the various activities and land allocations on the Forest. As lead
agency, the Forest Service would analyze and document direct, indirect,
and cumulative environmental effects for a range of alternatives. Each
alternative would include mitigation measures and monitoring
requirements. No alternatives to the proposed action have been
identified at this time, however, the following four preliminary issues
have been identified: (1) The presence of log trucks and other heavy
machinery on popular recreation traffic routes may increase hazards to
personal safety (management indicator: frequency and timing of logging
related traffic); (2) Prescribed burning associated with aspen
regeneration may generate smoke concentrations that could pool in urban
areas (management indicator: number of days expected to exceed
guidelines); (3) The proposed activities may affect areas the
undeveloped character of areas within the SERP area (measurement
indicator: number of acres altered within those areas); and, (4) The
proposed harvest levels may not optimize the recovery of the marketable
value of the wood products (measurement indicator: percent of acres
harvested of the total available spruce mortality on suitable and
operable acres).
Hugh C. Thompson, Forest Supervisor, Dixie National Forest, is the
responsible official. He can be reached by mail at 82 North 100 East,
P.O. Box 580, Cedar City, Utah, 84720-0580.
The Forest Service is seeking comments from individuals,
organizations, and local, state, and Federal agencies who may be
interested in or affected by the proposed action. Scoping notices have
been sent to potentially affected persons and those currently on the
Dixie National Forest mailing list that have expressed interest in
timber management proposals, proposals, relating to wildlife habitat
modifications and Forest Plan amendments. Other interested individuals,
organizations, or agencies may have their names added to the mailing
list for this project at any time by submitting a request to: Phillip
G. Eisenhauer, Project Environmental Coordinator, 82 North 100 East,
P.O. Box 627, Cedar City, UT 84720-0627.
The analysis area includes both National Forest System land and
private lands. Proposed treatments would occur only on National Forest
system lands. A permit is required to use the proposed haul route
through Cedar Breaks National Monument. No other federal or local
permits, licenses or entitlements would be needed.
The comment period on the draft environmental impact statement will
be 45 days from the date the Environmental Protection Agency publishes
the notice of availability in the Federal Register.
The Forest Service believes, at this early stage, it is important
to give reviewers notice of several court rulings related to public
participation in the environmental review process. First, reviewers of
the DEIS must structure their participation in the environmental review
of the proposal so that it meaningful and alerts an agency to the
reviewers' position and contentions. Vermont Yankee Nuclear Power Corp
v. NRDC, 435 U.S. 519, 553 (1978). Also, environmental objections that
could have been raised at the DEIS stage but that are not raised until
after completion of the final EIS may be waived or dismissed by the
courts. City of Angoon v. Hodel, (9th Circuit, 1986) and Wisconsin
Heritages, Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D. Wis. 1980).
Because of these court rulings, it is very important that those
interested in this proposed action participate by the close of the 45
day comment period so that substantive comments and objections are made
available to the Forest Service at the time it can meaningfully
consider them and respond to them in the final EIS.
To assist the Forest Service in identifying and considering issues
and concerns about the proposed action, comments on the DEIS should be
as specific as possible. It is also helpful if comments refer to
specific pages or chapters of the draft statement. Comments may also
address the adequacy of the statement or the merits of the alternatives
formulated and discussed in the statement. Reviewers may wish to refer
to the Council on Environmental Quality Regulations for implementing
the procedural provisions of the National Environmental Policy

[[Page 16758]]

Act at 40 CFR 1503.3 in addressing these points.

Dated: March 25, 1998.
Hugh C. Thompson,
Forest Supervisor, Dixie National Forest.
[FR Doc. 98-8863 Filed 4-3-98; 8:45 am]
BILLING CODE 0224-10-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A98-8863. Public record. Not legal advice.
