DEPARTMENT OF AGRICULTURE

Forest Service

Eagle Bird Project; Idaho Panhandle National Forests, Shoshone
County, ID

AGENCY: Forest Service, USDA.

ACTION: Notice of intent to prepare an environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: The St. Joe Ranger District of the Idaho Panhandle National
Forest is considering vegetation, road and trail activities in the
Eagle Bird Project. The project area is located approximately 13 miles
east of the town of Avery on the St. Joe River.
The interdisciplinary team has reviewed the current conditions
which indicated the project area could benefit from treatment. The
purpose and need is summarized below.
1. Restore properly functioning hydrologic conditions. 2. At the
project level, implement the Idaho Governor's Bull Trout Plan. 3. Move
vegetation toward historical conditions. 4. Reduce the risk of mountain
pine beetle in the

[[Page 65059]]

lodgepole pine forest type. 5. Meet wildlife security needs. 6. Restore
rare vegetation communities and habitat. 7. Provide a spectrum of
recreation opportunities that are appropriate for the National Forest
System lands within the area. 8. Provide quality dispersed camping,
single-track trail, all terrain vehicle (ATV) route, hunting and
fishing opportunities in a roaded natural setting. 9. Promote fire use
and control strategies for safety, efficiency of suppression, resource
values, and reduce risks. To create a trend toward allowing fires to
play a role as a disturbance mechanism. Reduce the risk of stand
replacing fires through vegetation management and promote beneficial
fire effects. 10. Where feasible and cost effective, contribute to the
timber supply by using timber harvest (one or more timber sales) to
achieve this and other project objectives. Inasmuch as it is compatible
with other objectives, harvest activities will maintain or improve the
long term growth and production of commercially valuable wood products
from the sites.
The project consists of three main parts. One part is vegetation
management, including timber harvesting and associated road
construction and prescribed burning. Another part is restoration of
stream channel conditions and fish habitat. The third part is
recreational trail development.

DATES: Comments should be postmarked on or before January 9, 1998.
Please include your name and address and the name of the project you
are commenting on.

ADDRESSES: Submit written comments and suggestions on the proposed
management activities or request to be placed on project mailing list
to Brad Gilbert, District Ranger, St. Joe Ranger District, HC Box 1,
Avery ID 83802. Brad Gilbert is the Responsible Official.

FOR FURTHER INFORMATION CONTACT:
Cameo Flood, Project Team Leader, St. Joe Ranger District, (208) 245-
4517.
Comments received in response to this solicitation, including names
and addresses of those who comment, will be considered part of the
public record on this proposed action and will be available for public
inspection. Comments submitted anonymously will be accepted and
considered; however, those who submit anonymous comments will not have
standing to appeal the subsequent decision under 36 CFR parts 215 or
217. Additionally, pursuant to 7 CFR 1.27(d), any person may request
the agency to withhold a submission from the public record by showing
how the Freedom of Information Act (FOIA) permits such confidentiality.
Persons requesting such confidentiality may be granted in only very
limited circumstances, such as to project trade secrets. The Forest
Service will inform the requester of the agency's decision regarding
the request for confidentiality, and where the request is denied, the
agency will return the submission and notify the requester that the
comments may be submitted with or without name and address within 10
days.

SUPPLEMENTARY INFORMATION:

Vegetation Management

Vegetation management under this proposal is designed to meet
several needs, including providing timber projects to local markets,
protecting and enhancing wildlife forage and cover needs, providing for
long term growth and yield as directed in the Idaho Panhandle National
Forests Forest Plan, increasing fire resiliency, reducing fire hazards,
and moving the vegetation to the conditions the area historically had
in terms of tree species composition and density. Treatments include:
Approximately 4,900 acres of commercial timber harvesting including
commercial thinning, shelterwood preparation and seed cuttings, group
shelterwoods, irregular group shelterwoods, and clearcuts. The attached
map shows proposed treatment areas by regeneration and intermediate
harvest. Regeneration treatments (1850 acres total) would be clearcuts
or some of the shelterwood cuts that would take most of the trees off
the units, leaving room to regenerate the stands to other species.
Intermediate harvests (3056 acres total) are the commercial thinning
and irregular cuts that remove some of the undesirable trees and favor
the size and types of trees needed to meet vegetation goals.
Approximately 691 acres of brush field burning for maintenance of
large, open spaced douglas-fir, ponderosa pine reestablishment and
wildlife habitat. Although these areas are not well stocked, commercial
harvesting is proposed prior to burning where feasible.
Approximately 15 acres of broadcast burning for white bark pine.
Approximately 218 acres would be treated to create a hazard
reduction zone. This treatment would include thinning out the canopy
for a width of 150 to 300 feet along a ridge, and removing small trees
from the understory.
Approximately 8.4 miles of road construction to access timber
harvesting units.

Stream Channel and Fish Habitat Restoration

The St. Joe District is considering elimination of either the Eagle
Creek or Bird Creek roads, or both, and active work instream to restore
natural channel function. In the case of both of the roads being
eliminated, an alternative road would be provided to allow recreational
access to portions of both streams. If one road is eliminated,
recreational and management access would be routed over the other
remaining road.

Eagle Creek Road

This is the most likely road to eliminate, rehabilitate the
riparian area and restore riparian function, because bull trout are
currently using this stream and improvements in conditions made there
would benefit the fish sooner. The road from the West Fork of Eagle
Creek down stream to the St. Joe River would be eliminated and
alternate access would be provided by improving a connecting road from
the Bird Creek System. Vehicle and ATV access to this 3.5 mile section
would be eliminated. Foot, horse, bicycle and most likely motorcycle
access would be provided.

Bird Creek Road

This stream has been more affected by the riparian road system than
Eagle Creek. No bull trout were found here in surveys done this summer,
but cutthroat trout are abundant. The upper reaches of the stream would
be good bull trout spawning habitat and the lower could be good rearing
habitat if the road was removed and instream improvements implemented.
If the 2.8 miles of streamside road from the upper bridge to the St.
Joe were removed, alternate access would be provided by improving a
connecting road from the Eagle Creek system. Vehicle and ATV access to
this section would be eliminated. Foot, horse, bicycle and most likely
motorcycle access would be provided.

Both Roads

If both riparian system roads were removed, alternate access into
the area would be developed. This could be over the Turner road system
(Road 1281) connected into the upper portion of the Bird Creek system
and on into the Eagle Creek System, or some other appropriate access.
There are additional roads that have caused watershed problem that
are not in riparian areas. These include specifically, Road 1281
(Turner Peak), Road 1286 (Bluebird) and Road 3638 (Mirror Creek). These
roads will be reconstructed where necessary to reduce the hazard of
future road failures that would adversely impact the stream.

[[Page 65060]]

Part of this portion of the project will be to eliminate or close
other roads in the area. These roads are currently closed to public
use. Most roads that will not be needed for timber management within
ten years or more would have hazardous fills pulled back to the
contour, drainage structures removed and be barricaded with a permanent
structure. Many of them have been overgrown with brush and trees.

ATV Trail Development

The district would like to look at the possibility of designating
or developing acceptable ATV routes to provide this recreation
opportunity. The Eagle Bird area offers several miles of potential ATV
opportunities along existing roads, if those roads were closed to
general vehicle traffic and managed as ATV routes. When used in
conjunction with open system roads, these routes could offer loop
opportunities, as well as connections to the Coeur d'Alene River and
Superior Ranger Districts to the north. The attached maps show
potential ATV routes on both open and restricted system roads.
Following management activities within the area, identified system
roads would be closed to general vehicle traffic to provide ATV
opportunities. Approximately one mile of single-track trail would also
be widened to provide an additional ATV loop opportunity.

Single-Track Trail Management

The area would continue to provide single-track trails for mixed
use by hikers, horseback riders, mountain bicyclists and motorcyclists.
These routes are identified on the attached map.

Float Trailhead Development

A float trailhead would be developed on the St. Joe River Road to
provide river access for Skookum Canyon, a popular destination for
whitewater enthusiasts during high spring runoff. Located at an
existing roadside parking area northeast of Tourist Creek, the
trailhead would provide a pathway to the river and singing.

Preliminary Issues

We expect issues and concerns with this project to include the
impacts on wild-life, fish, water quality, and recreation, as well as
road construction, clearcutting and economic feasibility. Issues will
be developed and analyzed based on public comment and the
interdisciplinary team's analysis of effects on resources. Alternatives
will be developed to modify or eliminate the impacts from proposed
activities and still meet the purpose for this project.
Additionally, some of the vegetation treatment may result in
openings of over 60 acres. While we would like comments that would
affect alternatives early, comments on the size of openings and their
effects will be accepted for 60 days after publication of this notice.
The draft environmental impact statement is expected to be filed
with the Environmental Protection Agency (EPA) and available for public
review in March 1998. The final environmental impact statement is
expected to be completed in May 1998.
The comment period on the draft environmental impact statement will
be 45 days from the date the Environmental Protection Agency publishes
the notice of availability in the Federal Register.
The Forest Service believes, at this early stage, it is important
to give reviewers notice of several court rulings related to public
participation in the environmental review process. First, reviewers of
draft environmental impact statements must structure their
participation in the environmental review of the proposal so that it is
meaningful and alerts and agency to the reviewer's position and
contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,
553 (1978). Also, environmental objections that could be raised at the
draft environmental statement stage but that are not raised until after
completion of the final environmental statement may be waived or
dismissed by the courts. City of Angoon v. Hodel, 803 F 2d 1016, 1022
(9th Cir. 1986) and Wisconsin Heritages, Inc. v. Harris, 490 F. Supp.
1334, 1338 (E.D. Wis. 1980). Because of these court rulings, it is very
important that those interested in this proposed action participate by
the close of the 45-day comment period so that substantive comments and
objections are made available to the Forest Service at a time when it
can meaningfully consider them and respond to them in the final
environmental impact statement.
To assist the Forest Service in identifying and considering issues
and concern on the proposed action, comments on the draft environmental
impact statement should be as specific as possible. It is also helpful
if comments refer to specific pages or chapters of the draft statement.
Comments may also address the adequacy of the draft environmental
impact statement or the merits of the alternatives formulated and
discussed in the statement. Reviews may wish to refer to the Council on
Environmental Quality Regulations for implementing the procedural
provisions of the National Environmental Policy Act at 40 CFR 1503.3 in
addressing these points.
The United States Department of Agriculture (USDA) prohibits
discrimination in its programs on the basis of race, color, national
origin, sex, religion, age, disability, political beliefs, and marital
or familial status. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means of
communication of program information (braille, large print, audiotape,
etc.) should contact USDA's TARGET Center ad (202) 720-2600 (voice and
TDD).
To file a complaint, write the Secretary of Agriculture, U.S.
Department of Agriculture, Washington, DC 20250, or call 1-800-245-6340
(voice) or 202-720-1127 (TDD). USDA is an equal employment opportunity
employer.

Dated: December 1, 1997.
Bradley Burmark,
St. Joe Deputy District Ranger.
[FR Doc. 97-32313 Filed 12-9-97; 8:45 am]
BILLING CODE 3410-11-M

---