# Total Mercury and Particulate Continuous Emissions Monitoring Systems; Measurement of Low Level Particulate Emissions; Implementation at Hazardous Waste Combustors; Proposed RuleNotice of Data Availability and Request for Comments

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A97-33740

## Record

- **Collection:** Federal Register
- **Document type:** Proposed Rule
- **Published:** December 30, 1997
- **Citation:** 62 FR 67788

## Text

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Parts 60 and 63

[FRL-5941-4]

Total Mercury and Particulate Continuous Emissions Monitoring
Systems; Measurement of Low Level Particulate Emissions; Implementation
at Hazardous Waste Combustors; Proposed Rule--Notice of Data
Availability and Request for Comments

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of data availability and request for comments.

-----------------------------------------------------------------------

SUMMARY: This announcement is a notice of data availability and
invitation for comment on the following reports pertaining to total
mercury and particulate continuous emissions monitoring systems: DRAFT:
Total Mercury CEMS Demonstration, Summary Table, dated December 1997;
and DRAFT: Particulate Matter CEMS Demonstration, Volume I (with
appendices), dated December 1997. EPA proposed requiring these monitors
for hazardous waste combustors in the hazardous waste combustor
proposed rule published on April 19, 1996. In addition, this document
discusses topics for implementing particulate matter continuous
emissions monitoring systems at hazardous waste combustors.
Readers should note that only comments about new information
discussed in this document will be considered. Issues related to the
April 19, 1996, proposed rule and subsequent documents that are not
directly affected by the documents or data referenced in this Notice of
Data Availability are not open for further comment.

DATES: Written comments on these documents and this document must be
submitted by January 29, 1998.

ADDRESSES: Commenters must send an original and two copies of their
comments referencing Docket Number F-97-CS6A-FFFFF to: RCRA Docket
Information Center, Office of Solid Waste (5305G), U.S. Environmental
Protection Agency Headquarters (EPA, HQ), 401 M Street, SW, Washington,
D.C. 20460. Comments may also be submitted electronically through the
Internet to: [email protected]. Comments in electronic format
should also be identified by the docket number F-97-CS6A-FFFFF. All
electronic comments must be submitted as an ASCII file avoiding the use
of special characters and any form of encryption. Commenters should not
submit electronically any confidential business information (CBI). An
original and two copies of the CBI must be submitted under separate
cover to: RCRA CBI Document Control Officer, OSW (5305W), 401 M Street,
SW, Washington D.C. 20460.
For other information regarding submitting comments electronically,
viewing the comments received, and supporting information, please refer
to the proposed rule (61 FR 17358 (April 19, 1996)). The RCRA
Information Center is located at Crystal Gateway One, 1235 Jefferson
Davis Highway, First Floor, Arlington, Virginia and is open for public
inspection and copying of supporting information for RCRA rules from
9:00 a.m. to 4:00 p.m. Monday through Friday, except for Federal
holidays. The public must make an appointment to view docket materials
by calling (703) 603-9230. The public may copy a maximum of 100 pages
from any regulatory document at no cost. Additional copies cost $0.15
per page.

FOR FURTHER INFORMATION CONTACT: For general information, call the RCRA
Hotline at 1-800-424-9346 or TDD 1-800-553-7672 (hearing impaired)
including directions on how to access some of the documents and data
referred to in this notice electronically. Callers within the
Washington Metropolitan Area must dial 703-412-9810 or TDD 703-412-3323
(hearing impaired). The RCRA Hotline is open Monday-Friday, 9:00 a.m.
to 6:00 p.m., Eastern Time.
The documents referred to in this notice are available over the
Internet. The documents can be accessed by typing the following
universal resource locator (URL):
http://www.epa.gov/epaoswer/hazwaste/combust/cems
This URL provides a home page through which all electronically
available documents can be downloaded. The Technology Transfer Network
(TTN) also provides a link to this page. CEMS information is available
on TTN at the following URL:
http://ttnwww.rtpnc.epa.gov/html/emtic/cem.htm
The home page contains links to the files that are available
electronically. The files are in an executable, compressed format to
facilitate

[[Page 67789]]

downloading. Once extracted, each compressed file may result in more
than one decompressed file. The reports are in Adobe
Acrobat, PDF format. The reader should note that
figures, diagrams, and appendices may not be available electronically
or may only be available in other formats.
For other information regarding the information contained in
Sections I, II, IV, and V of this notice, contact Mr. Scott Postma,
(5302W), Office of Solid Waste, 401 M Street, SW, Washington, D.C.
20460, phone (703) 308-6120, E-MAIL: [email protected]. For
information regarding Section III of this notice, contact Mr. H. Scott
Rauenzahn (5302W), Office of Solid Waste, 401 M Street, SW, Washington,
D.C. 20460, phone (703) 308-8477, e-mail:
[email protected].

SUPPLEMENTARY INFORMATION: On April 19, 1996, EPA proposed revised
standards (herein referred to as ``the proposed rule'') for hazardous
waste combustors (HWCs, i.e., incinerators and cement and lightweight
aggregate kilns that burn hazardous waste). See 61 FR 17358. Comments
received from the public in response to the proposed rule are found in
RCRA docket F-96-RCSP-FFFFF.
A previous notice of data availability (NODA), published on March
21, 1997, gave the public the opportunity to review the Agency's
approach to demonstrating CEMS for HWCs. This previous NODA is herein
referred to as ``the first CEMS NODA'' or ``CEMS NODA 1.'' See 62 FR
13776. Comments received from the public in response to the first CEMS
NODA are found in RCRA docket F-97-CS3A-FFFFF.
Readers should note that a separate docket was established for this
document. See the Addresses section above for more information.

Table of Contents

I. Introduction and Background
II. The Hg CEMS Demonstration Tests
III. The PM CEMS Demonstration Tests
A. PM performance Specification (PS) 11 Levels
1. Revised Specification Levels for the Correlation
Coefficient, Confidence Interval, and Tolerance Interval
2. Data Availability
3. Data Quality Objectives: New Procedures to Appendix F of 40
CFR Part 60
B. Manual Method Accuracy
1. Modification of the Filter Recovery Process
2. Improved Sample Collection
3. Elimination of Contamination
4. Improved Sample Analysis
5. Comparison of M5 and M5i Method Precision
6. Paired Data
C. Transferability of These Demonstration Test Results to Other
HWC Sources
IV. PM CEMS: Implementation and Compliance
A. PM CEMS Compliance Schedule
B. PM CEMS Operating Parameter Limit
1. Introduction
2. Data Excluded from Calculating the PM CEMS Operating
Parameter Limit
3. Determining the Normality of the Data
4. Averaging Periods for the PM CEMS Operating Parameter Limit
5. Options for Calculating the PM CEMS Operating Parameter
Limit
a. Using rank statistics to calculate the PM CEMS-based
operating parameter limit at one, fixed averaging period
b. The traditional standard setting approach
6. Consideration of a Variance Procedure to Project a Higher PM
CEMS Operating Parameter Limit
a. HAPs for which PM control is necessary to ensure compliance
b. Projecting a higher PM CEMS operating parameter limit
considering the ratio of the standard to the measured level of a HAP
c. Ensuring that the higher projected PM CEMS operating
parameter limit does not exceed the MACT PM standard
d. Establishing revised operating parameter limits for the PM
control device corresponding to the higher projected PM CEMS
operating parameter limit
e. Implementing the variance
7. EPA's PM CEMS Testing to Identify a CEMS-Based Emission
Level Achievable by MACT-Controlled Sources
C. RCA Test Frequency
D. Extrapolating PM CEMS Calibration Data
1. Extrapolating Light-Scattering PM CEMS Calibration Data
2. Extrapolation of Beta-gage Calibration Data
E. Need to Calibrate to Twice the Emission Standard
F. Allowing PM CEMS to be Used In-lieu of Method 5 Tests
G. Waivers from the PM CEMS Requirements
1. Waiver of PM and Hg CEMS Requirements for Small On-Site
Incinerators
2. PM CEMS Waiver for Sources with Short Life-Spans
3. Other Sources
V. Other Issues Concerning CEMS and Test Methods for HWCs
A. Performance Specifications for Optional CEMS
B. Stack Sampling Test Methods

PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES

I. Introduction and Background

In the proposed rule, EPA proposed that continuous emissions
monitoring systems (CEMS) be used for compliance with the HWC total
mercury (Hg) and particulate matter (PM) standards. See 61 FR at 17426
and 17435. To require CEMS for compliance the Agency, among other
things, must determine that the CEMS are commercially available and
have been demonstrated to meet certain performance specifications. To
make these determinations, the Agency tested various Hg and PM CEMS
being marketed in the U.S. and Europe. The first CEMS NODA described
the approach EPA is using to demonstrate the feasibility of PM and Hg
CEMS and requested comment on certain technical issues arising from
this program. This testing is now complete. Today the Agency is
providing notice of an opportunity to comment on the following
documents resulting from these CEMS demonstration test program: DRAFT:
Total Mercury CEMS Demonstration, Summary Table, dated December 1997;
and DRAFT: Particulate Matter CEMS Demonstration, Volume I (with
appendices), dated December 1997.
The remainder of this notice describes important information
bearing upon how the reports' results relate to EPA's approach to
demonstrating Hg and PM CEMS and how PM CEMS could be used for
compliance. Many of these issues were raised by commenters in response
to CEMS NODA 1 and the proposed rule. The reader is referred to the
referenced documents for specific information regarding the Hg and PM
CEMS demonstration test program and the comments cited here.

II. The Hg CEMS Demonstration Tests

EPA seeks comment on the document DRAFT: Total Mercury CEMS
Demonstration, Summary Table, dated December 1997, provided in the
above referenced docket for this NODA. This table summarizes results
from the Hg CEMS demonstration tests EPA conducted.
In summary, the Agency found certain aspects of the testing program
revealed substantial problems regarding the measurement of the Hg CEMS
accuracy and precision. EPA found it difficult to dynamically spike
known amounts of mercury (in the elemental and ionic form) and obtain
manual method and Hg CEMS measurements that agree at the test source.
As a result, the Agency now believes it has not sufficiently
demonstrated the viability of Hg CEMS as a compliance tool at all
hazardous waste combustors and should not require their use.
Nonetheless, EPA still believes Hg CEMS can and will work at some
sources but does not have sufficient confidence that all HWC conditions
are conducive to proper operation of the Hg CEMS tested. Facilities
should have the choice of using Hg CEMS if desired so long as the

[[Page 67790]]

permitting agency approves on a site-specific basis the Hg CEMS and its
site-specific performance specifications. See a related issue in
section V.A. of this NODA regarding the implementation of optional
CEMS.

III. The PM CEMS Demonstration Tests

This section describes the report DRAFT: Particulate Matter CEMS
Demonstration, Volume I (with appendices), dated December 1997,
contained in the docket identified in the Addresses section, above. EPA
issued previous notices asking vendors to participate in this program
(see 61 FR 7232, February 27, 1996) and to allow the public to comment
on the Agency's approach to demonstrating these monitors (see 62 FR
13775, March 21, 1997). Since this could represent the first time EPA
requires PM CEMS for compliance at stationary sources, the technical
discussion contained in this section is expected to have general
applicability beyond sources that burn hazardous waste. In particular,
EPA invites comment from all parties concerning the following documents
attached to this notice: Method 5I for the determination of low level
particulate emissions; Performance Specification 11 for PM CEMS; and
Quality Assurance Requirements for PM CEMS.

A. PM Performance Specification (PS) 11 Levels

In CEMS NODA 1, the Agency stated it intended to loosen the
proposed PM CEMS Performance Specification (PS) 11 to reflect what was
achievable by the monitors during this demonstration test. The test was
designed to be a reasonable worst case investigation of what
performance (relative to the proposed PS11) the monitors could achieve.
Many comments received in response to CEMS NODA 1 stated that the
proposed performance specifications were not sufficiently stringent and
opposed loosening the specification levels.
Concurrent with the Agency's invitation in CEMS NODA 1 to comment
on our approach to demonstrate PM CEMS, EPA determined that much of the
variability in the calibration curves resulted from inaccuracies in
performing the manual method, Method 5 (M5). Since the fundamental
approach in PS11 involves correlating manual method results to PM CEMS
outputs, the PS11 statistical results reflected this variability in the
manual method. Consequently, EPA undertook a systematic effort to
identify and remove this error from the manual method measurement
process. Manual method improvements were developed and observed, and
performance specification results for the PM CEMS improved as a result.
(See a related discussion in section III.B, below, regarding these
improvements to the manual method.)
1. Revised Specification Levels for the Correlation Coefficient,
Confidence Interval, and Tolerance Interval
As a result of comments on CEMS NODA 1, EPA decided to accept a
slightly modified version of the more stringent International Standards
Organization (ISO) specification 10155 for PM CEMS. Four of the five PM
CEMS tested during the PM CEMS demonstration tests were able to meet
all three performance specifications (i.e., those for the correlation
coefficient (r), confidence interval (CI), and Tolerance Interval (TI))
at all three of the emissions levels discussed in the May 2, 1997, NODA
as alternatives to the proposed emissions standards (69 mg/dscm for
cement kilns, 50 mg/dscm for light-weight aggregate kilns, and 34 mg/
dscm for hazardous waste incinerators.) See 62 FR 24212 for a
discussion of those alternative emissions standards. One technology, an
extractive light-scattering technology, did not meet all the
performance specification levels at all of the alternative
standards.1 Since EPA must show that at least one
commercially available PM CEMS can meet the proposed performance
specification, the fact that 4 of the 5 monitors were able to meet
these performance levels under reasonable worst-case test conditions
adequately shows that the modified specification levels are achievable.
The revised performance specification levels are presented in Table 1,
below.
---------------------------------------------------------------------------

\1\ This technology did meet 10 of the 14 specification
comparisons.

Table 1: Revised Performance Specifications for PM CEMS
------------------------------------------------------------------------
Confidence Tolerance
Correlation coefficient interval interval
------------------------------------------------------------------------
0.90 10% 25%
------------------------------------------------------------------------

As previously stated, these performance levels are nearly identical
to the ISO specification for PM CEMS. The only major difference between
these and the ISO specification levels is the correlation coefficient,
which is 0.95 in ISO 10155 and 0.90 in the modified PS11. This is
acceptable since the correlation coefficient does not directly relate
to measurement error while the confidence and tolerance intervals
do.2 The revised PS11 also requires that a minimum of 15
runs be used for the calibration while the ISO specification requires
only 9 runs. The ISO specification is also vague regarding the PM
concentration ranges required for a calibration. The revised PS11
stipulates three ranges: 0 to 30, 30 to 60, and 60 to 100% of the
facility's range of PM emissions.
---------------------------------------------------------------------------

\2\ The correlation coefficient is defined as the ratio
Sxy divided by the square root of the quantity
Sxx times Syy. Sxy is a measurement
of error as x relates to y, while Sxx and Syy
are a reflection of the range of the data set. As a result, the
correlation coefficient is not as useful a tool to evaluate
measurement error as the correlation and tolerance intervals. This
is particularly true as the correlation coefficient approaches 1.
---------------------------------------------------------------------------

2. Data Availability
EPA had proposed that PM CEMS be used at all times that hazardous
waste is in the unit. See 61 FR at 17441. Commenters to the proposed
rule did not view this favorably. They said this proposal is equivalent
to a 100% data availability requirement for PM CEMS. Commenters stated
that this requirement is not achievable since all mechanical devices
fail at some point, often without warning. They said a data
availability requirement in the 85, 90, or 95% range would be more
acceptable. Commenters suggested that when the PM CEMS were not
available, the PM-related operating parameter limits EPA proposed
should be used in place of the PM CEMS.
EPA largely agrees with this comment. The PM CEMS demonstration
tests show that a 100% data availability requirement is not achievable
for all PM CEMS in all instances. The Agency also agrees that when PM
CEMS are not operating, it is reasonable to provide for some back-up
compliance system in lieu of requiring sources to either stop burning
hazardous waste or have a back-up PM CEMS available. The PM APCD
operating parameters proposed in the event there is no PM CEMS
requirement are a good starting point for identifying such a back-up
system. See the discussion later in this section for more information
on this issue.
Based on these demonstration tests and the comments received, EPA
concludes that a 95% data availability requirement is achievable for
most PM CEMS. Therefore, EPA intends that PM CEMS be used 95% of the
time for compliance. However, there are useful technologies that cannot
meet this 95% data availability requirement. This data availability
requirement should be relaxed in certain instances. For instance, beta-
gages did not meet the 95% data availability requirement during the PM
CEMS tests. EPA believes beta-gages, with their relatively superior

[[Page 67791]]

performance and ability to measure PM emissions at truly wet stacks
(i.e., those with entrained water droplets in the stack gas), will be
useful at some sources for compliance. Therefore, EPA will consider an
85% data availability requirement for beta-gage technology PM
CEMS.3 The Agency anticipates other case-by-case
determinations will be made in the future as more is learned about the
performance, benefits, and data availability limitations of other PM
CEMS technologies.
---------------------------------------------------------------------------

\3\ One of the beta gage PM CEMS experienced a 74% data
availability during the PM CEMS demonstration test program. Much of
the additional downtime was because no U.S.-based technicians were
fully trained to service this instrument during this program and
parts and personnel had to be brought to the U.S. Once EPA requires
a new technology, such as PM CEMS, the market for that new
technology is expected to mature in the US similar to how one exists
overseas. As a result, data availability will be better than what
was experienced here.
---------------------------------------------------------------------------

Finally, EPA believes that increasing the amount of PM data
available will enable sources to improve their understanding and better
define the relationship between operating parameters and emission
levels. EPA is aware of two relevant examples which are described here.
The first one is an ongoing cooperative effort with industry,
regulatory agencies, and the local public. This effort is focused on a
venturi scrubber-controlled lime kiln at a pulp and paper plant where
testing is being conducted to evaluate the feasibility of a predictive
emission monitoring system (PEMS). Following preliminary measurements
and an experimentally designed test matrix, 595 Method 5 runs were
performed over a wide variety of process and scrubber operating
conditions, and PM emission levels. A correlation coefficient above 0.9
was obtained in correlating PM emission levels with 54 operating
parameters. In comparison, use of PM CEMS represents a powerful tool
for accumulating much data at a cost that is far less than performing
hundreds of Method 5 runs. As a result, PM CEMS allow for a cost-
effective way to implement a PM PEMS model than making hundreds of
Method 5 measurements.
The second example directly relates to the first. The Electric
Power Research Institute (EPRI) has already produced a means to
characterize and correlate PM emissions with operating conditions at
coal-fired utility boilers. PM emissions from utility boilers are
similar to HWCs in that their emissions are affected by a complexity of
variations from a number of fuel and feed characteristics, combustor
operations, and electrostatic precipitator (ESP) operations. As in the
lime kiln case mentioned above, use of PM CEMS represents a more
powerful tool for accumulating and correlating vast amounts of PM
emission data with PM-related operating parameters at a cost that is
far less than performing a large number of Method 5 runs.
These two examples, therefore, lead EPA to believe that a PM CEMS
requirement will allow HWC facilities to better define what PM APCD
operating parameter limits correspond to a given PM emissions
concentration. As a result, the Agency encourages HWC facilities to use
PM CEMS data to better define what operating parameters correspond to
compliance with a facility's PM CEMS limit. The site-specific limit is
discussed further in section IV.B. of this notice.
3. Data Quality Objectives: New Procedure 2 to Appendix F of 40 CFR
Part 60
EPA intends to expand the ISO specification to include certain data
quality objectives. For example, PM CEMS routinely and automatically
check and correct their raw outputs to compensate for phenomena such as
``fogging'' of the optics and drift of the measurement signal. A large
and sudden auto correction is indicative of the need to perform
maintenance on the PM CEMS. To address this concern, EPA intends to
include certain data quality objectives such as: The (PM CEMS internal)
calibration drift not exceed 8% during any drift check; the (PM CEMS
internal) calibration drift not exceed more than 4% per day for five
consecutive days; and the automated (PM CEMS internal) calibration
drift adjustment not exceed 2% for five consecutive days.
These data quality criteria would appear in a new Procedure 2 of
Appendix F to 40 CFR part 60. Just as Procedure 1 of Appendix F deals
with data quality objectives for gaseous CEMS for other CAA rules (CEMS
such as NOX and SOX), Procedure 2 would address
data quality objectives for PM CEMS. Procedure 2 would also include the
following data quality objectives: treatment of ``flagged data;'' PM
CEMS automatic zero and calibration span requirements; conduct of the
Absolute Calibration Audit and the quality of the standards used for
these audits; sample volume audit requirements for extractive systems;
relative calibration audit (RCA) requirements; the treatment of audit
failures; how manual method paired data outliers (see the CEMS NODA 1,
62 FR at 13780) are handled; definition of ``out-of-control''
situations; and how facilities are to respond to these ``out-of-
control'' situations. See Procedure 2 (which appears at the end of this
notice) and the draft final PM CEMS Demonstration Test Report for more
information regarding these requirements and Procedure 2.

B. Manual Method Accuracy

One outgrowth of these PM CEMS demonstration tests is that EPA has
made significant improvements in making Method 5 particulate
measurements. As previously mentioned, the calibration process for PM
CEMS involves correlating PM CEMS outputs to manual method results.
High variability in the manual method results will negatively affect
the PS11 calibration statistics. Therefore, one important way to
improve PS11 statistics is to improve the way manual method
measurements are made. These improvements involve the use of a new
Method 5I (M5i) for low level PM emissions. M5i consists of the
following improvements: improved sample collection; elimination of
possible contamination; and improved sample analysis. Each will be
discussed in the following paragraphs. M5i will be instrumental in
correlating PM CEMS outputs to manual method results. EPA also expects
this new method will be preferred in all cases where low level (i.e.,
below 45 mg/dscm [ cents0.02 gr/dscf]) measurements are
required. In practice, this means that M5i is expected to become the
standard method for most HWCs and many other MACT sources. EPA expects
many of the improvements in M5i can and will be implemented whenever
Method 5 (collectively, including Method 5, 5A, ..., 5H) is used to
make particulate measurements.
M5i is almost identical to the traditional M5. Differences are
discussed below. We also present a comparison of the precision of M5i
(which fully implements these improvements) and the traditional M5
(which largely does not use these improvements) and discuss the need
for and handling of paired M5 data.
1. Modification of the Filter Recovery Process
One way M5i differs from the traditional M5 is through the use of a
light-weight and integrated filter and filter assembly that can be
tared and weighed together. This improves M5 by eliminating the filter
recovery step. The filter recovery step can be a significant source of
measurement error at some sources. In some cases as the filter dries,
the filter adheres itself to the filter assembly. Recovery of the
filter then involves scraping the filter off the filter assembly
leaving some of the filter (and sample) on the filter assembly or
otherwise losing it to the environment. In other cases, the filter
recovery

[[Page 67792]]

process can lead to the loss of sample to the environment as light-
weight particles are lost to the air during handling. It can also lead
to contamination of the sample in cases where fugitive dust from the
environment lands on the filter during the recovery step. Simplifying
the recovery step through the use of a light-weight, integrated filter
and assembly addresses these concerns and thereby improves the
reliability of making PM measurements.
One consequence of this improvement, though, is that the filter
used M5i is smaller than that used in the traditional M5 (47 mm
compared to approximately 90 to 100 mm in the traditional M5). This
smaller filter can plug at higher emissions levels. For this reason,
this aspect of M5i may not be implementable at sources with emissions
above 45 mg/dscm (that is, total train catches exceeding 50 mg).
2. Improved Sample Collection
Another important improvement to M5 is to the sample collection
process itself. These improvements include: ensuring that the nozzle is
90 deg. to the direction of flow at each traverse location; and using
Pesticide Grade (i.e., low residue) acetone for probe rinse. Each is
discussed in the following paragraphs. These improvements to the sample
collection process may also be implemented over time into other
versions of Method 5.
Test crews routinely check the ``level'' of the probe only once
during sampling--prior to or at the beginning of the sampling process
itself. As the traverse progresses, the probe can become ``unlevel,''
i.e., it is no longer at a right (90 deg.) angle to the direction flow
in the stack gas. As the angle of the probe departs from 90 deg.,
inconsistent amounts of sample are collected and thereby causes error
in M5 measurements. This can be corrected by applying a level to the
sample probe and checking the level continuously throughout the
traverse. Ensuring that the probe angle is constant and level
throughout the traverse eliminates this potential source of measurement
error.
Finally, residue contained in the acetone used for the probe rinse
is another source of sampling error. Acetone is used for the probe
rinse since it is a solvent that evaporates readily at room
temperatures and thereby allows rapid weighing of the specimen
following sampling. The standard M5 procedures require that acetone
residue blank levels be determined and that reagent-grade acetone in
glass bottles with no more than 0.001% residue be used for probe
rinses. Acetone comes in many grades, including reagent grade,
depending on how the purchaser intends to use the acetone. Some grades
of acetone contain higher levels of residue. This residue remains after
the acetone evaporates and contaminates the probe rinse, making the
``catch'' during the probe rinse greater than what it really is.
Acetone blanks above 0.001% are not allowed by M5, so the acetone
itself must have a concentration of residue no more than this
requirement for the blanks. M5 also requires that the acetone be stored
in glass containers because acetone from metal containers generally
have a high residue blank level. Test crews routinely use reagent-grade
acetone purchased in small, glass containers since large quantity
purchases create a fire safety and storage issue. Though ordered with
the intent of meeting specifications, acetone suppliers often store
bulk, reagent grade acetone in metal containers and transfer this
acetone to glass containers only to ship the small quantities sold.
This means that the residue concentrations found in reagent grade
acetone are often higher than what is allowed by M5. The unallowable
amount of residue from high blank levels would have a negative effect
on the accuracy and precision of M5 results. This can be avoided by
requiring low-residue, Pesticide grade acetone.
3. Elimination of Contamination
In a general sense, eliminating contamination in the filter
handling processes will eliminate potential sources of error.
Contamination can be avoided by: using a portable desiccator for use in
transporting and holding the filters to and on the stack; using glass
plugs on the filter assemblies to keep them ``pure'' prior to and after
sampling; covering the desiccant with a 0.1 micron screen to eliminate
potential external contamination of filter housing during transport;
and handling the filter assemblies with powder free latex gloves. As
previously discussed, contamination in the M5 process will make
measured PM levels appear to be higher than what they truly are. Each
of these steps to eliminate contamination of the sample will ensure
that fugitive particulate from the environment does not contaminate,
thereby inadvertently causing a positive bias to the measured PM
levels.
4. Improved Sample Analysis
Finally, improved sample analysis will help eliminate error in the
Method 5 measurement process. Specific steps to improve M5 sample
analysis include: Elimination of all sources of static charge (such as
those on the operator, beakers, liners, and balance); use of light
weight Teflon beaker liners for gravimetric analysis of the probe
rinse; maintaining the laboratory area at a humidity level of 30% or
less; and putting a covered desiccant container in the balance weighing
chamber. Each is discussed in the following paragraphs.
High, varying levels of static charge typically produce variations
in repeated weighing of susceptible materials such as glass filter
holder assemblies and Teflon beakers (probe rinse catches). The need
for maintaining a relatively dry atmosphere in the analytical room
further exaggerates the negative effect of static charge on the
weighing process. To control and minimize the consequences of static
charge, EPA found it was necessary to preclude any and all aspects of
static electricity. This entailed using: (1) A static-free mat on the
floor area under the desiccator and balance; (2) a small charge-
neutralizer in the desiccator; (3) another small charge-neutralizer in
the weighing chamber of the balance; and (4) a static dissipator
aerosol spray to prevent static buildup on the Teflon beakers. EPA
found it was not possible to consistently reproduce the same weight
results (that is, within 0.5 mg) until all four measures were done.
The particulate, filter assembly, and filter are often hydrophilic
in nature, i.e., they tend to adsorb water from the air. The amount of
water these materials adsorb depends on the amount of water in the air.
The moisture content of air is often quantified in terms of the
relative atmospheric humidity, or what percentage the actual water
concentration of the air is relative to the saturation concentration.
The higher the relative humidity of the air, the more water is
adsorbed. The converse is also true. As a result, if the relative
humidity in the analysis room is high, the amount of water adsorbed
onto the particulate, filter, and assembly becomes variable and it
becomes increasingly difficult to obtain a stable measurement. Ensuring
that the relative humidity in the analysis room remains at a constant,
low level will ensure that the amount of water adsorbed by these
materials remains relatively small and constant. EPA found that
maintaining the relative humidity of the room to below 30% will control
this source of error.4
---------------------------------------------------------------------------

\4\ As humidity levels decrease, static charge tends to
increase. The elimination of static charge, previously discussed,
will aid at eliminating this problem.
---------------------------------------------------------------------------

To further control and minimize the adverse affects of humidity on
reproducing results in the weighing

[[Page 67793]]

process, a small covered desiccant container was placed in the
balance's weighing chamber. This ensures that the humidity level in the
weighing chamber is consistent with the humidity level in the
desiccator. The desiccant in the weighing chamber dries fugitive air
entering the chamber from the room, preventing the adsorption of room
air humidity on the materials being weighed.
5. Comparison of M5 and M5i Method Precision
M5i has been validated against Method 5.5 It is also
important to quantify the improvements to M5 just discussed. This can
be done by comparing the precision of both methods at each of the three
proposed PM standards: 34, 50, and 69 mg/dscm for hazardous waste
burning incinerators, LWAKs, and cement kilns, respectively. Precision
at the standards is important since measurements at the standard deal
with compliance determinations at facilities. The best estimate of the
standard deviation is presented to represent this precision.
---------------------------------------------------------------------------

\5\ Only the filter, extraction, and weighing steps were tested.
---------------------------------------------------------------------------

For M5i, the results presented are the best estimate of the
standard deviation at each of the three proposed emissions standards.
These results are calculated directly from the data obtained during the
PM CEMS demonstration tests. The relative standard deviation (e.g., the
best estimate of the standard deviation at an emissions concentration,
divided by that emissions concentration) for M5i is in all cases less
than 5%.
Historical data from Method 5 was derived from PM concentrations
ranging from 80 to 255 mg/dscm. This data indicates that the relative
standard deviation for M5 is constant at 10%. Therefore, if one were to
multiple the emissions standard by 10%, one can derive the best
estimate of the standard deviation at the three proposed emissions
standards.
Table 2, below, illustrates this comparison and shows that M5i is
an improvement to M5.

Table 2: Comparison of Method 5 and Method 5i Standard Deviations
------------------------------------------------------------------------
Best estimate of the
standard deviation (mg/
Proposed PM emissions standard (mg/dscm) at 7% dscm)
oxygen -------------------------
Method 5 Method 5i
------------------------------------------------------------------------
34 3.4 1.67
50 5.0 2.24
69 6.9 2.85
------------------------------------------------------------------------

6. Paired Data
Throughout most of the PM CEMS demonstration tests, EPA used two
simultaneous Method 5i sampling trains. These two simultaneous trains
are called ``paired trains'' and the paired train data are called
``paired data.'' The average of the paired data from the two trains was
considered the method result. If the ``paired data'' differed by more
than 30% from the method result, EPA eliminated the method result from
the calculation of the calibration.
EPA's experience is that, despite the efforts just discussed to
control method variability, intangibles which are unknown or
unquantifiable can cause variability in M5 (and M5i) measurements.
Since it is important that highly accurate M5 measurements be obtained
for calibrating PM CEMS, these intangibles must be identified in some
way and data affected by these intangibles must be eliminated from the
PM CEMS calibration. The fact that two simultaneously run M5 (or M5i)
measurements do not agree is ample evidence that something in the
sample collection and analysis process was not consistent.
Comments received during the comment period for CEMS NODA 1 stated
that this process would not be allowed if a facility were doing a
calibration for compliance. To address this concern, EPA has
incorporated this outlier procedure in the new Procedure 2 and M5i.
Having this procedure in the regulations will allow facilities to
exclude this type of erroneous data from their PM CEMS calibrations.
Please note that this procedure applies only if paired data are
obtained. Single measurements obtained at different times are not
paired data. Single runs cannot be eliminated by comparing these
results to other single measurements.
EPA strongly encourages facilities to use paired data during their
calibrations. Beyond the ability to eliminate paired data outliers from
the PM CEMS calibration, using the average of two runs as the method
result has a moderating affect on the calibration statistics EPA
calculated and used to base the PS11 revised in today's notice. This
moderating effect improves the PS11 criteria relative to what they
would be if paired data were not used. Some facilities may find it
difficult to obtain a suitable calibration using only single M5
measurements. However, while we encourage using paired data, we are not
requiring paired data for PM CEMS calibrations. This choice can be left
to the facilities to determine what makes the most economic and
technical sense at their site.

C. Transferability of These Demonstration Test Results to Other HWC
Sources

EPA believes this demonstration test program adequately shows that
PM CEMS will meet PS11 at most hazardous waste incinerators, cement
kilns, and light-weight aggregate kilns. These tests were conducted at
a reasonable worst-case facility for performance relative to the
proposed performance specifications6. Therefore, a PM CEMS
should pass the performance measures described in the revised draft
PS11 at most HWC sources. The paragraphs below discuss specific aspects
of PM CEMS and their applicability to each HWC source category.
---------------------------------------------------------------------------

\6\ For more on EPA's rationale that this is a reasonable worst-
case test, see CEMS NODA 1 and the PM CEMS Demonstration Test report
sited here.
---------------------------------------------------------------------------

For cement kilns, in-situ light scattering PM CEMS are
operationally very similar to continuous opacity monitors (COMs), a
technology employed at these sources for many years. Light-scattering
PM CEMS differ from COMs only in the way they obtain and interpret the
light from the source. As shown in the LaFarge tests,7
though, an informed decision is required to determine what type of in-
situ light-scattering PM CEMS is best suited for these sources. One PM
CEMS used at LaFarge was built with a heated air purge system to blow
cement kiln dust away from and out of the optics of the monitor while
the other was not. The monitor with the heated air purge performed very
well over the course of the tests, though improvements to the Method 5
measurements and a routine cleaning of the optics could have improved
performance. The PM CEMS without the heated air purge suffered
operational difficulty. In addition, PM from cement kilns is mostly
process dust (i.e., raw material). As such, its physical properties are
not significantly affected by changes in waste or fuel feeds.
Accordingly, in-situ light-scattering PM CEMS will pass performance
specifications at cement kilns if an informed decision is made to

[[Page 67794]]

purchase a monitor that is designed to address the dusty environment at
these facilities.
---------------------------------------------------------------------------

\7\ See section 2.6.7 of the PM CEMS Demonstration Test Report.
---------------------------------------------------------------------------

EPA believes that LWAKs are very similar to cement kilns relative
to the applicability of PM CEMS, and therefore the conclusions drawn in
the preceding paragraph also apply to LWAKs.
For incinerators, there are certain unique situations which must be
discussed: incinerators with truly wet stacks; incinerators with waste
heat boilers; and mobile incinerators.
As was the case with cement kilns, HWC incinerators with truly wet
stacks (i.e., those with entrained water droplets in the stack gas)
need to make an informed choice regarding what PM CEMS technology they
elect to use. In-situ light-scattering PM CEMS are likely to have
operational difficulty since the water droplets entrained in the stack
gas will be mistaken for particulate. This is a readily accepted source
of error and means that in-situ light-scattering PM CEMS are not a
practical choice for these sources. Beta-gage and certain other light-
scattering PM CEMS, however, are designed with extractive reheat
systems which heat up the extracted gas to above the water condensation
temperature. Incinerator groups are currently working to test these
types of systems to gain first-hand experience and data regarding the
use of PM CEMS at facilities with truly wet stacks. EPA encourages
these tests since they will result in valuable data which can be
communicated to personnel at incinerators with truly wet stacks to
assist their PM CEMS purchasing decisions.
Incinerators equipped with waste heat boilers (WHBs) downstream of
the combustion chamber(s) also require special consideration. Like
boilers, these incinerators blow soot periodically to clean the boiler
tubes. PM emissions will increase and the physical properties
(pertinent to PS11) of the PM may change during periods of soot
blowing. To help address the impact of soot-blowing, sources would be
required to include soot-blowing episodes during a minimum of three
calibration runs. This will ensure that calibration captures the higher
emissions that can occur during soot-blowing, thus minimizing the need
to extrapolate the calibration curve beyond measured values. In
addition, including soot-blowing during calibration runs will enable
the source to determine whether any change in the physical properties
of the PM during soot-blowing has adversely affected the calibration
(i.e., as evidenced by an inability to meet PS 11 when the soot-blowing
runs are included).
EPA requests comment on this approach to address the special
problems that soot-blowing may cause. In particular, EPA seeks the
following information:
--How many incinerators are currently equipped with WHBs? Are sources
likely to remove WHBs to facilitate compliance with the MACT standards
(e.g., D/F)?
--The normal frequency and duration of soot-blowing. Under what
conditions does the frequency and duration of soot-blowing change? How
often does this change(s) occur?
--How do PM emissions for runs that include episodes of soot blowing
compare to runs without soot blowing?
--How does the effect of the APCS, waste and fuel types, and other
relevant factors impact changes to the PM concentrations and physical
properties when one compares PM during soot-blowing and PM at other
times.
The reader should note that EPA intends to promulgate MACT
standards for hazardous waste boilers as part of Phase II of the HWC
rulemaking. EPA intends to address the applicability of PM CEMS to
boilers then. If because of unforeseen reasons EPA provides a PM CEMS
waiver for incinerators with WHBs, EPA would readdress the
applicability of PM CEMS to hazardous waste incinerators with waste
heat boilers in Phase II.
Finally, another class of hazardous waste incinerators are used at
Superfund sites during the clean-up process. These mobile incinerators
have small, limited waste processing capacity and are often trucked to
the site as needed. EPA is concerned that the variability of the feed
to mobile incinerators is beyond what was experienced at the DuPont
facility. As such, a unique calibration might be required for every
clean-up site, which is unnecessarily burdensome. Given the PM CEMS
implementation schedule discussed in section IV.A., below, implementing
PM CEMS at these incinerators may not be feasible, and EPA is
considering whether to waive the PM CEMS requirement for Superfund
mobile incinerators.
If the PM CEMS requirement is waived for certain facilities, the
other, traditional operating parameters discussed in this NODA would be
used instead to document compliance.

IV. PM CEMS: Implementation and Compliance 8
---------------------------------------------------------------------------

\8\ The reader should note that HWCs are currently regulated
under RCRA. Sources with a different regulatory history are likely
to have a different compliance regime than the one described here.
One should not assume that the compliance and implementation scheme
described here will necessarily be applied to sources with a
different regulatory history.
---------------------------------------------------------------------------

A. PM CEMS Compliance Schedule

Many comments received in response to the proposed rule stated that
facility personnel are not familiar with the operation and maintenance
characteristics of PM CEMS, or how to control their operating
conditions to ensure compliance using PM CEMS. For this and reasons
explained in section IV.B., EPA plans to allow a 12-month phase-in
period before PM CEMS would be used as a compliance parameter. This
section describes this compliance schedule.
Prior to the date PM CEMS would be used for compliance (i.e.,
during the 12-month phase-in period), limits on key PM-related and
other key operating parameters (e.g., metals feedrate) would be used to
ensure compliance with the MACT standards for PM, SVM, and LVM. This
one year phase-in period has four key milestones: The Compliance Date;
the performance Test Date; the Certification of Compliance (CoC) date;
and the Certification of PM CEMS performance date. By the Compliance
Date,9 facilities would determine, using engineering
judgment, the operating parameter limits necessary to ensure compliance
with the standards. These initial operating parameter limits would be
specified in a Precertification of Compliance (Pre-CoC) that would be
submitted to the permitting authority by the Compliance Date. By the
Test Date, which is nominally no later than six months after the
Compliance Date, facilities would have to conduct a performance test to
document compliance with the MACT emissions standards and identify
operating parameter limits based on levels achieved during the test.
Results of the performance tests and these revised operating parameter
limits would be submitted to the permitting authority in a
Certification of Compliance (CoC) nominally no more than nine months
after the Compliance Date. The operating parameter limits in the CoC
would be used as surrogate compliance measures to ensure that the
efficiency of

[[Page 67795]]

the PM control device was maintained at performance test levels until
the one-year anniversary date of the Compliance Date. Beginning at that
time, facilities would start using the PM CEMS and cease using the
operating parameters as their primary operating parameter for PM
control.
---------------------------------------------------------------------------

\9\ The Clean Air Act states that the Compliance Date can be no
more than three years after the effective date of the rule (i.e.,
date of publication in the Federal Register), unless a source
obtains an (up to) one-year time extension of the Compliance Date.
---------------------------------------------------------------------------

During this phase-in year, there are important PM CEMS-related
activities being performed. For instance, the PM CEMS, like all other
equipment necessary for compliance with the MACT standards, must be
installed by the Compliance Date. Like all other tests for the rule,
the PM CEMS calibrations and initial certifications (see section 8.3 of
PS11 and section 4 of Procedure 2) must also be performed by the Test
Date.
As discussed in the PM CEMS Demonstration Test Report, the
mathematical characteristics of a light-scattering PM CEMS calibration
curve can be difficult to determine. For this reason, a second
calibration would be required within 9 months of the Compliance Date if
a light-scattering PM CEMS is used. After this second calibration is
performed the source would compare the two calibrations separately to
determine which mathematical model best represents the data. This
information (i.e., the analysis of which mathematical model is best
suited for the calibration at this source and the calibration comprised
of all valid calibration data obtained) would be included in a
Certification of PM CEMS Performance (CoP) submitted within 12 months
after the Compliance Date. (A CoP for beta-gage CEMS would also be
submitted at this time, but would certify performance based on a single
calibration.)
This CoP would also include (for all types of CEMS) the analysis of
CEMS data to identify an achievable CEMS-based PM operating parameter
limit. See section IV.B., below, for more information regarding the PM
CEMS operating parameter limit. On the one-year anniversary of the
Compliance Date, facilities would also cease using the PM control
device operating parameter limits (such as pressure drop across a
fabric filter or total power input to an ESP) and start using the PM
CEMS operating parameter limit as their primary compliance parameter
for the PM control device.
A source using a light-scattering PM CEMS would be required to
perform a third calibration of the PM CEMS within 12 months of the
Compliance Date. The third calibration would verify that the
mathematical model selected by comparing the first two calibrations is
correct. If not, to the approach must be modified based on the new
data. If the model needed to be revised, the source would be required
to recalculate the PM CEMS operating parameter limit considering the 12
months of data following the Compliance Date. If the model did not need
to be revised, the source could elect to recalculate the PM CEMS
operating parameter limit considering the full 12 months of CEMS
recordings. (We request comment on whether all sources required to
perform a third calibration should be required to recalculate the PM
CEMS operating limit even if the calibration curve model did not need
to be revised.) The results of the third calibration,10
reassessment of the calibration model, and recalculation of the PM CEMS
operating parameter limit would be submitted in a second CoP. This
second CoP would be provided to the permitting authority within 15
months of the Compliance Date. Note that this second CoP would not be
required if a source uses a beta-gage type PM CEMS that needs only one
calibration. A source using a PM CEMS that requires only one
calibration (i.e., a beta-gage) would have the option, however, of
submitting a second CoP if it wants to update the PM CEMS operating
parameter limit based on a full year of data.
---------------------------------------------------------------------------

\10\ This would involve the verification that the mathematical
model used for the calibration is correct, a recalculation of the
``master'' calibration comprised of all three calibration curves,
and a revised site-specific PM CEMS operating parameter limit (this
time, using the first 12 months of data).
---------------------------------------------------------------------------

Table 3 summarizes how PM CEMS would be implemented for compliance.
Following this implementation schedule, facilities would be required to
document compliance with the MACT PM standard during periodic
performance testing. As discussed in section IV.F. below, a source
would have the option of using the PM CEMS or the manual method for
this determination. In addition, sources would be required to
recalculate their PM CEMS operating parameter limit based on the
previous year of CEMS data recorded when the source operated within the
operating parameter limits established during the new performance test.
This recalculation of the PM CEMS operating parameter limit is
necessary since the new performance test is likely to result in
numerically different PM-related APCD operating parameters than
resulted from the previous test.11 Facilities would submit
the revised operating parameter limits, including the revised PM CEMS
operating parameter limit, in a CoC describing the results of the new
performance test.
---------------------------------------------------------------------------

\11\ If the PM concentration and operating parameter limits
resulting from the subsequent performance test are more stringent
than those from the previous test, the facility would have the
option of not recalculating their PM CEMS operating parameter limit
and continue to operate under the older, more stringent limit.

[[Page 67796]]

Table 3: PM CEMS Compliance Schedule
----------------------------------------------------------------------------------------------------------------
By this date These PM CEMS activities would be performed
----------------------------------------------------------------------------------------------------------------
Compliance date............................. PM CEMS installed
Precertification of Compliance (Pre-CoC) submitted that
establishes PM APCD (and other) operating parameter limits to
ensure compliance with the SVM and LVM (and possibly D/F)
standards based on engineering judgment.
CD + 6 months (the ``Test Date'')........... PM CEMS calibration tests performed during MACT performance test.
Method 5i used to demonstrate compliance with the manual method-
based PM standard.
CD + 9 months............................... Certification of Compliance (CoC) submitted that establishes PM
APCD (and other) operating parameter limits to ensure compliance
with the SVM and LVM (and possibly D/F) standards based on what
levels were determined to correspond to compliance with the
standard during the Performance Test. (These limits supersede
those identified in the Pre-CoC.)
A second calibration of light-scattering PM CEMS is performed.
CD + 12 months.............................. Source identifies calibration curve, calculates the PM CEMS
operating parameter limit (through 9 months), recommends
alternative PM control device operating parameters and their
numerical limits, and submits a Certification of PM CEMS
Performance (CoP).
Source ceases using PM control device operating parameters as the
primary mode of compliance for PM and starts using the PM CEMS.
The operating parameters defined in the CoC are used for
compliance only when the PM CEMS is unavailable.
Source reports initial calibration (composite of all calibrations
through 9 months), PM CEMS-based limit, and revised operating
parameter limits (for use during CEMS malfunctions) to permitting
authority.
A third calibration of light-scattering PM CEMS is performed.
CD + 15 months.............................. Sources using light-scattering PM CEMS revise the calibration
curve if necessary based on the third calibration, recalculate
the PM CEMS operating parameter limit (through 12-months), update
the PM control device operating parameter limits for use during
CEMS malfunctions, and submit a second CoP documenting this
information.
The source starts using the revised operating parameters reported
in the CoP during periods when the PM CEMS is unavailable unless
those alternatives have been disapproved by the permitting
authority.
----------------------------------------------------------------------------------------------------------------

B. PM CEMS Operating Parameter Limit

EPA proposed using site-specific limits on key operating parameters
of the PM control device (e.g., pressure drop across a fabric filter)
to ensure that the device maintained its collection efficiency at
performance test levels. These limits, in combination with other
operating parameter limits (e.g., metals feedrate controls) would
ensure compliance with the semivolatile metal (SVM) and low volatile
metal (LVM) MACT standards. See 61 FR 17376 and 17430 (April 19, 1996).
These operating parameter limits on the PM control device would also
ensure compliance with the MACT PM standard 12, and possibly
the MACT dioxin and furan (D/F) and mercury (Hg) standards if the
source uses activated carbon injection to control these HAPs.
13 The availability of PM CEMS allows the Agency to improve
upon this approach through the use of PM CEMS as the sole PM control
device operating parameter 14. PM CEMS are a more sensitive
and accurate operating parameter than the conventional PM-related
operating parameters now used.
---------------------------------------------------------------------------

\12\ The Agency has proposed a MACT PM standard as a surrogate
to control emissions of non-enumerated metals HAPs (i.e., metal HAPs
other than those for which specific standards have been proposed--
Hg, SVM, and LVM). Those non-enumerated HAPs are Sb, Co, Mn, Ni, and
Se.
\13\ The Agency proposed that the site-specific PM limit be a
compliance parameter for the D/F standard irrespective of whether
activated carbon injection was used as a control device. This
requirement was grounded upon EPA's initial view that a significant
amount of D/F (and other heavy organic compounds) are adsorbed onto
particulate. As a result, PM needed to be controlled to ensure
continuous compliance with the D/F standard. The Agency is now
considering comments that significant D/F may not be adsorbed onto
PM. Cement and lightweight kiln PM, in particular, is generally
process dust (i.e., processed raw material). This process dust has
little affinity for adsorbing D/F. However, EPA's ultimate decision
on whether to limit PM on a site-specific basic does not depend on
whether there is a need to control PM at all HWCs for D/F control. A
site-specific PM limit is still needed to ensure compliance with the
SVM and LVM standards at all HWCs. Sources that use activated carbon
injection, howver, would be expected to have a significant amount of
D/F on the PM.
\14\ Note that the MACT standard for PM would continue to be a
manual methods-based standard. See subsection IV.F., below, for
options facilities could have to use PM CEMS for direct compliance
with this PM standard.
---------------------------------------------------------------------------

This section describes how PM CEMS would be implemented as an
operating parameter for the SVM, LVM, PM, and possibly D/F and Hg
standards. The reader should note that the proposed MACT standard for
PM is and will continue to be a manual methods-based standard. The
reader is referred to section IV.F., below, for options a facility
could choose to use PM CEMS as a direct indicator of compliance with
the MACT PM standard.
1. Introduction
The PM CEMS operating parameter limit would be determined using the
PM CEMS data obtained during normal operations from the Compliance Date
to the time when the calculation of the operating parameter limit is
performed. Although the PM CEMS would be used as an operating parameter
limit here, an approach to establishing this limit could be very
similar to how EPA establishes national standards from CEMS data. The
municipal waste combustor rule published on February 11, 1991, has an
example of how this is done 15.
---------------------------------------------------------------------------

\15\The methods used for establishing CEMS standards in the
February 1991 MWC rule are described in Appendices A and B of EPA
document number EPA-450/3-91-004, dated December 1990. This document
can also be found in the Air Docket, located in the Mall area of EPA
Headquarters, 401 M Street, SW, Washington, DC 20460. It is part of
docket number A-89-08-V-B-3.
---------------------------------------------------------------------------

EPA notes that even though the PM CEMS operating parameter limit
and the manual methods-based PM standard are both in units of
particulate concentration, it is likely that the PM CEMS operating
parameter limits will have a different numerical value than the manual
methods-based MACT PM standards. This is because the MACT PM standards
would be based on manual methods testing with no fixed averaging
period. PM CEMS operating parameter limits would have both a fixed
averaging period and a calculated

[[Page 67797]]

numerical limit. As discussed in section 4, below, the numerical value
of a limit or standard is a function of the averaging period. Since it
is likely that the PM MACT standard and the PM CEMS operating parameter
would have different averaging periods, one would expect the numerical
value of the PM CEMS operating parameter limit that indicates
compliance with the MACT standards would differ from the numerical
value of the MACT PM standard.
2. Data Excluded From Calculating the PM CEMS Operating Parameter Limit
Before calculating the PM CEMS operating parameter limit, the PM
CEMS data set must be screened to remove PM CEMS data recorded when the
PM CEMS was not available or the source was out of compliance with the
operating parameter limits established during the CoC.
First, the facility must remove from the data set all PM CEMS data
accumulated while the PM CEMS was not available or not performing
acceptably as defined by the regulations. Examples of the data not
included in the calculation of the PM CEMS operating parameter limit
include data obtained when the PM CEMS was ``out-of-control'' as
defined in Procedure 2 and PS11, periods when the PM CEMS was not
analyzing stack gas (as would happen during calibrations, maintenance,
etc.), and periods when the facility was not in operation.
Next, the facility would further screen the data to exclude times
when the facility was not operated in accordance with the operating
parameter limits resulting from the performance test and reported in
the CoC 16. Note that the CoC operating parameter limits
would supersede the Pre-CoC operating parameter limits for this
screening purpose. Although the Pre-CoC operating parameter limits may
be less stringent than the CoC limits and were valid limits prior to
submitting the CoC, the CoC limits are based on performance testing and
as such show what operating parameter levels reflect compliance with
the standards. The facility must also remove any data collected during
periods of PM APCS upset irrespective of whether the operating
parameter limits were exceeded. 17
---------------------------------------------------------------------------

\16\ For simplicity, EPA proposes to exclude data from all
periods in which the facility operated outside of the operating
envelope defined in the CoC irrespective of whether the parameter in
question affects PM control. Defining what operating parameters are
or are not related to PM control would force another layer of
complexity in this step.
\17\ Episodes of high PM emissions caused by periodic, routine
maintenance cycles (e.g., ESP rapping; soot-blowing for waste heat
boiler equipped incinerators, etc.) would not be considered upset
conditions. We request information on how to objectively distinguish
between high PM emissions attributable to PM control device upset
conditions versus normal emissions variability.
---------------------------------------------------------------------------

3. Determining the Normality of the Data
To calculate the PM CEMS operating parameter limit, the CEMS
recordings 18 must be averaged over an appropriate averaging
period. (See the discussion in the following section.) Accordingly,
sources would be required to identify the mathematical model that best
fits the screened CEMS data for purposes of averaging the data. For
example, a log-or exponential fit may better represent a ``normal'' fit
relative to an arithmetic model. To identify which mathematical model
represents the best fit, facilities would calculate the Shapiro-Wilk
Normality test statistic (W) at the 95% confidence level using the data
obtained from the PM CEMS 19. The mathematical model with a
Shapiro-Wilk test statistic closest to one (1) would be the model used
for averaging at the facility. This mathematical model would be used
for all PM CEMS emissions averaging at the facility.
---------------------------------------------------------------------------

\18\ The light-scattering CEMS provide instantaneous data,
recorded every minute as one-minute block averages. Beta-gage CEMS
have sampling periods longer than 1 minute.
\19\ Note that batch CEMS, such as beta-gages, may have sampling
periods longer than 1 minute. In this case, the test statistic would
be performed using the batch results.
---------------------------------------------------------------------------

4. Averaging Periods for the PM CEMS Operating Parameter Limit
Fundamental to any emissions control parameter is the way averaging
affects an emissions standard or limit. At a fixed numerical value, a
standard or limit is more stringent as the averaging period decreases
and less stringent as the averaging period increases because of
emissions variability. In the proposed rule, EPA said that an
appropriate averaging period for PM CEMS would be the length of time it
takes to make three Method 5 runs. The Agency still believes this is an
appropriate point of departure for the averaging period for the PM CEMS
operating parameter limit.
We proposed a 2 hour averaging period for PM CEMS, reasoning that
it would take 40 minutes to accumulate enough PM sample to meet Method
5 requirements for sample ``catch.'' See 61 FR at 17379. Commenters
argued, however, that although it takes 40 minutes to accumulate enough
sample, test crews routinely sample for one hour. In addition, comments
received in response to CEMS NODA 1 said the sampling time for a Method
5 run can vary from 1 to 8 hours. Basing the averaging period for the
PM CEMS operating parameter limit on the length of time it takes to
perform three Method 5 runs would result in an averaging period in the
range of 3 to 24 hours 20. This is still being evaluated.
---------------------------------------------------------------------------

\20\ Three to 24 hours is within the range of CEMS averaging
periods EPA typically promulgates. From a broader perspective,
averaging periods vary from regulation to regulation depending on
the analysis of issues pertaining to the technical, policy, and
regulatory history of each particular situation. Therefore, other
source categories may or may not have the same averaging period as
the one established for PM CEMS at HWC, depending on the outcome of
this analysis of issues.
---------------------------------------------------------------------------

5. Options for Calculating the PM CEMS Operating Parameter Limit
As discussed above, the stringency of the standard is a function of
two variables--its numerical limit and the averaging period. Equally
stringent standards would have a higher numerical limit at shorter
averaging period and a lower numerical limit at a longer averaging
period. Thus, to calculate the PM CEMS operating parameter limit, one
of these two variables must be held constant--either the numerical
limit or the averaging period. This section discusses two options for
calculating an achievable PM CEMS operating parameter limit by defining
the averaging period. EPA investigated ways to define the numerical
limit and allow facilities to calculate the averaging period associated
with that numerical limit, but found these alternatives often resulted
in trial-and-error type calculations and might result in all facilities
having different limits and averaging periods. We believe these
alternatives are too labor intensive and confusing--both for facilities
and the enforcement authority--and rejected this approach. Based on
comments and further analysis, the Agency will prescribe one
methodology in the final rule.
a. Using Rank Statistics to Calculate the PM CEMS-based Operating
Parameter Limit at One, Fixed Averaging Period. Under this approach,
the Agency would establish an averaging period common to all sources
and each source would calculate its PM CEMS operating parameter limit
using rank statistics. (As discussed above, EPA is considering
selecting an averaging period from within the range of three to 24
hours.) The averaging period would be the same for all facilities but
the numerical value of the PM CEMS operating parameter limit would
differ from facility-to-facility based on the historical data obtained
at each facility.

[[Page 67798]]

Using the rank statistics option to calculate the limit would
involve the following steps. First, the facility would take the
screened PM CEMS data (i.e., after non-compliance data has been
removed) and calculate rolling averages sequentially from the
Compliance Date 21 using the best-fit mathematical model and
the averaging period EPA promulgates. The facility would then take the
resulting rolling averages and sort them in order from lowest to
highest. The facility's PM CEMS operating parameter limit would be the
95th percentile highest PM CEMS rolling average, by rank, experienced
during the period the PM CEMS data was accumulated. The 95th percentile
is proposed here because it is the percentile level EPA historically
uses for these types of calculations. EPA could promulgate some other
percentile level, the 90th or 99th for example, if another percentile
level is achievable and better represents good PM control.
---------------------------------------------------------------------------

\21\ For simplicity, we believe it is best for facilities to
ignore periods when the CEMS recorded data which was screened out
and calculate the rolling averages as if the remaining data occurred
sequentially. EPA specifically requests comment on this approach.
---------------------------------------------------------------------------

This rank statistics option is easier to implement, relative to the
other options. It also would result in a PM CEMS operating parameter
limit that is in the range of actual emissions experienced by the
facility (i.e., as opposed to statistically projected emissions) and
demonstrated by the facility to be achievable over time. Since the
limit for all sources would be based on an averaging period that would
be fixed in the rulemaking, the limit would be easier to enforce as
well.
b. The Traditional Standard Setting Approach. Another approach the
Agency is considering to determine the PM CEMS operating parameter
limit is to use the way EPA has established CEMS-based standards in the
past. This approach involves calculating the average and standard
deviation of the data set and projecting an emissions level associated
with the data. As discussed in the MWC rule, EPA calculated
``continuous compliance levels'' for each source using the equation,
below.
where: y=x+K*5

y = the continuous compliance level;
``x-bar'' = the sample average
k = a constant associated with the averaging period and one
exceedance per year; and
s = the sample standard deviation.

This option has some benefits and weaknesses. As discussed, it
reflects a procedure EPA has previously used to establish CEMS-based
standards. It would also result in every facility having the same
averaging period and thus making it easier to track and enforce.
However, more complicated statistics are involved. EPA also compares
emissions from more than one facility when it uses this approach to set
standards and would be unable to oversee the application of this
approach on a site-specific basis. As a result, this approach may be
unworkable as a way to establish a PM CEMS operating parameter limit.
6. Consideration of a Variance Procedure to Project a Higher PM CEMS
Operating Parameter Limit
As discussed previously in today's notice, the PM CEMS operating
parameter limit would be based on CEMS recordings during the nine
months after the Compliance Date during those periods of time that the
source was operating within the operating parameter limits established
during the performance test (i.e., the operating parameter limits
established in the Certification of Compliance (CoC)). Comments
received in response to the proposed rule questioned the need to
establish PM-related operating parameters based on the performance test
if: (1) PM emissions measured using manual methods during the
performance test were well below the PM MACT standard; and (2)
emissions of HAPs (i.e., SVM, LVM, and possibly Hg, and D/F) for which
PM would be used as an operating parameter limit were well below their
MACT standards. Commenters were concerned that, although their sources
may readily achieve the MACT PM standard, it may be difficult
22 or expensive to ensure that performance test PM levels
are representative of the full range of levels achieved during
operations. The same situation could occur with the PM CEMS operating
parameter limit just discussed. Infrequent exceedances of the PM CEMS
operating parameter limit might or might not be an indication that the
SVM, LVM, Hg, D/F, or PM MACT emission standards have been exceeded.
Accordingly, commenters recommended that the rule allow sources to
project higher PM-related operating parameters based on how much
performance test emissions for these HAPs were below their MACT
standards.
---------------------------------------------------------------------------

\22\ For example, some PM control devices are so over-designed
that it is difficult to force them to operate at elevated PM levels
for the duration of a performance test.
---------------------------------------------------------------------------

EPA agrees in theory that establishing the PM CEMS operating
parameter limit considering performance test operations (i.e.,
historical CEMS data when the source operated within the CoC operating
parameter limits) could result in an overly conservative operating
parameter for PM control at sources with low PM and low HAPs that
require PM control to ensure compliance. To address the concerns
expressed in the comments received on the proposed rule, the Agency is
considering a variance procedure to establish an higher projected PM
CEMS operating parameter limit.
The variance procedure would allow facilities with very low
concentrations of PM and HAPs requiring PM control for compliance to
increase their PM CEMS operating parameter limit (derived from
operations within the CoC operating parameter limits). The factor used
to increase the PM CEMS operating parameter limit could be defined as
the ratio of the MACT standards for which PM control is required to
assure compliance, to the performance test levels of those HAPs. To
ensure that the source is still be in compliance with the MACT PM
standard, the same ratio would be calculated for the PM standard to the
unadjusted PM CEMS operating parameter limit. This approach is based on
the principle that, at a facility which has experienced no changes in
facility operations, the ratio of emissions of HAPs which require PM
control to ensure compliance to the PM concentration in the stack is
either constant or decreases as PM increases. In addition, revised
(i.e., less stringent) traditional operating parameter limits for the
PM control devices corresponding to the higher projected PM CEMS
operating parameter limit could be established based on historical
operating data at levels near the higher projected PM CEMS operating
parameter limit.
For illustration, an example follows. Assume that a hazardous waste
incinerator has low metals in the feed and uses a HEPA filter for PM
control. Further assume that: This incinerator's measured metals
emissions during the performance test were 10 g/dscm and 7
g/dscm for SVM and LVM, respectively; that the PM
concentration measured during the performance test was 5 g/
dscm; for simplicity that PM control is not required to assure
compliance with the D/F and Hg standards; the unadjusted PM CEMS
operating parameter limit is 15 mg/dscm; and from the HWC NODA
published on May 2, 1997, that the promulgated standards are 100
g/dscm, 55 g/dscm, and 34 mg/dscm for SVM, LVM, and
PM, respectively. The ratio of the standard to the measured levels are
10 and 7.8 for SVM and LVM. For PM,

[[Page 67799]]

the ratio is 6.8. The unadjusted PM CEMS operating parameter limit
would be increased by a factor of 6.8 since the ratio calculated for PM
has the lowest numerical value.
a. HAPs for which PM control is necessary to ensure compliance. PM
would be used as an operating parameter limit for semivolatile metals
(SVM), low volatility metals (LVM), and if activated carbon is used,
dioxin and furan (D/F) and mercury (Hg). See 61 FR 17422 and 17430
(April 19, 1996). Although the Agency is reconsidering whether PM is an
appropriate operating parameter to ensure compliance with the D/F
standard in some cases,23 PM would be an appropriate
operating parameter if activated carbon injection were used to control
D/F or mercury. This is because D/F and mercury adsorb onto the
activated carbon, and as PM emissions increase, emissions of activated
carbon with adsorbed D/F and mercury increase.
---------------------------------------------------------------------------

\23\ The Agency is considering comments that significant D/F may
not be adsorbed on emitted PM in all cases. Cement and lightweight
kiln PM, in particular, is generally process dust (i.e., raw
material) that has little affinity for absorbing D/F.
---------------------------------------------------------------------------

b. Projecting a higher PM CEMS operating parameter limit
considering the ratio of the standard to the measured level of a HAP.
The variance would be based on the principle that, as PM emissions
increase, the ratio of emissions of each HAP for which PM is an
operating parameter limit (i.e., SVM, LVM, and possibly D/F and Hg) to
PM emissions either is constant or decreases. Thus, the PM CEMS
operating parameter limit derived from operations within the CoC
operating parameter limits could be increased without exceeding the
MACT standards for those HAPs by a factor considering the ratio of the
standard for each of those HAPs to the performance test level of each
HAP.
LVM are generally not volatilized in the combustion chamber and
thus are evenly distributed over all sizes of particulates. Thus, as PM
emissions increase, the ratio of LVM emissions to PM emissions will be
constant.
SVM are generally volatilized during combustion and condense
preferentially on small particulates prior to (or in) the PM control
device. Thus for many PM control devices, as PM emissions increase, the
ratio of larger particulates to smaller particulates increases, and the
ratio of SVM emissions to total particulate emissions decreases (i.e.,
because the larger particulates have a lower concentration of SVM). For
emission control trains where PM particle size may remain constant with
an increase in PM emissions, the ratio of SVM emissions to PM emissions
would remain constant.
D/F and Hg are adsorbed onto the surface of carbonaceous
particulates (e.g., activated carbon). Smaller particulates have a
larger surface area per mass of particulate than larger particulates,
and thus D/F and Hg concentrations would be higher for smaller
particulates. Thus, similar to SVM, as PM emissions increase and the
ratio of larger particulates to smaller particulates increases, the
ratio of D/F and Hg emissions to total particulate emissions should
decrease (i.e., because the larger particulates have a lower
concentration of D/F and Hg).
The PM CEMS operating parameter limit derived from performance test
operations (i.e., calculated from historical CEMS data when the source
operated within the regulations) could be increased without exceeding
(theoretically) the MACT standards for SVM, LVM, and possibly D/F and
Hg by the ratio of the standard for each of those HAPs to the
performance test level of each HAP. It would be reasonably
conservative, however, to project the higher PM operating parameter
limit by the ratio of some fraction of the standard for those HAPs to
the performance test level of each HAP. This fraction of the standard
would need to allow for adequate flexibility for sources with low PM
and HAPs for which PM control is required while ensuring that the
standards are being met continuously. A specific percentage of the
standard within the range of reasonable values--50% to 100%-- could be
selected and would be appropriate given the uncertainty of projecting a
PM operating limit that is a primary compliance measure for several
MACT emissions standards. EPA believes choosing 75% of the standard as
the basis for calculating the ratio is a reasonable balance of these
issues. The percentage that would be appropriate is a point of interest
for the Agency.
Given that the PM CEMS operating parameter limit is a compliance
measure for SVM, LVM, and possibly D/F and Hg the allowable higher
projected PM CEMS operating parameter limit would be the lowest of the
values projected for each of these standards. For example, if the
projected PM CEMS operating parameter limit based on the ratio of 75%
of the SVM standard to the SVM performance test level was lower than
the PM CEMS operating parameter limit projections for LVM (and possibly
D/F and Hg), then the SVM-projected PM CEMS operating parameter limit
would be used to ensure that the SVM standard was not exceeded at the
higher projected PM operating parameter limit.
The Agency is concerned, however, about increasing the PM CEMS
operating parameter limit itself by the ratios discussed above. This is
because the limit would be established at the upper end of the range of
actual CEMS readings, or perhaps at levels that statistically exceed
what would be expected. See above discussion of options for calculating
the PM CEMS operating parameter limit. It may be more appropriate to
project the higher limit using the following options.
Under option 1, the ratio determined above would be applied to the
average PM emissions over time determined by the PM CEMS instead of
applying the ratio directly to the unadjusted PM CEMS limit itself. The
product of the ratio and the average PM emissions would then be
subtracted from the average emissions to determine the correction to
the PM CEMS operating parameter limit. This correction would then be
added to the PM CEMS operating parameter limit to determine the revised
PM CEMS operating parameter limit. Using the example described above
and assuming average PM CEMS emissions are 2 mg/dscm, the lowest ratio
(6.8 for PM) would be multiplied by the average PM emissions (2x6.8 =
13.6) and the average emissions would be subtracted from this product
(13.6-2). This difference (11.6) would be added to the PM CEMS
operating parameter limit to obtain the revised PM CEMS operating
parameter limit.
Under option 2, the PM CEMS recordings during the performance test
would be analyzed to calculate a PM CEMS operating parameter limit and
that limit would be increased by the factor defined by the ratio
discussed above (e.g., 6.8 in the first example). This approach would
ensure that infrequent high PM episodes that occurred over months of
CEMS operations would not be driving a PM CEMS limit that was then
projected further upward using the factors discussed above (unless
those high PM episodes actually occurred during the performance test).
Given the truncated emissions database (i.e., the performance test) for
calculating the higher projected limit under this option, however, the
limit may in fact be lower than the limit normally calculated from the
full CEMS emissions database (i.e., without attempted to project a
higher limit). In this case, the limit which is numerically higher
would be used.
The Agency requests information on which approach would be more
appropriate for projecting a higher PM CEMS operating parameter limit.
c. Ensuring that the higher projected PM CEMS operating parameter
limit

[[Page 67800]]

does not exceed the MACT PM standard. The PM CEMS operating parameter
limit would also be used to ensure compliance with the MACT PM
standard. We reiterate that the PM CEMS operating parameter limit is
not a measure of the emissions standard--the emissions standard is
defined in the rule as being measured by using manual methods--it is
instead an operating parameter limit used to ensure compliance with the
applicable standards. As discussed in section 1, above, it is likely
that due to several factors the PM CEMS operating parameter would have
a different numerical value that the MACT PM standard.
One reason for different numerical values is the use of different
techniques (i.e., one is manual methods based while the other is CEMS-
based) to determine a PM emissions value. The use of a manual method
test to determine a value is only a limited-time (e.g., 3 to 24 hours
every five years) measure of emissions, whereas a CEMS is a continuous
measure of emissions (e.g., 1 minute readings all the
time). Although the manual method will likely be a measure of ``high-
end'' PM emissions during performance testing, it may not account for
all potential variability during normal operations. The use of a CEMS
to monitor PM emissions is a way to continuously measure the
variability of (both low and high) PM emissions, inherent in any
engineered system.
Additionally, different values may be a result of the different
averaging periods stated for manual methods-based PM standard and the
PM CEMS operating parameter limit. See section 4, above, for a
discussion of the interrelationship between a numerical value of a
limit or standard and the averaging period. Having a PM CEMS operating
parameter limit with a different, possibly higher, numerical limit is
permissible and does not negate the value of the PM CEMS operating
parameter, provided there is reasonable correlation between the
operating parameter and the MACT PM standard. This section explains how
EPA would ensure that the numerically larger, revised PM CEMS operating
parameter limit would not violate the national PM standard.
Ensuring that the higher projected PM CEMS operating parameter
limit does not exceed the MACT PM standard is complicated by the fact
that the PM operating parameter limit would be CEMS-based while the
MACT PM standard would be manual method-based. Nonetheless, compliance
with the MACT PM standard can be ensured by limiting the increase in
the PM CEMS operating parameter limit (i.e., the projected PM CEMS
operating parameter limit divided by the limit prior to projection) to
the ratio of the MACT PM standard to the performance test PM level on a
manual method basis. Given that projections rather than measured values
would be used to ensure compliance with a standard, it may be prudent
to limit the increase in the projected PM CEMS operating parameter
limit to the ratio of 75% of the MACT PM standard to the performance
test PM level. A conservative factor of 75% is within the range of
reasonable values the Agency could have selected--50% to 100%.
Regarding the specific percentage EPA chooses, the reader is referred
to the previous discussion regarding the percentage EPA chooses for the
HAP standards that require PM control to ensure compliance.
Using the example from above and making the same assumptions, the
ratios would be calculated using 75 /dscm, 41/dscm,
and 26 mg/dscm in the numerator for SVM, LVM, and PM. These values are
75% of the standards for incinerators EPA discussed in the May 2, 1997,
HWC NODA. The resulting rations would be 7.5, 5.9, and 5.1. Since the
ratio calculated for PM is the lowest, ratio used to determine the
revised PM CEMS operating parameter limit would be 5.1.
d. Establishing Revised Operating Parameter Limits for the PM
Control Device Corresponding to the Higher Projected PM CEMS Operating
Parameter Limit. Ideally, PM control device operating parameter limits
(e.g, pressure drop across a fabric filter) should be established to
ensure compliance with the higher projected PM CEMS operating parameter
limit for compliance purposes while the CEMS is malfunctioning. Absent
these revised (i.e., less stringent) operating parameter limits, the
source would be required to: (1) Comply with the more stringent
operating parameter limits established during the performance test that
correspond to the original PM CEMS operating parameter limit; or (2)
ensure that a back-up CEMS is always available.
The Agency is considering an approach to establish revised
operating parameter limits for the PM control device corresponding to
operations at the higher projected PM CEMS operating parameter limit.
Under this approach, the source would analyze the historical operating
parameter values during those periods of time that PM emissions were
close to the higher projected PM CEMS operating parameter limit. Issues
that must be addressed, include: (1) What range of PM CEMS operating
parameter limit values should be considered to develop the database for
PM control device operating parameter values; and (2) how should the
database be analyzed to identify appropriate limits.
It may be appropriate to establish the revised PM control device
operating parameter limits based on the 90th percentile of values that
occur when PM levels are within 75% of the higher projected PM CEMS
operating parameter limit. This would help ensure that a significant
data set was available for evaluation and that the limits were not
based on the most lenient values recorded. This is important because
the higher projected PM CEMS operating parameter limit is likely to be
well beyond the calibration curve. 24
---------------------------------------------------------------------------

\24\ A source would be allowed to operate infrequently at levels
approaching a higher, projected PM CEMS operating parameter limit
that is beyond the calibration curve. If, however, a source operates
for prolonged periods at levels above the calibration curve, it must
perform Method 5 tests at those higher concentrations and include
those higher PM levels in the POM CEMS calibration. See discussion
on extrapolating PM CEMS calibration data elsewhere in today's
notice.
---------------------------------------------------------------------------

Based on further analysis, the Agency may consider other approaches
to define an appropriate data set of PM control device operating limits
and identify appropriate limits (e.g., considering a different
percentage of the historical data and/or basing the limit on a
different percentile of data). Alternatively, the Agency may conclude
that these approaches to revise the performance test-based operating
parameter limits would be too complicated or difficult for regulatory
officials to oversee, or that it would be difficult to confirm
compliance with the standards. In this event, sources would be required
to continue to comply with the PM control device operating parameter
limits established during the performance test when the CEMS
malfunctions even though the PM CEMS operating parameter limit has been
projected upward under procedures discussed above.
e. Implementing the Variance. Sources requesting the variance to
project a higher PM CEMS operating parameter limit would include the
request with the Certification of PM CEMS Performance (CoP) that would
be submitted within 12 months after the Compliance Date. The variance
request must include documentation of the analyses described above to
identify the higher projected PM CEMS operating parameter limit and the
revised, PM control device operating parameters associated with the
higher projected PM

[[Page 67801]]

operating parameter limit. Sources would be allowed to comply with the
higher projected PM CEMS operating parameter limit immediately upon
submitting the CoP. Regulatory officials would have three months to
review the variance request, however, and to notify the source of
intent to disapprove the higher projected PM CEMS operating parameter
limit (or the associated revised PM control device operating parameter
limits for use during CEMS malfunctions). In such cases, the regulatory
officials would provide the basis of their initial decision and provide
the source with an opportunity to present, within 30 calendar days,
additional information before final action on the variance.
7. EPA's PM CEMS Testing Program to Identify a CEMS-Based Emission
Level Achievable by MACT-Controlled Sources
The Agency is undertaking an additional PM CEMS testing program to
identify CEMS-based emission levels that are achievable by hazardous
waste combustors (i.e., hazardous waste burning incinerators, cement
kilns, and lightweight aggregate kilns) using MACT control. The testing
is scheduled to begin in December 1997 and results should be analyzed
by December 1998. The Agency is working with representatives of the
regulated community to identify one source in each of the three source
categories that is using MACT control and that would be likely to
define the most achievable level (i.e., considering average PM
emissions and emissions variability) for MACT-controlled sources.
Although these test results will not be used as part of the final
rule, the data will be valuable to permitting authorities and the
regulated community as a PM CEMS emission benchmark that is achievable
using MACT controls. Permitting authorities could use the data to
identify sources that appear to have established an anomalously high
CEMS-based PM operating parameter limit, and as a framework within
which to review Certifications of Performance in a cost-effective
manner. Likewise, sources wanting to ensure that their facility is
operating in a manner representative of MACT control could use this
information to see if their CEMS-based PM operating parameter limits
are below the levels that MACT sources show are achievable using MACT
control.

C. RCA Test Frequency

In the proposed rule, EPA said that facilities would be required to
perform relative calibration audits (RCAs) on their PM CEMS every 18
months. This testing interval would be relaxed to 30 months for small
on-site incinerators. These time intervals coincided with the proposed
Performance Test intervals. If these tests can be performed at the same
time as the performance tests, cost savings can be realized by the
facility relative to what the costs would be if the tests were not
conducted at the same time. As a result of the analysis of comments on
the performance test frequency, the Agency is considering requiring all
facilities to conduct comprehensive performance tests every five (5)
years. Therefore, we prefer that RCA tests be performed every five
years.
One of the goals of the PM CEMS Demonstration Test program was to
quantitatively define what RCA frequency is appropriate for PM CEMS.
Unfortunately, variability in the manual method masks any error that
can be identified as being caused by drift in the PM CEMS over time.
Therefore, we are unable to use the PM CEMS data from the demonstration
tests to extrapolate to an appropriate re-test frequency \25\.
---------------------------------------------------------------------------

\25\ In fact as method accuracy improved, the PM CEMS
calibration statistics got better over time. Extrapolating this data
would lead to erroneous conclusion that no retesting is ever needed,
since the PM CEMS calibration keeps getting better.
---------------------------------------------------------------------------

Lacking these long-term data, it is important to look at what is
done in other countries to qualitatively determine this RCA test
frequency. The United Kingdom (UK) requires that retesting be conducted
at least every year, and in Germany testing is required every 3 to 5
years. The RCA test frequency could therefore reasonably be between one
and five years. The UK, though, heavily relies on manual methods
testing--so much so that they believe using gas bottles is cost
prohibitive for gaseous (e.g., NOx and SOx) CEMS
testing and rely on manual methods testing instead. EPA is inclined to
believe that the German's longer retest frequency is more consistent
with our regulatory framework.

D. Extrapolating PM CEMS Calibration Data

One-minute or batch PM CEMS readings during the course of
operations are likely to occasionally exceed the highest M5i
calibration point during the course of PM CEMS use. This is because the
manual method results used to derive the calibration are (nominally)
one hour block averages of emissions over the sampling period while the
PM CEMS readings are averages of emissions on the order of minutes. See
section 4, above, regarding the interrelationship the numerical limits
of a standard or limit and its associated averaging period. In
addition, emissions variability within the sampling period of M5 is not
likely to represent the full range of emissions variability over all
periods of PM CEMS operation. Therefore, a system is needed to allow
the extrapolation of data beyond the calibration curve.
The revised calibration and implementation scheme described in
today's notice (i.e., multiple calibrations (for light-scattering PM
CEMS) over the full range of emissions at the facility) will result in
a calibration from which some reasonable and limited extrapolation is
reasonable. Therefore, the Agency proposes to allow the calibration
curve to be used for measurements up to 25% more than the maximum M5
\26\ measurement observed during the calibration. (This will be
referred to as the ``125% point.'') Beyond this point (125% of the
highest M5 measurement) EPA is concerned that extrapolating the
calibration data might lead to false compliance determinations.
Therefore, some environmentally conservative approach must be employed.
---------------------------------------------------------------------------

\26\ In this context, M5 is meant to refer to all the methods
(Method 5, Method 5A, . . ., Method 5I) used to calibrate PM CEMS.
---------------------------------------------------------------------------

Note that the ability to extrapolate beyond the calibration curve
in no way would mitigate the facility's requirement to calibrate over
its full range of PM emissions. If a facility experiences continuous
periods of PM emissions beyond the calibration curve, it would be
obligated to perform tests to capture these data into the calibration
curve. For example, a facility may determine that it occasionally has
several continuous hours of PM CEMS readings which are greater than the
125% point. Several continuous hours are enough time to conduct a M5
test, so the facility would be obligated to conduct M5 tests at this
emissions level and include these data in the calibration curve used at
the facility. EPA requests comment on how long a period of sustained
operations at emissions levels greater than the 125% point would be
necessary to require these additional calibration data points.
1. Extrapolating Light-Scattering PM CEMS Calibration Data
If it is necessary to extrapolate beyond the 125% point, an
environmentally conservative approach would consist of determining the
slope of the calibration curve at the 125% point and have the
calibration continue with a slope equal to or greater than the slope of
the curve at the 125% point. For example if the

[[Page 67802]]

curve is a log-normal relation, the slope of the curve at the 125%
point would be positive, but less than the slope of a straight line
that would also describe the correlation between method results and PM
CEMS outputs. Therefore, if a log-normal relationship best describes
the calibration curve, facilities should extrapolate beyond the 125%
point using a straight line beyond the 125% point. The slope of the
straight line would be the slope of the log-normal curve, taken from
the points on the calibration curve associated with the lowest M5
measurement and the 125% point.
If the calibration curve is best described by a straight line
arithmetic fit, then extrapolating beyond this 125% point would depend
on the slope of any quadratic fit of the data. If the quadratic curve
slopes negative at higher values of PM CEMS outputs, then the straight
line defined by the calibration would be used to extrapolate beyond the
125% point. If the quadratic fit slopes positive at higher values of PM
CEMS outputs, then the quadratic fit would be used beyond the 125%
point.
Finally, if the calibration curve is a quadratic fit, then the
quadratic fit can be used to extrapolate all data \27\.
---------------------------------------------------------------------------

\27\ Note: If the slope of the quadratic fit is ever less than
zero for values of PM CEMS output above what was measured by the
manual method (that is, it ever has a negative slope), this
indicates that the correlation between M5 measurements and PM CEMS
output is not represented by a quadratic fit and that another
mathematical model should be used.
---------------------------------------------------------------------------

2. Extrapolation of Beta-gage Calibration Data
For Beta-gage PM CEMS, extrapolating beyond the 125% point would
involve continuing the straight line defined by its linear calibration
equation. Beta-gage PM CEMS apparently are not sensitive to particle
changes in the physical characteristics of particulate, as the light-
scattering PM CEMS are. Therefore, a straight-line fit best represents
the calibration for beta-gage PM CEMS at all times.

E. Need to Calibrate to Twice the Emissions Standard

One issue raised by commenters during the comment period for the
proposed rule was EPA's proposal that facilities calibrate the PM CEMS
to twice the emissions limit. Commenters raised concerns that
facilities might not be able to emit PM at a concentration equal to
twice the standard. They also said this aspect of the proposal in
essence asks facilities to violate the emission standard and could lead
to an enforcement action against the facility. Commenters also had
concerns that facility personnel may not be sufficiently familiar with
the various process and APCD factors to acceptably calibrate the PM
CEMS over the full range of operations experienced at the facility.
Each of these points are discussed in the following paragraphs.
EPA agrees that it would be difficult for many facilities to emit
PM at any prescribed level. Many facilities have redundancies in their
PM APCDs to such an extent that emitting to the emissions limit may be
problematic. However to have accurate PM CEMS measurements, facilities
need to calibrate the PM CEMS over the full range of emissions
experienced at the facility. As a result, it would be necessary to
require facilities to calibrate the PM CEMS over the full range of
operations, including PM emissions. This would eliminate the
prescriptive nature of how high the calibration needs to be while still
addressing the issue that the site-specific calibration of PM CEMS
covers the broad range of PM emissions experienced at the facility.
EPA does not agree, however, that this approach could cause
facilities to violate the manual method MACT PM standard. The PM
standard would be defined as the average of three manual method
measurements. Any single run above the standard would not be a
violation by itself. Average emissions over the calibration would be
below the standard for a source equipped with MACT controls. Therefore,
we expect that sources would be able to calibrate PM CEMS at levels
higher than the PM emissions standard and still remain in compliance
with the standard. If this is not practical, however, EPA may consider
a waiver of the manual method PM standard during periods of calibrating
(and performing RCA tests of) the PM CEMS. The need to obtain and audit
an accurate calibration at and above the PM standard may override any
concerns about high short-term PM emissions. EPA would want to limit
the frequency and duration of calibration runs that exceed the
standard, however. We request comment regarding how such limits could
be implemented. One way this could occur is to require that sources
request in the performance test plan approval to exceed the standard
during calibration. Approval to exceed the standard would only be
required if the average of all PM CEMS calibration runs is greater than
the PM standard.
The revised draft PS 11 states that different PM levels should be
obtained by varying process conditions or, alternatively, by adjusting
the APC system. It is relatively silent in presenting a well-defined
protocol with guidelines on how EPA expects calibration tests to be
performed. This is because individual sources should know best how to
vary their PM emissions. For instance, inserting a throttle plate in
lieu of one (or several) bags in a baghouse and varying the opening of
the throttle plate(s) is likely an effective way to vary PM
concentration for the calibration at a facility equipped with a
baghouse. Varying power to an ESP and simulating various failure modes
(such as lowering the temperature in the ESP to cause condensation on
the plates) is likely vary PM sufficiently for the calibration at
sources equipped with an ESP.
The experience gained during the PM CEMS Demonstration tests
suggests that one can obtain a suitable range of emissions by varying
process conditions that affect inlet PM loading to the last in a series
of PM APCDs and adjusting the performance of that last APCD. Exactly
how this is accomplished at a given facility will vary and depend on
the waste fed to the unit, how the facility is designed and operated,
and in what order the APCDs are configured. Therefore, the language in
the revised PS11 is adequate. More prescriptive language may not work
in most cases.
Finally, EPA, will be working with industry representatives to
develop approaches to better describe how calibration tests should be
performed at individual HWC facilities. EPA expects to provide this
information in a technical implementation guide.

F. Allowing PM CEMS to be Used In-lieu of Method 5 Tests

Although the PM CEMS would be required only as an operating
parameter, EPA intends to allow facilities to voluntarily elect to use
the PM CEMS for compliance with manual methods-based PM standards.
Using the PM CEMS for compliance is expected to provide a cost savings
to the facility since the facility would not have to conduct periodic
Method 5 tests to document compliance with PM standards. Instead a
facility could elect to use the PM CEMS measurements during these
periodic tests. This would be acceptable if the facility uses the block
average of the PM CEMS readings during the M29 tests for the SVM and
LVM standards as the particulate ``method result.''

G. Waivers from the PM CEMS Requirements

In the proposed rule, EPA requested comment on waiving the PM and
Hg CEMS requirement for small, on-site incinerators. See 61 FR at
17439. Upon

[[Page 67803]]

further consideration, EPA has identified other classes of incinerators
where a PM CEMS requirement may be impractical. If the PM CEMS
requirement is waived for a given source, the facility would have to
comply with operating parameter limits to assure compliance for PM. Of
course, a facility could always elect to use a PM CEMS for compliance
even if a waiver procedure is promulgated for that facility.
1. Waiver of PM and Hg CEMS Requirements for Small On-site Incinerators
EPA is considering whether to waive the PM and Hg CEMS requirements
for small, on-site incinerators (SOSI). See the proposed rule, 61 FR at
17439. If a waiver is promulgated, a SOSI would be required to use
existing operating parameters in lieu of a PM CEMS to document
compliance with the PM, SVM, and LVM standards.
2. PM CEMS Waiver for Sources With Short Life-Spans
Given the PM CEMS compliance schedule discussed in section IV.A,
above, facilities with short, fixed life-spans raise several issues.
For instance, certain government-run incinerators are constructed for
the purposes of destroying waste that is too hazardous to transport
off-site. These incinerators often have short life spans (ranging from
months to a few years) and are constructed to fulfill the requirements
of a consent decree, memorandum of understanding (MOU), or other
legally binding enforcement agreement. For example the Department of
Defense (DoD), acting under a MOU with EPA, may construct an
incinerator to destroy nerve-gas agents that are too hazardous to
transport. When this activity is complete, the MOU would obligate DoD
to dismantle and destroy the incinerator.
It does not seem practical to mandate that these facilities use PM
CEMS if they will be in service for less than, or slightly longer than,
the implementation schedule just discussed. Therefore, EPA is
considering a waiver of the PM CEMS requirement for HWCs operating
under a legally binding agreement that ensures the source will stop
burning hazardous waste within three years of the Compliance Date.
EPA could likewise grant a waiver from the PM CEMS requirement for
facilities with short life-spans that lack the legally binding
agreement discussed above. However, EPA is concerned that without a
legally binding agreement to cease operations, the Agency lacks
certainty that operations will cease by a prescribed date. For this
reason, EPA would consider a waiver for other facilities that plan to
cease operations within the first year of compliance with the HWC
regulations, that is, prior to the need to use PM CEMS as the operating
parameter for PM control. Facilities that operate after the first year
would need to have PM CEMS installed, calibrated, meet data
availability requirements, determine the PM CEMS operating parameter
limit, and use the PM CEMS as the primary operating parameter for PM
control.
3. Other Sources
As discussed in section III.C. of this NODA, EPA may be unable to
determine whether the results of the PM CEMS demonstration test can be
transferred to two classes of incinerators: Those with waste heat
boilers and mobile incinerators. See section III.C. for more
information.

V. Other Issues Concerning CEMS and Test Methods for HWCs

A. Performance Specifications for Optional CEMS

In the proposed rule, EPA proposed other performance specifications
for multi-metals, hydrochloric acid (HCl), and chlorine gas
(Cl2) CEMS. These performance specifications were proposed
as PS10, 13, and 14, respectively. Based on what EPA has learned during
the course of demonstrating PM and Hg CEMS, EPA expects not to
promulgate the draft performance specifications (PS) for these CEMS at
the time of the HWC final rule. As discussed in section II of today's
notice, EPA does not plan to promulgate a PS for total mercury (Hg)
CEMS either. The Agency has not tested MM and Cl2 CEMS to
determine what performance is achievable by the CEMS. Hg CEMS have not
been demonstrated as a compliance tool for universal application to all
HWCs. EPA has tested HCl CEMS in preparation for the medical waste
incinerator rulemaking but did not require the use of HCl CEMS in that
rulemaking (see discussion starting at 62 FR 48360, September 15, 1997)
and does not believe requiring HCl CEMS for the HWC rulemaking is
appropriate either (see 61 FR at 17433).
Instead, EPA will consider enabling sources to demonstrate these
CEMS on a site-specific basis and to develop performance levels for the
CEMS as part of the demonstration. The Agency's only concern is that
the CEMS be proven to be a better and more reliable indicator of
compliance for the HAP or standard than the requirements specified in
the regulations. This approach is now being used to demonstrate a
multi-metals CEMS at the Von Roll incinerator in East Liverpool, Ohio.
EPA intends to accumulate the CEMS demonstration results and
experience and will share that information with permitting authorities
and sources wishing to document compliance with CEMS. Since the HCl
CEMS have been demonstrated by EPA, we believe the HCl CEMS performance
specification could more easily be used as a point of departure for
implementing HCl CEMS at a given facility.

B. Stack Sampling Test Methods

Another question is whether EPA should simplify the task of
determining the appropriate manual method tests to be used for
compliance. Currently, stack sampling and analysis methods for HWCs are
(with a few exceptions) located in RCRA's SW-846 for compliance with
the BIF and incinerator rules, and in 40 CFR part 60, Appendix A for
compliance with the NSPS and other air rules. Facilities could be
required to perform two identical tests, one for compliance with MACT
or RCRA and one for compliance with other air rules, using identical
test methods simply because one method is an ``SW-846'' method and the
other an ``air method.''
Stack test methods HWCs use for compliance should be found in one
place to facilitate compliance. EPA intends to reference 40 CFR part
60, Appendix A, when it requires a specific stack-sampling test method.
A few SW-846 methods do not have equivalents in 40 CFR part 60,
Appendix A, namely the VOST and semi-VOST methods. In these few cases,
EPA would continue to refer to these SW-846 methods as well.
This discussion only affects stack sampling methods and has no
affect on feedstream sampling and analysis.

Dated: December 19, 1997.
Matt Hale,
Acting Director, Office of Solid Waste.

Appendix I--Method 5i

Method 5I--Determination of Low Level Particulate Matter Emissions From
Stationary Sources

1. Applicability and Principal

1.1 Applicability. This method applies to the determination of
low level particulate matter (PM) emissions from stationary sources
and facilities performing calibrations or calibration audits of
particulate matter continuous emission monitors as specified in the
regulations. The method is effective for total train catches of 50
mg or less. The minimum detection limit for this method can be
determined by repeatedly collecting and analyzing blank samples. A
blank sample is a sample of blank air collected and analyzed

[[Page 67804]]

in the normal manner. The limit of detection can be calculated by
collecting and analyzing seven blank samples and then calculating an
estimate of the sample standard deviation of these blanks. The limit
of detection would be three times the estimated sample standard
deviation.
1.2 Principal. The PM is withdrawn isokinetically from the
source and collected on a 47 mm glass fiber filter maintained at a
temperature of 120 deg. 14 deg.C (248 deg.
25 deg.F). The PM mass, which includes any material that
condenses at or above the filtration temperature, is determined
gravimetrically after the removal of uncombined water.

2. Apparatus

2.1 Sampling Train. The sampling train configuration is the
same as shown in Method 5, Figure 5-1. The sampling train consists
of the following components: Pitot Tube, Probe liner Differential
Pressure Gauge, Filter Heating System, Condenser, Metering System,
Barometer, and Gas Density Determination Equipment. Same as Method
5, Sections 2.1.2 to 2.1.4, 2.1.6 and 2.1.7 to 2.1.10, respectively.
2.1.1 Probe Nozzle. Same as Method 5, Sections 2.1.1 with the
exception that it is constructed of Borosilicate or quartz glass
tubing with sharp, tapered leading edge.
2.1.2 Filter Holder. The filter holder for this sampling train
is constructed of Borosilicate or quartz glass front cover designed
to hold a 47 mm glass fiber filter, with a stainless steel filter
support, a silicone rubber or Viton O-ring and Teflon tape seal. The
holder design will provide a positive seal against leakage from the
outside or around the filter. The filter holder assembly fits into a
stainless steel filter holder and attaches immediately at the outlet
of the probe (or cyclone, if used). The tare weight of the filter,
Borosilicate or quartz glass, stainless steel filter support,
silicone rubber or Viton O-ring and Teflon tape seal will not exceed
31 grams. The filter holder is designed to use a 47 mm glass fiber
filter meeting the criteria in section 3.1.1 of Method 5. Figure 5I-
1 presents a schematic of the filter holder system. These units are
commercially available.
2.1.3 Glass Plugs and Clamps. Once the filter holder has been
assembled, desiccated and tared it is critical that the filter be
isolated from any external sources of contamination. This can be
accomplished by covering the leak-free ground glass or O-ring socket
on the front half glass filter cover with a Borosilicate or quartz
ground glass plug. The plug shall be secured in place with the
appropriate sized laboratory impinger clamp or any system that can
ensure a leak-free fitting. It is beneficial to place the glass plug
on the inlet socket as soon as the unit is assembled, however do not
tare the assembly with the plug in place, as this will increase the
tare weight introducing additional error into the final weighings.
2.2 Sample Recovery. Is the same as Method 5 for: Glass Sample
Storage Containers, Graduated Cylinder and/or Balance, Plastic
Storage Containers, Funnel and Rubber Policeman (Method 5 sections
2.2.3, 2.2.5--2.2.8, respectively) with the following exceptions:
2.2.1 Probe-Liner and Probe-Nozzle Brushes. Teflon
and nylon bristle brushes with stainless steel wire handles, should
be used to clean the probe. The probe brush shall have extensions
(at least as long as the probe) of Nylon, Teflon, or
similarly inert material. The brushes shall be properly sized and
shaped to brush out the probe liner and nozzle.
2.2.2 Wash Bottles--Two. Teflon wash bottles are
recommended however, polyethylene wash bottles may be used at the
option of the tester. It is recommended that acetone not be stored
in polyethylene bottles for longer than a month.
2.2.3 Sample Holder: A portable carrying case with clean
compartments of sufficient size to accommodate each filter assembly.
The filters shall be able to lay flat with the stainless steel
filter support placed down in the compartment. This system should
have an air tight seal to prevent contamination to the filters
during transport to and from the field. It is recommended that
desiccant be used in this case. The desiccant, if used, is housed in
a container that is capped with a 0.1 micron screen to ensure that
no dust particles can contaminate the outside of the filter h

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A97-33740. Public record. Not legal advice.
