NUCLEAR REGULATORY COMMISSION

[Docket No. 50-382]

Entergy Operations, Inc.; Waterford Steam Electric Station, Unit
3; Environmental Assessment and Finding of No Significant Impact

The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
NPF-38, issued to Entergy Operations, Inc., (the licensee), for
operation of the Waterford Steam Electric Station, Unit 3 (Waterford
3), located in St. Charles Parish, Louisiana.

Environmental Assessment

Identification of the Proposed Action

The proposed action would change the Waterford 3 Technical
Specifications to allow an increase in the Waterford 3 Spent Fuel Pool
(SFP) storage capacity from 1088 to 2398 fuel assemblies, and to allow
an increase in the maximum fuel enrichment from 4.9 w/o (weight
percent) to 5.0 w/o U-235. The increase in spent fuel storage capacity
is achieved by replacing the existing spent fuel storage racks by the
higher density racks, a process referred to herein as ``reracking.''
The proposed action is in accordance with the licensee's application
for license amendment dated March 27, 1997, as supplemented by letters
dated April 3, July 21, October 23, November 13, and December 12, 1997,
January 21, January 29, March 23, May 1, May 19, May 21, May 28, and
June 12, 1998.

The Need for the Proposed Action

The Waterford 3 SFP currently contains 1088 storage cells in 16
spent fuel racks and full core off-load capability would be lost in the
year 2000. Under the proposed reracking, the 16 existing racks, which
contain Boraflex as the neutron absorber, would be removed and replaced
by new high density modules. There are no commercial independent spent
fuel storage facilities operating in the U.S., nor are there any
domestic reprocessing facilities; therefore, the projected loss of
storage capacity in the Waterford 3 SFP would affect the licensee's
ability to operate Waterford 3. The proposed amendment will provide a
full core off-load capability through the end of Cycle 19 (Year 2018).

Environmental Impacts of the Proposed Action

Radiological Impacts
The Waterford 3 uses waste treatment systems designed to collect
and process gaseous, liquid, and solid waste that might contain
radioactive material. These radioactive waste treatment systems are
evaluated in the Final Environmental Statement (FES) dated March 1973.
The proposed rerack will not involve any change in the waste treatment
systems described in the FES.
Radioactive Material Released to the Atmosphere
During reactor operation, a small percentage of the fuel assemblies
in the core are expected to develop leaks, resulting in a release of
fission products to the reactor coolant. The storage of additional
spent fuel assemblies in the SFP will not significantly affect the
release of radioactive gases from the SFP since fission products
generally do not escape from the SFP.
The higher fuel burnup used in the new rack analysis will result in
a higher concentration of Krypton-85 (Kr-85) in the reactor coolant,
some of which will be introduced into the SFP water during refuelings.
Accounting for this increased Kr-85 concentration in the SFP water, the
licensee calculated that the Kr-85 concentration in the air in the fuel
handling building would be two orders of magnitude lower than the
permissible effluent concentration for the general public (Appendix B
of 10 CFR Part 20).
Iodine-131 released from spent fuel assemblies to the SFP water
will not be significantly increased due to the expansion of the fuel
storage capacity since the Iodine-131 inventory in the fuel will decay
to negligible levels between refuelings.
Most of the tritium in the SFP water results from activation of
boron and lithium in the primary coolant. A relatively small amount of
tritium is produced during reactor operation by the fission process
within the reactor fuel. The subsequent diffusion of the tritium
through the fuel and cladding represents a small contribution to the
total amount of tritium in the SFP water. Tritium releases from the
fuel assemblies to the reactor coolant occur mainly during reactor
operation and, to a limited extent, shortly after shutdown. Since a
small portion of the tritium is due to fission in the fuel, the
increased fuel burnup will result in an increase in the amount of
tritium in the reactor coolant.
Most airborne releases of tritium from nuclear power plants result
during refuelings from evaporation of reactor coolant, which contains
tritium in higher concentrations than in the SFP. The storage of
additional spent fuel assemblies in the SFP is not expected to increase
the SFP bulk water temperature significantly above the 155 deg. used in
the design analysis and, therefore, evaporation rates from the SFP are
not expected to increase. The higher tritium concentrations in the SFP
water are expected to result in higher airborne tritium levels in the
fuel handling building. However, the licensee has calculated these
tritium levels to be lower than the permissible effluent concentrations
for the general public contained in Appendix B of 10 CFR Part 20.
Solid Radioactive Wastes
Spent resins are generated by the processing of SFP water through
the SFP purification system. These spent resins are replaced about two
to four times a year and are disposed of as solid radioactive waste.
The licensee will use a vacuum system with an underwater filtration
unit to clean the floor of the Cask Storage Pit prior to reracking and
the floor of the SFP following removal of the old SFP rack modules.
Vacuuming of the SFP and Cask Storage Pit will remove any extraneous
debris, reduce general contamination levels prior to diving operations,
and ensure visual clarity in the SFP to facilitate diving operations
and SFP rack changeout. The licensee also plans on hydrolazing the old
fuel rack modules with demineralized water before removal from the SFP
to remove any loose crud from the modules. If necessary, the licensee
may also use a wire brush or equivalent abrasive tool to assist in the
removal of hot particles. The licensee does not expect that the
additional fuel storage made possible by the increased storage capacity
will result in a significant change in the generation of solid radwaste
(in the form of spent resins).
Once the old SFP rack modules have been hydrolazed, they will be
placed into anti-contamination bags and loaded into shipping containers
for shipment offsite for decontamination and disposal. The licensee has
stated that the shipping containers and procedures will conform to all
applicable U.S.

[[Page 36723]]

Department of Transportation (DOT) and/or U.S. NRC regulations.
Liquid Radioactive Wastes
There should not be a significant increase in the liquid release of
radionuclides from the plant as a result of the modifications. The SFP
cooling and purification system operates as a closed system. The SFP
ion exchanger resins remove soluble radioactive materials from the SFP
water and the frequency of resin changeout may increase during the
installation of the new racks due to the more frequent fuel shuffling
and underwater hydrolazing of the old racks during removal. When the
resins are changed out, a small amount of resin sluice water is
released. However, the amount of liquid radioactive released to the
environment as a result of the proposed reracking is expected to be
negligible.
Occupational Doses
Radiation Protection personnel will constantly monitor the doses to
the workers during the reracking operation. Divers used to perform work
in the SFP will be equipped with five remote readout radiation
detectors, which will be continuously monitored by Radiation Protection
personnel. The total occupational dose to plant workers as a result of
the reracking operation is estimated to be between 6 and 12 person-rem.
This dose estimate is comparable to doses for similar SFP modifications
performed at other plants. The upcoming reracking operation will follow
detailed procedures prepared with full consideration of ALARA
principles. On the basis of our review of the Waterford 3 proposal, the
staff concludes that the Waterford 3 SFP rack modification can be
performed in a manner that will ensure that doses to workers will be
maintained as low as is reasonably achievable (ALARA). The estimated
dose of 6 to 12 person-rem to perform the proposed SFP rerack is a
small fraction of the annual collective dose accrued at Waterford 3.
Uranium Fuel Cycle and Transportation
The environmental impacts of transportation resulting from the use
of higher enrichment fuel are discussed in the staff assessment
entitled ``NRC Assessment of the Environmental Effects of
Transportation Resulting from Extended Fuel Enrichment and
Irradiation,'' dated July 7, 1988. This was published in the Federal
Register on August 11, 1988 (53 FR 30355), as corrected on August 24,
1988 (53 FR 32322), in connection with an Environmental Assessment and
Finding of No Significant Impact related to the Sheron Harris Nuclear
Power Plant, Unit 1. As indicated therein, the environmental cost
contribution of an increase in fuel enrichment of up to 5 weight
percent U-235 and irradiation limits of up to 60 gigawatt days per
metric ton (GWD/MT) are either unchanged, or may in fact be reduced
from those summarized in Table S-4 as set forth in 10 CFR 51.52(c).
These findings are applicable to the proposed amendment for Waterford
3. Accordingly, the Commission concludes that this proposed action
would result in no significant radiological environmental impact.
Accident Considerations
In its application, the licensee evaluated the possible
consequences of a fuel handling accident to determine the thyroid and
whole-body doses at the Exclusion Area Boundary (EAB), Low Population
Zone (LPZ), and Control Room. The proposed reracking of the Waterford 3
SFP will not affect any of the assumptions or inputs used in evaluating
the dose consequences of a fuel handling accident and therefore will
not result in an increase in the doses from a postulated fuel handling
accident.
Nonradiological Impact
The proposed amendment does not modify land use at the site; no new
facilities or laydown areas are needed to support the rerack or
operation after rerack; therefore, the proposed amendment does not
affect land use or land with historical or archeological sites. The
proposed action does not result in any significant changes to the types
and amounts of effluents that may be released offsite. Therefore, no
changes or different types of nonradiological environmental impacts are
expected as a result of the amendment.
Summary
The Commission has completed its evaluation of the proposed action.
The change will not increase the probability or consequences of
accidents, no changes are being made in the types of any effluents that
may be released offsite, and there is no significant increase in the
allowable individual or cumulative occupational radiation exposure.
Accordingly, the Commission concludes that there are no significant
radiological environmental impacts associated with the proposed action.
With regard to potential nonradiological impacts, the proposed
action does not affect nonradiological plant effluents. Accordingly,
the Commission concludes that there are no significant nonradiological
environmental impacts associated with the proposed action.

Alternatives to the Proposed Action

Since the Commission has concluded there is no measurable
environmental impact associated with the proposed action, any
alternatives with equal or greater environmental impact need not be
evaluated. As an alternative to the proposed action, the staff
considered denial of the proposed action. Denial of the application
would not result in any significant change in current environmental
impacts. The environmental impacts of the proposed action and the
alternative action are similar.

Alternative Use of Resources

This action does not involve the use of any resources not
previously considered in the Final Environmental Statement for the
Waterford 3.

Agencies and Persons Consulted

In accordance with its stated policy, on June 17, 1998, the staff
consulted with the Louisiana State official, Dr. Stan Shaw of the
Louisiana Radiation Protection Division, regarding the environmental
impact of the proposed action. The State official had no comments.

Finding of No Significant Impact

Based upon the environmental assessment, the Commission concludes
that the proposed action will not have a significant effect on the
quality of the human environment.
Accordingly, the Commission has determined not to prepare an
environmental impact statement for the proposed action.
For further details with respect to the proposed action, see the
licensee's letter dated March 27, 1997, as supplemented by letters
dated April 3, July 21, October 23, November 13, and December 12, 1997,
January 21, January 29, March 23, May 1, May 19, May 21, May 28, and
June 12, 1998, which are available for public inspection at the
Commission's Public Document Room, The Gelman Building, 2120 L Street,
NW., Washington, DC, and at the local public document room located at
the University of New Orleans Library, Louisiana Collection, Lakefront,
New Orleans, LA 70122.

Dated at Rockville, Maryland, this 30th day of June 1998.

[[Page 36724]]

For the Nuclear Regulatory Commission.
John N. Hannon,
Director, Project Directorate IV-1, Division of Reactor Projects III/
IV, Office of Nuclear Reactor Regulation.
[FR Doc. 98-17919 Filed 7-6-98; 8:45 am]
BILLING CODE 7590-01-P

---