# Environmental Impact Statements and Regulations; Availability of EPA Comments

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A98-21941

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** August 14, 1998
- **Citation:** 63 FR 43699

## Text

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-5494-5]

Environmental Impact Statements and Regulations; Availability of
EPA Comments

Availability of EPA comments prepared July 13, 1998 Through July
17, 1998 pursuant to the Environmental Review Process (ERP), under
section 309 of the Clean Air Act and section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the OFFICE OF FEDERAL ACTIVITIES AT (202)
564-7167. An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 10, 1998 (63
FR 17856).

Draft EISs

ERP No. D-DOE-E00007-SC Rating EC2, Tritium Extraction Facility
(TEF), Construction and Operation near the Center of Savannah River
Site at H Area, (DOE/EIS-0271D), Aiken and Barnwell Counties, SC.
Summary: EPA had environmental concerns about the project. The
Final EIS should provide more information about emergency response
plans for potential spills and accidents.
ERP No. D-NPS-E61073-MS Rating EC1, Natchez Trace Parkway,
Construction of Section 3X Southern Terminus, Adam Counties, MS.
Summary: EPA had environmental concerns about adverse impacts to
wetlands which should be avoided to fully protect the environment.
ERP No. D-UAF-J11012-00 Rating LO, Colorado Airspace Initiative,
Modifications to the National Airspace System, such as the F-16
Aircraft and Aircrews of the 140th Wing of the Colorado Air National
Guard, also existing Military Operations Areas (MOAs) and Military
Training Routes (MTRs), CO, NM, KS, NB and WY.
Summary: EPA had no comments to the proposed action.

Final EISs

ERP No. F-AFS-L65299-AK, Cascade Point Access Road, Construction,
Maintenance and Operation, Road Easement within National Forest System
land in the vicinity of Echo Cove, EPA Permit, COE Section 10 and 404
Permits, Juneau, AK.
Summary: EPA continued to have objections to a Purpose and Need
statement that results in the evaluation of a restricted range of
alternatives, the potentially significant direct, indirect, and
cumulative environmental impacts to Berners Bay, and the level of
information/analyses presented in the EIS.
ERP No. F-USN-E11038-00, USS SEAWOLF Submarine Shock Testing,
Implementation, located in the Offshore Mayport, FL or Norfolk, VA.
Summary: EPA continued to have some environmental concerns about
the Seawolf testing and awaits with interest the outcome of additional,
future tests.

Other

ERP No. LD-BLM-L61219-AK Rating LO, Squirrel River Wild and Scenic
River Suitability Study, Designation and Non-Designation, National Wild
and Scenic Rivers System, AK.
Summary: EPA used a screening tool to conduct a limited review of
the action. Based upon the screen, EPA does not foresee having any
environmental objections to the proposed project. EPA will not be
conducting a detailed review.

Dated: August 11, 1998.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 98-21941 Filed 8-13-98; 8:45 am]
BILLING CODE 6560-50-U

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A98-21941. Public record. Not legal advice.
