# Deployable Universal Combat Earthmover (DEUCE)

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A97-22011

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** August 20, 1997
- **Citation:** 62 FR 44261

## Text

DEPARTMENT OF DEFENSE

Department of the Army

Deployable Universal Combat Earthmover (DEUCE)

AGENCY: U.S. Army Tank-automotive and Armaments Command, Army.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The Product Manager, Construction Equipment/Material Handling
Equipment (PM CE/MHE) has prepared a Life-Cycle Environmental
Assessment (LCEA) which examines the potential impacts to the natural
and human environment from the life cycle activities of the Deployable
Universal Combat Earthmover (DEUCE). Based on the LCEA, PM CE/MHE has
determined that the proposed action is not a major Federal action
significantly affecting the quality of the human environment, within
the meaning of the National Environmental Policy Act (NEPA) of 1969.
Therefore, the preparation of an environmental impact statement is not
required and the Army is issuing this Finding of No Significant Impact
(FONSI).

ADDRESSES: Written comments should be sent to, U.S. Army Tank-
automotive and Armaments Command (TACOM), ATTN: AMSTA-DSA-TA-CE
(DEUCE), Warren, MI 48397-5000

FOR FURTHER INFORMATION CONTACT:
For further information, or to obtain a copy of the Deuce Life-Cycle
Environmental Assessment contact Mr. Jeff Klein, Assistant Product
Manager (810) 574-6217.

SUPPLEMENTARY INFORMATION:

a. Proposed Action: This LCEA examines the potential impacts to the
natural and human environment from the procurement of the DEUCE to
satisfy the Army's need for a high-speed earthmoving capability, which
can deploy with Light and Airborne units. The DEUCE will have
earthmoving capabilities comparable to the D5B dozer, the ability to
travel at 30 MPH, and be C-130 air transportable. The DEUCE is designed
to improve the Army's ability to deploy with supported units, and
provide mobility, countermobility, and survivability tasks as required.
A minimum quantity of 67 bulldozers is required to fill the Army's
Force Package One contingency requirements.
The DEUCE will replace existing D5B dozers in selected units. The
current earthmoving system does not meet the changing Army role to
become a Rapid Power Projection type force.
b. Environmental Impacts: The DEUCE life-cycle includes the
transport of vehicles to test sites, testing, vehicle production,
deployment and operation of production vehicles and their eventual
demilitarization. Potential environmental impacts of these life-cycle
stages may include Air Quality, Noise, Water, Soil and Groundwater,
Hazardous Materials and Hazardous Wastes, and Flora, Fauna and
Threatened or Endangered Species at each of these life-cycle phases.
c. Additional Findings: Impacts from the proposed action would be
minimal and not significant for the following reasons:
(1) The DEUCE will be used in its intended environment. This
intended environment includes vehicle production and some testing at
the Contractor's facility, and the remainder of life-cycle activities
at Army installations and facilities.
(2) The DEUCE is very similar to vehicles produced commercially and
vehicles already in the Army inventory. It is being produced in low to
moderate quantities and will not significantly increase the vehicle
population at Army installations and facilities.
(3) The overall environmental risk associated with the DEUCE is
low. It does not introduce any new technologies or processes. Vehicle
life cycle activities do not introduce any potential environmental
impacts that are not already currently mitigated by Army policy and
procedures.
(4) The DEUCE Product Manager has ensured that the Contractor
producing the vehicle is environmentally complaint, has no permit
violations, and has commercial practices for Hazardous Material
Management and Pollution Prevention in production of the DEUCE.
(5) The DEUCE Product Manager recognizes that Army installations
and facilities have environmental plans and measures in place to
address vehicle life cycle activities very similar to that of the DEUCE
to prevent, mitigate and remediate environmental damage caused by
vehicle operation. Vehicle operations at these Army installations and
facilities are in conjunction with normal activities that are already
addressed in their site specific environmental impact statements.
d. Determination: It is therefore concluded that this program:
(1) Is not a major federal action significantly affecting the
quality of human environment.
(2) Will not have a significant impact on the environment.
(3) Is not likely to be environmentally controversial.
(4) Will not likely result in litigation based on environmental
quality issues.
(5) Does not require an Environmental Impact Statement (EIS).
Harry W. McClellan, Jr.,
Product Manager, Construction Equipment/Materials Handling Equipment.
[FR Doc. 97-22011 Filed 8-19-97; 8:45 am]
BILLING CODE 3710-08-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A97-22011. Public record. Not legal advice.
